Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
Majarrah BusinessMajarrah Business Complex 164 15-Jun-15 31-Dec-15 0
Stage IStage I 164 15-Jun-15 31-Dec-15 0
M10000000 Project Data Date 0 15-Jun-15 0M90000000 Stage 1 Ready for Operation 0 01-Dec-15 0M90000010 Stage I Soft Opening 0 31-Dec-15 0
Plaza LevelPlaza Level 138 15-Jun-15 30-Nov-15 1
GeneralGeneral 16 25-Jun-15 14-Jul-15 83
M10000100 Sign a Contract with Fountains and Water Fall Contractor 0 25-Jun-15 C/SCG N/A 33M10000200 Sign a Contract with Hardscape Contractor for Plaza 0 25-Jun-15 C/TB N/A 13M10000300 Sign a Contract with Public Address Supplier for Plaza 0 25-Jun-15 C/SCG N/A 33M10000400 Sign a Contract with CCTV Supplier for Plaza 0 25-Jun-15 C/SCG N/A 16M10000410 Sign a Contract with External Plaza Lighting Fixture Suppl 0 02-Jul-15 C/SCG N/A 39M10000440 Sign a Contract with Gas Company for Gas Facility 0 14-Jul-15 Client Gas 83
DesignDesign 22 15-Jun-15 09-Jul-15 33
Architectural DesArchitectural Design 10 15-Jun-15 25-Jun-15 1
M11000100 Final Architectural Design for Plaza level 10 15-Jun-15 25-Jun-15 T.B 1Structural DesignStructural Design 12 27-Jun-15 09-Jul-15 3
M11000200 Structural Design for Demolishing works 12 27-Jun-15 09-Jul-15 HW 3MEP DesignMEP Design 6 27-Jun-15 02-Jul-15 39
Electrical SystemsElectrical Systems 6 27-Jun-15 02-Jul-15 39Power SystemPower System 6 27-Jun-15 02-Jul-15 37
M11000300 Power System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 37Lighting SystemLighting System 6 27-Jun-15 02-Jul-15 39
M11000400 Lighting System for External Lighting By LCD 6 27-Jun-15 02-Jul-15 LCD 39Public Address SysPublic Address System 6 27-Jun-15 02-Jul-15 39
M11000500 Public Address System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 39CCTV SystemCCTV System 6 27-Jun-15 02-Jul-15 30
M11000600 CCTV System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 30Data SystemData System 6 27-Jun-15 02-Jul-15 37
M11000700 Data System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 37Mechanical SystemsMechanical Systems 6 27-Jun-15 02-Jul-15 35
Fire Fighting SysteFire Fighting System 6 27-Jun-15 02-Jul-15 35M11000800 Fire Fighting System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 35
Plumbing SystemPlumbing System 6 27-Jun-15 02-Jul-15 26Drainage SystemDrainage System 6 27-Jun-15 02-Jul-15 1
M11000900 Drainage System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 1Irrigation SystemIrrigation System 6 27-Jun-15 02-Jul-15 24
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
31-Dec-
31-Dec-
30-Nov-15, Pla
14-Jul-15, General
09-Jul-15, Design
25-Jun-15, Architectural Design
09-Jul-15, Structural Design
02-Jul-15, MEP Design
02-Jul-15, Electrical Systems02-Jul-15, Power System
02-Jul-15, Lighting System
02-Jul-15, Public Address System
02-Jul-15, CCTV System
02-Jul-15, Data System
02-Jul-15, Mechanical Systems02-Jul-15, Fire Fighting System
02-Jul-15, Plumbing System02-Jul-15, Drainage System
02-Jul-15, Irrigation System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 1 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 2
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M110001000 Irrigation System Layout for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 24Fountains and WateFountains and Water Fall 6 27-Jun-15 02-Jul-15 26
M110001004 Water Fall Design 6 27-Jun-15 02-Jul-15 SCG 26M110001002 Fountains Design 6 27-Jun-15 02-Jul-15 SCG 26
Shop DrawingsShop Drawings 28 27-Jun-15 30-Jul-15 29
Architectural ShoArchitectural Shop Drawing 12 27-Jun-15 09-Jul-15 13
M110001006 Plaza Architecture Layout Shop Drawing Submittal 6 27-Jun-15 02-Jul-15 N/A 13M110001008 Plaza Architecture Layout Shop Drawing Approval 6 04-Jul-15 09-Jul-15 T.B 13
Structural Shop DStructural Shop Drawing 16 11-Jul-15 30-Jul-15 3
M110001010 Plaza Structural Modifications Layout Submittal 10 11-Jul-15 22-Jul-15 ECIP 3M110001012 Plaza Structural Modifications Layout Approval 6 25-Jul-15 30-Jul-15 HW 3
Electrical SystemsElectrical Systems 18 04-Jul-15 26-Jul-15 33
Power SystemPower System 12 04-Jul-15 16-Jul-15 37M110001014 Power System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 37M110001016 Power System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 37
Lighting SystemLighting System 12 04-Jul-15 16-Jul-15 39M110001018 Lighting System for External Lighting Submittal 6 04-Jul-15 09-Jul-15 Ofoq 39M110001020 Lighting System for External Lighting Approval 6 11-Jul-15 16-Jul-15 SCG 39
Public Address SysPublic Address System 12 11-Jul-15 26-Jul-15 33M110001022 Public Address System for External Lighting Submittal 6 11-Jul-15 16-Jul-15 Ofoq 33M110001024 Public Address System for External Lighting Approval 6 19-Jul-15 26-Jul-15 SCG 33
CCTV SystemCCTV System 12 04-Jul-15 16-Jul-15 30M1PS1360 CCTV System for External Lighting Submittal 6 04-Jul-15 09-Jul-15 Ofoq 30M1PS1370 CCTV System for External Lighting Approval 6 11-Jul-15 16-Jul-15 SCG 30
Data SystemData System 12 04-Jul-15 16-Jul-15 37M110001026 Data System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 37M110001028 Data System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 37
Mechanical SysteMechanical Systems 21 04-Jul-15 29-Jul-15 29
Fire Fighting SystemFire Fighting System 12 04-Jul-15 16-Jul-15 35M110001030 Fire Fighting System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 35M110001032 Fire Fighting System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 35
Plumbing SystemPlumbing System 21 04-Jul-15 29-Jul-15 29Drainage SystemDrainage System 21 04-Jul-15 29-Jul-15 24
M110001034 Drainage System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 1M110001036 Drainage System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 1M110001038 Builder Work and Core drill openings for Floor drains
Submittal3 19-Jul-15 21-Jul-15 Ofoq 24
M110001040 Builder Work and Core drill openings for Floor drains Appr 6 22-Jul-15 29-Jul-15 HW 24
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
02-Jul-15, Fountains and Water Fall
30-Jul-15, Shop Drawings
09-Jul-15, Architectural Shop Drawing
30-Jul-15, Structural Shop Drawing
26-Jul-15, Electrical Systems
16-Jul-15, Power System
16-Jul-15, Lighting System
26-Jul-15, Public Address System
16-Jul-15, CCTV System
16-Jul-15, Data System
29-Jul-15, Mechanical Systems
16-Jul-15, Fire Fighting System
29-Jul-15, Plumbing System29-Jul-15, Drainage System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 2 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 3
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
Irrigation SystemIrrigation System 21 04-Jul-15 29-Jul-15 24M110001042 Irrigation System Layout for Plaza Level Submittal 15 04-Jul-15 21-Jul-15 Ofoq 24M110001044 Irrigation System Layout for Plaza Level Approval 6 22-Jul-15 29-Jul-15 SCG 24
Fountains and WateFountains and Water Fall 18 04-Jul-15 26-Jul-15 32M110001048 Water Fall Shop drawing Submittal 12 04-Jul-15 16-Jul-15 Ofoq 27M110001046 Fountains Shop drawing Submittal 12 04-Jul-15 16-Jul-15 Ofoq 32M110001052 Water Fall Shop drawing Approval 6 19-Jul-15 26-Jul-15 SCG 27M110001050 Fountains Shop drawing Approval 6 19-Jul-15 26-Jul-15 SCG 32
MaterialsMaterials 103 15-Jun-15 20-Oct-15 34
Structural MateriaStructural Materials 36 15-Jun-15 28-Jul-15 12
Structural Material SStructural Material Submittal 6 15-Jun-15 21-Jun-15 12M110001166 Expansion Joints Submittal 6 15-Jun-15 21-Jun-15 ECIP 12
Structural Material AStructural Material Approval 6 22-Jun-15 28-Jun-15 12M110001176 Expansion Joints Approval 6 22-Jun-15 28-Jun-15 ECIP 12
Structural Material PStructural Material P.O 6 29-Jun-15 05-Jul-15 12M110001186 Expansion Joints PO 6 29-Jun-15 05-Jul-15 ECIP 12
Structural Material DStructural Material Delivery 18 06-Jul-15 28-Jul-15 12M110001196 Expansion Joints Delivery to Site 18 06-Jul-15 28-Jul-15 ECIP 12
Finishing MateriaFinishing Materials 76 11-Jul-15 13-Oct-15 37
Finishing Material SFinishing Material Submittal 26 11-Jul-15 11-Aug-15 52M110001054 Plaza Flooring Filling (M-01&M-02&M-03) Material Submi 6 11-Jul-15 16-Jul-15 N/A 13M110001056 Plaza Walkway Filling (M-04) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 61M110001058 Plaza Driveway Filling (M-05 & M-06) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001060 Fountain Area M-07 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 54M110001062 Plaza Borders B-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001064 Building Borders B-02 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001068 Drive Borders B-03 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001070 Planters Copping (C-01 & C-02 & C-03) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001072 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Subm 6 11-Jul-15 16-Jul-15 N/A 70M110001074 Loose Gravel GR-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 72M110001078 Pre-Cast Concrete Curb CB-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 65M110001080 Soft Scape Material Submittal 26 11-Jul-15 11-Aug-15 MIAC 35
Finishing Material AFinishing Material Approval 26 19-Jul-15 18-Aug-15 52M110001082 Plaza Flooring Filling (M-01&M-02&M-03) Material Appro 6 19-Jul-15 26-Jul-15 T.B 13M110001084 Plaza Walkway Filling (M-04) Material Approval 6 19-Jul-15 26-Jul-15 T.B 61M110001086 Plaza Driveway Filling (M-05 & M-06) Material Approval 6 19-Jul-15 26-Jul-15 T.B 64M110001088 Fountain Area M-07 Material Approval 6 19-Jul-15 26-Jul-15 T.B 54M110001090 Plaza Borders B-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
29-Jul-15, Irrigation System
26-Jul-15, Fountains and Water Fall
20-Oct-15, Materials
28-Jul-15, Structural Materials
21-Jun-15, Structural Material Submittal
28-Jun-15, Structural Material Approval
05-Jul-15, Structural Material P.O
28-Jul-15, Structural Material Delivery
13-Oct-15, Finishing Mat
11-Aug-15, Finishing Material Submitta
18-Aug-15, Finishing Material Appro
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 3 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 4
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M110001092 Building Borders B-02 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64M110001094 Drive Borders B-03 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64M110001096 Planters Copping (C-01 & C-02 & C-03) Material Approval 6 19-Jul-15 26-Jul-15 T.B 64M110001098 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Appr 6 19-Jul-15 26-Jul-15 T.B 70M1100010100 Loose Gravel GR-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 72M1100010102 Pre-Cast Concrete Curb CB-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 65M1100010104 Soft Scape Material Approval 6 12-Aug-15 18-Aug-15 T.B 35
Finishing Material PFinishing Material P.O 46 27-Jul-15 17-Sep-15 35M1100010106 Plaza Flooring Filling (M-01&M-02&M-03) Material P.O 3 27-Jul-15 29-Jul-15 N/A 13M1100010108 Plaza Walkaway Filling (M-04) Material P.O 3 27-Jul-15 29-Jul-15 N/A 61M11000101010 Plaza Driveway Filling (M-05 & M-06) Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101012 Fountain Area M-07 Material P.O 3 27-Jul-15 29-Jul-15 N/A 54M11000101014 Plaza Borders B-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101016 Building Borders B-02 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101018 Drive Borders B-03 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101020 Planters Copping (C-01 & C-02 & C-03) Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101022 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material P.O 3 27-Jul-15 29-Jul-15 N/A 70M11000101024 Loose Gravel GR-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 72M11000101026 Pre-Cast Concrete Curb CB-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 65M11000101028 Soft Scape Material P.O 26 19-Aug-15 17-Sep-15 MIAC 35
Finishing Material DFinishing Material Delivery 61 30-Jul-15 13-Oct-15 37M11000101030 Plaza Walkaway Filling (M-04) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 61M11000101032 Plaza Driveway Filling (M-05 & M-06) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101034 Fountain Area M-07 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 54M11000101036 Plaza Borders B-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101038 Building Borders B-02 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101040 Drive Borders B-03 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101042 Planters Copping (C-01 & C-02 & C-03) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101044 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Deliv 26 30-Jul-15 29-Aug-15 N/A 70M11000101046 Loose Gravel GR-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 72M11000101048 Pre-Cast Concrete Curb CB-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 65M11000101050 Plaza Flooring Filling (M-01&M-02&M-03) Material Deliver 52 30-Jul-15 01-Oct-15 N/A 13M11000101052 Soft Scape Material Delivery 18 19-Sep-15 13-Oct-15 MIAC 35
MEP MaterialsMEP Materials 103 15-Jun-15 20-Oct-15 34
Material SubmittalMaterial Submittal 52 15-Jun-15 16-Aug-15 55Electrical Material SElectrical Material Submittal 52 15-Jun-15 16-Aug-15 55
M11000101054 PVC Conduit Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 50M11000101056 Wires for Power and Lighting Material Submittal 10 19-Jul-15 30-Jul-15 Ofoq 69M11000101058 External & Facade Lighting Fixture Material Submittal 12 19-Jul-15 02-Aug-15 N/A 46
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
17-Sep-15, Finishing Material
13-Oct-15, Finishing Mat
20-Oct-15, MEP Materi
16-Aug-15, Material Submittal16-Aug-15, Electrical Material Submit
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 4 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 5
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M11000101060 Structured Cable for Data System Material Submittal 18 19-Jul-15 09-Aug-15 Ofoq 49M11000101062 Distribution Board DB1, DB4 Material Submittal 18 19-Jul-15 09-Aug-15 Ofoq 46M11000101064 CCTV Cameras Material Submittal 18 19-Jul-15 09-Aug-15 N/A 30M11000101066 Floor Box Submittal 18 27-Jul-15 16-Aug-15 Ofoq 40M11000101068 Public Address Loud Speaker Material Submittal 18 27-Jul-15 16-Aug-15 N/A 36
Mechanical MateriaMechanical Material Submittal 12 19-Jul-15 02-Aug-15 32M11000101070 FD,AD, PD Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 1M11000101072 Fire Hydrant Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 38M11000101074 Siamese Connection Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 35M11000101076 Fountains and Water Fall Accessories Material Submittal 6 27-Jul-15 02-Aug-15 N/A 32
