Page 1
Final Environmental Impact Assessment Report
For proposed expansion of Formaldehyde and manufacturing of Paraformaldehyde & Reprocessing Silver
(Purification of Silver)
Category: 5(f)
of
Balaji Formalin Pvt. Ltd. Plot No. 1398, Village: Moti Bhoyan, Taluka: Kalol,
Dist.: Gandhinagar, Gujarat
Prepared by:
San Envirotech Pvt. Ltd. 424, Medicine Market,
Paldi Cross Road, Ahmedabad-380006
Email: [email protected]
(March, 2016)
Provisional accredited by NABET, vide letter no. NABET/EIA/327/IA14, dated 12.05.2014
Page 2
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1
Contents Particulars Page No.
Contents 1-8
List of Tables 9-11
List of Figures 12
List of Annexures 13
Index Chapter 1 Introduction Page No.
1.1 Preface 1-1
1.2 Purpose of the Report 1-1
1.3 Identification of Project & Project Proponent 1-3
1.3.1 Identification of Project site with site specific
criteria
1-3
1.3.2 Project Identification with respect to category 1-3
1.3.3 Project Proponent 1-3
1.4 Brief Description of Project 1-4
1.4.1 Nature of the project 1-4
1.4.2 Size of the Project 1-4
1.4.3 Location of the project 1-5
1.5 Regulatory Framework 1-5
1.6 Scope of the Study 1-5
1.7 Compliance to Terms of Reference 1-6
1.8 Objectives of EIA 1-24
1.9 Methodology for EIA 1-24
1.10 Details of Industries 1-26
Chapter 2 Project Description
2.1 Introduction 2-1
2.2 Type of project 2-1
2.3 Need for the expansion 2-1
2.4 Capital Investment 2-2
2.5 Land Requirement 2-2
2.6 Location of the project 2-2
2.7 Size or Magnitude of Operation 2-3
2.8 Proposed schedule for approval and
implementation
2-3
Page 3
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2
2.9 Details of Major Equipment and Machinery
(Existing & Proposed)
2-4
2.10 Manufacturing process, chemical reaction and
mass balance
2-6
2.10.1 Formaldehyde Production Technique 2-6
2.10.2 Process of making Para-formaldehyde from
Methanol using rake type drying method
2-9
2.10.3 Process of Silver Refining 2-11
2.11 Project Components 2-13
2.12 Input Requirements 2-14
(a) Raw Material Requirement 2-14
(b) Water Requirement 2-14
(c) Fuel 2-14
(d) Power 2-14
(e) Manpower 2-14
2.13 Utilities Requirement 2-14
2.14 Generation of Pollutants 2-15
2.14.1 Wastewater Generation 2-15
2.14.2 Gaseous Emissions 2-15
2.14.3 Hazardous/Solid Waste generation 2-16
2.14.4 Noise pollution 2-16
2.15 Pollution Control measures 2-16
2.15.1 Effluent Management 2-16
2.15.2 Air Pollution Control 2-16
2.15.3 Hazardous/Solid Waste Management 2-17
2.15.4 Noise Control Measures 2-17
2.15.5 Fugitive Emission Control 2-17
2.16 Resource Conservation 2-18
2.16.1 Heat Recovery 2-18
2.16.2 Rain Water Harvesting System 2-18
2.16.3 Green Belt Development 2-18
2.17 Odour control 2-18
2.18 Health & Safety 2-19
Chapter 3 Baseline Environmental Status
3.1 Prelude 3-1
3.1.1 Study area 3-1
3.1.2 Period of the study area 3-1
Page 4
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3
3.1.3 Basic Component of the Environment 3-1
3.1.4 Methodology 3-2
3.2 Establishment of baseline for Valued
Environmental Components
3-6
3.3 Air Environment 3-6
3.3.1 Design of Network for Ambient Air Quality
Monitoring Stations
3-6
3.3.2 Reconnaissance 3-7
3.3.3 Micrometeorology of the area 3-7
3.3.4 Ambient Air Quality Survey 3-8
3.3.5 Baseline Status 3-9
3.4 Hydro-geological status of the study area 3-9
3.5 Water Environment 3-10
3.5.1 Ground Water Quality (Primary data) 3-11
3.6 Noise Environment (Primary data) 3-12
3.6.1 Introduction 3-12
3.6.2 Methodology 3-12
3.6.3 Day-Time and Night-Time Noise Levels 3-13
3.6.4 Ambient Air Quality Standards in Respect of
Noise
3-13
3.6.5 Ambient Noise Levels in the Study Area 3-13
3.6.6 Conclusions 3-13
3.7 Soil Environment (Primary data) 3-13
3.7.1 Introduction 3-13
3.7.2 Soil Characteristics 3-14
3.7.3 Corollaries 3-14
3.8 Ecology (Primary data) 3-15
3.8.1 Period of the study 3-16
3.8.2 Study methodology 3-16
3.8.3 Floral Diversity in the study area 3-16
3.8.4 Cultivated plants in the study area 3-16
3.8.5 Faunal Diversity in the study area 3-17
3.9 Socio Economic & Land use (Secondary data) 3-17
3.9.1 Land use pattern and infrastructure 3-17
3.9.2 Demographic and Socio-Economic Environment 3-17
3.9.3 Living Standard and Infrastructure 3-18
Page 5
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4
Chapter 4 Anticipated Environmental Impacts &
Mitigation Measures
4.1 General 4-1
4.2 Impact on Topography 4-2
4.3 Air Environment 4-2
4.3.1 Prediction of Impact during Construction Phase 4-2
4.3.2 Prediction of Impact during Operational Phase 4-3
4.3.3 Sources of Air Pollution 4-3
4.3.4 Dispersion Modelling of Emissions from the plant 4-4
4.3.5 Micrometeorology 4-5
4.3.6 Air Quality Modeling and Predictions using the
Gaussian model
4-5
4.3.7 Details of Air Dispersion Model 4-7
4.3.8 Predicted GLCs 4-7
4.4 Water Environment 4-8
4.5 Noise Level Impact 4-9
4.5.1 Prediction of impact During Construction Phase 4-9
4.5.2 Prediction of impact During Operational Phase 4-9
4.6 Land/soil Environment 4-10
4.6.1 Prediction of impact during Construction Phase 4-10
4.6.2 Prediction of impact during Operation Phase 4-10
4.7 Ecological Impacts (Flora and Fauna) 4-11
4.8 Socio-Economic Impact 4-11
4.9 Mitigation Measures during Construction 4-13
4.10 Mitigation Measures during the Operational phase 4-13
4.10.1 Measures for Air Environment 4-13
4.10.2 Measures for Water Environment 4-14
4.10.3 Measures for Hazardous/Solid Waste 4-14
4.10.4 Measures for Noise 4-14
4.10.5 Health & Safety Measures 4-14
Chapter 5 Analysis of Alternatives
5.1 Prologue 5-1
5.2 Project Details 5-1
5.3 Site Alternative 5-1
5.4 Alternative For Technologies 5-2
Chapter 6 Environmental Monitoring Programme
6.1 Prelude 6-1
Page 6
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 5
6.2 Environment Monitoring Program 6-1
6.3 Objective of Monitoring Plan 6-1
6.4 Schedules for Environment Monitoring 6-2
6.5 Ambient Air Quality Monitoring 6-2
Chapter 7 Additional Studies
(A) Risk Assessment 7-1
7.1 Introduction 7-1
7.1.1 Scope of Study 7-1
7.1.2 Study Objective 7-1
7.1.3 The Study Approach 7-1
7.1.4 System Description 7-2
7.1.5 Identification of Hazards 7-2
7.1.6 Risk Reduction Measures 7-2
7.2 Probable Hazards & Risk 7-2
7.3 Hazardous Identification 7-2
7.4 Hazardous Substances to be handled at Balaji
Formalin Pvt. Ltd.
7-3
7.5 Hazardous Materials Classification 7-3
7.5.1 Raw Materials 7-5
7.6 Occupational Health 7-6
7.7 Risk Assessment 7-9
7.7.1 Risk Screening Approach 7-11
7.7.2 QRA Approach 7-11
7.8 Thermal Hazards 7-12
7.9 Damage due to Explosion 7-14
7.10 Toxic Release 7-14
7.11 Likely Failure Scenarios 7-15
7.12 Consequence Analysis 7-15
7.13 Pro-active Safety Measures 7-21
7.14 Action plan for handling & safety system 7-22
7.14.1 Safety Measures for Transportation and
Unloading of Hazardous Chemicals
7-23
7.14.2 Safety Measures for Storage/Handling of
Hazardous Chemicals
7-23
7.14.3 Safety Measures for Process Units 7-23
7.14.4 Safety Measures for Preventive Maintenance 7-24
7.14.5 Safety measures to prevent spillage/leakage of
toxic chemicals
7-25
Page 7
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 6
7.15 Safety management plan for acutely toxic
chemicals
7-25
7.15.1 Hazard Summary 7-25
7.15.2 Special Handling Procedures and Storage
Requirements
7-26
7.15.3 Personal Protective Equipment 7-27
7.15.4 Spill and Accident Procedures 7-27
7.15.5 Fire and Emergency Evacuation Procedures 7-28
7.16 Arrangements for ensuring Health and safety of
workers engaged in handling of toxic materials
7-29
7.17 On-site emergency plan 7-31
7.17.1 General 7-31
7.17.2 Statutory Requirement 7-31
7.17.3 Preparedness of On–Site Emergency Plan 7-32
7.17.4 Emergency Time Activities 7-32
7.17.5 Sequential actions during emergency 7-33
7.17.5.1 Incident 7-33
7.17.5.2 Responding Actions 7-33
7.17.5.3 Site Crisis 7-34
7.17.5.4 Messages 7-34
7.17.5.5 Discipline 7-35
7.17.5.6 Emergency Actions 7-35
7.17.5.7 Shut Down Procedure 7-35
7.17.5.8 Post Emergency Activities 7-36
7.17.6 Training, rehearsal and records 7-36
7.17.6.1 Need of Training & Rehearsal 7-36
7.18 Off-site emergency plan 7-38
7.18.1 Need of Off-Site Emergency Plan 7-38
7.18.2 Role of the Factory Management 7-40
7.18.3 Role of the Emergency Co-ordination Office (ECO) 7-41
7.18.4 Role of the Local Authority 7-41
7.18.5 Role of the Fire Authorities 7-42
7.18.6 Role of the Police and Evacuation Authorities 7-42
7.18.7 Role of the Health Authorities 7-43
7.18.8 Role of the Mutual Aid Agencies 7-44
7.18.9 Role of the factory Inspectorate 7-44
7.19 Disaster management Plan/emergency
management plan
7-44
Page 8
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7
7.19.1 Objectives 7-45
7.19.2 Emergency Management Plan 7-45
7.19.3 Responsibilities & Role of Key Personnel 7-47
7.19.4 Post Emergency Recovery 7-52
7.19.5 Accident Investigation 7-53
7.19.6 Damage Assessment 7-53
7.19.7 Cleanup and Restoration 7-53
(B) Social Impact Assessment 7-54
(C) Public Consultation 7-54
Chapter 8 Project Benefits
8.1 Introduction 8-1
8.2 Improvements in the physical infrastructure
including technical facility aspects
8-1
8.3 Improvement in Social Infrastructure 8-1
8.4 Employment potential 8-2
8.5 Other tangible benefits 8-3
Chapter 9 Environmental Cost Benefit Analysis
9.0 Environmental Cost Benefit Analysis 9-1
Chapter 10 Environment Management Plan
10.1 Introduction 10-1
10.2 Objective of Environmental Management Plan 10-1
10.3 Components of EMP 10-2
10.3.1 Environmental Management systems 10-2
10.3.2 Environmental, Health and Safety Management
System
10-2
10.3.3 Environmental Management Cell 10-3
10.4 Environmental Management during construction
phase
10-3
10.5 Environmental Management during operational
phase
10-4
10.5.1 Air Environment 10-4
10.5.2 Measures for fugitive emissions 10-4
10.5.3 Water Environment 10-5
10.5.4 Hazardous/Solid Waste Management 10-6
10.5.5 Noise Control Technique 10-6
10.6 Green Belt Development 10-7
10.7 Resource Conservation/Waste Minimization 10-9
10.8 Action Plan for Transportation of Raw Material 10-10
Page 9
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 8
and Products
10.8.1 Safety Instructions for transportation of
hazardous materials
10-11
10.8.2 Instructions for drivers & Responsibilities of
drivers
10-11
10.8.3 Manner of display of class labels 10-12
10.9 Health & Safety 10-13
10.9.1 Possibility of occupational health hazard & its
control
10-14
10.9.2 Possibility of occupational health hazard, its
control & Occupational surveillance
10-15
10.9.3 Preventive Measures 10-16
10.10 Occupational Health Programme 10-16
10.10.1 Occupational Health and First aid measures 10-19
10.11 Socio-Economic activities 10-19
10.12 Post-Project Environmental Monitoring 10-21
10.13 Environment Management cost estimate 10-22
10.14 Environment Policy 10-22
10.15 Reporting System of Non Compliances/Violations
of Environmental Norms
10-23
Chapter 11 Summary & Conclusion
11.1 Project Description 11-1
11.1.1 Location of Project 11-1
11.1.2 Product Profile 11-2
11.1.3 Investment of the Project 11-2
11.2 Description of Environment 11-2
11.2.1 Baseline Environmental Study 11-2
11.2.2 Air Environment 11-2
11.2.3 Water Environment 11-3
11.2.4 Noise Environment 11-5
11.3 Anticipated Environmental Impacts and
mitigation Measures
11-5
11.4 Environment Monitoring Programme 11-6
11.5 Additional Studies 11-7
11.5.1 Risk Assessment 11-7
11.6 Environmental Management Plan 11-7
11.7 Project Benefits 11-9
11.8 Conclusion 11-9
Chapter-12 Disclosure of Consultant engaged 12-1
Page 10
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 9
List of Tables
Table No.
Name Page No.
1.1 Product details 1-4
1.2 Details of four corners Co-Ordinate of Site 1-5
1.3 List of major industries 1-26
2.1 Structural facilities along with land break up 2-2
2.2 Location Details 2-3
2.3 List of Products 2-3
2.4 Plant Machineries (Existing & Proposed) 2-4
2.5 Utility Details 2-15
2.6 Details of raw materials along with source & mode of
transportation
2-20
2.7 Breakup of water consumption 2-21
2.7 (a) Wastewater Generation 2-21
2.8 Details of stacks with air emission quality 2-22
2.8 (a) Sources of fugitive emission with its quantification (Estimated)
2-22
2.9 Technical Details of forced evaporator 2-23
2.10 Details of Hazardous waste 2-24
2.11 Noise Survey of existing plant 2-25
3.1 Methodology of Ambient Air Monitoring 3-3
3.2 Surface Water Sampling Locations 3-3
3.3 Ground Water Sampling Locations 3-4
3.4 Surface Soil Sampling Locations 3-4
3.5 Soil Sample Analysis Methodology 3-5
3.6 Monitoring Methodology of Noise 3-5
3.7 Ambient Air Quality Monitoring Locations 3-20
3.8 Ambient Air Quality Status 3-21
3.9 Ambient Air Quality Status (PM10) 3-22
3.10 Ambient Air Quality Status (PM2.5) 3-23
3.11 Ambient Air Quality Status (SO2) 3-24
3.12 Ambient Air Quality Status (NOx) 3-25
3.13 Ambient Air Quality Status (CO, HC, VOCs) 3-26
3.14 National Ambient Air Quality Standards 3-27
3.15 Results of Groundwater Quality in the Study Area 3-29
3.16 Results of Surface water Quality in the Study Area 3-30
Page 11
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10
3.17 Indian Standard Specification for Drinking Water 3-31
3.18 Ambient Noise Levels in the Study Area 3-32
3.19 Ambient Air Quality Standards with respect to Noise 3-32
3.20 Soil Analysis of Study area 3-33
3.21 Traffic Survey 3-34
3.22 Floral Diversity 3-35
3.23 Faunal Biodiversity 3-37
3.24 Land use statistics base of satellite imaginary 3-39
3.25 Land Use Pattern 3-40
3.26 Summary of Socio-Economic Status (Demography) 3-41
3.27 Basic Amenities in the Study Area 3-43
4.1 Input data for air quality modeling 4-15
4.2 Existing/Estimated Air emission Quality (Before & After
APCM)
4-15
4.3 Cumulative Concentrations at various locations 4-16
4.4 The 24-hourly average GLC Concentration Values for SPM 4-17
4.5 The 24-hourly average GLC Concentration Values for SO2 4-18
4.6 The 24-hourly average GLC Concentration Values for NOx 4-19
6.1 Environment Monitoring Plan 6-4
6.2 Budget for implementation of Environmental Monitoring
Plan
6-5
7.1 Liquid Raw Materials Storage 7-3
7.2 Hazardous Raw Materials Sr. No. (MSHIC) &
Characteristics
7-5
7.3 Risk Classification 7-11
7.4 Effects due to Incident Radiation Intensity 7-13
7.5 Thermal Radiation Impact to Human 7-13
7.6 Tolerable Intensities for Various Objects 7-13
7.7 Damage due to Overpressure 7-14
7.8 Different Failure Scenarios 7-15
7.9 Distances of Occurrence of Various Thermal Radiation
Intensities [Storage Tank on Fire Plant Area Instantaneous Spill (Single Tank, Methanol)]
7-19
7.10 Distances of Occurrence of Various Thermal Radiation Intensities [Catastrophic Rupture Storage Facility Continuous Spill - Methanol]
7-20
7.11 Distances of Occurrence of Various Thermal Radiation Intensities [Storage Tank on Fire Plant Area
Instantaneous Spill (Single Tank, Formaldehyde)]
7-20
7.12 Distances of Occurrence of Various Thermal Radiation
Intensities [Catastrophic Rupture Storage Facility
7-20
Page 12
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 11
Continuous Spill- (Formaldehyde)]
7.13 Points raised during public hearing 7-54
10.1 Budgetary provisions for the next five years (Every Year) 10-20
10.2 Environment Management Cost Estimate 10-22
10.3 Design features for minimization of fugitive emissions 10-25
10.4 Environment Monitoring along with Frequency details 10-26
Page 13
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 12
List of Figures
Figure No.
Name Page No.
1.1 Location of the project site 1-27
1.2 Google map of 10 km radius 1-28
1.3 Image showing all four boundaries coordinates of the
site
1-29
2.1 Water Balance Diagram (Existing) 2-26
2.2 Water Balance Diagram (after proposed Expansion) 2-27
2.3 Plant Layout 2-28
2.4 Drawing of Evaporator 2-29
3.1 Graphical representation of Ambient Air quality 3-21
3.2 Graphical representation for PM10 3-22
3.3 Graphical representation for PM2.5 3-23
3.4 Graphical representation for SO2 3-24
3.5 Graphical representation for NOX 3-25
3.6 Location of AAQM 3-47
3.7 Wind Rose Diagram 3-48
3.8 Water sampling Locations 3-49
3.9 Locations of Noise monitoring station 3-50
3.10 Locations of Soil Sampling 3-51
3.11 Land use pattern with 10 km radius (Satellite Image) 3-52
3.12 Topo sheet of location with site location map of 10 km radius (1:25,000 scales)
3-53
3.13 Topo sheet of location with site location map of 10 km radius (1:50,000 scale)
3-54
3.14 Topo sheet of location with site location map of 10 km radius (1:100000 scale)
3-55
4.1 Isopleths for Ground Level Concentration for SPM 4-20
4.2 Isopleths for Ground Level Concentration for SO2 4-21
4.3 Isopleths for Ground Level Concentration for NOx 4-22
10.1 Hierarchical system or Administrative order of the
company
10-27
Page 14
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 13
List of Annexures
Annexure No. Annexure Name Page
No.
Annexure-I Membership certificate of approve TSDF site A-1
Annexure-II MSDS of haz. Chemicals A-2
Annexure-III Request letter to RO-MoEF, Bhopal A-12
Annexure-IV Photographs of existing plant site including existing
greenbelt
A-22
Annexure-V Land documents A-26
Annexure-VI Copy of Environmental Clearance (EC) A-30
Annexure-VII Narmada water usage permission A-36
Annexure-VIII Health checkup record of workers A-37
Annexure-IX Questionnaire for industry sector A-49
Annexure-X NABET/QCI certificate A-70
Annexure-XI Terms of Reference (TOR) letter A-72
Page 15
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-1
Chapter-1
Introduction
1.1 PREFACE
An Environmental Impact Assessment (EIA) is an assessment of the
possible positive or negative impact that a proposed project may have on
the environment, together consisting of the environmental, social and
economic aspects. It is an assessment and management tool that
evaluates the possible positive or negative impact that a proposed project
may have on the environment. EIA systematically examines both
beneficial and adverse consequences of the project and ensures that
these effects are taken into account during project design.
The purpose of the assessment is to ensure that decision makers
consider the ensuing environmental impacts when deciding to proceed
with a project.
As India is a developing country, lots of industrialization has been came
in focus since last few decades that ultimately leads the bigger issues
related the environmental quality of the country. Hence, it is needful for
Government of India to control the haphazard industrial development by
providing sustainable development under the legislation.
In India, Ministry of Environment and Forests has defined elaborated
‘Environmental Clearance (EC)’ framework along with requirements for
preparing Environmental Impact Assessment (EIA) under the
Environmental (Protection) Act, 1986 (Environmental Impact Assessment
Notification, 2006) for establishing/expanding and industry/development
projects although it supports development but only if the development
does not hamper the environment over a defined threshold limit.
1.2 PURPOSE OF THE REPORT
Industrial development in India has increased economic growth and
improved living standards of people. These growths are achieved through
industrialization, infrastructure development. The industrialization has
played a major role in development of the country. This industrialization
is also has many other benefits. Although the industrial development
Page 16
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-2
leads to rapid consumption of natural resources, fuel etc. in day to day
operational activity. These will deteriorating resources and increase
emissions of waste in terms of solid, liquid and gaseous. To control the
pollutions from industrial activity, government has framed regulations
which are governed by Ministry of Environment and Forest in India.
Environment Impact analysis is mandatory as per the Environment
Impact Assessment (EIA) Notification issued by Ministry of Environment
and Forests (MoEF&CC), New Delhi, dated 14th September 2006, its
subsequent amendment, for setting up a new projects or activities, or
expansion or modernization of existing projects or activities based on
their potential environmental impacts as indicated in the Schedule to the
notification, being undertaken in any part of India, unless prior
environmental clearance has been accorded.
Proposed activity ofM/s. Balaji FormalinPvt. Ltd. falls under the
schedule of 5(f) of schedule of EIA Notification, 2006 “Synthetic Organic
Chemical Industries (dyes & dye intermediates; bulk drugs and
intermediates excluding drug formulations; synthetic rubbers; basic
organic chemicals, other synthetic organic chemicals and chemical
intermediates)” and categorized under “A”. Therefore, unit requires
Environmental Clearance for proposed expansion of project.
EIA Consultant
In view of the above, legal aspect and monitoring work has been carried
out for all the environmental attributes by M/s. San Envirotech Pvt.
Ltd., Ahmedabad.Draft Environment Impact Assessment (EIA) and
Environmental Management Plan (EMP) have been prepared after
obtaining Terms of References (TORs) from Ministry of Environment,
Forests & Climate Change, New Delhi. The public hearing was held on the
basis of the draft EIA/EMP incorporating the Terms of References. Final
EIA/EMP Report after incorporating the comments and suggestions by the
public during public hearing will be submitted to MoEF&CC for
Environment Clearance.
Page 17
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-3
1.3 IDENTIFICATION OF PROJECT & PROJECT PROPONENT
1.3.1 Identification of project site with site specific criteria:
Balaji FormalinPvt. Ltd.is an existing unit at Plot No. 1398, Village: Moti
Bhoyan, Taluka: Kalol, Dist. Gandhinagar, Gujarat (India).The products
details are given in Table 1.1.Unit now proposed to expand its existing
production capacity with addition of new products.
Features justifying the location are summarized below:
• Availability of suitable and adequate land for proposed expansion;
• Availability of all basic facilities like infrastructure, communication,
medical facilities, fuel, water, power, unskilled & skilled manpower,
raw materials, road network etc.
• Considering market demand and economic viability, proponent has
decided to expand capacities of its existing products.
• Nearest city is Ahmedabad, which is 21.2 km away from the location,
and having good connectivity with other parts of the country by road,
rail & air.
• Availability of good communication and transportation facilities.
• No National park or wildlife habitat falls within 10 km radial distance
from proposed project site.
• No critically polluted area falls within 10 km radius.
• No R & R will be required.
1.3.2 Project identification with respect to category
As per the EIA Notification, 2006 and amendment thereof; proposed
activity is covered under 5(f) category- Synthetic organic chemicals
industry (dyes & dye intermediates; bulk drugs and intermediates
excluding drug formulations; synthetic rubbers; basic organic chemicals,
other synthetic organic chemicals and chemical intermediates).
1.3.3 Project proponent
M/s. Balaji Formalin Pvt. Ltd. is well known and leading and flagship
manufacturing company of formaldehyde.This is a manufacturing
company established in the year 2003. The management of the
organization is in the hands of Board of Directors of the company.
Page 18
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-4
Mr. Mahendra R. Gupta is the Director of the company. He is the senior
member, promoter of the company. He has wide and deep experience of
planning, designing and implementation of business. He provides all the
necessary directions of various aspects of developing the business.
Mr. Mukesh R. Guptais also the Director of the Company. He too is a
senior member and promoter of the company with very good knowledge
and practical experience in private sector. Further he has good
administrative power to provide inter discipline and co-ordination as well
as to develop the business.
1.4 BRIEF DESCRIPTION OF PROJECT
1.4.1 Nature of the project:
Unit proposed for expansion of existing capacity of formaldehyde with
addition of new products. So the project covered under schedule 5(f), -
“Synthetic organic chemicals industry” as per the EIA Notification-2006
and its amendment thereof, category A. Hence prior EC is required for
proposed expansion. List of raw materials to be used in the project
aregiven in Table 2.6of chapter-2. Generated wastewater will be directly
sent to forced effect evaporator & then sent to mechanical evaporator.
Condensate from evaporator will be reused for utility. So, there will no
effluent discharge outside industry premises. Hazardous waste generation
from the proposed project is given in Table 2.10.
1.4.2 Size of the project:
Balaji Formalin Pvt. Ltd.proposed to expand capacity of existing
product with introduction of new products. Production details are given in
below table:
Table 1.1 Product details
Sr.
No.
Products Existing
Production
(MTPM)
Additional
Production(MTPM)
Total
production
after expansion
(MTPM)
1 Formaldehyde 5000 7500 12500
2 Para
formaldehyde
00 835 835
3 Reprocessing 00 1.5 1.5
Page 19
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-5
of Silver
(Purification
of Silver)
1.4.3 Location of the project:
The unit is located in village Moti Bhoyan, Kalol Taluka, Gandhinagar
District of Gujarat state.The geographical co-ordinates of the proposed
site are 23°09'44.69"NLatitudeand72°26'45.54"ELongitude.The location
of the project site can be identified from the location map shown in
Figure 1.1 and satellite image/Google earth image is shown in Figure
1.2.Boundary co-ordinates latitude and Longitude of all four corners of
the site are given in Table 1.2 and shown in Figure 1.3.
Table 1.2
Details of four corners Co-Ordinate of Site
Point Latitude Longitude
A 23°09'45.44"N 72°26'44.63"E
B 23°09'44.73"N 72°26'47.64"E
C 23°09'43.06"N 72°26'47.19"E
D 23°09'43.64"N 72°26'44.47"E
1.5 REGULATORY FRAMEWORK
The MoEF&CC, CPCB and SPCBs together form the regulatory and
administrative core of the sector. Legislation for environmental protection
in India for chemical industry is mainly EIA Notification-2006, Water
(Prevention & Control of Pollution) Act-1974, Air (Prevention & Control of
Pollution) Act-1981, Water (Prevention and Control of Pollution) Cess Act,
1977; Hazardous & Other wastes (Management and Transboundary
Movement) Rules, 2015 are major Act/Rules/ Notification applicable to
industry.
1.6 SCOPE OF THE STUDY
The scope of the EIA study is based on the guideline provided by Ministry
of Environment, Forests& Climate change, Government of India for
structure of environmental impact assessment document.
The scope of the study broadly includes:
Page 20
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-6
Field sampling of environmental attributes at various representative
locations in the study area to establish the baseline status;
Collect & compile secondary data including socio-economic data;
Identification, assessment and evaluation of the beneficial and
adverse impacts on surrounding environment due to proposed
project activities considering the existing baseline status along with
compilation of other information;
Analysis of project proposal and data analysis;
Assessment of pollution potential due to proposed project;
Predict the incremental levels of pollutants in the study area due to
the proposed project;
Evaluate the predicted impacts on the various environmental
attributes by using scientifically developed and widely accepted
models;
Identification and assessment of risks associated with the proposed
project and their appropriate management through proper Risk
Assessment (RA) and Disaster Management Plan (DMP);
Prepare an Environmental Management Plan (EMP) to mitigate the
predicted impacts; and
Identify critical environmental attributes required to be monitored
during the project execution and to suggest post project monitoring.
The scope also includes all the conditions outlined in the TOR issued by
MoEF&CC and the compliance to the TOR is given in below.
1.7 COMPLIANCE TO TERMS OF REFERENCE
Based on the documents submitted and presented before
38thReconstituted Expert Appraisal Committee(Industry-2) held during
20st-21st April, 2015; Terms of Reference (TOR) was issued by MoEF&CC;
vide TORs letter no. J-11011/67/2015-IA II (I), dated 22.06.2015and
directed to prepare detailed EIA/EMP including following terms of
reference.Compliance of TORs for preparation of EIA/EMP is as below:
Sr.
No.
Conditions Compliance
A Specific ToR
1. Details on solvents to be used, We are not going to use any solvent in our process. Methanol
Page 21
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-7
measures for solvent recovery and for
emissions control.
is use as a raw material in
process and not as a solvent. So
no need to install solvent
recovery system.
2. Details of process emissions from the
proposed unit and its arrangement to
control.
There are chances of emit traces
of methanol and formaldehyde as
air pollutants and it will be
treated in tail gas treatment
plant (Incinerator).
Pls. refer table 2.8, page no. 2-
22 of chapter-2 for its details.
3. Ambient air quality data should
include VOC, etc.
Pls. refer table 3.9 to table 3.13,
page no. 3-22 to 3-26 of
chapter-3 for details of ambient
air quality including VOCs.
4. Work zone monitoring arrangements
for hazardous chemicals.
Pls. refer table 6.1, page no. 6-4
for monitoring of work zone.
5. Detailed effluent treatment scheme
including segregation of effluent
streams for units adopting 'Zero'
liquid discharge.
There will be only 1.0 KLD
process effluent which is
generates from purification of
silver and other source is water
treatment & utility. So need to
segregate it. Pls. refer sec.
2.15.1, page no. 2-16 of chapter-
2 for zero discharge scheme.
6. Action plan for odour control to be
submitted.
Pls. refer sec. 2.17, page no. 2-
18 of chapter-2 for details of
odor control.
7. A copy of the Memorandum of
Understanding signed with cement
manufacturers indicating clearly that
they co-process organic solid/
hazardous waste generated.
There is no generation of high
calorific solid waste which is
generally used in co processing.
So need to make MoU with any
cement manufacturer.
8. Authorization/Membership for the
disposal of liquid effluent in CETP and
solid/hazardous waste in TSDF, if
any.
Unit is zero discharge unit hence
CETP membership is not required
in our case. Membership
certificate of approve TSDFsite is
enclosed as Annexure-I.
9. Action plan for utilization of
MEE/dryers salts.
MEE salt may not reuse
anywhere in our process and no
marketable quality generation
hence we are directly disposed at
TSDF site.
10. Material Safety Data Sheet for all the
Chemicals are being used/will be
used.
MSDS of all the major chemicals
are attached as Annexure-II.
11. Authorization/Membership for the Membership certificate of
Page 22
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-8
disposal of solid/hazardous waste in
TSDF are being used/will be used.
approved TSDFsite is enclosed as
Annexure-I.
12. Authorization/Membership for the
disposal of solid/hazardous waste in
TSDF.
Membership certificate of
approved TSDFsite is enclosed as
Annexure-I.
13. Risk assessment for storage and
handling of hazardous chemicals/
solvents. Action plan for handling &
safety system to be incorporated.
Pls. refer chapter-7 for details of
risk assessment for storage and
handling of hazardous chemicals.
Pls. refer sec. 7.14, page no. 7-
22 of chapter-7 for action plan
for handling & safety system.
14. Arrangements for ensuring health and
safety of workers engaged in
handling of toxic materials.
Pls. refer sec. 7.16, page no. 7-
29 of chapter-7.
B Additional ToR
1. Public Consultation to be conducted
and issues raised and commitments
made by the project proponent on
the same should be included in
EIA/EMP Report in the form of tabular
chart with financial budget for
complying with the commitments
made.
Public hearing was conducted on
09.05.2016 and issues raised and
commitments made by the
project proponent is given in
table below.
2. Copy of Certified Compliance Report
to the environmental condition
prescribed in the existing
environmental clearance dated
24.08.2010.
Enclosed as Annexure-III.
Generic Terms of Reference (TOR) in respect of Industry Sector
1. Executive Summary (maximum 2-3 sheets in A4 size paper) of the
project covering project description,
description of the environment,
anticipated environmental impacts &
its mitigation measures,
environmental management plan,
environmental monitoring
programme, public consultation,
project benefits, social impacts
including R&R.
Executive Summary of the
project is included as Chapter-11.
2. Site Details:
i. Location of the project site
covering village, Taluka/Tehsil,
District and State on Indian map
of 1:1000,000 scale.
Pl. refers figure-1.1, page no.
1.27, of Chapter-1 of EIA report
for location of the project site
covering village, Taluka/Tehsil,
District and State on Indian map.
Page 23
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-9
ii. A topo sheet of the study area of
radius of 10km and site location
on 1:50,000/1:25,000 scale on an
A3/A2 sheet.
Topo sheet of study area with
site location on 1:25,000 scale
followed by 1:50,000 scale of a
circle of a radius of 10 kms is
incorporated in EIA/EMP report.
Pls. refer figure no. 3.12, 3.13,
3.14 on page no. 3-53 to 3-55 of
chapter-3.
iii. Co-ordinates (lat-long) of all four
corners of the site.
Coordinates (Lat long) of all four
corners of the site is given in sec.
1.4.3, page no. 1-5 of chapter-1.
iv. Google map-Earth downloaded of
the project site.
Google map of 10 km radius is
given as figure 1.2 on page no.
1.28 of chapter-1.
v. A map showing environmental
sensitivity [land use/land cover,
water bodies, reserved forests,
wildlife sanctuaries, national
parks, tiger reserve etc.] and from
critically/severely polluted area(s)
and Eco-sensitive Areas within
10km radius of the project site
vis-à-vis shortest (aerial)distance
from the project. If the project is
located within 10km of
CPAs/severely Polluted Areas,
confirm whether moratorium has
been imposed on the area.
Pl. refer figure 3.11, page no. 3-
52 of Chapter-3 of EIA report for land use map covering
environmental sensitivity
including land use/land cover,
water bodies, reserved forests, wildlife sanctuaries, national parks, tiger reserve etc.
As per the Notification of
MoEF&CC published dated
09.02.2015, Central Government notifies Thol Wild Life Sanctuary in the State of Gujarat, as Eco-
sensitive Zone, up to 2.244
kilometers from theboundary of
the Thol Wild Life Sanctuary. Our
Industrial location is 3.8 km away from the boundary of TholWild Life Sanctuary.
In addition to this, there is no
critically/severely polluted area
falls within 10km radius of the project site.
vi. Layout maps indicating existing
unit as well as proposed unit
indicating storage area, plant
area, greenbelt area, utilities etc.
In addition, if located within an
Industrial area/Estate/Complex,
layout of Industrial Area and
location of unit within the
Industrial Area/Estate/Complex,
layout of Industrial Area.
Pls. refer figure 2.3, page no. 2-
28 of chapter-2 for layout map
with demarcation.
Old building will be removed &
paraformaldehyde plant is to be
erected. Formaldehyde capacity
enhancement is only through
modification of current
machineries. So no new space is
required for the same.
vii. Photographs of the proposed and
existing (if applicable) plant site.
If existing, in addition to site map,
Photographs of existing plant site
including existing greenbelt area
are attached as Annexure-IV.
Page 24
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-10
provide photographs of
plantation/greenbelt in the
existing project. If fresh EC
application, photographs.
Old building will be removed &
paraformaldehyde plant is to be
erected. Formaldehyde capacity
enhancement is only through
modification of current
machineries. So no new space is
required for the same.
3. Land use break-up of total land of the
project site (identified and acquired)
– agricultural, forest, wasteland,
water bodies, settlements, etc. shall
be included.
Pls. refer table 2.1, page no. 2-2
of chapter-2 for details of
acquired land.
4. A copy of the mutual agreement for
land acquisition signed with land
oustees.
Plant is existing and land is
owned by the company. Land
documents are enclosed as
Annexure-Vhence no need of
mutual agreement for land
acquisition signed with land
oustees.
5. Proposal shall be submitted to the
Ministry for environment clearance
only after acquiring at least 60% of
the total land required for the project.
Necessary documents indicating
acquisition of land shall be included.
Proposed project is expansion of
existing activities and land is
already in possession since 2003.
Land documents are enclosed as
Annexure-V.
6. Forest and wildlife related issues:
i. Permission and approval for the
use of forest land (forestry
clearance), if any, and
recommendations of the State
Forest Department.
No forest land is involved hence
permission from State Forest
Department is not required.
ii. Land use map based on High
resolution satellite imagery (GPS)
of the proposed site delineating
the forest land (in case of projects involving forest land more than 40 ha).
Not applicable as no forest land is
involved in proposed project site.
iii. Status of application submitted for
obtaining the stage I forestry
clearance along with latest status
shall be submitted.
No forest land is involved hence
Forest Clearance is not required.
iv. The projects to be located within
10 km of the National Parks,
Sanctuaries, Biosphere Reserves,
Migratory Corridors of Wild
Animals, the project proponent
There is not any National Parks,
Sanctuaries, Biosphere Reserves;
Migratory Corridors of Wild
Animals falls within 10 km radius
of the project hence map duly
Page 25
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-11
shall submit the map duly
authenticated by Chief Wildlife
Warden showing these features
vis-à-vis the project location and
the recommendations or
comments of the Chief Wildlife
Warden-thereon.
authenticated by Chief Wildlife
Warden is not required.
v. Wildlife Conservation Plan duly
authenticated by the Chief Wildlife
Warden of the State Government
for conservation of Schedule I
fauna, if any exists in the study
area.
Not any Schedule I fauna is exist within study area of 10 km radius
hence Wildlife Conservation Plan
duly authenticated by the Chief Wildlife Warden of the State
Government is not required.
vi. Copy of application submitted for
clearance under the Wildlife
(Protection) Act, 1972, to the
Standing Committee of the
National Board for Wildlife.
There is not any National Parks, Sanctuaries, Biosphere Reserves
falls within 10 km radius of the
project hence clearance under the Wildlife (Protection) Act,
1972 is not required.
7. Expansion/modernization proposals:
i. Copy of all theEnvironmental
Clearance(s) including
Amendments thereto obtained for
the project from MoEF/SEIAA shall
be attached as an Annexure. A
certified copy of the latest
Monitoring Report of the Regional
Office of the Ministry of
Environment and Forests as per
circular dated 30th May, 2012 on
the status of compliance of
conditions stipulated in all the
existing environmental clearances
including Amendments should be
provided. In addition, status of
compliance of Consent to Operate
for the ongoing/existing operation
of the project from SPCB shall be
attached with the EIA-EMP report.
Copy of Environmental Clearance
is enclosed as Annexure-VI.
Certified compliance report from
RO, MoEF&CC, Bhopal is enclosed
as Annexure-III.
ii. In case the existing project has
not obtained environmental
clearance, reasons for not taking
EC Under the provisions of the EIA
Notification, 1994 and/or EIA
Notification, 2006 shall be
provided. Copies of Consent to
Establish/No Objection Certificate
and Consent to Operate (in case
Unit has obtained Environmental
Clearance (EC), for existing
activities, which is enclosed as
Annexure-VI.
Page 26
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-12
of units operating prior to EIA
Notification 2006, CTE and CTO of
FY 2005-2006) obtained from the
SPCB shall be submitted. Further,
compliance report to the
conditions of consents from the
SPCB shall be submitted.
Details of Industrial Operations
8. A list of major industries with name
and type within study area (10 km
radius) shall be incorporated.
