BRAYS BAYOU + BRIDGE Fall 2015 Concept Presentation Presented by: Julianne Crawford, Avi Gori, Kasia Nikiel
47

Final fall senior design presentation

Mar 19, 2017

Download

Engineering

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final fall senior design presentation

BRAYS BAYOU + BRIDGEFall 2015 Concept Presentation

Presented by:

Julianne Crawford, Avi Gori, Kasia Nikiel

Page 2: Final fall senior design presentation

Project Description + Goals

➔ Design Brays Bayou channel modifications

➔ Reconstruct of Greenbriar Bridge between Braeswood & Main

➔ Consider of additional stormwater flow from 7200 Main

➔ Coordinate with 7200 Main development for other features

➔ Protect Meyerland area from future flooding

Page 3: Final fall senior design presentation

Brays Bayou between Fannin St. and Greenbriar St.

Page 4: Final fall senior design presentation

Greenbriar Bridge

Page 5: Final fall senior design presentation

Background Research + Modeling

Page 6: Final fall senior design presentation

Project Brays➔ Funded by US Army Corps and HCFCD➔ Comprehensive re-design of Brays Bayou

◆ Channel Modifications◆ Bridge Replacement/Renovation◆ New Detention Area

➔ Aimed at mitigating riverine flooding throughout Brays Bayou Watershed ➔ Status:

◆ Upper Reach: Completed◆ Middle Reach: In Progress◆ Lower Reach: In Progress

➔ Scheduled to be completed in 2021

Page 7: Final fall senior design presentation

Project Brays Proposed Improvements

Page 8: Final fall senior design presentation

100-year Floodplain (TSARP Model - 2004)

Page 9: Final fall senior design presentation

100-year Floodplain (Current Conditions - 2010)

Page 10: Final fall senior design presentation

100-year Floodplain (Post Project Brays - 2021)

Page 11: Final fall senior design presentation

100-year Floodplain (TSARP) at Site Location

Page 12: Final fall senior design presentation

100-year Floodplain (Post Project Brays) at Site Location

Page 13: Final fall senior design presentation

Bridge - Current Conditions

Page 14: Final fall senior design presentation

Concept Design

Page 15: Final fall senior design presentation

OPTION 1: Widen the Channel

Page 16: Final fall senior design presentation

HEC-RAS Geometry for Greenbriar Section

Main Street

Greenbriar Street

Fannin Street

Page 17: Final fall senior design presentation

Cross Section Comparison - Downstream (RS 56478)

Current 100-yr Level (44.07 ft)

PPB 100-yr Level (43.47 ft)

PPB Geometry

Current Geometry

Page 18: Final fall senior design presentation

OPTION 1: Widen the Channel -- BRIDGE

Page 19: Final fall senior design presentation

OPTION 2: Retaining Wall

Page 20: Final fall senior design presentation

HEC-RAS Geometry for Greenbriar Section

Main Street

Greenbriar Street

Fannin Street

Page 21: Final fall senior design presentation

Cross Section Comparison - Upstream (RS 59882)

Current 100-yr Level (45.70 ft)

PPB 100-yr Level (44.96 ft)

PPB Geometry

Current Geometry

Page 22: Final fall senior design presentation

OPTION 2: Retaining Walls -- BRIDGE

Page 23: Final fall senior design presentation

Existing Plan View of Bridge Deck

Page 24: Final fall senior design presentation

87.0’

Bridge Tie-Ins With Existing Roads

87.0’

5% Grade 4.35’

Page 25: Final fall senior design presentation

Proposal

Page 26: Final fall senior design presentation

Modified Scenario

➔ Retaining walls and some

widening on both banks

from Main to Greenbriar

➔ Retaining walls and

substantial widening on the

right bank from Greenbriar

to Fannin

Page 27: Final fall senior design presentation

Modified HEC-RAS Geometry Examples (Upstream - RS 58740 )

Modified Geometry

PPB Geometry

Page 28: Final fall senior design presentation

Modified HEC-RAS Geometry Examples (Downstream - RS 57958)

Modified Geometry

PPB Geometry

Page 29: Final fall senior design presentation

Modified Scenario Results - RS 59882

Modified Geometry

PPB Geometry

Modified 100-yr LevelPPB 100-yr Level

44.71 ft 44.96 ft

Page 30: Final fall senior design presentation

Modified Scenario Results - RS 56478

Modified Geometry

PPB Geometry

Modified 100-yr LevelPPB 100-yr Level

43.47 ft 43.37 ft

Page 31: Final fall senior design presentation

Proposed Bridge Cross-Section

Page 32: Final fall senior design presentation

Proposed Plan View of Widened Bridge Deck

Page 33: Final fall senior design presentation

Impact of Proposed Modifications

➔ Modifications along the Main to Fannin portion of the channel should not have

drastic adverse effects on downstream sections.

➔ According to the 100-year floodplains, both current and post project brays, the

areas downstream of our site already face a much lower inundation hazard

than the middle and upper reaches.

Page 34: Final fall senior design presentation

Moving Forward

Page 35: Final fall senior design presentation

Brays Bayou

➔ Finalize channel modifications for Main to Fannin segment

➔ Add additional cross sections to existing HEC-RAS geometry

➔ Perform unsteady state HEC-RAS analysis

➔ Incorporate additional flow from hotel if necessary

Page 36: Final fall senior design presentation

Proposed HEC-RAS Geometry Modification

Page 37: Final fall senior design presentation

Bridge

➔ Finalize aesthetic design with 7200 Main St. group

➔ Determine appropriate foundations

➔ Superstructure/Substructure design of the bridge

Page 38: Final fall senior design presentation

Meyerland

Page 39: Final fall senior design presentation

May 2015 Storm - Comparison of Flooding to Current 100-year Floodplain

Page 40: Final fall senior design presentation

May 2015 Storm - Damage Reports in Meyerland

Page 41: Final fall senior design presentation

100-year Floodplain (Post Project Brays) at Meyerland

Page 42: Final fall senior design presentation
Page 43: Final fall senior design presentation

Appendix

Page 44: Final fall senior design presentation

Channel Profile

Fannin Greenbriar Main

Direction of Flow

Page 45: Final fall senior design presentation

Construction

Page 46: Final fall senior design presentation

Green Space

➔ Finalize design for green space with hotel

➔ Ensure that all trails are integrated smoothly

Page 47: Final fall senior design presentation

Meyerland 100-yr Floodplain - Current Conditions v. Post Project Brays