Material ApprovalMaterial Approval 55 18-Jun-15 23-Aug-15 55Electrical Material AElectrical Material Approval 55 18-Jun-15 23-Aug-15 55
M11000101078 PVC Conduit Material Approval 6 18-Jun-15 24-Jun-15 SCG 50M11000101080 Wires for Power and Lighting Material Approval 6 01-Aug-15 06-Aug-15 SCG 69M11000101082 External & Facade Lighting Fixture Material Approval 6 03-Aug-15 09-Aug-15 SCG 46M11000101084 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 49M11000101086 Distribution Board DB1, DB4 Material Approval 6 10-Aug-15 16-Aug-15 SCG 46M11000101088 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 30M11000101090 Floor Box Material Approval 6 17-Aug-15 23-Aug-15 SCG 40M11000101092 Public Address Loud Speaker Material Approval 6 17-Aug-15 23-Aug-15 SCG 36
Mechanical MateriaMechanical Material Approval 12 27-Jul-15 09-Aug-15 32M11000101094 FD,AD, PD Material Approval 6 27-Jul-15 02-Aug-15 SCG 1M11000101096 Fire Hydrant Material Approval 6 27-Jul-15 02-Aug-15 SCG 38M11000101098 Siamese Connection Material Approval 6 27-Jul-15 02-Aug-15 SCG 35M11000101100 Fountains and Water Fall Accessories Material Approval 6 03-Aug-15 09-Aug-15 SCG 32
Material P.OMaterial P.O 52 25-Jun-15 26-Aug-15 55Electrical Material Electrical Material P.O 52 25-Jun-15 26-Aug-15 55
M110001010102 PVC Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 50M110001010104 Wires for Power and Lighting Material P.O 3 08-Aug-15 10-Aug-15 Ofoq 69M110001010106 External & Facade Lighting Fixture Material P.O 3 10-Aug-15 12-Aug-15 N/A 46M110001010108 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 49M110001010110 Distribution Board DB1, DB4 Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 46M110001010112 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 30M110001010114 Floor Box Material P.O 3 24-Aug-15 26-Aug-15 Ofoq 40M110001010116 Public Address Loud Speaker Material P.O 3 24-Aug-15 26-Aug-15 N/A 36
Mechanical MateriaMechanical Material P.O 12 03-Aug-15 16-Aug-15 32M110001010118 FD,AD, PD Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 1M110001010120 Fire Hydrant Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 38M110001010122 Siamese Connection Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 35
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
02-Aug-15, Mechanical Material Submitta
23-Aug-15, Material Approval23-Aug-15, Electrical Material Appr
09-Aug-15, Mechanical Material Appr
26-Aug-15, Material P.O26-Aug-15, Electrical Material P.O
16-Aug-15, Mechanical Material P.O
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 5 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 6
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M110001010124 Fountains and Water Accessories Fall Material P.O 6 10-Aug-15 16-Aug-15 N/A 32Material DeliveryMaterial Delivery 91 29-Jun-15 20-Oct-15 34
Electrical Material Electrical Material Delivery 91 29-Jun-15 20-Oct-15 34M110001010126 PVC Conduit Material Delivery 3 29-Jun-15 01-Jul-15 Ofoq 50M110001010128 Wires for Power and Lighting Material Delivery 12 11-Aug-15 24-Aug-15 Ofoq 69M110001010130 Structured Cable for Data System Material Delivery 26 20-Aug-15 19-Sep-15 Ofoq 49M110001010132 External & Facade Lighting Fixture Material Delivery 36 13-Aug-15 27-Sep-15 N/A 46M110001010134 Distribution Board DB1, DB4 Material Delivery 36 20-Aug-15 04-Oct-15 Ofoq 46M110001010136 Floor Box Material Delivery 36 27-Aug-15 12-Oct-15 Ofoq 40M110001010138 Public Address Loud Speaker Material Delivery 36 27-Aug-15 12-Oct-15 N/A 36M110001010140 CCTV Cameras Material Delivery 48 20-Aug-15 20-Oct-15 N/A 30
Mechanical MateriaMechanical Material Delivery 52 10-Aug-15 13-Oct-15 38M110001010144 FD,AD, PD Material Delivery 20 10-Aug-15 01-Sep-15 Ofoq 1M110001010142 Fountains and Water Fall Accessories Material Delivery 45 17-Aug-15 12-Oct-15 N/A 32M110001010146 Fire Hydrant Material Delivery 52 10-Aug-15 13-Oct-15 Ofoq 38M110001010148 Siamese Connection Material Delivery 52 10-Aug-15 13-Oct-15 Ofoq 35
ConstructionConstruction 112 15-Jul-15 30-Nov-15 1
M1P1000 Removal of Temporary offices 6 22-Aug-15 27-Aug-15 HW ECIP 3Structural WorkStructural Work 36 15-Jul-15 27-Aug-15 65
M110001010150 Existing Planters to be demolished 6 01-Aug-15 06-Aug-15 HW ECIP 21M110001010350 Gas Room Ready to Receive Gas Facility 18 15-Jul-15 06-Aug-15 HW ECIP 83M110001010152 Stair form Upper Basement to Plaza Level to be demolished 12 01-Aug-15 13-Aug-15 HW ECIP 3M110001010154 Planters to be added above existing stair 12 01-Aug-15 13-Aug-15 HW ECIP 15M110001010156 Slab to be removed 12 01-Aug-15 13-Aug-15 HW ECIP 3M110001010158 New Planters to be added 12 01-Aug-15 13-Aug-15 HW ECIP 12M110001010160 Existing Slab to be opened 3 15-Aug-15 17-Aug-15 HW ECIP 12M110001010270 Expansion Joints 18 29-Jul-15 18-Aug-15 HW ECIP 12M110001010162 New Slab to be added 18 01-Aug-15 20-Aug-15 HW ECIP 9M110001010164 Two opening has been canceled and to be closed 18 01-Aug-15 20-Aug-15 HW ECIP 9M110001010166 Concrete slab to be added instead of demolished stair 12 15-Aug-15 27-Aug-15 HW ECIP 3M110001010168 Two New Stairs with a Ramp To Be Added 12 15-Aug-15 27-Aug-15 HW ECIP 3
MEP WorkMEP Work 87 30-Jul-15 14-Nov-15 15
Electrical WorksElectrical Works 62 29-Aug-15 14-Nov-15 15M110001010170 PVC conduits Raceway for Electrical Power outlets 6 29-Aug-15 03-Sep-15 SCG Ofoq 3M110001010174 PVC conduits Raceway for Data System 6 29-Aug-15 03-Sep-15 SCG Ofoq 3M110001010172 PVC conduits Raceway for External Lighting Fixture 6 29-Aug-15 03-Sep-15 SCG Ofoq 5M110001010176 PVC conduits Raceway for Public Address System (Sound
System)6 29-Aug-15 03-Sep-15 SCG Ofoq 5
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
20-Oct-15, Material De20-Oct-15, Electrical Ma
13-Oct-15, Mechanical M
30-Nov-15, Co
27-Aug-15, Structural Work
14-Nov-15, MEP W
14-Nov-15, Electri
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 6 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 7
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M110001010178 PVC conduits Raceway for CCTV System 6 29-Aug-15 03-Sep-15 SCG Ofoq 5M110001010180 Back Box for Floor Box 2 05-Sep-15 06-Sep-15 SCG Ofoq 3M110001010182 Wires for External Lighting Fixture 3 05-Sep-15 07-Sep-15 SCG Ofoq 60M110001010184 Wires for Electrical Power outlets 3 07-Sep-15 09-Sep-15 SCG Ofoq 64M110001010186 Structured Cable for Data System 3 20-Sep-15 26-Sep-15 SCG Ofoq 49M110001010192 Facade Lighting Fixtures Erection 6 29-Sep-15 05-Oct-15 SCG Ofoq 47M110001010188 Floor Box erection 2 05-Nov-15 07-Nov-15 SCG Ofoq 21M110001010190 External Lighting Fixture Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 15M110001010194 Public Address (Sound System) Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 17M110001010196 CCTV Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 17M110001010198 Distribution Board DB1, DB4 Erection 2 12-Nov-15 14-Nov-15 SCG Ofoq 15
Mechanical WorksMechanical Works 86 30-Jul-15 12-Nov-15 16M110001010200 Builder Work And Core Drill for Drainage 6 30-Jul-15 05-Aug-15 SCG Ofoq 24M110001010260 Gas Facility Network 12 08-Aug-15 20-Aug-15 SCG Gas 83M110001010202 Floor Drains first fix 6 02-Sep-15 08-Sep-15 SCG Ofoq 1M110001010204 Floor Drains second fix 3 04-Oct-15 07-Oct-15 SCG Ofoq 44M110001010208 Fire Hydrant 3 19-Oct-15 21-Oct-15 SCG Ofoq 35M110001010210 Siamese Connection 6 15-Oct-15 21-Oct-15 SCG Ofoq 35M110001010206 Floor Drains final fix 2 05-Nov-15 07-Nov-15 SCG Ofoq 21M110001010212 Irrigation for Main Road Island landscape 2 11-Nov-15 12-Nov-15 SCG Ofoq 12
Finishing WorkFinishing Work 76 29-Aug-15 30-Nov-15 1
M110001010214 Boundary wall (Travco Side) 18 29-Aug-15 17-Sep-15 HW ECIP 59M110001010216 Temporary Fence 10 05-Nov-15 16-Nov-15 T.B N/A 13Hard scapeHard scape 66 09-Sep-15 30-Nov-15 1
M110001010218 Insulation work for Plaza 18 09-Sep-15 03-Oct-15 HW ECIP 1M110001010300 Remove Facade Cladding for Facade Lighting Fixture Erec 7 28-Sep-15 05-Oct-15 T.B Kemet 47M110001010224 Walkways Filling Interlock 12 03-Oct-15 18-Oct-15 T.B N/A 35M110001010232 Driveway Filling Interlock & Bazalt Tiles 12 03-Oct-15 18-Oct-15 T.B N/A 38M110001010234 Driveway Boarders Bazalt tiles 12 03-Oct-15 18-Oct-15 T.B N/A 38M110001010220 Screed over Insulation 12 04-Oct-15 19-Oct-15 HW ECIP 1M110001010222 Flooring Filling Engineered Stone / Porcelain / Granite 15 19-Oct-15 04-Nov-15 T.B N/A 1M110001010238 Main Road Island hardscape 5 05-Nov-15 10-Nov-15 T.B N/A 12M110001010240 Planter Copping 6 05-Nov-15 11-Nov-15 T.B N/A 11M110001010242 Stairs Covering 6 05-Nov-15 11-Nov-15 T.B N/A 17M110001010228 Building Boarders Granite 12 05-Nov-15 18-Nov-15 T.B N/A 11M110001010230 Plaza Boarders Granite 12 05-Nov-15 18-Nov-15 T.B N/A 11M110001010226 Granite for Fountains 12 05-Nov-15 18-Nov-15 T.B N/A 1M110001010236 Fountains and Water Fall Accessories Erection 10 19-Nov-15 30-Nov-15 T.B N/A 1
Soft scapeSoft scape 6 12-Nov-15 18-Nov-15 11
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
12-Nov-15, Mecha
30-Nov-15, Fin
30-Nov-15, Ha
18-Nov-15, Soft s
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 7 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 8
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M110001010246 Main Road Island softscape 4 14-Nov-15 17-Nov-15 T.B MIAC 12M110001010244 Plaza softscape 6 12-Nov-15 18-Nov-15 T.B MIAC 11
Upper BasementUpper Basement 164 15-Jun-15 31-Dec-15 0
GeneralGeneral 0 07-Jul-15 07-Jul-15 15
M1P2760 Client Clear Vision about Security Issues as (CCTV, Access Control...)
0 07-Jul-15 Client 6
M1P2770 Client Clear Vision about Data Issues as (Central, IT requirements...)
0 07-Jul-15 Client 15
DesignDesign 78 15-Jun-15 15-Sep-15 17
Architectural DesArchitectural Design 24 15-Jun-15 12-Jul-15 0
M1P1020 Final Architectural Dimensional Plan for Upper Basement 6 15-Jun-15 21-Jun-15 T.B 0M1P1010 Final Parking Layout for Upper Basement 0 28-Jun-15 Client 0M1P1030 Final Architectural Package for Upper Basement 12 29-Jun-15 12-Jul-15 HW 0
Structural DesignStructural Design 6 09-Sep-15 15-Sep-15 17
M1P2750 Structural Design for Equipment Foundation (Child Pump , Supply and Exhaust Fans........)
6 09-Sep-15 15-Sep-15 HW 17
MEP DesignMEP Design 30 22-Jun-15 28-Jul-15 6
Electrical SystemsElectrical Systems 24 29-Jun-15 28-Jul-15 6Power SystemPower System 6 29-Jun-15 05-Jul-15 4
M1P1060 Updated Design for Power System 6 29-Jun-15 05-Jul-15 SCG 4Lighting SystemLighting System 6 29-Jun-15 05-Jul-15 4
M1P1070 Updated Design for Lighting System 6 29-Jun-15 05-Jul-15 SCG 4Fire Alarm SystemFire Alarm System 6 13-Jul-15 20-Jul-15 0
M1P1680 Updated Design for Fire Alarm System 6 13-Jul-15 20-Jul-15 C/SCG 0Parking SystemParking System 18 29-Jun-15 20-Jul-15 0
M1P1450 Updated Design for Parking System 18 29-Jun-15 20-Jul-15 C/SCG 0CCTV SystemCCTV System 6 13-Jul-15 20-Jul-15 2
M1P1040 Updated Design for CCTV System 6 13-Jul-15 20-Jul-15 C/SCG 2Data SystemData System 6 13-Jul-15 20-Jul-15 11
M1P1050 Updated Design for Data System 6 13-Jul-15 20-Jul-15 C/SCG 11BMS SystemBMS System 6 21-Jul-15 28-Jul-15 6
M1P2000 Updated Design for BMS System 6 21-Jul-15 28-Jul-15 SCG 6Mechanical SystemsMechanical Systems 24 22-Jun-15 20-Jul-15 12
HVAC SystemHVAC System 6 13-Jul-15 20-Jul-15 0M1P1080 HVAC Updated Design for Upper Basement 6 13-Jul-15 20-Jul-15 SCG 0
Fire Fighting SysteFire Fighting System 6 22-Jun-15 28-Jun-15 19M1P1130 Fire Fighting Updated Design for Upper Basement 6 22-Jun-15 28-Jun-15 SCG 19
Plumbing SystemPlumbing System 6 27-Jun-15 02-Jul-15 26
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
31-Dec-
07-Jul-15, General
15-Sep-15, Design
12-Jul-15, Architectural Design
15-Sep-15, Structural Design
28-Jul-15, MEP Design
28-Jul-15, Electrical Systems05-Jul-15, Power System
05-Jul-15, Lighting System
20-Jul-15, Fire Alarm System
20-Jul-15, Parking System
20-Jul-15, CCTV System
20-Jul-15, Data System
28-Jul-15, BMS System
20-Jul-15, Mechanical Systems20-Jul-15, HVAC System
28-Jun-15, Fire Fighting System
02-Jul-15, Plumbing System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 8 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 9
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
Drainage SystemDrainage System 6 27-Jun-15 02-Jul-15 20M1P1090 Final Update for Upper Basement Drainage System 6 27-Jun-15 02-Jul-15 SCG 20
Irrigation SystemIrrigation System 6 27-Jun-15 02-Jul-15 26M1P1100 Final Update for Plaza Irrigation System 6 27-Jun-15 02-Jul-15 SCG 26
Fountains and WateFountains and Water Fall 6 27-Jun-15 02-Jul-15 26M1P1110 Fountains Design 6 27-Jun-15 02-Jul-15 SCG 26M1P1120 Water Fall Design 6 27-Jun-15 02-Jul-15 SCG 26
Shop DrawingsShop Drawings 84 22-Jun-15 03-Oct-15 17
Architectural ShoArchitectural Shop Drawing 12 13-Jul-15 28-Jul-15 0
M1P1140 Upper Basement Architectural Shop Drawing Submittal 6 13-Jul-15 20-Jul-15 ECIP 0M1P1150 Upper Basement Architectural Shop Drawing Approval 6 21-Jul-15 28-Jul-15 HW 0
Structural Shop DStructural Shop Drawing 68 11-Jul-15 03-Oct-15 17
M1P1160 Upper Basement Construction , Expansion Joints Details Shop Drawing Submittal
6 11-Jul-15 16-Jul-15 ECIP 60
M1P1170 Upper Basement Construction , Expansion Joints Details Shop Drawing Approval
6 19-Jul-15 26-Jul-15 HW 60
M1P2780 Upper Basement Equipment Foundations shop drawings Submittal
6 16-Sep-15 26-Sep-15 ECIP 17
M1P2790 Upper Basement Equipment Foundations shop drawings Approval
6 27-Sep-15 03-Oct-15 HW 17
Electrical SystemsElectrical Systems 36 06-Jul-15 18-Aug-15 0
Power SystemPower System 12 06-Jul-15 20-Jul-15 4M1P1180 Upper Basement Power System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 4M1P1190 Upper Basement Power System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 4
Lighting SystemLighting System 12 06-Jul-15 20-Jul-15 4M1P1200 Upper Basement Lighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 4M1P1210 Upper Basement Lighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 4
Fire Alarm SystemFire Alarm System 12 21-Jul-15 04-Aug-15 12M1P1690 Upper Basement Fire Alarm System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 12M1P1700 Upper Basement Fire Alarm System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 12
Parking SystemParking System 12 21-Jul-15 04-Aug-15 0M1P1430 Upper Basement Parking System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0M1P1440 Upper Basement Parking System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0
CCTV SystemCCTV System 12 21-Jul-15 04-Aug-15 2M1P1220 Upper Basement CCTV System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 2M1P1230 Upper Basement CCTV System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 2