Pls. refer table 1.3, page no. 1-
26 of chapter-1 for name and
type of major industries working within the study of 10 km radius.
9. Details of proposed raw materials and
products along with production
capacity. If expansion project, details
for existing unit, separately for
existing and new (proposed) unit.
List of products & raw materials (existing &proposed) are given in table 2.3 & 2.6; page no. 2-3 &
2-20 of chapter-2.
10. Details of manufacturing process,
major equipment and machinery. If
expansion project, details of existing
unit, separately for existing and new
(proposed) unit.
Pls. refer sec. 2.10, page no. 2-6
of chapter-2 for details of manufacturing process.
List of major
equipment&machineries for
existing and proposed expansion
is given as sec. 2.8, page no. 2-3
of chapter-2.
11. List of raw materials required and its
source along with mode of
transportation shall be included. All
the trucks for raw material and
finished product transportation must
be “Environmentally Compliant”.
List of required raw materials, source along with mode of
transportation is given in table
2.6; page no. 2-20 of chapter-2.
All hazardous chemicals are
transport through approved
vehicle by concerned authority.
12. Quantity of fuel required, its source
and characteristics and documentary
evidence to substantiate confirmed
fuel linkage shall be furnished.
No fuel is used for existing
manufacturing because
exothermic reaction. Methanol is being used as starting fuel for 30
to 60 minutes when reaction initiated.
13. Project site layout plan to scale using
AutoCAD showing raw materials, fly
ash and other storage plans, bore
well or water storage, aquifers
(within 1 km) dumping, waste
disposal, green areas, water bodies,
rivers/drainage passing through the
project site shall be included.
Pls. refer figure 2.3, page no. 2-
28 of chapter-2 for project layout
plan.
14. Manufacturing process details of all
the plants including captive power
plant if any along with process flow
Pls. refer sec. 2.10, Page No. 2-6 of chapter-2 for details of
manufacturing process.
Page 27
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-13
chart shall be included. We are not going set up captive
power plant hence not applicable.
15. Mass balance for the raw material
and products shall be included.
Pls. refer sec. 2.10, Page No. 2-
6of chapter-2 for mass balance
for the raw material and
products.
16. Energy balance data for all the
components of the plant shall be
incorporated.
Our is small scale unit and
energy balance data for all the
components of plant may not technically feasible and may not correct in our case.
Environmental Status
17. Geological features and Geo-
hydrological status of the study area
shall be included.
Hydrogeological status of the
study area is given in sec. 3.4;
page no. 3-10 of chapter-3.
18. Details of drainage of the project up
to 5 km radius of study area. If the
site is within 1 km radius of any
major river, peak and lean river
discharge as well as flood occurrence
frequency based on peak rainfall data
of the past 30 years. Details of RL of
the project site and mRL of the river
should also be provided.
There is not any river & flood
Hazard zone within 1 km radius
from the site hence this point is
not applicable.
19. One season site-specific micro-
meteorological data using
temperature, relative humidity,
hourly wind speed and direction and
rainfall and AAQ data (except
monsoon) at 8 locations for PM10,
PM2.5, SO2, NOX, CO and HC (methane
& non-methane) should be collected.
The monitoring stations should take
into account the pre-dominant wind
direction, population zone and
sensitive receptors including reserved
forests.
One season site-specific micro-
meteorological data are given in
sec. 3.3.3 on page no. 3-7 and
AAQ data are tabulated in table
no. 3.9 to 3.13 on page no. 3-22
to 3-26.
Figure 3.6 shows Air monitoring
stations on page no. 3-47.
The monitoring locations have
beenselected on the basis of pre-
dominantwind direction,
population zone andsensitive
receptors.
20. Surface water quality of nearby River
(60m upstream and downstream)
and other surface drains at eight
locations to be provided.
We are not going to disposed off
our treated effluent into river
hence, 60 m upstream and
downstream sampling may not
require in our case.
However, we have collected
samples from surface water
sources like pond, canal &Thol
lake. Result of same is tabulated
in table 3.16, page no. 3-30 of
Page 28
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-14
chapter-3.
21. Ground water monitoring minimum at
8 locations shall be included.
We have carried out ground
water monitoring at 8 locations in
the study area.Results are
tabulated in Table 3.15, page no.
3-29 of chapter-3.
22. Noise levels monitoring at 8 locations
within the study area.
We have carried out noise level
monitoring at 8 locations in the
study area.Monitoring results
with locations are tabulated in
Table 3.18, page no. 3-32 of
chapter-3.
23. Traffic study of the area for the
proposed project in respect of
existing traffic, type of vehicles,
frequency of vehicles for
transportation of materials, additional
traffic due to proposed project,
Parking arrangement etc.
Pls. refer table 3.21, page no. 3-
34 of chapter-3 of EIA report for
traffic survey.
24. Detailed description on flora and
fauna (terrestrial and aquatic) exists
in the study area shall be given with
special reference to rare, endemic
and endangered species. If Schedule-
I fauna are found within the study
area, a Wildlife Conservation Plan
shall be prepared and furnished.
Pls. refer table 3.22 and 3.23 on
page no. 3-35 & 3-37 for details
of flora and fauna.
25. Emissions (g/second) with and
without the air pollution control
measures.
Pl. refers table no. 4.2, page no.
4-15 of chapter-4 for emissions
(g/second) with and without air
pollution control system.
26. Cumulative impact of all sources of
emissions (including transportation)
on the AAQ of the area shall be well
assessed. Details of the model used
and the input data used for modeling
shall also be provided. The air quality
contours should be plotted on a
location map showing the location of
project site, habitation nearby,
sensitive receptors, if any.
Pl. refer table no. 4.3, page no.
4-16 of chapter-4 for cumulative
impact along with 24 hrs.
maximum GLC.
Pls. sec. 4.3.7, page no. 4-7 and
table 4.1, page no. 4-15 of
chapter-4 for details of model
used and input data used for
modeling.
Pls. refer figure 4.1 to 4.3, page
no. 4-20 to 4-22 for the air
quality contours plotted on a
location map.
27. Impact of the transport of the raw
materials and end products on the
surrounding environment shall be
Estimated 24-48 nos./day of
trucks/ tankers will be in and out
from our factory premises. There
Page 29
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-15
assessed and provided. In this
regard, options for transport of raw
materials and finished products and
wastes (large quantities) by rail or
rail-cum road transport or conveyor-
cum-rail transport shall be examined.
is no nearby railway line so entire
materials are transport through
road from port or factory.
28. Details of water requirement, water
balance chart for new unit or for
existing unit as well as proposed
expansion (in case of expansion).
Water balance diagramfor
existing unit as well as proposed
expansion is given asfigure 2.1&
2.2, page no. 2-26 & 2-27 of
chapter-2.
29. Source of water supply and quantity
and permission of withdrawal of
water (surface/ground) from
Competent Authority.
Source of water supply is
Narmada Water supply.
Permission obtained for usage of
Narmada water is enclosed as
Annexure-VII.
Pls. refer figure 2.1 & 2.2, page
no. 2-26 & 2-27 for quantity of
water requirement.
30. Details regarding quantity of effluents
generated, recycled and reused and
discharged to be provided. Methods
adopted/to be adopted for the water
conservation shall be included. Zero
discharge effluent concepts to be
adopted.
Pls. refer water balance diagram
figure 2.1& 2.2, page no. 2-26 &
2-27 for detailed water balance
including quantity of effluent
generated, recycled/reused &
discharge.
31. A note on treatment of wastewater
from different plant operations,
extent recycled and reused for
different purposes shall be included.
Complete scheme of effluent
treatment. Characteristics of
untreated and treated effluent to
meet the prescribed standards of
discharge under E(P) Rules.
Pls. refer sec. 2.15.1, page no. 2-
16 for complete scheme of
wastewater treatment, reuse
/recycle details.
Major source of effluent is water
treatment & utility and we are
achieving zero discharge so no
major difference of raw & treated
effluent and practically no need
to give the treatment.
32. Action plan for control of ambient air
quality parameters as per NAAQES
Standards for PM10, PM2.5, SO2 and
NOX, etc. as per GSR 826(E) dated
16th November, 2009.
Following steps will be taken to
control the air quality as per the
NAAQES standards notified by
the Ministry on 16th September,
2009.
• Paved road will be made.
• Pneumatically transfer of raw
materials.
• Adequate implementation of
APCM.
• Effective implementation of air
Page 30
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-16
pollution monitoring.
• Development of greenbelt.
33. An action plan to control and monitor
secondary fugitive emissions from all
the sources as per the latest
permissible limits issued by the
Ministry vide G.S.R. 414(E) dated
30th May, 2008.
All liquid raw materials and
finished products shall be
transport pneumatically. Solid
materials are handling in close
manner.
34. Action plan for solid/hazardous waste
generation, storage, utilization and
disposal. Copies of MOU regarding
utilization of solid waste shall also be
included. EMP shall include the
concept of waste minimization,
recycle/reuse/recover techniques,
Energy conservation and natural
resource conservation.
Pls. refer table 2.10, page no. 2-
24 of chapter-2 for hazardous
waste details.
There is no generation of high
calorific solid waste which is
generally used in co processing.
So need to make MoU with any
cement manufacturer.
Pls. refer sec. 2.16.1, page no. 2-
18 for heat recovery details.Pls.
refer sec. 10.7 of Chapter-10 on
page no. 10-9 for resource
conservation/waste minimization
details.
35. Proper utilization of fly ash shall be
ensured as per Fly Ash Notification,
1999 and subsequent amendment in
2003 and 2009. A detailed plan of
action should be provided.
There is no use of any type of
fuel hence no generation of fly
ash.
36. Action plan for the greenbelt
development plan in 33% area i.e.
land with not less than 1,500 trees
per ha. Giving details of species,
width of plantation, planning schedule
etc. shall be included. The green belt
shall be around the project boundary
and a scheme for greening of the
roads used for the project shall also
be incorporated. All rooftops/terraces
shall have some green cover.
Pls. refer sec. 10.6, page no. 10-
7 of chapter-10 for greenbelt
development plan.
Design details along with
methodology and type of species
are covered under this section.
37. Action plan for rainwater harvesting
measures at plant site shall be
submitted to harvest rainwater from
the roof tops and storm water drains
to recharge the ground water and
also to use for the various activities
at the project site to conserve fresh
water and reduce the water
requirement from other sources. Rain
Pls. refer sec. 2.16.2, page no. 2-
18 of chapter-2 for rain water
harvesting details.
Page 31
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-17
water harvesting and groundwater
recharge structures may also be
constructed outside the plant
premises in consultation with local
Gram Panchayats and Village Heads
to augment the ground water level.
Incorporation of water harvesting
plan for the project is necessary, if
source of water is bore well.
38. Environment Management Plan (EMP)
to mitigate the adverse impacts due
to the project along with item wise
cost of its implementation.
Total capital cost and recurring
cost/annum for environmental
pollution control measures shall be
included.
Pls. refer chapter-10 for detailed
EMP.
Pls. refer table 10.2, page no.
10.22 of chapter-10.
39. Details of Rehabilitation &
Resettlement (R & R) involving the
project. R&R shall be as per policy of
the State Govt. and a detailed action
plan shall be included.
No Rehabilitation & Resettlement
(R & R) is involved in this project.
40. Action plan for post-project
environmental monitoring shall be
submitted.
Pls. refer sec. 10.12, page no.
10.21 and table 10.4, page no.
10-26 of chapter-10 for details of
environmental monitoring plan.
41. Disaster Preparedness and
Emergency Management Plan
including Risk Assessment and
damage control needs to be
addressed and included.
Pls. refer chapter-7 for risk
assessment.
Pls. refer sec. 7.19, page no. 7-
44 of chapter-7 for Disaster
Management Plan (DMP).
42. Occupational health:
i. Details of existing Occupational &
Safety Hazards. What are the
exposure levels of above
mentioned hazards and whether
they are within Permissible
Exposure Level (PEL). If these are
not within PEL, what measures the
company has adopted to keep
them within PEL so that health of
the workers can be preserved.
Estimated work area quality with
TWA limit is summarized in Table
2.8(a), page no. 2-22 of Chapter-
2 which is well within the limit.
Pls. refer sec. 10.10, page no.
10-16 of chapter-10 of EIA report
for proposed activity carry out by
the industry for occupation
health.
ii. Details of exposure specific health
status evaluation of worker. If the
workers’ health is being evaluated
by pre designed format, chest x
rays, Audiometry, Spirometry,
Activity proposed in sec. 10.10,
page no. 10-16 of chapter-10 of
EIA report.
Page 32
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-18
Vision testing (Far & Near vision,
color vision and any other ocular
defect) ECG, during pre-
placement and periodical
examinations give the details of
the same. Details regarding last
month analyzed data of
abovementioned parameters as
per age, sex, duration of exposure
and department wise.
iii. Annual report of health status of
workers with special reference to
Occupational Health and Safety.
Unit is frequently done health
checkup of workers and records
are maintained in health register.
Copy of reference health checkup
report of workers is enclosed as
Annexure-VIII.
iv. Action plan for the implementation
of OHS standards as per
OSHAS/USEPA.
Noted the point and prepare
action plan for the
implementation of OHS
standards. Unit is follow OSHAS
18001 standard and will obtain
certification from competent
agency.
v. Plan and fund allocation to ensure
the occupational health & safety
of all contract and casual workers.
It is already proposed in EMS
plan.
43. Corporate Environment Policy
i. Does the company have a well
laid down Environment Policy
approved by its Board of
Directors? If so, it may be detailed
in the EIA report.
ii. Does the Environment Policy
prescribe for standard operating
process/procedures to bring into
focus any infringement/deviation /
violation of the environmental or
forest norms/conditions? If so, it
may be detailed in the EIA.
iii. What is the hierarchical system or
Administrative order of the
company to deal with the
environmental issues and for
ensuring compliance with the
environmental clearance
conditions? Details of this system
may be given.
Our is a proposed unit and there
will be an Environment Policy
approved by Director.
Pls. refer sec. 10.14 on page no.
10-22 of chapter-10 for
environment policy.
Environment Policy includes
standard operating process
including commitment from
management.
Pls. refer figure 10.1 of chapter-
10 on page no. 10-27.
Page 33
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-19
iv. Does the company have system of
reporting of non-compliances/
violations of environmental norms
to the Board of Directors of the
company and/or shareholders or
stakeholders at large? This
reporting mechanism shall be
detailed in the EIA report.
Pls. refer sec. 10.15 of chapter-
10 on page no. 10-23.
44. Details regarding infrastructure
facilities such as sanitation, fuel,
restroom etc. to be provided to
thelabour force during construction as
well as to the casual workers
including truck drivers during
operation phase.
This is an existing plant. So all
the facilities are already
provided.
45. At least 5% of the total cost of the
project shall be earmarked towards
the Enterprise Social Commitment
based on Public Hearing issues and
item-wise details along with time
bound action plan shall be included.
Socio-economic development
activities need to be elaborated upon.
Unit has allocated 2.5% of the
total cost of the project for CSR
activities.
Pls. refer sec. 10.11 & table 10.1,
page no. 10-19& 10-20 of
chapter-10 for budget of CSR
activities.
Detail scope of CSR activity will
be finalized after suggestions
obtained during the public
hearing.
46. Any litigation pending against the
project and/or any direction/order
passed by any Court of Law against
the project, if so, details thereof shall
also be included. Has the unit
received any notice under the Section
5 of Environment (Protection) Act,
1986 or relevant Sections of Air and
Water Acts? If so, details thereof and
compliance/ATR to the notice(s) and
present status of the case.
No
47. The questionnaire for industry sector
(available on MoEF website) shall be
submitted as an Annexure to the EIA-
EMP Report.
Pls. refer Annexure-IX for
questionnaire for industry sector.
48. TORs’ prescribed by the Expert
Appraisal Committee (Industry) shall
be considered for preparation of EIA-
EMP report for the project in addition to all the relevant information as per the ‘Generic Structure of EIA’ given in
Appendix III and IIIA in the EIA
EIA report is prepared based on
TOR as well as generic structure
given in Appendix-III of EIA
Notification, 2006.
Page 34
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-20
Notification, 2006. Where the
documents provided are in a
language other than English, an
English translation shall be provided. The draft EIA-EMP report shall be
submitted to the State Pollution Control Board of the concerned State
forconduct of Public Hearing. The
SPCB shall conduct the Public Hearing/public consultation,
districtwise, as per the provisions of EIA notification, 2006. The issues
raised in the Public Hearing and
during the consultation process and
the commitments made by the project proponent on the same shall be included separately in EIA-EMP
Report in the form of tabular chart
with financial budget (capital and
revenue) along with time-schedule of implementation for complying with
the commitments made. The final EIA report shall be submitted to the
Ministry for obtaining environmental
clearance.
Issues raised in the Public
Hearing and replies by the
project proponent on the same is tabulated in table below.
49. A tabular chart with index for point
wise compliance of above TORs. Done
50. The TORs prescribed shall be valid for
a period of two years for submission
of the EIA-EMP reports along with
Public Hearing Proceedings (wherever stipulated).
Noted the point
The following general points shall be noted:
i. All documents shall be properly
indexed, page numbered.
Noted and complied
ii. Period/date of data collection shall be
clearly indicated.
Noted and complied
iii. Authenticated English Translation of all material in Regional languages
shall be provided.
Noted and complied
iv. The letter/ application for environmental clearance shall quote
the MoEF file no. and also attach a copy of the letter.
Noted and complied
v. The copy of the letter received from
Ministry shall be also attached as an
annexure to the final EIA-EMP Report.
Complied
ToR letter received from MoEFCC
is attached as Annexure XI.
ADDITIONAL TORs FOR SYNTHETIC ORGANIC CHEMICALS INDUSTRY
1. Manufacturing process details along
with the chemical reactions and process flow chart.
Pls. refer sec. 2.10, page no. 2-6
of chapter-2 for of manufacturing process details along with the chemical reactions and process
Page 35
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-21
flow chart.
2. Name of all the solvents to be used in
the process and details of solvent
recovery system.
We are not going to use any
solvent in our process. Methanol
is use as a raw material in
process and not as a solvent. So
no need to install solvent recovery system.
3. Design details of ETP, incinerator, if
any along with boiler, scrubbers/bag
filters etc.
Refer table 2.9, page no. 2-23 for
technical specification of forced
effect evaporator.
4. The details of solid and hazardous
wastes generation, storage,
utilization and disposal particularly
related to the hazardous waste,
calorific value of hazardous waste and
detailed characteristic of the
hazardous waste. Action plan for the
disposal of fly ash generated from
boiler shall be included.
Pls. refer table 2.10, page no. 2-
24 of chapter-2 for details of
hazardous waste.
There is only salt generation from
MEE and no Hazardous
characteristics envisage in
recover salt from MEE.
There is no use of any fuel hence
no generation of fly ash.
5. Precautions to be taken during
storage and transportation of
hazardous chemicals shall be clearly
mentioned and incorporated.
Pls. refer sec. 7.14.1, page no. 7-
23 of chapter-7.
6. Material Safety Data Sheet for all the
Chemicals are being used/will be
used. CAS No./RTECS No./DOT/UN
etc to be mentioned against each
chemicals.
MSDS of all the Haz. Chemicals
are given as Annexure-II.
7. Details of VOC monitoring in the
working zone environment and other
hazardous emissions such asChlorine,
HCl, etc. if any.
Pls. refer chapter-6 of EIA report.
8. Authorization/Membership for the
disposal of solid/hazardous waste in
TSDF.
Membership certificate of
approved TSDFsite is enclosed as
Annexure-I.
9. Risk assessment for storage for
chemicals/solvents. Action plan for
handling & safety system.
Pls. refer chapter-7 for risk
assessment.
10. Details of occupational health
programme.
i) To which chemicals, workers are
exposed directly or indirectly.
ii) Whether these chemicals are
within Threshold Limit Values
(TLV)/ Permissible Exposure
Levels as per ACGIH
Pls. refer sec. 10.10 on page no.
10-16 of chapter-10 for
occupational health programme
details.
Refer sec. 10.10 on page no. 10-
16 for list of chemicals, and
measures, details of Pre-
placement and periodical medical
monitoring of workers, LFT.
Page 36
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-22
recommendation.
iii) What measures company has
taken to keep these chemicals
within PEL/TLV.
iv) How the workers are evaluated
concerning their exposure to
chemicals during pre-placement
and periodical medical
monitoring.
v) Liver function tests (LFT) during
pre-placement and periodical
examination.
Pls. refer table 2.8(a), page no.
2-22 of chapter-2 for threshold
limit & estimated results of Haz.
Chemicals.
11. A Toxic management Plan shall be
prepared.
Pls. refer sec. 7.16, page no. 7-
29 of chapter-7.
12. A write up on “Safe Practice” followed
for handling, storage, transportation
and unloading of chemicals to be
submitted.
Pls. refer sec. 7.14, page no. 7-
22 of chapter-7.
13. What are onsite and offsite
emergency plan during chemical
disaster.
Pls. refer section 7.17& 7.18,
page no. 7-31 & 7-38
respectively of chapter-7 for
onsite & offsite emergency plan.
14. A write up on “Treatment of workers
affected by accidental spillage of
chemicals”.
Pls. refer sec. 7.14.5, page no. 7-
25 of chapter-7.
Points raised during public hearing and its compliances/response from project
proponent/consultant.
Sr.
No.
Name and
Address
Point Represented Reply from the Project
Proponent
1. Thakor Chunthaji
Ramsang,
Moti Bhoyan
• At present how much quantity of formaldehyde is
producing?
• You have Environment clearance for existing unit.
The date of submission of
compliance report for last three years.
• Environment clearance is obtained for the existing
unit on 24/08/2010, whereas Consent No.
AWH.71755, Dt. 13/09/2015 was obtained
from GPCB. That means
Industry have operated the plant from year 2010-July
2012 without obtain GPCB consent? Submit the
details of How many Products were produced
• Representative of the company inform that currently
unit producing 5000 MT/Month
(max) Formaldehyde. • We are regularly submitting
compliances report of EC to
Regional office, MoEF&CC, Bhopal at interval of six
months. • We have renewed our consent
to operate on 13.09.2015 and we have obtained consent to
operate with same capacity from GPCB. During this period
we were produced same
product Formaldehyde with max production capacity of
5000 MT/Month.
Page 37
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-23
and how much the quantity
of each product during this
time (Aug’10-July’15). • Provide validity of
Environmental Clearance obtained for Existing unit.
• Provide the details of tree
plantation after expansion.
• Provide the area of block No. 1398.how much area
is covered for existing construction
• When N.A is obtained for
Block No. 1398?
• Any permission is obtained from the Authority like
Gram Panchayat-MotiBhoyan, Taluka
Panchayat Jilla Panchayat –Gandhinagar or Collector
of Gandhinagar for
proposed expansion?
• Which type of work done for social welfare activities
in last three years? How much fund expanse for this
activity during three years? • Give details of how many
local people get
employment for existing unit? Give details of each
local employment with their address.
• How you meet your water
requirement for Existing plant?
• Thol lake Bird Sanctuary is
3 km away from the project site which is not
included in study and this
is very serious matter.
• How much solid waste is
generated per month and where it is dispose? Give
details. • Is there ETP at present
operation? If yes, then
• We have obtained EC on
24/08/2010 with validity of 5
years for its implementation. During this time, we have
established our plant and obtained CTE & CTO & not
violate EC Condition.
• We have around 150 trees
planted in our premises which include Palm tree, Jasud,
Madhukamini, Chandani,
exsora pink, exsora red etc. • We have 4281 Sqm net in
Block No. 1398. Around 60%of area is covered under
construction. • We have obtained N.A
permission for block no. 1398
dt: 20/12/2004. • We will obtain required
permissions for proposed expansion from Authority like
Gram Panchayat-MotiBhoyan, Taluka Panchayat Jilla
Panchayat –Gandhinagar or Collector of Gandhinagar
before start our project
activity. • Being a small unit, some CSR
activities carried out by us and committed to more focus on
CSR work in upcoming period.
• Unit is providing employment
around 40 employees those who are coming from
Gandhinagar and Ahmadabad district. Summary of name of
employee and there village is
attach herewith. • Currently we are fulfilling our
water demand from water supply of Narmada Nigam.
• Unit is not using any fuel in the plant and achieves Zero
discharge hence major environmental impact is
localized. There is no any
adverse impact envisage on Bird of Thol lake hence detail
impact study is not carried out.
• Currently we are disposed of industrial solid waste at
Saurashtra Environment Project Pvt. Ltd Bhachau.
• There is no waste water
Page 38
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-24
provide its capacity.
• How many Showcase Notices, Closure Notices
etc. obtain for existing unit under Air Act-1981& EPA-
1986? Give the reasons of
notices.
generation from process only
waste water generate from
Cooling tower and Boiling, it it will be evaporate to achieve
zero discharge. Hence ETP is not required in our unit.
• Still we have received three notices from GPCB one is dt:
7/09/2011, second: 05/12/2012 & third one on dt:
06/02/2013. We have
immediately take actions to comply non-compliance of
notices.
1.8 OBJECTIVE OF EIA
EIA is a policy and management tool for both planning and decision
making. EIA assists in identification, prediction and evaluation of the
foreseeable environmental consequences of proposed developmental and
industrial projects.
The objectives of the present EIA Study is to assess the impacts on
various environmental components due to the proposed project activity,
identify potential source of pollution, evaluate impact on environment and
to recommend appropriate environmental management system and
environment management plan for the unit to ensure that the adverse
impacts if any will be minimized. Moreover, to prepare an Environmental
Statement to indicate conclusively if the overall impacts are positive or
negative.
1.9 METHODOLOGY FOR EIA
Environmental Assessment (EA), another term used in the environmental
studies, refers to an understanding of the present status of environment
and a study of how to manage them. Keeping in view the nature and size
of the proposed project and industrial area and various guidelines
available, it was decided to cover an area of 10-km radius from the
center of proposed plant site for the purpose of environmental impact
assessment study. The methodology is briefly reported below and has
been described in this section.
Baseline data Collection
The baseline data for the impact zone have been generated for the
following environmental parameters:
Page 39
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-25
Ambient Air Quality
Micrometeorology
Noise Levels
Surface and ground water quality
Soil Quality
Flora and fauna
Land use pattern
Socio-economics
The baseline status of the above environmental parameters has been
worked out based on the rapid monitoring/analysis carried out during the
study period of October-2015 to December-2015 supplemented by
data collected from various government departments, census publications
etc. The data is collected and analyzed as per the standard methods for
establishing the baseline data and to determine the impact of proposed
activity on the same.
Evaluation of Impact from Project Activities
The environmental Impact resulting from the various project activities,
have been identified, predicted and evaluated based on the study of
manufacturing process and other project related activities as well as
correlating the same with existing base line status.
Preparation of Environmental Management Plan
Environmental Management plan has been prepared covering pollution
prevention measures at source in terms of air and water pollution control
measures, solid waste/ hazardous waste management, safety
management, green belt development, environmental surveillance and
environmental management team.
Finally, the detailed assessment of the resultant environmental impacts
have been made based on the impacts identification and evaluated from
the activities over the baseline status of various environmental
components to reduce the pollution and to delineate a comprehensive
environment management plan along with recommendations and
suggestions to improve environment management system.
Page 40
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-26
1.10 DETAILS OF INDUSTRIES
Table 1.3 List of major industries
Sr.
No.
Name of Industry Type of Industry Distance
1. Kothari Techno Tex Mfg. of Drop wire, Healds for
Quality Fabric Weaving
300 Mtrs
2. Shree Rama Multi-Tech
Ltd.
Mfg. of Lami Tubes, Labels,
Cups, Flexible
200 Mtrs
3. Gujarat Dyestuff
Industries Pvt. Ltd.
Mfg. of PP/PE Woven Fabric,
Sacks, Antiblock Master
Batches
250 Mtrs
4. Singhal Industries Pvt.
Ltd.
Mfg. of PP/HDPE Leno Bags,
Jumbo Bags, Woven Sack Bags.
500 Mtrs
5. CRI Ltd. Manufacturer of ball pen tips,
nozzle trader and exporter of
ball pen tips, nozzle supplier of
ball pen tips & nozzle
100 Mtrs
6. Arvind Mills Ltd. Mfg. of Clothes 2 Kms
Page 41
Lo
Fig
ocation of
Projec
San
gure 1.1
f the proj
ct Locatio
Envirotec
ject site
n
ch Pvt. Ltd
d., Ahmeddabad
Page 42
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-28
Figure 1.2
Google map of 10 km radius
Page 43
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 1-29
Figure 1.3
Image showing all four boundaries coordinates of the site
Page 44
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-1
Chapter-2
Project Description
2.1 INTRODUCTION
M/s. Balaji Formalin Pvt. Ltd. is a working unit at Plot No. 1398, Nr. Rama
Multi Tech Ltd., Village: Moti Bhoyan, Taluka: Kalol, Dist.: Gandhinagar
for manufacturing of Formaldehyde of 5000 MTPM capacity. Now, looking
to the market demand, unit intends to enhance its production capacity of
Formaldehyde up to 12500 MTPM along with Para Formaldehyde - 835
MTPM and Reprocessing Silver (Purification of Silver) - 1.5 MTPM.
Expansion will be done in existing plant premises. Unit has obtained EC
from MoEF&CC vide its letter no. J-11011/625/2009-IA II (I), dated
24.08.2010 and have valid consent to operate issued by GPCB vide order
no. AWH-71755, date of issue 13/07/2015 and valid up to 15/04/2020.
2.2 TYPE OF PROJECT
Unit proposed to expand production capacity of Formaldehyde and going
to add new products Para Formaldehyde manufacturing activity.
Production of Formaldehyde and going to add new products Para
Formaldehydeis covered under the basic organic chemicals. The project
activity falls under item 5(f) of Schedule of Environment Clearance
Notification dated 14th September, 2006 and its subsequent amendment.
Considering the project location and itscapacity, as per notification, it falls
under Category “A” project. Hence, it is necessary to obtain
Environmental Clearance from Central level before start the expansion
work.
2.3 NEED FOR THE EXPANSION
Unit is established in the year 2003 for manufacturing of Formaldehyde
with capacity of 1500 MTPM and currently produces 5000 MTPM
Formaldehyde. The end use of this product is mainly for Resins,
disinfectant & other industrial uses. Due to increasing market demand,
unit proposes to increase its production activity by expansion of existing
production and adding some new products.
Page 45
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-2
The promoters of the company have more than 15 years of experience in
the same business. The chemicals-Formaldehyde offered by the unit is
appreciated throughout the local markets for their accurate composition
and quality, which has been a reason for the steady growth of the
company over the years. With the increasing market demand, unit
proposes to increase its production activity by adding some new products.
2.4 CAPITAL INVESTMENT
Existing cost of project is Rs. 10.0 crores. The estimated cost of the
proposed expansion will be around Rs. 8.0 crores. So after expansion, it
will be tune around Rs. 18.0 crores. Out of this, around Rs. 1.0 crore will
earmark for pollution control measures as capital investment and Rs. 20
lakhs will be recurring cost per annum. Unit is using excess steam
generate from exothermic process reaction resulted to reduce the
operational cost.
2.5 LAND REQUIREMENT
Proposed expansion will be carried out in existing plant premises
admeasuring total area of the premises as 4281 m2. The area use in the
unit is for plant/machinery, raw material & finished product storages,
office etc. Detailed break-up of land is given in below table:
Table 2.1 Structural facilities along with land break up
Sr. No. Particular Land Occupied, sqm
1. Process Area 924
2. Raw Material Storage 432
3. Utilities 365
4. Final Product Storage 432
5. Office Building 90
6. Green Belt 1500
7. Parking 100
8. Internal Road 438
Total 4281
2.6 LOCATION OF THE PROJECT:
Project site details are given in following table:
Page 46
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-3
Table 2.2: Location Details
Sr.No. Particulars Details
1. Plant location
Plot No. 1398
Village Moti Bhoyan
Taluka Kalol
District Gandhinagar
State Gujarat
2. Co-ordinates
Latitude 23°09'44.69"N
Longitude 72°26'45.54"E
3. Nearest Habitat Moti Bhoyan-1.45 km
4. Nearest Railway Station Kalol-10.6 km
5. Nearest Airport Ahmedabad-21.2 km
6. Nearest City Ahmedabad-12.0 km
7. Nearest Highway SH 41-10.0 km
Note: Aerial distances are presented in above table.
2.7 SIZE OR MAGNITUDE OF OPERATION
Unit is involved in the manufacturing of Formaldehyde and now, proposed
for expansion in existing production capacity by adding some new
products. Production details are as under:
Table 2.3: List of products
Sr.
No.
Products Existing
Production (MTPM)
Additional
production (MTPM)
Total production
after expansion (MTPM)
1 Formaldehyde 5000 7500 12500
2 Para Formaldehyde 00 835 835
3 Reprocessing of Silver
(Purification of Silver)
00 1.5 1.5
2.8 PROPOSED SCHEDULE FOR APPROVAL AND IMPLEMENTATION
Specifics Applied
under the
Act
Specifics for
approval or legal
procedure
Related recent
Status
Implementation
EC for
Expansion
of Project
Under
Environment
Protection
Environment
Clearance for the
expansion project
Submitted
Form-I, TOR
presentation,
Project will expand
after obtaining EC
from MoEF&CC.
Page 47
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-4
Act, 1986 from MoEF&CC as
per the guideline
of EIA
Notification-2006&
amended time to
time.
TORs awarded
on 22.06.2015
Operation
of the
Expansion
Project
Under Air,
Water, Haz.
Waste &
Environment
(Protection)
Act, 1986
CTE & CTO/CCA
from GPCB.
Will apply for
CTE/CCA to
GPCB.
After obtaining
CC&A.
2.9 DETAILS OF MAJOR EQUIPMENT AND MACHINERY (EXISTING &
PROPOSED)
The proposed expansion project will be carried out within the existing
plant premises. Building construction will be done as per requirement.
Restructure of the plant building will be done if required considering
safety point of view. For the manufacturing of the products, required Raw
materials are available nearby and can be transported to the project site
with ease because of good road connectivity. The details about existing
infrastructural facilities and plant machineries for proposed expansion are
shown in Table 2.4.
Table 2.4 Plant machineries (Existing & Proposed)
Sr.
No.
Particulars Qty. Status
(Existing/Proposed)
Formaldehyde
1. Reactor 2 Existing & Refurnished
2. Evaporator 2 Existing
3. Absorber-1 2 Existing
4. Absorber-2 2 Existing
5. Air Washer 1 Existing
6. Steam Filter 2 Existing
7. Methanol Filter 4 Existing
8. Steam Drum 3 Existing
9. Steam Distributor 2 Existing
10. Hot Water Tank 2 Existing
11. Plate Type Heat Exchange 10 Existing
12. DCS System 2 sets Existing
13. Other Field Instruments 2 Lot Existing
14. Air Compressor 4 Existing
15. Pump & Motors 2 Lot Existing
16. Roots Blower 5 Existing
Page 48
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-5
Sr.
No.
Particulars Qty. Status
(Existing/Proposed)
17. Air Filter 2 Existing
18. Super Heater 1 Existing
19. Gas Filter 1 Existing
20. Bubble Cap Tank 1 Existing
21. Incinerator 1 Existing
Paraformaldehyde
1. 1st Stage, Falling Film Evaporator with
Separator
1 Proposed
2. 1st Stage, Condenser for Falling Film
Evaporator
1 Proposed
3. 2nd Stage, Thin Film Evaporator with
rotating wiper system, drive for
rotation & motor
1
Proposed
4. 2nd Stage, Concentrate Buffer Tank 1 Proposed
5. 2nd Stage, Condenser for Thin Film
Evaporator
1 Proposed
6. Feed Tank with Agitator (Drying Unit) 1 Proposed
7. Pressure Nozzle System
(Atomizing System)
1 Proposed
8. Steam heated gas heater (Inlet Gas) 1 Proposed
9. Steam heated gas heater (Hot Gas) 1 Proposed
10. Roof Air Disperser (Spray Chamber) 1 Proposed
11. Congealing Chamber
(Spray Chamber)
1 Proposed
12. Fluid Bed System consisting of 1
stationary fluid bed unit divided into 2
drying sections and 1 cooling section
1 Proposed
13. Cyclones (Outlet Gas) 1 Proposed
14. Scrubber/Condenser with buffer tank 1Lot Proposed
15. Heat Exchanger 1 Proposed
16. Oxygen Analyzer 1 Proposed
17. Other Field Instruments 1Lot Proposed
18. PLC with SCADA 1 Proposed
19. Packing Machine 1 Proposed
20. Structure supply & Installation 1Lot Proposed
Silver catalyst plant
1. Electrolysis Tub 3 Proposed
2. Current Rectifier 3 Proposed
3. Electric Oven 1 Proposed
4. Muffle Furnace 1 Proposed
5. Agitated Tank 1 Proposed
6. Vacuum Filter 1 Proposed
Page 49
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-6
Sr.
No.
Particulars Qty. Status
(Existing/Proposed)
7. Vacuum Pump 1 Proposed
8. Melting Furnace 1 Proposed
9. Sieving Machine 1 Proposed
10. Circulation Pump 1 Proposed
11. Scrubber 1 Set Proposed
12. Different Tubs [Plastic & SS] 1 Set
each
Proposed
2.10 MANUFACTURING PROCESS, CHEMICAL REACTION & MASS
BALANCE
2.10.1 Formaldehyde Production Technique:
a) Feed Methanol, air, water vapour
Catalyst: Silver/Metal oxide
b) The methanol in the measuring storage tank is pumped up to an elevated
tank by a methanol pump. After being controlled by measuring, the
methanol coming out from the elevate tank flows into an evaporator for
vaporization of which the temperature is controlled within 440C ~ 470C
and the liquid level is controlled as 50%,then the vaporized methanol
gets into a super heater. The heat for the vaporization of methanol is
provided by the 700C circulating fluid in the 1# formaldehyde absorber.
c) The air is filtered by a filter before being delivered to the evaporator by a
blower. It mixes with the methanol in the evaporator and enters into then
super heater together. The air flow is regulated by the blower through
frequency conversion to control the flow ratio of air to methanol
(A/M=1.8 ~1.95).
d) When the pressure gets stable, the vapour (0.3MPa) gets into a mist
eliminator for dehumidification through the pipeline before entering into
the superheat. The flow ratio of air to methanol shall be controlled at
desired level. In the formaldehyde production technique using silver as
catalysis, the water vapor is an inert gas which does not participate in
chemical reactions. The added water vapor changes the explosive range
of the methanol and air, the production of formaldehyde thereby
becomes far from the explosive area and stays safe and reliable.
e) After the flow rates are regulated and proportioned, the methanol, air and
water vapor enter into the super heater and the superheating
Page 50
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-7
temperature shall be controlled at 1200C. Then, these materials enter into
a reactor.
f) In the reactor, under the catalysis of silver of 6500C, the methanol is
dehydrated and oxidised, generating Formaldehyde. Dehydration reaction
is an endothermic reaction and oxidation reaction is an exothermic
reaction, but the heat release is more than that can adsorbed, therefore
the reaction system is a state of heat energy surplus. The water vapour is
not involved in reactions but it can absorb a lot of heat of reaction,
maintaining the temperature at 6500C.
Chemical Reaction
CH3OH CH2O + H2 - 20Kcal-----------------1
CH3OH + ½ O2 CH2O + H2O + 38 Kcal------2
1 – 2=18Kcal
The 6500C reaction gas leaves the reaction and gets into heat exchanger.
For the heat exchanger, the medium is water. The outlet temperature of
heat exchanger is 1600C. The water absorbs heat, forming the water
vapour of 0.35 MPa which will be used to arranging the raw materials for
production in the super heater after its pressure stabilized.
g) The generated gas of about 1600C enter into 1# and 2# formaldehyde
absorber in proper order and gets absorbed by the cooled circling fluid
through spraying. The temperature of the circulating fluid at the bottom
of 1# absorber shall be control at 700C and fluid is pumped to the
evaporator by circulating pump to supply the heat for the evaporation of
methanol. In the 1# absorber, the concentration shall be controlled as
37%, and temperature of the top shall be controlled at 450 to 500C. The
circulating fluid is also a composition of the Formaldehyde product by this
technique. The temperature of the top of 2# absorber shall be controlled
at 300 to 350C and keep adding water by 300-500 kg/h from top to
reduce the release of formaldehyde.
The tail gas is discharged from the top of the absorber and sent to a tail
gas treatment unit. The tail gas contain 18 to 20% hydrogen and small
amount of Formaldehyde, methanol and methane, which will generate
Page 51
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-8
heat after burning to produce 0.6 MPa water vapor for the application of
other devices. Through tail gas treatment unit, the pollution of
formaldehyde, methanol and methane to atmosphere is reduced and the
recycling of combustion heat is very effective to reduce pollution
discharge and take advantage of wasted energy.
