Final P Ach Proj Subm Oper Janua Project P hievab j ect P mitted t rator ary 27, 20 Plan ble Po Plan f to Inde 016 otent f or Lo penden ial St ong T e nt Elec t udy erm A ctricity S Anal y System ysis m
Final P
AchProj
SubmOper Janua
Project P
hievabject P
mitted trator
ary 27, 20
Plan
ble PoPlan f
to Inde
016
otentfor Lo
penden
ial Stong Te
nt Elec
tudy erm A
ctricity S
Analy
System
ysis
m
Con
1 Proj
2 Met2
2
2
2
2
ntents
ject Back
hodology.1 Task 1
2.1.1 T
2.1.2 T
2.1.3 T
2.1.4 T
.2 Task 2
Foreca
2.2.1 T
2.2.2 T
2.2.3 T
2.2.4 T
.3 Task 3
2.3.1 T
2.3.2 T
2.
2.
2.3.3 T
2.3.4 T
.4 Task 4
..........
2.4.1 T
2.4.2 T
2.4.3 T
2.4.4 T
.5 Task 5
2.5.1 T
2.5.2 T
2.5.3 T
Achievable
kground a
y and Tas: Refine M
Task 1 Obj
Task 1 Met
Task 1 Del
Task 1 Sch
2: Develop
ast ............
Task 2 Obj
Task 2 Met
Task 2 Del
Task 2 Sch
3: Estimate
Task 3 Obj
Task 3 Met
3.2.1 Scre
3.2.2 Mea
Task 3 Del
Task 3 Sch
4: Bundle C
.................
Task 4 Obj
Task 4 Met
Task 4 Del
Task 4 Sch
5: Comparis
Task 5 Obj
Task 5 Met
Task 5 Del
Potential Stud
and Scop
sks ..........easures ...
ectives .....
thodology .
iverables ..
hedule .......
IESO Zone
.................
ectives .....
thodology .
iverables ..
hedule .......
e Economic
ectives .....
thodology .
een Measur
asure-Level
iverables ..
hedule .......
Cost-Effect
.................
ectives .....
thodology .
iverables ..
hedule .......
son of Eco
ectives .....
thodology .
iverables ..
dy – Final Lon
pe ...........
................................
.................
.................
.................
.................
e Profiles a
.................
.................
.................
.................
.................
c Potential
.................
.................
res for Cos
l Assessme
.................
.................
tive Measu
.................
.................
.................
.................
.................
onomic Po
.................
.................
.................
ng Term Analy
...............
...............
.................
.................
.................
.................
.................
and Disagg
.................
.................
.................
.................
.................
l ................
.................
.................
st-Effectiven
ent .............
.................
.................
ures and M
.................
.................
.................
.................
.................
otential with
.................
.................
.................
ysis Project Pl
...............
................................
.................
.................
.................
.................
gregated B
.................
.................
.................
.................
.................
.................
.................
.................
ness ..........
.................
.................
.................
Map to End
.................
.................
.................
.................
.................
h EUF Mod
.................
.................
.................
lan
...............
...............
.................
.................
.................
.................
.................
Baseline Lo
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
Use Marke
.................
.................
.................
.................
.................
del Potenti
.................
.................
.................
i
.... 1
.... 2
..... 3
..... 3
..... 3
..... 4
..... 4
oad
..... 4
..... 4
..... 5
..... 7
..... 7
..... 7
..... 7
..... 7
..... 7
..... 8
... 10
... 10
ets
... 10
... 10
... 11
... 11
... 11
ial 11
... 11
... 11
... 12
2
2
2
3 Tas
4 Fina
2.5.4 T
.6 Task 6
2.6.1 T
2.6.2 T
2.
2.
2.
2.6.3 T
2.6.4 T
.7 Task 7
2.7.1 T
2.7.2 T
2.
2.
2.
2.7.3 T
2.7.4 T
.8 Task 8
2.8.1 T
2.8.2 T
2.8.3 T
2.8.4 T
k Plan an
al Report
Achievable
Task 5 Sch
6: Estimate
Task 6 Obj
Task 6 Met
6.2.1 Estim
6.2.2 Estim
6.2.3 Long
Task 6 Del
Task 6 Sch
7: Results A
Task 7 Obj
Task 7 Met
7.2.1 Sens
7.2.2 Long
7.2.3 Gas
Task 7 Del
Task 7 Sch
8: Develop
Task 9 Obj
Task 8 Met
Task 8 Del
Task 8 Sch
nd Sched
..............
Potential Stud
hedule .......
e Achievab
ectives .....
thodology .
mating Lon
mating Lon
g Term Cos
iverables ..
hedule .......
Analysis ..
ectives .....
thodology .
sitivity Anal
g Term Plan
s Integration
iverables ..
hedule .......
Report an
ectives .....
thodology .
iverables ..
hedule .......
dule .........
................
dy – Final Lon
.................
le Long Te
.................
.................
g Term Un
g Term Co
st Curves ..
.................
.................
.................
.................
.................
lysis ..........
nning and D
n ...............
.................
.................
d Delivera
.................
.................
.................
.................
...............
...............
ng Term Analy
.................
erm Potent
.................
.................
constrained
nstrained A
.................
.................
.................
.................
.................
.................
.................
Design Insi
.................
.................
.................
bles .........
.................
.................
.................
.................
...............
...............
ysis Project Pl
.................
tial ............
.................
.................
d Achievab
Achievable
.................
.................
.................
.................
.................
.................
.................
ights .........
.................
.................
.................
.................
.................
.................
.................
.................
...............
...............
lan
.................
.................
.................
.................
ble Potentia
Potential ..
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
.................
...............
...............
ii
... 12
... 12
... 12
... 12
al .. 13
... 14
... 15
... 16
... 16
... 16
... 16
... 18
... 18
... 18
... 19
... 19
... 19
... 19
... 19
... 19
... 20
... 20
.. 20
.. 22
1 P
The AchiEnergy aLocal DisFramewoand Demreduction There areconserva D
pCp
Dpa
This projanalysis B C
eO
The main A
saare
Id A D R
1 Behind-the
eligible mea
roject
ievable Poteand a conditistribution Coork. The IES
mand Managns in electric
e two major ation potentiaDevelop an e
otential betwConservation
lanning and
Develop a 20lanning and nalysis.
ect plan outis from 2015
Both transmisCurrently com
nergy manaOntario mark
n outputs of Annual provinavings and an unconstraesource plandentification
Analysis to idDevelopmentRecommenda
e-meter-generatiasures. The poten
Achievable
t Back
ential Study ion of the En
ompanies (LDSO is require
ement (CDMcity consump
needs for dal in Ontario
estimate of Lween 2015 an First Frame
design. This
0 year provinenergy effic
lines the pla5 to 2035 anssion- and dmmercially aagement/behet1.
