Top Banner
Final P Ach Proj Subm Oper Janua Project P hievab j ect P mitted t rator ary 27, 20 Plan ble Po Plan f to Inde 016 otent f or Lo penden ial St ong T e nt Elec t udy erm A ctricity S Anal y System ysis m
26

Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Mar 06, 2018

Download

Documents

lamdien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Final P

 

AchProj

SubmOper Janua

Project P

hievabject P

mitted trator

ary 27, 20

Plan 

ble PoPlan f

to Inde

016

otentfor Lo

penden

ial Stong Te

nt Elec

tudy erm A

ctricity S

Analy

System

ysis

m

Page 2: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Con

1  Proj

2  Met2

2

2

2

2

ntents

ject Back

hodology.1  Task 1

2.1.1  T

2.1.2  T

2.1.3  T

2.1.4  T

.2  Task 2

Foreca

2.2.1  T

2.2.2  T

2.2.3  T

2.2.4  T

.3  Task 3

2.3.1  T

2.3.2  T

2.

2.

2.3.3  T

2.3.4  T

.4  Task 4

..........

2.4.1  T

2.4.2  T

2.4.3  T

2.4.4  T

.5  Task 5

2.5.1  T

2.5.2  T

2.5.3  T

Achievable

kground a

y and Tas: Refine M

Task 1 Obj

Task 1 Met

Task 1 Del

Task 1 Sch

2: Develop

ast ............

Task 2 Obj

Task 2 Met

Task 2 Del

Task 2 Sch

3: Estimate

Task 3 Obj

Task 3 Met

3.2.1  Scre

3.2.2  Mea

Task 3 Del

Task 3 Sch

4: Bundle C

.................

Task 4 Obj

Task 4 Met

Task 4 Del

Task 4 Sch

5: Comparis

Task 5 Obj

Task 5 Met

Task 5 Del

Potential Stud

and Scop

sks ..........easures ...

ectives .....

thodology .

iverables ..

hedule .......

IESO Zone

.................

ectives .....

thodology .

iverables ..

hedule .......

e Economic

ectives .....

thodology .

een Measur

asure-Level

iverables ..

hedule .......

Cost-Effect

.................

ectives .....

thodology .

iverables ..

hedule .......

son of Eco

ectives .....

thodology .

iverables ..

dy – Final Lon

pe ...........

................................

.................

.................

.................

.................

e Profiles a

.................

.................

.................

.................

.................

c Potential

.................

.................

res for Cos

l Assessme

.................

.................

tive Measu

.................

.................

.................

.................

.................

onomic Po

.................

.................

.................

ng Term Analy

...............

...............

.................

.................

.................

.................

.................

and Disagg

.................

.................

.................

.................

.................

l ................

.................

.................

st-Effectiven

ent .............

.................

.................

ures and M

.................

.................

.................

.................

.................

otential with

.................

.................

.................

ysis Project Pl

...............

................................

.................

.................

.................

.................

gregated B

.................

.................

.................

.................

.................

.................

.................

.................

ness ..........

.................

.................

.................

Map to End

.................

.................

.................

.................

.................

h EUF Mod

.................

.................

.................

lan

...............

...............

.................

.................

.................

.................

.................

Baseline Lo

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

Use Marke

.................

.................

.................

.................

.................

del Potenti

.................

.................

.................

i

.... 1 

.... 2 

..... 3 

..... 3 

..... 3 

..... 4 

..... 4 

oad

..... 4 

..... 4 

..... 5 

..... 7 

..... 7 

..... 7 

..... 7 

..... 7 

..... 7 

..... 8 

... 10 

... 10 

ets

... 10 

... 10 

... 11 

... 11 

... 11 

ial 11 

... 11 

... 11 

... 12 

Page 3: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2

2

2

3  Tas

4  Fina

2.5.4  T

.6  Task 6

2.6.1  T

2.6.2  T

2.

2.

2.

2.6.3  T

2.6.4  T

.7  Task 7

2.7.1  T

2.7.2  T

2.

2.

2.

2.7.3  T

2.7.4  T

.8  Task 8

2.8.1  T

2.8.2  T

2.8.3  T

2.8.4  T

k Plan an

al Report

Achievable

Task 5 Sch

6: Estimate

Task 6 Obj

Task 6 Met

6.2.1  Estim

6.2.2  Estim

6.2.3  Long

Task 6 Del

Task 6 Sch

7: Results A

Task 7 Obj

Task 7 Met

7.2.1  Sens

7.2.2  Long

7.2.3  Gas

Task 7 Del

Task 7 Sch

8: Develop

Task 9 Obj

Task 8 Met

Task 8 Del

Task 8 Sch

nd Sched

..............

Potential Stud

hedule .......

e Achievab

ectives .....

thodology .

mating Lon

mating Lon

g Term Cos

iverables ..

hedule .......

Analysis ..

ectives .....

thodology .

sitivity Anal

g Term Plan

s Integration

iverables ..

hedule .......

Report an

ectives .....

thodology .

iverables ..

hedule .......

dule .........

................

dy – Final Lon

.................

le Long Te

.................

.................

g Term Un

g Term Co

st Curves ..

.................

.................

.................

.................

.................

lysis ..........

nning and D

n ...............

.................

.................

d Delivera

.................

.................

.................

.................

...............

...............

ng Term Analy

.................

erm Potent

.................

.................

constrained

nstrained A

.................

.................

.................

.................

.................

.................

.................

Design Insi

.................

.................

.................

bles .........

.................

.................

.................

.................

...............

...............

ysis Project Pl

.................

tial ............

.................

.................

d Achievab

Achievable

.................

.................

.................

.................

.................

.................

.................

ights .........

.................

.................

.................

.................

.................

.................

.................

.................

...............

...............

lan

.................

.................

.................

.................

ble Potentia

Potential ..

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

.................

...............

...............

ii

... 12 

... 12 

... 12 

... 12 

al .. 13 

... 14 

... 15 

... 16 

... 16 

... 16 

... 16 

... 18 

... 18 

... 18 

... 19 

... 19 

... 19 

... 19 

... 19 

... 19 

... 20 

... 20 

.. 20 

.. 22 

Page 4: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

1 P

The AchiEnergy aLocal DisFramewoand Demreduction There areconserva D

pCp

Dpa

This projanalysis B C

eO

The main A

saare

Id A D R

                  1 Behind-the

eligible mea

roject

ievable Poteand a conditistribution Coork. The IES

mand Managns in electric

e two major ation potentiaDevelop an e

otential betwConservation

lanning and

Develop a 20lanning and nalysis.

ect plan outis from 2015

Both transmisCurrently com

nergy manaOntario mark

n outputs of Annual provinavings and an unconstraesource plandentification

Analysis to idDevelopmentRecommenda

                       e-meter-generatiasures. The poten

Achievable

t Back

ential Study ion of the En

ompanies (LDSO is require

ement (CDMcity consump

needs for dal in Ontario

estimate of Lween 2015 an First Frame

design. This

0 year provinenergy effic

lines the pla5 to 2035 anssion- and dmmercially aagement/behet1.