Flow diagram
Page 52
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-9
2.10.2 Process of making Para-formaldehyde from Methanol using rake
type drying method
First step process of Para Formaldehyde is production of formaldehyde
from Methanol with above mentioned process.
Formaldehyde is firstly concentrated and dehydrated until the
formaldehyde concentration is increased 65%. Then it is sent to the
vacuum type dryer for further dehydration and drying to make
powder/Prills.
The whole drying process is operated under vacuum condition. The
evaporation condensate contains 10-15% of formaldehyde fumes, which
is condensate and collect as diluted formaldehyde for recycling in
formaldehyde plant.
Condenser 1: The vapor, which contains formaldehyde & water vapor
from evaporator and concentrated receiving vessel pump into
1#condenser for cooling. The condensate is dilute formaldehyde solution
which is finally discharged into dilute formaldehyde storage tank, which is
return back to formaldehyde plant.
Condenser 2: The vapor, which contains formaldehyde & water vapor
from dryer into 2# condenser for cooling. The condensate is dilute
formaldehyde solution which is finally sent to dilute formaldehyde storage
tank, which is return back to formaldehyde plant.
Absorber: Off gas of 1# condenser, 2# condenser and vent of Dryer are
taken into absorber tower where water circulates from circulation tank.
Formaldehyde whichever in off gas is absorb in water and convert into
dilute formaldehyde. When absorption liquid formaldehyde solution
reaches certain concentration, then it is taken into dilute formaldehyde
storage tank and it is used in formaldehyde plant.
All source of dilute Formaldehyde from Condenser 1 & 2 +
Absorber are collected into Dilute formaldehyde storage tank
which have around (4 to 4.5%) concentration of Formaldehyde
which is recycled in formaldehyde plant.
Page 53
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-10
Process Flow Diagram:
Evaporator
(65-75%)
Condenser 1
Dilute formaldehyde
storage tank
(4 to 4.5%)
Circulation
tank
FM solution
Concentrate
receiving vessel Dryer
Condenser 2
Off gas Off gas
Absorber
Cooling water in
Cooling water out
Cooling water in
Cooling water out
Packing
Powder form Heat out
Heat in Off gas
Page 54
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-11
2.10.3 Process of Silver Refining
Stage-I
Process of making silver nitrate
In a vessel 50 Ltr of water/dilute solution of Silver Nitrate is taken to
which 16 Kg of silver is added @ 50-55 Degree C, under constant stirring.
Nitric Acid 9.3 Kg is added in the same to convert silver to silver nitrate.
During reaction nitrous fumes are evolved which is absorbed in scrubber.
Stage-II
In a tank containing refining cells with hood, connected to scrubber,
which can hold silver.
Silver nitrate solution is added to tank in which current from 20 to 200
Amp & DC voltage of 2 to 20 Volts is applied.
Silver crystals are deposited on silver cathode plate.
Silver crystals are removed from cathode plate by scrapping, then
collected and washed with DM water to remove silver nitrate. Water used
in washing is recycled back to electrolysis tank.
Wet crystals are dried and sieved to obtain different sizes.
The fumes generated are absorbed in a scrubber.
In scrubber NaOH solution is circulated to absorb nitrous fumes.
Neutralize solution is taken to common Evaporator.
Stage-III
Melting Process
Silver crystals to be reprocessed are melted in electric/gas furnace @ 900
Degree C and converted into ingots/small pieces.
Page 55
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-12
Flow Diagram
Stage 1 process (silver refining process)
AgNO3Solution
Silver electrolysis
Recovered silver
Silver plate
D.C. current
Washing
D.M. water
Dilute
AgNO3reused
Drying
Silver Catalyst
AgNO3 Preparation
HNO3
Silver metal
Page 56
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-13
Stage 2 process Silver recovery from AgNO3
2.11 PROJECT COMPONENTS
Components of the project include all facilities required for the operation
of the project with legal necessity.
a) Input requirements: Raw materials, water, fuel, power etc.
b) Utility requirements: Re-Boiler, cooling tower, D. G. Set etc.
c) Pollution control facilities:
Water Treatment Facilities: Forced effect evaporator and
mechanical evaporator.
Air Pollution Control Facilities: Tail gas treatment units.
Hazardous/Solid waste facilities: It includes sludge storage and final
disposal facility at approved TSDF site by GPCB.
d) Other facilities: It includes greenbelt area, rain water harvesting
system etc.
Silver recovery unit
Filtration
AgNO3from silver
refining process
NaOH
Silver Washing
Water
To effluent
Drying
Melting
Reducing
agent
To evaporator
Ingots/small
process
Page 57
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-14
2.12 INPUT REQUIREMENTS
(a) Raw material requirement:
The details of the raw material requirement are given in Table 2.6.
(b) Water requirement:
At present, total water requirement (Industrial + Domestic + Greenbelt)
is 129 KLD (104 KLD freshwater + 25 KLD recycle water). After
expansion; water requirement will be increased up to 610 KLD, out of
which 535 KLD is fresh water & 75 KLD is recycle water (condensate from
evaporator). Fresh water consumption is mainly for domestic, process,
utilities, greenbelt development. Source of fresh water is Narmada Water
supply and it will be same after expansion.
Detailed breakup of the waterconsumption is given in Table 2.6. Water
balance diagram is given in Figure 2.1.
(c) Fuel:
No fuel is used for existing manufacturing because exothermic reaction.
Methanol is being used as starting fuel for 30 to 60 minutes when
reaction initiated. After expansion, same technology will be used hence
no need of fuel. Only HSD is used for stand-by D. G. set, which is used in
case of emergency/power failure only.
(d) Power:
Electricity is supply from Gujarat Electricity Board (GEB-UGVCL). At
present, power requirement is 400 kVA. There will be increase in power
consumption. Additional requirement will be 950 kVA. Hence, total 1350
kVA will be required after expansion. There is also provision of stand by
D. G. Set of 400 kVA (Existing) and proposed addition of 1000 kVA to
meet the power requirement in case of power failure.
(e) Manpower:
After expansion, total manpower will be 55; i.e. existing 30 nos. and
proposed 25 nos. which include manpower at all levels (i.e. chemists,
supervisors, operators, miscellaneous etc.).
2.13 UTILITIES REQUIREMENTS
Utilities facilities are tabulated below:
Page 58
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-15
Table 2.5: Utility details
Sr.
No.
Particulars Qty. Capacity
1. Cooling towers 4 200 TR each [Existing]
2. D. G. Sets 2 400 kVA( Existing) + 1000 kVA
(Proposed)
3. Air Compressor 4 22 CFM x 1 [Existing]
39 CFM x 2 [Existing]
39 CFM x 1 [Existing]
2.14 GENERATION OF POLLUTANTS
The sources of pollution will be as below;
2.14.1 Wastewater generation:
Source of water pollution is mainly from process, RO/DM reject, utilities
i.e. cooling bleed off and from domestic use. Currently, 30 KLD
wastewater is generated from raw water treatment and utilities. After
expansion, it will be increased up to 121 KLD. Wastewater generated
from the inter-reaction is retained with the product. RO/DM reject,
wastewater generated from silver refining & cooling bleed off will be
directly sent to force effect evaporator & then sent to mechanical
evaporator. Condensate from evaporator will be reused for utility i.e. for
cooling. Thus unit will achieve zero discharge after proposed expansion.
Generated Domestic wastewater will be sent to soak pit.
2.14.2 Gaseous Emissions:
There will not be any process emission except tail gas, which will be
emitted after proper burning/incineration in tail gas treatment plant. Tail
gas treatment plant is integral part of process plant. It will be
updated/modify along with process plant after expansion. The tail gas
treatment plant will be adequate to reduce the pollution of formaldehyde,
methanol and methane to atmosphere. There will also be recycling of
combustion heat which is very effective to reduce pollution discharge and
take advantage of wasted energy.
Unit has installed one D G Set (400 kVA) and going to install additional
one D G Set with capacity of 1000 kVA. Both the D G Sets are used as
standby in absence of power supply from state grid. HSD will be used as
Page 59
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-16
fuel. Most probable pollutants will be SPM, SO2 and NOx. The details of
the flue gas stacks and process gas stacks are given in Table-2.8.
2.14.3 Hazardous/Solid Waste generation:
Main source of hazardous waste generation is Evaporation Salt, used oil &
discarded containers/barrels. After expansion, source of Haz. waste
generation will remain same but there will beincrease in the quantity of
hazardous waste generation. The details of hazardous waste generation
are given in Table-2.10.
2.14.4 Noise Pollution:
At present, the main source of noise generation is process plant,
vehicular transportation & other machineries.
There will be slight increase in noise level due to proposed manufacturing
activities, due to installation of some new additional mechanical
equipment required for the proposed expansion. The noise level in the
unit is well within the prescribed limit. Noise monitoring for existing plant
activities are given in Table-2.11.
2.15 POLLUTION CONTROL MEASURES
The details of pollution control strategy for various parameters are given
hereunder:
2.15.1 Effluent Management
As discussed in earlier section of this chapter, main source of water
pollution is from silver refining process, RO/DM reject, utilities i.e. cooling
bleed off. Wastewater generated from water treatment, silver refining &
cooling bleed off will be directly sent to forced effect evaporator & then
sent to mechanical evaporator. Condensate from evaporator will be
reused for utility i.e. for cooling. Thus, unit will achieve zero discharge
after proposed expansion.
Generated Domestic wastewater will be sent to soak pit. Technical details
of forced effect evaporator and mechanical evaporator are given in table
Table-2.9 and Figure-2.4.
2.15.2 Air Pollution Control
There will not be any process emission except tail gas, which will be
emitted after proper burning/incineration in proposed tail gas treatment
plant. After expansion, it will be modify along with process plant. The tail
Page 60
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-17
gas treatment plant will be adequate to reduce the pollution of
formaldehyde, methanol and methane to atmosphere. There will also be
recycling of combustion heat which is very effective to reduce pollution
discharge and take advantage of wasted energy.
The flue gas emission from D. G. set will be well within gaseous emission
norms and there is no need of any air pollution control measures.
Adequate stack height will be provided to control & disperse the air
pollutants within the satisfactory levels and facility for sampling such as
ladder and sampling point will be provided as per the GPCB guidelines.
The details of the flue gas stacks and process gas stacks are given in
Table-2.8.
2.15.3 Hazardous/Solid Waste Management
Entire quantity of hazardous waste will be handled and disposed as per
Hazardous & Other Wastes (Management & Transboundary Movement)
Rules’2016. Salt from evaporator will be disposed to secured TSDF site
for landfilling; discarded containers/barrels will be sold to authorized
recyclers. Used oil will be sold to CPCB approved recyclers.
The unit has provided isolated area with impervious flooring for the
storage of hazardous waste. Thus, hazardous waste management system
provided by the unit is adequate. The details of hazardous waste
generation are given in Table 2.10.
2.15.4 Noise control measures:
Following steps will be taken by industry to control noise:
Proper maintenance ofequipment and oiling to avoidincrease in noise.
Provide PPEs like ear puff, ear plugs etc. to workers.
Rotate the workers from noise generating area to other.
Develop the green beltadequately.
2.15.5 Fugitive Emission Control
Fugitive emission of VOCs is likely to emit from production activities.
There are also chances of the fugitive emission due to handling of raw
materials and from process.
However, to prevent the same the unit takes all the precautionary
measures like to carry out entire process in the closed pipeline and
reactors with practically zero leakages. As major raw material & finished
Page 61
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-18
products are in liquid form, practice of pneumatically transfer is adopted
to avoid generation of fugitive emission. All raw materials are stored in
closed conditions to minimized fugitive emission. Frequent work area
monitoring will be done to check fugitive emissions level.
2.16 RESOURCE CONSERVATION
2.16.1 Heat Recovery
The unit introduces modernized techniques so that generated heat from
exothermic reaction is utilized for steam generation. Unit has installed tail
gas treatment plant.Therefore, wasted heat energy will be recovered in
recycled for various industrial activities. Thus, there will not be any
additional fuel requirement which will step towards resource recovery and
conservation. With tail gas treatment plant there will also be reduction in
pollutant concentration and better quality of air emission will be obtained.
Better quality water from Mechanical Evaporator will be recovered and
reused in process. This resulted in conservation of fresh water
requirement. There will also be recycling of combustion heat which is very
effective to reduce pollution discharge and take advantage of wasted
energy.
2.16.2 Rain Water Harvesting System
The unit has provided Rain water harvesting system within the plant, for
capacity of 100 Kl underground tank. During the rainy days, they will first
use rain water for process and utilities and only balance water use form
ground water source. Further, unit is using this water for manufacturing
process.
2.16.3 Green Belt Development
The unit has developed greenbelt area around 1500m2 in its existing unit
and some more area will be added for greenbelt development outside the
plant boundary. The greenbelt area is around 35% of total land area.
Local spices are planted and survival rate is more than 70%.
2.17 Odour control:
The only source of odour is Methanol & Formaldehyde handling and
storage which will be in minor quantity. Both the chemicals are
pneumatically transferred to the reactor as well as packing containers
Page 62
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-19
with practically zero leakages. However, proper personal protective
equipment will be provided to the workers which are handling odorous
materials.
2.18 Health& Safety:
M/s. Balaji Formalin will be followed occupational health program right
from the start of production.
The following check-ups shall be carried out regularly to avoid
occupational hazards:
Pre-employment medical check-up at the time of employment
Provision of periodic medical check-up for all the employees
To provide necessary first aid facilities, the first aid training shall also
be given to the employees
The unit has appointed doctor for the examination and treatment of
the employee.
Page 63
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-20
Table 2.6
Details of raw materials along with source & mode of transportation
Sr.
No.
Name of Raw
Materials
Consumption (MTPM) Source Mode of
transport Existing Proposed Total
Formaldehyde (37%) - 12500 MTPM
1 Methanol 2270 3405 5675 Indigenous
/Imported
Through
Tankers
from Kandla/
Mundra/
Dahej Port
Para Formaldehyde - 835 MTPM
1 Formaldehyde
(37%)
0 2338 2338 Own
manufacturing
--
Purified Silver - 1.5 MTPM
1 Silver Metal
(98%)
0 1.530 1.530 Indigenous Road
2 HNO3 (98%) 0 2.400 2.400 Indigenous Road
Page 64
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-21
Table 2.7
Breakup of water consumption
Description Water Consumption (KLD)
Existing Proposed
addition
Total
Domestic 3.5 4.5 8.0
Gardening 2.5 1.5 4.0
Industrial
Process 63.0 205.0 268.0
Water Treatment 10.0 40.0 50.0
Boiler 15.0 -15.0 0.0
Cooling 10+25* 195+50* 205+75*
Total Industrial 123.0 475.0 598.0
Total D + G + I 129.0 481.0 610.0
Recycle water 25.0 50.0 75.0
Fresh Water
Requirement
104.0 431.0 535.0
* Condensate water
Table 2.7(a)
Wastewater Generation
Description Wastewater generation (KLD)
Existing Proposed
addition
Total
Domestic 2.5 4.5 7.0
Industrial
Water Treatment 10.0 40.0 50.0
Process 0.0 1.0 1.0
Cooling 18.0 52.0 70.0
Boiler 2.0 -2.0 0.0*
Total Industrial 30.0 91.0 121.0
Total (D +I) 32.0 95.5 128.0
* Use of re-boiler for steam generation to utilize energy from
exothermic reaction and no chances of generation of blow down.
Page 65
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-22
Table 2.8
Details of stacks with air emission quality
Sr.
No.
Stack
attached to
Stack
Temp.
In 0K
Velocity
m/s
Stack
Height
in m
Dia.
of
Stack
(m)
Fuel
Used
SPM
mg/
Nm3
SO2
mg/
Nm3
NOX
mg/
Nm3
Existing Stack
01 Tail gas
treatment
incinerator
525 8.5 18 0.300 Waste
gas
-* -* -*
02 D.G. Set
(400 kVA)
453 15 11 0.225 HSD-
45
lit/hr.
80 25 30
Proposed additional stack
01 D. G. Set
(1000 kVA)
475 15 11 0.300 HSD-
110
lit/hr.
110 35 30
Tail gas*
Quality of
tail gas
Unit % V/V
CO2 CO CH4 O2 H2O N2 H2 CH2O CH3OH
2.96 0.0 0.0 0.84 15.26 80.94 0.0 0.0 0.0
Table 2.8(a)
Sources of fugitive emission with its quantification (Estimated)
Sr.
No.
Pollutants Location Results
(μg/m3)
TLV/TWA
Limit
(mg/m3)
1. Methanol Process Area 1043 262
2. Formaldehyde Process Area 36 0.37
3. PM Packing Area 121 -
Page 66
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-23
Table 2.9
Technical specification of forced evaporator
Sr.
No.
Description Specification
1 Feed Quantity 1500 kg/hr.
2 Feed temperature 300C
3 Feed pH 6-8
4 Water Evaporation Capacity 1388 kg/hr.
5 Total Solids in Product Feed 3.0%
6 Concentrate Outlet @ 40% 112 kg/hr.
7 Steam requirement 850 kg/hr.
8 Steam Pressure 1.5 Kg/cm2 (g)
9 Power requirement 25 KW
PROCESS/PLANT EQUIPMENT
1 Calandria – I 1 no.
2 Vapor Separator‐1 1 no.
3 Primary Surface Condenser 1 no.
4 Effect Recirculation Pump with Mechanical Seal and
Non‐flame Proof Electric Motor
1 no.
5 Condensate Pump with Mechanical Seal and
Non‐flame Proof Electric Motor
1 no.
6 Water Ring Vacuum Pump with Non‐flame Proof
Electric Motor
1 no.
7 Feed Tank 1 no.
8 Condensate Collection Pot 1 no.
Instruments
Pressure Gauges will be provided in discharge of all Centrifugal Pumps
Vacuum Gauges will be provided to all Vapour Separator, Primary
Condenserof Evaporator.
Temperature Indicators will be provided to Feed Inlet to First Preheater
andFeed Outlet to Last Preheater.
Temperature Indicators will be provided to all Recirculation Liquid Inlet
andOutlet of Calandrias.
Temperature Indicators will be provided to All Vapour Separator Top.
Temperature Indicator will be provided on Condensate Pot.
Flow meter will be provided at the feed and condensate outlet
dischargepump.
Page 67
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-24
Table 2.10
Details of Hazardous waste
Sr.
No.
Name of
Waste
Category
of waste
Quantity Method of Disposal
Existing Proposed
addition
Total
1 Evaporation
Salt
35.3 5
MT/month
10
MT/month
15
MT/month
Collection, Storage,
transportation,
disposal at TSDF-
SEPPL.
2 Discarded
Containers
33.1 500
Nos./yr.
500
Nos./yr.
1000
Nos./yr.
Collection, Storage,
decontamination,
transportation,
disposal by selling to
authorized recycler or
reuse.
3 Used Oil 5.1 50 lit./yr. -- 50 lit./yr. Collection, Storage,
transportation,
disposal by selling to
registered re-
processor or reused
as lubricant.
Page 68
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-25
Table 2.11
Noise Survey of existing plant
Sr.
No.
Locations Noise Level
dB(A)
1. Nr. Main Gate 63.1
2. Backside of plant 59.2
3. Inside Plant Building 63.5
4. Nr. Methanol storage tanks 59.6
5. Nr. Ejector 74.3
6. Nr. D. G. Set 67.4
Page 69
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-26
Figure2.1
Water Balance Diagram (Existing)
Water
consumption
104 m3/d
Domestic
3.5 m3/d
Process
63 m3/d
Utilities
35 m3/d
Greenbelt
2.5 m3/d
Soak pit
2.5 m3/d
Retained
with product
105 m3/d
Water generation from reaction 47 m3/d
Evop loss
5.0 m3/d
Boiler
15 m3/d
Cooling
10+25 m3/d
Multi Effect
evaporator
30 m3/d
Condensate
25m3/d
RO treatment
Reject
10m3/d
Page 70
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-27
Figure2.2
Water Balance Diagram (after proposed Expansion)
Water consumption - 535 m3/d
Domestic 8.0 m3/d
RO/DM 298 m3/d
Soak pit 7.0 m3/d
Water generation from inter-reaction68 m3/d
Water scrubber for PF (4.0 -4.5% of Formaldehyde
40 m3/d
Water retain with Formaldehyde 40+68+147=
255 m3/d
Reject 30* m3/d
Product water
268 m3/d
PF 0+40m3/d
Formaldehyde
0+40m3/d Steam
267 m3/d
Water with RM 42 m3/d
Effluent 1.0* m3/d
Silver 1 m3/d
Live steam147 m3/d
RO/Softening
Cooling
205+75 m3/d
Bleed of 70 m3/d
System loss 2.5 m3/d
Force effect evaporator
70+20+30*+1* = 121 m3/d
Mechanical Evaporator
78 m3/d
Salt 500 kg
System loss 43 m3/d
75 m3/d
Greenbelt 4 m3/d
Utilities 225 m3/d
Product water 205 m3/d
Reject 20 m3/d
Page 71
San Envirotech Pvt. Ltd., Ahmedabad
Page 72
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 2-29
Figure 2.4
Drawing of Evaporator
Page 73
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-1
Chapter-3
Baseline Environmental Status
3.1 Prelude
To assess environmental impacts from proposed project at a specific
location, it is essential to monitor the environmental quality prevailing in
the surrounding area prior to implementation of the proposed project.
The environmental status within the impact zone could be used for
identification of significant environmental issues to be addressed in the
impact assessment study.
In order to identify and establish the extent of likely impacts, it is
essential to gather information on existing environmental quality with
regard to various components of the environment.
3.1.1 Study area
M/s. Balaji Formalin Pvt. Ltd. is an existing unit located at Plot No. 1398,
Village: Moti Bhoyan, Taluka: Kalol, Dist.: Gandhinagar. The baseline
study was carried out within 10 km radius (as per TOR) from the center
of the proposed project.
3.1.2 Period of the Study area
The baseline study of the proposed project was carried out during
October-2015 to December-2015 within 10 km radius from the center
of the proposed project.
3.1.3 Basic Component of the Environment
The basic component of study of the present environment is obligatory to
predict the environmental impact on the study area; therefore it is
necessary to discriminate the various components of which Environment
made.
Environment consists of Atmosphere, Hydrosphere, Lithosphere and
Biosphere. These Environment components have been considered for the
study of the Existing environment. They are as follows:
(I) Lithosphere: It includes the terrain and landscape study. Such as
a) Topography and Geology of the study area
Page 74
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-2
(II) Hydrosphere or Water Environment: It includes water quality of the
study area by means of -
a) Surface water quality
b) Ground water quality
(III) Atmosphere or Air Environment: Atmospheric condition mainly
depend upon the
a) Climatic condition, and
b) Micrometeorological data such as wind, temperature, humidity,
Rainfall etc. of the project area.
(IV) Biosphere: Ecological systems consist of varieties of interrelationship
between both abiotic and biotic components including dependence,
competition and mutualism. Biotic components comprises of both plant
and animal communities, which interact not only within and between
themselves but also with the abiotic physical and chemical components of
the environment. Whereas biotic component includes study of
a) Fauna: Study of the animal
b) Flora: Study of the Plant
(V) Other Component: Other component of the surrounding area includes
Socio- Economic data and noise level data of the surrounding area.
Survey for above all components of the study area and data collected by
means of Primary and Secondary data are described from Sec: 3.3 to
3.9.
3.1.4 Methodology
(a) AIR ENVIRONMENT MONITORING:
Process:
Reconnaissance
Design of Network for AAQM Stations (fig: 3.6 shown all eight Air
monitoring stations counting project site)
Air quality monitoring or data collection
Sample analysis
Methodology:
To understand the Air environment in the study area, monitoring of the air
quality was done by setting up reconnaissance and using Respirable Dust
Page 75
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-3
Sampler (RDS) & Fine Particulate Sampler for monitoring of PM10, PM2.5, SO2,
NOX. Details of methodology for AAQ monitoring are given in below table.
Table 3.1: Methodology of Ambient Air Monitoring
Sampling
Parameters
Sampling
equipment
Analytical
Equipment
Sensitivity
/Detection
Limit
Methodology
PM10 Respirable Dust
Sampler with
cyclone & flow
measurement
Electronic
Balance
1 μg/m3 Gravimetric
IS: 5182 (Part 23)
2006
PM2.5 Fine Particulate
Sampler
Electronic
Balance
1 μg/m3 Guideline for the
measurement of
ambient air pollutant
Volume-1 by CPCB,
2011, Gravimetric
SO2 Gaseous flow
attachment with
RDS Sampler
Spectro
Photometer
0.002 ppm Colorimetric
IS: 5182: (Part II)
2001
NOx Gaseous flow
attachment with
RDS Sampler
Spectro
Photometer
0.002 ppm Colorimetric
IS: 5182: (Part VI)
2006
VOC Grab sample Gas
Chromatograph
0.01 ppm
As per equipment
manual
CO Grab sample Gas
Chromatograph
- As per equipment
manual
HC Grab sample Gas
Chromatograph
- As per equipment
manual
(b) WATER ENVIRONMENT MONITORING:
Process:
Reconnaissance
Design of network stations for collection of water sample (fig: 3.8 shows
all eight water sample stations)
Sample collection & preservation
Analysis of water quality by using following methodology
Methodology for water sample collection:
Water sampler was use for collection of surface water sample. Sampling
locations with source & date of sampling is given in table below:
Table 3.2: Surface Water Sampling Locations
Sample Code
Location Date of Sampling
Source Taluka District
SW1 Piyaj village 04/12/2015 Pond Kalol Gandhinagar
SW2 Hajipur 04/12/2015 Pond Kalol Gandhinagar
SW3 Lapkaman 05/12/2015 Pond Daskroi Ahmedabad
SW4 Thol 06/12/2015 Lake Kadi Mahesana
SW5 Narmada Canal
06/12/2015 Canal Kalol Gandhinagar
Page 76
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-4
Methodology for water sample Analysis:
To understand the water quality of the study area, analysis of sample
collected from all eight locations including the plant site was conducted as
per IS: 10500: 2012 of drinking water or APHA (American Public Health
Association). Details are given in below table:
Table 3.3: Ground Water Sampling Locations
Sample
Code
Locations Date of
Sampling
Taluka District
GW1 Project Site 04/12/2015 Kalol Gandhinagar
GW2 Moti Bhoyan 04/12/2015 Kalol Gandhinagar
GW3 Hajipur 04/12/2015 Kalol Gandhinagar
GW4 Khatraj 05/12/2015 Kalol Gandhinagar
GW5 Sherisa 05/12/2015 Kalol Gandhinagar
GW6 Vadsar 05/12/2015 Kalol Gandhinagar
GW7 Karoli 06/12/2015 Kalol Gandhinagar
GW8 Ganapatpura 06/12/2015 Kalol Gandhinagar
(c) LAND ENVIRONMENT MONITORING:
Reconnaissance
Design of network stations for collection of soil sample (fig: 3.10 shows
all six soil sample collection stations counting project site)
Sample collection
Physico-Chemical analysis of soil based on following methodology
Methodology for soil sample collection:
Undisturbed top soil samples were collected manually. Sampling locations
with date of sampling is given in table below:
Table 3.4: Surface soil sampling locations
Sample
code
Locations Date of
sampling
Tehsil District
S1 Project site 04/12/2015 Kalol Gandhinagar
S2 Hajipur 04/12/2015 Kalol Gandhinagar
S3 Moti Bhoyan 04/12/2015 Kalol Gandhinagar
S4 Khatraj 05/12/2015 Kalol Gandhinagar
S5 Sherisa 05/12/2015 Kalol Gandhinagar
S6 Ganpatpura 06/12/2015 Kalol Gandhinagar
Methodology for analysis:
To understand the soil quality of the study area, analysis of all six locations
including the plant site was conducted by making suspension of soil sample
and analysis were done by using following methodology.
Page 77
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-5
Table 3.5: Soil Sample analysis methodology
Sampling
Parameters
Sample
collection
Analytical
Equipment
Methodology
Remarks
Porosity
Manual
sample
collection
using
container
tube for
collecting
undisturbed
top soil
- IS: 2720 Part 7 Trial pit method
for topsoil
sample
collection;
disturbed
samples
Water holding
capacity
- -
Permeability - IS: 2720 Part 17
Moisture
content
Electronic
Balance
IS: 2720 Part 2
Texture - IS: 2720 Part 4
Particle size
Distribution
Glass wares
IS: 2720 Part 4
5% Leachate to
be made and
analyzed as per
APHA,
“Standard
Methods”
All method
numbers are as
per APHA
“Standard
Methods”
(22nd
edition)
Cation
Exchange
Capacity
Centrifuge
IS: 2720 Part 24
(1976)
SAR
F. Photometer
(Na, K)
Titration
(Ca & Mg)
Calculation
pH pH Meter 4500 H+B
Electrical
Conductivity
Conductivity
Meter
As per IS 14767
-2000
Calcium Glass wares 3500 Ca B
Magnesium Glass wares 3500 Mg B
Sodium (Na) Flame
Photometer
3500 Na B
Potassium
Flame
Photometer
3500 K B
(d) NOISE ENVIRONMENT MONITORING:
Reconnaissance
Design of network stations for noise monitoring (fig: 3.9 shows all ten
noise monitoring stations counting project site)
Methodology:
To understand the noise environment in the study area, a survey was
conducted using Sound Level Meter at each of the ten locations including the
plant site. Monitoring methodology of noise is given in below table.
Table 3.6: Monitoring Methodology of Noise
Environment
Component
Sampling
Location
Sampling
Parameter
Sampling
Frequency
Sampling
Equipment
Detection
Limit
Ambient Noise levels
08 Locations
Decibels – dB (A)
Once during the study
Hourly reading
for 24 hours at
each location
Noise Level Meter
0.1 dB (A)
Page 78
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-6
3.2 Establishment of baseline for valued environmental components
Environmental Impact Assessment (EIA) studies need a significant
amount of primary and secondary baseline environmental data.
The primary baseline environmental data are those which need to be
collected in the field to define the status of environment (like air quality
data, water quality data, noise quality etc.).
The secondary baseline environmental data are those data which
have been collected over the years and can be used to understand the
existing environmental scenario of the study area by any recognized
agencies. (Such as Used IMD data for micrometeorological data- rainfall,
humidity and Census data for Socio Economic etc.)
The environmental impact assessment (EIA) studies are conducted over a
short period of time and therefore the understanding the environmental
trends based on few months of primary data has its own limitations.
Ideally, the primary data has to be considered along with the secondary
data for complete understanding of the existing environmental status of
the area.
3.3 Air Environment
The impact on air environment would depend and has been identified on
the basis of identification of sources of air pollution from various process
operations; the nature of pollutants and their quantities likely to be
discharged to the atmosphere; and the baseline data on air quality.
The baseline data on air quality and micrometeorological conditions of the
area surrounding the project site have been generated through an
appropriately designed network for monitoring of Ambient Air Quality
(AAQ) within the zone of likely impacts.
3.3.1 Design of Network for Ambient Air Quality Monitoring Stations
The following criteria were taken into account while designing the
ambient air quality-monitoring network:
Topography/Terrain of the study area
Populated areas within the region
Prediction of maximum concentrations and distances of their likely
occurrence under prevailing meteorological conditions
Page 79
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-7
Representation of regional background
Representation of valid cross sectional distribution in downwind
direction
3.3.2 Reconnaissance
Reconnaissance was undertaken to establish the baseline status of air
environment in the study region. The prime objective of the NAAQ
survey, within 10 km radial study area around the plant was to establish
the existing ambient air quality levels. Eight Ambient Air Quality
Monitoring (AAQM) stations including project site were selected based on
the criteria used for designing the network. The locations (relative
directions and distances) of these stations with respect to project site are
given in Table 3.7 and details of these stations are shown in Figure 3.6.
The Particulate Matter (PM10), Particulate Matter (PM2.5), Sulphur Dioxide
(SO2) and Oxides of Nitrogen (NOx), CO, HC (methane & non-methane)
and VOCs were identified as significant parameters for ambient air quality
monitoring, particularly because these are likely to be emitted from the
industries and for which ambient air quality standards are prescribed. The
micrometeorological data on wind speed, wind direction, temperature and
relative humidity were collected through a weather monitoring station for
the study period. The baseline status of air quality was monitored within
the study area i.e. 10 km radial distance from project site as per the
latest regulatory guidelines.
3.3.3 Micrometeorology of the area
The micrometeorological conditions at the project site will regulate the
transport and diffusion of air pollutants released into the atmosphere. The
principle meteorological variables are horizontal convective transport
(average wind speed and direction), vertical convective transport
(atmospheric stability, mixing height) and topography of the area. The
data on surface meteorological parameters (hourly average wind speed
and direction) in the study area were collected during the October-2015
to December-2015 using portable weather monitoring station placed at
industry site. The sensors of this equipment were kept at about 10 m
above ground level with free exposure to the atmosphere all through the
Page 80
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-8
study period. In addition, data on temperature as well relative humidity
were also recorded simultaneously using a data logger.
Wind Rose (Secondary data)
The 24 hourly wind rose was prepared using the data on wind direction
and speed collected during October-2015 to December-2015 in the
study area. The same, as depicted in Figure 3.7, shows the predominant
wind directions are ENE, NE, NNE, N, NNW implying that wind comes
from these directions for most of the time during the period. The wind
speed class 1-5 kmph occurred for 9.47%, 6-10 kmph about 31.70%, 11-
15 kmph 33.33% and above 15 kmph and below 30 kmph occurred for
15.64% of the study duration and of the time. The calm condition (below
1 kmph) prevails 9.9% of time. The wind data generated at site were also
compared with the climatologically data obtained from the nearest Indian
Meteorological Department station. The local prevailing wind pattern
during the study period is in conformity with the climatologically normal
of the region.
Temperature (Primary data)
During the study period, the maximum temperature was recorded as
40.0°C and minimum was 13.0°C.
Relative Humidity (Primary data)
During study period, the maximum relative humidity was recorded as
78% and min. was 11%.
Rainfall (Primary data)
No rainfall during the study period at project site.
3.3.4 Ambient Air Quality Survey
The ambient air quality monitoring was carried out at eight AAQM
locations, with a frequency of twice a week to assess the existing
sub-regional air quality status during the period of October-2015 to
December-2015. The Respirable Dust Sampler and Fine Particulate
Sampler along with the analytical methods prescribed by CPCB were used
for carrying out air quality monitoring. At all these sampling locations;
PM10, PM2.5, SO2, NOx, CO, HC (methane & non-methane) and VOCs were
Page 81
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-9
monitored on 24-hourly basis to enable the comparison with ambient air
quality standards prescribed by the Central Pollution Control Board.
The data on concentrations of various pollutants were processed for
different statistical parameters like arithmetic mean, standard deviation,
minimum and maximum concentration and various percentile values.
3.3.5 Baseline Status
The existing baseline levels with respect to PM10, PM2.5, SO2, NOx, CO, HC
(methane & non-methane) and VOCs are presented in Tables 3.9 to
3.13 with interpretation of statistical analysis of observed ambient air
quality data for eight locations. Presented results, represent the cross
sectional distribution of baseline air quality status of the study region.
Particulate Matter (PM10)
An average and 98th percentile value of 24-hourly PM10 values at all the
locations varied between 65.4-74.6 g/m3 and 69.2-79.3 g/m3, which
are well within the stipulated standard of CPCB, 100 g/m3.
Particulate Matter (PM2.5)
An average and 98th percentile value of 24-hourly PM2.5 values at all the
locations varied between 31.7-37.5 g/m3 and 37.0-41.6 g/m3, which
are well within the stipulated standard of CPCB, 60 g/m3.
Sulphur Dioxide (SO2)
An average and 98th percentile value of 24-hourly SO2 value of arithmetic
mean at all the locations ranged between 18.1-20.9 g/m3 and 20.6-25.2
g/m3 respectively, which are well within the stipulated standards of 80
g/m3.
Oxides of Nitrogen (NOx)
An average and 98th percentile value of 24 hourly NOx value of arithmetic
mean at all the locations ranged between 18.6-22.6 g/m3 and 20.7-26.7
g/m3 respectively, which are much lower than the standards stipulated
by CPCB, i.e. 80 g/m3.
3.4 Hydro-geological status of the study area
Gandhinagar district is situated in the central part of Gujarat and has four
talukas (Mansa, Kalol, Dahegam and Gandhinagar) with 302 villages.
Total area of the district is 2140 Sq. Km. and total population, as per
Page 82
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-10
2001 census is 13,34,731 souls. Average rainfall of last decade is 698
mm in the district. Main Rivers of the Gandhinagar district are Sabarmati,
Meshwo and Khari, which originate from Aravalli hills and meet in the Gulf
of Cambay. The topography of the district is almost even. General flow of
district is north to South.
Geologically the Gandhinagar district is covered with quaternary alluvium
formation of Cambay basin. Rocky area is not found in this district. The
alluvial formation is made up of multi-layer sand, silt and clay formation.
Alluvium thickness is more in western side of the district, while less in
eastern side. Silt, clay dominates alluvium found in the northwest side
while coarse-grained sand with gravels is common in the eastern part.
Tertiary clay (Blue clay) occurs at different depths in the area. It
demarcates the potable water boundary, below which water quality
deteriorates. In the eastern part it occurs at very shallow depth i.e. at 40
to 50 mts restricting drilling depth up to that depth. Ground water occurs
in semi-confined to confined and in un-confined conditions. Total depth of
the bore in east side is ranging from 50 to 180 Mts., while in northwest
side, depth of the bore varies from 200 to 350 Mts. Presently village
water supply schemes are mainly based on ground water through tube-
wells. Water level of the district is depleting very fast due to less
recharge and un-controlled withdrawal.
Rainfall in the study area:
The study area receives maximum rainfall from mid-June to September
from southwest monsoon. The annual average rainfall in Gandhinagar for
last ten years is around 698 mm. Thus, Rainfall in the study area can
therefore be termed as moderate.
3.5 Water Environment
Water is one of the essential requirements of living elements. Also it is an
essential requirement for many of the industrial activities. The change in
quality of water may bring about an adverse impact on the entire
environment. Due to their physical, chemical and biological interrelations,
change in water quality parameter may trigger changes in other
Page 83
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-11
variables. Physico-chemical parameters have been analyzed to ascertain
the baseline status of fresh water.
There are mainly two types of water available in the region: surface
water and ground water.
Surface Water: There are surface water bodies like lakes, village
pond/reservoir in the study area. Surface water samples were collected
from pond of Piyaj, Hajipur, Lapkaman, Thol Lake & from Narmada Canal
near project site. Table: 3.16 show the analysis of the same.
Ground water: Ground water is the major/important source of water
supply in the study area. Water samples have been collected from project
site and different seven villages (Moti Bhoyan, Khatraj, Hajipur, Sherisa,
Vadsar, Karoli, Ganapatpur). Table: 3.15 show the analysis of the same.
3.5.1 Ground Water Quality (Primary data)
Collected water samples were analyzed for various desirable
characteristics of ground water. Sampling location is shown in Figure
3.8. The results are shown in Table 3.15.
Color: All the samples were colorless meeting desirable norms.
pH: All the samples meet the desirable standards (pH ranges from 7.59
to 7.83).
Total Dissolved Solids (TDS): TDS in samples ranges from 998 mg/L
(Project Site) to 1346 mg/L (Sherisa). All the samples meet the
permissible limit of 2000 mg/L (If alternate sources of potable water are
not available).
Calcium: Calcium contents in the water ranges from 49 mg/L (Karoli) to
65 mg/L (Moti Bhoyan), all the samples meet the permissible limit of 200
mg/L (If alternate sources of potable water are not available).
Magnesium: Magnesium content in the water ranges from 39 mg/L
(Hajipur) to 61 mg/L (Sherisa). All the samples meet even the
permissible limit of 100 mg/L (if alternate source of potable water in not
available).
Sulphate: Sulphate content in the water ranges from 18 mg/L (Project
site) to 36 mg/L (Sherisa). All the samples meet the permissible limit of
400 mg/L for drinking water.
Page 84
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-12
Fluoride: Fluoride content in the water ranges from 0.57 mg/L (Moti
Bhoyan) to 0.75 mg/L (Sherisa). All the samples meet the permissible
limit (1.5 mg/L).
Total Alkalinity: Total alkalinity in the water samples ranges from 362
mg/L (Khatraj) to 485 mg/L (Project Site). All the samples are within the
permissible limit of drinking water (600 mg/L) (if alternate source of
portable water is not available).
Other Parameters: Potassium (ranges from 13 mg/L to 22 mg/L),
Sodium (ranges from 289 mg/L to 423 mg/L) and Chloride (ranges from
382 mg/L to 602 mg/L).
