Top Banner
THE TOURISM AS A TERRITORIAL PROJECT Antoine Canazzi Menling Li 20 Jan. 2016 Final review
59

Final Presentation - 2

Apr 14, 2017

Download

Documents

Antoine Canazzi
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final Presentation - 2

The Tourism as a TerriTorial projecT

Antoine CanazziMenling Li

20 Jan. 2016Final review

Page 2: Final Presentation - 2

The Tourism in few numbers

Page 3: Final Presentation - 2

伀挀挀甀瀀愀琀椀漀渀 㠀㠀─伀挀挀甀瀀愀琀椀漀渀 㘀─

㌀㔀㘀 栀漀琀攀氀猀㔀 ─

㌀㠀㈀ 栀漀琀攀氀猀㜀㈀─

㌀㤀㠀 栀漀琀攀氀猀㘀─

The Tourism as a densiTy

Page 4: Final Presentation - 2

Accommodation different than hotel represent 39% of the beds.

The Tourism as a pressure on The real esTaTe markeT

Page 5: Final Presentation - 2

Jesolo

Mestre Center Mestre-Airport

Burano-Torcello

Murano SantʼErasmo

Punta Sabbioni

Lido di Jesolo

Le Vignole

Alberoni

Fusina

chioggia

Lido

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

2.481 beds

32.255 beds

Venezia

The Tourism as a scenario

What if the touristic accommodations were remove from the island of Venice ?

Page 6: Final Presentation - 2

TourisTic accommodaTions around Venice

The train connection could appear as potential diffusor. Indeed, each years, 172 000 tourists in Venezia come from Padova whom 85% are foreigner.

LegendNetwork geography

Vaporetto network

Tramway lines

Train stationHotels and touristic accomodations

Each year, 2 200 000 tourists from Jesolo commute to Venezia, whom 88% of foreigner.

Page 7: Final Presentation - 2

secondary urban areas

Concentration of hotels usually overlap the commercial, service or partrimonial structure of the territory.

It highlights the potential of the connection Mestre-Airport or of the canal Brenta, and in the same time Chioggia, Jesolo, Lido, Mestre or even Murano.

And so secondary urban areas that could potentially be more exploited for tourism.

LegendBuildings amenities

Commerces

Educationials

Services

Patrimonials

Hotels and touristic accomodations

Page 8: Final Presentation - 2

The Time To commuTe To Venezia as a deTerminanT facTor

30 minutes commuting to Venice

Hotels and touristic accomodations

Venice island mains entrances

Legend

Vaporetto network

Page 9: Final Presentation - 2

Two TerriTories To explore

From Mestre to Marco Polo Airport

From Margherato Fusina

Page 10: Final Presentation - 2

accessibiliTy

Page 11: Final Presentation - 2

climaTe change-flooding

Page 12: Final Presentation - 2

biodiVersiTy-birds calendar

Page 13: Final Presentation - 2

biodiVersiTy-birds nesTing

Page 14: Final Presentation - 2

biodiVersiTy-birds winTering

Page 15: Final Presentation - 2

focus on marghera - fusina

From Margherato Fusina

Page 16: Final Presentation - 2

descripTion of exisTing siTuaTion

Page 17: Final Presentation - 2

exisTing accommodaTion and acessibiliTy

Page 18: Final Presentation - 2

exisTing green space

Page 19: Final Presentation - 2

exisTing microTopography

Page 20: Final Presentation - 2

exisTing waTer sysTem and ThreaTs

Page 21: Final Presentation - 2

requalified waTer circulaTion sysTem

Page 22: Final Presentation - 2

exisTing wasTeland (abandoned houses and space)