the long termnce-wide anassociated cined scenar

nning. of opportun

dentify most t of long-termations to dire

                   on or embeddedntial savings from

Potential Stud

kgrou

is a requiremnergy ConseDCs), which

ed to coordinM) programsption betwee

eveloping a o: LDC-specific and 2020 to ework and tos is referred

ncial achievaciency progra

an for the lonnd the scopeistribution-cvailable, as

haviour-base

m analysis wd IESO zone

costs betweeio. This outp

ities and inssensitive inp

m cost curveect future wo

d load displacemem eligible behind

dy – Final Lon

und an

ment of a dirervation Agreh governs thenate, supports by LDCs toen January 1

new estima

and provincinform the m

o provide insto as the sh

able potentiaam design. T

ng term analye includes theonnected cuwell as new

ed energy eff

will be: e-specific acen 2015 andput will assis

ights for lonputs to the rees. ork.

ent, demand res-the-meter gener

ng Term Analy

nd Sco

rective from eement betwe 2015 - 202t and fund th

o achieve a t, 2015 and

ate of the ach

ce-wide (LDCmid-term revsights to asshort term ana

al forecast toThis is refer

ysis. The time following m

ustomers; anw and emergfficiency mea

chievable cod 2035 undest to inform th

g term consesults.

ponse, and priciration will be ana

ysis Project Pl

ope

the Ontario ween the IES20 Conservahe delivery ototal of 7 TWDecember 3

hievable ele

C-aggregateiew of the 20

sist LDCs witalysis.

o inform longred to as the

meframe of tmain items: nd ing, technoloasures appli

ost effective r a budget che IESO’s lo

servation pro

ng mechanisms alyzed in a separ

lan

Ministry of SO and Ontaation First of Conservat

Wh of persist31, 2020.

ctricity

e) achievable015- 2020 th program

g term resoue long term

the long term

ogy-based acable to the

electricity constrained aong term

ogram design

will not be includrate study.

1

ario’s

tion ing

e

rce

m

and

and

n.

ded as

Page 5: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2 M

To conduand meacosts wilsector, s2025, 20dynamic Details o

The propcollaboratransparedocumenThis projanalysis.

One of thplanningthe long methodoNexant’sdata andjustificati

The long

T T T T T T T T

These ei

Method

uct the long sure energyl be modeledubsector, an30 and 2035cost curve t

on the propos

posed approaative study aency into mont assumptioect plan sum

he main obje, which usesterm analyslogy of the lo model. Inpu results in thon of differe

term analys

Task 1: RefinTask 2: DeveTask 3: EstimTask 4: BundTask 5: CompTask 6: EstimTask 7: ResuTask 8: Deve

ght tasks are

Achievable

dolog

term analysy savings estd by IESO znd by end us5 time horizotool and provsed approac

ach relies onapproach in wodeling assuons, and cleammarizes the

ectives of thes the End-Usis of the achong term anuts and outphe EUF modences and/or

sis is organiz

ne measureselop IESO zomate economdle cost-effecpare econom

mate achievaults analysis elop report a

e described

Potential Stud

y and

is, Nexant wtimates fromone in the lo

se for each oons. Nexant vide it to IESch to conduc

n best practiwhich Nexanumptions. Nearly explain te approach t

e long term ase Forecastehievable potenalysis is struputs from Neel. The resu

r to make ad

zed into the

s one profiles amic potentialctive measurmic potentialable long term

nd deliverab

in detail in t

dy – Final Lon

d Task

will build on tm the short teong term anaof the ten IESwill load the

SO to informct the long te

ices in potennt staff proviexant will shathe methodoto conduct th

analysis is toer (EUF) moential study cuctured to dexant’s mode

ults of the twdjustments to

following tas

and forecast

res and mapl to EUF potem potential a

bles

the remainde

ng Term Analy

ks

the data inpuerm analysisalysis. FindinSO zones ae achievable long term re

erm analysis

ntial analysedes IESO aare all majoologies emphe long term

o provide inpodel. To ensucan be usedevelop an ecel will be ma

wo models wio the two mo

sks:

t disaggrega

p to end useential and develop

er of this sec

ysis Project Pl

uts, participas. However, ngs will be rnd reported

e potential finesource plan

s are provide

es and is emnd its stakehr analysis sployed in the

m achievable

put to IESO’ure the datad by the EUFconomic potpped to enaill be compaodels as app

ated load

e markets

p cost curves

ction.

lan

ation estimatsavings and

reported by for the 2020

ndings into anning decisi

ed below.

mbedded in aholders preadsheetsstudy repor

e potential

’s long term a and resultsF model, thetential with able the use ared to informpropriate.

s

2

tes, d

0, a ons.

a

s, ts.

s from e

of m

Page 6: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2.1 T

2.1.1 TThe objethe focusprogramscommercmeasure

2.1.2 TThe longthe sameto new onew techmeasureadditionaworking gNexant wsavings, performemeasureload). Thpercenta

Where futerm studcalculatioprocuredwith the aEUIs to aThese imincorporastandardterm anaof the mechart thacan easil

Task 1:

Task 1 Objeective of Tass on the longs. This will ncially availabs during the

Task 1 Meth term analys

e list of measr emerging m

hnologies. Th list for the lo

al new and egroup to ide

will only incluso that accu

ed. As in the s (e.g., addihis will be acges are esti

uture code cdy horizon, Nons to accoud throughout appropriate adjust througmprovementsated as apprs on energy

alysis. Nexaneasure for cot Nexant willy be tracked

Achievable

Refine

ectives k 1 is to revig term develnecessitate tble before 20e 20-year per

hodology sis will start wsures develomeasures. IEhe results ofong term an

emerging mentify measur

ude those emurate cost-efshort term ational kWh s

ccomplishedmated.

hanges fromNexant will flunt for this “dthe study hocodes and s

gh time to acs to applicabropriate. IESy efficiency pnt will also aost-effectivel develop ford over time a

Potential Stud

Measur

iew the meaopment of che inclusion035 and alsoriod.

with measuroped for the ESO has funf the ACEEE

nalysis. Additeasures to beres for inclusmerging meaffectiveness analysis, Nesavings for ad in the meas

m product stalag the affecdual baselineorizon, the mstandards. Fccount for imble end use ESO has compotential, andccount for thness calcular Ontario’s mand account

dy – Final Lon

res

sure list for onservation of new mea

o consider th

re research.short term a

nded ACEEEE study will ptional researe added. Nesion in the loasures wherand savingsxant will also

a LED light bsure researc

andards are cted measuree” in the savmeasure basFor example

mprovementsEUIs will be missioned ad the study ihe dual baseations. Figurmajor end usted for during

ng Term Analy

the short terand deman

asures that ihe influence

This researanalysis. PaE research inprovide one rch will be coexant will conong term mere reliable das potential co account fobulb due to tch task wher

known to tares and condvings potentiselines will ae, the TEA-Ps in efficiencresearched

a study to des expected t

eline when cre 2-1 belowse and techng measure r

ysis Project Pl

rm analysis,nd managems expected tof standard

rch will buildrticular attennvestigatinginput in deveonducted tonsult with th

easure list. Aata exists onalculations c

or interactivethe reduced re measures

ake effect duduct the addial. As measadjust accordPOT model ecies due to b from the EU

etermine theto provide in

considering lw illustrates anologies so cresearch.

lan

and edit it wment (CDM)

to become s and codes

on and utilizntion will be g a number oeloping the determine e IESO and

As a framewon cost and can be e effects betwspace cooli

s savings

uring the longitional savin

sures are re-dingly to alig

enables end building codeUF model an impact of

nput in the loifetime savin

a sample Gacode change

3

with

s on

ze paid

of

APS ork,

ween ng

g gs

-gn use

es. nd

ong ngs antt es

Page 7: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2.1.3 TThe delivincludes where staassumptthe APS revised.