Heavy metals like copper, lead, chromium and zinc are found below
detectable limit in all samples.
Conclusions: Ground water samples from villages meet the permissible
limit set by the authority (BIS). Indian Standard specification for drinking
water is given in Table 3.17.
3.6 Noise Environment (Primary data)
3.6.1 Introduction
Noise can be defined as an unwanted sound. It interferes with speech and
hearing and is intense enough to damage hearing or is otherwise
annoying. The definition of noise as unwanted sound implies that it has
an adverse effect on human beings and their environment. Noise can also
disturb natural wildlife and ecological system.
Sound is mechanical energy from a vibrating surface, transmitted by
cyclic series of compression and rarefaction of molecules of the materials
through which it passes. Sound can be transmitted through gases, liquids
and solids. The number of compressions and refractions of the air
molecules in the unit of time is described as its frequency. Frequency is
expressed in hertz (Hz), which is the same as the number of cycles per
second.
3.6.2 Methodology
To understand the noise environment in the study area, a survey was
conducted using Sound Level Meter at each of the ten locations including
the plant site as shown in Figure 3.9.
Page 85
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-13
3.6.3 Day-Time and Night-Time Noise Levels
Noise survey was carried out once at each of the ten locations in the day
and night time during the study period. Table 3.18 depicts average
Leq(day) and Leq(night) noise levels for all locations.
3.6.4 Ambient Air Quality Standards in Respect of Noise
Ministry of Environment and Forest has notified the ambient standards in
respect of noise in Gazette of India dated 14th February, 2000. Table
3.19 depicts these standards in respect of noise.
3.6.5 Ambient Noise Levels in the Study Area
The Leq values of noise levels during day-time varied from 48.1 dB(A) to
62.2 dB(A). Highest Leq daytime value was recorded at Bus stop
Ganpatpura due to transportation of vehicles. The Leq values of noise
levels during night time varied from 38.5 dB(A) to 54.6 dB(A). Highest Leq
value during night time was recorded at Near Project Site.
3.6.6 Conclusions
The hourly Leq noise levels recorded at various locations in the study area
show considerable fluctuations because of changes in traffic movement,
commercial and domestic activities in the study area. In the study area
higher Noise value during day time was noted at Bus stop Ganpatpura,
due to the movement of vehicles and it is within the Ambient standards of
Commercial area for day time {65 dB (A)} and highest results in night
time was recorded at Project Site, which is within the prescribed limit of
Industrial area for night time {70 dB (A)}.
3.7 Soil Environment (Primary data)
3.7.1 Introduction
Soils may be defined as a thin layer of earth’s crust that serves as a
natural medium for the growth of plants. It is the unconsolidated mineral
matter that has been subjected to and influenced by genetic and
environmental factors. Soils serve as a reservoir of nutrients for plants
and crops and provide mechanical anchorage and favorable tilth. The
study area has more or less flat topography. The soil analysis results
show that the soil is a fertile land.
Page 86
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-14
The study area has soil with the following physical and chemical
characteristics.
3.7.2 Soil Characteristics
Samples of soil were collected from 6 locations (Nr. Project site,
Ganpatpura, Moti Bhoyan, Khatraj, Hajipur, Sherisa) during the study
period and these locations are shown in Figure 3.10.
The values of important physical and chemical parameters of these soil
samples are depicted in Table 3.20. From the tabulated values, the
following conclusions can be made about the physical and chemical
characteristics of these soil samples.
3.7.3 Corollaries
Physical Parameters
Particle Size: A Particle size of the different constituents (clay, silt, sand
and gravel) controls the porosity and water holding characteristic of the
soil. Clay (size < 0.002 mm) amount in the soil samples ranges from
26% to 32%; Silt (size 0.002 to 0.075 mm) in the soil samples is 16% to
30% and Sand (size 0.075 to 0.475 mm) in the soil samples is 19% to
33%; while Gravel (size > 4.75 mm) in the soil samples is 16% to 26%.
Analysis shows that the soil has moderate water holding capacity.
Porosity: Porosity is a measure of space in between soil particles caused
by structural conditions and determined under identical conditions.
Porosity of soil samples of the study area ranges from 42.9 to 45.7%.
Water Holding Capacity (WHC): Water holding capacity (WHC) of soil
samples of the study area ranges between 40.4% to 42.8% and these
being sandy soils are not capable of retaining sufficient water during
irrigation for facilitating the plant growth.
Bulk Density: Bulk Density of soils in the study area is found to be in the
range from 1.34 to 1.41 g/cm3. Bulk density is of greater importance for
characterizing the physical behavior of soils. Generally, soils with low bulk
density have favorable physical conditions (porosity and permeability)
whereas those with high bulk density exhibit poor physical conditions.
Page 87
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-15
Chemical Parameters
pH: pH of soils in the study area is found to be in the range of 7.35 to
7.71.
Chloride: Chloride content in soils of the study area is found to be in the
range of 138 to 242 mg/kg.
Soluble Calcium: The soluble calcium as CaCO3 in soil samples is found
to be in the range of 21 to 98 mg/kg.
Magnesium: Magnesium content in soil samples of the study area ranges
from 16 to 37 mg/kg.
Available Phosphorus: Available Phosphorus content in soil samples of
the study area ranges from 34 to 82 mg/kg.
Available Nitrogen: Available nitrogen content in soil samples of the
study area is found to be in the range from 116 to 149 mg/kg.
Potassium: Potassium content in soil samples of the study area is found
to be in the range from 24 to 39 mg/kg.
Sodium: Sodium content in soil samples of the study area is found to be
in the range from 103 to 185 mg/kg.
Total Organic Matter (TOM): Total organic matter content in soil
samples of the study area is found to be in the range of 1.19 to 1.42
mg/kg.
3.8 Ecology (Primary data)
A detailed flora fauna study was carried out in 10 km radius area of the
site. The structure and type of vegetation depends on climatic conditions
and physiography of an area. It provides goods and services essential to
support human livelihoods and aspirations and enables societies to adapt
to change needs and circumstances. In addition, biodiversity maintains
the ecological balance necessary for planetary and human survival.
Climate of the study area is suited for the variety of vegetation. The
contents of this subsection are based primarily on reconnaissance survey
carried out by the team of San Envirotech Pvt. Ltd. & through secondary
sources.
Page 88
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-16
3.8.1 Period of the study
The baseline study, for the assessment of the floral and faunal
biodiversity of the terrestrial environment of the study area, within 10 km
radius of the site was conducted during October-2015 to December-
2015.
3.8.2 Study methodology
The survey methodology was based on the flora and fauna species
identification in personal and recently recorded and found in the region by
the localities. Sampling of grass species was carried out by quadrat
sampling method to examine the species distribution and its frequency in
the region.
Quadrat Sampling Method:
A quadrat (or plot-based) survey is a quantitative examination of species
distribution and abundance. Quadrats are more likely to detect
inconspicuous or threatened species because a smaller area is sampled in
a concentrated search. This survey technique also provides a basis for
subsequent monitoring. The survey was carried out for the vegetation
ground cover found in the road edges by 1 m2 quadrat and study on the
edge effect due to rapid industrialization and urbanization. The results
and findings of the same are discussed in the following sections.
3.8.3 Floral diversity in the study area
The vegetation of this area was represented by very tall trees, middle
layer trees and shrubs, ground layer of herbaceous and twiners and
climbers. The various terrestrial plants available in the study area are
reported in Table 3.22.
3.8.4 Cultivated plants in the study area
Almost all the villages in the study area were actively engaged in
agriculture practices. For irrigation in the non-monsoon season the
villagers were depending up on the village lakes/ponds. The agriculture
crops practiced in this area are Arando, Kapas and Jower, Bajra, Guvar
are generally cultivated immediately after summer. Wheat is cultivated as
major crop in winter season.
Page 89
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-17
3.8.5 Faunal Diversity in the study area
For the documentation of the faunal biodiversity of the study area with
respect to birds, reptiles, amphibians sps.; a baseline survey had been
conducted for the study area of 10 km radius. A faunal biodiversity with
their scientific names and common names is presented in Table 3.23.
3.9 Socio Economic & Land use (Secondary data)
3.9.1 Land use pattern and infrastructure
The land use pattern indicates the manner in which different parts of land
in an area is being utilized or non-utilized. It is an important indicator of
environmental health; human activity and a degree of inter play between
these two. Even though the soil quality, water availability and climate
have strong influence on agriculture and vegetation, the human activity
may alter the natural environment to a large extent to suit human needs.
Unnatural land use often triggers rapid environmental deterioration and
disturbs ecological balance. In census records, major land use
classifications are; Forests, Culturable land, culturable wasteland and
area not available for cultivation. Culturable land is further classified as:
irrigated and unirrigated. Area not available for cultivation includes lands
put to non-agriculture uses as well as barren and uncultivable lands.
The main land use in area is for dwellings, infrastructure and related
activities. However, the land use pattern for rural areas is discussed
below. The information is preliminary based on 2001 Census as depicting
in Table 3.25. Total land area is 28943.5 ha, out of that Irrigated area is
17024.5 ha. It constitutes 58.82% of the total land area. Land has got
irrigation facilities from tube well with electricity. 7086.3 ha are un-
irrigated by source and it constitutes 24.48% of total land area. The
study area consist of Cultivable wasteland is 2033.3 ha (7.02%). Area not
available for cultivation is 2799.9 ha & it constitute 9.67%.
3.9.2 Demographic and Socio-Economic Environment
The demographic and Socio-economic details of the study area are
discussed below. These are primarily based on census data of 2001. Data
on number of households, population as well as literacy and employment
pattern in the study area have been presented in Table-3.26. The
Page 90
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-18
employment pattern in the area is indicator of number of persons
employed in various sectors. It also indicates the various categories of
employment flourishing in the area. The Study area in 10 km radius has
39 villages including project site.
The total no. of household in the villages are 19926 and the total
population is 102135 (53.10% men & 47.88% women). 57.96% of are
literate while literacy rate among women & men is 20.96% & 37.00%
respectively. 27.83% of male population is part of main worker, while
only 10.31% of female population is a part of main workers. 2.52% of
male workers are marginal workers, while 8.77% of female workers are
engaged in such type of activities. 22.75% of male population and
28.80% of female population are non-workers.
3.9.3 Living Standard and Infrastructure
In India it is not possible to setup a primary standard of living because of
wide variations in terms of income, economic conditions, social custom,
employment opportunity, pattern of spending, etc. However, availability
of amenities like education, medical, water supply, communication, road
network, electricity, etc. significantly reflects the level of development of
the area. Information on available amenities in the study area has been
extracted from census record of 2001. Total numbers of village in study
area are 39. On the basis of data presented in the Table 3.27, the status
of available amenities is discussed in following sub-sections:
Educational Facilities
As per 2001 census, there are 44 primary schools, 10 Higher Secondary
schools, 3 Higher Secondary/Intermediate/Pre-University/Junior College
or Senior Secondary and 9 colleges in all 39 villages.
Medical Facilities
39 villages in the study area have 22 Registered Private Medical
Practitioner, 22 Community Health Worker/Health Worker, 25 Hospitals,
21 Maternity and Child Welfare Centre, 19 Primary Health Centre, 14
primary health sub centers, 3 Dispensary, 13 Family Welfare Centre, 2
Maternity Home and 1 Child Welfare Centre in study area of 10 km.
Page 91
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-19
Drinking Water Supply
All the villages in the study area have two or more sources of drinking
water. Most of the villages in study area have Well water supply in
addition to Tap water (almost all). Moreover all villages have facility of
Tube Well water facility, 11 have Tank water facility, 1 have canal and 2
have hand pump facilities.
Communication and Transport
The main mode of public transport available in the study area is by bus
service. All villages have approach to railway station as western railway
meter gauge line is passing through nearby. Majority of villages in the
study area is connected with pucca road.
Post and Telegraph
As per 2001 census record out of 39 villages in study area, almost all the
villages have post office facility at doorstep & phone facility.
Power Supply
As per 2001 census record almost all the villages are getting power
supply for all purposes.
Page 92
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-20
Table 3.7: Ambient Air Quality Monitoring Locations
(Period of Monitoring: October-2015 to December-2015)
Sr.
No.
Sampling
Location
Direction w.r.t.
center of
Industry
Distance
km
Type of Area
1 Project Site (A1) -- -- Industrial
2 Moti Bhoyan (A2) NNE (Upwind) 1.45 Residential
3 Khatraj (A3) W (Downwind) 2.92 Residential
4 Ganapatpura (A4) ENE (Up Wind) 5.17 Residential
5 Karoli (A5) W (Downwind) 1.40 Residential
6 Bhimasan (A6) WSW (Downwind) 3.75 Residential
7 Sherisa (A7) NNE (Up Wind) 4.06 Residential
8 Jethlaj (A8) SSW (Downwind) 3.78 Residential
Page 93
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-21
Table 3.8: Ambient Air Quality Status
(Period: October-2015 to December-2015)
Sr. No.
Sampling Station
PM10
(g/m3)
PM2.5
(g/m3)
SO2
(g/m3)
NOx
(g/m3)
Average (Min-Max)
1 Project Site (A1) 70.7 (61.8-77.4)
35.0 (28.4-40.6)
19.9 (16.3-26.0)
22.2 (18.3-27.6)
2 Moti Bhoyan (A2) 73.0 (64.5-78.2)
33.5 (29.0-37.7)
19.4 (13.0-22.9)
19.2 (14.6-22.0)
3 Khatraj (A3) 65.4 (61.6-69.3)
37.5 (34.0-41.7)
19.2 (14.4-22.6)
21.1 (16.6-24.6)
4 Ganapatpura (A4) 73.9 (67.7-77.8)
35.3 (30.7-39.4)
18.1 (13.9-21.1)
18.6 (14.3-20.8)
5 Karoli (A5) 69.9 (64.0-77.4)
34.9 (32.2-37.1)
18.1 (15.1-20.7)
21.2 (17.4-23.9)
6 Bhimasan (A6) 67.9 (60.5-71.6)
35.5 (33.1-37.6)
20.9 (18.8-23.9)
22.6 (20.2-25.2)
7 Sherisa (A7) 74.6 (70.9-79.8)
34.5 (31.2-40.0)
19.9 (18.0-23.6)
21.5 (18.1-25.9)
8 Jethlaj (A8) 72.5 (63.2-78.7)
31.7 (27.3-38.2)
18.1 (14.1-21.6)
20.8 (16.3-24.8)
Figure 3.1 Graphical representation of Ambient Air quality
Page 94
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-22
Table 3.9: Ambient Air Quality Status (PM10)
(Period: October-2015 to December-2015)
Average - 24 Hours Unit - g/m3
Station Name Max Min 98th
Percentile
75th
Percentile
50th
Percentile
25th
percentile
Avg. SD
Project Site (A1) 77.4 61.8 77.2 74.6 71.0 67.3 70.7 4.8
Moti Bhoyan (A2) 78.2 64.5 78.0 75.9 73.2 71.2 73.0 3.5
Khatraj (A3) 69.3 61.6 69.2 67.4 65.0 63.5 65.4 2.4
Ganapatpura (A4) 77.8 67.7 77.6 75.8 74.1 72.5 73.9 2.6
Karoli (A5) 77.4 64.0 76.3 71.8 69.7 67.9 69.9 3.3
Bhimasan (A6) 71.6 60.5 71.6 70.5 68.2 66.3 67.9 3.1
Sherisa (A7) 79.8 70.9 79.3 75.9 74.5 73.1 74.6 2.4
Jethlaj (A8) 78.7 63.2 78.4 74.8 72.7 69.7 72.5 3.8
Figure 3.2 Graphical representation for PM10
Page 95
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-23
Table 3.10: Ambient Air Quality Status (PM2.5)
(Period: October-2015 to December-2015)
Average - 24 Hours Unit - g/m3
Station Name Max Min 98th
Percentile
75th
Percentile
50th
Percentile
25th
percentile
Avg. SD
Project Site (A1) 40.6 28.4 40.2 36.2 35.3 33.6 35.0 3.2
Moti Bhoyan (A2) 37.7 29.0 37.1 34.9 33.5 32.2 33.5 2.1
Khatraj (A3) 41.7 34.0 41.6 39.2 36.9 36.0 37.5 2.3
Ganapatpura (A4) 39.4 30.7 39.2 37.0 35.4 33.5 35.3 2.4
Karoli (A5) 37.1 32.2 37.0 35.9 35.1 34.1 34.9 1.3
Bhimasan (A6) 37.6 33.1 37.6 36.7 35.6 34.5 35.5 1.4
Sherisa (A7) 40.0 31.2 39.2 35.7 33.9 33.0 34.5 2.3
Jethlaj (A8) 38.2 27.3 38.0 33.0 31.7 30.2 31.7 2.8
Figure 3.3 Graphical representation for PM2.5
Page 96
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-24
Table 3.11: Ambient Air Quality Status (SO2)
(Period: October-2015 to December-2015)
Average-24 Hours Unit-g/m3
Station Name Max Min 98th
Percentile
75th
Percentile
50th
Percentile
25th
percentile
Avg. SD
Project Site (A1) 26.0 16.3 25.2 22.3 19.3 17.8 19.9 2.7
Moti Bhoyan (A2) 22.9 13.0 22.7 22.0 19.9 18.2 19.4 2.9
Khatraj (A3) 22.6 14.4 22.5 20.8 19.1 18.0 19.2 2.1
Ganapatpura (A4) 21.1 13.9 20.9 19.6 18.0 16.8 18.1 1.8
Karoli (A5) 20.7 15.1 20.6 19.7 18.3 16.9 18.1 1.8
Bhimasan (A6) 23.9 18.8 23.9 21.7 20.6 19.9 20.9 1.6
Sherisa (A7) 23.6 18.0 23.5 20.4 19.5 18.8 19.9 1.6
Jethlaj (A8) 21.6 14.1 21.5 20.2 18.5 16.2 18.1 2.4
Figure 3.4 Graphical representation for SO2
Page 97
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-25
Table 3.12: Ambient Air Quality Status (NOx)
(Period: October-2015 to December-2015)
Average-24 Hours Unit-g/m3
Station Name Max Min 98th
Percentile
75th
Percentile
50th
Percentile
25th
percentile
Avg. SD
Project Site (A1) 27.6 18.3 26.7 24.3 21.9 20.4 22.2 2.5
Moti Bhoyan (A2) 22.0 14.6 21.9 21.2 20.0 17.1 19.2 2.4
Khatraj (A3) 24.6 16.6 24.4 22.6 21.1 19.6 21.1 2.0
Ganapatpura (A4) 20.8 14.3 20.7 19.9 18.9 17.6 18.6 1.7
Karoli (A5) 23.9 17.4 23.7 22.7 21.3 20.0 21.2 1.7
Bhimasan (A6) 25.2 20.2 25.0 23.7 22.8 21.4 22.6 1.5
Sherisa (A7) 25.9 18.1 25.4 23.0 20.7 20.0 21.5 2.1
Jethlaj (A8) 24.8 16.3 24.7 23.8 20.9 17.8 20.8 2.9
Figure 3.5 Graphical representation for NOX
Page 98
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-26
Table 3.13: Ambient Air Quality Status (CO, HC, VOCs)
(Period: October-2015 to December-2015)
Sr.
No.
Station Name Concentration (g/m3)
VOCs VOCs as BTX
Methanol Formaldehyde Benzene Toluene Xylene Total
1 Project Site (A1) 1252 47 1.06 1.25 BDL 2.31
2 Moti Bhoyan (A2) BDL BDL BDL BDL BDL BDL
3 Khatraj (A3) BDL BDL BDL BDL BDL BDL
4 Ganapatpura
(A4)
BDL BDL BDL BDL BDL BDL
5 Karoli (A5) BDL BDL 1.04 BDL BDL 1.04
6 Bhimasan (A6) BDL BDL 1.01 BDL BDL 1.01
7 Sherisa (A7) BDL BDL BDL BDL BDL BDL
8 Jethlaj (A8) BDL BDL BDL BDL BDL BDL
Sr.
No.
Station Name Concentration (g/m3)
CO HC
MHC NMHC
1 Project Site (A1) 204 1043 1310
2 Moti Bhoyan (A2) 196 992 41
3 Khatraj (A3) 182 1007 52
4 Ganapatpura (A4) 175 873 21
5 Karoli (A5) 163 895 19
6 Bhimasan (A6) 154 1004 22
7 Sherisa (A7) 169 974 28
8 Jethlaj (A8) 192 981 22
Page 99
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-27
Table 3.14: National Ambient Air Quality Standards
(EP, 7th amendment rules-2009)
Pollutants Time-weighted
average
Concentration in ambient air
Industrial,
Residential,
Rural and
others area
Ecologically
Sensitive
area
(Notified by
Central
Government)
Method of
Measurement
Sulphur Dioxide
(SO2) µg/m3
Annual Average* 50 20 Improved west and
Gaeke
Ultraviolet
fluorescence
24 hours** 80 80
Oxides of
Nitrogen as
(NO2) µg/m3
Annual Average* 40 30 Modified Jacob
&Hochheiser
(Na-Arsenate)
Chemiluminescence
24 hours** 80 80
Particulate Matter
(Size less than 10
µm or PM10) µg/m3
Annual Average* 60 60 Gravimetric
TOEM
Beta attenuation 24 hours** 100 100
Particulate Matter
(Size less than 2.5
µm or PM2.5)
µg/m3
Annual Average* 40 40 Gravimetric
TOEM
Beta attenuation 24 hours** 60 60
Ozone (O3)
µg/m3
8 hours ** 100 100 UV photometric
Chemiluminescence
Chemical Method 1hours** 180 180
Lead (Pb)
µg/m3
Annual Average* 0.50 0.50 AAS/ICP method
after sampling on
EPM 2000 or
equivalent filter
paper
ED-XRF using
Teflon filter
24 hours** 1.0 1.0
Carbon Monoxide
(CO) mg/m3
8 hours** 02 02 Non Dispersive
Infra Red (NDIR)
spectroscopy 1 hour** 04 04
Ammonia (NH3)
µg/m3
Annual Average* 100 100 Chemiluminescence
Indophenol Blue
Method 24 hours** 400 400
Benzene (C6H6)
µg/m3
Annual* 05 05 Gas
chromatography
based continuous
analyzer
Adsorption and
desorption followed
by GC analysis
Benzo(a)Pyrine
(BaP)-particulate
phase only,
µg/m3
Annual* 01 01 Solvent extraction
followed by
HPLC/GC analysis
Arsenic (As),
µg/m3
Annual* 06 06 AAS/ICP method
after sampling on
EPM 2000 or
equivalent filter
paper
Page 100
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-28
Nickel (Ni)
µg/m3
Annual* 20 20 AAS/ICP method
after sampling on
EPM 2000 or
equivalent filter
paper
*
Annual Arithmetic mean of minimum 104 measurements in a year taken
twice a week 24 hourly at uniform interval.
**
24 hourly/8 hourly or 01 hourly values, as applicable, shall be complied
with 98% of the time in a year. 2% of the time the time, they may
exceed the limits but not two consecutive days of monitoring.
Page 101
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-29
Table 3.15: Results of Groundwater Quality in the Study Area
(Date of Monitoring: 04/12/15 to 06/12/15)
Parameters Unit CONCENTRATION Method of Test
(Ref. to IS) Project site
(GW1)
Motibhoyan(GW2)
Hajipur (GW3)
Khatraj (GW4)
Sherisa (GW5)
Vadsar (GW6)
Karoli (GW7)
Ganapatpura
(GW8)
pH pH Unit 7.76 7.68 7.69 7.71 7.75 7.83 7.82 7.59 3025(Part 11)
Color Co-Pt Unit
Colorless Colorless Colorless Colorless Colorless Colorless Colorless Colorless 3025(Part 4)
Taste --- Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable 3025 (Part 7&8)
Odour --- Unobjecti- onable
Unobjecti- onable
Unobjecti- onable
Unobjecti- Onable
Unobjecti- onable
Unobjecti- onable
Unobjecti- onable
Unobjecti- onable
3025(Part 5)
Conductivity μmhos/cm
1437 1867 1638 1534 1949 1625 1612 1573 3025 (Part 14)
Turbidity NTU 4.8 5.5 5.2 6.7 7.4 6.1 7.2 6.1 3025(Part 10)
TDS mg/L 998 1284 1126 1068 1346 1114 1107 1092 3025(Part 16)
Total Hardness as
CaCO3
mg/L 358 356 303 338 386 383 361 339 3025(Part 21)
Total Alkalinity mg/L 485 443 379 362 384 391 410 414 3025 (Part 23)
Calcium as Ca+2 mg/L 51 65 57 61 54 56 49 55 3025(Part 40)
Magnesium as Mg+2 mg/L 56 47 39 45 61 59 58 49 3025(Part 46)
Chlorides as Cl- mg/L 382 492 528 463 602 503 492 518 3025(Part 32)
Sulfates as SO4-2 mg/L 18 23 27 20 36 19 25 19 3025(Part 24)
Fluoride as F- mg/L 0.64 0.57 0.58 0.62 0.75 0.69 0.62 0.67 3025(Part 60)
Nitrates as NO3-3 mg/L 14.5 12.8 14.9 18 16 19 14.8 15.2 3025(Part 34)
Sodium as Na+ mg/L 289 368 408 341 423 362 376 382 3025(Part 45)
Potassium as K+ mg/L 16 21 17 13 22 18 20 16 3025(Part 45)
Phenol mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 3025(Part 43)
Cadmium as Cd mg/L <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 3025(Part 41)
Nickel as Ni mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 3025(Part 54)
Copper as Cu mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 3025(Part 42)
Lead as Pb mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 3025(Part 47)
Manganese as Mn mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 3025(Part 59)
Iron as Fe mg/L 0.23 0.31 0.24 0.25 0.19 0.28 0.19 0.23 3025(Part 53)
Chromium mg/L <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 3025(Part 52)
Zinc as Zn mg/L <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 <0.004 3025(Part 49)
Page 102
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-30
Table 3.16: Results of Surface water Quality in the Study Area
(Date of Monitoring: 04/12/15 to 06/12/15)
Parameters Unit Concentration Test Method
(Ref to IS) Piyaj Pond (SW1)
Hajipur Pond (SW2)
Lapkaman pond (SW3)
Thol Lake (SW4)
Narmada Canal (SW5)
pH pH Unit 7.72 7.97 7.64 7.59 7.81 3025 (Part 11)
Colour Co-Pt Unit Colorless Colorless Colorless Colorless Colorless 3025(Part 4)
Odour --- Unobjecti- onable
Unobjecti- onable
Unobjecti- onable
Unobjecti- onable
Unobjecti- onable
3025(Part 5)
Temperature 0C 28 28 28 28 28 --
Conductivity Micro mhos/cm
553 625 585 575 437 3025 (Part 14)
Turbidity NTU 9.5 10.4 14.6 14.6 15.9 3025 (Part 10)
TDS mg/L 387 432 409 392 298 3025 (Part 16)
Dissolved Oxygen mg/L 5.2 3.1 4.7 4.2 3.7 --
Total Hardness as CaCO3 mg/L 198 215 206 124 80 3025 (Part 21)
Total Alkalinity mg/L 229 214 194 217 132 3025 (Part 23)
Sodium as Na+ mg/L 103 128 119 134 103 3025(Part 45)
Potassium K+ mg/L 14 14 12 19 16 3025(Part 45)
Calcium Ca+2 mg/L 43 40 43 20 14 3025 (Part 40)
Magnesium Mg+2 mg/L 22 28 24 18 11 3025 (Part 46)
Chlorides as Cl- mg/L 137 187 172 142 118 3025 (Part 32)
Sulfates as SO4-2 mg/L 19 23 19 24 17 3025 (Part 24)
Nitrates as NO3-3 mg/L 12.3 10.8 12.1 12.1 6.2 3025 (Part 34)
Fluoride as F- mg/L 0.24 0.15 0.32 0.32 0.27 3025(Part 60)
Phenol as C6H5OH mg/L <0.01 <0.01 <0.01 <0.01 <0.01 3025 (Part 43)
Cadmium as Cd mg/L <0.003 <0.003 <0.003 <0.003 <0.003 3025 (Part 41)
Copper as Cu mg/L <0.01 <0.01 <0.01 <0.01 <0.01 3025 (Part 42)
Lead as Pb mg/L <0.01 <0.01 <0.01 <0.01 <0.01 3025 (Part 47)
Manganese as Mn mg/L <0.01 <0.01 <0.01 <0.01 <0.01 3025 (Part 59)
Iron as Fe mg/L <0.01 <0.01 <0.01 <0.01 <0.01 3025 (Part 53)
Total Chromium mg/L <0.001 <0.001 <0.001 <0.001 <0.001 3025 (Part 52)
Zinc as Zn mg/L <0.004 <0.004 <0.004 <0.004 <0.004 3025 (Part 49)
Nickle as Ni mg/L <0.01 <0.01 <0.01 <0.01 <0.01 3025 (Part 54)
Page 103
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-31
Table 3.17: Indian Standard Specification for Drinking Water
Sr.
No.
Parameters Desirable Limit Permissible Limit
in the Absence of
Alternate Source
I Essential Characteristics
1. Colour, Hazen Units, Max. 5 25
2. Odour Unobjectionable -
3. Taste Agreeable -
4. Turbidity, NTU, Max. 5 10
5. pH value 6.5-8.5 No Relaxation
6. Total Hardness (as CaCO3) mg/l, Max. 300 600
7. Iron (as Fe) mg/ l, Max. 0.3 1.0
8. Chlorides (as Cl) mg/l, Max. 250 1000
9. Residual Free Chlorine, mg/l, Min. 0.2* -
II Desirable Characteristics
10. Dissolved Solids, mg/l, Max. 500 2000
11. Alkalinity (as CaCO3), mg/l, Max. 200 600
12. Sulphate (as SO4) mg/l, Max. 200 400
13. Nitrate (as NO3) 50 No Relaxation
14. Fluoride (as F) mg/l, Max. 1.0 1.5
15. Calcium (as Ca) mg/l, Max. 75 200
16. Magnesium (as Mg) mg/l, Max. 30 100
17. Copper (as Cu) mg/l, Max. 0.05 1.5
18. Manganese (as Mn) mg/l, Max. 0.1 0.3
19. Mercury (as Hg) mg/l, Max. 0.001 No Relaxation
20. Cadmium (as Cd) mg/l, Max. 0.01 No Relaxation
21. Selenium (as Se) mg/l, Max. 0.01 No Relaxation
22. Arsenic (As As) mg/l, Max. 0.05 No Relaxation
23. Lead (as Pb) mg/l, Max. 0.05 No Relaxation
24. Zinc (as Zn) mg/l, Max. 5 15
25. Aluminium (as Al) mg/l, Max. 0.03 0.2
26. Boron (as B) mg/l, Max. 1 5
27. Chromium (as Cr) mg/l, Max. 0.05 No Relaxation
28. Cyanide (as CN) mg/l, Max. 0.05 No Relaxation
29. Phenolic Compounds (as C6H5OH)
mg/l, Max.
0.001 0.002
30. Anionic Detergents (as MBAS) mg/l,
Max. mg/l, Max.
0.2 1.0
31. Mineral Oil mg/l, Max. 0.01 0.03
32. Pesticides Absent 0.001
33. Radioactive Materials
a. Alpha Emitters, Bq/I, Max.
b. Beta Emitters, Pci/I, Max
-
-
0.1
0.037
*Applicable only when water is chlorinated
Source: IS: 10500-2012
Page 104
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-32
Table 3.18: Ambient Noise Levels in the Study Area
Sr.
No.
Noise
Monitoring
Locations
Date of
Monitoring
CPCB Limits in
dB (A)
Average Noise
levels in dB (A)
Leq (Day)
dB A
Leq (Night)
dB A
Leq (Day)
dB A
Leq (Night)
dB A
1. Near Project Site 04/12/2015 75.0 70.0 59.3 54.6
2. Village Hajipur 04/12/2015 55.0 45.0 54.6 43.2
3. Village Moti Bhoyan 04/12/2015 55.0 45.0 52.7 43.3
4. Village Khatraj 05/12/2015 55.0 45.0 53.9 44.4
5. Temple Khatraj 05/12/2015 50.0 40.0 49.1 38.5
6. Village Sherisa 05/12/2015 55.0 45.0 54.8 44.0
7. Village Vadsar 05/12/2015 55.0 45.0 51.7 43.9
8. Primary School Vadsar
05/12/2015 50.0 40.0 48.1 39.6
9. Village Ganpatpura 06/12/2015 55.0 45.0 54.4 44.8
10. Bus stop Ganpatpura
06/12/2015 65.0 55.0 62.2 53.3
Table 3.19: Ambient Air Quality Standards with respect to noise
Category of Area Limits Leq, dB(A)
Day Time Night Time
Industrial 75 70
Commercial 65 55
Residential 55 45
Silence 50 40
Page 105
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-33
Table 3.20: Soil Analysis of Study area
(Date of Sampling: 04/12/15 to 06/12/15)
S.
No.
Parameters Unit Nr.
Project
site
(S1)
Hajipur
(S2)
MotiBho
yan
(S3)
Khatraj
(S4)
Sheris
a
(S5)
Ganpa
tpura
(S6)
1. pH (5%) Solution -- 7.52 7.43 7.49 7.35 7.71 7.68
2. Moisture % 2.9 5.1 5.6 3.7 6.3 4.2
3. Loss of Ignition % 6.8 5.9 6.3 6.6 6.1 5.7
4. Particle Size
Clay (<0.002
mm)
% 32 29 31 26 30 29
Silt (0.002 to
0.075 mm)
% 16 27 24 30 28 20
Sand (0.075 -
0.475 mm)
% 27 25 19 28 22 33
gravel (size >
4.75 mm)
% 25 19 26 16 20 18
Texture -- Sandy
Loam
Sandy
Loam
Sandy
Loam
Sandy
Loam
Sandy
Loam
Sandy
Loam
5. Water Holding
Capacity
% 42.7 42.3 41.9 40.4 41.2 42.8
6. Permeability cm/hr 3.16 3.23 3.14 2.88 3.15 2.9
7. Bulk Density g/cm3 1.34 1.39 1.41 1.36 1.38 1.40
8. Porosity % 45.7 43.7 42.9 44.9 44.1 43.3
9. Sodium
Absorption Ratio
Meq/
100
gm
2.33 5.54 3.86 4.79 4.23 3.41
10. Sodium mg/kg 103 139 128 185 132 127
11. Potassium mg/kg 35 25 29 39 24 38
12. Calcium mg/kg 98 21 38 51 32 45
13. Magnesium mg/kg 30 16 27 37 25 36
14. Chlorides mg/kg 235 138 165 242 139 196
15. Sulphates mg/kg 94 63 103 179 107 78
16. Organic Matter mg/kg 1.22 1.25 1.19 1.31 1.42 1.34
17. Total Nitrogen mg/kg 116 137 149 142 126 123
18. Total Phosphorus mg/kg 78 51 55 43 34 82
19. Iron mg/kg 1.02 1.09 1.22 1.35 1.43 1.16
20. Cation Exchange
Capacity
mg/
100
gm
12.8 9.1 10.4 14.7 10.0 11.7
Page 106
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-34
Table 3.21
Traffic Survey
TRAFFIC SHEET
LOCATION Near plant site Khatraj-Kalol Road
TIME 09.00 to 10.00 DATE 05/12/2015
TOTAL PCU calculation Total PCU/hr
BUSES* 32 PCU x 3 96
CARS/VANS 170 PCU x 1 170
MOTORCYCLES /
BICYCLES
392 PCU x0.5 191
Total 457
TIME 18.00 to 19.00 DATE 05/12/2015
TOTAL PCU calculation Total PCU/hr
BUSES* 37 PCU x 3 111
CARS/VANS 163 PCU x 1 163
MOTORCYCLES /
BICYCLES
402 PCU x0.5 201
Total 475
Note: *Mini-bus, Chartered Bus, School Bus, have been collectively classified
as Buses.
Additional traffic from our project will be estimated 144 PCU/day [24-48
trucks/tankers (in & out) x 3] and 12 PCU/day from car and motorcycle,
which have insignificant impact on existing traffic load.
Page 107
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-35
Table 3.22: Floral Diversity
(i) Trees
Sr.
No.
Family Scientific name Local name
1. Fabaceae Pongamia pinnata Karanj
2. Myrtaceae Eucalyptus globules Nilgiri
3. Mimosaceae Acacia nilotica
Subsp. Indica
Baval
Acacia auriculiformis Australian Baval
Prosopis juliflora Gandobaval
Leucaena leucoephala Pardesi Baval
Acacia caiechu Khair
Albizzia indica Siris
Prosopis spicigera Khijado
4. Salvadoraceae Salvadora aleoides Pilvo
5. Meliaceae Azadirachta indica Limbado
Melia azedarah Bakan Limdo
6. Arecaceae Roystonea regia Royal Palm
7. Moraceae Ficus benghalensis Vad
Ficus religiosa Piplo
8. Caesalpiniaceae Parkinsonia aculeate Rambaval
Peltophorum pterocarpum Tamarafali
(ii) Shrubs
Sr.
No.
Family Scientific name Local name
1. Euphorbiaceae Euphorbia nivulia Buch –
Ham
Thor
2. Capparidaceae Cadaba indica Telio hemkand
Capparis sepiaria Kerdo
Capparis sepiaria Kanthar
3. Apocgnaceae Thevetia peruviane Merr Pili karen
Nerium indicum Mill Lal Karen
4. Convolvulaceae Ipomoea fistulosa Nafatio
5. Rhamnaceae
Zizgphus mummularia Chanibor
Zizgphus glabrata Hegne Bor
6. Asclepiadaceae Calotropis gigantea Akado
Calotropis procera Akado
Page 108
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-36
(iii) Herbs
Sr.
No.
Family Scientific name Local name
1. Acanthaceae Hygrophila auriculata
(Schum.)
Kanatashelio,
Akaro
2. Solanaceae Solanum indicum Rigni
3. Amaranthaceae Amarantus paniculatus Rajagro
4. Papilionaceae Phaseolus aureus Roxb. Mag
Phaseolus
aconitifolius,Jacquin
Math
Cyamopsis psoralioides Guvar
5. Lamiaceae Ocimum sanctum Tulsi
O. Canam Sims Ramtulsi
O. Basilicum Damro
6. Liliaceae Aloe barbadensis mill Kunvarpato
7. Rutaceae Citrus aurantifolia, Swingle Limbodi
8. Poaceae Triticum aestivum Ghau
Sorghum bicolor Jowar
Zea mays Makai
Pennisetum typhoides Bajra
Cynodon doctylon Darbh
Chloris barbata Mindadin
Heteropogon contortus Dabhsuliu
(iv) Climbers and Twiners
Sr.
No.
Family Scientific name Local name
1. Cuscutaceae Cuscuta reflexa Roxb Amarvel
2. Menispermaceae Cocculus hirsutus Vevdi
3. Convolvulaceae Ipomea aquatic Forsk Nadanivel
Page 109
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-37
Table 3.23: Faunal Diversity
(i) Birds
Sr.
No.
Family Scientific name Local name
1. Threskiornithidae Pseudibis papillosa Black Ibis
2. Accipitridae
Elanus caerwleus Black – winged kite
Accipitel nisus Sparrow – hawk
3. Anhingidae
Anhinga melanogaster
Darter or Snake
Birds
4. Charadriidae Himantopus himantopus Black-winged Stilt
Vanellus indicus
Red-wattled
Lapwing
5. Apodidae (Swifts) Apus apus Common Swift
6. Ardeidae Bubulcus ibis Cattle egret
Ardeola grajii Pond Heron
7. Alcedinidae Alcedo atthis Common kingfisher
8. Dacelonidae Halcyon smyrnensis White brested
Kingfisher
9. Columbidae Columba livia Blue Rock Pigeon
Streptopelia orientalis
Oriental Turtle
Dove
Streptopelia chinensis Spotted Dove
10. Meropidae
Merops persicus
Merops superciliosus
Blue-cheeked Bee-
eater
11. Corvidae Corvus splendens House crow
12. Muscicapidae Saxicoloides fulicata Indian Robin
13. Passeridae Passer domesticus House Sparrow
14. Pycnonotidae Pycnonotus cafer Red-vented Bulbul
15. Sturnidae Acridotheres tristis Common Myna
16. Sylviidae Turdoides striatus Jungle Babbler
17. Ciconiidae Mycteria leucocephala Painyed Strok
18. Rallidae Amaurornis phoenicurus White – breasted
water hen
(ii) Butterflies
Sr. No.
