ABSTRACT
To meet the power demands of the country, it is required to set up new projects,
time to time so that demand and generation gap may be narrowed but most
important is to full utilization of existing capacity. This may be possible only by
increasing the reliability, availability and maintainability of power generation units
and by operating the units at its full capacity.
This vocational training report is concerned with the overall operation of
the plant, machines used in the plant, water treatment in the plant and
thermodynamic cycles used in the NTPC, Auraiya Gas Power Plant.
7/30/2019 Final Report - Ntpc
3/31
7/30/2019 Final Report - Ntpc
4/31
CONCLUSION
THE COMPANY
NTPC Limited is the largest thermal power generating company of India. A public
sector company, it was incorporated in the year 1975 to accelerate power
development in the country as a wholly owned company of the Government of
India. At present, Government of India holds 89.5% of the total equity shares of
the company and the balance 10.5% is held by FIIs, Domestic Banks, Public and
others. Within a span of 30 years, NTPC has emerged as a truly national power
company, with power generating facilities in all the major regions of the country.
Based on 1998 data , carried out by data monitor UK, NTPC is 6th
largest in terms
of thermal power generation and the second most efficient in terms of capacity
utilization amongst the thermal utilities in the world.
7/30/2019 Final Report - Ntpc
5/31
NTPC Ltd. IN INDIAN POWER SECTOR
NTPCs core business is engineering, construction and operation of power
generating plant and also providing consultancy to power utilities in India and
abroad. As on date the installed capacity of NTPC is 24,954 MW through its 14
coal based (20,685 MW), 7 gas based (3,955 MW) and 3 joint venture projects
(314 MW). NTPC acquired 50% equity of the SAIL Power Supply Corporation
Ltd. (SPSCL). This joint venture company operates the captive power plants of
Durgapur(120 MW), Rourkela(120 MW) and Bhilai(74 MW). NTPCs share on 31
march 2006 in the total installed capacity of the country was 19.51% and it
contributed 27.68% of the total power generation of the country during 2005-06.
NTPC has set new bench marks for the power industry both in the area of
power plant construction and operation. It is providing power at the cheapest
average tariff in the country. With its experience and expertise in the power sector,
7/30/2019 Final Report - Ntpc
6/31
NTPC is extending consultancy services to various organizations in the power
business.
INSTALLED CAPACITY
AN OVERVIEW
Projects No. of Projects Commissioned
Capacity(MW)
NTPC OWNED
COAL 14 20,685
GAS/LIQ FUEL 07 3,955
TOTAL 21 24,640
OWNED BY JVCS
COAL 3 314*GRAND TOTAL 24 24,954
*Captive Power Plant under JV with SAIL
PROJECT PROFILE
Coal Stations
Coal Based State Commissioned
Capacity(MW)
Singrauli Uttar Pradesh 2,000
Korba Chhattisgarh 2,100
Ramagundam Andhra Pradesh 2,600
Farakka West Bengal 1,600
Vindhyachal Madhya Pradesh 2,260
Rihand Uttar Pradesh 2,000Kahalgaon Bihar 840
NTCPP Uttar Pradesh 840
Talcher Kaniha Orissa 3,000
Unchahar Uttar Pradesh 840
Talcher Thermal Orissa 460
Simhadri Andhra Pradesh 1,000
7/30/2019 Final Report - Ntpc
7/31
Tanda Uttar Pradesh 440
Badarpur Delhi 705
Total (Coal) 20,685
Gas/Liq. Fuel Stations
Gas Based State Commissioned
Capacity(MW)
Anta Rajasthan 413
Auraiya Uttar Pradesh 663
Kawas Gujarat 645
Dadri Uttar Pradesh 817
Jhanor-Gandhar Gujarat 648
Kayamkulam Kerala 350
Faridabad Haryana 430
Total (Gas) 3,966
7/30/2019 Final Report - Ntpc
8/31
Introduction of gas power station ntpc(Auraiya)
Auraiya gas power station is a gas based combined cycle power plant of NTPC.