2.1.4 TTask 1 w

2.2 TD

2.2.1 TThe objeby sectorprofiles wsimilar bouse forecthe two fo

Figu

Task 1 Delivverables of Temerging anandard and/ions. Nexanworking for

Task 1 Schewill commenc

Task 2: Disaggr

Task 2 Objeective of this r, by subsecwill be built frottom-up apcast. Adjustorecasts are

Achievable

ure 2-1: Sam

verables Task 1 will bnd new tech/or code chant will submitreview and w

edule ce in Octobe

Develoregated

ectives task is to de

ctor and by erom the LDCproach, andments will b

e in general

Potential Stud

mple Gantt C

e a revised hnology meaanges are ant the long tewill clearly id

er 2015 and

p IESO Baselin

evelop load pend use by yC load profiled then will bee made to thalignment. T

dy – Final Lon

Chart of Co

measure listsures, and u

nticipated torm analysis dentify meas

be complete

Zone Pne Load

profiles that year for eaches developede compared ahe IESO ZonTask 2 Metho

ng Term Analy

de Changes

t from the shupdated savaffect baselmeasure to

sures that ha

ed by end of

Profilesd Forec

identify the h of the ten Id for the shoagainst the ne forecastsodology

ysis Project Pl

s Over Time

hort term anavings values ine consumIESO, the e

ave been ad

f December,

and cast

share of theESO zones.ort term anaEUF model

s where need

lan

e

alysis that for measureption

expert panel dd and/or

2015.

e electricity lo. These loadlysis using areference ended to ensu

4

es

and

oad d a nd re

Page 8: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2.2.2 TSince theIESO zondevelop talign withsteps. Figestablish

Figure 2

1)

                  2 Where LD

resides in eathe distributi

Task 2 Methe aim of the ne level (as ten load proh the ten IESgure 2-2 sho

hed for each

2-2: Simplif

Disaggregaload by secanalysis, Ndevelop thesum up thesubsector w

Add in Traconnected map the cuload repres

Compare wby subsecto                       

C service territorach IESO zone. ion of load and c

Achievable

hodology long term anopposed to file forecasts

SO zones usows a simpliIESO Zone

fied Illustrat

ate Base Yector/subsectoexant will dr

e LDC Profile necessary b

within each z

nsmission-customers astomer acco

sents the elig

with EUF Moor as summe                   

ries cross multiplRespective shar

customers by sub

Potential Stud

nalysis is to estimating as (energy sased in the EUfied example.

tion of Base

ear Load byor and develraw on the wes. We will baseline yeazone2.

-Connectedand energy loounts to the gible populat

odel: Next, wed up by IES

le IESO zones, Nres of their load absector and end

dy – Final Lon

estimate acachievable pales by sectoUF model foe of how the

eline Load F

y Sector/Sulop the ten IE

work completmap each Lar (2014) en

Customersoad for eachappropriate tion for the lo

we will compSO Zone fro

Nexant will estimand customers wuse for that LDC

ng Term Analy

chievable potpotential for eor, by subse

or long term pe Baseline L

Forecast De

bsector: ToESO zone pted as part o

LDC to an IEergy load an

s: Nexant wih of the applsubsector toong term an

pare the distm each LDC

mate the share of will then be allocaC remaining cons

ysis Project Pl

tential at theeach LDC),

ector, and byplanning in toad Forecas

evelopment

o disaggregaprofiles for thof the short tSO zone(s) nd customer

ill add in tranlicable IESOo ensure the

nalysis.

tribution of sC load profile

each LDC’s loadated to the appro

stant across IESO

lan

e province anNexant will

y end use) ththe followingst will be

t by IESO Z

ate the base he long termterm analysito allocate a

rs by sector

nsmission O zones, ande top-line 20

sales by sece with the

d and customersopriate IESO zonO zones.

5

nd

hat g

Zone

year s to and and

d 14

tor,

s that ne, with

Page 9: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2)

3)

4)

5)

6)

By propepenetratimeasure

distribution discrepanciexplain the

Disaggregasubsector loThis will bebenchmarkstudies, and

Apply BaseNexant will percentagesales for th

Apply IESOsector driveIESO’s EUF

Subtract CNexant will savings throadoption ofmore efficieby IESO thaappropriatethe savingspersisting sestablish th

Adjust Endfor changesgrowth rateforecast wilchanges in CAGRs willto the respeby IESO zoand retail sby sector by

erly accountion rates, reps as a result

Achievable

of sales by ies exist, Necause for d

ate Base Yeoad profiles done by an

king studies, d the EUF m

e Year Loadapply the te

es by sector, e base year

O’s Gross Rers to develoF model’s gr

Codes and Swork with though the lonf more stringent product sat summariz

e persisting ss from the grsavings will bhe Baseline f

d Use and Ss to the end

es (CAGR) fol be reviewethe end use

l also be resective end uone will be repace forecay subsector)

ng for thesepresenting tht of CDM eff

Potential Stud

sector, by sexant will woifferences, a

ear Load bywill be disagalyzing secothe U.S. En

model end us

d Profiles toen 2014 base

by subsecto(2014).

Reference Fop a gross reross referenc

Standards ahe IESO’s Eng-term studgent buildingstandards (ezes the persisavings by IEross referencbe subtracteforecast.

Subsector Luse and cus

or end use eed and appliee shares of esearched frose loads. A

esearched frsts so that a) over time c

e factors, thehe differenceforts and the

dy – Final Lon

ubsector froork with EUFand if necess

y End Use: Nggregated byondary sourcergy Informase load profi

o IESO Zonee year load por, by end us

Forecast: Neference forece forecast.

and PersistiUF model sty horizon an codes (e.g.

e.g. appliancisting savingESO zone, bce forecast.

ed from the to

Load Sharesstomer subsenergy intensed to the baenergy load m sources s

Additionally, crom IESO’s Gadjustments can be accou

e long term pe between th

e “business a

ng Term Analy

om the EUF mF modeling stsary adjust a

Next, each oy end use foces such as ation Agencles.

e Base Yeaprofiles (enese) to the to

Nexant will apecast (2015

ng Savingstaff to obtainnticipated by HVAC and

ces). Next, wgs by measuby sector an These codeop-line gros

s by Year (asector mix ovsity estimatese year IESover time ca

such as the Echanges in tGross Load to the custounted for by

potential studhe anticipateas usual” ad

ysis Project Pl

model. If sigtaff to underassumptions

of the ten IEor the 2014 b

Ontario andcy (EIA) ener

ar Top-Line ergy sales diop-line IESO

pply IESO seto 2035) co

s from Grosn the respecty end use dulighting) and

we will reviewure and allocd by end uses and stands reference

as appropriaver time, comes from the EO Zone load

an be capturEIA in the Uthe total annForecast an

omer mix (saIESO zone.

dy will estimed adoption

doption rates

lan

gnificant rstand and s.