Family Scientific name Local name
1. Papilionidae Papilio polgtes Linnaeus Common Mormon
Pachliopta aristolochiae Common Rose
2. Pieridae Eurema hecabe
Linnaeus
Common Grass
yellow
Catopsilia Pomona
Fabricius
Common Emigrant
Page 110
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-38
3. Nymphalidae Melanitis leda Linnaeus Common evening
Brown
Junonia hierta Fabricius Yellow Orange tip
Mycalesis perseus
Common bush
Brown
(iii) Reptiles
Sr.
No.
Scientific name Local name
1. Ptyas mucosus (Linn.) Common rat snake
2. Calotes versicolor (Daudin) Common garden lizard
3. Nanja Naja (Linn.)* Indian cobra
4. Hemidactylus flaviviridis House Gecko
* Not sighted but included as per the information provided by villagers.
(iv) Mammals
Sr.
No.
Scientific name Local name
1. Herpestes edwardsi (Geoffory) Common Mongoose
2. Funambulus palmarum
(Linnaeus)
Three striped palm Squirrel
3. Rattus rattus (Linnaeus) Common House rat
Page 111
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-39
Table 3.24
Land use statistics base of satellite imaginary
Sr.
No.
Category Area
(in Hectares)
Area in
%
1 Agricultural Land 207.3 65.91
2 Barren Land 0.27 0.09
3 Industrial 15.2 4.83
4 Built-up Land (Residential &
storage yard)
55.4 17.61
5 Forest Land (Green cover) 22.04 7.01
6 Water Body 14.11 4.49
7 Wetland (Non-forested
Wetland)
0.2 0.06
Total 314.52 100
Page 112
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-40
Table 3.25
Land Use Pattern
Name of
Village
Total Area
of the
Village
(ha)
Irrigated
by source
(ha)
Un-
irrigated
(ha)
Culturable
waste
(ha)
Area not
available for
cultivation
(ha)
Pratappura 347.6 270.6 10.1 51.6 15.3
Piyaj 826.4 633.6 91.1 34.3 67.4
Ramnagar 441.2 382.0 40.1 0.0 19.0
Ranchhodpura 272.9 200.9 38.3 33.7 0.0
Vansajada 521.7 400.8 47.9 73.0 0.0
Santej 2108.0 1,400.0 443.4 18.7 246.0
Karoli 367.6 310.0 9.2 0.0 48.4
Khatraj 404.6 249.0 110.3 17.7 27.6
Bhimasan 170.9 90.1 46.0 9.7 25.0
Vayana 811.4 227.7 425.8 67.6 90.3
Adhana 502.0 350.5 92.0 28.3 31.2
Nasmed 1256.9 500.0 643.7 110.9 2.3
Sanavad 325.5 100.0 70.1 16.9 138.5
Jethlaj 556.4 400.2 88.8 64.1 3.4
Dantali 248.2 200.0 11.1 24.9 12.3
Vadsar 1115.4 923.8 25.0 23.1 143.5
Jaspur 900.9 780.1 23.5 86.3 11.0
Bhoyan Moti 1204.3 1,040.0 16.6 129.0 18.7
Sabaspur 361.9 100.0 210.9 6.0 45.0
Ganpatpura 290.3 171.5 100.4 14.5 3.9
Usmanabad 129.6 80.0 34.3 5.8 9.6
Palsana 597.6 488.9 17.0 50.2 41.6
Borisana 862.5 720.5 49.0 41.2 51.7
Himmatpura 137.2 35.5 45.3 22.2 34.2
Dhanaj 607.5 425.0 100.9 79.6 2.1
Sherisa 1122.5 927.1 50.0 22.7 122.8
Hajipur 1358.8 1,100.0 87.2 35.0 136.6
Fuletra 1046.7 370.3 379.1 245.3 52.1
Vamaj 1756.5 689.9 827.7 112.7 126.1
Vansol 330.6 103.4 146.5 26.0 54.6
Adraj 1575.1 973.2 371.4 91.2 139.4
Ambliyara 452.9 235.5 148.8 35.9 32.7
Sedfa 231.6 75.2 129.8 13.5 13.1
Thol 2627.6 800.0 855.1 99.1 873.4
Vadavi 940.4 425.4 374.7 79.7 60.5
Lapkaman 517.2 297.3 95.2 92.8 31.9
Lilapur 391.3 216.0 131.8 28.5 15.1
Khodiyar 413.4 208.5 162.2 21.6 21.2
Bhadaj 810.4 122.0 536.0 120.0 32.4
Page 113
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-41
Table 3.26: Summary of Socio-Economic Status (Demography)
Name of the
Village/
Town/
Ward
No. of
Occupied
Residential
House
Total Population
(Including institutional
and houseless
population)
Literates Total main
Workers
Marginal
Workers
Cultivators Agricultural
Laborer
Non-Worker
P M F M F M F M F M F M F M F
Pratappura 326 1734 906 828 647 384 430 191 93 272 246 2 85 10 383 365
Piyaj 718 3766 1955 1811 1311 637 837 252 275 554 357 10 118 14 843 1005
Ramnagar 372 1965 1024 941 768 587 538 298 25 99 246 61 81 48 461 544
Ranchhodpura 197 1066 538 528 297 134 190 9 72 185 67 0 73 2 276 334
Vansajada 456 2356 1194 1162 815 380 554 110 167 487 345 9 33 9 473 565
Santej 1323 6371 3620 2751 2402 1040 2319 288 36 114 261 11 429 36 1265 2349
Karoli 400 1410 775 635 557 300 502 245 41 92 142 15 24 13 232 298
Khatraj 447 1868 1063 805 730 275 688 123 21 187 149 7 66 1 354 495
Bhimasan 202 1170 603 567 360 118 302 114 58 172 125 34 119 62 243 281
Vayana 255 1223 620 603 339 143 361 7 3 164 188 1 92 5 256 432
Adhana 88 455 234 221 184 78 93 50 20 4 24 0 42 1 121 167
Nasmed 486 2355 1207 1148 706 346 672 190 18 64 274 24 114 14 517 894
Sanavad 127 709 342 367 233 131 173 130 3 1 100 1 32 15 166 236
Jethlaj 484 2618 1383 1235 881 381 703 475 57 302 124 23 369 331 623 458
Dantali 166 819 437 382 308 126 260 82 8 31 47 3 16 3 169 269
Vadsar 1210 5512 3024 2488 2286 1324 1759 548 69 335 468 142 128 55 1196 1605
Jaspur 569 2934 1488 1446 995 682 697 286 98 350 209 65 143 43 693 810
Bhoyan Moti 1039 5141 2643 2498 1641 670 1463 958 263 495 668 81 169 112 917 1045
Sabaspur 359 1842 928 914 555 223 430 100 31 157 251 3 39 5 467 657
Ganpatpura 61 286 143 143 107 43 56 2 25 56 4 0 35 1 62 85
Usmanabad 145 834 439 395 278 179 124 9 97 154 48 0 0 2 218 232
Palsana 708 3691 1952 1739 1397 852 967 496 25 231 490 59 169 32 960 1012
Borisana 1742 8700 4569 4131 3591 2512 2483 677 42 215 490 60 111 359 2044 3239
Himmatpura 135 722 365 357 272 201 192 130 4 60 136 0 21 11 169 167
Dhanaj 439 2259 1183 1076 892 571 670 490 15 61 207 26 229 217 498 525
Sherisa 983 5029 2551 2478 1710 911 1400 413 73 731 550 39 261 45 1078 1334
Hajipur 623 2447 1739 1708 1106 700 927 483 59 391 267 94 246 285 753 834
Fuletra 5 54 2884 1496 1388 906 433 655 174 94 162 293 0 214 33 747 1052
Page 114
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-42
Name of the
Village/
Town/
Ward
No. of
Occupied
Residential
House
Total Population
(Including institutional
and houseless
population)
Literates Total main
Workers
Marginal
Workers
Cultivators Agricultural
Laborer
Non-Worker
P M F M F M F M F M F M F M F
Vamaj 846 4357 2448 1909 1952 1253 1202 575 238 435 405 18 164 52 1008 899
Vansol 308 1556 805 751 516 235 404 294 90 171 216 9 115 84 311 286
Adraj 1035 5480 2937 2543 2223 1315 1388 386 47 746 448 112 459 160 1502 1411
Ambliyara 238 1161 601 560 380 149 286 160 51 142 69 3 94 38 264 258
Sedfa 49 266 127 139 89 61 78 38 5 4 50 4 13 29 44 97
Thol 1188 6121 3186 2935 2325 1477 1568 408 211 884 683 25 317 130 1407 1643
Vadavi 537 2745 1410 1335 933 538 720 275 74 265 206 2 269 54 616 795
Lapkaman 382 1,856 966 890 738 529 520 134 2 0 145 3 102 3 444 756
Lilapur 241 1231 639 592 400 211 311 218 6 6 164 85 73 23 322 368
Khodiyar 587 2915 1492 1423 1026 551 794 563 58 183 211 56 229 242 640 677
Bhadaj 455 2281 1197 1084 935 731 706 146 1 2 132 16 125 63 490 936
Page 115
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-43
Table 3.27: Basic Amenities in the Study Area
Name of
Village
Educational
Facility
Medical
Facility
Drinking
Water
Facility
Communication
(Post
or Telegraph)
Transportation
Facility
(Bus etc.)
Approach
to
Village
Nearest town
and Distance
(Kms.)
Power
Supply
Pratappura P(2), C(5-10)
RMP(2), CHW, H (5-10),
MCW(5-10), PHC(5-10)
T
PO, PH(17) BS, RS(5-10) PR, MR, FP
Kalol (5)
EA
Piyaj P, C(5-10)
PHS, RMP(3), CHW(3),
H(5-10), MCW(5-10),
PHC(5-10)
T
PO, PH(10) BS, RS(5-10) PR
Kalol (5)
EA
Ramnagar P, C(5-10)
RMP, CHW, H(5-10),
MCW(5-10), PHC(5-10)
T, TW, TK,
C
PO, PH(20) BS, RS(5-10) PR
Kalol (7)
EA
Ranchhodpura P, C(10+)
H(10+), MCW(10+),
PHC(10+)
T, TW, TK
PO, PH(15)
BS, RS(10+)
PR, MR, FP
Ahmadabad
(19)
EA
Vansajada P, C(10+)
H, D, RMP, CHW, MCW(5-
10), PHC(5-10)
T, HP, TW,
W, TK
PO, PH(10)
BS, RS(10+)
PR, MR, FP
Kalol (13)
EA
Santej P(3), S,
C(10+)
D, PHS, FWC, RMP(2),
CHW(2), H(10+),
MCW(10+), PHC(5-10)
T, TW
PO, PH(150)
BS, RS(10+)
PR, MR, FP
Ahmadabad
(15)
EA
Karoli P, C(10+)
H, D, RMP, CHW, MCW(5-
10), PHC(5-10)
T, HP, TW,
W, TK
PO, PH(15)
BS, RS(10+)
PR, MR, FP
Kalol (12)
EA
Khatraj P, C(10+)
RMP, CHW, H(10+),
MCW(10+), PHC(10+)
T, TW
PO, PH
BS, RS(10+)
PR
Kalol (15)
EA
Bhimasan P, C(10+) RMP, CHW, H(10+),
MCW(10+), PHC(<5)
T, TW, W,
TK
PO(<5), PH(10+) BS, RS(10+) PR, MR, FP Kalol (25)
ED
EAG
Vayana P, C(10+)
H(10+), MCW(5-10),
PHC(10+)
T, TW, TK
PO(5-10), PH(5-
10)
BS, RS(10+)
PR, MR, FP
Kalol (25)
EA
Adhana P, C(10+)
H(10+), MCW(10+),
PHC(5-10)
T, W, TK PH(5), PO(<5)
BS, RS(10+)
PR, MR, FP
Kalol (28)
EA
Nasmed P(2), C(10+)
PHS, FWC, CHW(2), H(5-
10), MCW(5-10),
PHC(10+)
T, TW
PH(5), PO(<5)
BS, RS(10+)
PR
Sanand (12)
EA
Sanavad P, C(10+)
H(10+), MCW(10+),
PHC(<5)
T, TW
PH(4), PO(<5)
BS, RS(10+)
PR
Kalol (18)
EA
Jethlaj P(2), C(10+)
H(2), PHS, FWC, RMP,
CHW, MCW(5-10), PHC(5-10)
T, TW
PO, PH(5)
BS, RS(10+)
PR, MR, FP
Kalol (17)
EA
Dantali P, C(<5)
H(10+), MCW(10+),
PHC(5-10)
TW
PO, PH
BS, RS(10+)
PR, MR, FP
Kalol (12)
EA
Page 116
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-44
Name of
Village
Educational
Facility
Medical
Facility
Drinking
Water
Facility
Communication
(Post
or Telegraph)
Transportation
Facility
(Bus etc.)
Approach
to
Village
Nearest town
and Distance
(Kms.)
Power
Supply
Vadsar P(2), S,
C(10+)
H(3), D(3), MH, CWC,
PHS, FWC, RMP, CHW,
MCW(10+), PHC(10+)
T, TW
PO, PH(20)
BS, RS(10+)
PR, MR, FP
Kalol (13)
EA
Jaspur P, S, C(5-10)
PHS, FWC, RMP(2),
CHW(2), H(5-10),
MCW(<5), PHC(<5)
T, TW, W,
TK
PO, PH(30)
BS, RS(5-10)
PR, MR, FP
Kalol (7)
EA
Bhoyan Moti P, C(5-10)
RMP, CHW, H(5-10),
MCW(5-10), PHC(5-10)
T, TW, TK PO, PH(14)
BS, RS(5-10)
PR, MR, FP
Kalol (8)
EA
Sabaspur P, C(5-10)
H(5-10), MCW(5-10),
PHC(5-10)
T, TW
PO(<5), PH(5-10) BS, RS(5-10)
PR, MR, FP Kalol (7)
EA
Ganpatpura P, C(5-10)
H(5-10), MCW(5-10),
PHC(5-10)
T, TW, W,
TK
PO, PH
BS, RS(5-10)
MR, FP
Kalol (7)
EA
Usmanabad P, C(10+)
RMP, CHW, H(10+),
MCW(10+), PHC(10+)
T, W
PO(10+),
PH(10+)
BS, RS(10+)
PR, MR, FP
Kalol (10)
EA
Palsana P, S, C(<5)
RMP, CHW, H(<5),
MCW(<5), PHC(<5)
T, TW
PO, PH(18)
BS, RS(<5)
PR, MR, FP
Kalol (4)
EA
Borisana P(4), S,
C(<5)
HC, H(<5), MCW(<5),
PHC(<5)
T, TW, W,
TK
PO, PH(108)
BS, RS(<5)
PR, MR, FP
Kalol (4)
EA
Himmatpura P, C(10+)
RMP, CHW, H(<5),
MCW(<5), PHC(<5)
T, TW, TK, PH(15), PO(<5)
BS, RS(5-10)
PR
Kalol (23)
EA
Dhanaj P(2), C(<5) H(<5), MCW(<5),
PHC(<5)
T, TW
PO, PH(3)
BS, RS(<5)
PR, MR, FP Kalol (3)
EA
Sherisa P(2), S, C(5-
10)
PHS, FWC, RMP(2), CHW,
H(5-10), MCW(5-10),
PHC(5-10)
T, TW
PO, PH(29)
BS, RS(5-10)
PR
Kalol (7)
EA
Hajipur P, S, C(10+)
MH, PHC, FWC, CHW(3),
H(10+), MCW(10+)
T, TW
PO, PH
BS, RS(10+)
PR
Kalol (13)
EA
Fuletra P, C(10+)
PHS, FWC, H(10+),
MCW(<5), PHC(<5)
T, TW
PO, PH
BS, RS(5-10)
PR
Kadi (14)
EA
Vamaj P(2), S, PUC,
C(10+)
PHS, FWC, H(10+),
MCW(<5), PHC(<5)
T, TW
PO, PH(60)
BS, RS(10+)
PR
Kalol (9)
EA
Vansol P, C(10+)
MCW, PHS, FWC, H(10+),
PHC(10+)
T, TW
PO(<5), PH(<5)
BS, RS(5-10)
PR
Kalol (16)
EA
Adraj P, S, PUC,
C(10+)
MCW, PHC, PHS, FWC,
H(10+)
T, TW
PO, PH(75)
BS, RS(10+)
PR, MR
Kalol (12)
EA
Page 117
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-45
Name of
Village
Educational
Facility
Medical
Facility
Drinking
Water
Facility
Communication
(Post
or Telegraph)
Transportation
Facility
(Bus etc.)
Approach
to
Village
Nearest town
and Distance
(Kms.)
Power
Supply
Ambliyara P, C(10+)
H(10+), MCW(<5),
PHC(<5)
T
PH, PO(<5)
BS, RS(10+)
MR
Kadi (15)
EA
Sedfa P, C(10+)
H(10+), MCW(<5),
PHC(<5)
TW, W
PO(<5), PH(<5)
BS, RS(10+)
PR, MR
Kadi (23)
EA
Thol P, S, PUC,
C(10+)
MCW, PHS, FWC, RMP, O,
H(10+), PHC(5-10)
T, TW
PO, PH(128)
BS, RS(10+)
PR
Sanand (12)
EA
Vadavi P, C(10+)
RMP, H(10+), MCW(<5),
PHC(<5)
T, TW
PO, PH(5)
BS, RS(10+)
PR
Kadi (14)
EA
Lapkaman P, C(10+)
RMP, CHW, H(10+),
MCW(<5), PHC(<5)
T, TW, W PO, PH(9)
BS, RS(10+)
PR
Kalol (15)
EA
Lilapur P, C(10+)
RMP, CHW, H(<5),
MCW(5-10), PHC(5-10)
T, TW
PH(7), PO(5-10)
BS, RS(10+)
PR
Kalol (13)
EA
Khodiyar P, C(10+)
PHS, RMP, CHW, H(10+),
MCW(10+), PHC(10+)
T, TW
PH(11), PO(5-10)
BS, RS
PR, MR
Ahmadabad
(18)
EA
Bhadaj P, C(10+)
PHS, RMP, CHW, H(<5),
MCW(<5), PHC(<5)
T, TW, TK PO, PH(17) BS, RS(<5) PR Ahmadabad
(18)
EA
Page 118
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-46
Abbreviations:
Educational P - Primary School
S - Higher Secondary schools C - College, Any college (Graduate level & above) like Arts, Science,
Commerce PUC - Higher Secondary/Intermediate/Pre-University/Junior College or Senior
Secondary
Medical Facility
RMP - Registered Private Medical Practitioner CHW - Common Health Worker H - Hospitals
MCW- Maternity & Child welfare Centre PHC - Primary Health Centre
PHS - Primary Health Sub-Centre D - Dispensary
FWC - Family Welfare Centre MH - Maternity Home CWC - Child Welfare Centre
Drinking Water
T - Tap Water W - Well Water TW - Tube well Water
TK - Tank Water HP - Hand Pump
Post and Telegraph PO - Post Office
PH - Telephone Connection
Transportation BS - Bus RS - Railway Station
Approach to Village
PR - Paved Road MR - Mud Road FP - Foot Path
Power Supply
EA - Electricity for all Purposes ED - Electricity for domestic use EAG - Electricity for agricultural use
Page 119
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-47
Figure 3.6
Location of AAQM
Indicating AAQM stations
Project Site
10 km
Page 120
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-48
Figure 3.7
Wind Rose Diagram
Page 121
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-49
Figure: 3.8
Water sampling Locations
Indicating Ground Water sampling location
Indicating Surface Water Sampling location
Project Site
10 km
Page 122
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-50
Figure: 3.9
Locations of Noise monitoring station
Indicating Noise Monitoring location
Project Site
10 km
Page 123
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-51
Figure: 3.10
Locations of Soil sampling
Indicating Location of Soil sampling
Project Site
10 km
Page 124
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-52
Figure 3.11 Land use pattern with 10 km radius
(Satellite Image)
Project Site
Page 125
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-53
Figure 3.12
Topo sheet of location with site location map of 10 km radius (1:25,000 scales)
Page 126
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-54
Figure 3.13
Topo sheet of location with site location map of 10 km radius (1:50,000 scale)
Page 127
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 3-55
Figure 3.14
Topo sheet of location with site location map of 10 km radius (1:1,00,000 scale)
Page 128
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-1
Chapter-4
Anticipated Environmental Impacts &
Mitigation Measures 4.1 GENERAL
Environmental Impact can be defined as any change in environmental
conditions which may be adverse or beneficial; occurred due to action or
set of actions under consideration.
Environmental impact can be assessed by identifying the sources of the
impact and predicting the same. The identification of environmental
impacts has been made by co-relating the relationship between project
activity and environmental parameters. The project activities of the
proposed project are usually divided into two phases: Construction Phase
and Operation Phase. The activities like building construction,
transportation of construction material, etc. are usually considered in the
construction phase. While in the operation phase, the activities like
manufacturing process, transportation and storage of raw materials and
finished products, resource consumption, emergency, disaster and
greenbelt development has been considered.
The next step is prediction of impacts, which is an important component
in environmental impact assessment process. Several techniques and
methodologies are in vogue for predicting the impacts due to existing and
proposed industrial development on physical, chemical, biological and
socio-economic components of environment. Such predictions delineate
contribution in existing baseline condition for the proposed project. The
additional impacts due to proposed expansion activities are analyzed by
keeping in mind the baseline status. This helps to assess the assimilative
capacity of the environment and in turn the gravity of the impacts.
The third important component of the environmental assessment is the
evaluation. Based on the identification and prediction of the nature of
impact the environment, the impact can be evaluated qualitatively and
quantitatively.
Page 129
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-2
As such it becomes important to estimate the peak incremental
concentrations of gaseous pollutants caused due to the emissions from
the proposed expansion activities. Chapter 2 of this report discusses the
details of pollution sources from the plant.
There are various types of impacts which may arise due to the proposed
expansion activities. The impact assessment has been addressed for the
following attributes, which may get affected due to the proposed
expansion activities of the project.
Impact on Topography
Impact on Air Environment
Impact on Water Environment
Impact on Noise Environment
Impact on Land Environment (Hazardous waste generation)
Impact on Ecology (Flora and Fauna)
Impact on Socio-Economic Environment
4.2 IMPACT ON TOPOGRAPHY
Since the proposed expansion will be carried out in the existing premises,
very less construction work will be required for the installation of
new/additional machineries. The area of the plant is almost flat terrain.
During the construction, excavated soil will be restored to its original
shape. Thus, the impact during the construction is reversible, for short
terms and insignificant. During the operational phase of the project, no
impact is envisaged on the topography.
4.3 AIR ENVIRONMENT
Sources of Impact
There are chances of impact on the air environment due to installation of
new machinery during construction phase and due to gaseous emission
from the Tail Gas Treatment unit during operational phase.
4.3.1 Prediction of impact during Construction Phase
Since the proposed expansion will be carried out within the existing
premises, construction activities will be required only for the installation
of new plant & machineries. Hence; there will be some minor impacts on
the quality of the air but this will not cause any adverse effects on the
surrounding atmosphere. There will be chances of dust emission from site
Page 130
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-3
cleaning and construction activity. This will be limited up to working area
only. Dust and other emissions are not likely to spread in wider area,
which would affect homes and other properties. Dust will generate within
working areas and measures will be taken to protect workers.
However, to mitigate the impact due to Suspended Particulate Matter
(SPM), regular sprinkling of the water will be done along with the
construction activities.
4.3.2 Prediction of Impact during Operational Phase
Mathematical models are used for predictions of impact during
Operational Phase includes steady state Gaussian Plume Dispersion
model designed for multiple point sources.
The impacts on air quality from project depend on various factors like
design capacity, configuration, process technology, raw material, fuel to
be used, air pollution control measures, operation and maintenance.
Apart from the above, other activities associated with any project, viz.,
transportation of fuel, raw materials and finished products, storage
facilities and material handling within the plant premises may also
contribute to air pollution.
4.3.3 Sources of Air Pollution
The unit propose to adopt modernized techniques of the process, the
process along with proposed expansion in the production capacity. Tail
gas treatment plant is installed where there is no use of fuel. This is
resulted in no air pollution. Tail gas treatment plant will be
updated/modify along with process plant after expansion. The estimated
tail gas quality is given in Table-2.8 of Chapter-2 of EIA report.
Other source of flue gas emission is from standby existing D. G. Sets with
power generation capacity of 400 kVA & proposed will have capacity of
1000 kVA. HSD with fuel consumption is 45 lit/hr. for 400 kVA & 110
lit/hr. for proposed D G Set with capacity of 1000 kVA.
Adequate stack height to the stack has been provided for proper
dispersion of gaseous emission. Existing/estimated emission levels of
stacks are given in Table 4.1. The results show that all parameters are
well within the stipulated norms.
Page 131
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-4
Fugitive Emission
The fugitive pollutants such as RPM, VOCs are likely to emit from
process area. However it will be within acceptable level.
To minimize fugitive emission; the unit has adopted the practice of
carrying out entire manufacturing process into closed vessel as well as
tail gas treatment plant will also be established, which reduces the
concentration of the pollutants.
Special care is also taken while material handling and storage.
To reduce the pollutant emitted during transportation, the unit has
adopted the practice of regular check-up and maintenance of vehicular
engines for complete combustion of the fuel.
To mitigate the impact due to Suspended Particulate Matter (SPM),
following control measures will be implemented:
Paved road will be developed inside the plant premises.
Regular housekeeping will be carried out.
Construction material will be stored separately and covered to
control dust emission due to wind.
Regular maintenance of vehicles and machinery will be carried out.
PUC certified vehicles will be used.
Ambient air quality monitoring will be done at strategic location.
4.3.4 Dispersion Modeling of Emissions from the plant
In the present study, the mathematical model that has been used for
prediction on air quality includes steady state Gaussian Plume Dispersion
model designed for multiple point sources.
The objective of dispersion modeling is to predict the ground level
concentration during the operation of proposed expansion activities and
its impact on ambient air quality of the area. The ground level
concentrations of pollutants have been computed using computer
simulation model Industrial Source Complex Short Term (ISCST-3) of
United State Environmental Protection Agency (USEPA) and considering
guidelines stipulated by CPCB for air pollution dispersion modeling.
The key emitted pollutants will be Suspended Particulate Matter (SPM),
Sulphur Dioxide (SO2), Nitrogen Oxide (NOx).
Page 132
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-5
4.3.5 Micrometeorology
The hourly wind speed, solar insolation and total cloudiness during day
time and wind speed and total cloudiness during night time were used to
determine the hourly atmospheric stability classes (defined by Pasquill
and Gifford as A to F, A being most unstable and F being most
stable).The hourly stability classes were determined based on the
technique suggested by Turner.
Turner’s system used for determining the stability classes is as follows:
- For day or night: If total cloud cover (TC) = 10/10 and ceiling
<7000 ft (2134 m), NR=0
- For night-time (defined as period from one hour before sunset to
one hour after sunrise):
a) If TC<4/10, use NR = -2
b) If TC>4/10, use NR = -1
- For daytime: determine isolation class number (IN)
a) If TC<5/10, use NR=IN
b) If TC>5/10, modify IN by the sum of the following applicable
criteria
If ceiling<7000 ft (2134m), modification = -2
If ceiling>7000 ft but <16000 ft (4877 m), modification = -1
- If TC=10/10 and ceiling>7000 ft, modification = -1, and let
modified value of IN=NR, except for day-time NR cannot be <+1.
During the study period, stability calculated based on above-mentioned
Turner method gives average stability as A-B class during Day time and E
class during Night time. The mean mixing height considered for prediction
is 100 m as mean minimum and 1000 m as mean maximum. Average
micro meteorological data of October-2015 to December-2015 is
used.
4.3.6 Air Quality Modeling and Predictions using the Gaussian Model
The impact on air quality due to emissions from single source or group of
sources is evaluated by use of mathematical models. When air pollutants
are emitted into the atmosphere, they are immediately diffused into
surrounding atmosphere, transported and diluted due to winds. The air
quality models are designed to simulate these processes mathematically
Page 133
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-6
and to relate emissions of primary pollutants to the resulting downwind
air quality. The inputs include emissions, meteorology and surrounding
topographic details to predict the impacts of conservative pollutants.
The impacts of air pollutants were predicted using Gaussian air dispersion
model, which is selected on the basis of existence of multiple point
sources within the industrial complex and the plain terrain at the project
site. The Gaussian air dispersion model has been developed to simulate
the effect of emissions from point sources on air quality. Gaussian model
is extensively used for predicting the Ground Level Concentrations (GLCs)
of conservative pollutants from point, area and volume sources. The
impacts of primary air pollutants are predicted using this air quality
model keeping in view the plain terrain at the project site. The
micrometeorological data monitored at project site during study period
have been used in this model.
The Gaussian model provides estimates of pollutant concentrations at
various receptor locations. It is, an hour-by-hour steady state Gaussian
model which takes into account the following:
- Terrain adjustments
- Stack-tip downwash
- Gradual plume rise
- Buoyancy-induced dispersion, and
- Complex terrain treatment and consideration of partial reflection
- Plume reflection off elevated terrain
- Building down wash
- Partial penetration of elevated inversions is accounted for Hourly
source emission rates, exit velocity, and stack gas temperature
A Gaussian air dispersion models were used to estimate the ambient air
quality levels at the different monitoring stations due to stack emissions.
Only two stability conditions based on the meteorology aspects were used
to calculate the theoretical maximum ground level concentration is
comparing the actual data and data generated from mathematical
modeling, it highlights that the stability condition E & A-B were
predominant in the region.
Page 134
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-7
4.3.7 Details of Air Dispersion Model
Prediction of GLC values are made by using Industrial Source Complex
Short Term Model Version-3 (ISCST-3) software approved by U.S.
Environmental Protection Agency (USEPA). This model uses a steady
state, sector-averaged Gaussian plume equation for application in
complex terrain (i.e. terrain stack or release height) and is run using
stability classes developed by Pasquill and Gifford.
Following are the assumptions made while using the model:
- No dry and wet depletion of pollutants
- Receptors are on flat terrain with no flag pole
(a) Input data for air quality modeling
Stack emissions data have been used for prediction of short-term
incremental GLC values of PM, SO2, NOx using one season meteorological
data collected at site during Oct-2015 to Dec-2015. Input data is given
in Table 4.1.
(b) Source Characteristics/Release Characteristics
The details of stack emissions (with & without APCM) is given in Table
4.2 and cumulative concentrations at various locations is given as Table
4.3.
(c) Meteorological Parameters
Hourly meteorological data collected at site for the period of Oct-2015 to
Dec-2015 have been used for computing the meteorological parameters.
(d) Dispersion Modeling Results
The 24 hourly average ground level concentration (GLC) values from
proposed project have been computed for PM, SO2, NOx & considering
topographical features around the proposed plant and applicable stability
classes. The maximum 24 hourly average GLC values for PM, SO2, NOx
from proposed expansion are given in Table 4.4 to Table 4.6.
Corresponding isopleths plotted are shown in Figure 4.1 to Figure 4.3.
4.3.8 Predicted GLCs
It is predicted that highest 24–hourly incremental GLC value for SPM, SO2
& NOx are 2.134 g/m3, 0.672 g/m3 and 0.656 g/m3 respectively. The
point of maximum concentration by unit would be 1.0 km from center of
industry in S direction.
Page 135
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-8
With this marginal contribution due to the proposal of the project, the
levels of PM10, SO2 & NOx will remain well below the 24 - hourly ambient
air quality standards for SO2 & NOx (80 g/m3), PM10 (100 g/m3), PM2.5
(60 g/m3) prescribed by CPCB. The 24-hourly average GLC Values for
SPM, SO2 and NOX are reported in Table 4.4 to Table 4.6. The operation
of proposed plant is not likely to cause any significant impact on the
ambient air quality of the study area.
4.4 WATER ENVIRONMENT
(A) Sources of Impacts
The main sources of impact on water environment will be due to use of
additional fresh water from “Narmada Water” supply system during
construction and operation phase. The unit will be Zero Discharge Unit
after proposed expansion therefore; there will not be any impact due to
industrial wastewater.
Prediction of Impact-
During Construction phase
Since the proposed expansion will be in the existing premises,
construction will be required only for the installation of new plant and
machineries. There will not be any adverse impact on the quality of water
because very small quantities of water will be used. No disposal of
construction waste outside the plant and no leaching are anticipated.
Thus, the quality and quantity of ground water will not have any adverse
impact during construction phase.
During Operational Phase
After proposed expansion, water requirement will be satisfied through
“Narmada Water”. Unit has obtained necessary permission for it.
The increase in water requirement due to proposed expansion will be
from 129.0 KL/day to 610.0 KL/day; out of which industrial water
requirement will be 598.0 KL/day only. Unit is reuse 25.0 treated
wastewater currently and it will be increased up to 75.0 KL/day after
expansion.
The unit is engaged in the manufacturing of Formaldehyde, which is
continuous process and water also retained with the product. Therefore,
there will not any wastewater generation from the process. Since there is
Page 136
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-9
no need of plant washing and cleaning hence, the main source of
industrial wastewater generation is cooling bleed off and RO reject.
Currently, industrial wastewater generation is 30.0 KL/day and it will be
increased up to 121.0 KL/day which will be sent to Evaporator to achieve
zero liquid discharge and condensate of evaporator is reuse in utilities.
(B) Impact Assessment
Fresh water requirement will increase from 104.0 KL/day to 535.0 KL/day
after proposed expansion. Source of water is Narmada water, a surface
water source. However, unit will be recharging ground water during the
monsoon season. For that, industry proposes to make khettalavadi in
nearby villages to recharge rain water. Thus, there will not be any major
impact on the water environment due to proposed expansion. After
expansion also unit will continue to achieve zero discharge. Effluent will
evaporated in in-house Force effect evaporator & Mechanical evaporator
to achieve zero discharge and condensate from Mechanical evaporator
will be reuse.
Domestic effluent will be discharge through soak pit followed by septic
tank. Thus, there will not be any major impact on the water environment
due to proposed expansion activities.
4.5 NOISE LEVEL IMPACT
Any unwanted sound that creates disturbance in hearing is termed as
Noise. Hence, it is important to assess the present noise quality of the
area in order to predict the potential impact of future noise levels due to
the project.
4.5.1 Prediction of impact during Construction Phase
The impact on noise environment will be due to installation of new
mechanical equipments and machineries. The noise produced during
construction may have significant impact on the existing ambient noise
levels. The impact will be very minor and temporary in nature.
4.5.2 Prediction of impact during Operational Phase
The main sources of noise (at present & after expansion) within the
plants are: manufacturing activities, transferring pumps and material
handling systems. Suitable noise control system will be provided to
ensure that noise does not exceed the limits. The noise level shall,
Page 137
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-10
however, exceed the limits for a short period during start-up of
equipments. The other sources of noise are the movement of vehicles
along the road. However, proper noise preventive measures have been
taken to minimize the noise pollution like ear plugs, efficient silencers to
the vehicles, etc.
The results of monitoring carried out in the region have been presented in
Chapter-3. The results are below the standards prescribed for Industrial
environment. It can be concluded that, the impact on noise environment
will be long term but insignificant. The mitigation measures proposed for
minimising impacts on noise quality are provided in Chapter 10.
4.6 LAND/SOIL ENVIRONMENT
The main source of impact on land and soil environment will be due to
construction activities and hazardous waste disposal. There will not be
any disposable hazardous waste generation from the manufacturing
process.
4.6.1 Prediction of impact during Construction Phase
Since the proposed expansion will be carried out in the existing premises,
all the existing infrastructure facilities will be utilized with addition of
some new machineries and equipment. Therefore, no major construction
activities will be carried out. Further, the area of the plant is flat. Leveling
would not be required. Thus, topography will also be remained
unchanged after proposed expansion.
Thus, the impact on the land/soil during the construction is for short
terms and insignificant.
4.6.2 Prediction of impact during Operation Phase
Hazardous/solid waste generation will be the main source of impact on
the soil environment. No disposable will be generated during the plant
operation; therefore, there will not be any impact on the land
Environment due to plant operation.
The main source of hazardous waste generation will remain same only
qty. will be increased after proposed expansion.
Generated hazardous wastes will be is Evaporation Salt, used oil &
discarded containers/barrels.
Page 138
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-11
Evaporation salt will be disposed to secured TSDF site for landfilling;
discarded containers/barrels will be sold to authorized recyclers. Used oil
will be sold to CPCB approved recyclers. The unit has provided isolated
area with impervious flooring for the storage of hazardous waste.
Entire quantity of the hazardous waste will be stored in the isolated
hazardous waste storage area within premises having leachate collection
system and roof cover. Thus, after taking adequate steps for the
hazardous waste storage, there will be minor impact on the environment
due to proposed project activities.
4.7 ECOLOGICAL IMPACTS (FLORA AND FAUNA)
Unit is already in existence. So there will not be any cutting of natural
vegetation. On the contrary, the unit proposes to plant more tress in
existing greenbelt to make it dense. The area around the premises
consists of an adequate growth of vegetation. Various trees, shrubs and
herbs are found in and around it.
Also, the trees are identified for their sensitivity & pollution tolerance
capacity. This concept helps to plan the greenbelt of the area making it
less polluted and a pollution absorber.
The high Stomatal Index of Azadirachta Indica makes them susceptible to
SO2. However, the SO2 emissions from the industry will be well within the
limits and disperse from the adequate height. Hence, no major adverse
impact is expected on these plants with the increased emissions.
The high SPM levels may harm leaves by blocking stomata and thus
interfering with exchange of gases during photosynthesis and respiration
and also cause abrasion of plant surfaces when the wind blows. But the
site is not subjected to high-speed winds and the plants can be expected
to be free from any major impacts of SPM on plants.
Thus, there will not be any significant impact on ecological environment
due to proposed expansion activities.
4.8 SOCIO-ECONOMIC IMPACT
The proposed expansion will be in the existing premises and no additional
land will be required. Therefore, no displacement of person is envisaged.
Page 139
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-12
The plant is most modern and will require educated and trained
manpower. The surrounding area has got good educational facilities and
most of employees will come from the surrounding area.
The operation of the existing plant requires a workforce of 30 persons
and after expansion it will be increased up to 55. Thus, increasing
industrial activity will boost up the commercial and economical status of
the locality to some extent.
Thus, overall impacts on socio-economic environment are long term and
positive in nature.
Page 140
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-13
Mitigation Measures for different component
4.9 MITIGATION MEASURES DURING CONSTRUCTION:
In order to mitigate the adverse environment impact due to the
construction phase are given below:
Regular sprinkling of the water will be recommended along with the
construction activities.
Regular maintenance of machinery and transportation of vehicles
during construction to reduce noise pollution.
The domestic sewage generated during the construction activity will be
routed to septic tanks followed by soak pit.
To protect the workers working in noisy area, personal protective
equipments like earmuffs/earplugs, safety shoes will be provided.
Tree plantation will be increased around periphery of plant premises
and along the road sides.
4.10 MITIGATION MEASURES DURING THE OPERATIONAL PHASE:
4.10.1 Measures for Air Environment
A) Stack Emission
Flue gas volume will be checked for amount of air needed for the
complete combustion of the fuel.
Since, there will be no air pollution from process and utilities except
tail gas emission after proper treatments.
The unit will also provide adequate APCM & stack monitoring facilities
for the periodic monitoring of the stack to verify the compliance of the
stipulated norms.
In order to minimize the air pollution, unit will also develop greenbelt
in and around its premises.
B) Measures for fugitive emissions
The unit will take following measures:
Paved roads make to reduce the fugitive emission. Water sprinkler will
be provided to reduce the dusting from road transportation.
Regular maintenance of valves, pipes etc.
Page 141
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-14
To reduce the pollutant emission during transportation, unit has
adopted the practice of regular check-up and maintenance of vehicular
engines for complete combustion of the fuel by the transporters.
Regular periodic monitoring of work area to check the fugitive
emission.
4.10.2 Measures for water environment
Unit proposed to recharge ground water during the whole year and
especially in monsoon to balance the water table by making a
recharge sump/ structures etc. in own premises.
Use of high-pressure hoses for cleaning the floor to reduce the amount
of wastewater generated.
4.10.3 Measures for hazardous/solid waste
Classification of waste
Collection, Storage, Transportation & disposal at TSDF site & sell to
appropriate recycler &/or reuse.
Data Management and Reporting
Separate storage area
4.10.4 Measures for Noise
To minimize the noise pollution, the unit proposes the following noise
control measures,
Noise suppression measures such as enclosures, buffers and/or
protective measures will be provided, if required (wherever noise level
is more than 90 dB (A)).
Employees will be provided with ear protection measures like earplugs
or earmuffs. Earplug will be provided to all workers where exposure is
85 dB (A) or more.
Extensive oiling, lubrication and preventive maintenance will be carried
out for the machineries and equipments to reduce noise generation.