Page 23: Final Presentation - 2

sTraTegy

Page 24: Final Presentation - 2

scenario 1 : requalify accommodaTion, requalify miliTary area

Page 25: Final Presentation - 2

scenario 2 : requalify accommodaTion, requalify miliTary area

Page 26: Final Presentation - 2

scenario 3 : requalify accommodaTion, requalify miliTary area

Page 27: Final Presentation - 2

requalify accommodaTion, requalify camping area

Page 28: Final Presentation - 2

requalify dikes and salTmarsh

Page 29: Final Presentation - 2

focus on mesTre - airporT

From Mestre to Marco Polo Airport

Page 30: Final Presentation - 2

an in-beTween periphery wiTh a low connecTiViTy

Page 31: Final Presentation - 2

a TerriTory in projecT : Tessera ciTy airporT and boschi di mesTre

Page 32: Final Presentation - 2

The second scenario for Tessera ciTy airporT

Page 33: Final Presentation - 2

The risk of by passing urban areas

Page 34: Final Presentation - 2

an underused TerriTory, The poTenTial View on Venice

Page 35: Final Presentation - 2

an alTernaTiVe projecT To use The poTenTialiTy of The TerriTory

Page 36: Final Presentation - 2

siTuaTion fragmenTed: urbanizaTion along The roads

Page 37: Final Presentation - 2

Fast bus along Via Orlanda

Waterbus along the canal di San Giuliano

Tramway in-between the fragmented urban areas

a new public TransporTaTion as a guideline, 3 scenarios

Page 38: Final Presentation - 2

abandonned buildings/fields

Underused buildings/fields

Source: Cecilia Furlan

abandonned and underused

Page 39: Final Presentation - 2

siTuaTion

Page 40: Final Presentation - 2

Tessera

Built areas

Roads Promenade Water(Canals, ditches, lagoon channels)

Campalto

Industrial areas Agricultural areas Natural areas(Parcs, banks, woods, barene)

Services areas(Cimetery, water treatment)

Airport

cuT secTion

Page 41: Final Presentation - 2

Industries HotelsPark Water treatment park

Water treatment park

Natural area(not used, behind

industrial area)

siTuaTion : The case of campalTo

Page 42: Final Presentation - 2

750

m

AGRICULTURE WATER TREATMENT

BARENE LAGOONCANAL DI SAN GIULIANO

PUMPINGWASTE WATER CANAL

Three lines ThaT build The TerriTory logic

Page 43: Final Presentation - 2

scenario 1 : The linear ciTybuilding The sTreeT facade and resToring underused indusTries along Via orlanda

Page 44: Final Presentation - 2

The necessiTy of proposing an alTernaTiVe road

Page 45: Final Presentation - 2

Fast bus lineExisting buildingsprobably impacted

(able to turn into commerce)

Requalified industrial area

Public space Thin tower

(Hotels)New buildings

(hostels, dwelling,...)

a sTraTegy of renewal along The road

Page 46: Final Presentation - 2

75m to 100m

Thin TowerTo caTch The View on Venice, To saVe ground, To concenTraTe acTiViTies and requalify around

Page 47: Final Presentation - 2

inserTion and public space

Page 48: Final Presentation - 2

axonomeTry

Page 49: Final Presentation - 2

scenario 2 : The reconnecTed ciTyresToring conTinuiTy, resToring underused indusTries and deVeloping acTiViTies inTo The Thickness of The Tissue

Page 50: Final Presentation - 2

building in-beTween

Page 51: Final Presentation - 2

Requalified industrial area(New indoor market in the

old warehouse for example)

Public Space

New buildings(hostels, dwelling,...)

Tramway line Existing buildingsprobably impacted

(able to turn into commerce)

Thin tower(Hotels)

a sTraTegy of concenTraTion around a cenTer

Page 52: Final Presentation - 2

building conTinuiTy To reconnecT

Page 53: Final Presentation - 2

axonomeTry

Page 54: Final Presentation - 2

scenario 3 : The lagunare ciTyresToring The harbor, proposing more Than a View and deVeloping The relaTionship wiTh The lagoon

Page 55: Final Presentation - 2

building along and aboVe The waTer and The barene

Page 56: Final Presentation - 2

Stadium(proposal inside the Tessera city

airport)

Requalified industrial area

(New indoor market in the old warehouse for example)

Harbor restorationIndustries along the canal restoration

New buildings on pier

(hotels, dwelling,...)

Existing buildingsprobably impacted

(able to turn into commerce)

Waterbus boat line

sTaTegy of “neVer reach The ground“

Page 57: Final Presentation - 2

building on pier

Page 58: Final Presentation - 2

axonomeTry

Page 59: Final Presentation - 2

Thank you for your aTTenTion