SO zone baseline yead Canada rgy use prof

Gross Saleistribution zone energ

ector and sunsistent with

ss Forecasttive energy ue to the d the adoptiow data provi

cate the e and subtradards, and forecast to

ate): To accmpound annEUF referend profiles so red. As need.S. and app

nual customend from officales distribut.

mate the net of efficiency

s absent CD

6

ar.

ile

es:

y

ub-h the

:

on of ided

act

count nual ce that

ded, lied ers ce tions

y M

Page 10: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

interventover a 10where Neoccur ab

2.2.3 TThe delivsales by type (distLDC-speeach of t

2.2.4 TWork on

2.3 T

2.3.1 TThe objeeffectivencosts for

2.3.2 TEstimatinanalysis

N

Ete

Details oprovided

2.3.2.1 Once theNexant wend use tests to dless thanthe measthan 1.0

ion. This is t0- to 20-yearexant estimaove baseline

Task 2 Delivverable of tasector, by stribution vs.

ecific load prohe ten IESO

Task 2 Schethis task wil

Task 3:

Task 3 Objeectives of Tasness calculaeach cost-e

Task 3 Methng economicand will incl

Nexant will sc

Economic poen IESO zon

on the steps below.

Screen Mee measure awill screen eamarket. IES

determine con 1.0 will be sure to be inwill be deem

Achievable

true even in r horizon, anates the meae measure a

verables sk 2 will be ubsector, bytransmissioofiles in the

O zones.

edule l commence

Estimat

ectives sk 3 is to run

ator based oeffective mea

hodology c potential wude the follo

creen all me

tential will bnes.

involved in e

easures for ssumptions ach individuO uses the t

ost effectivenreviewed bycluded in th

med to be co

Potential Stud

the economnd is particulasure adoptiadoption rate

a Microsoft y end use) fon load). Theshort term a

e in Novemb

te Econ

n the revisedn the TRC teasure using

will build on aowing main a

easures for c

e modeled a

estimating e

Cost-Effecthave been ual measure total resourcness, and my Nexant ande economic

ost effective

dy – Final Lon

mic scenario,larly importaion and assoes.

Excel file thaor each of the workbook wanalysis, alo

ber 2015 and

nomic P

d measure liest to estimaNexant’s TE

analysis and additional an

cost-effective

at the measu

conomic pot

tiveness updated for for cost effe

ce cost (TRCeasures with

d IESO staff potential. Mat a particul

ng Term Analy

where adopant in the achociated savin

at shows thehe ten IESO will include ang with the m

d be complet

Potentia

ist (from Tasate economiEA-POT mod

research conalysis and/o

eness

ure-level and

tential for the

the long termectiveness beC) and progrh a TRC valto determin

Measures wiar efficiency

ysis Project Pl

ption is assuhievable potngs that can

e load profilezones, sepa

all the analysmapping sch

ted by end o

al

sk 1) throughic savings podeling tool.

onducted in tor research:

d estimated

e long term

m analysis (efore bundlinram adminisue of greatee whether itth a TRC va

y level. For th

lan

umed to be 1tential analysn be expecte

e by year (enarated by loasis used for heme of LDC

of January, 2

h Nexant’s cotential and

the short ter

for each of t

analysis are

see Sectionng measuretrator cost (P

er than 0.75 t’s appropriaalue of greathe TRC

7

100% sis,

ed to

nergy ad the Cs to

2016.

cost-

rm

the

e

2.1) s by PAC) but

ate for er

Page 11: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

calculatiobenefits. cost, andconsistendiscount

2.3.2.2 Drawing model wireferenceplanning full adoptequation measurepotential

Total numb

Base equip

Saturation

Remaining

Applicabilit

Savings Fa

ons, a 15% n Nexant will

d Nexant willncy with valurates.

Measure-Lon the previill apply the e sales forechorizon. Th

tion of cost-eused in the is shown inanalysis for

Equation

Parameter

ber of househo

pment energy u

share

g Factor

ty Factor

actor

Achievable

non-energy l collect the l coordinate ues used by

Level Assesious data comeasure-levcast (see Seis calculatedeffective eneresidential s Equation 1

r each individ

n 1: Core Eq

olds

use intensity

Potential Stud

benefit (NEBrelevant datwith IESO toIESO, for e

sment ompilation anvel savings iection 2.2) tod savings byergy efficiensector energ, while the cdual measur

quation for R

Number of hou

Amount of kW

Percentage ofof homes with

Fraction of equaccount histor

Fraction of appefficient technfeasible in all sapplicability fa

Percentage re

dy – Final Lon

B) adder willa, such as ino use the apxample the v

nd cost-effecnputs to the

o estimate say measure wcy measures

gy efficiency ore equationre is shown

Residential

useholds eligib

Wh consumed p

f households welectric water

uipment that isrical savings an

plicable units thology (e.g. heasingle family ho

actor does not o

eduction in ene

ng Term Analy

l be includedncremental eppropriate ecvalues of av

ctiveness ane respective savings poten

will represents available ipotential an

n utilized in tin Equation

Sector – M

Definition

ble for a given m

per year for bas

with the measurheating)

s not already ennd persistence

hat is technicaat pump water omes). Care woverlap with the

rgy consumptio

ysis Project Pl

d to the meaequipment cconomic datvoided suppl

nalysis, Nexashare of thential over thet the savingsn the marke

nalysis for eathe nonresid2 below.

Measure Pot

measure

seline equipme

re’s end use pr

nergy efficient, of the savings

lly feasible for heaters are no

will be taken soe remaining fac

on with efficien

lan

asure-level cost and prota to ensure ly costs and

ant’s TEA-POe disaggregae 20-year s possible gietplace. The ach individuadential secto

tential

ent

resent (e.g. sha

which takes in

conversion to ot technically o that the ctor.

nt equipment

8

gram

OT ated

ven core al

or

are

nto

Page 12: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Total stockby LDC

Base equip

Equipment

Remaining

Applicabilit

Savings Fa

The calcAchievabeach ma4: Bundleindustry-resolutioensure aissues suintegrate(based olimiting toiteratively