4.10.5 Health & Safety measures
Provision of periodic medical check-up for all the employees.
Protective equipments will be regularly checked and will be kept easily
accessible and easily workable during emergency.
Various types of fire extinguishers such as (Foam type, water CO2
type, CO2 type) will be provided inside the factory premises.
Page 142
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-15
Table 4.1
Input data for air quality modeling
Sr.
No.
Stack attached
to
Stack
Temp.
(0K)
Velocity
(m/s)
Stack
Height
(m)
Dia.
of
Stack
(m)
Fuel
Used
SPM
(g/s) SO2
(g/s)
NOX
(g/s)
Existing Stack
1 D.G. set
(400 kVA)
453 15 11 0.225 HSD-
45
lit./hr.
0.012 0.004 0.004
Proposed additional stack
1 D G Set
(1000 kVA)
475 15 11 0.300 HSD-
110
lit/hr.
0.029 0.009 0.008
Table 4.2
Existing/Estimated Air emission Quality (with & without APCM)
Sr.
No.
Stack attached to Without APCM With APCM
SPM
(g/s)
SO2
(g/s)
NOX
(g/s)
SPM
(g/s)
SO2
(g/s)
NOX
(g/s)
1 D.G. Set (400 kVA) 0.012 0.004 0.004 0.012 0.004 0.004
2 D.G. Set (1000 kVA) 0.029 0.009 0.008 0.029 0.009 0.008
Page 143
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-16
Table 4.3
Cumulative Concentrations at various locations
Station Direction Distance
(Km)
Baseline
Concentration
(g/m3)
Predicted GLC
(g/m3)
Cumulative
Concentration
(g/m3)
PM SO2 NOx PM SO2 NOx PM SO2 NOx
Project Site
(A1)
-- -- 70.7 19.9 22.2 0.16 0.15 0.15 70.86 20.05 22.35
Moti Bhoyan
(A2)
NNE
(Upwind)
1.45 73.0 19.4 19.2 0.45 0.20 0.20 73.45 19.60 19.40
Khatraj (A3) W
(Downwind)
2.92 65.4 19.2 21.1 1.05 0.35 0.25 66.45 19.55 21.35
Ganapatpura
(A4)
ENE
(Up Wind)
5.17 73.9 18.1 18.6 0.15 0.05 0.05 74.05 18.15 18.65
Karoli (A5) W
(Downwind)
1.40 69.9 18.1 21.2 0.45 0.15 0.25 70.35 18.25 21.45
Bhimasan
(A6)
WSW
(Downwind)
3.75 67.9 20.9 22.6 0.15 0.05 0.05 68.05 20.95 22.65
Sherisa (A7) NNE
(Up Wind)
4.06 74.6 19.9 21.5 0.30 0.35 0.05 74.90 20.25 21.55
Jethlaj (A8) SSW
(Downwind)
3.78 72.5 18.1 20.8 0.15 0.10 0.10 72.65 18.20 20.90
Page 144
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-17
Table 4.4
The 24-hourly average GLC Concentration Values for SPM
RANK CONC RECEPTOR
(XR,YR)
TYPE RANK CONC RECEPTOR
(XR,YR)
TYPE
1 2.134 ( .00, -1000.00) GC 26 1.280 ( 1000.00, -1000.00) GC
2 2.075 ( .00, 1000.00) GC 27 1.269 ( .00, -1000.00) GC
3 1.987 ( 1000.00, -1000.00) GC 28 1.248 ( 2000.00, -2000.00) GC
4 1.875 ( .00, 1000.00) GC 29 1.235 ( 1000.00, -1000.00) GC
5 1.741 ( .00, -1000.00) GC 30 1.210 ( .00, -1000.00) GC
6 1.726 ( .00, -1000.00) GC 31 1.204 (-1000.00, .00) GC
7 1.704 ( .00, -1000.00) GC 32 1.196 ( .00, -1000.00) GC
8 1.678 (-1000.00, .00) GC 33 1.184 ( .00, 3000.00) GC
9 1.669 ( .00, 2000.00) GC 34 1.180 (1000.00, -1000.00) GC
10 1.657 ( .00, -1000.00) GC 35 1.172 ( .00, -1000.00) GC
11 1.656 ( 1000.00, 1000.00) GC 36 1.168 ( .00, -1000.00) GC
12 1.617 ( .00, -1000.00) GC 37 1.168 ( .00, -1000.00) GC
13 1.567 ( .00, -1000.00) GC 38 1.161 ( 1000.00, .00) GC
14 1.529 (-1000.00, -1000.00) GC 39 1.161 ( 1000.00, -1000.00) GC
15 1.505 ( .00, -1000.00) GC 40 1.160 ( .00, -2000.00) GC
16 1.446 (-1000.00, .00) GC 41 1.159 ( 1000.00, -1000.00) GC
17 1.442 ( .00, -1000.00) GC 42 1.158 (-1000.00, -1000.00) GC
18 1.433 ( .00, 2000.00) GC 43 1.155 ( .00, -1000.00) GC
19 1.431 (-1000.00, -1000.00) GC 44 1.143 ( .00, -1000.00) GC
20 1.410 (-1000.00, .00) GC 45 1.142 ( .00, -1000.00) GC
21 1.371 ( 1000.00, -1000.00) GC 46 1.106 (-1000.00, -1000.00) GC
22 1.296 ( 1000.00, .00) GC 47 1.098 ( .00, -2000.00) GC
23 1.289 (-1000.00, .00) GC 48 1.094 (-1000.00, .00) GC
24 1.288 ( .00, -1000.00) GC 49 1.090 ( 1000.00, -1000.00) GC
25 1.281 (-1000.00, .00) GC 50 1.082 ( .00, -2000.00) GC
Note: Receptor Types: GC = Grid cart, Concentration in µg/m3
Page 145
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-18
Table 4.5
The 24-hourly average GLC Concentration Values for SO2
RANK CONC RECEPTOR
(XR,YR)
TYPE RANK CONC RECEPTOR
(XR,YR)
TYPE
1 0.672 ( .00, -1000.00) GC 26 0.403 ( 1000.00, -1000.00) GC
2 0.653 ( .00, 1000.00) GC 27 0.400 ( .00, -1000.00) GC
3 0.626 ( 1000.00, -1000.00) GC 28 0.393 ( 2000.00, -2000.00) GC
4 0.590 ( .00, 1000.00) GC 29 0.389 ( 1000.00, -1000.00) GC
5 0.548 ( .00, -1000.00) GC 30 0.381 ( .00, -1000.00) GC
6 0.544 ( .00, -1000.00) GC 31 0.379 (-1000.00, .00) GC
7 0.537 ( .00, -1000.00) GC 32 0.377 ( .00, -1000.00) GC
8 0.529 (-1000.00, .00) GC 33 0.373 ( .00, 3000.00) GC
9 0.526 ( .00, 2000.00) GC 34 0.372 ( 1000.00, -1000.00) GC
10 0.522 ( .00, -1000.00) GC 35 0.369 ( .00, -1000.00) GC
11 0.521 ( 1000.00, 1000.00) GC 36 0.368 ( .00, -1000.00) GC
12 0.509 ( .00, -1000.00) GC 37 0.368 ( .00, -1000.00) GC
13 0.494 ( .00, -1000.00) GC 38 0.366 ( 1000.00, -1000.00) GC
14 0.482 (-1000.00, -1000.00) GC 39 0.366 ( .00, -2000.00) GC
15 0.474 ( .00, -1000.00) GC 40 0.365 ( 1000.00, .00) GC
16 0.455 (-1000.00, .00) GC 41 0.365 ( 1000.00, -1000.00) GC
17 0.454 ( .00, -1000.00) GC 42 0.365 (-1000.00, -1000.00) GC
18 0.451 ( .00, 2000.00) GC 43 0.364 ( .00, -1000.00) GC
19 0.451 (-1000.00, -1000.00) GC 44 0.360 ( .00, -1000.00) GC
20 0.444 (-1000.00, .00) GC 45 0.359 ( .00, -1000.00) GC
21 0.432 ( 1000.00, -1000.00) GC 46 0.348 (-1000.00, -1000.00) GC
22 0.408 ( 1000.00, .00) GC 47 0.346 ( .00, -2000.00) GC
23 0.406 (-1000.00, .00) GC 48 0.345 (-1000.00, .00) GC
24 0.406 ( .00, -1000.00) GC 49 0.343 ( 1000.00, -1000.00) GC
25 0.404 (-1000.00, .00) GC 50 0.341 ( .00, -2000.00) GC
Note: Receptor Types: GC = Grid cart, Concentration in µg/m3
Page 146
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-19
Table 4.6
The 24-hourly average GLC Concentration Values for NOx
RANK CONC RECEPTOR
(XR,YR)
TYPE RANK CONC RECEPTOR
(XR,YR)
TYPE
1 0.656 ( .00, -1000.00) GC 26 0.393 (-1000.00, .00) GC
2 0.648 ( .00, 1000.00) GC 27 0.392 ( .00, -1000.00) GC
3 0.616 ( 1000.00, -1000.00) GC 28 0.382 ( 1000.00, -1000.00) GC
4 0.584 ( .00, 1000.00) GC 29 0.382 ( 2000.00, -2000.00) GC
5 0.537 ( .00, -1000.00) GC 30 0.374 ( .00, -1000.00) GC
6 0.534 ( .00, -1000.00) GC 31 0.372 (-1000.00, .00) GC
7 0.528 ( .00, -1000.00) GC 32 0.370 ( .00, -1000.00) GC
8 0.516 (-1000.00, .00) GC 33 0.366 ( .00, -1000.00) GC
9 0.513 ( .00, 2000.00) GC 34 0.365 ( .00, -1000.00) GC
10 0.512 ( .00, -1000.00) GC 35 0.365 ( .00, -1000.00) GC
11 0.511 ( 1000.00, 1000.00) GC 36 0.363 ( 1000.00, .00) GC
12 0.501 ( .00, -1000.00) GC 37 0.363 ( 1000.00, -1000.00) GC
13 0.484 ( .00, -1000.00) GC 38 0.362 ( .00, 3000.00) GC
14 0.472 (-1000.00, -1000.00) GC 39 0.361 ( .00, -1000.00) GC
15 0.466 ( .00, -1000.00) GC 40 0.357 ( 1000.00, -1000.00) GC
16 0.446 (-1000.00, .00) GC 41 0.356 ( 1000.00, -1000.00) GC
17 0.446 ( .00, -1000.00) GC 42 0.355 ( .00, -2000.00) GC
18 0.441 (-1000.00, -1000.00) GC 43 0.355 (-1000.00, -1000.00) GC
19 0.440 ( .00, 2000.00) GC 44 0.355 ( .00, -1000.00) GC
20 0.435 (-1000.00, .00) GC 45 0.352 ( .00, -1000.00) GC
21 0.421 ( 1000.00, -1000.00) GC 46 0.340 (-1000.00, -1000.00) GC
22 0.399 ( 1000.00, .00) GC 47 0.337 ( 1000.00, -1000.00) GC
23 0.397 ( -1000.00, .00) GC 48 0.336 (-1000.00, .00) GC
24 0.396 ( .00, -1000.00) GC 49 0.335 ( .00, -2000.00) GC
25 0.395 ( 1000.00, -1000.00) GC 50 0.331 ( .00, -2000.00) GC
Note: Receptor Types: GC = Grid cart, Concentration in µg/m3
Page 147
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-20
Figure 4.1: Isopleths for Ground Level Concentrations for SPM
Page 148
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-21
Figure 4.2: Isopleths for Ground Level Concentrations for SO2
Page 149
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 4-22
Figure 4.3: Isopleths for Ground Level Concentrations for NOx
Page 150
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 5-1
Chapter-5
Analysis of Alternatives
5.1 PROLOGUE:
Alternative analysis is the process of analyzing the proposed locating for
suitability for basic necessities to operate the plant safely, this analysis
also covers the environmental aspect of pollution prevention and
improvement in quality of life nearby the project vicinity. The project
alternative is the course of action in pace of another, that would meet the
same purpose and need, but which would avoid or minimize negative
impacts and enhance project benefits.
Such projects may result in specific impacts which can be avoided or
mitigated by adherence to certain predetermined performance standards,
guidelines or design criteria. Alternative approaches may therefore be
more effective in integrating environmental and social concerns into the
project planning process.
5.2 PROJECT DETAILS:
Balaji Formalin is already in existence at Plot No. 1398, Village: Moti
Bhoyan, Taluka: Kalol, District: Gandhinagar, Gujarat for manufacturing
of Formaldehyde. Unit now proposed to expand its existing production
capacity with introducing new products (Para Formaldehyde & Purification
of silver). Expansion will be carried out in the existing premises.
Proposed expansion activities is falls under 5(f) category - Synthetic
organic chemicals industry (dyes & dye intermediates; bulk drugs and
intermediates excluding drug formulations; synthetic rubbers; basic
organic chemicals, other synthetic organic chemicals and chemical
intermediates) and therefore prior EC is required.
5.3 SITE ALTERNATIVE:
The project is already in existence. It is very well familiar with the
surrounding environment; therefore, it becomes easy for the unit to
expand the project in the same premises.
The other supporting features are briefly summarized hereunder,
Availability of adequate land for expansion;
Page 151
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 5-2
Availability of all basic facilities like infrastructure, communication,
transportation, medical facilities, water, power, unskilled & skilled
manpower, raw materials, road network etc.
Proximity of market;
Nearest city Ahmedabad is 12.0 km away from the project site
which is very well connected with other parts of the country by
road, rail & air;
No R & R will be required;
Easy availability of manpower for proposed expansion activities;
So no alternative for site is analyzed.
5.4 ALTERNATIVE FOR TECHNOLOGIES:
Particular Proposed Technology Alternatives
Water Forced effect evaporator followed
mechanical evaporator.
Domestic w/w will be disposed off
in soak pit through septic tank.
Proposed technology is
adequate to achieve zero
discharge.
Air Tail gas treatment plant &
adequate stack height & acoustic
enclosure to the stand-by D. G.
set.
Proposed technology is
adequate to keep emission
within limit.
Solid/
Hazardous
waste
Haz. Waste will be stored in
separate storage area and finally
disposed to approve TSDF site,
disposal by selling to registered
recycler.
As proposed disposal facilities
are safe disposal facilities and
also guided by authority. No
thoughts are required to
switching on other
alternative.
Page 152
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 6-1
Chapter-6
Environmental Monitoring Program
6.1 PRELUDE:
Environment monitoring is the sampling and analysis tool to know the
environment conditions at particular time. The record of environmental
monitoring is most important as the environmental changes are slow in
nature and impact appears after many years. Environmental Monitoring is
the technical heart of assessment of environmental and social impacts
arising due to implementation of the proposed project. An equally
essential element of this process is to develop measures to eliminate,
offset or reduce impacts to acceptable levels during implementation and
operation of projects. The integration of such measures into project
implementation and operation is supported by clearly defining the
environmental requirements within an Environmental Management Plan.
Balaji Formalin Pvt. Ltd. is an existing unit for manufacturing of
Formaldehyde. Unit now proposed to expand its existing production
capacity with addition of new products. Expansion will be carried out in
the existing premises. It has proposed adequate environmental
monitoring programme.
6.2 ENVIRONMENT MONITORING PROGRAM:
The continuous monitoring of Environmental parameters like air, water,
noise, soil and performance of pollution control facilities and safety
measures in the plant are vital for proper Environmental management of
any industrial project. Therefore, the company shall create environmental
monitoring facilities by the environmental and safety department to
monitor air and water pollutants as per the guideline of GPCB & CPCB.
Moreover, air and water shall be monitored by outside agencies
authorized by GPCB at regular frequencies. This department shall also
carry out periodical checkup of fire and safety equipments.
6.3 OBJECTIVE OF MONITORING PLAN:
The basic objective of implementing a monitoring plan on a regular basis
is as follows:
Page 153
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 6-2
Know the pollution status within the plant and its vicinity.
Generate data for corrective action in respect of pollution.
Correlate the production operations with emission and control
mechanism.
Examine the performance of pollution control system.
Assess the Environmental impacts.
Remedial measures and environment management plant to reverse
the impacts.
6.4 SCHEDULES FOR ENVIRONMENT MONITORING:
The environmental monitoring will be scheduled on regular interval to
assess the conditions. The record of these monitoring will be compared
with the baseline study to know the changes in environmental conditions.
The post-project environmental monitoring suggested herewith should be
as per the following guideline. The highlights of the integrated
environmental monitoring plan are:
The stack monitoring facilities like ladder, platform and porthole at
all the stacks will be maintained in good condition.
Regular monitoring of all gaseous emissions from stacks/vents.
The performance of air pollution control equipment evaluated based
on these monitoring results.
Water consumption will be recorded daily.
As far as possible, noise curbed at its source, with the help of
acoustic hoods and other such noise reducing equipment. Regular
noise level monitoring will be carried out.
Greenbelt will be properly maintained and new plantation
programmes will be undertaken frequently.
Continuous environmental awareness programmes will be carried
out for the employees and also in the surrounding villages.
6.5 AMBIENT AIR QUALITY MONITORING
Schemes for monitoring ambient air quality, stack emissions and fugitive
emissions are proposed. The ambient air quality monitoring systems are
recommended for monitoring the ground level concentrations and fugitive
emissions around the plant. Unit should install three monitoring stations
Page 154
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 6-3
around its battery limit (at 1200 as per guideline) for monitoring PM, SO2
and NOx. The combined data will provide overall characteristic and
emission from the industry. For this, the following equipment is
recommended to be procured or can higher the services from
Environmental consultant by the project proponent for implementing the
above mentioned monitoring schemes:
Respirable Dust Sampler
Blower - 1.0-1.5 m3/min capacity with adapter for uniform suction
through filter and a properly calibrated manometer assembly for the
determination of flow rate through filter paper.
Rota meter - For gaseous sampling, calibrated Rota meter (0-5 LPM) for
maintaining flow rate should be provided.
Main housing - The main housing should be rectangular with a stand of
about 1.25 m height.
Besides this, stack emissions monitoring as per GPCB guidelines shall be
carried out.
Water Environment:
Wastewater generated from water treatment, silver refining process &
cooling bleed off will be directly sent to forced effect evaporator & then
sent to mechanical evaporator. Condensate from evaporator will be
reused for utility i.e. for cooling. Thus, unit will achieve zero discharge
after proposed expansion.
Noise Environment:
Monitoring of noise levels is essential to assess the efficacy of
maintenance schedules undertaken to reduce noise levels and noise
protection measures. A good quality digital sound pressure level meter is
essential for this purpose.
Transportation:
All the necessary precaution will be taken while carrying out transport of
the materials as per the Hazardous rules of transportation, central Motor
Vehicle Act-1988 & 1989. The vehicle for transportation of raw materials,
by-products and products will be parked at specified loading facilities
where there will be a provision of fire extinguishers.
Page 155
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 6-4
Table: 6.1 Environment Monitoring Plan
Nature of
Analysis
Frequency of analysis
with its analyzer
Parameters
Wastewater
analysis
Monthly by external agency pH, TDS, SS, Oil &
Grease, etc.
Stack monitoring of
each stack
Monthly by external agency PM, SO2, NOX
Ambient Air Quality
Monitoring
Monthly for 24 hours or as
per the statutory conditions
by external agency
PM10, PM2.5, SO2, NOX
Noise level Monthly as per the statutory
conditions by external
agency
Nr. Main gate, Nr. D. G.
Set, Process area, Raw
material storage area
etc.
Work zone fugitive
monitoring
Monthly by external agency Dust, VOCs
Health check-up of
workers
As per the statutory
guideline
All workers
Page 156
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 6-5
Table: 6.2 Budget for implementation of Environmental Monitoring Plan
Particulars No. of
location
Parameters Methodologies Total
Budget
(Tentrati
ve)
Method of
Monitoring
Method of
Analysis
Stack Monitoring
of each stack
All stacks PM, SO2, NOx Stack
monitoring
kit
PM: IS 11255:
part-1: 1985
SO2: IS 11255:
part-2: 1985
NOx: IS 11255:
part-7: 2005
3200/
stack
Ambient Air
Quality
Monitoring
3
locations
PM2.5, PM10,
SO2, NOx
RDS, Fine
particulate
sampler
PM2.5: IS 5182:
part-23: 2006
PM10: IS 5182:
part-23: 2006
SO2: IS 5182:
part-2: 2001
NOx: IS 5182:
part-6: 2006
5500/
station
Waste water
Analysis
1 sample pH, TDS, SS,
Oil & Grease,
etc.
-- APHA-AWWA
22nd edition
2500/
Sample
Work zone
fugitive
monitoring
2 to 3
locations
Dust, VOCs Personal
sampler,
VOC
sampler
Gravimetric, GC 1500/
location
Noise Pollution 6 to 8
locations
Sound Level
Meter
Sound
Level Meter
Sound Level
Meter
1000/
location
Page 157
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-1
Chapter-7
Additional Studies
(A) Risk Assessment
7.1 INTRODUCTION
The risk assessment studies have been conducted for identification of
hazards, to calculate damage distances and to spell out risk mitigation
measures.
Balaji Formalin Pvt. Ltd. is a working unit at Plot No. 1398, Nr. Rama
Multi Tech Ltd., Post: Moti Bhoyan, Taluka: Kalol, Dist.: Gandhinagar for
manufacturing of Formaldehyde of 5000 MTPM capacity and intends to
enhance its production capacity of Formaldehydeup to 12500 MTPM along
with Para Formaldehyde - 835 MTPM and Reprocessing Silver (Purification
of Silver) - 1.5 MTPM.
7.1.1 Scope of Study
The scope of work is to carry out risk analysis for the proposed expansion
of plant covering all the hazardous chemicals to be handled and stored at
the plant after expansion.
7.1.2 Study Objective
The objective of the risk analysis includes the following:
Identification of hazards
Selection of credible scenarios
Consequences Analysis of selected accidents scenarios
Risk Mitigation Measures
7.1.3 The Study Approach
The risk assessment study broadly comprised of the following steps:
System Description
Identification of Hazards
Selection of Credible Accident Scenarios
Consequence Analysis
Risk Mitigation Measures
Page 158
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-2
7.1.4 System Description
This step comprised the compilation of the location, design and
operational information needed for the risk analysis.
7.1.5 Identification of Hazards
Hazards associated with the plant after expansion was identified.
Summary of relevant accident cases was reviewed.
7.1.6 Risk Reduction Measures
Based on hazard identification and consequence analysis, risk reduction
measures were suggested to reduce risk and enhance safety at the plant.
7.2 PROBABLE HAZARDS & RISK
Hazard identification and risk assessment is carried out through careful
study of plant process. Following this various scenarios by which an
accident can occur are then determined. Concurrent study of both
probability and the consequences of an accident are carried out and the
final risk assessment is made. Since chemical & fuel posses‟ different kind
of hazard, both have been separately associated. The chemicals poses
more of Occupational Health Hazard, while fuel posses more of
safety/accidental hazards. Hazard & risk assessment has been carried out
for exposure to harmful dust/vapors, liquid pool evaporation or boiling
and leakage‟s in confined space.
7.3 HAZARDOUS IDENTIFICATION
Hazard is defined as a chemical or physical conditions those have the
potential for causing damage to people, property or the environment.
Hazard identification is the first step in the risk analysis and entails the
process of collecting information on:
the types and quantities of hazardous substances stored and
handled,
the location of storage tanks & other facilities,
Potential hazards associated with the spillage and release of
hazardous chemicals.
Page 159
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-3
7.4 HAZARDOUS SUBSTANCES TO BE HANDLED AT BALAJI FORMALIN
PVT. LTD.
Balaji is having raw materials few of which are hazardous in nature
(inflammable, highly toxic). These materials are being stored with full
safety and security.
Some of the materials will be stored in Tank farms. Some of the
safety measures proposed is: Hazardous material (inflammable/ tank
farm) will be away from the main plant.
Storage area will be cordoned off with barbed wire with „restricted
entry‟, „safety signs/posters‟, „No smoking/No naked flame‟ sign will
be posted all around it.
All light fittings/electric installations/equipment in the flammable
chemicals storage area will be flame proof type only.
Table 7.1: Liquid Raw Materials Storage
Sr.
No.
Name of
Chemicals
Storage capacity of Chemicals Material of
Construction
Existing
1 Methanol 3 Nos. of Tank x 95 KL Capacity= 285 KL 1 No of Tank x 79 KL Capacity= 79 KL Total 4 Nos. Tank = 364 KL
MS-Underground
2 Formaldehyde 1 No. of Tank x 77 KL Capacity= 77 KL
1 No. of Tank x 92 KL Capacity= 92 KL 1 No. of Tank x 260 KL Capacity= 260 KL 1 No. of Tank x 295 KL Capacity= 295 KL
2 Nos. of Tank x 130 KL Capacity= 260 KL 2 Nos. of Tank x 22 KL Capacity= 44 KL
Total 8 Nos. Tank = 1028 KL
MS-Above
ground
Proposed
3 Methanol 6 Nos. of Tank x 95 KL Capacity= 570 KL
1 No of Tank x 79 KL Capacity= 79 KL Total 7 Nos. Tank = 649 KL
MS-
Underground
4 Formaldehyde 1 Nos. of Tank x 77 KL Capacity= 77 KL 1 Nos. of Tank x 92 KL Capacity= 92 KL
1 No of Tank x 260 KL Capacity= 260 KL 1 Nos. of Tank x 295 KL Capacity= 295 KL
2 Nos. of Tank x 130 KL Capacity= 260 KL 2 Nos. of Tank x 22 KL Capacity= 44 KL Total 8 Nos. Tank = 1028 KL
MS-Above ground
7.5 HAZARDOUS MATERIALS CLASSIFICATION:
Hazardous materials have been defined under MSIHC Rules (1989) - 2
(e) which means. (i) Any chemical which satisfies any of the criteria laid
Page 160
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-4
down in Part I of Schedule I and is listed in Column 2 of Part II of this
Schedule;
Toxic Chemicals: Chemicals having the following values of acute
toxicity and which owing to theirphysical and chemical properties, are
capable of producing major accident hazards:
S.
No.
Toxicity Oral
Toxicity
LD50
(mg/kg)
Dermal
Toxicity
LD50
(mg/kg)
Inhalation
Toxicity
LC50
(mg/l)
Remarks
1 Extremely Toxic >5 < 40 < 0.5 --
2 Highly Toxic >5 – 50 > 20 – 200 < 0.5 – 2.0 --
3 Toxic >50 – 200 > 200 – 1000 > 2 – 10 --
Flammable chemicals:
(i) Flammable gases; 200C and at standard pressure of 101.3 KPa are:
Ignitable when in a mixture of 13% or less by volume with air, or;
Have a flammable range with air of at least 12% regardless of
thelower flammable limits.
(ii) Extremely flammable liquids: Chemicals which have a flash point
lower than or equal to 230C and the boiling point less than 350C;
(iii) Very Highly flammable liquids: Chemicals which have a flash point
lower than or equal to 230C and the boiling point higher than 35 0C;
(iv) Highly Flammable Liquid: Chemicals which have a flash point lower
than or equal to 600C but higher than 230C.
(v) Flammable liquids: Chemicals which have a flash point higher than
600C but lower than 900C.
Explosives: Explosive means a solid or liquid or pyrotechnic substance
(or a mixture of substances) or an article.
a. Which is in itself capable by chemical reaction of producing gas at
such a temperature and pressure and at such a speed as to cause
damage to surroundings;
b. That is designed to produce an effect by heat, light, sound, gas or
smoke or a combination of these as the result of non-detonative
self-sustaining exothermic chemical reaction.
Any chemical listed in Column 2 of Schedule 2;
Any chemical listed in Column 2 of Schedule 3;
Page 161
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-5
7.5.1 Raw Materials
Many of the raw materials are defined and listed under MSIHC Rules
(1989). The sr. no. as defined under MSIHC Rules (1989) and other
hazardous properties of the hazardous raw materials are in Table below.
Table 7.2: Hazardous Raw Materials Sr. No. (MSHIC) & Characteristics
S.
No.
Material S. No.& Threshold
Quantity (TQ in Kg)
as per MSHIC Rules
Chemicals Hazards
Potential
Remarks
Sched
ule-1, Part-
II
Sched
ule-2, Part-I
Sched
ule-3, Part-I
Hazards Toxic
1. Methanol
CAS
No.:67-
56-1
257 - - FP-12 0C ; BP-
64.70C LEL-6%;
UEL-36%
Incompatibiliti
es with Other
Materials:
Oxidizing
agents,
reducing
agents, acids,
alkali metals,
potassium,
sodium, metals
as powders
LD50, 5628
mg/kg
LC50-
64000
mg/l
May be fatal or
cause blindness if
swallowed. Vapor
harmful.
Flammable liquid
& vapor. Harmful if
swallowed, inhaled,
or absorbed
through the skin.
Causes eye, skin,
and respiratory
tract irritation. May
cause central
nervous system
depression.
2. Formalde
hyde
CAS No.:
50-00-0
205 - 112
TQ-1:
5 MT
FP-56 0C ; BP-
980C LEL-7%;
UEL-73%
May react
violently with
acids/ alkali/
oxidizing agents
etc.
LD50- 800
mg/kg,
Inhale
Exposure
Limit: 0.5
ppm
Death if inhaled or
absorbed; severe
eye irritation and
burns; allergic
dermatitis,skin
burns; bronchitis,
pulmonary edema;
headache,
dizziness, nausea,
vomiting
3. Para
Formalde
hyde
CAS No.:
30525-
89-4
- - - FP-700C; BP-Not
Available, MP-
1200-1700C,
LEL-7%; UEL-
73% May form
carbondioxide,
carbon
monoxide &
formaldehyde
when heated to
decomposition
Adequate
ventilatio
n needed.
TLV: 2
mg/m3
Toxic formaldehyde
gas may be
produced if
paraformaldehyde
decomposes.
Note:
Oral Toxicity (OT) in LD50 (mg/kg)
Dermal Toxicity (DT) in LD50 (mg/kg)
Inhalation Toxicity in LC50 (mg/l) [4 hrs.]
Page 162
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-6
7.6 OCCUPATIONAL HEALTH
Balaji plant deals in someof the highly hazardous chemicals namely
formaldehyde and methanol. The occupational hazards due to these
chemicals and preventive and remedial measures are as given below:
a. Formaldehyde:
i. Eye contact: Always use face mask or goggles while handling
chemicals. In case of eye contact immediate first aid is needed to
prevent eye damage. IMMEDIATELY flush eyes with copious quantities
of water for at least 20 minutes holding lids apart to ensure flushing of
the entire surface. Seek immediate medical attention. DO NOT use an
eye ointment.
ii. Skin contact: Always use face mask hand gloves, apron etc. While
handling chemicals. In case of skin contact immediate first aid is
needed to prevent skin damage. Immediately flush skin with plenty of
water for at least 20 minutes while removing contaminated clothing
and shoes. Seek immediate medical attention. Wash contaminated
clothing before reusing.
iii. Inhalation: Remove patient to fresh air. Administer approved oxygen
supply if breathing is difficult. Administer artificial respiration or CPR if
breathing has ceased. Seek immediate medical attention.
iv. Ingestion: If conscious, wash out mouth with water. DO NOT induce
vomiting. Seek immediate medical attention.
b. Methanol:
Danger! Poison! May be fatal or cause blindness if swallowed. Vapor
harmful. Liquid and vapor are flammable. Harmful if swallowed, inhaled,
or absorbed through the skin. Causes eye, skin, and respiratory tract
irritation. May cause central nervous system depression. Cannot be made
non-poisonous?
Target Organs: Eyes, nervous system, optic nerve, Potential Health
Effects
i. Eye: May cause painful sensitization to light. Methanol is a mild to
moderate eye irritant.
Page 163
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-7
ii. Inhalation, ingestion or skin absorption of methanol can cause
significant disturbance in vision, including blindness.
iii. Skin: Causes moderate skin irritation. May be absorbed through the
skin in harmful amounts. Prolonged and or repeated contact may
cause defatting of skin and dermatitis. Methanol can be absorbed
through the skin, producing systemic effects that include visual
disturbances.
iv. Ingestion: May be fatal or cause blindness if swallowed. Aspiration
hazard. Cannot be made non-poisonous. May cause gastrointestinal
irritation with nausea, vomiting and diarrhoea. May cause systematic
toxicity with acidosis. May cause central nervous system depression,
characterized by excitement, followed by headache, dizziness,
drowsiness, and nausea.
v. Inhalation: Methanol is toxic and can very readily form extremely
high vapor concentrations at room temperature. Inhalation is the most
common route of occupational exposure and/or snowy vision, and
blindness. Depending on the severity of exposure and the promptness
of treatment, survivors may recover completely or may have
permanent blindness, vision disturbances and/or nervous system
effects.
First Aid Measures:
i. Eyes: In case of contact, immediately flush eyes with plenty of water
for a t least 15 minutes. Get medical aid.
ii. Skin: In case of contact, immediately flush skin with plenty of water
for at least 15 minutes while removing contaminated clothing and
shoes. Get medical aid immediately. Wash clothing before reuse.
iii. Ingestion: Potential for aspiration if swallowed. Get medical aid
immediately. Do not induce vomiting unless directed to do so by
medical personnel. Never give anything by mouth to an unconscious
person. If vomiting occurs naturally, have victim lean forward.
iv. Inhalation: If inhaled, remove to fresh air. If not breathing, give
artificial respiration. If breathing is difficult, give oxygen. Get medical
aid.
Page 164
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-8
v. Antidote: Ethanol may inhibit methanol metabolism
c. Para Formaldehyde:
Very hazardous in case of skin contact (irritant), of eye contact (irritant).
Hazardous in case of skin contact (sensitizer), of ingestion, of inhalation.
Slightly hazardous in case of skin contact (corrosive), of eye contact
(corrosive). The amount of tissue damage depends on length of contact.
Eye contact can result in corneal damage or blindness. Skin contact can
produce inflammation and blistering. Inhalation of dust will produce
irritation to gastro-intestinal or respiratory tract, characterized by
burning, sneezing and coughing. Severe over-exposure can produce lung
damage, choking, unconsciousness or death. Inflammation of the eye is
characterized by redness, watering, and itching. Skin inflammation is
characterized by itching, scaling, reddening or occasionally, blistering.
Eye Contact: Check for and remove any contact lenses. In case of
contact, immediately flush eyes with plenty of water for at least 15
minutes. Cold water may be used. Get medical attention immediately.
Skin Contact: In case of contact, immediately flush skin with plenty of
water for at least 15 minutes while removing contaminated clothing and
shoes. Cover the irritated skin with an emollient. Cold water may be
used. Wash clothing before reuse. Thoroughly clean shoes before reuse.
Get medical attention immediately.
Serious Skin Contact: Wash with a disinfectant soap and cover the
contaminated skin with an anti-bacterial cream. Seek immediate
medicalattention.
Inhalation: If inhaled, remove to fresh air. If not breathing, give
artificial respiration. If breathing is difficult, give oxygen. Get medical
attention immediately.
Serious Inhalation: Evacuate the victim to a safe area as soon as
possible. Loosen tight clothing such as a collar, tie, belt or waist band. If
breathing is difficult, administer oxygen. If the victim is not breathing,
perform mouth-to-mouth resuscitation. WARNING: It maybe hazardous
to the person providing aid to give mouth-to-mouth resuscitation when
Page 165
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-9
the inhaled material is toxic, infectious orcorrosive. Seek immediate
medical attention.
Ingestion: Do NOT induce vomiting unless directed to do so by medical
personnel. Never give anything by mouth to an unconscious person. If
large quantities of this material are swallowed, call a physician
immediately. Loosen tight clothing such as a collar, tie, belt or waistband.
7.7 RISK ASSESSMENT
A three „levels‟ risk assessment approach has been adopted for the
Balaji‟s facilities. The risk assessment levels are generally consistent with
the practices encountered through various assignments for medium and
large chemical complexes. The brief outline of the three tier approach is
given below:
Level 1 – Risk Screening
i. This is top-down review of worst- case potential hazards/risks, aimed
primarily at identifying plant sites or areas within plant, which pose the
highest risk. Various screening factors considered include:
Inventory of hazardous materials;
Hazardous Materials properties;
Storage conditions (e.g. temperature and pressure);
Location sensitivity (distance to residential areas/populace).
ii. The data/information is obtained from plant. The results provide a
relative indication of the extent of hazards and potential for risk
exposure.
Level 2 – Major Risk Survey (Semi - Quantitative)
i. The survey approach combines the site inspection with established risk
assessment techniques applied both qualitative as well quantitative
mode. The primary objective is to identify and select major risks at a
specific location in the plant considering possible soft spots/weak links
during operation/maintenance. Aspects covered in the risk usually
include:
Process Hazards;
Process Safety Management Systems;
Fire Protection and Emergency response equipments and programs.
Page 166
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-10
Security Vulnerability;
Impact of hazards consequences (equipment damage, business
interruption, injury, fatalities);
Qualitative risk identification of scenarios involving hazardous
materials;
Risk reduction measures.
ii. Selection of critical scenarios and their potential of damage provide
means of prioritising mitigate measures and allocate the resources to the
areas with highest risks.
Level 3 – Quantitative Risk Assessment (Deterministic)
This is the stage of assessment of risks associated with all credible
hazards (scenarios) with potential to cause an undesirable outcome such
as human injury, fatality or destruction of property. The four basic
elements include:
Hazards identification utilising formal approach (Level 2, HAZOP etc.);
i. Frequency Analysis based on past safety data (incidents/accidents);
Identifying likely pathway of failures and quantifying the
toxic/inflammable material release;
ii. Hazards analysis to quantify the consequences of various hazards
scenarios (fire, explosion, BLEVE, toxic vapor release etc.). Establish
minimum value for damage (e.g. IDLH, over pressure, radiation flux)
to assess the impact on environment.
iii. Risk Quantification: Quantitative techniques are used considering
effect/impact due to weather data, population data, and frequency of
occurrences and likely hood of ignition/toxic release. Data are
analyzed considering likely damage (in terms of injury/fatality,
property damage) each scenarios is likely to cause.
QRA provides a means to determine the relative significance undesired
events, allowing analyst and the team to focus their risk reduction efforts
where they will be beneficial most.
Proposed expansion of Balaji plant is a medium level plant but hazardous
in nature. Existing plant (similar to proposed expansion project) is in
operation. The QRA for this plant is based on Level 1 and Level 2. Details
Page 167
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-11
of raw materials and the bulk storages of liquid materials is gives in
Table 7.1 & the hazardous nature of raw materials and products are
summarized in table 7.2.
7.7.1 Risk Screening Approach
Risk screening of Balaji plant was undertaken through process study and
study of data/information provided by technical personal of Balaji. Data of
major/bulk storages of raw materials, intermediates and other chemicals
were collected. MSDS of hazardous chemicals were studied vis a vis their
inventories and mode of storage. Balaji plant will have few hazardous
chemicals and also producing Formaldehyde and Para Formaldehyde
which are in hazardous nature. The chemicals stored in bulk (liquid or
gaseous) and defined under MSHIC Rule will be considered for detailed
analysis. The solid products powder or granules spillage can results in
polluting small area only. The damage to personnel can be through
ingress- dermal (if individual come in contact), oral (if individual food
gets infected through fugitive dust) or inhalation (fugitive dust). The main
route is fugitive dust which incovered area will move to short distance
only. The risk is through liquid products which are volatile material. The
toxic vapours due to spillage of such material can travel to some distance
and cause damage. Considering these aspects only extremely hazardous
(ET) liquid have been considered for QRA. The liquid products will be
stored in bulk storage tanks.
7.7.2 QRA Approach
Identification of hazards and likely scenarios (based on Level-1 and
Level-2 activities) calls for detailed analysis of each scenario for potential
of damage, impact area (may vary with weather conditions/wind
direction) and safety system in place. Subsequently each incident is
classified according to relative risk classifications provided in Table below
as Table 7.3
Table 7.3: Risk Classification
Stage Description
High
(> 10-2/yr)
A failure which could reasonably be expected to occur within the expected life time of the plant.
Page 168
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-12
Stage Description
Examples of high failure likelihood are process leaks or single instrument or valve failures or a human error
which could result in releases of hazardous materials.
Moderate
(10-2-10-4/yr.)
A failure or sequence of failures which has a low probability of occurrence within the expected lifetime of
the plant. Examples of moderate likelihood are dual instrument or
valve failures, combination of instrument failures and human errors, or single failures of small process lines or
fittings.
Low (<10-4)
A failure or series of failures which have a very low probability of occurrence within the expected lifetime of
plant. Examples of „low‟ likelihood are multiple instruments or
valve failures or multiple human errors, or single spontaneous failures of tanks or process vessels.