the long termnce-wide anassociated cined scenar
nning. of opportun
dentify most t of long-termations to dire
on or embeddedntial savings from
Potential Stud
kgrou
is a requiremnergy ConseDCs), which
ed to coordinM) programsption betwee
eveloping a o: LDC-specific and 2020 to ework and tos is referred
ncial achievaciency progra
an for the lonnd the scopeistribution-cvailable, as
haviour-base
m analysis wd IESO zone
costs betweeio. This outp
ities and inssensitive inp
m cost curveect future wo
d load displacemem eligible behind
dy – Final Lon
und an
ment of a dirervation Agreh governs thenate, supports by LDCs toen January 1
new estima
and provincinform the m
o provide insto as the sh
able potentiaam design. T
ng term analye includes theonnected cuwell as new
ed energy eff
will be: e-specific acen 2015 andput will assis
ights for lonputs to the rees. ork.
ent, demand res-the-meter gener
ng Term Analy
nd Sco
rective from eement betwe 2015 - 202t and fund th
o achieve a t, 2015 and
ate of the ach
ce-wide (LDCmid-term revsights to asshort term ana
al forecast toThis is refer
ysis. The time following m
ustomers; anw and emergfficiency mea
chievable cod 2035 undest to inform th
g term consesults.
ponse, and priciration will be ana
ysis Project Pl
ope
the Ontario ween the IES20 Conservahe delivery ototal of 7 TWDecember 3
hievable ele
C-aggregateiew of the 20
sist LDCs witalysis.
o inform longred to as the
meframe of tmain items: nd ing, technoloasures appli
ost effective r a budget che IESO’s lo
servation pro
ng mechanisms alyzed in a separ
lan
Ministry of SO and Ontaation First of Conservat
Wh of persist31, 2020.
ctricity
e) achievable015- 2020 th program
g term resoue long term
the long term
ogy-based acable to the
electricity constrained aong term
ogram design
will not be includrate study.
1
ario’s
tion ing
e
rce
m
and
and
n.
ded as
2 M
To conduand meacosts wilsector, s2025, 20dynamic Details o
The propcollaboratransparedocumenThis projanalysis.
One of thplanningthe long methodoNexant’sdata andjustificati
The long
T T T T T T T T
These ei
Method
uct the long sure energyl be modeledubsector, an30 and 2035cost curve t
on the propos
posed approaative study aency into mont assumptioect plan sum
he main obje, which usesterm analyslogy of the lo model. Inpu results in thon of differe
term analys
Task 1: RefinTask 2: DeveTask 3: EstimTask 4: BundTask 5: CompTask 6: EstimTask 7: ResuTask 8: Deve
ght tasks are
Achievable
dolog
term analysy savings estd by IESO znd by end us5 time horizotool and provsed approac
ach relies onapproach in wodeling assuons, and cleammarizes the
ectives of thes the End-Usis of the achong term anuts and outphe EUF modences and/or
sis is organiz
ne measureselop IESO zomate economdle cost-effecpare econom
mate achievaults analysis elop report a
e described
Potential Stud
y and
is, Nexant wtimates fromone in the lo
se for each oons. Nexant vide it to IESch to conduc
n best practiwhich Nexanumptions. Nearly explain te approach t
e long term ase Forecastehievable potenalysis is struputs from Neel. The resu
r to make ad
zed into the
s one profiles amic potentialctive measurmic potentialable long term
nd deliverab
in detail in t
dy – Final Lon
d Task
will build on tm the short teong term anaof the ten IESwill load the
SO to informct the long te
ices in potennt staff proviexant will shathe methodoto conduct th
analysis is toer (EUF) moential study cuctured to dexant’s mode
ults of the twdjustments to
following tas
and forecast
res and mapl to EUF potem potential a
bles
the remainde
ng Term Analy
ks
the data inpuerm analysisalysis. FindinSO zones ae achievable long term re
erm analysis
ntial analysedes IESO aare all majoologies emphe long term
o provide inpodel. To ensucan be usedevelop an ecel will be ma
wo models wio the two mo
sks:
t disaggrega
p to end useential and develop
er of this sec
ysis Project Pl
uts, participas. However, ngs will be rnd reported
e potential finesource plan
s are provide
es and is emnd its stakehr analysis sployed in the
m achievable
put to IESO’ure the datad by the EUFconomic potpped to enaill be compaodels as app
ated load
e markets
p cost curves
ction.
lan
ation estimatsavings and
reported by for the 2020
ndings into anning decisi
ed below.
mbedded in aholders preadsheetsstudy repor
e potential
’s long term a and resultsF model, thetential with able the use ared to informpropriate.
s
2
tes, d
0, a ons.
a
s, ts.
s from e
of m
2.1 T
2.1.1 TThe objethe focusprogramscommercmeasure
2.1.2 TThe longthe sameto new onew techmeasureadditionaworking gNexant wsavings, performemeasureload). Thpercenta
Where futerm studcalculatioprocuredwith the aEUIs to aThese imincorporastandardterm anaof the mechart thacan easil
Task 1:
Task 1 Objeective of Tass on the longs. This will ncially availabs during the
Task 1 Meth term analys
e list of measr emerging m
hnologies. Th list for the lo
al new and egroup to ide
will only incluso that accu
ed. As in the s (e.g., addihis will be acges are esti
uture code cdy horizon, Nons to accoud throughout appropriate adjust througmprovementsated as apprs on energy
alysis. Nexaneasure for cot Nexant willy be tracked
Achievable
Refine
ectives k 1 is to revig term develnecessitate tble before 20e 20-year per
hodology sis will start wsures develomeasures. IEhe results ofong term an
emerging mentify measur
ude those emurate cost-efshort term ational kWh s
ccomplishedmated.
hanges fromNexant will flunt for this “dthe study hocodes and s
gh time to acs to applicabropriate. IESy efficiency pnt will also aost-effectivel develop ford over time a
Potential Stud
Measur
iew the meaopment of che inclusion035 and alsoriod.
with measuroped for the ESO has funf the ACEEE
nalysis. Additeasures to beres for inclusmerging meaffectiveness analysis, Nesavings for ad in the meas
m product stalag the affecdual baselineorizon, the mstandards. Fccount for imble end use ESO has compotential, andccount for thness calcular Ontario’s mand account
dy – Final Lon
res
sure list for onservation of new mea
o consider th
re research.short term a
nded ACEEEE study will ptional researe added. Nesion in the loasures wherand savingsxant will also
a LED light bsure researc
andards are cted measuree” in the savmeasure basFor example
mprovementsEUIs will be missioned ad the study ihe dual baseations. Figurmajor end usted for during
ng Term Analy
the short terand deman
asures that ihe influence
This researanalysis. PaE research inprovide one rch will be coexant will conong term mere reliable das potential co account fobulb due to tch task wher
known to tares and condvings potentiselines will ae, the TEA-Ps in efficiencresearched
a study to des expected t
eline when cre 2-1 belowse and techng measure r
ysis Project Pl
rm analysis,nd managems expected tof standard
rch will buildrticular attennvestigatinginput in deveonducted tonsult with th
easure list. Aata exists onalculations c
or interactivethe reduced re measures
ake effect duduct the addial. As measadjust accordPOT model ecies due to b from the EU
etermine theto provide in
considering lw illustrates anologies so cresearch.