Data SystemData System 12 21-Jul-15 04-Aug-15 11M1P1240 Upper Basement Data System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11M1P1250 Upper Basement Data System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
02-Jul-15, Drainage System
02-Jul-15, Irrigation System
02-Jul-15, Fountains and Water Fall
03-Oct-15, Shop Drawings
28-Jul-15, Architectural Shop Drawing
03-Oct-15, Structural Shop
18-Aug-15, Electrical Systems
20-Jul-15, Power System
20-Jul-15, Lighting System
04-Aug-15, Fire Alarm System
04-Aug-15, Parking System
04-Aug-15, CCTV System
04-Aug-15, Data System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 9 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 10
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
BMS SystemBMS System 12 05-Aug-15 18-Aug-15 0M1P2010 Upper Basement BMS System Layout Submittal 6 05-Aug-15 11-Aug-15 Ofoq 0M1P2020 Upper Basement BMS System Layout Approval 6 12-Aug-15 18-Aug-15 SCG 0
Mechanical SysteMechanical Systems 66 22-Jun-15 08-Sep-15 17
HVAC SystemHVAC System 66 22-Jun-15 08-Sep-15 17M1P2210 HVAC Static Calculations for Child Water Pump Submittal 6 22-Jun-15 28-Jun-15 Ofoq 0M1P2230 Fans Static Pressure Calculations Submittal 6 22-Jun-15 28-Jun-15 Ofoq 28M1P2220 HVAC Static Calculations for Child Water Pump Approval 6 29-Jun-15 05-Jul-15 SCG 0M1P2240 Fans Static Pressure Calculations Approval 6 29-Jun-15 05-Jul-15 SCG 28M1P3560 Builder Work for Shaft Opening Layout Submittal 3 06-Jul-15 08-Jul-15 Ofoq 28M1P3570 Builder Work for Shaft Opening Layout Approval 6 09-Jul-15 15-Jul-15 HW 28M1P1260 Upper Basement HVAC System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0M1P1270 Upper Basement HVAC System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0M1P2730 Upper Basement Fan Room Details Submittal 6 29-Jul-15 04-Aug-15 Ofoq 41M1P2740 Upper Basement Fan Room Details Approval 6 05-Aug-15 11-Aug-15 SCG 41M1P2190 Upper Basement Plant Room Details Submittal 6 26-Aug-15 01-Sep-15 Ofoq 17M1P2200 Upper Basement Plant Room Details Approval 6 02-Sep-15 08-Sep-15 SCG 17
Fire Fighting SystemFire Fighting System 12 29-Jun-15 12-Jul-15 19M1P1280 Upper Basement Fire Fighting System Layout Submittal 6 29-Jun-15 05-Jul-15 Ofoq 19M1P1290 Upper Basement Fire Fighting System Layout Approval 6 06-Jul-15 12-Jul-15 SCG 19
Plumbing SystemPlumbing System 12 04-Jul-15 16-Jul-15 26Drainage SystemDrainage System 12 04-Jul-15 16-Jul-15 26
M1P1300 Upper Basement Drainage System Layout Submittal 6 04-Jul-15 09-Jul-15 Ofoq 26M1P1310 Upper Basement Drainage System Layout Approval 6 11-Jul-15 16-Jul-15 SCG 26
Irrigation SystemIrrigation System 12 04-Jul-15 16-Jul-15 26M1P1320 Upper Basement Irrigation System for Plaza Layout Submit 6 04-Jul-15 09-Jul-15 Ofoq 26M1P1330 Upper Basement Irrigation System for Plaza Layout Appro 6 11-Jul-15 16-Jul-15 SCG 26
Fountains and WateFountains and Water Fall 12 04-Jul-15 16-Jul-15 26M1P1340 Upper Basement Fountains and Water Fall System Layout
Submittal6 04-Jul-15 09-Jul-15 Ofoq 26
M1P1350 Upper Basement Fountains and Water Fall System Layout Approval
6 11-Jul-15 16-Jul-15 SCG 26
Composite DrawiComposite Drawing 12 19-Aug-15 01-Sep-15 0
M1P1360 Upper Basement MEP Composite Drawing Submittal 6 19-Aug-15 25-Aug-15 Ofoq 0M1P1370 Upper Basement MEP Composite Drawing Approval 6 26-Aug-15 01-Sep-15 SCG 0
MaterialsMaterials 146 15-Jun-15 09-Dec-15 6
Finishing MateriaFinishing Materials 35 27-Jul-15 05-Sep-15 58
Material SubmittalMaterial Submittal 20 27-Jul-15 18-Aug-15 58
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
18-Aug-15, BMS System
08-Sep-15, Mechanical Systems
08-Sep-15, HVAC System
12-Jul-15, Fire Fighting System
16-Jul-15, Plumbing System16-Jul-15, Drainage System
16-Jul-15, Irrigation System
16-Jul-15, Fountains and Water Fall
01-Sep-15, Composite Drawing
09-Dec-15, M
05-Sep-15, Finishing Materials
18-Aug-15, Material Submittal
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 10 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 11
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M110001206 Expansion Joints Submittal 6 27-Jul-15 02-Aug-15 ECIP 60M1P1380 False Ceiling Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 17M1P1390 Flooring Tiles Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 41M1P1400 Paint Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 29M1P1410 Curb Stone Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 46M1P1420 Interlock Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 58M1P3920 Doors Submittal 18 29-Jul-15 18-Aug-15 ECIP 58M1P3930 Raised Floor Submittal (Expected in IT & Main IT Room) 18 29-Jul-15 18-Aug-15 ECIP 47
Material ApprovalMaterial Approval 20 03-Aug-15 25-Aug-15 58M110001216 Expansion Joints Approval 6 03-Aug-15 09-Aug-15 HW 60M1P1460 False Ceiling Material Approval 6 19-Aug-15 25-Aug-15 HW 17M1P1470 Flooring Tiles Material Approval 6 19-Aug-15 25-Aug-15 HW 41M1P1480 Paint Material Approval 6 19-Aug-15 25-Aug-15 HW 29M1P1490 Curb Stone Material Approval 6 19-Aug-15 25-Aug-15 HW 46M1P1500 Interlock Material Approval 6 19-Aug-15 25-Aug-15 HW 58M1P3940 Doors Approval 6 19-Aug-15 25-Aug-15 HW 58M1P3950 Raised Floor Approval (Expected in IT & Main IT Room) 6 19-Aug-15 25-Aug-15 HW 47
Material P.OMaterial P.O 17 10-Aug-15 29-Aug-15 58M110001226 Expansion Joints P.O 3 10-Aug-15 12-Aug-15 ECIP 60M1P1510 False Ceiling Material P.O 3 26-Aug-15 29-Aug-15 ECIP 17M1P1520 Flooring Tiles Material P.O 3 26-Aug-15 29-Aug-15 ECIP 41M1P1530 Paint Material P.O 3 26-Aug-15 29-Aug-15 ECIP 29M1P1540 Curb Stone Material P.O 3 26-Aug-15 29-Aug-15 ECIP 46M1P1550 Interlock Material P.O 3 26-Aug-15 29-Aug-15 ECIP 58M1P3960 Doors P.O 3 26-Aug-15 29-Aug-15 ECIP 58M1P3970 Raised Floor P.O (Expected in IT & Main IT Room) 3 26-Aug-15 29-Aug-15 ECIP 47
Material DeliveryMaterial Delivery 20 13-Aug-15 05-Sep-15 58M110001236 Expansion Joints Delivery 6 13-Aug-15 19-Aug-15 ECIP 60M1P1560 False Ceiling Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 17M1P1570 Flooring Tiles Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 41M1P1580 Paint Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 29M1P1590 Curb Stone Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 46M1P1600 Interlock Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 58M1P3980 Doors Delivery 6 30-Aug-15 05-Sep-15 ECIP 58M1P3990 Raised Floor Delivery (Expected in IT & Main IT Room) 6 30-Aug-15 05-Sep-15 ECIP 47
MEP MaterialsMEP Materials 146 15-Jun-15 09-Dec-15 6
Material SubmittalMaterial Submittal 72 15-Jun-15 08-Sep-15 46Electrical Material SElectrical Material Submittal 72 15-Jun-15 08-Sep-15 20
M10 PVC , EMT Conduit with Accessories Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 48
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
25-Aug-15, Material Approval
29-Aug-15, Material P.O
05-Sep-15, Material Delivery
09-Dec-15, M
08-Sep-15, Material Submittal08-Sep-15, Electrical Material Su
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 11 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 12
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M100 Cable Trays Submittal 6 15-Jun-15 21-Jun-15 Ofoq 86M20 Wires for Power and Lighting Material Submittal 6 21-Jul-15 28-Jul-15 Ofoq 52M30 Lighting Fixture Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 40M90 Wiring Devices Submittal 12 21-Jul-15 04-Aug-15 Ofoq 15M110 Fire Alarm Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 0M40 Structured Cable for Data System Material Submittal 4 05-Aug-15 09-Aug-15 Ofoq 11M50 Distribution Board Material Submittal 16 21-Jul-15 09-Aug-15 Ofoq 4M60 CCTV Cameras Material Submittal 4 05-Aug-15 09-Aug-15 N/A 2M80 Parking System Material Submittal 18 05-Aug-15 25-Aug-15 N/A 0M420 LV Cables Submittal 6 02-Sep-15 08-Sep-15 Ofoq 12M450 BMS Submittal 18 19-Aug-15 08-Sep-15 Ofoq 1Electrical EquipmentElectrical Equipment 54 15-Jun-15 18-Aug-15 10
M1P1620 R.M.U Submittal 18 15-Jun-15 05-Jul-15 Ofoq 34M1P1630 MVSG Submittal 18 15-Jun-15 05-Jul-15 Ofoq 34M1P1710 UPS Submittal 26 15-Jun-15 14-Jul-15 Ofoq 12M1P1610 Generator Submittal 18 29-Jun-15 20-Jul-15 Ofoq 2M1P1640 Transformer Submittal 18 29-Jun-15 20-Jul-15 Ofoq 22M1P1650 MDB Submittal 18 21-Jul-15 11-Aug-15 Ofoq 4M1P1660 EMDB Submittal 18 21-Jul-15 11-Aug-15 Ofoq 4M1P1720 MCC Submittal 18 21-Jul-15 11-Aug-15 Ofoq 10M1P1670 ATS Submittal 6 12-Aug-15 18-Aug-15 Ofoq 10
Mechanical MateriaMechanical Material Submittal 72 15-Jun-15 08-Sep-15 46HVAC System SubmHVAC System Submittal 54 15-Jun-15 18-Aug-15 58
M1P2030 Galvanized Duct Submittal 6 15-Jun-15 21-Jun-15 Ofoq 46M1P2070 Child Water Pipes Submittal 6 15-Jun-15 21-Jun-15 Ofoq 76M1P2080 Child Water Insulation Submittal 6 15-Jun-15 21-Jun-15 Ofoq 106M1P2040 Volume Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P2050 Fire Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P2060 Fire Smoke Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P2090 Supply Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46M1P2100 Exhaust Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46
Fire Fighting SystemFire Fighting System Submittal 48 13-Jul-15 08-Sep-15 3M1P2800 Seamless Black Steel Pipes Submittal 3 13-Jul-15 15-Jul-15 Ofoq 26M1P2810 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Submittal6 13-Jul-15 20-Jul-15 Ofoq 29
M1P2820 Sprinklers Submittal 6 13-Jul-15 20-Jul-15 Ofoq 20M1P2850 Fire Hose Stations Submittal 6 13-Jul-15 20-Jul-15 Ofoq 28M1P2860 Fire Hose Real Stations Submittal 6 13-Jul-15 20-Jul-15 Ofoq 28M1P2870 Fire Extinguishers Submittal 6 13-Jul-15 20-Jul-15 Ofoq 19
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
18-Aug-15, Electrical Equipment
08-Sep-15, Mechanical Material S18-Aug-15, HVAC System Submittal
08-Sep-15, Fire Fighting System S
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 12 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 13
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P2830 FM200 System for (MVSG Room, RMU Room, Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)Submittal
12 19-Aug-15 01-Sep-15 Ofoq 4
M1P2840 Foam Fire System for (Generator Room, Feul Tank Room) Submittal
12 26-Aug-15 08-Sep-15 Ofoq 3
Plumbing System SPlumbing System Submittal 18 19-Jul-15 09-Aug-15 72M1P3150 PPR Domestic Water Pipes Submittal 6 19-Jul-15 26-Jul-15 Ofoq 54M1P3170 UPVC for Drainage System Submittal 6 19-Jul-15 26-Jul-15 Ofoq 48M1P3180 PVC for Forced Main Line Submittal 6 19-Jul-15 26-Jul-15 Ofoq 66M1P3190 Irrigation System PVC Submittal 6 19-Jul-15 26-Jul-15 Ofoq 66M1P3200 Valves Submittal 6 19-Jul-15 26-Jul-15 Ofoq 72M1P3210 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Submittal 6 19-Jul-15 26-Jul-15 Ofoq 36M1P3220 Hose Bibbs Submittal 6 19-Jul-15 26-Jul-15 Ofoq 84M1P3140 HDPE Domestic Water Pipes Submittal 12 19-Jul-15 02-Aug-15 Ofoq 72M1P3160 HDPE for Drainage , Waste , Vent, Storm Systems Submitta 12 19-Jul-15 02-Aug-15 Ofoq 72M1P3120 Fountains Tank Submittal 18 19-Jul-15 09-Aug-15 N/A 40M1P3130 Water Fall Tank Submittal 18 19-Jul-15 09-Aug-15 N/A 40
Mechanical EquipmMechanical Equipment Submittal 36 06-Jul-15 18-Aug-15 60HVAC EquipmentHVAC Equipment Submittal 36 06-Jul-15 18-Aug-15 60
M1P2150 Child Water Pumps Submittal 12 06-Jul-15 20-Jul-15 Ofoq 0M1P2160 Exhaust Fans Submittal 12 06-Jul-15 20-Jul-15 Ofoq 41M1P2170 Supply Fans Submittal 12 06-Jul-15 20-Jul-15 Ofoq 41M1P2110 Fuel Oil Storage Tank Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2M1P2120 AC DX Split Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 60M1P2130 Heat Exchangers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2M1P2140 Expansion and Compression Tanks Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2M1P2180 Fan Coil Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 17
Material ApprovalMaterial Approval 87 18-Jun-15 03-Oct-15 34Electrical Material AElectrical Material Approval 87 18-Jun-15 03-Oct-15 8
M70 PVC , EMT Conduit with Accessories Conduit Material Approval
6 18-Jun-15 24-Jun-15 SCG 48
M120 Cable Trays Approval 6 22-Jun-15 28-Jun-15 SCG 86M130 Wires for Power and Lighting Material Approval 6 29-Jul-15 04-Aug-15 SCG 52M140 Lighting Fixture Material Approval 6 05-Aug-15 11-Aug-15 SCG 40M150 Wiring Devices Approval 6 05-Aug-15 11-Aug-15 SCG 15M160 Fire Alarm Material Approval 6 05-Aug-15 11-Aug-15 SCG 0M170 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 11M180 Distribution Board Material Approval 6 10-Aug-15 16-Aug-15 SCG 24M190 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 2
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
09-Aug-15, Plumbing System Submittal
18-Aug-15, Mechanical Equipment Su18-Aug-15, HVAC Equipment Submi
03-Oct-15, Material Appro03-Oct-15, Electrical Mater
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 13 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 14
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M200 Parking System Material Approval 6 26-Aug-15 01-Sep-15 SCG 0M410 LV Cables Approval 6 09-Sep-15 15-Sep-15 SCG 12M460 BMS Approval 18 09-Sep-15 03-Oct-15 SCG 1Electrical EquipmentElectrical Equipment 42 06-Jul-15 25-Aug-15 10
M1P1740 R.M.U Approval 6 06-Jul-15 12-Jul-15 SCG 34M1P1750 MVSG Approval 6 06-Jul-15 12-Jul-15 SCG 34M1P1800 UPS Approval 6 15-Jul-15 22-Jul-15 SCG 12M1P1730 Generator Approval 6 21-Jul-15 28-Jul-15 SCG 2M1P1760 Transformer Approval 6 21-Jul-15 28-Jul-15 SCG 22M1P1770 MDB Approval 6 12-Aug-15 18-Aug-15 SCG 4M1P1780 EMDB Approval 6 12-Aug-15 18-Aug-15 SCG 4M1P1810 MCC Approval 6 12-Aug-15 18-Aug-15 SCG 16M1P1790 ATS Approval 6 19-Aug-15 25-Aug-15 SCG 10
Mechanical MateriaMechanical Material Approval 72 22-Jun-15 15-Sep-15 46HVAC System ApproHVAC System Approval 54 22-Jun-15 25-Aug-15 58
M1P2250 Galvanized Duct Approval 6 22-Jun-15 28-Jun-15 SCG 46M1P2290 Child Water Pipes Approval 6 22-Jun-15 28-Jun-15 SCG 76M1P2300 Child Water Insulation Approval 6 22-Jun-15 28-Jun-15 SCG 106M1P2260 Volume Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P2270 Fire Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P2280 Fire Smoke Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P2310 Supply Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46M1P2320 Exhaust Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46
Fire Fighting SystemFire Fighting System Approval 51 16-Jul-15 15-Sep-15 3M1P2880 Seamless Black Steel Pipes Approval 6 16-Jul-15 25-Jul-15 SCG 26M1P2890 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Approval6 21-Jul-15 28-Jul-15 SCG 29