The plant is situated in Distt. Auraiya of Uttar Pradesh, on main railway track. It is
60 km from Kanpur. The plant has 4 Gas Turbines (GT) and 2 Steam Turbines
(ST) with 4 Waste Heat Recovery Boilers (WHRB). Though the plant is normally
operated on combined cycle but it may be operated on open cycle mode in case of
any problem in WHRB. The plant is basically divided in two modules and each
module has 2 GT, 1ST and 2WHRB. Their capacities are as follows:-
MODULE I: Gas Turbine Capacity : 2 X 111.19 MW
Steam Turbine Capacity : 109.3 MW
Total Module I Capacity : 331.68 MW
MODULE II: Gas Turbine Capacity : 2 X 111.19 MW
Steam Turbine Capacity : 109.3 MW
7/30/2019 Final Report - Ntpc
9/31
Total Module II Capacity : 331.68 MW
TOTAL PLANT CAPACITY: 663.36 MW
THE BASIC DIAGRAM OF ARRANGEMENT OF
UNITS IN AURAIYA GAS POWER PLANT
GT - Gas Turbine
STSteam Turbine
WHRBWaste Heat Recovery Boiler
ST # 1 ST # 2
109.3 MW 109.3 MW
111.19 MW 111.19 MW 111.19 MW 111.19 MW
STATION CAPACITY
MODULE #1
2 X 111.19 + 109.3 = 331.68 MW
MODULE #2
2 X 111.19 + 109.3 = 331.68 MW
663.36 MW
GT # 1 GT # 2 GT # 3 GT # 4
WHRB #1 WHRB #2 WHRB #3 WHRB #4
7/30/2019 Final Report - Ntpc
10/31
Combined CYCLE
Combined Cycle is a term used when a power producing engines or plant
employs more than one thermodynamic cycle. Heat engines are only able to use a
portion of the energy their fuel generates (usually less than 30%). The remaining
heat from combustion is generally wasted. Combining two or more cycles such
as the Brayton cycle and Rankine Cycle results in improved overall efficiency.
Combined Cycle Plants
The combined-cycle unit combines the Rankine (steam turbine) and Brayton
(gas turbine) thermodynamic cycles by using heat recovery boilers to capture the
energy in gas turbine exhaust gases for steam production to supply a steam turbine
as shown in the Combined Cycle Cogeneration Unit. Process steam can be also
provided for industrial purposes.
Fossil fuel-fired (central) power plants use either steam or combustion
turbines to provide the mechanical power to electrical generators. Pressurized high
temperature steam or gas expands through various stages of turbines, transferring
energy to the rotating turbine blades. The turbine is mechanically coupled to a
generator, which produces electricity.
7/30/2019 Final Report - Ntpc
11/31
Combined cycle operation of ntpc, Auraiya
7/30/2019 Final Report - Ntpc
12/31
7/30/2019 Final Report - Ntpc
13/31
FUELS
Mainly two fuels are used in this gas power plant which are listed below
Natural gas Naphtha
The Natural gas is supplied by GAIL, Dibiyapur and is taken directly
From the pipeline which goes from Hazira to Jagdishpur.
The other fuel is supplied by IOC, Kanpur and Mathura.
STORAGE CAPACITY FOR NAPHTHA
There are two tanks for storing Naphtha fuel each having a capacity of 1500 KL.
There are three transfer pumps for loading fuel from tankers. The two pumps
work and the third is auxiliary. There are twelve unloading pipes, thus twelve
trucks con be unloaded at a time.
If a gas turbine is running at full load then it consumes 20 KL Naphtha fuelin one hour.
7/30/2019 Final Report - Ntpc
14/31
7/30/2019 Final Report - Ntpc
15/31
7/30/2019 Final Report - Ntpc
16/31
In addition to traditional power generation applications, gas turbines are recently
being employed as power sources for pumps used in emergency situations such as
natural disasters, due to their short start-up times and for water jet propulsion
systems (used in high-speed ships). In thermal power plants using gas turbines,
there is a trend towards the use of combined cycle power generation systems. This
technology takes advantage of the high temperature of the exhaust gases produced
by gas turbines, passing the gases through a heat recovery steam generator to
produce high- temperature steam. This steam is then routed through a steam
turbine to generate additional electricity.
The approach yields a greater thermal efficiency than is possible with a gas turbine
alone, and recently some power plants, including the Higashi-Niigata Thermal
Power Station, have surpassed 50% thermal efficiency. This level of efficiency is
among the worlds best.