lan
and edit it wment (CDM)
to become s and codes
on and utilizntion will be g a number oeloping the determine e IESO and
As a framewon cost and can be e effects betwspace cooli
s savings
uring the longitional savin
sures are re-dingly to alig
enables end building codeUF model an impact of
nput in the loifetime savin
a sample Gacode change
3
with
s on
ze paid
of
APS ork,
ween ng
g gs
-gn use
es. nd
ong ngs antt es
2.1.3 TThe delivincludes where staassumptthe APS revised.
2.1.4 TTask 1 w
2.2 TD
2.2.1 TThe objeby sectorprofiles wsimilar bouse forecthe two fo
Figu
Task 1 Delivverables of Temerging anandard and/ions. Nexanworking for
Task 1 Schewill commenc
Task 2: Disaggr
Task 2 Objeective of this r, by subsecwill be built frottom-up apcast. Adjustorecasts are
Achievable
ure 2-1: Sam
verables Task 1 will bnd new tech/or code chant will submitreview and w
edule ce in Octobe
Develoregated
ectives task is to de
ctor and by erom the LDCproach, andments will b
e in general
Potential Stud
mple Gantt C
e a revised hnology meaanges are ant the long tewill clearly id
er 2015 and
p IESO Baselin
evelop load pend use by yC load profiled then will bee made to thalignment. T
dy – Final Lon
Chart of Co
measure listsures, and u
nticipated torm analysis dentify meas
be complete
Zone Pne Load
profiles that year for eaches developede compared ahe IESO ZonTask 2 Metho
ng Term Analy
de Changes
t from the shupdated savaffect baselmeasure to
sures that ha
ed by end of
Profilesd Forec
identify the h of the ten Id for the shoagainst the ne forecastsodology
ysis Project Pl
s Over Time
hort term anavings values ine consumIESO, the e
ave been ad
f December,
and cast
share of theESO zones.ort term anaEUF model
s where need
lan
e
alysis that for measureption
expert panel dd and/or
2015.
e electricity lo. These loadlysis using areference ended to ensu
4
es
and
oad d a nd re
2.2.2 TSince theIESO zondevelop talign withsteps. Figestablish
Figure 2
1)
2 Where LD
resides in eathe distributi
Task 2 Methe aim of the ne level (as ten load proh the ten IESgure 2-2 sho
hed for each
2-2: Simplif
Disaggregaload by secanalysis, Ndevelop thesum up thesubsector w
Add in Traconnected map the cuload repres
Compare wby subsecto
C service territorach IESO zone. ion of load and c
Achievable
hodology long term anopposed to file forecasts
SO zones usows a simpliIESO Zone
fied Illustrat
ate Base Yector/subsectoexant will dr
e LDC Profile necessary b
within each z
nsmission-customers astomer acco
sents the elig
with EUF Moor as summe
ries cross multiplRespective shar
customers by sub
Potential Stud
nalysis is to estimating as (energy sased in the EUfied example.
tion of Base
ear Load byor and develraw on the wes. We will baseline yeazone2.
-Connectedand energy loounts to the gible populat
odel: Next, wed up by IES
le IESO zones, Nres of their load absector and end
dy – Final Lon
estimate acachievable pales by sectoUF model foe of how the
eline Load F
y Sector/Sulop the ten IE
work completmap each Lar (2014) en
Customersoad for eachappropriate tion for the lo
we will compSO Zone fro
Nexant will estimand customers wuse for that LDC
ng Term Analy
chievable potpotential for eor, by subse
or long term pe Baseline L
Forecast De
bsector: ToESO zone pted as part o
LDC to an IEergy load an
s: Nexant wih of the applsubsector toong term an
pare the distm each LDC
mate the share of will then be allocaC remaining cons
ysis Project Pl
tential at theeach LDC),
ector, and byplanning in toad Forecas
evelopment
o disaggregaprofiles for thof the short tSO zone(s) nd customer
ill add in tranlicable IESOo ensure the
nalysis.
tribution of sC load profile
each LDC’s loadated to the appro
stant across IESO
lan
e province anNexant will
y end use) ththe followingst will be
t by IESO Z
ate the base he long termterm analysito allocate a
rs by sector
nsmission O zones, ande top-line 20
sales by sece with the
d and customersopriate IESO zonO zones.
5
nd
hat g
Zone
year s to and and
d 14
tor,
s that ne, with
2)
3)
4)
5)
6)
By propepenetratimeasure
distribution discrepanciexplain the
Disaggregasubsector loThis will bebenchmarkstudies, and
Apply BaseNexant will percentagesales for th
Apply IESOsector driveIESO’s EUF
Subtract CNexant will savings throadoption ofmore efficieby IESO thaappropriatethe savingspersisting sestablish th
Adjust Endfor changesgrowth rateforecast wilchanges in CAGRs willto the respeby IESO zoand retail sby sector by
erly accountion rates, reps as a result
Achievable
of sales by ies exist, Necause for d
ate Base Yeoad profiles done by an
king studies, d the EUF m
e Year Loadapply the te
es by sector, e base year
O’s Gross Rers to develoF model’s gr
Codes and Swork with though the lonf more stringent product sat summariz
e persisting ss from the grsavings will bhe Baseline f
d Use and Ss to the end
es (CAGR) fol be reviewethe end use
l also be resective end uone will be repace forecay subsector)
ng for thesepresenting tht of CDM eff
Potential Stud
sector, by sexant will woifferences, a
ear Load bywill be disagalyzing secothe U.S. En
model end us
d Profiles toen 2014 base
by subsecto(2014).
Reference Fop a gross reross referenc
Standards ahe IESO’s Eng-term studgent buildingstandards (ezes the persisavings by IEross referencbe subtracteforecast.
Subsector Luse and cus
or end use eed and appliee shares of esearched frose loads. A
esearched frsts so that a) over time c
e factors, thehe differenceforts and the
dy – Final Lon
ubsector froork with EUFand if necess
y End Use: Nggregated byondary sourcergy Informase load profi
o IESO Zonee year load por, by end us
Forecast: Neference forece forecast.
and PersistiUF model sty horizon an codes (e.g.
e.g. appliancisting savingESO zone, bce forecast.
ed from the to
Load Sharesstomer subsenergy intensed to the baenergy load m sources s
Additionally, crom IESO’s Gadjustments can be accou
e long term pe between th
e “business a
ng Term Analy
om the EUF mF modeling stsary adjust a
Next, each oy end use foces such as ation Agencles.
e Base Yeaprofiles (enese) to the to
Nexant will apecast (2015
ng Savingstaff to obtainnticipated by HVAC and
ces). Next, wgs by measuby sector an These codeop-line gros
s by Year (asector mix ovsity estimatese year IESover time ca
such as the Echanges in tGross Load to the custounted for by
potential studhe anticipateas usual” ad
ysis Project Pl
model. If sigtaff to underassumptions
of the ten IEor the 2014 b
Ontario andcy (EIA) ener
ar Top-Line ergy sales diop-line IESO
pply IESO seto 2035) co
s from Grosn the respecty end use dulighting) and
we will reviewure and allocd by end uses and stands reference
as appropriaver time, comes from the EO Zone load
an be capturEIA in the Uthe total annForecast an
omer mix (saIESO zone.
dy will estimed adoption
doption rates
lan
gnificant rstand and s.