A separaeach zoncustomethe main

Equation 2

Parameter

k sq. footage by

pment energy u

t Saturation sha

g Factor

ty Factor

actor

ulations will ble Potentialrket class ane Cost-Effecstandard men. Running tccurate acco

uch as meased measure ron TRC valueotal adoptiony reduces th

ate bottom-une’s combiners) for a totaTEA-POT m

Achievable

2: Core Equa

y building type

use intensity

are

be iterativel) model to and end use. ctive Measurethods to acthe measureounting of insure interactranking logice) and avoidn to 100% whe baseline f

p model willed LDC eneral of 30 modemodel dashb

Potential Stud

ation for No

The forecas

The electricequipment a

Percentage (e.g. percen

Fraction of einto account

Fraction of aefficient techfeasible in afactor does

Percentage

y completedassess econo

This task ocres and Mapccurately estes through ondividual andtions and mec arranges ads double-cowithin any meforecast afte

be used forrgy sales anels. Figure 2board where

dy – Final Lon

onresidentia

sted aggregated

ity used per sqand/or end use

of square footantage of floor sp

equipment thatt historical savi

applicable unitshnology (e.g. hall facilities). Canot overlap wit

reduction in en

d using Nexaomic potenticcurs in parap to End-useimate savingur TEA-POTd bundled measure compand applies mounting poteneasure comper the applica

r each sectond customer 2-3 below sh

the high-lev

ng Term Analy

al Sector –

Definition

d square foota

quare foot per ye in each subse

age served by pace served by

t is not already ings and persis

s that is technicheat pump wateare will be taketh the remainin

nergy consump

ant’s TEA-POial for each mallel with thee Markets. Thgs potential T model at th

measures savpetition groumeasures inntial savingspetition grouation of each

or for each IEcounts and

hows a sampvel model inp

ysis Project Pl

Measure Po

n

ge for a given

year by each bector

a given measuy electric water

y energy efficienstence of the s

cally feasible foer heaters are en so that the ang factor.

ption with effici

OT (Technicmeasure and

e subsequenhe TEA-POTat a high dehis stage is cvings, while

ups. The TEA order of cos

s (repeat parup by end ush subsequen

ESO zone (ctransmissio

ple screen caputs are ent

lan

otential

building type

ase-case

ure’s end use r heating)

nt, which takesavings

or conversion tnot technically applicability

ent equipment

cal-Economid ultimately

nt task, i.e. TT model utiliegree of critical so asconsidering

A-POT modest effectivenrticipation) b

se. It also nt measure.

comprised ofn-connectedapture imagtered.

9

s

to

t

c-for

Task zes

s to el’s ess

by

f d e of

Page 13: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Savings wmeasureduration savings pend use IESO’s E

2.3.3 TThe delivworkbooeffective

2.3.4 TThis task

2.4 TE

2.4.1 TThe objesub-secto

will be expre life time andof the measpotential willmarket so th

End Use Fore

Task 3 Delivverable of Tak that summmeasures fo

Task 3 Schek will comme

Task 4: End Use

Task 4 Objeective of Tasor end use)

Achievable

Figure

essed as ped measure d

sure life. Thi provide the

hat achievabecaster (EU

verables ask 3 will inc

marizes the mor each sect

edule ence in Janu

Bundlee Marke

ectives k 4 is to calcfor each yea

Potential Stud

2-3: TEA-PO

rsisting savidecay. This is “bottom-up

e foundation ble potential F) model.

clude an outmeasure-levetor and IESO

uary 2016 an

e Cost-Eets

culate the ecar of the long

dy – Final Lon

OT Model S

ngs over timmeans savinp” approachfor bundlingcan be estim

put from theel savings aO zone.

nd be comple

Effective

conomic savg-term poten

ng Term Analy

Screen Capt

me, which takngs will be p

h for estimatig (i.e. mappinmated by en

e TEA-POT mnd costs ass

eted by end

e Measu

vings potentintial study ho

ysis Project Pl

ture

kes into conpersistent oning measureng) individua

nd use for co

model in a Msociated with

of February

ures an

al by end usorizon.

lan

sideration nly for the e-level econoal measuresomparison w

MS Excel h all cost-

y, 2016.

nd Map

se market (i.

10

omic s by with

to

e.,

Page 14: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2.4.2 TThis taskPotentialeffective use markwill genesector, bwill then The mappotential zones.

2.4.3 TThe delivpotential

2.4.4 TThis task

2.5 TM

2.5.1 TThe objepotential potential with EUFadjust mo

2.5.2 TNexant wdiscrepalimit diffeall major on load plives, avoor EUF mFurtherm

Task 4 Methk occurs in p. Based on measure pe

kets. This maerate an outpy subsector,be mapped

pping taxonofor each en

Task 4 Delivverable of Taand costs b

Task 4 Schek will begin in

Task 5: Model P

Task 5 Objeectives of this

by end use by end use

F modeling sodeling assu

Task 5 Methwill share its ncies betwe

erences in ecmodeling as

profiles, end oided costs, model assummore, we will

Achievable

hodology parallel and it

the outputs ermutations tatrix is deve

put table that, by end useto the respe

omy will be ud use marke

verables ask 4 will bebroken out by

edule n January 20

CompaPotentia

ectives s task is to cfrom the TEfrom their E

staff to underumptions.

hodology economic pen model finconomic potssumptions use saturatinflation rate

mptions will bdiscuss mo

Potential Stud

teratively wiof the TEA-to a measur

eloped with tht summarize

e, by vintageective end usused to sum et using Micr

a MS Excely end use m

016 and be c

arison oal

compare NexEA-POT modEUF model. Irstand and e

otential findndings on ecential estimait will be usiions, fuel shes, and morebe made so deling meth

dy – Final Lon

th the previo-POT model,re bundle bahe TEA-POT

es the individe and by IESses marketsup gross merosoft Excel

l workbook tmarket for ea

completed b

of Econo

xant’s initial del with IESOIf significant explain the c

ings by end conomic poteates, Nexantng in its long

hares, equipme. As approthat the twoodology ass

ng Term Analy

ous task, i.e, Nexant will

ased on theirT model outdual measurO zone. The

s for comparieasure levelPivot Table

that summarach year of th

by end of Fe

omic Po

estimate of O’s estimatediscrepanci

cause for diff

use market ential (if appt will first shag term analyment energy

opriate, chano models aligsumptions th

ysis Project Pl

. Task 3: Esl identify andr applicabilityput. The TEA

re savings ane matrix tablison with the MWH energs for each o

rizes the ecohe planning

bruary 2016

otential

long term eces of long teries exist, Neferences, an

with IESO spropriate). Asare with IES

ysis includingy use intensinges to eithegn to the extehat are used

lan

timate Econd map the coy to specific A-POT modnd costs by e of measur

e EUF modegy savings

of the ten IES

onomic savintime horizon

6.

l with E

conomic rm economic

exant will wond if necessa

staff and discs a means to

SO staff a lisg assumptioities, measu

er the TEA-Pent possiblewithin the tw

11

nomic ost-end-

del

res el.

SO

ngs n.

UF

c ork ary

cuss o t of

ons re

POT e. wo

Page 15: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

models toSome of

M

H

Bof

Nexant wNexant’smodel in

2.5.3 TThe delivhas end detailing

2.5.4 TThis task

2.6 T

2.6.1 TThe objeuse markten IESO

2.6.2 TAssessineffective example percenta

o understanthe modelin

Measure turn

How measure

Building stockf new constr

will develop, model and IESO long t

Task 5 Delivverable of Tause savingswhy discrep

Task 5 Schek will be com

Task 6:

Task 6 Objeective of this ket for each

O zones.