As a means of increasing the thermal efficiency of gas turbines themselves,
manufacturers are beginning to build turbines with high inlet temperatures.
7/30/2019 Final Report - Ntpc
17/31
7/30/2019 Final Report - Ntpc
18/31
BOILER ECINOMIZER:-
A boiler economizer is a device that reduces the overall fuel requirements aboiler requires which results in reduced fuel costs as well as fewer emissions
since the boiler operates at a much higher efficiency. Boiler economizers recover
the waste heat from the boilers hot stack gas and transfer this waste heat to the
boilers feed-water. Because the boiler feed-water is now at a higher temperature
that it would have been without a boiler economizer, the boiler does not need to
provide as much additional heating to produce the steam requirements of a facility
or process, thereby using less fuel and reducing the fuel expenses. Boiler
economizers also help improve a boilers efficiency by extracting heat from the
flue gases discharged from the final super heater section of a radiant/reheat unit or
the evaporation bank of a non-reheat boiler. Heat is transferred, again, back to the
boiler feed-water, which enters at a much lower temperature than saturated steam.
WASTE HEAT RECOVERY:-Many industrial processes generate large amount of waste energy that simply
pass out of plant stacks and into the atmosphere or are otherwise lost. Most
industrial waste heat streams are liquid, gaseous or a combination of the two and
have temperatures from slightly above ambient to over 2000F.
Waste heat recovery methods used with industrial process heating operations
intercept the waste gases before they leave the process, extract some of the heat
they contain, and recycle that heat back to the process.
Common methods of recovering heat include direct heat recovery to the
process, recuperators/regenerators, and waste heat boilers.
7/30/2019 Final Report - Ntpc
19/31
WATER TREATMENT PLANT & STORAGE
Since steam is taken out continuously and returned to the boiler, losses due toblow downs and leakages have to be made up for maintaining designed boiler
water quantity by means of the level gauges provided on the boiler drum. For this,
continuous make up water is added to the boiler water system. Since this make up
requires pure water this quality water is obtained by a Demineralised (DM) water
treatment plant. However some storage is essential as DM plant may be down for
maintenance. For this purpose a storage tank is installed from which continuously
DM water is drawn for boiler make up.
The impurities in water input to this plant generally consist of calcium andmagnesium salts imparting hardness to the water. These salts have to be removed
from the water. If hardness is present in makeup water to the boiler, the salts not
only form deposits on the tube surfaces but also lead to overheating in those
localities resulting in tube failures. Therefore these have to be completely removed
for use as boiler make up, this is done using DM water treatment plant which gives
the purest form of water.
This generally consists of cation, anion and mixed bed exchangers. The final
water from this process consists generally of hydrogen ions and hydroxide ions
which is the chemical combination of pure water. The DM water being very pure is
highly corrosive, once it absorbs oxygen from the atmosphere because of its very
high affinity for oxygen absorption. The capacity of the DM plant is dictated by the
type and quantity of salts in the raw water input.
The storage tank for DM water is made from materials not affected by corrosive
water, such as PVC. The piping and valves are generally of stainless steel.
7/30/2019 Final Report - Ntpc
20/31
7/30/2019 Final Report - Ntpc
21/31
powering massive steam turbines with high temperature steam generated by a
nuclear reactor.
In order to increase the efficiency of steam turbines, Takasago Machinery
Works, Mitsubishi Heavy Industries Ltd is using 3D design technology to shaperotor blades, developing and manufacturing larger rotor blades and designing
methods to prevent the loss of steam throughput.
PASS OUT OR EXTRACTION TURBINES:-
The steam turbines that are used in NTPC, Auraiya are Pass out OR Extraction
turbines. In these types of turbines steam is exhausted at different stages and used
in heating the steam water for the boiler or processing work.
The high pressure steam from the boiler enters the HP stage of turbine where it
expands and the pressure is reduced to such a value that is required for processing
work. A part of this low pressure steam leaving the high pressure stage is suppliedto the processing work while the remaining steam expands further in the L.P. stage.
The exhaust steam from the processing plant and the low pressure turbine steam is
condensed in the condenser and pumped back to the boiler.
7/30/2019 Final Report - Ntpc
22/31
CIRCULATING WATER PUMPS
These pumps are used to pump water to the deaerator from where the watergoes to boiler feed pump.