SO zone baseline yead Canada rgy use prof
Gross Saleistribution zone energ
ector and sunsistent with
ss Forecasttive energy ue to the d the adoptiow data provi
cate the e and subtradards, and forecast to
ate): To accmpound annEUF referend profiles so red. As need.S. and app
nual customend from officales distribut.
mate the net of efficiency
s absent CD
6
ar.
ile
es:
y
ub-h the
:
on of ided
act
count nual ce that
ded, lied ers ce tions
y M
interventover a 10where Neoccur ab
2.2.3 TThe delivsales by type (distLDC-speeach of t
2.2.4 TWork on
2.3 T
2.3.1 TThe objeeffectivencosts for
2.3.2 TEstimatinanalysis
N
Ete
Details oprovided
2.3.2.1 Once theNexant wend use tests to dless thanthe measthan 1.0
ion. This is t0- to 20-yearexant estimaove baseline
Task 2 Delivverable of tasector, by stribution vs.
ecific load prohe ten IESO
Task 2 Schethis task wil
Task 3:
Task 3 Objeectives of Tasness calculaeach cost-e
Task 3 Methng economicand will incl
Nexant will sc
Economic poen IESO zon
on the steps below.
Screen Mee measure awill screen eamarket. IES
determine con 1.0 will be sure to be inwill be deem
Achievable
true even in r horizon, anates the meae measure a
verables sk 2 will be ubsector, bytransmissioofiles in the
O zones.
edule l commence
Estimat
ectives sk 3 is to run
ator based oeffective mea
hodology c potential wude the follo
creen all me
tential will bnes.
involved in e
easures for ssumptions ach individuO uses the t
ost effectivenreviewed bycluded in th
med to be co
Potential Stud
the economnd is particulasure adoptiadoption rate
a Microsoft y end use) fon load). Theshort term a
e in Novemb
te Econ
n the revisedn the TRC teasure using
will build on aowing main a
easures for c
e modeled a
estimating e
Cost-Effecthave been ual measure total resourcness, and my Nexant ande economic
ost effective
dy – Final Lon
mic scenario,larly importaion and assoes.
Excel file thaor each of the workbook wanalysis, alo
ber 2015 and
nomic P
d measure liest to estimaNexant’s TE
analysis and additional an
cost-effective
at the measu
conomic pot
tiveness updated for for cost effe
ce cost (TRCeasures with
d IESO staff potential. Mat a particul
ng Term Analy
where adopant in the achociated savin
at shows thehe ten IESO will include ang with the m
d be complet
Potentia
ist (from Tasate economiEA-POT mod
research conalysis and/o
eness
ure-level and
tential for the
the long termectiveness beC) and progrh a TRC valto determin
Measures wiar efficiency
ysis Project Pl
ption is assuhievable potngs that can
e load profilezones, sepa
all the analysmapping sch
ted by end o
al
sk 1) throughic savings podeling tool.
onducted in tor research:
d estimated
e long term
m analysis (efore bundlinram adminisue of greatee whether itth a TRC va
y level. For th
lan
umed to be 1tential analysn be expecte
e by year (enarated by loasis used for heme of LDC
of January, 2
h Nexant’s cotential and
the short ter
for each of t
analysis are
see Sectionng measuretrator cost (P
er than 0.75 t’s appropriaalue of greathe TRC
7
100% sis,
ed to
nergy ad the Cs to
2016.
cost-
rm
the
e
2.1) s by PAC) but
ate for er
calculatiobenefits. cost, andconsistendiscount
2.3.2.2 Drawing model wireferenceplanning full adoptequation measurepotential
Total numb
Base equip
Saturation
Remaining
Applicabilit
Savings Fa
ons, a 15% n Nexant will
d Nexant willncy with valurates.
Measure-Lon the previill apply the e sales forechorizon. Th
tion of cost-eused in the is shown inanalysis for
Equation
Parameter
ber of househo
pment energy u
share
g Factor
ty Factor
actor
Achievable
non-energy l collect the l coordinate ues used by
Level Assesious data comeasure-levcast (see Seis calculatedeffective eneresidential s Equation 1
r each individ
n 1: Core Eq
olds
use intensity
Potential Stud
benefit (NEBrelevant datwith IESO toIESO, for e
sment ompilation anvel savings iection 2.2) tod savings byergy efficiensector energ, while the cdual measur
quation for R
Number of hou
Amount of kW
Percentage ofof homes with
Fraction of equaccount histor
Fraction of appefficient technfeasible in all sapplicability fa
Percentage re
dy – Final Lon
B) adder willa, such as ino use the apxample the v
nd cost-effecnputs to the
o estimate say measure wcy measures
gy efficiency ore equationre is shown
Residential
useholds eligib
Wh consumed p
f households welectric water
uipment that isrical savings an
plicable units thology (e.g. heasingle family ho
actor does not o
eduction in ene
ng Term Analy
l be includedncremental eppropriate ecvalues of av
ctiveness ane respective savings poten
will represents available ipotential an
n utilized in tin Equation
Sector – M
Definition
ble for a given m
per year for bas
with the measurheating)
s not already ennd persistence
hat is technicaat pump water omes). Care woverlap with the
rgy consumptio
ysis Project Pl
d to the meaequipment cconomic datvoided suppl
nalysis, Nexashare of thential over thet the savingsn the marke
nalysis for eathe nonresid2 below.