Minor
Incidents
Impact limited to the local area of the event with potent
for „knock – on- events‟
Serious
Incident
One that could cause: Any serious injury or fatality on/off site;
Property damage of $ 1 million (or equivalent) offsite or $ 5 million (or equivalent) onsite.
Extensive
Incident
One that is five or more times worse than a serious
incident.
Assigning a relative risk to each scenario provides a means of prioritising
associated risk mitigation measures and planned actions.
7.8 THERMAL HAZARDS
In order to understand the damages produced by various scenarios, it is
appropriate to understand the physiological/physical effects of thermal
radiation intensities. The thermal radiation due to tank fire usually results
in burn on the human body. Furthermore, inanimate objects like
equipment, piping, cables, etc. may also be affected and also need to be
evaluated for damages. Table 7.4, Table 7.5 & Table 7.7 respectively
give tolerable intensities of various objects and desirable escape time for
thermal radiation.
Thermal hazards could be from fires or explosion. Fire releases energy
slowly while explosion release energy very rapidly (typically in micro
seconds). Explosion is rapid expansion of gases resulting in rapidly
moving shock wave. Explosion can be confined (within a vessel or
Page 169
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-13
building) or unconfined (due to release of flammable gases). BLEVE
(boiling liquid expanding vapour explosion) occurs if a vessel containing a
liquid at a temperature above its atmospheric boiling point ruptures. The
subsequent BLEVE is the explosive vaporisation of large fraction of its
vapour contents; possibly followed by combustion or explosion of the
vaporised cloud if it is combustible. Thermal hazards have been
considered for various scenarios including: Catastrophic Formaldehyde
tank failure, spillage and “Toxic Vapours” spread.
Table 7.4: Effects due to Incident Radiation Intensity
Incident
Radiation kW/m2
Damage Type
0.7 Equivalent to Solar Radiation
1.6 No discomfort on long duration
4.0 Sufficient to cause pain within 20 sec. Blistering of
skin (first degree burn are likely).
9.5 Pain threshold reached after 8 sec. Second degree
burn after 20 sec.
12.5 Minimum energy required for piloted ignition of
wood, melting of plastic tubing etc.
25 Minimum Energy required for piloted ignition of
wood, melting, plastic tubing etc.
37.5 Sufficient to cause damage to process equipment.
62.0 Spontaneous ignition of wood.
Table 7.5: Thermal Radiation Impact to Human
Exposure
Duration
Radiation Energy
{1% lethality; kW/m2}
Radiation
Energy for 2nd degree burns;
kW/m2
Radiation
Energy for 1stdegree
burns; kW/m2
10 sec 21.2 16 12.5
30 9.3 7.0 4.0
Table 7.6: Tolerable Intensities for Various Objects
Sl.
No.
Objects Tolerable Intensities
(kw/m2)
1 Drenched Tank 38
2 Special Buildings
(No window, fire proof doors)
25
Page 170
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-14
3 Normal Buildings 14
4 Vegetation 10-12
5 Escape Route 6 (up to 30 secs.)
6 Personnel in Emergencies 3 (up to 30 secs.)
7 Plastic Cables 2
8 Stationary Personnel 1.5
7.9 DAMAGE DUE TO EXPLOSION
The explosion of a dust or gas (either as a deflagration or detonation)
results in a reaction front moving outwards from the ignition source
preceded by a shock wave or pressure front. After the combustible
material is consumed the reaction front terminates but the pressure wave
continues its outward movement. Damage estimates based on
overpressure are given in Table 7.7 below:
Table 7.7: Damage due to Overpressure
Sl.
No.
Overpressure
(psig/bar)
Damage
1. 0.04 Loud Noise/sonic boom glass failure
2. 0.15 Typical pressure for glass failure
3. 0.5 - 1 Large and small windows usually
shattered
4. 0.7 Minor damage to house structure
5. 1 Partial demolition of houses, made
uninhabitable.
6. 2.3 Lower limit of serious structure damage
7. 5 - 7 Nearly complete destruction of houses
8. 9 Loaded train box wagons completely
demolished
9. 10 Probable total destruction of houses
10. 200 Limits of crater lip
7.10 TOXIC RELEASE
Toxic materials handled in Balaji complex are Formaldehyde and
Methanol as defined in MSHIC rules and indicated in Table 7.2. These
chemicals are stored in bulk (in tank farm).
Page 171
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-15
Damage criteria: For toxic release the damage criteria considered is IDLH
concentration (if data are available). In the absence of non-availability of
IDLH, „Inhalation Toxicity (IT) data for rats‟ are considered.
7.11 LIKELY FAILURE SCENARIOS
Few likely failure scenarios have been selected after critical appraisal of
raw materials and products properties and storage inventories. Failure
scenarios selected are as given in Table 7.8 below:
Table 7.8: Different Failure Scenarios
Sr. No. Scenario Remark
Raw materials
1 Formaldehyde Tank catastrophic
failure, spillage and Toxic Vapours
Toxic
2 Methanol spillage; Toxic vapours; fire Flammable/Toxic
7.12 CONSEQUENCE ANALYSIS
The facilities at the Material Storage Dyke area are mainly comprised of
methanoland formaldehyde storage tanks. The hazards posed by them
are mainly in the form offire. There is a possibility of flash fire taking
place in the event of large spill of hydrocarbons, mainly major failure
scenarios were evaluated to assess the effect onpeople and property
inside the plant area as well as outside.
a) Tank Fire
b) Bund Fire
c) Flash fire
The effect of fire on people and property outside will chiefly manifest
itself in the form of thermal radiation. A criteria was selected for deciding
the maximum level of thermal radiation to which the outside population
can be subjected. Thermal radiation levels from fire scenarios of each
tank are worked out at various distances and their effects are evaluated
against the set criteria.
Thermal Radiation
Thermal radiation due to pool fire may cause various degrees of burns on
exposed human bodies. Moreover, their effects on inanimate objects like
Page 172
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-16
piping, equipment orvegetation also need to be evaluated to assess their
impact.
For continuous presence of persons, the following thermal radiation
intensity levels are usually adopted:
-1.6 Kw/m2 for outside population
-4.5 Kw/m2 for plant operators
This is the criteria that are followed in case of flare design where peak
load conditionmay occur for a short time but mostly without warning. The
operators are usually trained and properly clothed; they are expected to
run for shelter quickly. For secondary fire, an incident radiation intensity
of 12.5 Kw/m2 is required. This is usually taken as the minimum criteria.
The facilities at the storage area mainly comprises of vertical cylindrical
tanks of structural steel. The hazard posed by them is mainly in the form
offire. There is a possibility of tank fire taking place and is evaluated to
assess theeffect on people and property.
Damage Criteria: Damage estimates due to thermal radiation have been
arrived at by correlating recorded incidents. The consequences can then
be visualized by super imposing the effects on the proposed site plan and
identifying the elements within the project site as well as the neighboring
environment which may be affected.
The damage criteria due to accidental release of hydrocarbon arise
primarily from fire. Contamination of soil or water is not expected as fuel
will vaporize quickly and wouldnot leave any residue as it happens with
oil. The vapour of methanol/formaldehyde is not toxic and hence no
effects of toxicity are expected.
Consequence of Spill: The tank on fire situation would occur if the heat
on peripheral surface of the tank leads to internal tank pressure. Pool fire
would occur when solvent collected in the dyke due to leakages get
ignited.
Thermal Damage
The following table presents the damage and effects due to thermal
radiation oninanimate objects like piping, equipment or vegetation in
addition to effects on human beings.
Page 173
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-17
Incident radiation
(in kW/m2)
Type of damage
62.0 Spontaneous ignition of wood.
37.5 Sufficient to cause damage to process equipment.
32.0 Maximum thermal radiation intensity allowed on
thermally protected adjoining equipment
25.0 Minimum energy required to ignite wood at
infinitely long exposure (non-piloted)
12.5 Minimum energy required for piloted ignition of wood, melting of plastic
8.0 Maximum thermal radiation intensity allowed on thermallyunprotected adjoining equipment
4.5 Sufficient to cause pain to personnel if unable to
reach coverwithin 50 seconds, however blistering of skin (1stdegree burns)
1.6 Causes no discomfort on long exposures
0.6 Equivalent to solar radiation
The effect of incident radiation and exposure time on lethality is stated in
the followingtable:
Radiation Exposure and Lethality
Incident radiation
(Kw/m2)
Exposure time
(seconds)
Lethality
(%)
Degree of
burns
4.5 20 0 1st
4.5 50 0 1st
8.0 20 0 1st
8.0 50 <1 3rd
8.0 60 <1 3rd
12.0 20 <1 2nd
12.0 50 8 3rd
Methodology
Storage tanks are evaluated to assess the effect in the event of its
catching fire. For the present study, the scenarios under consideration
assume that the peak level ofradiation intensity will not occur suddenly.
Based on the past experience, it is found that 20-30 minutes time will be
required before a tank fire grows to full size. For radiation calculations,
full tank fire has been considered. From the above considerations, the
Page 174
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-18
criteria of 4.5 kW/m2 have been selected to judge acceptability of the
scenarios.
The assumptions for calculations are:
-It is not continuous exposure;
-There is not enough time available for warning the public and initiating
emergencyaction;
-Within 10 minutes, plant personnel would attend any eventuality
-Secondary fire at public road and building is not likely to happen;
-The effect of smoke on reduction of source radiation intensity has not
beenconsidered; therefore hazard distances calculated tend to be
conservative; and
-Shielding effect of intervening trees or other structures has not been
considered. Nolethality is expected from this level of intensity although
burn injury takes placedepending on time of exposure.
Pool Fire
Following an accidental release, chemicals will form a confined pool with
in the dyke area or an unconfined pool in case liquids were allowed to be
stored in the absence of a dyke. Should the vapour above the pool ignite,
the liquid will burn as a pool fire. Thepool fire will result in thermal
radiation. It could also damage the storage tanks located within the
common dyke area.
Model Computations
Although the interest of this study is to find out the distance from a
burning tank to aradiation intensity level of 4.5 Kw/m2, calculations of the
levels of radiation intensity as indicated have been included, the hazard
distances for storage tank on fire: (i) Plant area instantaneous spill
(Single Tank, Methanol) (ii) Plant area instantaneousspill (Single Tank,
Formaldehyde) and (iii) Catastrophic rupture of storage facility
Continuous spill (All tanks). Radiation distances shown in above tables
are at tank elevations. At ground level theradiation intensity will be
comparatively low.
CONCLUSION
1. The following arrangements are available for the storage tanks:
Page 175
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-19
-Independent high level alarm and trip off liquid inlet-line.
-Low level alarm.
-Provision of auto deluge water sprinkler system for each bulk
storagetank. The auto deluge water sprinkler would be set to start
working at atemperature of 660C.
2. The turbine building, switchyard, transformer yard, administrative
building, pantry, first aid center, fire stations etc. should be located
safely, if viewed inthe light of worst accident scenarios.
3. In case of any tank on fire or fire in the vicinity, the cooling of
adjoining tank should be resorted promptly in addition to tank on fire so
that the tank shell of neighboring tanks does not give away.
4. The night vision wind sock is mounted on top of administrative
building, and the Dyke area with adequate illumination so that people can
move in upwind directions in the event of massive spillage.
5. Population growth around the plant and colony should be watched by
appropriate authorities. Unauthorized growth of shanty colonies and
hutmentsaround the plant should be avoided.
6. No machinery of vital importance like fire-fighting pump house,
Hydrant and Fuel oil pump house should be placed within radiation
contours of 32.0 kw/m2 heat intensity.
Strict adherence to standards and accepted maintenance and operation of
the plant plays a vital role in maintaining the plant. The monitoring of the
health of equipment, pipeline and machines, thickness survey will
improve plant performance and safety.
Table 7.9
Distances of Occurrence of Various Thermal Radiation Intensities
Storage Tank on FirePlant Area Instantaneous Spill
(Single Tank, Methanol)
Radiation Intensity
(kw/m2)
Distance of Occurrence
(metres)
Tank Capacity (KL) 95
37.5 1.53
32.0 1.65
12.5 2.63
Page 176
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-20
8.0 3.29
4.5 4.40
1.6 7.37
Table 7.10
Distances of Occurrence of Various Thermal Radiation Intensities
[Catastrophic Rupture Storage Facility Continuous Spill - Methanol]
Radiation Intensity
(kw/m2)
Distance of Occurrence
(metres)
37.5 15.09
32.0 16.03
12.5 26.08
8.0 32.58
4.5 43.41
1.6 72.81
Table 7.11
Distances of Occurrence of Various Thermal Radiation Intensities
Storage Tank on FirePlant Area Instantaneous Spill
(Single Tank, Formaldehyde)
Radiation Intensity
(kw/m2)
Distance of
Occurrence (metres)
Tank Capacity (KL) 295
37.5 4.24
32.0 4.57
12.5 6.94
8.0 9.15
4.5 12.22
1.6 20.46
Table 7.12
Distances of Occurrence of Various Thermal Radiation Intensities
[Catastrophic Rupture Storage Facility Continuous Spill-
(Formaldehyde)]
Radiation Intensity
(kw/m2)
Distance of Occurrence
(metres)
37.5 3.91
Page 177
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-21
32.0 4.23
12.5 6.77
8.0 8.46
4.5 11.27
1.6 18.90
7.13 PRO-ACTIVE SAFETY MEASURES
Accidents/incidents just don‟t happen themselves. They are caused due
to human failure (mostly) or natural causes (rare). Some of the measures
to prevent the incidents/accidents are given below:
All employees must receive and understand the locally applicable
Workplace Hazardous Materials information guide, safety rules and
MSDS of hazardous chemicals (if such a guide exists). In any case, the
management is responsible for proper instruction (SOP).
Develop a positive attitude toward safety: prevention is better than
cure.
Good housekeeping is extremely important. Maintain a safe, clean
work environment.
You may work hard, but never in haste.
Follow the safety norms/Safe Operating Procedure (SOP) provided by
the authorities when operating equipment/machineries.
Learn what to do in case of emergencies (e.g., fire, chemical spill).
Learn emergency first aid.
Seek medical attention immediately if affected by chemicals anduse
first aid until medical aid is available.
Report all accidents and near-misses to the management.
Adopt LDAR (Leak detection and repair) system and sincerely act on
the same.
Access to emergency exits, eye-wash fountains and safety showers
must not be blocked. Fountains and showers should be checked
periodically for proper operation. (Safety showers are used for
chemical spills and fire victims)
Page 178
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-22
Wash hands immediately after contact with potentially hazardous or
toxic chemicals.
Clean up any spillage immediately. Use appropriate materials for each
spillage.
Strictly observe “No Smoking” and other safety rules.
Use personal safety equipment as described below.
Body protection: Chemical-resistant apron.
Hand protection: gloves, particularly when handling concentrated
acids, bases, and other hazardous chemicals.
Dust mask: when crushing or milling/grinding samples, etc.
Gas Masks: When entering an area where toxic gases or vapors
are likely to occur.
Eye protection: safety glasses with face shields. Persons wearing
contact lenses should always wear safety glasses dealing with
corrosive chemicals.
Foot protection: proper footwear should be used.
Read labels before opening a chemical container.
Unit has well-equipped first aid post. It will also have staff personnel
trained in first aid. Injured personnel will be immediately rushed to
hospital after giving first aid. All employees will have regular medical
check-up as per norms.
An emergency vehicle/ ambulance will always (round the clock)
available for meeting any eventuality.
7.14 ACTION PLAN FOR HANDLING & SAFETY SYSTEM
Formaldehyde & Methanol are the main Haz. Chemicals to be handled in
the project, classified as flammable and poisonous chemical. Flammable
chemicals will be stored in open area outside the process plant with all
the safety measures. Hazardous chemicals bags/barrels/drums will be
stored and handle in dispensing room for taking out sample from the
container for quality check-up purpose or for the partial use. This activity
for Hazardous material handling will be carried out by using all PPE with
proper ventilation & under supervision.
Page 179
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-23
7.14.1 Safety Measures for Transportation and Unloading of Hazardous
Chemicals
Solvent unloading standard procedure will in place and will be
implemented for safe unloading of road tanker.
Static earthing provision will be made for tanker unloading.
Drum handling trolleys will be used for transportation of drums up to
plant and internal handling from storage to process area.
Display Boards will be provided on all storage tanks which include the
name of the chemicals and its major hazardous characteristics.
Fire extinguishers will be provided as required.
First aids boxes will also be provided at different places wherever
required.
Water showering system will be provided to the flammable chemicals
storage area.
Area will be declared as “NO SMOKE ZONE”.
7.14.2 Safety Measures for Storage/Handling of Hazardous Chemicals:
All Hazardous and flammable chemicals will store separately and away
from the strong oxidant & kept it in well ventilated room. Adequate
firefighting system will be installed. Safety shower and eye washer will be
installed near storage area. Flame proof light fitting will be provided at
storage area. Sprinkler system will be installed near storage area. Safety
permit system will be followed for loading and unloading. Isolate storage
will be provided with wire fencing under lock and key. Caution note,
hazardous identification board will be provided. Only authorized person
will be permitted in storage area and register will be maintained. “NO
SMOKING “board will be displayed and Wind Indicator and siren will be
provided.
7.14.3 Safety Measures for Process Units
Safety measures are the most important aspect of selection of process
technology to ensure safety in production unit. For the safety in
production area some important critical safety measures will be provided
within the process technology/equipment itself & will put continue efforts
for developing new technology/equipment. Company will ensure such
Page 180
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-24
provision in the technology/equipment /machineries at time of purchase.
The details of the critical safety measures for process unit are as below;
any reaction upsets will be confined to the reaction vessel itself as
defined quantity of raw materials will be issued to the reaction vessel by
metering pumps/load cells. Process parameters control will be provided
as per SOP- Standard Operating Procedures.
Materials will be transferred by pumping through pipeline or by vacuum
from drums. All reaction vents will be connected to vapor condensers
system. Hazardous materials will be transferred by pipelines and in
control manners. Trained person will be engaged for handling of
hazardous materials. Proper safety precautions will be taken during
handling of hazardous materials. All solvents and flammable material with
required quantity will be charge in reactor by pump or by gravity. All the
vessels will be examined periodically by a recognized competent person.
All the vessels and equipments will be well earthed appropriately and well
protected against Static Electricity. Temperature indicators will be
provided near all reactor and distillation systems. Flame proof light
fittings will be installed in the plant. All the Plant Personnel will be
provided with Personal Protection Equipments to protect against any
adverse health effect during operations, leakage, spillages or splash. PPE
like Helmets, Safety Shoes and Safety Glasses will be provided to the
employees.
7.14.4 Safety Measures for Preventive Maintenance
The safety measures in form of the general Do's & Don'ts for safety in
process & other plant area are as below:
Do not work on equipments without permission from plant head and
maintenance head.
Make sure equipment is empty and fluxed with nitrogen and air.
Check VOC content for flammable and make sure that no flammable
vapour contents.
Keep proper and adequate fire extinguisher near work area.
Use proper PPE.
Page 181
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-25
Do not allow any employment without pre-medical check-up or
without checking fitness.
Check all motors are disconnected and fuse pulled out before
maintenance.
Work in any equipment must be conducted in presence of supervisor.
Make sure all process lines are disconnected.
Additional safety measures in form of the checklist covering Do's &
Don'ts of preventive maintenance, strengthening of HSE,
manufacturing utility staff for safety related measures will be
updated timely and will be made available to all concern department
& personnel.
7.14.5 Safety measures to prevent spillage/leakage of toxic chemicals
The preventive maintenance will be planned and carried out as per plan
to avoid the failure of valve, pipe lines and other component of
transferring line. The spillage will be confined to the dyke area
underneath the vessel. The resultant splash of such chemicals will result
in exposure of toxic chemicals to employees. Decontamination facilities
(Safety shower and eye wash fountains) will be provided in the plant
area, which can be used to decontaminate the affected employees.
Suitable decontamination procedure will be used to decontaminate the
spilled or leaked material. The SOP for decontamination will be reared
with all related department.
7.15 SAFETY MANAGEMENT PLAN FOR ACUTELY TOXIC CHEMICALS
Purpose: Develop a reference document that can be used by a Principle
Investigator or a designee to assist in the development of Safety
Operating Procedures (SOP) for acutely toxic chemicals.
The following elements below should be included when developing safety
guidelines for acutely toxic chemicals:
7.15.1 Hazard Summary
These guidelines are intended to provide general guidance on how to
safely work with acutely toxic chemicals.
Toxic chemicals are defined as those with an LD50 value for oral exposure
in rats of 50-500 mg/kg, for skin contact in rabbits of 200-100 mg/kg, or
Page 182
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-26
for inhalation exposure in rats of 200-2000 ppm/air.
Highly toxic chemicals are defined as those with an LD50 value for oral
exposure in rats of less than 50-500 mg/kg, for skin contact in rabbits of
less than 200-100 mg/kg, or for inhalation exposure in rats of less than
200-2000 ppm/air.
An acutely toxic chemical causes damage in a relatively short time after a
single concentrated dose. Irritation, burns, illness, or death may result.
These substances may cause severe inflammation, shock, collapse or
even sudden death when inhaled in high concentrations.
Examples include: Hydrogen Cyanide, Hydrogen Sulfide, Nitrogen
Dioxide, Carbon Monoxide, Ammonia
Highly toxic gases are a chemical that has a median lethal concentration
in air of 200 ppm by volume or less of gas or vapor, or 2mg/L or less of
mist, fume or dust, when administered by continuous inhalation for 1
hour.
Examples: Nitrogen Dioxide, cyanogen, phosgene, fluorine, nitric oxide,
chlorine pentafluoride, arsine, chlorine trifluoride, sulfur tetra fluoride,
and hydrogen selenide.
7.15.2 Special Handling Procedures and Storage Requirements
Handling processes should be designed to minimize the potential for
splash, splatter, or other likely scenarios for accidental contact. The
handling of these materials needs to be conducted in a fume hood. If the
process does not permit the handling of such materials in a fume hood,
the lab personnel should contact Environmental Health and Safety at x4-
4036 for review the adequacy of ventilation measures.
For use of highly toxic materials, a designated area shall be established
where limited access, special procedures, knowledge, and work skills are
required. A designated area can be the entire laboratory, a specific
laboratory workbench, or a laboratory hood. Designated areas must be
clearly marked with signs that identify the chemical hazard and include
an appropriate warning; for example: WARNING! HYDROFLUORIC ACID
WORK AREA – HIGHLY TOXIC MATERIAL.
Upon leaving the designated area, remove any personal protective
Page 183
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-27
equipment worn and wash hands, forearms, face and neck.
After each use (or day), wipe down the immediate work area and
equipment to prevent accumulation of chemical residue.
At the end of each project, thoroughly decontaminate the designated
area before resuming normal laboratory work in the area.
7.15.3 Personal Protective Equipment
At minimum, safety glasses, lab coat, long pants, and closed toed shoes
are to be worn when entering laboratories having hazardous chemicals.
If the use half mask, or full face respirator is requested, the individual
and/or their supervisor must first contact Environmental Health & Safety
for a consultation to determine if respirator use is necessary. This
includes a medical evaluation; respirator fit test, and training.
Eye protection in the form of safety glasses must be worn at all times
when handling acutely toxic chemicals. Ordinary prescription glasses do
not provide adequate protection. Adequate safety glasses must meet the
requirements of the Practice for Occupational and Educational Eye and
Face Protectionand must be equipped with side shields. Safety glasses
with side shields do not provide adequate protection from splashes,
therefore, when the potential for splash hazard exist other eye protection
and/or face protection must be worn.
Disposable nitrile gloves provide adequate protection against accidental
hand contact with small quantities of most laboratory chemicals.
However, the handling of some acutely toxic chemicals will require
chemical resistant gloves. Lab workers should review the MSDS for the
acutely toxic agents.
7.15.4 Spill and Accident Procedures
If there is a spill involving an extremely hazardous chemical, emergency
responders should be contacted immediately. Building occupants can be
notified of a building evacuation through the activation of a fire alarm pull
station.
Personnel: If lab personnel are exposed to an extremely hazardous
chemical, call fire department immediately. Remove any contaminated
clothing, and IMMEDIATELY flush contaminated skin with water for at
Page 184
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-28
least 15 minutes following any skin contact. For eye exposures,
IMMEDIATELY flush eyes with water for at least 15 minutes. Consult
MSDS for guidance on appropriate first aid. Where medical attention is
required, ensure to bring along MSDS(s) of chemical(s) to aid medical
staff in proper diagnosis and treatment.
7.15.5 Fire and Emergency Evacuation Procedures:
In case of fire or emergency situation and campus police.
Immediately evacuate the building via the nearest exit when the fire
alarm is activated.
If unable to evacuate due to a disability, shelter in the area of rescue /
refuge, typically a stairwell landing, and wait for assistance from drill
volunteers or emergency responders.
Instruct visitors and students to evacuate and assist them in locating the
nearest exit.
Do not use elevators to exit the building during an evacuation as they
may become inoperable.
Carry only those personal belongings that are within the immediate
vicinity.
Close doors to limit the potential spread of smoke and fire.
Terminate all hazardous operations and power off equipment.
Close all hazardous materials containers.
Remain outside of the building until the building is released for reentry.
Do not restrict or impede the evacuation.
Convene in the designated grassy gathering area and await instruction
from emergency responders or drill volunteers. Avoid parking lots.
Report fire alarm deficiencies, (e.g., trouble hearing the alarm) to
facilities personnel for repair.
Notify evacuation drill volunteers or emergency responders of persons
sheltering in the areas of rescue/refuge.
Never assume that an alarm is a “false alarm”. Treat all fire alarm
activations as emergencies. Get out of the building!
Proper consideration of safety in handling and disposal of chemicals
should be observed. The following points must be observed for this
Page 185
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-29
purpose.
All hazardous and toxic chemicals must be identified. Material information
sheets must be acquired and specific warning sign must be shown for
potentially dangerous chemicals.
In transport and transfer of chemicals, proper handling precautions
provided by manufacturer must be observed. All containers for storage
should be chemical resistant, leak free, and with good caps of stoppers.
Gloves and goggles should be used while handling chemical of toxic
nature. It is preferred that at least two persons should be present at all
time while working with chemicals.
Heating flammable solvent may cause fire. Such work must be carried out
in a well-ventilation fume-cupboard.
When your body is contact with the chemical, flush your body with plenty
of fresh water and report the accident to the laboratory technician.
Waste products and disposals must be discharged with proper
neutralization. If the material to be disposed is extremely toxic or
poisonous, the material should be kept in closed container and sent to
appropriate agency for proper disposal.
7.16 ARRANGEMENTS FOR ENSURING HEALTH AND SAFETY OF
WORKERS ENGAGED IN HANDLING OF TOXIC MATERIALS
The significance of Safety & Health in chemicalindustries has been a vital
issue in achieving productivity and quality standard. Following is an effort
for safety and Health of workers working in chemical plant.
Numbers of chemicals are used in plant have specific health hazards in
nature. Following are basic fundamental principles properly underlie all
the workers working in the plant. Occupational health and safety is about
preventing people from being harmed by work or becoming ill from work
by taking adequate precautions and providing a safe and healthy work
environment. Consideration of each should be encouraged before
beginning work as part of the culture of safety within the plant.
Plan ahead. Determine the potential hazards associated with
production.
Page 186
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-30
Minimize exposure to chemicals. Do not allow toxic chemicals to
come in contact with skin. Provide proper ventilation devices to
prevent/minimize airborne.
Do not underestimate hazards or risks. Assume that any mixture
of chemicals will be more toxic than its most toxic component. Treat
all the chemicals as toxic substances.
Be prepared for accidents. Before beginning of any batch reaction,
know what specific steps to take which cause to accident if any
hazardous substance release accidently. Proper follow SOP- Standard
Operating procedure to take batch reaction.
Unit will assess is careful examination of what, at work, could cause harm
to workers. Accidents and ill health. All risks in the workplace must be
identified and assessed for control measures to be put in place.
Follow the five steps of hazard identification will be taken by unit namely;
• Identify the hazards
• Decide who might be harmed and how
• Evaluate the risks and decide on precaution
• Record your findings and implement them
• Review your assessment and update if necessary
Following Information workers should know regarding hazardous
chemicals
We shall ensure that the employee is adequately trained with regard to:
The contents of the hazardous chemical substances
Potential source exposure to chemicals
Potential risks to health caused by exposure
Measures taken by the employer to protect employees against any
risk from exposure
Precautions to be taken by an employee to protect himself against the
health risks associated exposure
Correct use, maintenance of safety equipment, facilities and
engineering controls
Importance of good housekeeping at the workplace and personal
hygiene
Page 187
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-31
Safe working procedures
Procedures to be followed in the event of spillages or leakages
7.17 ON-SITE EMERGENCY PLAN
7.17.1 General
The emergency is an undesirable occurrence of events of such magnitude
and nature that adversely affect business, cause loss of human lives and
property as well as damage to the environment.
Industrial units are vulnerable to various kinds of natural and man-made
emergencies. Examples of Natural disasters are flood, cyclone,
earthquake, lightening etc. and manmade disasters are major fire,
explosion, sudden heavy leakage of toxic/flammable gases, building
collapse, human errors, vehicle crash, sabotage, etc.
It is impossible to forecast the time and nature of emergency, which
might strike the unit. In spite of the fact that every industry is expected
to take steps to assess, minimize and, wherever feasible, eliminate risks,
accidents may still occur. Risks can only be minimized; it can never be
totally eliminated. However, an effective emergency plan helps to
minimize the losses in terms of human lives, plant assets and
environmental damage and to resume the working condition as soon as
possible. In all these steps speed is the essence.
Controlling the emergency will require prompt action by the operating
staff, the staff of various agencies, emergency teams and the outsiders
when called for. Minimizing the effect on people may be achieved by
prompt communication, rescue, evacuation etc., if the situation so
warrant.
7.17.2 Statutory Requirement
The provisions for preparing the on-site emergency plan are explained
below:
The Factories Act, 1948:
Rules 68J (12), Schedule 8 A of the Gujarat Factories Rules 1963
(Amended 1995) providing that the every occupier, who has control of an
industrial activity pertaining to hazardous chemicals shall furnish the On-
Site Emergency Plan detailing how major accidents shall be dealt with
Page 188
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-32
along with explaining specific responsibilities and actions by various
persons.
The Environment (Protection) Act-1986:
Rule 13(1) under the Manufacture, Storage and Import of Hazardous
Chemicals Rule 1989 (amended 1994), rules framed under The
Environment (Protection) Act-1986, indicates that the occupier shall
prepare and keep up-to-date an on-site emergency plan containing
details specified in schedule II and detailing responsibilities and actions
by different person and agencies.
Chemical Accidents (Emergency Planning, Preparedness and
Response) Rule, 1996
Under these rules, framed under The Environment (Protection) Act-1986,
the state government has constituted a Local Crisis Group & District Crisis
Group to deal with major chemical accidents and to provide expert
guidance for handling chemical accidents. Further provision is made that
the Major Accident Hazard units have to prepare the on-site emergency
plan and submit the plan to the crisis groups. The local emergency plan
will dovetail with the District off-site emergency plan.
7.17.3 Preparedness of On–Site Emergency Plan
The On-site Emergency Plan describes planning, preparation and training
for on-site action in the event of emergency.
For On-Site Emergency Plan Advance planning and proper training of
each employee‟s into the emergency function is very essential to make
emergency control measure more effective. It is not possible to eliminate
emergency but is definitely possible to control them. The scope of onsite
emergency plan is to prepare for activate the emergency time activities,
to controlled and contained within the shortest time if emergency arise
after failure of our pre-emergency control measures. Following stage
activities are consider for the purpose, as they are co-related and provide
better points for emergency preparedness
7.17.4 Emergency Time Activities
It is not possible to include and discuss every action, which should be
taken first during emergency. It is also not possible to describe entire
Page 189
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-33
actions on emergency situation. The basic principle of handling
emergency, that may be relied upon, who have the knowledge and
experience to assess the situation and give direction as per the objectives
as quickly as possible. Sometimes, it is a natural gift and it is an art by
heart. However, the aim is to control the situation by safest way in a
limited time within existing available resources. Further, it should be
handle with such a care that minimum loss of life, property and
environment. In short, the objective of the plan should be successfully
complied with.
7.17.5 Sequential actions during emergency
7.17.5.1 Incident
There are possibilities of occurrences of various types of the accidents or
mishaps in the factory premises or around the factory. Most of the
occurrences will be of minor nature, while few occurrences may be of
major type. If the factory is fortunate enough, there may not be a single
incident or mishap during its lifespan. However, when any incident
occurs, it cannot be distinguished immediately whether it is minor or
major, the subsequent development, or gravity of situation, or
seriousness of such occurrence is required safe handling irrespective of
its nature, if it cannot be controlled.
It should be general practice that whenever any person notices the
accident/fire/explosion/mishap at the site, he should immediately shout
“FIRE”, “FIRE” or “HELP”, “HELP” and such message should reach to the
Supervisor/Shift Officer/Senior Person of the unit.
7.17.5.2 Responding Actions
The root cause of occurrence should be removed immediately if possible.
Similarly, if any incident takes place in the premises, using available
resources, within the factory as well as nearby, to their optimum, it
should be so responded that the incident is contained immediately before
spreading. If the incident looks severe and could not be controlled by
simple efforts, the Shift Officer or Senior Personnel should rush to the
place and make every effort to control the incident using various
resources at the site. Further, if the incident is uncontrollable even using
Page 190
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-34
own resources, he should immediately call for additional helps form
outside resources such as Mutual Aiders, Fire Brigade, etc. He should act
the Incident Controller and immediately start the following actions:
Sound the siren or ring the emergency bell.
Take continuous responding actions with the use of other helps.
Call the higher authorities and Site Main Controller.
7.17.5.3 Site Crisis
On arrival, the Site Main Controller (Factory Manager) will take the
charge of Incident site. He will immediately assess the situation and
manage the Situation as site crisis. The incident can be said as on-site-
emergency.
Activate the emergency teams like fire team, first aid team,
communication.
Team, rescue team, essential workers, key personnel, etc.
The Emergency control room will communicate the messages
regarding
Prevailing situation to requisite authorities, outside resources,
agencies, neighbors, etc.
Non-essential person will rush to safe shelter and roll call will be
taken.
He will order to shut down the plant, if situation so warrants.
Now, if the situation is uncontrollable by the management of the unit,
he will immediately call for the local crisis group to handle the
situation.
7.17.5.4 Messages
While conveying the messages regarding the incident, the following
details should be incorporated.
Brief description of incident
Type of help required & direction
Chemical involved & Quantity
Action immediately taken
Development of the incident
Page 191
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-35
7.17.5.5 Discipline
The plan assuming certain discipline at site during emergency, as follows;
Do not get panicky.
Do not approach the site of incident as an observer.
Do not engage telephone unnecessary.
Do not move about unnecessary.
Do not approach unnecessarily for information or more inquiry.
Arrange medical first aid care to the injured.
Do not allow unnecessary crowd nearby incident.
7.17.5.6 Emergency Actions
On receiving information, the Emergency Control Centre will activate
and urgently establish the contact with the required persons, agencies
and authorities.
The essential workers, responsible to carry out certain specific
functions, will have to start work immediately.
The non-essential workers should go to the assembly center.
The cordoning the incident area will be ensured.
The water should be sprayed on the flammable storage tank, even if
not caught under fire.
The experts for the responding to emergency situation will be
consulted, if required. vii. Authentic information for incident will be
provided to Press/Public by the authorized officer only.
Removal the flammable, dangerous material, cylinders, etc. should be
arranged along with isolation from fire.
The trapped personnel, if any, in incident will be rescued.
All assistance will be provided to the Fire Brigade to control spreading
of fire.
Any remotest possibility of re-ignition or explosion should be looked
into and controlled.
7.17.5.7 Shut Down Procedure
It is advisable to shut down the plant for safety, if situation so warrants.
The safe shut down procedure should be adopted during such
eventualities. First of all, main electrical supply should be cut-off/switch-
Page 192
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-36
off. Similarly, the pipelines supplying flammable gas, liquid or chemicals
should be immediately shut-off by valves and should be isolated from the
process line. The water shower on flammable storage tank, if installed, to
be started to keep it in cool condition, if tank is in vicinity of fire. The
shutdown procedure should be laid down in the process manual, which
will be useful during such emergency.
7.17.5.8 Post Emergency Activities
Post emergency activities comprise of step taken after the emergency is
over. To Find out the reason of emergency after the investigation and
suggest the preventive measure. For the investigation different level
personnel from different dept., are selected and an investigation team is
formed. The following steps are taken after the emergency is over.
Collection of record
Conducting the investigation/inquiry committee with the suggestion
for preventive measure
Making the insurance claim and necessary procedure
Implementation of the recommendation of inquiry reports
Rehabilitation of the affected persons within the plant and outside the
plant. They are in continuous touch with the hospitalized person and
give status report of them to the top management.
Restart the plant if shut down happened
7.17.6 Training, rehearsal and records
7.17.6.1 Need of Training & Rehearsal
Extensive experience in the chemical industry with on-site emergency
planning has proved the need and value of rehearsal of emergency
procedures. When finalized, the major emergency procedure should be
set down in clear, concise terms and everyone on-site made aware of
them, particularly the key personnel and essential workers. They should
then be put to the test. This may best be done by arranging a series of
preliminary exercises to test certain system, including the alternative
arrangements in cases of failure. The speed of Mobilization of the factory
emergency teams, search & rescue and treatment of casualties,
emergency isolation and shut down procedures. These exercises will help
Page 193
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-37
to define the procedures by identifying deficiencies and difficulties. At this
stage, more exercises that are elaborate can be planned to involve the
outside services who should be closely involved at the planning stage.
Each exercise should at various positions, e.g. At the scene, the
emergency control center, work entrance; assemble points or casualty
reception area. A following round-the-table discussion between
managers, senior officers of the emergency services, factory inspectorate
and observers will further assist to develop practical and effective
procedures. It is recommended that a major emergency exercises should
be conducted at regular intervals with arrangement with the outside
agencies.
There is much practical advantage to be gained in situations where
people required working together in handling emergencies are already
known to each other. Close local liaison and combined exercises are
invaluable in this respect. At the same time, familiarization visits to works
especially of the fire service personnel, will help enormously to acquaint
with the works layout and the nature of potential hazards. Emergency
plans need to be tested when first devised and thereafter to be rehearsed
at suitable intervals. Their normal training and experience in day-to-day
operation will generally qualify individual personnel with duties under the
plans. Some duties, however, such as firefighting for the works fire team
are not routine and special training will be needed. In addition, key
personnel will need training in their emergency roles both individually and
as a team. For the professional emergency services the general training
may be taken for granted.
Rehearsals or exercises are important for all personnel likely to be
involved in an incident on or off-site because, for example:
They familiarize on-site personnel with their roles, equipment and the
details of the plans.
They allow the professional emergency services to test their parts of
the plan and the co-ordination of all the different organizations. They
also familiarize them with the special hazards.
Page 194
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-38
They prove the current accuracy of the details of the plan [phone no.,
etc.] and the availability of special equipment.
They give experience and build confidence in the team members. In
the initial shock and confusion of a real incident, ability to fall back on
established initial actions is invaluable.
Employers should ensure that the on-site emergency procedures for such
process plants, storage facility, etc. are tested regularly and that all
employees receive initial and refresher training. Exercises should be
arranged to test each part of the emergency plan on each plant, state by
state, starting with first immediate action. Emergency isolation and shut
down should be rehearsed from the emergency services, the emergency
planning officer [EPO] should be invited to attend on-site exercise, and
familiarization visits should be encouraged. The complete plan for each
site including both on-site and off-site components should be tested.
Many organizations now use tabletop exercises to test emergency plans.
These are very cost effective because they do not interrupt the day-to-
day running of the plant and because many events can be catered for in
one session. However, they are theoretical in nature and should be
communications and key personnel working from the locations they would
use in an emergency. It is, of course, essential that the exercises be
carefully prepared, the results analyzed and the lessons learned,
circulated and discussed. Full-scale practices involving all concerned that
all reasonably practicable measures have been taken. After each
rehearsal of practice, the plan should be reviewed to take account of any
shortcomings highlighted by the exercise. In addition, its effectiveness
should be reviewed every time it is used to with a real emergency. Fix
your periodicity to carry out table tope exercises and real rehearsal of
this on-site and off-site emergency plan, including mutual aid agencies
and mention here in this chapter.
7.18 OFF-SITE EMERGENCY PLAN
7.18.1 Need of Off-Site Emergency Plan
A major accident, major emergency and disaster may affect areas outside
the works. Explosions can scatter debris over wide areas, the effects of
Page 195
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-39
blast can cover considerable distances wild can spread burning brands of
toxic gases. In some cases, e.g., as the result of an explosion, outside
damage will be immediate and part of the available resources of the
Emergency Services may need to be developed in the affected area. In
any event, the possibility of further damage any remain, e.g., as the
result of further explosion or by the effect of wind spreading burning
brands of hazardous materials. Perhaps the most significant risk to
outside areas is that associated with a large release of toxic vapors.