Task 6 Methng achievablend use maof adoption ge of the eli

Achievable

d how thoseng assumptio

nover rates a

es are priorit

k and how itruction build

in consultatthe EUF moterm resourc

verables ask 5 will bes and costs cpancies exist

edule mpleted betw

Estimat

ectives task is to deof the study

hodology e energy eff

arket savingscurves usedgible popula

Potential Stud

e assumptionons we will r

and assumpt

tized for ado

t is accounteing stock)

ion with IESodel, to enabce planning

a MS Excelcalibrated to ts.

ween January

te Achi

evelop realisy horizon yea

ficiency potes opportunitid in a prior Nation that ado

dy – Final Lon

ns may impareview includ

tions

option (e.g. T

ed for in the f

O, the mappble IESO to uprocess.

l output workthe EUF mo

y 1, 2016 an

evable

stic estimatesars of 2020,

ential requirees will be ad

Nexant studyopts an effic

ng Term Analy

act findings ode:

TRC vs. part

forecast (e.g

ping of inputuse the data

kbook from todel (if appro

nd February

Long T

s of energy 2025, 2030,

es estimatingdopted over y where the ciency oppor

ysis Project Pl

of economic

ticipant payb

g. accountin

ts and outpua and results

the TEA-POopriate) and

29, 2016.

Term Po

efficiency po, and 2035 f

g the rate at time. Figurey-axis show

rtunity over t

lan

c potential.

back)

g for the add

uts between s from Nexan

OT model tha/or a Memo

otential

otential by efor each of th

which cost-e 2-4 shows

ws the time (the x-a

12

dition

nt’s

at

end he

-an

axis).

Page 16: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2.6.2.1 BecauseNexant wachievabprimarily levels of dependealley netwCDM proparticipatkWh savachievab

Fig

Estimatinge program imwill incorporable potential

be correlateprogram ma

ent on numerworks, staff

ogram delivetion rates wiings to estab

ble potential

Equ

Achievable

gure 2-4: Sa

g Long Termmplementatioate individuascenario an

ed with incenaturity. Whilerous factors resources, e

ery aggressivll be multipliblish achievawould be as

uation 3: Un

Achiev

Potential Stud

ample Mark

m Unconstraon scenariosally developed/or end usentive rates, re we recognin addition t

etc.), Nexantveness for aied against eable potentias illustrated i

nconstraine

Potentivable

dy – Final Lon

et Adoption

ained Achies have a direed sets of pae market. Thresulting cusize that adoto incentive rt uses incenll factors infleach end usal. The algorn Equation 3

d Achievab

tkji

EUial,,,

ng Term Analy

n Curves by

evable Poteect influence articipation rahe participatstomer paybption of efficrates (e.g. p

ntive rate as luencing par

se market’s grithm to estim3.

ble Potentia

tki RATUM ,,

ysis Project Pl

y Scenario

ential over marke

ates correspion rates forack periods

ciency opporprogram mara proxy to rerticipation. Tgross economate uncons

al Algorithm

tkjiTE ,,,

lan

et adoption raponding to ear this study wand differin

rtunities is rketing, tradeepresent ove

These mic potentiastrained

m

13

ates, ach

will g

e erall

al

Page 17: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Where: EIESO ZoRATEi,j,k,t

year t The likelinotably cparticipatour own program the Ontarecently Nexant’sin-depth other, anparticipat

To estabspendingrates givedelivery (engagem

2.6.2.2 It is anticgreater thbudget cachievabwith histobaseline administrfor each percentarates). TSource dwhich wieach secbudget fo

                  3 Energy Eff

http://www.p

EUMi,k,t = the ne k in year

t = the

ihood that a cost, and clotion rates, Nevaluation dby measurerio market areleased Ac access to Ebenchmarki

nd to peer grtion rates an

blish the avaig, Nexant wien 100% inc(e.g. industry

ment, etc.).

Estimatingcipated that than the avaionstrained s

ble scenario orical spendachievable

rative costs measure ange of the tot

The administdata to estimll be multipliector. Incentivor the baseli

                       ficiency Potentiapuc.state.pa.us/E

Achievable

sum of end t participation

given custoosely related Nexant will redatabases toe. Research and nearby rehievable Po

E Source’s Dng and gap

roups in the nd look for re

ilable achievll develop ancentive for my-leading ex

g Long Termthe budget rilable CDM pscenario, Nein which theing and adoscenario wil(marketing,

nd/or end usetal incrementrative costs

mate an averaed against thve and admine achievab

                   l Study for Penns

Electric/pdf/Act12

Potential Stud

use market

n rate of ado

mer will adoincentive le

esearch 201o identify thewill also incegions, basetential Asse

DSM Insight’analysis to cregion. Thiselationships

vable potentn adoption c

measure incrxpenditures o

m Constrainequired to aprogram budexant will este incentive leption rates al be estimatestaff salariee market. T

ntal cost of awill be reseage adminishe savings finistrative co

ble scenario.

sylvania. 2015. 29/SWE_EE_Pot

dy – Final Lon

of type i eco

option curve j

opt a measurevels and pay1 to 2015 his

e number of plude customed on findingssment for ts tool. The Ecompare LDbenchmarkto expenditu

ial in the Oncurve that aliremental coson marketing

ned Achievattain the ava

dget in Ontatimate the reevels and asacross the ped by calculs, evaluation

The incentivell adopted marched from

strative cost for each meaosts will be a.

tential_Study-No

ng Term Analy

onomic pote

j for end use

re is a functiyback periodstorical partparticipants

mer willingnesgs from relevthe State of E Source da

DC’s existingking analysisures and pro

ntario CDM mgns with exp

sts and very g, administra

able Potentiailable achierio for the lo

equired budgssociated parovince. Thating both thn costs, etc.e costs will bmeasures (bam prior IESO

factor ($/kWasure and/oadded togeth

o_Appendices.pd

ysis Project Pl

ential energy

e market i fo

ion of severads. To informicipation trenand level ofss to participvant studiesPennsylvan

ata will be usg CDM progrs will exploreogram desig

market with npected measaggressive ation, trade

ial evable potenong-term. Thget needed frticipation rae required bhe incentive ) and adding

be calculatedased on histevaluations

Wh-saved) for end use mher to calcul

df

lan

y savings for

or IESO Zone

al factors, mm the nds derived f savings by pate trends s including thia3 and from

sed to condurams to eache past n.

no constrainsure adoptioprogram ally

ntial will be herefore, for for a “baselinates are aligbudget of this

cost and g them togetd as a torical incents and from Eor each sectomarket within

ate total req

14

r

e k in

most

from

in he

m uct an h

nts on on

the ne” ned s

ther

tive or,

quired

Page 18: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

With the to apply aand/or enwith the apotential accordingfactor of receive abe repeafor each current Cshown in