Measure Pot
measure
seline equipme
re’s end use pr
nergy efficient, of the savings
lly feasible for heaters are no
will be taken soe remaining fac
on with efficien
lan
asure-level cost and prota to ensure ly costs and
ant’s TEA-POe disaggregae 20-year s possible gietplace. The ach individuadential secto
tential
ent
resent (e.g. sha
which takes in
conversion to ot technically o that the ctor.
nt equipment
8
gram
OT ated
ven core al
or
are
nto
Total stockby LDC
Base equip
Equipment
Remaining
Applicabilit
Savings Fa
The calcAchievabeach ma4: Bundleindustry-resolutioensure aissues suintegrate(based olimiting toiteratively
A separaeach zoncustomethe main
Equation 2
Parameter
k sq. footage by
pment energy u
t Saturation sha
g Factor
ty Factor
actor
ulations will ble Potentialrket class ane Cost-Effecstandard men. Running tccurate acco
uch as meased measure ron TRC valueotal adoptiony reduces th
ate bottom-une’s combiners) for a totaTEA-POT m
Achievable
2: Core Equa
y building type
use intensity
are
be iterativel) model to and end use. ctive Measurethods to acthe measureounting of insure interactranking logice) and avoidn to 100% whe baseline f
p model willed LDC eneral of 30 modemodel dashb
Potential Stud
ation for No
The forecas
The electricequipment a
Percentage (e.g. percen
Fraction of einto account
Fraction of aefficient techfeasible in afactor does
Percentage
y completedassess econo
This task ocres and Mapccurately estes through ondividual andtions and mec arranges ads double-cowithin any meforecast afte
be used forrgy sales anels. Figure 2board where
dy – Final Lon
onresidentia
sted aggregated
ity used per sqand/or end use
of square footantage of floor sp
equipment thatt historical savi
applicable unitshnology (e.g. hall facilities). Canot overlap wit
reduction in en
d using Nexaomic potenticcurs in parap to End-useimate savingur TEA-POTd bundled measure compand applies mounting poteneasure comper the applica
r each sectond customer 2-3 below sh
the high-lev
ng Term Analy
al Sector –
Definition
d square foota
quare foot per ye in each subse
age served by pace served by
t is not already ings and persis
s that is technicheat pump wateare will be taketh the remainin
nergy consump
ant’s TEA-POial for each mallel with thee Markets. Thgs potential T model at th
measures savpetition groumeasures inntial savingspetition grouation of each
or for each IEcounts and
hows a sampvel model inp
ysis Project Pl
Measure Po
n
ge for a given
year by each bector
a given measuy electric water
y energy efficienstence of the s
cally feasible foer heaters are en so that the ang factor.
ption with effici
OT (Technicmeasure and
e subsequenhe TEA-POTat a high dehis stage is cvings, while
ups. The TEA order of cos
s (repeat parup by end ush subsequen
ESO zone (ctransmissio
ple screen caputs are ent
lan
otential
building type
ase-case
ure’s end use r heating)
nt, which takesavings
or conversion tnot technically applicability
ent equipment
cal-Economid ultimately
nt task, i.e. TT model utiliegree of critical so asconsidering
A-POT modest effectivenrticipation) b
se. It also nt measure.
comprised ofn-connectedapture imagtered.
9
s
to
t
c-for
Task zes
s to el’s ess
by
f d e of
Savings wmeasureduration savings pend use IESO’s E
2.3.3 TThe delivworkbooeffective
2.3.4 TThis task
2.4 TE
2.4.1 TThe objesub-secto
will be expre life time andof the measpotential willmarket so th
End Use Fore
Task 3 Delivverable of Tak that summmeasures fo
Task 3 Schek will comme
Task 4: End Use
Task 4 Objeective of Tasor end use)
Achievable
Figure
essed as ped measure d
sure life. Thi provide the
hat achievabecaster (EU
verables ask 3 will inc
marizes the mor each sect
edule ence in Janu
Bundlee Marke
ectives k 4 is to calcfor each yea
Potential Stud
2-3: TEA-PO
rsisting savidecay. This is “bottom-up
e foundation ble potential F) model.
clude an outmeasure-levetor and IESO
uary 2016 an
e Cost-Eets
culate the ecar of the long
dy – Final Lon
OT Model S
ngs over timmeans savinp” approachfor bundlingcan be estim
put from theel savings aO zone.
nd be comple
Effective
conomic savg-term poten
ng Term Analy
Screen Capt
me, which takngs will be p
h for estimatig (i.e. mappinmated by en
e TEA-POT mnd costs ass
eted by end
e Measu
vings potentintial study ho
ysis Project Pl
ture
kes into conpersistent oning measureng) individua
nd use for co
model in a Msociated with
of February
ures an
al by end usorizon.
lan
sideration nly for the e-level econoal measuresomparison w
MS Excel h all cost-
y, 2016.
nd Map
se market (i.
10
omic s by with
to
e.,
2.4.2 TThis taskPotentialeffective use markwill genesector, bwill then The mappotential zones.
2.4.3 TThe delivpotential
2.4.4 TThis task
2.5 TM
2.5.1 TThe objepotential potential with EUFadjust mo
2.5.2 TNexant wdiscrepalimit diffeall major on load plives, avoor EUF mFurtherm
Task 4 Methk occurs in p. Based on measure pe
kets. This maerate an outpy subsector,be mapped
pping taxonofor each en
Task 4 Delivverable of Taand costs b
Task 4 Schek will begin in
Task 5: Model P
Task 5 Objeectives of this
by end use by end use
F modeling sodeling assu
Task 5 Methwill share its ncies betwe
erences in ecmodeling as
profiles, end oided costs, model assummore, we will
Achievable
hodology parallel and it
the outputs ermutations tatrix is deve
put table that, by end useto the respe
omy will be ud use marke
verables ask 4 will bebroken out by
edule n January 20
CompaPotentia
ectives s task is to cfrom the TEfrom their E
staff to underumptions.
hodology economic pen model finconomic potssumptions use saturatinflation rate
mptions will bdiscuss mo
Potential Stud
teratively wiof the TEA-to a measur
eloped with tht summarize
e, by vintageective end usused to sum et using Micr
a MS Excely end use m
016 and be c
arison oal
compare NexEA-POT modEUF model. Irstand and e
otential findndings on ecential estimait will be usiions, fuel shes, and morebe made so deling meth
dy – Final Lon
th the previo-POT model,re bundle bahe TEA-POT
es the individe and by IESses marketsup gross merosoft Excel
l workbook tmarket for ea
completed b
of Econo
xant’s initial del with IESOIf significant explain the c
ings by end conomic poteates, Nexantng in its long
hares, equipme. As approthat the twoodology ass
ng Term Analy
ous task, i.e, Nexant will
ased on theirT model outdual measurO zone. The
s for comparieasure levelPivot Table
that summarach year of th
by end of Fe
omic Po
estimate of O’s estimatediscrepanci
cause for diff
use market ential (if appt will first shag term analyment energy
opriate, chano models aligsumptions th
ysis Project Pl
. Task 3: Esl identify andr applicabilityput. The TEA
re savings ane matrix tablison with the MWH energs for each o
rizes the ecohe planning
bruary 2016
otential
long term eces of long teries exist, Neferences, an
with IESO spropriate). Asare with IES
ysis includingy use intensinges to eithegn to the extehat are used
lan
timate Econd map the coy to specific A-POT modnd costs by e of measur
e EUF modegy savings
of the ten IES
onomic savintime horizon
6.
l with E
conomic rm economic
exant will wond if necessa
staff and discs a means to
SO staff a lisg assumptioities, measu
er the TEA-Pent possiblewithin the tw
11
nomic ost-end-
del
res el.
SO
ngs n.