M1P2900 Sprinklers Approval 6 21-Jul-15 28-Jul-15 SCG 20M1P2910 Fire Hose Stations Approval 6 21-Jul-15 28-Jul-15 SCG 28M1P2920 Fire Hose Real Stations Approval 6 21-Jul-15 28-Jul-15 SCG 28M1P2930 Fire Extinguishers Approval 6 21-Jul-15 28-Jul-15 SCG 19M1P2940 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)Approval
6 02-Sep-15 08-Sep-15 SCG 4
M1P2950 Foam Fire System for (Generator Room, Feul Tank Room) Approval
6 09-Sep-15 15-Sep-15 SCG 3
Plumbing System APlumbing System Approval 18 27-Jul-15 16-Aug-15 72M1P3230 PPR Domestic Water Pipes Approval 6 27-Jul-15 02-Aug-15 SCG 54M1P3240 UPVC for Drainage System Approval 6 27-Jul-15 02-Aug-15 SCG 48
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
25-Aug-15, Electrical Equipment
15-Sep-15, Mechanical Materia25-Aug-15, HVAC System Approval
15-Sep-15, Fire Fighting System
16-Aug-15, Plumbing System Approva
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 14 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 15
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P3250 PVC for Forced Main Line Approval 6 27-Jul-15 02-Aug-15 SCG 66M1P3260 Irrigation System PVC Approval 6 27-Jul-15 02-Aug-15 SCG 66M1P3270 Valves Approval 6 27-Jul-15 02-Aug-15 SCG 72M1P3280 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Approval 6 27-Jul-15 02-Aug-15 SCG 36M1P3290 Hose Bibbs Approval 6 27-Jul-15 02-Aug-15 SCG 84M1P3300 HDPE Domestic Water Pipes Approval 6 03-Aug-15 09-Aug-15 SCG 72M1P3310 HDPE for Drainage , Waste , Vent, Storm Systems Approval 6 03-Aug-15 09-Aug-15 SCG 72M1P3320 Fountains Tank Approval 6 10-Aug-15 16-Aug-15 SCG 40M1P3330 Water Fall Tank Approval 6 10-Aug-15 16-Aug-15 SCG 40
Mechanical EquipmMechanical Equipment Approval 30 21-Jul-15 25-Aug-15 60HVAC EquipmentHVAC Equipment Approval 30 21-Jul-15 25-Aug-15 60
M1P2370 Child Water Pumps Approval 6 21-Jul-15 28-Jul-15 SCG 0M1P2380 Exhaust Fans Approval 6 21-Jul-15 28-Jul-15 SCG 41M1P2390 Supply Fans Approval 6 21-Jul-15 28-Jul-15 SCG 41M1P2330 Fuel Oil Storage Tank Approval 6 19-Aug-15 25-Aug-15 SCG 2M1P2340 AC DX Split Units Approval 6 19-Aug-15 25-Aug-15 SCG 60M1P2350 Heat Exchangers Approval 6 19-Aug-15 25-Aug-15 SCG 2M1P2360 Expansion and Compression Tanks Approval 6 19-Aug-15 25-Aug-15 SCG 2M1P2400 Fan Coil Units Approval 6 19-Aug-15 25-Aug-15 SCG 17
Material P.OMaterial P.O 84 25-Jun-15 07-Oct-15 34Electrical Material Electrical Material P.O 84 25-Jun-15 07-Oct-15 12
M210 PVC , EMT Conduit with Accessories Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 48M220 Cable Trays P.O 3 29-Jun-15 01-Jul-15 Ofoq 86M230 Wires for Power and Lighting Material P.O 3 05-Aug-15 08-Aug-15 Ofoq 52M240 Lighting Fixture Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 40M250 Wiring Devices P.O 3 12-Aug-15 15-Aug-15 Ofoq 15M260 Fire Alarm Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 0M270 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 11M280 Distribution Board Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 24M290 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 2M300 Parking System Material P.O 3 02-Sep-15 05-Sep-15 N/A 0M430 LV Cables P.O 3 16-Sep-15 19-Sep-15 Ofoq 12M470 BMS P.O 3 04-Oct-15 07-Oct-15 Ofoq 1Electrical EquipmentElectrical Equipment 39 13-Jul-15 29-Aug-15 42
M1P1830 R.M.U P.O 3 13-Jul-15 15-Jul-15 Ofoq 78M1P1840 MVSG P.O 3 13-Jul-15 15-Jul-15 Ofoq 40M1P1890 UPS P.O 3 25-Jul-15 27-Jul-15 Ofoq 12M1P1820 Generator P.O 3 29-Jul-15 01-Aug-15 Ofoq 2M1P1850 Transformer P.O 3 29-Jul-15 01-Aug-15 Ofoq 60
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
25-Aug-15, Mechanical Equipment A25-Aug-15, HVAC Equipment Appr
07-Oct-15, Material P.O07-Oct-15, Electrical Mater
29-Aug-15, Electrical Equipment
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 15 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 16
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P1860 MDB P.O 3 19-Aug-15 22-Aug-15 Ofoq 10M1P1870 EMDB P.O 3 19-Aug-15 22-Aug-15 Ofoq 16M1P1900 MCC P.O 3 19-Aug-15 22-Aug-15 Ofoq 16M1P1880 ATS P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
Mechanical MateriaMechanical Material P.O 69 29-Jun-15 19-Sep-15 46HVAC System P.OHVAC System P.O 51 29-Jun-15 29-Aug-15 58
M1P2410 Galvanized Duct P.O 3 29-Jun-15 01-Jul-15 Ofoq 46M1P2450 Child Water Pipes P.O 3 29-Jun-15 01-Jul-15 Ofoq 76M1P2460 Child Water Insulation P.O 3 29-Jun-15 01-Jul-15 Ofoq 106M1P2420 Volume Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P2430 Fire Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P2440 Fire Smoke Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P2470 Supply Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46M1P2480 Exhaust Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46
Fire Fighting SystemFire Fighting System P.O 48 26-Jul-15 19-Sep-15 3M1P2960 Seamless Black Steel Pipes P.O 3 26-Jul-15 28-Jul-15 Ofoq 26M1P2970 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) P.O3 29-Jul-15 01-Aug-15 Ofoq 29
M1P2980 Sprinklers P.O 3 29-Jul-15 01-Aug-15 Ofoq 20M1P2990 Fire Hose Stations P.O 3 29-Jul-15 01-Aug-15 Ofoq 28M1P3000 Fire Hose Real Stations P.O 3 29-Jul-15 01-Aug-15 Ofoq 28M1P3010 Fire Extinguishers P.O 3 29-Jul-15 01-Aug-15 Ofoq 19M1P3020 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)P.O
3 09-Sep-15 12-Sep-15 Ofoq 4
M1P3030 Foam Fire System for (Generator Room, Feul Tank Room) P 3 16-Sep-15 19-Sep-15 Ofoq 3Plumbing System PPlumbing System P.O 15 03-Aug-15 19-Aug-15 72
M1P3340 PPR Domestic Water Pipes P.O 3 03-Aug-15 05-Aug-15 Ofoq 54M1P3350 UPVC for Drainage System P.O 3 03-Aug-15 05-Aug-15 Ofoq 48M1P3360 PVC for Forced Main Line P.O 3 03-Aug-15 05-Aug-15 Ofoq 66M1P3370 Irrigation System PVC P.O 3 03-Aug-15 05-Aug-15 Ofoq 66M1P3380 Valves P.O 3 03-Aug-15 05-Aug-15 Ofoq 72M1P3390 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D P.O 3 03-Aug-15 05-Aug-15 Ofoq 36M1P3400 Hose Bibbs P.O 3 03-Aug-15 05-Aug-15 Ofoq 84M1P3410 HDPE Domestic Water Pipes P.O 3 10-Aug-15 12-Aug-15 Ofoq 72M1P3420 HDPE for Drainage , Waste , Vent, Storm Systems P.O 3 10-Aug-15 12-Aug-15 Ofoq 72M1P3430 Fountains Tank P.O 3 17-Aug-15 19-Aug-15 N/A 40M1P3440 Water Fall Tank P.O 3 17-Aug-15 19-Aug-15 N/A 40
Mechanical EquipmMechanical Equipment P.O 30 29-Jul-15 01-Sep-15 60
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
19-Sep-15, Mechanical Materi29-Aug-15, HVAC System P.O
19-Sep-15, Fire Fighting System
19-Aug-15, Plumbing System P.O
01-Sep-15, Mechanical Equipment
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 16 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 17
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
HVAC EquipmentHVAC Equipment P.O 30 29-Jul-15 01-Sep-15 60M1P2530 Child Water Pumps P.O 6 29-Jul-15 04-Aug-15 Ofoq 0M1P2540 Exhaust Fans P.O 6 29-Jul-15 04-Aug-15 Ofoq 52M1P2550 Supply Fans P.O 6 29-Jul-15 04-Aug-15 Ofoq 52M1P2490 Fuel Oil Storage Tank P.O 6 26-Aug-15 01-Sep-15 Ofoq 2M1P2500 AC DX Split Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 60M1P2510 Heat Exchangers P.O 6 26-Aug-15 01-Sep-15 Ofoq 2M1P2520 Expansion and Compression Tanks P.O 6 26-Aug-15 01-Sep-15 Ofoq 2M1P2560 Fan Coil Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 17
Material DeliveryMaterial Delivery 134 29-Jun-15 09-Dec-15 6Electrical Material Electrical Material Delivery 121 29-Jun-15 24-Nov-15 1
M310 PVC , EMT Conduit with Accessories Conduit Material Delivery
6 29-Jun-15 05-Jul-15 Ofoq 48
M320 Cable Trays Delivery 6 02-Jul-15 08-Jul-15 Ofoq 86M330 Wires for Power and Lighting Material Delivery 6 09-Aug-15 15-Aug-15 Ofoq 52M340 Lighting Fixture Material Delivery 18 16-Aug-15 05-Sep-15 N/A 40M370 Structured Cable for Data System Material Delivery 18 20-Aug-15 09-Sep-15 Ofoq 11M350 Wiring Devices Delivery 36 16-Aug-15 29-Sep-15 Ofoq 15M390 CCTV Cameras Material Delivery 45 20-Aug-15 17-Oct-15 N/A 2M360 Fire Alarm Material Delivery 52 16-Aug-15 20-Oct-15 Ofoq 0M380 Distribution Board Material Delivery 52 20-Aug-15 25-Oct-15 Ofoq 24M440 LV Cables Delivery 26 20-Sep-15 25-Oct-15 Ofoq 12M400 Parking System Material Delivery 45 06-Sep-15 02-Nov-15 N/A 0M480 BMS Delivery 40 08-Oct-15 24-Nov-15 Ofoq 1Electrical EquipmentElectrical Equipment 90 16-Jul-15 05-Nov-15 14
M1P1920 R.M.U Delivery 26 16-Jul-15 17-Aug-15 Ofoq 78M1P1940 Transformer Delivery 26 02-Aug-15 31-Aug-15 Ofoq 60M1P1930 MVSG Delivery 52 16-Jul-15 16-Sep-15 Ofoq 40M1P1950 MDB Delivery 52 23-Aug-15 27-Oct-15 Ofoq 10M1P1960 EMDB Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16M1P1990 MCC Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16M1P1980 UPS Delivery 78 28-Jul-15 01-Nov-15 Ofoq 12M1P1970 ATS Delivery 52 30-Aug-15 03-Nov-15 Ofoq 10M1P1910 Generator Delivery 78 02-Aug-15 05-Nov-15 Ofoq 2
Mechanical MateriaMechanical Material Delivery 131 02-Jul-15 09-Dec-15 6HVAC System DelivHVAC System Delivery 60 02-Jul-15 12-Sep-15 52
M1P2570 Galvanized Duct Delivery 6 02-Jul-15 08-Jul-15 Ofoq 46M1P2610 Child Water Pipes Delivery 6 02-Jul-15 08-Jul-15 Ofoq 76M1P2620 Child Water Insulation Delivery 6 02-Jul-15 08-Jul-15 Ofoq 106M1P2580 Volume Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
01-Sep-15, HVAC Equipment P.O
09-Dec-15, M24-Nov-15, Elec
05-Nov-15, Electrica
09-Dec-15, M12-Sep-15, HVAC System Delive
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 17 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 18
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P2590 Fire Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P2600 Fire Smoke Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P2630 Supply Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46M1P2640 Exhaust Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46
Fire Fighting SystemFire Fighting System Delivery 85 29-Jul-15 10-Nov-15 15M1P3040 Seamless Black Steel Pipes Delivery 6 29-Jul-15 04-Aug-15 Ofoq 26M1P3050 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Delivery18 02-Aug-15 22-Aug-15 Ofoq 29
M1P3070 Fire Hose Stations Delivery 36 02-Aug-15 12-Sep-15 Ofoq 28M1P3080 Fire Hose Real Stations Delivery 36 02-Aug-15 12-Sep-15 Ofoq 28M1P3060 Sprinklers Delivery 45 02-Aug-15 26-Sep-15 Ofoq 20M1P3090 Fire Extinguishers Delivery 78 02-Aug-15 05-Nov-15 Ofoq 19M1P3100 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)Delivery
45 13-Sep-15 09-Nov-15 Ofoq 4
M1P3110 Foam Fire System for (Generator Room, Feul Tank Room) Delivery
40 20-Sep-15 10-Nov-15 Ofoq 3
Plumbing System DPlumbing System Delivery 30 06-Aug-15 09-Sep-15 60M1P3450 PPR Domestic Water Pipes Delivery 6 06-Aug-15 12-Aug-15 Ofoq 54M1P3460 UPVC for Drainage System Delivery 6 06-Aug-15 12-Aug-15 Ofoq 48M1P3470 PVC for Forced Main Line Delivery 6 06-Aug-15 12-Aug-15 Ofoq 66M1P3480 Irrigation System PVC Delivery 6 06-Aug-15 12-Aug-15 Ofoq 66M1P3490 Valves Delivery 6 06-Aug-15 12-Aug-15 Ofoq 72M1P3500 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Delivery 6 06-Aug-15 12-Aug-15 Ofoq 36M1P3510 Hose Bibbs Delivery 6 06-Aug-15 12-Aug-15 Ofoq 84M1P3520 HDPE Domestic Water Pipes Delivery 12 13-Aug-15 26-Aug-15 Ofoq 72M1P3530 HDPE for Drainage , Waste , Vent, Storm Systems Delivery 12 13-Aug-15 26-Aug-15 Ofoq 72M1P3540 Fountains Tank Delivery 18 20-Aug-15 09-Sep-15 N/A 40M1P3550 Water Fall Tank Delivery 18 20-Aug-15 09-Sep-15 N/A 40
Mechanical EquipmMechanical Equipment Delivery 104 05-Aug-15 09-Dec-15 6HVAC EquipmentHVAC Equipment Delivery 104 05-Aug-15 09-Dec-15 6
M1P2660 AC DX Split Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 60M1P2720 Fan Coil Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 17M1P2700 Exhaust Fans Delivery 52 05-Aug-15 08-Oct-15 Ofoq 52M1P2710 Supply Fans Delivery 52 05-Aug-15 08-Oct-15 Ofoq 52M1P2650 Fuel Oil Storage Tank Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2M1P2670 Heat Exchangers Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2M1P2680 Expansion and Compression Tanks Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2M1P2690 Child Water Pumps Delivery 104 05-Aug-15 09-Dec-15 Ofoq 0
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
10-Nov-15, Fire Fig
09-Sep-15, Plumbing System Del
09-Dec-15, M09-Dec-15, H
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 18 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 19
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
ConstructionConstruction 137 16-Jul-15 31-Dec-15 0
Structural WorkStructural Work 112 16-Jul-15 01-Dec-15 0
M1P3580 Openings for Duct Shafts 12 16-Jul-15 01-Aug-15 HW ECIP 28M1P3590 Completion of All demolishing and remodeling in Plaza Leve 0 27-Aug-15 HW ECIP 53M1P3600 Expansion Joints 12 29-Aug-15 10-Sep-15 HW ECIP 53M1P3890 Equipments Concrete Foundations 12 04-Oct-15 19-Oct-15 HW ECIP 17M1P4000 Upper Basement Screed 12 18-Nov-15 01-Dec-15 HW ECIP 0
MEP WorkMEP Work 98 02-Sep-15 31-Dec-15 0
Electrical WorksElectrical Works 98 02-Sep-15 31-Dec-15 0Power SystemPower System 71 02-Sep-15 29-Nov-15 2
M1P3610 Upper Basement PVC Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P3620 Upper Basement EMT Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P3630 Upper Basement Cable Trays for LV Cables 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P3640 Wires for Upper Basement Power Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 41M1P3660 Laying Upper Basement DB Panels 2 26-Oct-15 27-Oct-15 SCG Ofoq 24M1P3650 Laying Upper Basement LV Cables 6 26-Oct-15 01-Nov-15 SCG Ofoq 12M1P3790 Wiring Devices Erection and termination 12 02-Nov-15 15-Nov-15 SCG Ofoq 12M1P3670 Termination Upper Basement DB Panels 6 11-Nov-15 17-Nov-15 SCG Ofoq 12Power EquipmentPower Equipment 35 20-Oct-15 29-Nov-15 2
M1P3700 Laying Upper Basement Transformer 2 20-Oct-15 21-Oct-15 SCG Ofoq 23M1P3720 Laying R.M.U 2 20-Oct-15 21-Oct-15 SCG Ofoq 29M1P3740 Laying MVSG 2 20-Oct-15 21-Oct-15 SCG Ofoq 17M1P3730 Termination R.M.U 6 22-Oct-15 28-Oct-15 SCG Ofoq 29M1P3680 Laying Upper Basement MCC's 2 28-Oct-15 29-Oct-15 SCG Ofoq 16M1P3830 Laying EMDB 2 28-Oct-15 29-Oct-15 SCG Ofoq 16M1P3900 Laying MDB 2 28-Oct-15 29-Oct-15 SCG Ofoq 10M1P3860 Laying UPS 2 02-Nov-15 03-Nov-15 SCG Ofoq 12M1P3710 Termination Upper Basement Transformer 12 22-Oct-15 04-Nov-15 SCG Ofoq 23M1P3850 Laying ATS 2 04-Nov-15 05-Nov-15 SCG Ofoq 10M1P3760 Laying Generator Package 2 07-Nov-15 08-Nov-15 SCG Ofoq 2M1P3750 Termination MVSG 18 22-Oct-15 11-Nov-15 SCG Ofoq 17M1P3690 Termination Upper Basement MCC's 12 31-Oct-15 12-Nov-15 SCG Ofoq 16M1P3840 Termination EMDB 12 31-Oct-15 12-Nov-15 SCG Ofoq 16M1P3880 Termination UPS 12 04-Nov-15 17-Nov-15 SCG Ofoq 12M1P3870 Termination ATS 12 07-Nov-15 19-Nov-15 SCG Ofoq 10M1P3910 Termination MDB 18 31-Oct-15 19-Nov-15 SCG Ofoq 10M1P3770 Termination of Generator 18 09-Nov-15 29-Nov-15 SCG Ofoq 2