DEAERATOR
The deareators are used to deaerate the water before feeding it into BFP. This isdone because HRB is a water tube boiler and the tubes containing water have very
small diameter. There are some gases like CO2 if present in water they can create
rusting or can choke the tubes. So these gases are removed in the deaerator. There
are total four deareators in the NTPC, Auraiya one each for every WHRB.
WORKING OF WHRB:-
The feed water enters into steam drum through boiler economizer from where it
goes into boiler and converted into steam. This steam further goes to super heater
and at the output superheated steam at the temperature of 530 C is gained. This
superheated steam is used to drive steam turbine to generate electricity as in the
cycle.
7/30/2019 Final Report - Ntpc
23/31
COOLING SYSTEM
The majority of the electricity generated is produced by steam driven turbinegenerators. A very important step in this power generation process is the
condensation of exhaust steam from the final, low pressure turbine when the steam
condenses, the rapid decrease from vapor-to-liquid specific volume creates a
vacuum at the turbine outlet (monitored as turbine backpressure) that increases
power generation efficiency.
Low turbine backpressures are achieved when the steam condensate
temperatures are lower.
Designing and operating a cooling system that can consistently and continually
remove the heat of condensation at those low temperatures is essential. Therefore,
the cooling system should be considered the integral part of power generation
process that can have a major influence on the overall power plant performance
and availability.
The waste heat removed by the cooling system during the steam condensation
step must ultimately be transferred to the surrounding environment. Having a high
unit heat capacity, water has been the traditional transfer medium of choicebecause it has been readily available, relatively inexpensive and reusable up to a
point. Wet cooling systems use water to absorb heat via indirect contact with steam
in a condenser. The heated water is either discharged to a large surface water body
such as lake or river (once through cooling) or passed through a cooling tower and
recycled back to the condenser (recirculated cooling).
Many of the plants built during the last decade are based on the combined cycle
process of power generation. In the most common 2-on-1 arrangement,
electricity is produced by two combustion turbine generators with the hot exhaustgas from these turbines used to produce steam in a heat recovery steam generator
for a single steam driven turbine generator. Since the combustion turbines produce
roughly two third of the overall electrical power and have no steam condensation
step, a combined cycle plant requires only about one-third the amount of cooling
needed by a conventional steam electric plant of equivalent capacity.
7/30/2019 Final Report - Ntpc
24/31
7/30/2019 Final Report - Ntpc
25/31
the fill the water splashes down from one fill to the next by gravity. Outside air
enters the towers via fans in the form of horizontal slats in the side of the towers.
The slates usually slope downward to keep t water in. The intimate mix between
air and water enhances heat and mass transfer (evaporation), which cools the
water. Cold water is then collected in concrete basin at the bottom of the towerwhere it is pumped back to the condenser. The now hot, moist air leaves the tower
at the top.
7/30/2019 Final Report - Ntpc
26/31
WATER SOURCES
7/30/2019 Final Report - Ntpc
27/31
CONTROL SYSTEM OF THE PLANT
There are three of controlling systems available in the plant and they are asfollows:-
LOCAL CONTROL:-In it the control commands are given to the machine from that place where
machine is located. This system is rarely used.
SWITCHYARD CONTROL:-In it all controlling commands are given from switchgear room.
REMOTE SYSTEM:-This system is frequently used. In it all controlling commands are given
from central computerized control room.
In the central computerized control room, there are two set of
controlling devices. If one set is shut down for maintenance then
commands are given by second set.
7/30/2019 Final Report - Ntpc
28/31
ELECTRICAL AND SWITCHYARD
DEPARTMENT
Electrical energy management system ensures supply of energy to every
consumer at all times at rated voltage, frequency and specified waveform at lowest
cost and minimum environmental degradation. The switchgear, protection and
network automation are integral parts of the modern energy management system
and national economy. The modern 3-ph, 50 HZ, AC interconnected system has
several conventional and non-conventional power plants, HV transmission
network, substations, MV and LV distribution systems and connected electrical
loads. The energy form is supplied to various consumers located in vast
geographical area, instantly, automatically, and safely with required quality at all
times. The service continuity and high quality of power supply have become very
important.