UF
c ork ary
cuss o t of
ons re
POT e. wo
models toSome of
M
H
Bof
Nexant wNexant’smodel in
2.5.3 TThe delivhas end detailing
2.5.4 TThis task
2.6 T
2.6.1 TThe objeuse markten IESO
2.6.2 TAssessineffective example percenta
o understanthe modelin
Measure turn
How measure
Building stockf new constr
will develop, model and IESO long t
Task 5 Delivverable of Tause savingswhy discrep
Task 5 Schek will be com
Task 6:
Task 6 Objeective of this ket for each
O zones.
Task 6 Methng achievablend use maof adoption ge of the eli
Achievable
d how thoseng assumptio
nover rates a
es are priorit
k and how itruction build
in consultatthe EUF moterm resourc
verables ask 5 will bes and costs cpancies exist
edule mpleted betw
Estimat
ectives task is to deof the study
hodology e energy eff
arket savingscurves usedgible popula
Potential Stud
e assumptionons we will r
and assumpt
tized for ado
t is accounteing stock)
ion with IESodel, to enabce planning
a MS Excelcalibrated to ts.
ween January
te Achi
evelop realisy horizon yea
ficiency potes opportunitid in a prior Nation that ado
dy – Final Lon
ns may impareview includ
tions
option (e.g. T
ed for in the f
O, the mappble IESO to uprocess.
l output workthe EUF mo
y 1, 2016 an
evable
stic estimatesars of 2020,
ential requirees will be ad
Nexant studyopts an effic
ng Term Analy
act findings ode:
TRC vs. part
forecast (e.g
ping of inputuse the data
kbook from todel (if appro
nd February
Long T
s of energy 2025, 2030,
es estimatingdopted over y where the ciency oppor
ysis Project Pl
of economic
ticipant payb
g. accountin
ts and outpua and results
the TEA-POopriate) and
29, 2016.
Term Po
efficiency po, and 2035 f
g the rate at time. Figurey-axis show
rtunity over t
lan
c potential.
back)
g for the add
uts between s from Nexan
OT model tha/or a Memo
otential
otential by efor each of th
which cost-e 2-4 shows
ws the time (the x-a
12
dition
nt’s
at
end he
-an
axis).
2.6.2.1 BecauseNexant wachievabprimarily levels of dependealley netwCDM proparticipatkWh savachievab
Fig
Estimatinge program imwill incorporable potential
be correlateprogram ma
ent on numerworks, staff
ogram delivetion rates wiings to estab
ble potential
Equ
Achievable
gure 2-4: Sa
g Long Termmplementatioate individuascenario an
ed with incenaturity. Whilerous factors resources, e
ery aggressivll be multipliblish achievawould be as
uation 3: Un
Achiev
Potential Stud
ample Mark
m Unconstraon scenariosally developed/or end usentive rates, re we recognin addition t
etc.), Nexantveness for aied against eable potentias illustrated i
nconstraine
Potentivable
dy – Final Lon
et Adoption
ained Achies have a direed sets of pae market. Thresulting cusize that adoto incentive rt uses incenll factors infleach end usal. The algorn Equation 3
d Achievab
tkji
EUial,,,
ng Term Analy
n Curves by
evable Poteect influence articipation rahe participatstomer paybption of efficrates (e.g. p
ntive rate as luencing par
se market’s grithm to estim3.
ble Potentia
tki RATUM ,,
ysis Project Pl
y Scenario
ential over marke
ates correspion rates forack periods
ciency opporprogram mara proxy to rerticipation. Tgross economate uncons
al Algorithm
tkjiTE ,,,
lan
et adoption raponding to ear this study wand differin
rtunities is rketing, tradeepresent ove
These mic potentiastrained
m
13
ates, ach
will g
e erall
al
Where: EIESO ZoRATEi,j,k,t
year t The likelinotably cparticipatour own program the Ontarecently Nexant’sin-depth other, anparticipat
To estabspendingrates givedelivery (engagem
2.6.2.2 It is anticgreater thbudget cachievabwith histobaseline administrfor each percentarates). TSource dwhich wieach secbudget fo
3 Energy Eff
http://www.p
EUMi,k,t = the ne k in year
t = the
ihood that a cost, and clotion rates, Nevaluation dby measurerio market areleased Ac access to Ebenchmarki
nd to peer grtion rates an
blish the avaig, Nexant wien 100% inc(e.g. industry
ment, etc.).
Estimatingcipated that than the avaionstrained s
ble scenario orical spendachievable
rative costs measure ange of the tot
The administdata to estimll be multipliector. Incentivor the baseli
ficiency Potentiapuc.state.pa.us/E
Achievable
sum of end t participation
given custoosely related Nexant will redatabases toe. Research and nearby rehievable Po
E Source’s Dng and gap
roups in the nd look for re
ilable achievll develop ancentive for my-leading ex
g Long Termthe budget rilable CDM pscenario, Nein which theing and adoscenario wil(marketing,
nd/or end usetal incrementrative costs
mate an averaed against thve and admine achievab
l Study for Penns
Electric/pdf/Act12
Potential Stud
use market
n rate of ado
mer will adoincentive le
esearch 201o identify thewill also incegions, basetential Asse
DSM Insight’analysis to cregion. Thiselationships
vable potentn adoption c
measure incrxpenditures o
m Constrainequired to aprogram budexant will este incentive leption rates al be estimatestaff salariee market. T
ntal cost of awill be reseage adminishe savings finistrative co
ble scenario.
sylvania. 2015. 29/SWE_EE_Pot
dy – Final Lon
of type i eco
option curve j
opt a measurevels and pay1 to 2015 his
e number of plude customed on findingssment for ts tool. The Ecompare LDbenchmarkto expenditu
ial in the Oncurve that aliremental coson marketing
ned Achievattain the ava
dget in Ontatimate the reevels and asacross the ped by calculs, evaluation
The incentivell adopted marched from
strative cost for each meaosts will be a.
tential_Study-No
ng Term Analy
onomic pote
j for end use
re is a functiyback periodstorical partparticipants
mer willingnesgs from relevthe State of E Source da
DC’s existingking analysisures and pro
ntario CDM mgns with exp
sts and very g, administra
able Potentiailable achierio for the lo
equired budgssociated parovince. Thating both thn costs, etc.e costs will bmeasures (bam prior IESO
factor ($/kWasure and/oadded togeth
o_Appendices.pd
ysis Project Pl
ential energy
e market i fo
ion of severads. To informicipation trenand level ofss to participvant studiesPennsylvan
ata will be usg CDM progrs will exploreogram desig
market with npected measaggressive ation, trade
ial evable potenong-term. Thget needed frticipation rae required bhe incentive ) and adding
be calculatedased on histevaluations
Wh-saved) for end use mher to calcul
df
lan
y savings for
or IESO Zone
al factors, mm the nds derived f savings by pate trends s including thia3 and from
sed to condurams to eache past n.