Lighting SystemLighting System 36 02-Sep-15 19-Oct-15 25
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
31-Dec-
01-Dec-15, Str
31-Dec-
31-Dec-29-Nov-15, Pow
29-Nov-15, Pow
19-Oct-15, Lighting Sys
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 19 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 20
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P3800 Upper Basement PVC Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 25M1P3810 Upper Basement EMT Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 25M1P3820 Wires for Upper Basement Lighting Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 25M1P3780 Lighting Fixture Erection and termination 18 27-Sep-15 19-Oct-15 SCG Ofoq 25
Low Current SysteLow Current Systems 98 02-Sep-15 31-Dec-15 0Fire Alarm SystemFire Alarm System 98 02-Sep-15 31-Dec-15 0
M1P4010 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 19M1P4020 Fire Alarm Cable 18 21-Oct-15 10-Nov-15 SCG Ofoq 0M1P4030 Fire Alarm Devices 18 11-Nov-15 01-Dec-15 SCG Ofoq 0M1P4040 Testing And Precommissioning 25 02-Dec-15 31-Dec-15 SCG Ofoq 0
Data SystemData System 98 02-Sep-15 31-Dec-15 0M1P4050 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0M1P4060 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0M1P4070 Face Plates Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0M1P4080 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0
CCTV SystemCCTV System 98 02-Sep-15 31-Dec-15 0M1P4090 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0M1P4100 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0M1P4110 Cameras Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0M1P4120 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0
BMS SystemBMS System 97 02-Sep-15 30-Dec-15 1M1P4130 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 32M1P4140 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 32M1P4150 BMS System with FACP Termination 12 25-Nov-15 08-Dec-15 SCG Ofoq 1M1P4160 Testing And Precommissioning 18 09-Dec-15 30-Dec-15 SCG Ofoq 1
Parking SystemParking System 98 02-Sep-15 31-Dec-15 0M1P4170 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 12M1P4180 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 12M1P4190 Parking System 20 03-Nov-15 25-Nov-15 SCG Ofoq 0M1P4200 Testing And Precommissioning 30 26-Nov-15 31-Dec-15 SCG Ofoq 0
Mechanical WorksMechanical Works 98 02-Sep-15 31-Dec-15 0HVAC SystemHVAC System 98 02-Sep-15 31-Dec-15 0
M1P4210 Galvanized Duct Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 1M1P4230 Child Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 31M1P4220 Volume Dampers , Fire Dampers and Fire Smoke Dampers
Erection12 27-Sep-15 11-Oct-15 SCG Ofoq 1
M1P4250 Child Water Pipes Test and Flushing 12 27-Sep-15 11-Oct-15 SCG Ofoq 31M1P4290 Fan Coil Unit Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 17M1P4240 Duct Smoke Test 12 12-Oct-15 26-Oct-15 SCG Ofoq 1M1P4270 Child Water Pipes Insulation 12 12-Oct-15 26-Oct-15 SCG Ofoq 31
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
31-Dec-31-Dec-
31-Dec-
31-Dec-
30-Dec-
31-Dec-
31-Dec-31-Dec-
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 20 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 21
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P4260 Duct Insulation 12 27-Oct-15 09-Nov-15 SCG Ofoq 1M1P4280 Air Grill Supply and Exhaust 18 10-Nov-15 30-Nov-15 SCG Ofoq 1HVAC EquipmentHVAC Equipment 72 07-Oct-15 31-Dec-15 0
M1P4300 AC DX Split Units Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 60M1P4310 Exhaust Fans Erection 18 10-Oct-15 31-Oct-15 SCG Ofoq 52M1P4320 Supply Fans Erection 18 10-Oct-15 31-Oct-15 SCG Ofoq 52M1P4330 Fuel Oil Storage Tank Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2M1P4340 Heat Exchangers Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2M1P4350 Expansion and Compression Tanks Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2M1P4360 Child Water Pumps Erection 18 10-Dec-15 31-Dec-15 SCG Ofoq 0
Fire Fighting SysteFire Fighting System 95 02-Sep-15 28-Dec-15 3M1P4370 Seamless Black Steel Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 2M1P4380 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Erection6 27-Sep-15 03-Oct-15 SCG Ofoq 2
M1P4450 Pipe Testing and Flushing 12 04-Oct-15 19-Oct-15 SCG Ofoq 2M1P4390 Fire Hose Stations Erection 36 13-Sep-15 29-Oct-15 SCG Ofoq 28M1P4400 Fire Hose Real Stations Erection 36 13-Sep-15 29-Oct-15 SCG Ofoq 28M1P4420 Fire Extinguishers 3 07-Nov-15 09-Nov-15 SCG Ofoq 19M1P4410 Sprinklers Erection 45 20-Oct-15 10-Dec-15 SCG Ofoq 2M1P4430 FM200 System for (MVSG Room, RMU Room,
Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)
40 10-Nov-15 27-Dec-15 SCG Ofoq 4
M1P4440 Foam Fire System for (Generator Room, Feul Tank Room) Erection
40 11-Nov-15 28-Dec-15 SCG Ofoq 3
Plumbing SystemPlumbing System 54 02-Sep-15 09-Nov-15 19M1P4510 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Erection 12 02-Sep-15 15-Sep-15 SCG Ofoq 19M1P4460 PPR Domestic Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 37M1P4490 Irrigation System PVC Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 49M1P4500 Valves Erection 6 27-Sep-15 03-Oct-15 SCG Ofoq 37M1P4520 Hose Bibbs Erection 6 27-Sep-15 03-Oct-15 SCG Ofoq 49M1P4470 UPVC for Drainage System Erection 18 16-Sep-15 11-Oct-15 SCG Ofoq 19M1P4570 Testing Domestic Network 6 04-Oct-15 11-Oct-15 SCG Ofoq 37M1P4550 Fountains Tank Erection 26 10-Sep-15 15-Oct-15 SCG N/A 40M1P4560 Water Fall Tank Erection 26 10-Sep-15 15-Oct-15 SCG N/A 40M1P4530 HDPE Domestic Water Pipes Erection 6 12-Oct-15 19-Oct-15 SCG Ofoq 37M1P4480 PVC for Forced Main Line Erection 12 12-Oct-15 26-Oct-15 SCG Ofoq 19M1P4580 Testing for Drainage Network 6 27-Oct-15 02-Nov-15 SCG Ofoq 19M1P4540 HDPE for Drainage , Waste , Vent, Storm Systems Erection 6 03-Nov-15 09-Nov-15 SCG Ofoq 19
Finishing WorkFinishing Work 126 29-Jul-15 29-Dec-15 2
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
31-Dec-
28-Dec-
09-Nov-15, Plumbi
29-Dec-
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 21 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 22
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P4660 Block Work Completion for Equipments / Service / Stores Rooms
12 29-Jul-15 11-Aug-15 HW ECIP 0
M1P4670 Plaster Work Applied for Equipments / Service / Stores Roo 12 12-Aug-15 25-Aug-15 HW ECIP 0M1P4620 Curb Stone Material Erection 12 06-Sep-15 19-Sep-15 HW ECIP 46M1P4680 MEP 1st Fix for Equipments / Service / Stores Rooms 26 26-Aug-15 28-Sep-15 SCG Ofoq 0M1P4630 Interlock Material Erection 12 20-Sep-15 07-Oct-15 HW ECIP 46M1P8420 Paint 1st and 2nd Coat for Ceiling and Walls in Upper
Basement26 06-Sep-15 10-Oct-15 HW ECIP 54
M1P4590 False Ceiling Erection for Equipments / Service / Stores Rooms
12 29-Sep-15 13-Oct-15 HW ECIP 0
M1P4610 Paint Applied for Equipments / Service / Stores Rooms 12 15-Oct-15 28-Oct-15 HW ECIP 0M1P4650 Raised Floor Erection (Expected in IT & Main IT Room) 6 29-Oct-15 04-Nov-15 HW ECIP 6M1P4600 Flooring Tiles Applied for Equipments / Service / Stores Roo 12 29-Oct-15 11-Nov-15 HW ECIP 0M1P4640 Doors Erection for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 HW ECIP 5M1P4690 MEP Final Fix for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 SCG Ofoq 0M1P8430 Final Coat of Paint for Walls and Ceiling 12 12-Dec-15 26-Dec-15 HW 2M1P8440 Epoxi Paint for Flooring 12 15-Dec-15 29-Dec-15 HW 2
Lower BasementLower Basement 164 15-Jun-15 31-Dec-15 0
GeneralGeneral 0 07-Jul-15 07-Jul-15 15
M1P6450 Client Clear Vision about Secuirty Issues as (CCTV, Access Control...)
0 07-Jul-15 Client 6
M1P6460 Client Clear Vision about Data Issues as (Central, IT requirements...)
0 07-Jul-15 Client 15
DesignDesign 60 15-Jun-15 25-Aug-15 41
Architectural DesArchitectural Design 24 15-Jun-15 12-Jul-15 0
M1P4700 Final Parking Layout for Lower Basement 0 28-Jun-15 Client 0M1P4710 Final Architectural Dimensional Plan for Lower Basement 12 15-Jun-15 28-Jun-15 T.B 0M1P4720 Final Architectural Package for Lower Basement 12 29-Jun-15 12-Jul-15 HW 0
Structural DesignStructural Design 6 19-Aug-15 25-Aug-15 41
M1P6440 Structural Design for Equipment Foundation (Fire Pump , Supply and Exhaust Fans........)
6 19-Aug-15 25-Aug-15 HW 41
MEP DesignMEP Design 24 29-Jun-15 28-Jul-15 6
Electrical SystemsElectrical Systems 24 29-Jun-15 28-Jul-15 6Power SystemPower System 6 29-Jun-15 05-Jul-15 15
M1P4750 Updated Design for Power System 6 29-Jun-15 05-Jul-15 SCG 15Lighting SystemLighting System 6 29-Jun-15 05-Jul-15 15
M1P4760 Updated Design for Lighting System 6 29-Jun-15 05-Jul-15 SCG 15Fire Alarm SystemFire Alarm System 6 13-Jul-15 20-Jul-15 0
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
31-Dec-
07-Jul-15, General
25-Aug-15, Design
12-Jul-15, Architectural Design
25-Aug-15, Structural Design
28-Jul-15, MEP Design
28-Jul-15, Electrical Systems05-Jul-15, Power System
05-Jul-15, Lighting System
20-Jul-15, Fire Alarm System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 22 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 23
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P5370 Updated Design for Fire Alarm System 6 13-Jul-15 20-Jul-15 C/SCG 0Parking SystemParking System 18 29-Jun-15 20-Jul-15 0
M1P5140 Updated Design for Parking System 18 29-Jun-15 20-Jul-15 C/SCG 0CCTV SystemCCTV System 6 13-Jul-15 20-Jul-15 2
M1P4730 Updated Design for CCTV System 6 13-Jul-15 20-Jul-15 C/SCG 2Data SystemData System 6 13-Jul-15 20-Jul-15 11
M1P4740 Updated Design for Data System 6 13-Jul-15 20-Jul-15 C/SCG 11BMS SystemBMS System 6 21-Jul-15 28-Jul-15 6
M1P5690 Updated Design for BMS System 6 21-Jul-15 28-Jul-15 SCG 6Mechanical SystemsMechanical Systems 18 29-Jun-15 20-Jul-15 6
HVAC SystemHVAC System 6 13-Jul-15 20-Jul-15 0M1P4770 HVAC Updated Design for Lower Basement 6 13-Jul-15 20-Jul-15 SCG 0
Fire Fighting SysteFire Fighting System 6 29-Jun-15 05-Jul-15 3M1P4820 Fire Fighting Updated Design for Lower Basement 6 29-Jun-15 05-Jul-15 SCG 3
Plumbing SystemPlumbing System 6 13-Jul-15 20-Jul-15 6Drainage SystemDrainage System 6 13-Jul-15 20-Jul-15 6
M1P4780 Final Update for Lower Basement Drainage System 6 13-Jul-15 20-Jul-15 SCG 6
Shop DrawingsShop Drawings 60 29-Jun-15 08-Sep-15 41
Architectural ShoArchitectural Shop Drawing 12 13-Jul-15 28-Jul-15 4
M1P4830 Lower Basement Architectural Shop Drawing Submittal 6 13-Jul-15 20-Jul-15 ECIP 4M1P4840 Lower Basement Architectural Shop Drawing Approval 6 21-Jul-15 28-Jul-15 HW 4
Structural Shop DStructural Shop Drawing 50 11-Jul-15 08-Sep-15 41
M1P4850 Lower Basement Construction , Expansion Joints Details Shop Drawing Submittal
6 11-Jul-15 16-Jul-15 ECIP 64
M1P4860 Lower Basement Construction , Expansion Joints Details Shop Drawing Approval
6 19-Jul-15 26-Jul-15 HW 64
M1P6470 Lower Basement Equipments Foundations shop drawings Submittal
6 26-Aug-15 01-Sep-15 ECIP 41
M1P6480 Lower Basement Equipments Foundations shop drawings Approval
6 02-Sep-15 08-Sep-15 HW 41
Electrical SystemsElectrical Systems 36 06-Jul-15 18-Aug-15 0
Power SystemPower System 12 06-Jul-15 20-Jul-15 15M1P4870 Lower Basement Power System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 15M1P4880 Lower Basement Power System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 15
Lighting SystemLighting System 12 06-Jul-15 20-Jul-15 15M1P4890 Lower Basement Lighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 15M1P4900 Lower Basement Lighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 15
Fire Alarm SystemFire Alarm System 12 21-Jul-15 04-Aug-15 12M1P5380 Lower Basement Fire Alarm System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 12
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
20-Jul-15, Parking System
20-Jul-15, CCTV System
20-Jul-15, Data System
28-Jul-15, BMS System
20-Jul-15, Mechanical Systems20-Jul-15, HVAC System
05-Jul-15, Fire Fighting System
20-Jul-15, Plumbing System20-Jul-15, Drainage System
08-Sep-15, Shop Drawings
28-Jul-15, Architectural Shop Drawing
08-Sep-15, Structural Shop Draw
18-Aug-15, Electrical Systems
20-Jul-15, Power System
20-Jul-15, Lighting System
04-Aug-15, Fire Alarm System
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 23 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 24
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P5390 Lower Basement Fire Alarm System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 12Parking SystemParking System 12 21-Jul-15 04-Aug-15 0
M1P5120 Lower Basement Parking System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0M1P5130 Lower Basement Parking System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0
CCTV SystemCCTV System 12 21-Jul-15 04-Aug-15 2M1P4910 Lower Basement CCTV System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 2M1P4920 Lower Basement CCTV System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 2
Data SystemData System 12 21-Jul-15 04-Aug-15 11M1P4930 Lower Basement Data System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11M1P4940 Lower Basement Data System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11
BMS SystemBMS System 12 05-Aug-15 18-Aug-15 0M1P5700 Lower Basement BMS System Layout Submittal 6 05-Aug-15 11-Aug-15 Ofoq 0M1P5710 Lower Basement BMS System Layout Approval 6 12-Aug-15 18-Aug-15 SCG 0
Mechanical SysteMechanical Systems 42 29-Jun-15 18-Aug-15 41
HVAC SystemHVAC System 42 29-Jun-15 18-Aug-15 41M1P5920 Fans Static Pressure Calculations Submittal 6 29-Jun-15 05-Jul-15 Ofoq 21M1P5930 Fans Static Pressure Calculations Approval 6 06-Jul-15 12-Jul-15 SCG 21M1P7250 Builder Work for Shaft Opening Layout Submittal 3 13-Jul-15 15-Jul-15 Ofoq 22M1P7260 Builder Work for Shaft Opening Layout Approval 6 16-Jul-15 25-Jul-15 HW 22M1P4950 Lower Basement HVAC System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0M1P4960 Lower Basement HVAC System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0M1P6420 Lower Basement Fan Room Details Submittal 6 05-Aug-15 11-Aug-15 Ofoq 41M1P6430 Lower Basement Fan Room Details Approval 6 12-Aug-15 18-Aug-15 SCG 41
Fire Fighting SystemFire Fighting System 12 06-Jul-15 20-Jul-15 3M1P4970 Lower Basement Fire Fighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 3M1P4980 Lower Basement Fire Fighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 3
Plumbing SystemPlumbing System 12 21-Jul-15 04-Aug-15 11Drainage SystemDrainage System 12 21-Jul-15 04-Aug-15 11
