Top Banner
Final Presentation Tuesday, April 21 st , 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh
27

Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Jan 29, 2016

Download

Documents

Sharon Knight
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Final Presentation

Tuesday, April 21st, 2009

Project Advisor: Dr. Whit Smith

Group Members- Chris A. Higginbotham-John Lewis- Nikhail Singh

Page 2: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Design Approach

• Consulting thought process• Evaluated list of problems and

objectives• Determined priorities for these issues• Adapted to a dynamic environment

Page 3: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Original Expected Tasks1. Interface volunteer portion of Donor Perfect with volunteers.

2. Donation Station in rear of building.

3. Install a PC in the volunteer check-in area.

4. Badges – Issue guests badges with bar codes.

5. Check the badges against list and notify if security alerts.

6. Download/upgrade additional Microsoft Software.

7. Website Upgrades. Do not touch donation portion.

8. Implement Donor Perfect Software.

9. Virus/Spyware on Server and PC’s.

10. Install UPS’ and surge protection on switches and DSL.

11. Interface ups software with ADSWC server so that it will do a controlled shutdown.

12. Map out Ethernet cabling.

13. Implement stronger passwords.

14. Implement Flash drives with USB extension cables.

15. Move printers onto print server for network printing.

16. Repair two teen lab computers

17. Use Database for verifying volunteers.

k

Page 4: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Tasks Performed - Promised1. Interface volunteer portion of Donor Perfect with volunteers.2. Donation Station in rear of building. 3. Install a PC in the volunteer check-in area.4. Badges – Issue guests badges with bar codes.5. Check the badges against list and notify if security alerts.6. Download/upgrade additional Microsoft Software. 7. Website Upgrades: Do not touch donation portion.8. Worked with Donor Perfect to get the software installed onto the server.9. Installed Symantec Antivirus and Malwarebytes onto 31 PC’s.10. Install UPS’ and surge protection on switches and DSL.11. Interface ups software with ADSWC server so that it will do a controlled shutdown.12. Mapped out Ethernet cabling.13. Added Admin passwords to all new PC’s in case users forget their password. 14. Implement Flash drives with USB extension cables in both the training lab and in

job counseling.15. Move printers onto print server for network printing.16. Repaired two teen lab computers and several of the mice. 17. Set up volunteer scheduling using Volgistics.

Page 5: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Tasks Performed - Additional18. Moved Symantec and MS Office downloads into easily accessible folders on the server.19. Fixed Fontaine’s Adobe and Webmail problem.20. Worked with office fax machine to get it working again.21. Tried to install new wireless router for laptop usage.22. Worked for many days on determining and labeling good monitors and PC’s in the storage

room. Repaired many of the existing PC’s.23. Worked on security camera system to determine status of cameras and cabling.24. Updated Fontaine’s computer.25. Fixed domains on Ebony’s PC because it wouldn’t log in.26. Set up GT user/password accounts.27. Constructed secure password list.28. Worked for three days on getting rid of malware on the training lab computers.29. Fixed the Internet connection problems in the training labs caused by the installation of the

Symantec Antivirus on 3-4 PC’s.30. Urgent repair of Cynthia’s PC. The hard drive crashed and needed to be replaced and to be

reloaded with all of the software.31. Urgent repair of Deb’s PC. The hard drive crashed and needed to be replaced and to be reloaded

with all of the software. Also, the motherboard was bad on it.32. Worked to find “lost” data on the Access database.33. Worked with “Whentohelp” software to see if it would integrate with the web site.

Page 6: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Tasks Performed - Additional

34. Upgraded Microsoft Office 2007 on a couple of PC’s and put vrs. 2003 on several others.35. Worked unsuccessfully to uninstall the K9 software from the job counseling PC’s.36. Worked with Nancy on problem with Thunderbird email program. Installed MS Outlook, but later

went back and reinstalled Thunderbird software.37. Made many modifications/corrections to the web site. Do not touch donation portion.38. Installed Donor Perfect Software onto five additional PC’s.39. Constructed FAQ list for future Teams.40. Constructed Volgistics document for future Teams.41. Constructed Badge /Barcode Scanner document for future Teams.42. Constructed website update document for future Teams.43. Constructed contact list document for future Teams.44. Constructed general tips document for future Teams.45. Reset “Deep Freeze” application on job counseling PC’s.46. Replaced Shirley’s printer.47. Installed two new PC’s in Engineering office.48. Ran Camera/power cable for new camera at the donation station.49. Ran new CAT-5e cable for new donation station PC.50. Updated Adobe Acrobat software on Fontaine’s PC.51. Fixed Gean Jones’ email logon problem.52. Trained Deb on Volgistics usage for volunteers.