For fulfilling the foresaid purpose, a state of the art, scientifically and
technologically advanced SUBSTATION is required. Sub-station is the load
control centre of the thermal plant where power at rated voltage, frequency and
waveform is exported/ imported as per requirements.
The substation at NTPC, Auraiya has two switchyards, one of 220 KV and
other of 440KV. There are two bus bars and one transfer bus for supplyingelectricity. After step up, the 220 KV output from the generator transformer is fed
to either of two bus bars through relays and circuit breakers and these are
connected to various feeders through various equipments.
There are total 10 lines going out of NTPC, Auraiya for supplying
electricity. Their descriptions are as follows:-
1. 2 lines of 220 KV to Agra.2. 2 lines of 440 KV to Agra.3. 2 lines of 220 KV to Maingaon, M.P.4. 2 lines of 220 KV to Railway.5. 2 lines of 220 KV to GAIL, Dibiyapur.
7/30/2019 Final Report - Ntpc
29/31
DIFFERENT TYPES OF EQUIPMENTS USED IN
SUB-STATIONS:-
BUS-BARS:-
Bus bar is term used for main bar of conductor carrying an electric current to
which may be made. These are mainly convenient means of connecting switches
and other equipments into various arrangements.
There are two bus bars and one transfer bus for supplying electricity. Both bus
bars are used continuously and transfer bus is used in case of many repairing or
maintenance.
LIGHTENING ARRESTORS:-
These are equipments designed to protect insulators of power lines and
electrical installations from lightening surges by diverting the surge to earth and
instantly restoring the circuit insulation to its normal strength with respect to earth.
INDICATING AND METERING INSTRUMENTS:-
Ammeters, voltmeters, watt meters, KWH meter and KVA meters are installed
in sub-station to watch over the currents flowing in the circuit and voltages and
power loads.
ISOLATORS:-
One of the cardinal measures for ensuring full safety in carrying out work onequipment in electrical installations is to disconnect reliably the unit or the section
on which the work is to be done from all other live parts of the installation. To
guard against mistakes, it is necessary that apparatus, which make a visible break
in the circuit such as isolators, should do this.
7/30/2019 Final Report - Ntpc
30/31
Isolators do not have arc control devices therefore cannot be used to interrupt
currents at which the arc will be drawn across the contacts. The open arc in these is
very dangerous, in that it will not only damage the isolator or the equipment
surrounding it but will also cause the flashover between the phase in other words, it
will result in short circuit in the installation i.e. why isolators are used only fordisconnecting parts after de-energizing them by opening their respective circuits by
use of their circuit breakers.
CIRCUIT BREAKERS:-
Circuit breakers are mechanical devices designed to close or open contact or
electrical circuit under normal conditions. CB is equipped with a strip coil directly
attached to relay or other means to operate in abnormal conditions such as over
power etc. In NTPC, Auraiya Gas power plant SF6 CB is used.
In sulphur puffer type SF6 CB is filled with SF6 gas at single pressure
(4to6kgf/cm2).
The pressure and gas flow required for arc extinction is obtained by piston
action.
In double pressure type SF6 CB the gas from high-pressure system is released
to into low-pressure system over the arc during the arc quenching process.
DUPLICATE BUS BAR ARRANGEMENT:-
The duplicate bus bar system provides additional flexibility, continuity of
supply and permits periodic maintenance without total shut down. In the event of
fault on one bus the other bus can be used.
RELAYS:-
Relay is a device by means of which an electrical circuit (trip or alarm circuit)
is controlled (closed) by change in the other circuit. Relays are automatic. The
function of relay in power supply system is to recognize a start out and to initiate
the operation of CB or other devices to isolate the defective elements with
minimum disturbance to the normal power supply system.
7/30/2019 Final Report - Ntpc
31/31
CONCLUSION
Thus this vocational training report deals with overall operation of the NTPC plantin Auraiya. Also the report has a view of some parts used in plant.
The depleting resources of oil, gas and coal (the conventional fuels) along
with atmospheric pollution problems have drawn the attention of the scientists and
engineers all over the world to find out other sources for the generation of electric
power. These sources of energy are going to attain the nerve centre of the future
power plants. Though atomic and nuclear power plants have been developed on
conventional lines, but lot of work is yet to be done. Efforts are being made to
convert atomic and nuclear energy directly into electric power with the help of