M1P4990 Lower Basement Drainage System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11M1P5000 Lower Basement Drainage System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11
Composite DrawiComposite Drawing 12 19-Aug-15 01-Sep-15 0
M1P5050 Lower Basement MEP Composite Drawing Submittal 6 19-Aug-15 25-Aug-15 Ofoq 0M1P5060 Lower Basement MEP Composite Drawing Approval 6 26-Aug-15 01-Sep-15 SCG 0
MaterialsMaterials 149 15-Jun-15 13-Dec-15 3
Finishing MateriaFinishing Materials 35 27-Jul-15 05-Sep-15 58
Material SubmittalMaterial Submittal 20 27-Jul-15 18-Aug-15 58M110001246 Expansion Joints Submittal 6 27-Jul-15 02-Aug-15 ECIP 64M1P5070 False Ceiling Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 21
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
04-Aug-15, Parking System
04-Aug-15, CCTV System
04-Aug-15, Data System
18-Aug-15, BMS System
18-Aug-15, Mechanical Systems
18-Aug-15, HVAC System
20-Jul-15, Fire Fighting System
04-Aug-15, Plumbing System04-Aug-15, Drainage System
01-Sep-15, Composite Drawing
13-Dec-15,
05-Sep-15, Finishing Materials
18-Aug-15, Material Submittal
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 24 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 25
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P5080 Flooring Tiles Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 45M1P5090 Paint Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 33M1P5100 Curb Stone Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 46M1P5110 Interlock Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 58M1P7610 Doors Submittal 18 29-Jul-15 18-Aug-15 ECIP 58
Material ApprovalMaterial Approval 20 03-Aug-15 25-Aug-15 58M110001256 Expansion Joints Approval 6 03-Aug-15 09-Aug-15 HW 64M1P5150 False Ceiling Material Approval 6 19-Aug-15 25-Aug-15 HW 21M1P5160 Flooring Tiles Material Approval 6 19-Aug-15 25-Aug-15 HW 45M1P5170 Paint Material Approval 6 19-Aug-15 25-Aug-15 HW 33M1P5180 Curb Stone Material Approval 6 19-Aug-15 25-Aug-15 HW 46M1P5190 Interlock Material Approval 6 19-Aug-15 25-Aug-15 HW 58M1P7630 Doors Approval 6 19-Aug-15 25-Aug-15 HW 58
Material P.OMaterial P.O 17 10-Aug-15 29-Aug-15 58M110001266 Expansion Joints P.O 3 10-Aug-15 12-Aug-15 ECIP 64M1P5200 False Ceiling Material P.O 3 26-Aug-15 29-Aug-15 ECIP 21M1P5210 Flooring Tiles Material P.O 3 26-Aug-15 29-Aug-15 ECIP 45M1P5220 Paint Material P.O 3 26-Aug-15 29-Aug-15 ECIP 33M1P5230 Curb Stone Material P.O 3 26-Aug-15 29-Aug-15 ECIP 46M1P5240 Interlock Material P.O 3 26-Aug-15 29-Aug-15 ECIP 58M1P7650 Doors P.O 3 26-Aug-15 29-Aug-15 ECIP 58
Material DeliveryMaterial Delivery 20 13-Aug-15 05-Sep-15 58M110001276 Expansion Joints Delivery 6 13-Aug-15 19-Aug-15 ECIP 64M1P5250 False Ceiling Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 21M1P5260 Flooring Tiles Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 45M1P5270 Paint Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 33M1P5280 Curb Stone Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 46M1P5290 Interlock Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 58M1P7670 Doors Delivery 6 30-Aug-15 05-Sep-15 ECIP 58
MEP MaterialsMEP Materials 149 15-Jun-15 13-Dec-15 3
Material SubmittalMaterial Submittal 72 15-Jun-15 08-Sep-15 40Electrical Material SElectrical Material Submittal 72 15-Jun-15 08-Sep-15 20
M490 PVC , EMT Conduit with Accessories Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 48M570 Cable Trays Submittal 6 15-Jun-15 21-Jun-15 Ofoq 86M530 Wires for Power and Lighting Material Submittal 6 21-Jul-15 28-Jul-15 Ofoq 56M520 Lighting Fixture Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 44M560 Wiring Devices Submittal 12 21-Jul-15 04-Aug-15 Ofoq 15M580 Fire Alarm Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 0M500 Structured Cable for Data System Material Submittal 4 05-Aug-15 09-Aug-15 Ofoq 11
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
25-Aug-15, Material Approval
29-Aug-15, Material P.O
05-Sep-15, Material Delivery
13-Dec-15,
08-Sep-15, Material Submittal08-Sep-15, Electrical Material Su
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 25 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 26
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M510 Distribution Board Material Submittal 16 21-Jul-15 09-Aug-15 Ofoq 24M540 CCTV Cameras Material Submittal 4 05-Aug-15 09-Aug-15 N/A 2M550 Parking System Material Submittal 18 05-Aug-15 25-Aug-15 N/A 0M900 LV Cables Submittal 6 02-Sep-15 08-Sep-15 Ofoq 12M930 BMS Submittal 18 19-Aug-15 08-Sep-15 Ofoq 1Electrical EquipmentElectrical Equipment 18 21-Jul-15 11-Aug-15 16
M1P5410 MCC Submittal 18 21-Jul-15 11-Aug-15 Ofoq 16Mechanical MateriaMechanical Material Submittal 30 13-Jul-15 18-Aug-15 58
HVAC System SubmHVAC System Submittal 12 05-Aug-15 18-Aug-15 58M1P5720 Galvanized Duct Submittal 6 05-Aug-15 11-Aug-15 Ofoq 4M1P5760 Child Water Pipes Submittal 6 05-Aug-15 11-Aug-15 Ofoq 34M1P5770 Child Water Insulation Submittal 6 05-Aug-15 11-Aug-15 Ofoq 64M1P5730 Volume Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P5740 Fire Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P5750 Fire Smoke Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P5780 Supply Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46M1P5790 Exhaust Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46
Fire Fighting SystemFire Fighting System Submittal 6 21-Jul-15 28-Jul-15 23M1P6490 Seamless Black Steel Pipes Submittal 3 21-Jul-15 25-Jul-15 Ofoq 20M1P6500 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Submittal6 21-Jul-15 28-Jul-15 Ofoq 23
M1P6510 Sprinklers Submittal 6 21-Jul-15 28-Jul-15 Ofoq 14M1P6540 Fire Hose Stations Submittal 6 21-Jul-15 28-Jul-15 Ofoq 22M1P6550 Fire Hose Real Stations Submittal 6 21-Jul-15 28-Jul-15 Ofoq 22M1P6560 Fire Extinguishers Submittal 6 21-Jul-15 28-Jul-15 Ofoq 13
Plumbing System SPlumbing System Submittal 6 05-Aug-15 11-Aug-15 64M1P6840 PPR Domestic Water Pipes Submittal 6 05-Aug-15 11-Aug-15 Ofoq 46M1P6860 UPVC for Drainage System Submittal 6 05-Aug-15 11-Aug-15 Ofoq 40M1P6870 PVC for Forced Main Line Submittal 6 05-Aug-15 11-Aug-15 Ofoq 58M1P6890 Valves Submittal 6 05-Aug-15 11-Aug-15 Ofoq 64M1P6900 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Submittal 6 05-Aug-15 11-Aug-15 Ofoq 28
Mechanical EquipmMechanical Equipment Submittal 30 13-Jul-15 18-Aug-15 35HVAC EquipmentHVAC Equipment Submittal 30 13-Jul-15 18-Aug-15 35
M1P5850 Exhaust Fans Submittal 12 13-Jul-15 28-Jul-15 Ofoq 21M1P5860 Supply Fans Submittal 12 13-Jul-15 28-Jul-15 Ofoq 21M1P5810 AC DX Split Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 35M1P5870 Fan Coil Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 17
Fire Fighting EquFire Fighting Equipment Submittal 6 21-Jul-15 28-Jul-15 3M1P8450 Fire Pumps Submittal 6 21-Jul-15 28-Jul-15 Ofoq 3
Plumbing EquipmPlumbing Equipment Submittal 6 05-Aug-15 11-Aug-15 11
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
11-Aug-15, Electrical Equipment
18-Aug-15, Mechanical Material Subm18-Aug-15, HVAC System Submittal
28-Jul-15, Fire Fighting System Submittal
11-Aug-15, Plumbing System Submittal
18-Aug-15, Mechanical Equipment Su18-Aug-15, HVAC Equipment Submi
28-Jul-15, Fire Fighting Equipment Submi
11-Aug-15, Plumbing Equipment Subm
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 26 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 27
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P8460 Domestic Water Pump Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11M1P8470 Irrigation Pump Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11M1P8480 Waste Water Submersible Pumps Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11M1P8490 Sewage Water Submersible Pumps Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11
Material ApprovalMaterial Approval 87 18-Jun-15 03-Oct-15 28Electrical Material AElectrical Material Approval 87 18-Jun-15 03-Oct-15 8
M590 PVC , EMT Conduit with Accessories Conduit Material Approval
6 18-Jun-15 24-Jun-15 SCG 48
M670 Cable Trays Approval 6 22-Jun-15 28-Jun-15 SCG 86M630 Wires for Power and Lighting Material Approval 6 29-Jul-15 04-Aug-15 SCG 56M620 Lighting Fixture Material Approval 6 05-Aug-15 11-Aug-15 SCG 44M660 Wiring Devices Approval 6 05-Aug-15 11-Aug-15 SCG 15M680 Fire Alarm Material Approval 6 05-Aug-15 11-Aug-15 SCG 0M600 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 11M610 Distribution Board Material Approval 6 10-Aug-15 16-Aug-15 SCG 24M640 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 2M650 Parking System Material Approval 6 26-Aug-15 01-Sep-15 SCG 0M890 LV Cables Approval 6 09-Sep-15 15-Sep-15 SCG 12M940 BMS Approval 18 09-Sep-15 03-Oct-15 SCG 1Electrical EquipmentElectrical Equipment 6 12-Aug-15 18-Aug-15 16
M1P5500 MCC Approval 6 12-Aug-15 18-Aug-15 SCG 16Mechanical MateriaMechanical Material Approval 27 26-Jul-15 25-Aug-15 58
HVAC System ApproHVAC System Approval 12 12-Aug-15 25-Aug-15 58M1P5940 Galvanized Duct Approval 6 12-Aug-15 18-Aug-15 SCG 4M1P5980 Child Water Pipes Approval 6 12-Aug-15 18-Aug-15 SCG 34M1P5990 Child Water Insulation Approval 6 12-Aug-15 18-Aug-15 SCG 64M1P5950 Volume Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P5960 Fire Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P5970 Fire Smoke Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P6000 Supply Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46M1P6010 Exhaust Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46
Fire Fighting SystemFire Fighting System Approval 9 26-Jul-15 04-Aug-15 23M1P6570 Seamless Black Steel Pipes Approval 6 26-Jul-15 01-Aug-15 SCG 20M1P6580 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Approval6 29-Jul-15 04-Aug-15 SCG 23
M1P6590 Sprinklers Approval 6 29-Jul-15 04-Aug-15 SCG 14M1P6620 Fire Hose Stations Approval 6 29-Jul-15 04-Aug-15 SCG 22M1P6630 Fire Hose Real Stations Approval 6 29-Jul-15 04-Aug-15 SCG 22M1P6640 Fire Extinguishers Approval 6 29-Jul-15 04-Aug-15 SCG 13
Plumbing System APlumbing System Approval 6 12-Aug-15 18-Aug-15 64
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
03-Oct-15, Material Appro03-Oct-15, Electrical Mater
18-Aug-15, Electrical Equipment
25-Aug-15, Mechanical Material Ap25-Aug-15, HVAC System Approval
04-Aug-15, Fire Fighting System Approv
18-Aug-15, Plumbing System Approv
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 27 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 28
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P6950 PPR Domestic Water Pipes Approval 6 12-Aug-15 18-Aug-15 SCG 46M1P6970 UPVC for Drainage System Approval 6 12-Aug-15 18-Aug-15 SCG 40M1P6980 PVC for Forced Main Line Approval 6 12-Aug-15 18-Aug-15 SCG 58M1P7000 Valves Approval 6 12-Aug-15 18-Aug-15 SCG 64M1P7010 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Approval 6 12-Aug-15 18-Aug-15 SCG 28
Mechanical EquipmMechanical Equipment Approval 24 29-Jul-15 25-Aug-15 35HVAC EquipmentHVAC Equipment Approval 24 29-Jul-15 25-Aug-15 35
M1P6070 Exhaust Fans Approval 6 29-Jul-15 04-Aug-15 SCG 21M1P6080 Supply Fans Approval 6 29-Jul-15 04-Aug-15 SCG 21M1P6030 AC DX Split Units Approval 6 19-Aug-15 25-Aug-15 SCG 35M1P6090 Fan Coil Units Approval 6 19-Aug-15 25-Aug-15 SCG 17
Fire Fighting EquFire Fighting Equipment Approval 6 29-Jul-15 04-Aug-15 3M1P8500 Fire Pumps Approval 6 29-Jul-15 04-Aug-15 SCG 3
Plumbing EquipmPlumbing Equipment Approval 6 12-Aug-15 18-Aug-15 11M1P8540 Domestic Water Pump Approval 6 12-Aug-15 18-Aug-15 SCG 11M1P8550 Irrigation Pump Approval 6 12-Aug-15 18-Aug-15 SCG 11M1P8560 Waste Water Submersible Pumps Approval 6 12-Aug-15 18-Aug-15 SCG 11M1P8570 Sewage Water Submersible Pumps Approval 6 12-Aug-15 18-Aug-15 SCG 11
Material P.OMaterial P.O 84 25-Jun-15 07-Oct-15 28Electrical Material Electrical Material P.O 84 25-Jun-15 07-Oct-15 8
M690 PVC , EMT Conduit with Accessories Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 48M770 Cable Trays P.O 3 29-Jun-15 01-Jul-15 Ofoq 86M730 Wires for Power and Lighting Material P.O 3 05-Aug-15 08-Aug-15 Ofoq 56M720 Lighting Fixture Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 44M760 Wiring Devices P.O 3 12-Aug-15 15-Aug-15 Ofoq 15M780 Fire Alarm Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 0M700 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 11M710 Distribution Board Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 24M740 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 2M750 Parking System Material P.O 3 02-Sep-15 05-Sep-15 N/A 0M910 LV Cables P.O 3 16-Sep-15 19-Sep-15 Ofoq 12M950 BMS P.O 3 04-Oct-15 07-Oct-15 Ofoq 1Electrical EquipmentElectrical Equipment 3 19-Aug-15 22-Aug-15 16
M1P5590 MCC P.O 3 19-Aug-15 22-Aug-15 Ofoq 16Mechanical MateriaMechanical Material P.O 27 02-Aug-15 01-Sep-15 55
HVAC System P.OHVAC System P.O 9 19-Aug-15 29-Aug-15 58M1P6100 Galvanized Duct P.O 3 19-Aug-15 22-Aug-15 Ofoq 4M1P6140 Child Water Pipes P.O 3 19-Aug-15 22-Aug-15 Ofoq 34M1P6150 Child Water Insulation P.O 3 19-Aug-15 22-Aug-15 Ofoq 64M1P6110 Volume Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
25-Aug-15, Mechanical Equipment A25-Aug-15, HVAC Equipment Appr
04-Aug-15, Fire Fighting Equipment App
18-Aug-15, Plumbing Equipment App
07-Oct-15, Material P.O07-Oct-15, Electrical Mater
22-Aug-15, Electrical Equipment
01-Sep-15, Mechanical Material P29-Aug-15, HVAC System P.O
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 28 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 29
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P6120 Fire Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P6130 Fire Smoke Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P6160 Supply Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46M1P6170 Exhaust Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46
Fire Fighting SystemFire Fighting System P.O 6 02-Aug-15 08-Aug-15 23M1P6650 Seamless Black Steel Pipes P.O 3 02-Aug-15 04-Aug-15 Ofoq 20M1P6660 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) P.O3 05-Aug-15 08-Aug-15 Ofoq 23
M1P6670 Sprinklers P.O 3 05-Aug-15 08-Aug-15 Ofoq 14M1P6700 Fire Hose Stations P.O 3 05-Aug-15 08-Aug-15 Ofoq 22M1P6710 Fire Hose Real Stations P.O 3 05-Aug-15 08-Aug-15 Ofoq 22M1P6720 Fire Extinguishers P.O 3 05-Aug-15 08-Aug-15 Ofoq 13
Plumbing System PPlumbing System P.O 3 19-Aug-15 22-Aug-15 64M1P7060 PPR Domestic Water Pipes P.O 3 19-Aug-15 22-Aug-15 Ofoq 46M1P7080 UPVC for Drainage System P.O 3 19-Aug-15 22-Aug-15 Ofoq 40M1P7090 PVC for Forced Main Line P.O 3 19-Aug-15 22-Aug-15 Ofoq 58M1P7110 Valves P.O 3 19-Aug-15 22-Aug-15 Ofoq 64M1P7120 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D P.O 3 19-Aug-15 22-Aug-15 Ofoq 28