no constrainsure adoptioprogram ally
ntial will be herefore, for for a “baselinates are aligbudget of this
cost and g them togetd as a torical incents and from Eor each sectomarket within
ate total req
14
r
e k in
most
from
in he
m uct an h
nts on on
the ne” ned s
ther
tive or,
quired
With the to apply aand/or enwith the apotential accordingfactor of receive abe repeafor each current Cshown in
Where: EIESO Zo
RATEi,j,k,t
end use
Factor,j,k,t
2.6.2.3 Nexant’ssavings afor each for each Curves wused in oenables tcombinatthe 20-yesector fomanufac
required buda scaling facnd use markavailable bugiven budge
g to cost effe0% to remov
a scaling facated in an iteIESO zone
Conservationn Equation 4
Equati
A
EUMi,k,t = the ne k in year
t = the market i for
t = the Zone
Long Term dynamic Coat various lescenario (busubsector, a
will be develoour dynamic the user to stion of variabear cost curvr the replaceturing subse
Achievable
dget of the “ctor to the baket as a meadget. This pet constraintectiveness. ve all savingtor of 100% erative procein the 2015-
n First Frame.
ion 4: Budg
PAchievable
sum of end t
participationIESO Zone
scaling factok in year t so
m Cost Curvost Curve Tovelized costudget constrand each enoped using dMicrosoft Ex
see differencbles from drve of for the ement only oector from a
Potential Stud
“baseline” acaseline achie
ans to constrprocess will ts. To do thMeasures t
gs potential fto ensure a
ess until the 2035 time hework and IA
get Constrai
i
Potential,
use market
n rate basedk in year t
or applied too that baseli
ves ool is set up ts per unit ofrained and ud use at eacdirect outputxcel-based Cces in potentop-down meconstrained
on retrofit vindrop-down m
dy – Final Lon
chievable scevable scenrain long termbe completeis, Nexant what are the lfor this scenll savings pocosts are eqorizon accoAP budget le
ined Achiev
tkjtkiEUM
,,,,,
of type i eco
on historica
o adoption cuine achievab
to generatef savings. Neunconstrainech requestedts from NexaCost Curve Ttial under vaenus. For exd achievable ntage measumenu to see
ng Term Analy
cenario estabnario participm achievabled in a mannwill prioritize least cost ef
nario. Most cotential are iqual to the arding to an aevels. The a
vable Poten
tkjiRATE ,,,
onomic ener
al incentive r
urve j for endble costs are
e cost curvesexant will deed achievabld time horizoant’s TEA-PTool. Nexan
arying cost thxample, IESO
potential scures; and thee how the co
ysis Project Pl
blished, the pation rate ofe savings po
ner that maxand arrangeffective will rcost effectivencluded. Th
available estassumed exalgorithm for
ntial Algorit
kjiFactor ,,
rgy savings
rates of adop
d use markee equal to av
s that presenevelop distince potential),on of the stu
POT model, wnt’s Cost Cuhresholds byO staff will bcenario of theen select ch
ost curve cha
lan
next step wif each measotential to al
ximizes savine each measreceive a scae measures his process wtimated budg
xtension of r this proces
hm
tk,
potential for
ption curve
et i for IESO vailable budg
nt potential ct supply cu for each se
udy. The Cowhich are th
urve Tool y selecting a
be able to reve industrial
hemical anges. The C
15
ill be sure lign ngs sure aling will
will get
ss is
r
j for
get
rves ector, ost hen
any view
Cost
Curve toosavings. measurebelow sh
To develcomplete
1)
2)
3)
4)
This procchanges curves, tacontribut
2.6.3 TThe delivestimatesThis worprovided
2.6.4 TTask 6 w
2.7 T
2.7.1 TThe resudesign inactionabto data a
ol will displa The Cost C level to end
hows a samp
op the achieed:
Aggregate use marketSort and rabased on thSum the peeach time hGraph the i
cess would bthrough tim
ables will beions to ener
Task 6 Delivverable of ths of long terkbook will prto IESO.
Task 6 Schewill begin in F
Task 7:
Task 7 Objeults analysis nsights, and le decisionsnd assumpt
Achievable
ay both the toCurve Tool cd use marketple screen ca
evable poten
all commerct) for each acnk the bundheir incremeersisting enehorizon (202ncreasing le
be repeated e along with
e developed rgy savings.
verables is task will Mm achievablrovide the ne
edule February 201
Results
ectives focuses on tgas integrat, understandions.
Potential Stud
otal MWh saan be set upt level for vaapture of this
ntial cost cur
cial, industriachievable poled measurental levelize
ergy savings 0, 2025, 203
evelized cost
for each timh the increasthat show th
MS Excel wole potential fecessary inp
16 and be co
s Analy
three key artion. The objd sensitivitie
dy – Final Lon
avings as wep to display darious time hs tool.
rves for each
al, and residotential scene groups (ened cost ($/kW
(MWh) as a30, 2035) t against the
me horizon ofsed MWh savhe ranked bu
orkbook that for each secputs to Nexa
ompleted by
sis
reas: sensitivjective of thes in the mod
ng Term Analy
ell as the totadata at varyi
horizons thro
h scenario, t
ential bundlenario. nd use markWh). a % of sales
e persisting M
f the study tovings. In conundled meas
includes thector and for eant’s Cost Cu
y March 31, 2
vity analysise task is to edeling, and p
ysis Project Pl
al cost to obing levels ofoughout the
the following
ed measure
ets) from low
and/or gros
MWh saving
o capture conjunction witsure groups
e calculationeach of the turve Tool wh
2016
s, long term penable IESOplan for futur
lan
btain those f resolution fstudy. Figur
g steps will b
groups (or e
west to highe
ss savings at
gs.
ost-effectiventh the cost with the rela
ns for and ten IESO zonhich will also
planning andO to make re improvem
16
from re 2-5
be
end
est,
t
ness
ative
nes. o be
d
ments
Achievable Potential Study – Final Long Term Analysis Project Plan 17
Figure 2-5: Sample Screen Capture: Cost Curve Tool
2.7.2 T2.7.2.1 Nexant win the sePOT modchanges Parametecosts, dis
2.7.2.2 Nexant spotential savings arecommeprimarily CDM properforminevaluatioas designNexant w
Task 7 MethSensitivity
will develop ansitivity anadel is set upin paramete
ers that can scount rates
Long Termsenior progra
resides by sare currentlyendations onthrough a g
ogram achievng or under-on and delivened program
will deliver th
F
Achievable
hodology y Analysis a list of whatlysis, which to run multi
ers impact bpotentially b
s, etc.
m Planning aam planning sector, subsy being captun the best map analysesved savings -performing iery team wh
ms for utilitieshat summariz
igure 2-6: S
Potential Stud
t are typicallwill be revieple scenariooth econombe included
and Design staff will ideector and enured by sectethods for c
s by comparito identify a
identified poo has evaluas throughouzes our gap
Sample Gap
dy – Final Lon
y the most sewed with IEos in short-oic and achiein the sensit
Insights entify opportnd use, comtor, subsectocapturing theing modeled
areas where otential. Staffated IESO’st North Ameanalysis find
p Analysis B
ng Term Analy
sensitive moSO and APSrder to gain
evable potentivity analysi
unities for wmpare these oor and end uese opportund potential st
CDM achievf will consult
s programs oerica. Figure dings.