Where: EIESO Zo

RATEi,j,k,t

end use

Factor,j,k,t

2.6.2.3 Nexant’ssavings afor each for each Curves wused in oenables tcombinatthe 20-yesector fomanufac

required buda scaling facnd use markavailable bugiven budge

g to cost effe0% to remov

a scaling facated in an iteIESO zone

Conservationn Equation 4

Equati

A

EUMi,k,t = the ne k in year

t = the market i for

t = the Zone

Long Term dynamic Coat various lescenario (busubsector, a

will be develoour dynamic the user to stion of variabear cost curvr the replaceturing subse

Achievable

dget of the “ctor to the baket as a meadget. This pet constraintectiveness. ve all savingtor of 100% erative procein the 2015-

n First Frame.

ion 4: Budg

PAchievable

sum of end t

participationIESO Zone

scaling factok in year t so

m Cost Curvost Curve Tovelized costudget constrand each enoped using dMicrosoft Ex

see differencbles from drve of for the ement only oector from a

Potential Stud

“baseline” acaseline achie

ans to constrprocess will ts. To do thMeasures t

gs potential fto ensure a

ess until the 2035 time hework and IA

get Constrai

i

Potential,

use market

n rate basedk in year t

or applied too that baseli

ves ool is set up ts per unit ofrained and ud use at eacdirect outputxcel-based Cces in potentop-down meconstrained

on retrofit vindrop-down m

dy – Final Lon

chievable scevable scenrain long termbe completeis, Nexant what are the lfor this scenll savings pocosts are eqorizon accoAP budget le

ined Achiev

tkjtkiEUM

,,,,,

of type i eco

on historica

o adoption cuine achievab

to generatef savings. Neunconstrainech requestedts from NexaCost Curve Ttial under vaenus. For exd achievable ntage measumenu to see

ng Term Analy

cenario estabnario participm achievabled in a mannwill prioritize least cost ef

nario. Most cotential are iqual to the arding to an aevels. The a

vable Poten

tkjiRATE ,,,

onomic ener

al incentive r

urve j for endble costs are

e cost curvesexant will deed achievabld time horizoant’s TEA-PTool. Nexan

arying cost thxample, IESO

potential scures; and thee how the co

ysis Project Pl

blished, the pation rate ofe savings po

ner that maxand arrangeffective will rcost effectivencluded. Th

available estassumed exalgorithm for

ntial Algorit

kjiFactor ,,

rgy savings

rates of adop

d use markee equal to av

s that presenevelop distince potential),on of the stu

POT model, wnt’s Cost Cuhresholds byO staff will bcenario of theen select ch

ost curve cha

lan

next step wif each measotential to al

ximizes savine each measreceive a scae measures his process wtimated budg

xtension of r this proces

hm

tk,  

potential for

ption curve

et i for IESO vailable budg

nt potential ct supply cu for each se

udy. The Cowhich are th

urve Tool y selecting a

be able to reve industrial

hemical anges. The C

15

ill be sure lign ngs sure aling will

will get

ss is

r

j for

get

rves ector, ost hen

any view

Cost

Page 19: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Curve toosavings. measurebelow sh

To develcomplete

1)

2)

3)

4)

This procchanges curves, tacontribut

2.6.3 TThe delivestimatesThis worprovided

2.6.4 TTask 6 w

2.7 T

2.7.1 TThe resudesign inactionabto data a

ol will displa The Cost C level to end

hows a samp

op the achieed:

Aggregate use marketSort and rabased on thSum the peeach time hGraph the i

cess would bthrough tim

ables will beions to ener

Task 6 Delivverable of ths of long terkbook will prto IESO.

Task 6 Schewill begin in F

Task 7:

Task 7 Objeults analysis nsights, and le decisionsnd assumpt

Achievable

ay both the toCurve Tool cd use marketple screen ca

evable poten

all commerct) for each acnk the bundheir incremeersisting enehorizon (202ncreasing le

be repeated e along with

e developed rgy savings.

verables is task will Mm achievablrovide the ne

edule February 201

Results

ectives focuses on tgas integrat, understandions.

Potential Stud

otal MWh saan be set upt level for vaapture of this

ntial cost cur

cial, industriachievable poled measurental levelize

ergy savings 0, 2025, 203

evelized cost

for each timh the increasthat show th

MS Excel wole potential fecessary inp

16 and be co

s Analy

three key artion. The objd sensitivitie

dy – Final Lon

avings as wep to display darious time hs tool.

rves for each

al, and residotential scene groups (ened cost ($/kW

(MWh) as a30, 2035) t against the

me horizon ofsed MWh savhe ranked bu

orkbook that for each secputs to Nexa

ompleted by

sis

reas: sensitivjective of thes in the mod

ng Term Analy

ell as the totadata at varyi

horizons thro

h scenario, t

ential bundlenario. nd use markWh). a % of sales

e persisting M

f the study tovings. In conundled meas

includes thector and for eant’s Cost Cu

y March 31, 2

vity analysise task is to edeling, and p

ysis Project Pl

al cost to obing levels ofoughout the

the following

ed measure

ets) from low

and/or gros

MWh saving

o capture conjunction witsure groups

e calculationeach of the turve Tool wh

2016

s, long term penable IESOplan for futur

lan

btain those f resolution fstudy. Figur

g steps will b

groups (or e

west to highe

ss savings at

gs.

ost-effectiventh the cost with the rela

ns for and ten IESO zonhich will also

planning andO to make re improvem

16

from re 2-5

be

end

est,

t

ness

ative

nes. o be

d

ments

Page 20: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Achievable Potential Study – Final Long Term Analysis Project Plan 17

Figure 2-5: Sample Screen Capture: Cost Curve Tool

Page 21: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2.7.2 T2.7.2.1 Nexant win the sePOT modchanges Parametecosts, dis

2.7.2.2 Nexant spotential savings arecommeprimarily CDM properforminevaluatioas designNexant w

Task 7 MethSensitivity

will develop ansitivity anadel is set upin paramete

ers that can scount rates

Long Termsenior progra

resides by sare currentlyendations onthrough a g

ogram achievng or under-on and delivened program

will deliver th

F

Achievable

hodology y Analysis a list of whatlysis, which to run multi

ers impact bpotentially b

s, etc.

m Planning aam planning sector, subsy being captun the best map analysesved savings -performing iery team wh

ms for utilitieshat summariz

igure 2-6: S

Potential Stud

t are typicallwill be revieple scenariooth econombe included

and Design staff will ideector and enured by sectethods for c

s by comparito identify a

identified poo has evaluas throughouzes our gap

Sample Gap

dy – Final Lon

y the most sewed with IEos in short-oic and achiein the sensit

Insights entify opportnd use, comtor, subsectocapturing theing modeled

areas where otential. Staffated IESO’st North Ameanalysis find

p Analysis B

ng Term Analy

sensitive moSO and APSrder to gain

evable potentivity analysi

unities for wmpare these oor and end uese opportund potential st

CDM achievf will consult

s programs oerica. Figure dings.