Mechanical EquipmMechanical Equipment P.O 24 05-Aug-15 01-Sep-15 35HVAC EquipmentHVAC Equipment P.O 24 05-Aug-15 01-Sep-15 35
M1P6230 Exhaust Fans P.O 6 05-Aug-15 11-Aug-15 Ofoq 21M1P6240 Supply Fans P.O 6 05-Aug-15 11-Aug-15 Ofoq 21M1P6190 AC DX Split Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 35M1P6250 Fan Coil Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 17
Fire Fighting EquFire Fighting Equipment P.O 3 05-Aug-15 08-Aug-15 3M1P8510 Fire Pumps P.O 3 05-Aug-15 08-Aug-15 Ofoq 3
Plumbing EquipmPlumbing Equipment P.O 3 19-Aug-15 22-Aug-15 11M1P8580 Domestic Water Pump P.O 3 19-Aug-15 22-Aug-15 Ofoq 11M1P8590 Irrigation Pump P.O 3 19-Aug-15 22-Aug-15 Ofoq 11M1P8600 Waste Water Submersible Pumps P.O 3 19-Aug-15 22-Aug-15 Ofoq 11M1P8610 Sewage Water Submersible Pumps P.O 3 19-Aug-15 22-Aug-15 Ofoq 11
Material DeliveryMaterial Delivery 137 29-Jun-15 13-Dec-15 3Electrical Material Electrical Material Delivery 121 29-Jun-15 24-Nov-15 1
M790 PVC , EMT Conduit with Accessories Conduit Material Delivery
6 29-Jun-15 05-Jul-15 Ofoq 48
M870 Cable Trays Delivery 6 02-Jul-15 08-Jul-15 Ofoq 86M830 Wires for Power and Lighting Material Delivery 6 09-Aug-15 15-Aug-15 Ofoq 56M820 Lighting Fixture Material Delivery 18 16-Aug-15 05-Sep-15 N/A 44M800 Structured Cable for Data System Material Delivery 18 20-Aug-15 09-Sep-15 Ofoq 11M860 Wiring Devices Delivery 36 16-Aug-15 29-Sep-15 Ofoq 15
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
08-Aug-15, Fire Fighting System P.O
22-Aug-15, Plumbing System P.O
01-Sep-15, Mechanical Equipment01-Sep-15, HVAC Equipment P.O
08-Aug-15, Fire Fighting Equipment P.O
22-Aug-15, Plumbing Equipment P.O
13-Dec-15, 24-Nov-15, Elec
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 29 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 30
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M840 CCTV Cameras Material Delivery 45 20-Aug-15 17-Oct-15 N/A 2M880 Fire Alarm Material Delivery 52 16-Aug-15 20-Oct-15 Ofoq 0M810 Distribution Board Material Delivery 52 20-Aug-15 25-Oct-15 Ofoq 24M920 LV Cables Delivery 26 20-Sep-15 25-Oct-15 Ofoq 12M850 Parking System Material Delivery 45 06-Sep-15 02-Nov-15 N/A 0M960 BMS Delivery 40 08-Oct-15 24-Nov-15 Ofoq 1Electrical EquipmentElectrical Equipment 52 23-Aug-15 27-Oct-15 16
M1P5680 MCC Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16Mechanical MateriaMechanical Material Delivery 107 05-Aug-15 13-Dec-15 3
HVAC System DelivHVAC System Delivery 18 23-Aug-15 12-Sep-15 52M1P6260 Galvanized Duct Delivery 6 23-Aug-15 29-Aug-15 Ofoq 4M1P6300 Child Water Pipes Delivery 6 23-Aug-15 29-Aug-15 Ofoq 34M1P6310 Child Water Insulation Delivery 6 23-Aug-15 29-Aug-15 Ofoq 64M1P6270 Volume Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P6280 Fire Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P6290 Fire Smoke Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P6320 Supply Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46M1P6330 Exhaust Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46
Fire Fighting SystemFire Fighting System Delivery 81 05-Aug-15 12-Nov-15 13M1P6730 Seamless Black Steel Pipes Delivery 6 05-Aug-15 11-Aug-15 Ofoq 20M1P6740 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Delivery18 09-Aug-15 29-Aug-15 Ofoq 23
M1P6780 Fire Hose Stations Delivery 36 09-Aug-15 19-Sep-15 Ofoq 22M1P6790 Fire Hose Real Stations Delivery 36 09-Aug-15 19-Sep-15 Ofoq 22M1P6750 Sprinklers Delivery 45 09-Aug-15 03-Oct-15 Ofoq 14M1P6800 Fire Extinguishers Delivery 78 09-Aug-15 12-Nov-15 Ofoq 13
Plumbing System DPlumbing System Delivery 6 23-Aug-15 29-Aug-15 64M1P7170 PPR Domestic Water Pipes Delivery 6 23-Aug-15 29-Aug-15 Ofoq 46M1P7190 UPVC for Drainage System Delivery 6 23-Aug-15 29-Aug-15 Ofoq 40M1P7200 PVC for Forced Main Line Delivery 6 23-Aug-15 29-Aug-15 Ofoq 58M1P7220 Valves Delivery 6 23-Aug-15 29-Aug-15 Ofoq 64M1P7230 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Delivery 6 23-Aug-15 29-Aug-15 Ofoq 28
Mechanical EquipmMechanical Equipment Delivery 104 09-Aug-15 13-Dec-15 3HVAC EquipmentHVAC Equipment Delivery 52 12-Aug-15 17-Oct-15 27
M1P6350 AC DX Split Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 35M1P6410 Fan Coil Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 17M1P6390 Exhaust Fans Delivery 52 12-Aug-15 17-Oct-15 Ofoq 21M1P6400 Supply Fans Delivery 52 12-Aug-15 17-Oct-15 Ofoq 21
Fire Fighting EquFire Fighting Equipment Delivery 104 09-Aug-15 13-Dec-15 3M1P8520 Fire Pumps Delivery 104 09-Aug-15 13-Dec-15 Ofoq 3
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
27-Oct-15, Electrical E
13-Dec-15, 12-Sep-15, HVAC System Delive
12-Nov-15, Fire Fi
29-Aug-15, Plumbing System Delive
13-Dec-15, 17-Oct-15, HVAC Equip
13-Dec-15,
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 30 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 31
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
Plumbing EquipmPlumbing Equipment Delivery 78 23-Aug-15 26-Nov-15 11M1P8620 Domestic Water Pump Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11M1P8630 Irrigation Pump Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11M1P8640 Waste Water Submersible Pumps Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11M1P8650 Sewage Water Submersible Pumps Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11
ConstructionConstruction 138 15-Jul-15 31-Dec-15 0
Structural WorkStructural Work 119 15-Jul-15 08-Dec-15 4
M1P8340 Lower Basement PC Slab On Grade 18 15-Jul-15 06-Aug-15 HW ECIP 71M1P7270 Openings for Duct Shafts 12 26-Jul-15 08-Aug-15 HW ECIP 22M1P7290 Expansion Joints 12 20-Aug-15 02-Sep-15 HW ECIP 64M1P7580 Equipments Concrete Foundations 12 09-Sep-15 26-Sep-15 HW ECIP 41M1P7690 Lower Basement RC Slab On Grade 18 18-Nov-15 08-Dec-15 HW ECIP 4
MEP WorkMEP Work 98 02-Sep-15 31-Dec-15 0
Electrical WorksElectrical Works 98 02-Sep-15 31-Dec-15 0Power SystemPower System 61 02-Sep-15 17-Nov-15 12
M1P7300 Lower Basement PVC Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P7310 Lower Basement EMT Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P7320 Lower Basement Cable Trays for LV Cables 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P7330 Wires for Lower Basement Power Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 41M1P7350 Laying Lower Basement DB Panels 2 26-Oct-15 27-Oct-15 SCG Ofoq 24M1P7340 Laying Lower Basement LV Cables 6 26-Oct-15 01-Nov-15 SCG Ofoq 12M1P7480 Wiring Devices Erection and termination 12 02-Nov-15 15-Nov-15 SCG Ofoq 12M1P7360 Termination Lower Basement DB Panels 6 11-Nov-15 17-Nov-15 SCG Ofoq 12Power EquipmentPower Equipment 14 28-Oct-15 12-Nov-15 16
M1P7370 Laying Lower Basement MCC's 2 28-Oct-15 29-Oct-15 SCG Ofoq 16M1P7380 Termination Lower Basement MCC's 12 31-Oct-15 12-Nov-15 SCG Ofoq 16
Lighting SystemLighting System 36 02-Sep-15 19-Oct-15 29M1P7490 Lower Basement PVC Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 29M1P7500 Lower Basement EMT Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 29M1P7510 Wires for Lower Basement Lighting Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 29M1P7470 Lighting Fixture Erection and termination 18 27-Sep-15 19-Oct-15 SCG Ofoq 29
Low Current SysteLow Current Systems 98 02-Sep-15 31-Dec-15 0Fire Alarm SystemFire Alarm System 98 02-Sep-15 31-Dec-15 0
M1P7700 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 19M1P7710 Fire Alarm Cable 18 21-Oct-15 10-Nov-15 SCG Ofoq 0M1P7720 Fire Alarm Devices 18 11-Nov-15 01-Dec-15 SCG Ofoq 0M1P7730 Testing And Precommissioning 25 02-Dec-15 31-Dec-15 SCG Ofoq 0
Data SystemData System 98 02-Sep-15 31-Dec-15 0M1P7740 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
26-Nov-15, Plum
31-Dec-
08-Dec-15, S
31-Dec-
31-Dec-17-Nov-15, Power
12-Nov-15, Power
19-Oct-15, Lighting Sys
31-Dec-31-Dec-
31-Dec-
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 31 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 32
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P7750 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0M1P7760 Face Plates Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0M1P7770 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0
CCTV SystemCCTV System 98 02-Sep-15 31-Dec-15 0M1P7780 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0M1P7790 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0M1P7800 Cameras Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0M1P7810 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0
BMS SystemBMS System 97 02-Sep-15 30-Dec-15 1M1P7820 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 32M1P7830 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 32M1P7840 BMS System Erection & Termination 12 25-Nov-15 08-Dec-15 SCG Ofoq 1M1P7850 Testing And Precommissioning 18 09-Dec-15 30-Dec-15 SCG Ofoq 1
Parking SystemParking System 98 02-Sep-15 31-Dec-15 0M1P7860 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 12M1P7870 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 12M1P7880 Parking System 20 03-Nov-15 25-Nov-15 SCG Ofoq 0M1P7890 Testing And Precommissioning 30 26-Nov-15 31-Dec-15 SCG Ofoq 0
Mechanical WorksMechanical Works 95 02-Sep-15 28-Dec-15 3HVAC SystemHVAC System 72 02-Sep-15 30-Nov-15 1
M1P7900 Galvanized Duct Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 1M1P7920 Child Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 31M1P7910 Volume Dampers , Fire Dampers and Fire Smoke Dampers
Erection12 27-Sep-15 11-Oct-15 SCG Ofoq 1
M1P7940 Child Water Pipes Test and Flushing 12 27-Sep-15 11-Oct-15 SCG Ofoq 31M1P7980 Fan Coil Unit Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 17M1P7930 Duct Smoke Test 12 12-Oct-15 26-Oct-15 SCG Ofoq 1M1P7960 Child Water Pipes Insulation 12 12-Oct-15 26-Oct-15 SCG Ofoq 31M1P7950 Duct Insulation 12 27-Oct-15 09-Nov-15 SCG Ofoq 1M1P7970 Air Grill Supply and Exhaust 18 10-Nov-15 30-Nov-15 SCG Ofoq 1HVAC EquipmentHVAC Equipment 26 07-Oct-15 07-Nov-15 21
M1P8000 AC DX Split Units Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 35M1P8040 Exhaust Fans Erection 18 18-Oct-15 07-Nov-15 SCG Ofoq 21M1P8050 Supply Fans Erection 18 18-Oct-15 07-Nov-15 SCG Ofoq 21
Fire Fighting SysteFire Fighting System 95 02-Sep-15 28-Dec-15 3M1P8060 Seamless Black Steel Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 2M1P8070 Fire Fighting Network Valves (O.S&Y gate valve, Check
valve, Alarm Check Valve) Erection6 27-Sep-15 03-Oct-15 SCG Ofoq 2
M1P8140 Pipe Testing and Flushing 12 04-Oct-15 19-Oct-15 SCG Ofoq 2M1P8110 Fire Hose Stations Erection 36 20-Sep-15 05-Nov-15 SCG Ofoq 22
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
31-Dec-
30-Dec-
31-Dec-
28-Dec-30-Nov-15, HV
07-Nov-15, HVAC E
28-Dec-
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 32 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 33
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P8120 Fire Hose Real Stations Erection 36 20-Sep-15 05-Nov-15 SCG Ofoq 22M1P8130 Fire Extinguishers 3 14-Nov-15 16-Nov-15 SCG Ofoq 13M1P8080 Sprinklers Erection 45 20-Oct-15 10-Dec-15 SCG Ofoq 2Fire Fighting EquipFire Fighting Equipment 12 14-Dec-15 28-Dec-15 3
M1P8530 Fire Pumps Erection 12 14-Dec-15 28-Dec-15 SCG Ofoq 3Plumbing SystemPlumbing System 87 02-Sep-15 17-Dec-15 11
M1P8240 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Erection 12 02-Sep-15 15-Sep-15 SCG Ofoq 25M1P8180 PPR Domestic Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 43M1P8230 Valves Erection 6 27-Sep-15 03-Oct-15 SCG Ofoq 43M1P8200 UPVC for Drainage System Erection 18 16-Sep-15 11-Oct-15 SCG Ofoq 25M1P8260 Testing Domestic Network 6 04-Oct-15 11-Oct-15 SCG Ofoq 43M1P8210 PVC for Forced Main Line Erection 12 12-Oct-15 26-Oct-15 SCG Ofoq 25M1P8270 Testing for Drainage Network 6 27-Oct-15 02-Nov-15 SCG Ofoq 25Plumbing EquipmePlumbing Equipment 18 28-Nov-15 17-Dec-15 11
M1P8660 Domestic Water Pump Erection 18 28-Nov-15 17-Dec-15 SCG Ofoq 11M1P8670 Irrigation Pump Erection 18 28-Nov-15 17-Dec-15 SCG Ofoq 11M1P8680 Waste Water Submersible Pumps Erection 18 28-Nov-15 17-Dec-15 SCG Ofoq 11M1P8690 Sewage Water Submersible Pumps Erection 18 28-Nov-15 17-Dec-15 SCG Ofoq 11
Finishing WorkFinishing Work 126 29-Jul-15 29-Dec-15 2
M1P8350 Block Work Completion for Equipments / Service / Stores Rooms
12 29-Jul-15 11-Aug-15 HW ECIP 4
M1P8360 Plaster Work Applied for Equipments / Service / Stores Roo 12 12-Aug-15 25-Aug-15 HW ECIP 4M1P8310 Curb Stone Material Erection 12 06-Sep-15 19-Sep-15 HW ECIP 46M1P8370 MEP 1st Fix for Equipments / Service / Stores Rooms 26 26-Aug-15 28-Sep-15 SCG Ofoq 4M1P8320 Interlock Material Erection 12 20-Sep-15 07-Oct-15 HW ECIP 46M1P8390 Paint 1st and 2nd Coat for Ceiling and Walls in Lower
Basement26 06-Sep-15 10-Oct-15 HW ECIP 54
M1P8280 False Ceiling Material Erection for Equipments / Service / Stores Rooms
12 29-Sep-15 13-Oct-15 HW ECIP 4
M1P8300 Paint Material Applied for Equipments / Service / Stores Rooms
12 15-Oct-15 28-Oct-15 HW ECIP 4
M1P8290 Flooring Tiles Material Applied for Equipments / Service / Stores Rooms
12 29-Oct-15 11-Nov-15 HW ECIP 4
M1P8330 Doors Erection for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 HW ECIP 5M1P8380 MEP Final Fix for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 SCG Ofoq 4M1P8400 Final Coat of Paint for Walls and Ceiling 12 12-Dec-15 26-Dec-15 HW ECIP 2M1P8410 Epoxi Paint for Flooring 12 15-Dec-15 29-Dec-15 HW ECIP 2
Building 1Building 1 154 15-Jun-15 19-Dec-15 10
DesignDesign 43 15-Jun-15 05-Aug-15 33
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
28-Dec-
17-Dec-15,
17-Dec-15,
29-Dec-
19-Dec-15
05-Aug-15, Design
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 33 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 34
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P8700 Interior Design Package 1 15-Jun-15 15-Jun-15 EK 17M1P8710 Updated MEP Design Package 1 29-Jun-15 29-Jun-15 SCG 17M1P9030 Updated MEP Design Package for 1st & Ground Floors 18 15-Jun-15 05-Jul-15 SCG 1M1P9170 Top Roof Equipment Foundation Design 12 22-Jul-15 05-Aug-15 HW 33
Shop DrawingsShop Drawings 55 16-Jun-15 20-Aug-15 65
5th Floor Shop D5th Floor Shop Drawings 18 16-Jun-15 06-Jul-15 24
M1P8720 5th Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 17M1P8730 5th Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24
4th Floor Shop D4th Floor Shop Drawings 18 16-Jun-15 06-Jul-15 24
M1P8740 4th Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 23M1P8750 4th Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24
3rd Floor Shop D3rd Floor Shop Drawings 18 16-Jun-15 06-Jul-15 24