Bubble Cha
ysis Project Pl
odeling paramS working gran understa
ntial savings is are incent
where long-teopportunitiesuse, and pronities. This wtudy findingsved savingst internally wover the pas
2-6 shows a
rt Output
lan
meters to incroup. The TEanding of howand costs.
tive rate, avo
erm savings s against wh
ovide will be condus with actuals are either owith Nexant’st 6 years, asa sample ou
18
clude EA-w
oided
here
ucted l over-s s well utput
2.7.2.3 Our propnatural gpotential to identifyresearchappropriafuel. Sennatural genable fupotential input in p
2.7.3 TThe delivenergy splanning recommefuture ele
2.7.4 TThis task
2.8 T
2.8.1 TDevelop assumpt
2.8.2 TThe repomilestoneof the prodeliverabformat foaddresse
Gas Integrposed staff foas potential studies for t
y insights an efforts betwated and cha
nior staff will as utilities, I
urther coordistudies. We
prioritizing th
Task 7 Delivverables for avings potenand to optim
endations ofectricity and
Task 7 Schek will be exec
Task 8:
Task 9 Objea report, exeions, data, a
Task 8 Methort and delivee a section ooject all the sbles. All repoor review by ed in develop
Achievable
ration or this projecstudies. In s
the same clind opportuniween the stuaracterized bconsult withESO, and stination and ie will share the recommen
verables Task 7 incluntial; 2) insigmize the reaf future worknatural achi
edule cuted during
Develo
ectives ecutive sum
analyses, res
hodology erables will bof the report sections will
ort sections, IESO and reping the fina
Potential Stud
ct has extensome instanent. This exities throughdies. Througboth fuel typ
h representatakeholder gintegration bthese insightnded work a
ude 1) sensitghts and reclization of th
k required toievable pote
g April 2016.
p Repo
mmary report sults, and re
be developeand associa
l be compilefinal report a
elevant stakeal versions.
dy – Final Lon
sive experieces, we’ve cperience pro
hout the courgh our work
pe markets atives from thgroup to devbetween fututs with IESO
and initiatives
tivity analysicommendatiohe potential e
enable furthential.
ort and D
and deliveraecommendat
ed in parallelated deliverad into a finaand deliveraeholders. Fe
ng Term Analy
ence in condconducted sovides us wirse of the stuwith Northw
and programhe Ontario Evelop a list ofure electricityO and the stas.
s of inputs aons regardinenergy savinher coordina
Delivera
ables that cations form al
with Tasks ables will bel report and
ables will firseedback from
ysis Project Pl
ducting both subsequent gith the necesudy and to s
western Enerms, without a Energy Boardf work and iny and naturaakeholder gr
and assumptng long termngs; and 3) ation and inte
ables
apture the mll the previou
1 to 7. At eae developed,
final accomst be developm the review
lan
electric and gas and elecssary knowlestreamline rgy, we havebias toward
d, Ontario nitiatives to
al gas achievroup to obtai
tions’ impac program
egration betw
methodologieus tasks.
ach major and at the epanying ped in draft
ws will be
19
ctric edge
e d one
vable in
ct the
ween
es,
end
2.8.3 TThe delivaccompaeach LDCpanel, an
2.8.4 TThis task
3 Ta
The taskscheduleanalysis while thethe first h
Task 8 Delivverables for anying deliveC’s potentiand APS work
Task 8 Schek will comme
ask P
s described e. The schedof data are s
e modelling ohalf of 2016.
Achievable
verables this task will
erables, suchl analysis. Aking group.
edule ence in Janu
lan an
in Section 2dule indicatescheduled oof the potent The study i
Potential Stud
l be the finalh as MS Exc
All deliverable
uary 2016 an
nd Sc
2 are summas when the t
occur during tial analysis s scheduled
dy – Final Lon
l report, execcel workbooes will be su
nd be comple
hedul
arized in Figtasks will bethe last halfscenarios a
d to be comp
ng Term Analy
cutive summks with resu
ubmitted for
eted by May
le
ure 3-1 and e completed.f of 2015 fromnd generatio
pleted by Jun
ysis Project Pl
mary report aults, each LDreview by IE
y 2016
it includes t. The data cm Septembeon of resultsne 2016.
lan
and DC profile anESO, expert
the associateollection ander to Decems will occur d
20
nd
ed d
mber, during
Achievable Potential Study – Final Long Term Analysis Project Plan 21
Figure 3-1: Task Plan and Schedule
2016
Task Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
1 Refine Measures
2 Develop IESO Zone Profiles and Disaggregated Load Forecast
3 Estimate Economic Potential
3.1 Screen measures for cost‐effectiveness
3.2 Measure‐level assessment
4 Bundle Cost‐Effective Measures and Map to End Use Markets
5 Comparison and Calibration of Economic Potential with EUF Model Potential
6 Estimate Achievable Long Term Potential
6.1 Long term unconstrained achievable potential
6.2 Long term constrained achievable potential
6.3 Long term cost curves
7 Results Analysis
7.1 Sensitivity analysis
7.2 Long term planning and design insights
7.3 Gas integration
8 Develop Report and Deliverables (Draft and Final versions)
4 F
The mainmilestone
Arere
Ae
The deta
E In M M IE E A S P R T A A
The repoworking g
inal R
n final reportes will inform
An executive ecommendaeport.
A detailed colements of t
ailed report w
Executive sumntroduction
Methodology Measures anESO Zone P
Economic PoAchievable PSensitivity AnPotential ComRecommendaTerminology Acronyms Appendices
orts will first bgroup before
Achievable
Report
t will be devem a section w
summary reations, and in
mprehensivhe projects.
will contain th
mmary
d End Use MProfiles otential ScenPotential Scenalysis mpared with ations
be submittede it is update
Potential Stud
t
eloped as thwithin the re
eport. The renformation w
ve report. The
he following
Markets
nario enarios
Baseline an
d in draft fored to a final v
dy – Final Lon
he project proport. Two re
eport will higwill be extrac
e report will
sections:
nd Reference
mat for revieversion.
ng Term Analy
ogresses aneports will be
ghlight the kected from the
provide a de
e Case Fore
ew and discu
ysis Project Pl
nd each of the developed
ey results ane detailed co
etail discuss
ecast
ussion with
lan
he major :
nd omprehensiv
sion of all the
IESO and A
22
ve
e
APS
Achievable
T
16
Potential Stud
Nexant
TD Canad
1 Bay St
M5J 2
C
www.n
dy – Final Lon
Canada
da Trust
treet, Su
2S1 Toro
Canada
nexant.c
ng Term Analy
a, Inc.
Tower
uite 2721
onto
com
ysis Project Pl
lan
23