Bubble Cha

ysis Project Pl

odeling paramS working gran understa

ntial savings is are incent

where long-teopportunitiesuse, and pronities. This wtudy findingsved savingst internally wover the pas

2-6 shows a

rt Output

lan

meters to incroup. The TEanding of howand costs.

tive rate, avo

erm savings s against wh

ovide will be condus with actuals are either owith Nexant’st 6 years, asa sample ou

18

clude EA-w

oided

here

ucted l over-s s well utput

Page 22: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2.7.2.3 Our propnatural gpotential to identifyresearchappropriafuel. Sennatural genable fupotential input in p

2.7.3 TThe delivenergy splanning recommefuture ele

2.7.4 TThis task

2.8 T

2.8.1 TDevelop assumpt

2.8.2 TThe repomilestoneof the prodeliverabformat foaddresse

Gas Integrposed staff foas potential studies for t

y insights an efforts betwated and cha

nior staff will as utilities, I

urther coordistudies. We

prioritizing th

Task 7 Delivverables for avings potenand to optim

endations ofectricity and

Task 7 Schek will be exec

Task 8:

Task 9 Objea report, exeions, data, a

Task 8 Methort and delivee a section ooject all the sbles. All repoor review by ed in develop

Achievable

ration or this projecstudies. In s

the same clind opportuniween the stuaracterized bconsult withESO, and stination and ie will share the recommen

verables Task 7 incluntial; 2) insigmize the reaf future worknatural achi

edule cuted during

Develo

ectives ecutive sum

analyses, res

hodology erables will bof the report sections will

ort sections, IESO and reping the fina

Potential Stud

ct has extensome instanent. This exities throughdies. Througboth fuel typ

h representatakeholder gintegration bthese insightnded work a

ude 1) sensitghts and reclization of th

k required toievable pote

g April 2016.

p Repo

mmary report sults, and re

be developeand associa

l be compilefinal report a

elevant stakeal versions.

dy – Final Lon

sive experieces, we’ve cperience pro

hout the courgh our work

pe markets atives from thgroup to devbetween fututs with IESO

and initiatives

tivity analysicommendatiohe potential e

enable furthential.

ort and D

and deliveraecommendat

ed in parallelated deliverad into a finaand deliveraeholders. Fe

ng Term Analy

ence in condconducted sovides us wirse of the stuwith Northw

and programhe Ontario Evelop a list ofure electricityO and the stas.

s of inputs aons regardinenergy savinher coordina

Delivera

ables that cations form al

with Tasks ables will bel report and

ables will firseedback from

ysis Project Pl

ducting both subsequent gith the necesudy and to s

western Enerms, without a Energy Boardf work and iny and naturaakeholder gr

and assumptng long termngs; and 3) ation and inte

ables

apture the mll the previou

1 to 7. At eae developed,

final accomst be developm the review

lan

electric and gas and elecssary knowlestreamline rgy, we havebias toward

d, Ontario nitiatives to

al gas achievroup to obtai

tions’ impac program

egration betw

methodologieus tasks.

ach major and at the epanying ped in draft

ws will be

19

ctric edge

e d one

vable in

ct the

ween

es,

end

Page 23: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

2.8.3 TThe delivaccompaeach LDCpanel, an

2.8.4 TThis task

3 Ta

The taskscheduleanalysis while thethe first h

Task 8 Delivverables for anying deliveC’s potentiand APS work

Task 8 Schek will comme

ask P

s described e. The schedof data are s

e modelling ohalf of 2016.

Achievable

verables this task will

erables, suchl analysis. Aking group.

edule ence in Janu

lan an

in Section 2dule indicatescheduled oof the potent The study i

Potential Stud

l be the finalh as MS Exc

All deliverable

uary 2016 an

nd Sc

2 are summas when the t

occur during tial analysis s scheduled

dy – Final Lon

l report, execcel workbooes will be su

nd be comple

hedul

arized in Figtasks will bethe last halfscenarios a

d to be comp

ng Term Analy

cutive summks with resu

ubmitted for

eted by May

le

ure 3-1 and e completed.f of 2015 fromnd generatio

pleted by Jun

ysis Project Pl

mary report aults, each LDreview by IE

y 2016

it includes t. The data cm Septembeon of resultsne 2016.

lan

and DC profile anESO, expert

the associateollection ander to Decems will occur d

20

nd

ed d

mber, during

Page 24: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Achievable Potential Study – Final Long Term Analysis Project Plan 21

Figure 3-1: Task Plan and Schedule

  2016 

Task  Aug  Sep Oct  Nov  Dec Jan Feb Mar  Apr May Jun

1  Refine Measures                                  

2  Develop IESO Zone Profiles and Disaggregated Load Forecast                                  

3  Estimate Economic Potential                                  

3.1  Screen measures for cost‐effectiveness                                  

3.2  Measure‐level assessment                                  

4  Bundle Cost‐Effective Measures and Map to End Use Markets                                  

5  Comparison and Calibration of Economic Potential with EUF Model Potential                                  

6  Estimate Achievable Long Term Potential                                  

6.1  Long term unconstrained achievable potential                                  

6.2  Long term constrained achievable potential                                  

6.3  Long term cost curves                                  

7  Results Analysis                                  

7.1  Sensitivity analysis                                  

7.2  Long term planning and design insights                                  

7.3  Gas integration                                  

8  Develop Report and Deliverables (Draft and Final versions)                                  

Page 25: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

4 F

The mainmilestone

Arere

Ae

The deta

E In M M IE E A S P R T A A

The repoworking g

inal R

n final reportes will inform

An executive ecommendaeport.

A detailed colements of t

ailed report w

Executive sumntroduction

Methodology Measures anESO Zone P

Economic PoAchievable PSensitivity AnPotential ComRecommendaTerminology Acronyms Appendices

orts will first bgroup before

Achievable

Report

t will be devem a section w

summary reations, and in

mprehensivhe projects.

will contain th

mmary

d End Use MProfiles otential ScenPotential Scenalysis mpared with ations

be submittede it is update

Potential Stud

t

eloped as thwithin the re

eport. The renformation w

ve report. The

he following

Markets

nario enarios

Baseline an

d in draft fored to a final v

dy – Final Lon

he project proport. Two re

eport will higwill be extrac

e report will

sections:

nd Reference

mat for revieversion.

ng Term Analy

ogresses aneports will be

ghlight the kected from the

provide a de

e Case Fore

ew and discu

ysis Project Pl

nd each of the developed

ey results ane detailed co

etail discuss

ecast

ussion with

lan

he major :

nd omprehensiv

sion of all the

IESO and A

22

ve

e

APS

Page 26: Final Project Plan - ieso.ca · PDF file6.2.2 Estim 6.2.3 Long ask 6 Del ask 6 Sch: ... r a budget c e IESO’s lo ... best practi hich Nexan mptions. Ne

Achievable

T

16

Potential Stud

Nexant

TD Canad

1 Bay St

M5J 2

C

www.n

dy – Final Lon

Canada

da Trust

treet, Su

2S1 Toro

Canada

nexant.c

ng Term Analy

a, Inc.

Tower

uite 2721

onto

com

ysis Project Pl

lan

23