M1P8760 3rd Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 23M1P8770 3rd Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24
2nd Floor Shop D2nd Floor Shop Drawings 18 16-Jun-15 06-Jul-15 24
M1P8780 2nd Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 23M1P8790 2nd Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24
1st Floor Shop Dr1st Floor Shop Drawings 49 16-Jun-15 13-Aug-15 1
M1P8810 1st Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24M1P9040 1st Floor Electrical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Ofoq 1M1P9050 1st Floor Mechanical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Delta 1M1P8800 1st Floor MEP Composite Drawing 0 13-Aug-15 SCG E/Ofoq 1
Ground Floor ShoGround Floor Shop Drawings 49 16-Jun-15 13-Aug-15 1
M1P8830 Ground Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24M1P9060 1st Floor Electrical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Ofoq 1M1P9070 1st Floor Mechanical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Delta 1M1P8820 Ground Floor MEP Composite Drawing 0 13-Aug-15 SCG E/Ofoq 1
Upper Basement Upper Basement Floor Shop Drawings 49 16-Jun-15 13-Aug-15 1
M1P8850 Upper Basement Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24M1P9100 1st Floor Electrical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Ofoq 1M1P9110 1st Floor Mechanical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Delta 1M1P8840 Upper Basement Floor MEP Composite Drawing 0 13-Aug-15 SCG E/Ofoq 1
Lower Basement Lower Basement Floor Shop Drawings 49 16-Jun-15 13-Aug-15 1
M1P8870 Lower Basement Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24M1P9120 1st Floor Electrical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Ofoq 1M1P9130 1st Floor Mechanical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Delta 1M1P8860 Lower Basement MEP Composite Drawing 0 13-Aug-15 SCG E/Ofoq 1
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
20-Aug-15, Shop Drawings
06-Jul-15, 5th Floor Shop Drawings
06-Jul-15, 4th Floor Shop Drawings
06-Jul-15, 3rd Floor Shop Drawings
06-Jul-15, 2nd Floor Shop Drawings
13-Aug-15, 1st Floor Shop Drawings
13-Aug-15, Ground Floor Shop Drawin
13-Aug-15, Upper Basement Floor Sho
13-Aug-15, Lower Basement Floor Sho
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 34 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 35
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
Roof Floor Shop Roof Floor Shop Drawings 18 02-Jul-15 26-Jul-15 60
M1P8880 Roof Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 35M1P8890 Roof Floor Architecture Shop Drawing 18 04-Jul-15 26-Jul-15 T.B ECIP 60
Shafts DetailsShafts Details 6 15-Aug-15 20-Aug-15 45
M1P8900 Electrical Risers Shaft Details 6 15-Aug-15 20-Aug-15 SCG E/Ofoq 45M1P8910 Mechanical Risers Shaft Details 6 15-Aug-15 20-Aug-15 SCG E/Delta 45
Stairs DetailsStairs Details 12 27-Jul-15 09-Aug-15 75
M1P8920 Stairs Shop Drawings 12 27-Jul-15 09-Aug-15 EK MI 75
MaterialMaterial 128 15-Jun-15 18-Nov-15 10
M1P8930 Remainging 1st Fix Electrical Materials Delivery 26 15-Jun-15 14-Jul-15 E/Ofoq 7M1P8950 Remainging 1st Fix Mechanical Materials Delivery 26 15-Jun-15 14-Jul-15 E/Delta 7M1P8970 Interior Materials Delivery 78 07-Jul-15 12-Oct-15 MI 24M1P8940 Remainging Final Fix Electrical Materials Delivery 52 15-Aug-15 19-Oct-15 E/Ofoq 1M1P8960 Remainging Final Fix Mechanical Materials Delivery 52 15-Aug-15 19-Oct-15 E/Delta 1M1P8980 Mechanical Equipments 78 15-Aug-15 18-Nov-15 E/Delta 10
CostructionCostruction 128 15-Jul-15 19-Dec-15 10
5th Floor5th Floor 106 15-Jul-15 23-Nov-15 1
M1P8990 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 7M1P9220 Finishing Work 52 08-Aug-15 11-Oct-15 MI 7M1P9230 MEP Final Fix 18 20-Oct-15 09-Nov-15 E/D/O 1M1P9240 Final Finishing and Fixtures 12 10-Nov-15 23-Nov-15 MI 1
4th Floor4th Floor 106 15-Jul-15 23-Nov-15 7
M1P9000 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 13M1P9250 Finishing Work 52 08-Aug-15 11-Oct-15 MI 13M1P9260 MEP Final Fix 18 20-Oct-15 09-Nov-15 E/D/O 7M1P9270 Final Finishing and Fixtures 12 10-Nov-15 23-Nov-15 MI 7
3rd Floor3rd Floor 106 15-Jul-15 23-Nov-15 7
M1P9010 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 13M1P9280 Finishing Work 52 08-Aug-15 11-Oct-15 MI 13M1P9290 MEP Final Fix 18 20-Oct-15 09-Nov-15 E/D/O 7M1P9300 Final Finishing and Fixtures 12 10-Nov-15 23-Nov-15 MI 7
2nd Floor2nd Floor 106 15-Jul-15 23-Nov-15 7
M1P9020 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 13M1P9310 Finishing Work 52 08-Aug-15 11-Oct-15 MI 13M1P9320 MEP Final Fix 18 20-Oct-15 09-Nov-15 E/D/O 7M1P9330 Final Finishing and Fixtures 12 10-Nov-15 23-Nov-15 MI 7
1st Floor1st Floor 88 15-Aug-15 30-Nov-15 1
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
26-Jul-15, Roof Floor Shop Drawings
20-Aug-15, Shafts Details
09-Aug-15, Stairs Details
18-Nov-15, Mater
19-Dec-15
23-Nov-15, 5th F
23-Nov-15, 4th F
23-Nov-15, 3rd
23-Nov-15, 2nd
30-Nov-15, 1st
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 35 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 36
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P9080 MEP 1st Fix Completion 18 15-Aug-15 03-Sep-15 E/D/O 1M1P9340 Finishing Work 40 05-Sep-15 26-Oct-15 MI 1M1P9350 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P9360 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
Ground FloorGround Floor 88 15-Aug-15 30-Nov-15 1
M1P9090 MEP 1st Fix Completion 18 15-Aug-15 03-Sep-15 E/D/O 1M1P9370 Finishing Work 40 05-Sep-15 26-Oct-15 MI 1M1P9380 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P9390 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
Upper Basement Upper Basement Core Area 88 15-Aug-15 30-Nov-15 1
M1P9140 MEP 1st Fix Completion 18 15-Aug-15 03-Sep-15 E/D/O 1M1P9400 Finishing Work 40 05-Sep-15 26-Oct-15 MI 1M1P9410 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P9420 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
Lower Basement Lower Basement Core Area 88 15-Aug-15 30-Nov-15 1
M1P9150 MEP 1st Fix Completion 18 15-Aug-15 03-Sep-15 E/D/O 1M1P9430 Finishing Work 40 05-Sep-15 26-Oct-15 MI 1M1P9440 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P9450 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
RoofRoof 128 15-Jul-15 19-Dec-15 10
M1P9160 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 32M1P9180 Roof Equipment Foundation 18 08-Aug-15 27-Aug-15 ECIP 32M1P9190 Roof Insulation 26 29-Aug-15 30-Sep-15 ECIP 32M1P9200 Roof Flooring 18 01-Oct-15 24-Oct-15 ECIP 32M1P9210 Roof Equipment installation 26 19-Nov-15 19-Dec-15 E/D/O 10
ShaftsShafts 26 05-Sep-15 08-Oct-15 45
M1P9460 Electrical Risers 26 05-Sep-15 08-Oct-15 E/Ofoq 45M1P9470 Mechanical Risers 26 05-Sep-15 08-Oct-15 E/Delta 45
StairsStairs 18 10-Nov-15 30-Nov-15 1
M1P9480 Stairs Finishing 18 10-Nov-15 30-Nov-15 MI 1ElevatorsElevators 50 20-Sep-15 22-Nov-15 8
M1P9490 Elevator Well Ready for Work 0 20-Sep-15 HW ECIP 8M1P9485 Elevator Material At Site 1 20-Sep-15 20-Sep-15 SCG Kone 8M1P9510 Elevator Mechanical Work 20 21-Sep-15 19-Oct-15 SCG Kone 8M1P9520 Elevator Electrical Work 12 20-Oct-15 02-Nov-15 SCG Kone 8M1P9530 Electrical Power Source 1 03-Nov-15 03-Nov-15 SCG Kone 8M1P9540 Elevator Tests 10 04-Nov-15 15-Nov-15 SCG Kone 8M1P9550 Elevator Final Completion 6 16-Nov-15 22-Nov-15 SCG Kone 8
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
30-Nov-15, Gr
30-Nov-15, Up
30-Nov-15, Lo
19-Dec-15
08-Oct-15, Shafts
30-Nov-15, Sta
22-Nov-15, Elev
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 36 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 37
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
Building 4Building 4 154 15-Jun-15 19-Dec-15 10
DesignDesign 74 15-Jun-15 10-Sep-15 10
M1P9560 Interior Design Package 18 15-Jun-15 05-Jul-15 EK 1M1P9890 MEP Design Package for Building 4 18 06-Jul-15 28-Jul-15 SCG 1M1P10030 Top Roof Equipment Foundation Design 12 29-Aug-15 10-Sep-15 HW 10
Shop DrawingsShop Drawings 80 06-Jul-15 13-Oct-15 23
2nd Floor Shop D2nd Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1
M1P9650 2nd Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P10420 2nd Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P10430 2nd Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9640 2nd Floor MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1
1st Floor Shop Dr1st Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1
M1P9670 1st Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P9900 1st Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P9910 1st Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9660 1st Floor MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1
Ground Floor ShoGround Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1
M1P9690 Ground Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P9920 1st Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P9930 1st Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9680 Ground Floor MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1
Upper Basement Upper Basement Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1
M1P9710 Upper Basement Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P9960 1st Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P9970 1st Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9700 Upper Basement Floor MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1
Lower Basement Lower Basement Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1
M1P9730 Lower Basement Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P9980 1st Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P9990 1st Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9720 Lower Basement MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1
Roof Floor Shop Roof Floor Shop Drawings 30 20-Aug-15 28-Sep-15 16
M1P9740 Roof Floor MEP Composite Drawing 0 20-Aug-15 SCG E/Ofoq 10M1P9750 Roof Floor Architecture Shop Drawing 18 05-Sep-15 28-Sep-15 T.B ECIP 16
Shafts DetailsShafts Details 6 26-Aug-15 01-Sep-15 35
M1P9760 Electrical Risers Shaft Details 6 26-Aug-15 01-Sep-15 SCG E/Ofoq 35
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
19-Dec-15
10-Sep-15, Design
13-Oct-15, Shop Drawing
25-Aug-15, 2nd Floor Shop Drawing
25-Aug-15, 1st Floor Shop Drawings
25-Aug-15, Ground Floor Shop Dra
25-Aug-15, Upper Basement Floor S
25-Aug-15, Lower Basement Floor S
28-Sep-15, Roof Floor Shop
01-Sep-15, Shafts Details
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 37 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 38
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P9770 Mechanical Risers Shaft Details 6 26-Aug-15 01-Sep-15 SCG E/Delta 35Stairs DetailsStairs Details 12 29-Sep-15 13-Oct-15 23
M1P9780 Stairs Shop Drawings 12 29-Sep-15 13-Oct-15 EK MI 23
MaterialMaterial 120 15-Jun-15 09-Nov-15 26
M1P9790 1st Fix Electrical Materials Delivery 18 15-Jun-15 05-Jul-15 E/Ofoq 43M1P9810 1st Fix Mechanical Materials Delivery 18 15-Jun-15 05-Jul-15 E/Delta 43M1P9800 Final Fix Electrical Materials Delivery 40 26-Aug-15 17-Oct-15 E/Ofoq 9M1P9820 Fix Mechanical Materials Delivery 40 26-Aug-15 17-Oct-15 E/Delta 9M1P9830 Interior Materials Delivery 78 29-Jul-15 02-Nov-15 MI 13M1P9840 Mechanical Equipments 60 26-Aug-15 09-Nov-15 E/Delta 26
CostructionCostruction 98 22-Aug-15 19-Dec-15 10
2nd Floor2nd Floor 78 26-Aug-15 30-Nov-15 1
M1P9880 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10170 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10180 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10190 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
1st Floor1st Floor 78 26-Aug-15 30-Nov-15 1
M1P9940 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10200 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10210 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10220 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
Ground FloorGround Floor 78 26-Aug-15 30-Nov-15 1
M1P9950 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10230 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10240 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10250 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
Upper Basement Upper Basement Core Area 78 26-Aug-15 30-Nov-15 1
M1P10000 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10260 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10270 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10280 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
Lower Basement Lower Basement Core Area 78 26-Aug-15 30-Nov-15 1
M1P10010 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10290 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10300 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10310 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1
RoofRoof 98 22-Aug-15 19-Dec-15 10
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
13-Oct-15, Stairs Details
09-Nov-15, Materia
19-Dec-15
30-Nov-15, 2nd
30-Nov-15, 1st
30-Nov-15, Gr
30-Nov-15, Up
30-Nov-15, Lo
19-Dec-15
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 38 of 39 TASK filter: All Activities
© Primavera Systems, Inc.
Page 39
Activity ID Activity Name OriginalDuration
Start Finish Consultant Contractor TotalFloat
M1P10020 MEP 1st Fix Completion 18 22-Aug-15 10-Sep-15 E/D/O 10M1P10040 Roof Equipment Foundation 18 12-Sep-15 05-Oct-15 ECIP 10M1P10050 Roof Insulation 26 07-Oct-15 07-Nov-15 ECIP 10M1P10060 Roof Flooring 18 08-Nov-15 28-Nov-15 ECIP 10M1P10070 Roof Equipment installation 18 29-Nov-15 19-Dec-15 E/D/O 10
ShaftsShafts 26 16-Sep-15 21-Oct-15 35
M1P10320 Electrical Risers 26 16-Sep-15 21-Oct-15 E/Ofoq 35M1P10330 Mechanical Risers 26 16-Sep-15 21-Oct-15 E/Delta 35
StairsStairs 18 15-Oct-15 04-Nov-15 23
M1P10340 Stairs Finishing 18 15-Oct-15 04-Nov-15 MI 23ElevatorsElevators 50 20-Sep-15 22-Nov-15 8
M1P10350 Elevator Well Ready for Work 0 20-Sep-15 HW ECIP 8M1P10360 Elevator Material At Site (There is No Contract/Obligation)
and This item Subjected to Client1 20-Sep-15 20-Sep-15 Client 8
M1P10370 Elevator Mechanical Work 20 21-Sep-15 19-Oct-15 Client 8M1P10380 Elevator Electrical Work 12 20-Oct-15 02-Nov-15 Client 8M1P10390 Electrical Power Source 1 03-Nov-15 03-Nov-15 Client 8M1P10400 Elevator Tests 10 04-Nov-15 15-Nov-15 Client 8M1P10410 Elevator Final Completion 6 16-Nov-15 22-Nov-15 Client 8
Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016
21-Oct-15, Shafts
04-Nov-15, Stairs
22-Nov-15, Elev
Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36
Actual WorkRemaining Work
Critical Remaining WorkMilestone
Summary Page 39 of 39 TASK filter: All Activities