Page 7: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Projected vs. Actual

Projected Tasks by Category Actual Tasks by Category

Page 8: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Project Objectives• Website Modifications• Shelter Security• Hardware Issues• Database Integration

Page 9: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Website Modifications• Integrated online volunteer

applications• Provided volunteers with autonomous

scheduling• General website editing and

maintenance• Provided user guide for website

maintenance to the staff

Page 10: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Volunteer Page

Page 11: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Volunteer Interface

Page 12: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Volgistics Functionality

Database to store volunteer information Print volunteer reports Schedule volunteers Allows volunteers to sign-in and sign-out on

site Eliminates paper records

Page 13: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Volgistics Interface

Page 14: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Shelter Security

• ID Badges• Virus/Malware• Security Cameras

Page 15: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

ID Badges

Page 16: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Virus/Malware

• Symantec• Constant Virus Protection

• Malwarebytes Anti-Malware• Protection from Malware (Free Edition)

Page 17: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Security Camera Status

• Found three dead security cameras• All of the cables are functional• Ran new cabling for Donation Station.

Page 18: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Hardware Issues

• Networking

•Computer Repair

Page 19: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Networking

• Mapped out network cabling• Set up network printing for several PC’s• Active Directory – User Accounts• Web filtering (K9 software)

Page 20: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Computer Repair

• Hardware Hardware Failures (PC’s, Printers, Monitors)

•Software Virus and Spyware Software Installation Internet Speed Database Issues Largest Time Absorber

Page 21: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Time Spent

Percentage of Time Spent -

ProjectedPercentage of Time Spent - Actual

Page 22: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Donor Perfect and Volgistics Integration• Install the DonorPerfect program and

ensure the system is functioning• Collect volunteer records using

Volgistics• Integrate Volgistic's records with the

DonorPerfect database

Page 23: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Access Database IntegrationBefore

After

Page 24: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Access Database Integration

Decodes Barcode

Output

Page 25: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

CostsCostsMaterial Costs:Material Costs:• Barcode Scanner and Holder = $167.00Barcode Scanner and Holder = $167.00• Donor Perfect Software = $4695.00Donor Perfect Software = $4695.00• Donor Perfect Import Module = $595.00 + $100/year recurring cost.Donor Perfect Import Module = $595.00 + $100/year recurring cost.• CAT-5e cabling = $113.00CAT-5e cabling = $113.00• COAX cabling = $140.00COAX cabling = $140.00• Volgistics = $130.00/monthVolgistics = $130.00/month• Total Material Costs = $5850.00 + $1660/year recurring cost.Total Material Costs = $5850.00 + $1660/year recurring cost.

• Still Need to purchase security camera equipment for approximately Still Need to purchase security camera equipment for approximately $1000.00$1000.00

Labor:Labor:• Labor Hours: 3.5 hours/day per Student = 10.5 Hours/dayLabor Hours: 3.5 hours/day per Student = 10.5 Hours/day

X 27 days X 27 days

= = 283 Total Hours283 Total Hours

Page 26: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Future Needs• Order more USB flash drives.• Additional repair equipment.• Acquire and install a wireless router.• Install managed switches to be able to monitor network usage and bandwidth statistics.• Sell all donated equipment on Craig’s list to bring in additional revenue.• Install new cameras and power regulators.• Implement badges to guests.• Access Database optimization• Active resident malware (purchase Malewarebytes).• Fix web filtering software.• Ensure that critical staff PC’s are being backed up on the server (set up separate backup process so that it doesn’t interfere with main server backup process).• Reinforce staff training on all new software.• Work with new group to lessen learning curve. Tell them to allot more time for maintenance needs.• Important Documents• Password List

Page 27: Final Presentation Tuesday, April 21 st, 2009 Project Advisor: Dr. Whit Smith Group Members - Chris A. Higginbotham -John Lewis - Nikhail Singh.

Questions?