Management will usually need expert advice in drawing up plans so that if
such a release occurs, they will be able to collaborate with Emergency
services to estimate as far as practicable which downwind areas are at
the risk. It may be necessary to prepare in advance simple charts or
tables relating the likely spread of the vapor cloud taking into account its
expected buoyancy, the local topography and all possible conditions
during the time of release. It may also be desirable to install instruments
indicating wind speed and direction. Advice on all these matters can be
obtained from the Meteorological office.
The fact of the major emergency and the spread or potential spread of its
effects outside the work may require that road and rail traffic past the
works has to be halted or diverted. The police, taking account of the
advice of the Site Main Controller. They will also, where necessary, inform
the Rail. The problem is usually exacerbated by members of the public
driving to the scene to view the situation. The net effect can be cause
problems to those who have a real need to get to the works, including the
key personnel who will have been called out. Liaison at local level will
help to devise a means whereby key personnel can readily identify
themselves to the police controllers. The use of a windscreen sticker of
other identify label may be advantageous.
All emergency plans should consider the possible effects of incidents on
the neighboring population and the remedial measures should be devised
in consultation with the local authority and emergency services. The off-
site emergency plan should be based on those events identified by the
manufacturer, which could affect people and the environment outside his
Page 196
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-40
premises. The manufacturer should provide the necessary information on
the nature, extent and likely effects of such incidents. The plan should
cater in detail for those events identified as being the most likely but
should be sufficiently flexible to allow the remedial measures to be able
to be extended and increased to deal with extremely adverse
combinations of circumstances and consequences. The factory
inspectorate and the local authority should be satisfied that the
information provided is sufficiently detailed unambiguous and clearly
stated to be comprehensible and for the dangers to be provided. Several
different planned responses may be necessary at a single site depending
on the size and characteristics of the incidents.
Thus in brief the two main purposes of the off-site emergency plant are:
To provide the local/district authorities, police, fire brigade, doctors,
surrounding industries and the public the basic information of risk
and environmental impact assessment and to appraise them of the
consequences and the protection/ prevention measures and control
plans and to seek their help to communicate with the public in case
of a major emergency. This information from every industry enable
the District Authorities to educate the public that what can go wrong
the measures taken to train them of their individual role in case of
emergency, and
To assist the District Authorities for preparing the off-site emergency
(Contingent) plan for the district or particular area and organize
rehearsals from time to time and initiate corrective action bases on
the lessons learnt.
In charge of the on-site Emergency plan of the Site Main Controller
will keep liaison, for this purpose, with the District Authorities.
7.18.2 Role of the Factory Management
The on-site and off-site plans should dovetail so that the emergency
services are summoned at the appropriate time and are provided with
accurate information and a correct assessment of the situation. The
responsibility for this should be with the Site Main Controller. The site
main controller will provide a copy of this on-site and off-site emergency
Page 197
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-41
plans to the District Authorities, the factory inspectorate and the
emergency services so that from information from the various annexure,
such authorities will make their emergency preparedness to formulate
and execute the District/Area off-site Emergency Plan. On their advice,
necessary modifications may also be made to make the plan more
perfected.
7.18.3 Role of the Emergency Co-ordination Office (ECO)
The various emergency services will be co-coordinated by an emergency
co-coordinating officer (ECO) who is likely to be a senior police office, but
depending on the circumstances, could be a senior fire officer. The ECO
will liaise closely with the Site main controller. Again, depending on local
arrangements, for every severe incident with major or prolonged off-site
consequences, the external control may pass to a senior local authority
administrator or even an administrator appointed by the central or state
government. The emergency control Center of the factory or/and any
other control centers may be utilized by the ECO to keep liaison with the
site main controller.
7.18.4 Role of the Local Authority
Generally, the duty to prepare the off-site plan lies with the local
authorities. They may have appointed an Emergency Planning Officer
(EPO) to carry out this duty as part of the EPO‟s role in preparing for a
whole range of different emergencies within the local authority area. The
EPO will need to liaise with the works to obtain the information to provide
the basis for the plan. This liaison will need to be maintained to ensure
that the plan is continually kept up to date. It will be the responsibility of
the EPO to ensure that all those organizations, which will be involved off-
site in handling the emergency, know their role and are able to accept it
by having for example, sufficient staff and appropriate equipment to
cover their particular responsibilities. Rehearsals for off-site plans are
important for the same reasons, as on-site plans will need to be
organized by the EPO.
It will be the duty of the local authority to inform public, road/rail traffic,
news media, etc., while operating off0site plan. It will also announce
Page 198
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-42
public protection measures; termination public awareness system will be
developed. The ILO suggestion of separation distances is useful for
planning (Proposed development) by the local authorities.
7.18.5 Role of the Fire Authorities
The control of a fire is normally the responsibility of the senior fire
brigade officer who would take over the handling of the fire from the
incident controller on arrival at the site. The senior fire Brigade Officer
may also have a similar responsibility for other events, such as
explosions and toxic releases. Fire authorities having major hazards
works in their area should have familiarized themselves with the location
on site of all stores of flammable materials, water and foam supply
points, and fire-fighting equipment. They may well have been involved in
on-site emergency rehearsals both as participants and, on occasion, as
observers of exercises involving only site personnel.
7.18.6 Role of the Police and Evacuation Authorities
The police normally assume the overall control of an emergency, with a
senior officer designated as emergency co-coordinating officer. Formal
duties of the police during an emergency include protecting life and
property and controlling traffic movements. The functions include
controlling by standers, evacuating the public, identifying the dead and
dealing with casualties, and informing relatives of dead or injured.
There may be separate authorities, agencies to carry out evacuation and
transportation work.
For evacuation, the following criteria are useful:
An early decision will be required in many cases on the advice to be given
to people living within range of the accident in particular whether they
should be evacuated or told to go indoors. In the later case, the decision
can regularly be reviewed in the event of an escalation of the incident.
Consideration of evacuation may include the following factors:
In case of major fire but without explosion risk (e.g. on oil storage tank),
only houses close to the fire are likely to need evacuation. Although a
severe smoke hazard may require this to be reviewed periodically.
Page 199
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-43
If a fire is escalating and in turn threatening a store of hazardous
material, if might be necessary to evacuate people nearby, but only if
there is time; if insufficient time exists, people should be advised to stay
indoors and shield themselves from the fire. This later case particularly
applies if the installation at risk could produce a fireball with very severe
thermal radiation.
For releases or potential releases of toxic materials, limited evacuation
may be appropriate downwind if there is time. The decision would depend
party on the type of housing at risk Conventional housing of solid
construction with windows closed offers substantial protection from the
effects of a toxic cloud, while shanty houses which can exist close to
factories, particularly in developing countries, offer little or no protection.
The major difference between releases of toxic gas is that toxic clouds
are generally hazardous down greater distances. Also a toxic cloud
drifting at, say, 300 meters per minute covers a large area or land very
quickly. Any consideration of evacuation must take this into account.
The shelters for evacuated persons and their welfare shall also be
arranged.
7.18.7 Role of the Health Authorities
Health authorities, including doctors, surgeons, hospitals, ambulances
and so on, have a vital part to play following a major accident, and they
should form an integral part of any emergency plan.
For major fires, injuries will be the result of the effects of thermal
radiation to a varying degree, and the knowledge and experience to
handle this in extreme cases may be generally available in most
hospitals. For major toxic releases, the effects vary according to the
chemical in question, and it is important for health authorities who might
be involved in dealing with the aftermath of a toxic release to be familiar
with the treatment appropriate to such require medical equipment and
facilities additional to those available locally, and a medical mutual aid
scheme should exist to enable the assistance of neighboring authorities to
be obtained in the event of an emergency.
Page 200
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-44
7.18.8 Role of the Mutual Aid Agencies
Various type of mutual aid available from the surrounding factories and
other agencies should also be utilized, as per need, as a part of the on-
site and off-site emergency plan.
7.18.9 Role of the factory Inspectorate
The factory inspectors are likely to want to satisfy themselves that the
organization responsible for producing the off-site plan has made
adequate arrangements for handling emergencies for all types, including
major emergencies. They may wish to see well-documented procedures
and evidence of exercises undertaken to test the plan. In the event of an
accident, the factory inspector will assist the District Emergency Authority
for information and help in getting mutual aid from surrounding factories.
In the aftermath, factory inspectors may wish to ensure that the affected
areas are rehabilitated safely. In addition, they may require items of plan
and equipment essential for any subsequent investigation to be
impounded for expert analysis, and may also want to interview witness as
soon as practicable.
In the state of Gujarat, District Emergency Control (Contingent) plans
have been formulated, and some rehearsed, for some districts and the
copies are available from the local factory inspectorate. All hazardous
factories needing on-site and off-site emergency plans are advised to
keep constant liaison with them.
The communication system between the factory and various above role-
playing authorities must be effective. Ineffective public telephone system
will not be useful in emergencies. Therefore, it should be improved and
other effective system like duplex (two way) radio telephone, wireless
set, hot line, emergency lead vehicles, etc., should be maintained
between important organizations.
7.19 DISASTER MANAGEMENT PLAN/EMERGENCY MANAGEMENT PLAN
Balaji plant at Moti Bhoyan is an expansion project. The „Risk
Assessment‟ report has been prepared based on the risks and hazards
identification of the plant. Balaji is a medial scale plant employing only 55
personnel (after expansion) However, basic requirement of emergency
Page 201
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-45
planning and subsequent actions (Incase of emergency) will be same.
Balaji has to delegate responsibilities to various employees as per plant
personnel set up. The EMP proposed is for guidance for preparing EMP as
per plant set up and submitting to authorities for approval, mock drill and
further improvement.
Admittedly, the best way of managing an emergency situation lies in its
prevention. This is sought to be achieved by good engineering design and
construction, use of latest technology and sophisticated equipment,
reliable safety systems, careful personnel selection and training.
Adequate knowledge of dangers and appropriate safety training ensures
that all hazardous situations will be handled without any panic and
controlled by rational actions. This is supplemented with repeated
practices through real time exercises (mock drills) and noting the weak
spots and taking needful corrective actions. Nevertheless, it is recognized
that despite our best efforts, things can go wrong. Therefore, it is
essential to plan and develop the support system, required in case an
emergency arises.
7.19.1 Objectives
The Emergency Management Plan (EMP) is developed to make the best
possible use of the resources available at Balaji and the nearby agencies
to provide help/assistance in case of an emergency in the plant. The
activities will include:
Rescue the victims and give them the necessary medical attention in
the shortest possible time.
Safeguard other person (evacuate them to a safer place).
Contain the incident and control it with minimum damage to human
and life and property.
Provide necessary information to families/relatives of affected persons,
outside agencies including media and statutory bodies.
7.19.2 Emergency Management Plan
The organizational set-up necessary for chain of commands during
emergency situation in the plant is as given below.
Page 202
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-46
In charge (Operations) of the Balaji is the Chief Emergency Coordinator
and he shall be the main guiding person directing the emergency
operations. He shall be assisted by:
Chief Site Coordinator. In charge (Production)
Coordinate and direct all the activities from
Emergency site.
In absence ofIncharge (Prod.), next In charge
(Prod.) will act as Chief Site Coordinator.
In charge-Maintenance
Coordinate all the maintenance activities from the
EmergencyControlCenter (ECC).
In absence of Incharge (Maint.), next personwill
act as Chief maintenance Coordinator.
Chief Service Coordinator Incharge (HR)
Coordinate with local administration take care of
transport, medical,canteen arrangements, and
evacuation of people if required.
In absence of Incharge(HR), next person (P&A)
will act as Chief Service Coordinator.
Chief Material Coordinator Incharge (Material)
In absence of Incharge (Material), next person
(Material) will act as Material Coordinator.
Fire & Safety Controller Incharge (F&S)
In absence of Incharge (F&S), Supervisor. (F & S)
will act as Fire & Safety Controller and also for
first aid.
Two “Assembly Points” will be identified (based on wind direction and
away from hazardous areas) and duly marked.
Format for Telephone Numbers of the Authorities:
DISASTER MANAGEMENT
KEY PERSONNEL - OFFSITE EMERGENCY RESPONSE
OFFICERS PLACE OFFICE RES.
DIVISIONAL COMMISSIONER
Page 203
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-47
COLLECTOR & DISTRICT MAGISTRATE
CITY MAGISTRATE
DY.I.G. OF POLICE
SUPDT.OF POLICE
POLICE CONTROL ROOM (CITY)
POLICE STATION KALOL INDUSTRIAL
AREA
DY CHIEF INSPECTOR OF FACTORIES
GUJARAT POLLUTION CONTROL BOARD
FIRE BRIGADE, KALOL
HOME GUARD
NEAREST CIVIL HOSPITAL (CHIEF
MEDICAL SUPTD)
7.19.3 Responsibilities & Role of Key Personnel
Over all In-charge –Incharge (Operation)
On getting the information about emergency from Incharge (Prod.) rush
to incident site/ECC. Assess the overall situation and provide guidance in
critical decision-making.
Chief Site Coordinator- Manager (Prod.)
On getting the information about emergency from Supervisor Plant,
inform over all In-charge P (O).
Rush to the emergency site to assess the situation and decide to:
o Declare emergency based on amount/extent of hazards and
water/air analysis (toxic/flammable material release) and advise
Incharge (F&S) for sounding emergency siren.
o Review if plant shutting down is required to contain / control the
hazard.
o Review, evacuation from affected areas and sending the affected
person to a safe place.
o Advise Incident Controller and other key personnel to take
necessary action.
o He will interact with Chief Service Coordinator and advise him on
possible effects on areas inside and outside the factory to initiate
Off- Site Emergency Response Plan.
Page 204
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-48
o Remain in touch with Overall in-charge (P -O) and inform about
the situation & actions being taken and seek his advice for the
critical decisions.
Chief Maintenance Coordinator- Incharge (Maintenance)
After getting information about emergency from manager concerned
Plant. Inform all concerned personnel to be on alert.
Rush to the ECC, assess the situation and facilitate Chief Site
Coordinator-Incharge (Prod.), Maintenance support needed to tackle
the emergency.
Facilitate elect. isolation of the affected area, if required through
Supervisor (E&I)
Facilitate lighting arrangements at (a) affected locations and (b)
Assembly points if required through Supervisor (E&I)
Facilitate work-shop facilities with adequate manpower if required
through supervisor (Maintenance). Remain in touch with Chief Site
Controller.
Chief Service Coordinator - Incharge (HR)
On getting information from the Medical Coordinator rush to the
Emergency Control Centre.
Assess the situation in consultation with Chief Site Coordinator and
Incident Controller and ensure that casualties get adequate transport
/ medical help.
Make arrangement to shift all the persons to the safest place if called
for.
Assess 'Law and Order' situation.
Inform local authorities about the severity of situation in close co-
ordination with Chief site Coordinator and in consultation with Overall
In-charge -P (O).
Inform the District Authority/local police station in case their help is
required for evacuation of personnel/preserving law and order.
Evacuation of adjoining areas and villages, if required.
Remain in touch with overall In-charge - P (O) and seek his advice for
the critical decisions.
Page 205
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-49
Chief Material Coordinator-Incharge (Materials)
Rush to the emergency control centre on receipt of the message from
Chief Service Coordinator/on hearing the emergency siren and inform
Supervisor. (Store) about the emergency.
Get the stores opened for requirement of the Firefighting/safety and
other materials, which may be required during emergency.
Assess the situation in consultation with Chief site coordinator &
incident controller for any material requirement /help at the affected
site.
He will be responsible for the arrangements of trucks for movement of
bulk material if required.
Remain in touch with Chief site coordinator, Incident controller, and
Chief maintenance coordinator.
Incident Controller Concerned Plant –SupervisorConcerned Plant
o Rush to the site of emergency after getting information from Shift In-
charge assesses the situation and immediately inform Incharge –
Prod.
Take over charge from shift in charge.
Ensure that persons working in the area are safe and isolate
source of toxic release if possible.
Advise and assist Incharge (F&S) for providing water curtains to
contain toxic release with in the plant battery.
Remain in touch with Chief Site Controller and other concerned
officers.
Coordinate with Chief Maintenance / Chief Material coordinators
forassistance required at site.
Depending upon the severity of incident, ensure that adequate
emergency services like Medical/ Laboratory/ Mechanical/ Electrical
etc.are summoned.
Preservation of evidence as far as possible without affecting the
operation of emergency procedures to facilitate any subsequent
inquiries into the causes and circumstances, which led to the
emergency.
Page 206
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-50
Shift In charge (Concerned Plant):
Immediately proceed to the site of emergency and assess the
situation:
o Emergency Control Room (with name and location of emergency)
During odd hours/till arrival of Fire shift I/C should act as chief fire
coordinator.
Initiate the shutting down operations for controlling the hazard if
unavoidable.
Cordon off the area and do not allow any body to enter the affected
area without respiratory protection (In case of toxic gas leakage).
Direct rescue operations with the help of fire and safety staff.
Have regard to the need for preserving evidence that could facilitate
subsequent inquiry.
Advise Supervisor of the plant to take roll call and account for missing
personnel.
Hand over charge of the operation to thesupervisor when he arrives at
site.
Ensure service agencies like Electrical, mechanical, instrumentation
are mobilized to handle the emergencies.
Security Officer Vehicle Control and Security Personnel
Deployment at the locations
Rush to the spot of emergency on getting information from Security
Officer on duty and inform Incharge (HR) about emergency.
Arrange one emergency vehicle immediately for ECC.
Keep in touch with Chief Service Coordinator, Chief Site Coordinator
and Incharge (F&S).
He will act as a special rescue Coordinator at the time of evacuation
of employees and others if required.
Alerts complete staff under his control and make it available at a
known point, as per the guidance of Chief Site Coordinator/Chief
Service Coordinator.
Page 207
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-51
Anticipate and arrange vehicles required at emergency site in
consultation with Incharge (F&S) and Chief Site Coordinator and Chief
Service Coordinator.
On request send vehicles for getting plant personnel/fire personnel
required for emergency.
Arrange vehicle in consultation with Medical Coordinator/Chief Service
Coordinator for shifting injured to Kalol hospital.
During emergency arrange for opening of relevant gates/barriers
foreasy movement of vehicles. Security Guards should be posted on
these gates/barriers to prevent unauthorized entry.
Arrange transport and temporary shelters for evacuated personnel
and inform the relatives of the affected personnel if required.
Fire & Safety Controller-Incharge (F&S)
Rush to the spot of emergency after getting information from ECC and
inform to Supervisor (F&S).
Direct rescue operations under the guidance of Chief Site
Coordinator/Incident controller if required.
Ask additional help from C.S.O. for cordoning off the area and advise
fire personnel for rescue/firefighting if required.
Arrange to provide water curtains, water monitors, at affected
locations if required.
Organize and supervise fire-fighting operations if called or.
Provide necessary respiratory equipment to plant personnel for
emergency use.
Advise Chief Site Coordinator to arrange additional help Mutual aid
group/neighboring industries if required.
Give safety precautions to the personnel at rescue work.
Fire Control Room In-Charge
On receiving emergency message from the Incharge (F&S)/on hearing
siren, rush to ECC and take charge of Fire Control Centre from the fire
operator/fire supervisor.
Assess the situation and Call fire staff from fire barrack.
Immediately rush fire crew to emergency spot.
Page 208
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-52
Inform Medical Centre for sending ambulance to emergency site.
Fire Supervisor should also ensure the following:
Supervisor to look for the wind direction and cordon off the area.
Use water monitors/hydrants/water curtains in consultation with
incident/Chief site controller.
Provide respiratory equipment‟s to the plant personnel.
In case of toxic spillage at site, put foam (HAZMAT)/sand on the
spillage area.
Remain in touch with Incharge (F&S).
Chief Site Co-coordinator will instruct Fire Control Room In-charge for
operation of “All Clear Siren” when the disaster is contained/
controlled.
However, regular testing of siren & emergency buzzer plant control
rooms for 2 minutes on every Monday at 13.00 hrs. is being done.All
clear siren will sound for 2 minutes with a continuous sound.
7.19.4 Post Emergency Recovery
The post-emergency procedures discussed briefly below are designed to
successfully manage the damage/losses of an emergency event. The
focus of these procedures is to move the plant back into normal operating
mode as quickly and efficiently as possible.
Immediately after the “ALL CLEAR” an emergency meeting will be held
in emergency control centre to assess the loss both for men & materials,
where in following will be present with attendance records, details of
injured, outside situation and preparation of press release (if felt
necessary)
Overall In charge
Chief Site Coordinator
Chief Maintenance Coordinator
Chief Service Coordinator
Incident Controller
Material Coordinator
Security
Fire & Safety Controller
Page 209
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-53
7.19.5 Accident Investigation
a. As soon as possible after the emergency is over and plant
operation has become normal, the investigation and analysis is
to be carried out to determine the cause of the event.
b. Representatives from various disciplines will be members of
the investigation and analysis team.
c. The areas of the events are to be sealed off so that tempering
or alterations of the physical evidence are not likely to occur.
d. Key components are to be photographed and logged with time,
place, direction etc.
e. Statements are to be taken from those who were involved with
the operation or who witnessed the event.
7.19.6 Damage Assessment
This phase of recovery establishes the quantum of replacement
machinery considered necessary for bringing back plant to normal
operation; property and personnel losses accounted and culminates in a
list of necessary repair, replacement and construction work.
Insurance companies will be informed of the damage and requested to
pay the compensation as per claim.
7.19.7 Cleanup and Restoration
This phase will only begin once the investigation is complete. Reporting
documentations are to be prepared and forwarded to appropriate
authorities. Repair, clean up and restoration work to begin.
Page 210
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-54
B) Social Impact Assessment
No any negative Social Impact envisaged from the proposed expansion
project activities. In fact, positive Social impact was prevail during the
study of Sociological data because, necessity for unskilled and skilled
person will increase for proposed activities and unit will accord
opportunity first prior to the local people. There will be no R & R due to
proposed activities.
C) Public Consultation
The public hearing was held on 09.05.2016 on the basis of the draft
EIA/EMP incorporating the Terms of References. Report is finalized after
incorporating the comments and suggestions by the public during pubic
consultation is given below.
Table 7.13 Points raised during public hearing
Sr.
No.
Name and
Address
Point Represented Reply from the Project
Proponent
1. Thakor
Chunthaji
Ramsang,
Moti Bhoyan
At present how much
quantity of formaldehyde is
producing?
You have Environment
clearance for existing unit.
The date of submission of
compliance report for last
three years.
Environment clearance is
obtained for the existing
unit on 24/08/2010,
whereas Consent No.
AWH.71755, Dt.
13/09/2015 was obtained
from GPCB. That means
Industry have operated the
plant from year 2010-July
2012 without obtain GPCB
consent? Submit the
details of How many
Products were produced
and how much the quantity
of each product during this
time (Aug‟10-July‟15).
Provide validity of
Environmental Clearance
obtained for Existing unit.
Representative of the
company inform that
currently unit producing
5000 MT/Month (max)
Formaldehyde.
We are regularly submitting
compliances report of EC to
Regional office, MoEF&CC,
Bhopal at interval of six
months.
We have renewed our
consent to operate on
13.09.2015 and we have
obtained consent to operate
with same capacity from
GPCB. During this period we
were produced same product
Formaldehyde with max
production capacity of 5000
MT/Month.
We have obtained EC on
24/08/2010 with validity of 5
years for its implementation.
During this time, we have
established our plant and
obtained CTE & CTO & not
violate EC Condition.
Page 211
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-55
Provide the details of tree
plantation after expansion.
Provide the area of block
No. 1398.how much area
is covered for existing
construction
When N.A is obtained for
Block No. 1398?
Any permission is obtained
from the Authority like
Gram Panchayat-Moti
Bhoyan, Taluka Panchayat
Jilla Panchayat –
Gandhinagar or Collector
of Gandhinagar for
proposed expansion?
Which type of work done
for social welfare activities
in last three years? How
much fund expanse for this
activity during three years?
Give details of how many
local people get
employment for existing
unit? Give details of each
local employment with
their address.
How you meet your water
requirement for Existing
plant?
Thol lake Bird Sanctuary is
3 km away from the
project site which is not
included in study and this
is very serious matter.
How much solid waste is
generated per month and
where it is dispose? Give
details.
Is there ETP at present
operation? If yes, then
provide its capacity.
We have around 150 trees
planted in our premises
which include Palm tree,
Jasud, Madhukamini,
Chandani, exsora pink,
exsora red etc.
We have 4281 Sqm net in
Block No. 1398. Around
60%of area is covered under
construction.
We have obtained N.A
permission for block no.
1398 dt: 20/12/2004.
We will obtain required
permissions for proposed
expansion from Authority
like Gram Panchayat-Moti
Bhoyan, Taluka Panchayat
Jilla Panchayat –
Gandhinagar or Collector of
Gandhinagar before start our
project activity.
Being a small unit, some
CSR activities carried out by
us and committed to more
focus on CSR work in
upcoming period.
Unit is providing
employment around 40
employees those who are
coming from Gandhinagar
and Ahmadabad district.
Summary of name of
employee and there village
is attach herewith.
Currently we are fulfilling our
water demand from water
supply of Narmada Nigam.
Unit is not using any fuel in
the plant and achieves Zero
discharge hence major
environmental impact is
localized. There is no any
adverse impact envisage on
Bird of Thol lake hence detail
impact study is not carried
out.
Currently we are disposed of
industrial solid waste at
Saurashtra Environment
Project Pvt. Ltd Bhachau.
There is no waste water
generation from process only
waste water generate from
Cooling tower and Boiling, it
it will be evaporate to
achieve zero discharge.
Hence ETP is not required in
our unit.
Page 212
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 7-56
How many Showcase
Notices, Closure Notices
etc. obtain for existing unit
under Air Act-1981& EPA-
1986? Give the reasons of
notices.
Still we have received three
notices from GPCB one is dt:
7/09/2011, second:
05/12/2012 & third one on
dt: 06/02/2013. We have
immediately take actions to
comply non-compliance of
notices.
Page 213
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 8-1
Chapter-8
Project Benefits
8.1 Introduction
All industrial projects have positive and negative effects on nearby
locations due to its operational activities. This chapter mainly highlights
and focuses on those points which will become beneficial to the
surrounding area or community in terms of infrastructural development,
social development, boosting employment and other tangible benefits due
to upcoming or proposed activities.
The proposed expansion project has a potential for employment of
skilled, semi-skilled and unskilled employees during construction phase as
well as operational phase. Followings are the benefits that surrounding
area will get due to the expansion activities:
8.2 Improvements in the physical infrastructure including technical
facility aspects:
Physical infrastructure includes infrastructural & technological facilities of
the project, necessary for the operation. Unit is already in existence and
has well developed physical infrastructural facilities; however, due to the
expansion of the project, minor construction work, modification of plant
building will be done. Thus, following infrastructural facilities will be
developed due to proposed expansion:
Improvement in local amenities facilities
Improvement in road link facilities as transportation through truck
and other vehicles will increased due to expansion of project
Improvement in local civilization
Increase income of local population
Increase requirement of man power
8.3 Improvement in Social Infrastructure:
Due to proposed expansion activity, Social Infrastructure will improve by
means of Civilization, Vocational Training and Basic Amenities.
Page 214
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 8-2
Civilization:
Due to expansion; employment and other infrastructural facilities will
boost up income of surrounding people and improve quality of life. This
will indirectly boost up the civilization of the surrounding people.
Vocational Training:
Moreover, unit will provide vocational training opportunity to the
surrounding people and greed for employment will motivate the
education activities that will lead the change in life style of the
surrounding and affected people hence social infrastructure will be
improved.
Basic Amenities:
Better education facilities, proper health care, road, infrastructure and
drinking water facilities are basic social amenities for better living
standard of any human being which will further augment the above
amenities either by providing or by improving the facilities in the area,
which will help in uplifting the living standards of local communities.
8.4 Employment potential
Due to the expansion project, infrastructure will get improved and
enhance the employment opportunity for both skilled and unskilled
person from nearby area. Direct employment as well as indirect
employment due to ancillary services will be given to the local people.
Therefore, the socio-economic status of the local people will get
improved. The details of employment opportunity during Construction
and Operation phase are discussed underneath:
Increased employment opportunity in Construction phase:
Construction work and commissioning will require manpower and
resources. The unit has proposed to employ local contractual labor force
for this phase. Hence with the inception, project may lead to slight
growth in the social status & improvement of the quality of life in the
surrounding area.
Increased employment opportunity in Operation phase:
After expansion, total nos. of employee will be 55 nos. This will ultimately
boost the employment opportunity.
Page 215
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 8-3
8.5 Other tangible benefits:
Moreover, unit will provide vocational training opportunity to the
surrounding people that will provide educational help & increase the
knowledge of the surrounding people.
Page 216
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 9-1
Chapter-9
Environmental Cost Benefit Analysis
9.0 ENVIRONMENTAL COST BENEFIT ANALYSIS
As per EIA Notification 2006, this Chapter of the ‘Environmental Cost
Benefit Analysis’ is applicable only if it is recommended at the Scoping
stage. As per the ToR points issued by MoEF&CC, New Delhi vide File No.
J-11011/67/2015-IA II (I) & ToR Letter dated 22nd June, 2015, the
Environmental Cost Benefit Analysis is not applicable and hence has not
been prepared.
Page 217
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-1
Chapter-10
Environment Management Plan
10.1 INTRODUCTION
Assessment of environmental and social impacts arising due to
implementation of the proposed project activities is at the technical heart
of EIA process. An equally essential element of this process is to develop
measures to eliminate, offset or reduce impacts to acceptable levels
during implementation and operation of projects. The integration of such
measures into project implementation and operation is supported by
clearly defining the environmental requirements within an Environmental
Management Plan (EMP).
From the previous chapter it can be said that the proposed expansion
project of M/s. Balaji Formalin Pvt. Ltd. has very less pollution
generation in terms of water, air and hazardous waste generation. For
abatement of environmental pollution, the unit would adopt several
measures, which are summarized in this chapter.
M/s. Balaji Formalin Pvt. Ltd. is the existing unit and equally concern for
production as well as pollution control. The unit has already done the
homework to develop the efficient Environmental Management Plan for
existing set up and plan for proposed expansion.
10.2 OBJECTIVES OF ENVIRONMENTAL MANAGEMENT PLAN
The objectives of the Environmental Management Planare summarized
here under,
To limit/reduce the degree, extent, magnitude or duration of adverse
impacts.
To treat all the pollutants i.e. liquid effluent, air emissions and
hazardous waste with adoption of adequate and efficient technology
To comply with all the norms and standards stipulated by Gujarat
Pollution Control Board/Central Pollution Control Board.
To create good working conditions.
To reduce any risk hazards and design the disaster management plan
Page 218
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-2
Continuous development and search for innovative technologies for a
cleaner and better environment.
10.3 COMPONENTS OF EMP
EMP for the proposed project of Balaji Formalin Pvt. Ltd. covers following
aspects:
Description of proposed mitigation measures for proposed operation
phase only
Description of monitoring program
Institutional arrangements
Implementation schedule and reporting procedures
All above aspects and objectives are kept in the view and considering the
same EMP is prepared for two major fields.
10.3.1 Environmental Management systems
Unit is well aware of environmental requirements for planning and
implementation of the project and set up a department with trained
personnel headed under the qualified manager. As indicated in the
Chapter-4 of this report: Environmental Impacts and Mitigation Measures,
the environmental impact due to the proposed project is almost
negligible.
10.3.2 Environmental, Health and Safety Management System
Chemical Industries prefer an integrated approach and make
environmental management a part of overall Environment, Health and
Safety (EHS) Management system. This model EHS system suggests and
addresses EMS issues such as:
Management system expectation
Management leadership, responsibilities and accountability
Risk assessment and management
Compliance and other requirements
Personnel, training and contractor services
Documentation and communications
Facilities design and construction
Operation, maintenance and management
Community awareness and emergency response
Page 219
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-3
EHS performance monitoring and measurement
Incident investigation reporting and analysis
EHS management system audit
Management review and audit
With this type of EHS management approach, proposed expansion project
would be able to integrate the requirements of ISO-14001 & ISO-18001
into the overall management system.
10.3.3 Environmental Management Cell
Apart from having an environmental management plan, it is also
necessary to have a permanent organizational set up charged with the
task of ensuring effective implementation. In this effect, unit has already
assigned responsibilities to officers from various disciplines to co-ordinate
the activities concerned with management and implementation of
environment control measures. An organogram of Environment
management is shown in Figure-10.1. Basically, this department
undertake monitoring of environmental pollution level by measuring stack
emissions, ambient air quality, effluent quality, Noise level, etc. either
departmentally or appointing external agency whenever necessary.
10.4 ENVIRONMENTAL MANAGEMENT DURING CONSTRUCTION PHASE
Since the proposed expansion project of M/s. Balaji Formalin Pvt. Ltd. for
formaldehyde, Paraformaldehyde and purification of silver matal will be
carried in the existing premises, construction activities will be required
only for the installation of new plant and machineries. Hence, there will
be some adverse impacts on the quality of air and water but, this will not
cause adverse effects on the surrounding atmosphere. No disposal of
construction waste outside the plant and no leaching are anticipated. The
impact will be temporary and negligible. The construction activities for
installation work shall generate noise anddust within working areas.
Therefore, measures will be taken to protect workers. In order to mitigate
the adverse environment impacts during the construction phase, regular
sprinkling of the water will be done.
Page 220
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-4
10.5 ENVIRONMENTAL MANAGEMENT DURING OPERATIONAL PHASE
10.5.1 Air Environment
The unit has already adopted modernized techniques for production of
Formaldehyde and same successful technology will be used for proposed
expansion. Tail gas treatment plant is integral part of process plant. It
will be updated/modify along with process plant after expansion. No
additional stack/vent to emit air pollution in atmosphere except stack of
D. G. set which will not operate regularly. The estimated tail gas quality
is given in Table-2.8.
However, in order to achieve the reduction, it is suggested that during
operational phase, proper air flow will be maintained to ensure proper
combustion and subsequent minimization of any unburned combustibles.
For this, combustion process may be further improved by adopting
following measures.
Optimization of combustion aerodynamics should be done using a
flame retention device.
Re-circulation of flue gas may be considered to achieve the triple
goals of low PM emissions, low NOX emissions and high thermal
efficiency.
Primary flame zone O2 level should be decreased by decreasing
overall O2 level, controlling (delaying) mixing of fuel and air and use
of fuel-rich primary flame zone.
The tail gas treatment plant will be adequate to reduce the pollution of
formaldehyde, methanol and methane to atmosphere. There will also be
recycling of combustion heat which is very effective to reduce pollution
discharge and take advantage of wasted energy. The unit has also
provided adequate stack monitoring facilities for the periodic monitoring
of the stack to verify the compliance of the stipulated norms.
10.5.2 Measures for fugitive emissions
The fugitive emissions may be from leakage through valves, fittings,
pumps, etc. Continous processes will furhter help to reduce fugitive
emmision because repitally valve on/off is not required which helpful to
maitain practically zero leckages.
Page 221
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-5
Good house-keeping, proper maintenance and continuous observation will
prevent the chances of any fugitive emission from the process plant.
However, unit will adopt adequate measures for the minimization/
prevention of the fugitive emission. The unit proposes to adopt following
measures, which will be continued after the production starts.
Regular maintenance of valves, pumps and other equipments to
prevent leakage and thus minimize the fugitive emissions of VOCs.
Entire process will be carried out in the closed reactors with proper
maintenance of pressure and temperature.
Regular periodic monitoring of work area to check the fugitive
emission.
Unit will strictly follow design features as suggested in Table 10.3 for new
equipment may be considered.
10.5.3 Water Environment
Total water requirement due to proposed expansion will be increased
from 129 KLD to 610 KLD (535 KLD fresh water + 75 KLD recycle water)
out of which industrial water requirement will be 598 KLD (523 KLD fresh
water + 75 KLD recycle water). After proposed expansion water
requirement will be satisfied through “Narmada Water”.
The unit proposes to practice of maintaining the records for the total
water withdrawal from various resources and consumption at various
levels in the plant. As mentioned in the previous chapter, the only source
of industrial wastewater generation is RO/DM reject, wastewater
generated from silver refining & cooling bleed off.
The unit is engaged in the manufacturing of Formaldehyde, which is
continuous process and water also retained with the product. Therefore
there will not any wastewater generation from the process. Since there is
no need of plant washing and cleaning hence, the main source of
industrial wastewater generation is cooling bleed off and RO reject.
The total quantity of industrial wastewater will be 121.0 KLD which will be
sent to Evaporator to separate out the salts and recover better quality
water which will be reused in process. Thus, this steps toward water
conservation.
Page 222
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-6
The other source of wastewater generation is domestic wastewater of 7.0
KLD quantities which is disposed to soak pit through septic tank.
Cleaner production technologies will also be adopted to reduce the
quantity of fresh water requirement and industrial wastewater
generation.
The mitigation measures for minimizing the impacts on water
environment in general includes following:
Minimization of water use
Segregation and collection philosophy for effluent to minimize waste
generation and facilitate treatment as well as recycle.
Treatment philosophy to achieve mandated standards.
Reuse/recycle
Some of the measures, which are to be implemented, include:
Reducing the actual process water consumption by way of
improvement in operation of processing units.
10.5.4 Hazardous/Solid Waste Management
There will be only one source for disposal of hazardous waste namely
evaporator salt. This salt is collected properly and store in premises and
finally disposal at TSDF-SEPPL. Other Hazardous sources are discarded
Containers & Used Oil. Discarded Containers are collected and storage in
premises and disposal by selling to authorized recycler or reuse. Same as
Used oil is collected and storage in premises and disposal by selling to
registered re-processor or reused as lubricant.
10.5.5 Noise Control Technique
The main sources of noise within the plant are: Tai gas treatment unit, air
compressors, manufacturing activities, transferring pumps and material
handling systems. Additional noise will be generated due to installation of
new machineries and equipments however, these impacts will be very
minor and temporary in nature. The impact on the environment during
the operational phase will be long term but, of insignificant quantity.
To minimize the noise pollution, the unit proposes the following noise
control measures:
Page 223
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-7
Noise suppression measures such as enclosures, buffers and/or
protective measures should be provided (wherever noise level is
more than 90 dB (A)).
Employees should be provided with ear protection measures like
earplugs or earmuffs. Earplug should be provided to all workers
where exposure is 85 dB (A) or more.
The transportation contractor shall be informed to avoid
unnecessary speeding of the vehicles inside the premises.
Extensive oiling, lubrication and preventive maintenance will be
carried out for the machineries and equipments to reduce noise
generation.
The selection of any new plant equipment will be made with
specification of low noise levels.
Areas with high noise levels will be identified and segregated where
possible and will include prominently displayed caution boards.
The green belt area will be developed within industrial premises and
around the periphery to prevent the noise pollution in surrounding
area.
Monitoring of noise levels is essential to assess the efficacy of
maintenance schedules undertaken to reduce noise levels and noise
protection measures. A good quality digital sound pressure level meter is
essential for this purpose.
10.6 GREEN BELT DEVELOPMENT
Tree plantation is one of the effective remedial measures to control the
air pollution and noise pollution. It also causes aesthetics improvement of
the area as well as sustains and supports the biosphere.
Plantation around the pollution sources control the air pollution by
filtering the air particulate and interacting with gaseous pollutant before it
reaches the ground.
Each plant shows different air pollution tolerance level depending upon
number of factors. In green belt area about 1000 trees per acre of land
as prescribed by Gujarat Pollution Control Board shall be planted. The
Page 224
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-8
selection of tree species suitable for plantation at the industry shall be
governed by following factors,
The trees should be tolerant to air pollutants present in the area
The trees should be able to grow and thrive on soil of the area, be
evergreen, inhabitant and having minimum of leaf fall.
The trees should be tall in peripheral curtain plantation and with
large and spreading canopy in primary and secondary attenuation
zone
It is also recommended to plant few trees, which are sensitive to air
pollution as air pollution indicator.
The unit has extensive greenbelt in 1500 sqm, which is around 35% of
total land area. Local spices are planted and survival rate is more than
70%.
Design of Green Belt
As far as possible, following guidelines will be considered in greenbelt
development:
The spacing between the trees will be maintained as per GPCB
guideline i.e. 1 tree/4 sqm.
Spaces, so that the trees may grow vertically and slightly increase
the effective height of the green belt.
Planting of trees in each row will be in staggered orientation.
The short trees (< 10 m height) will be planted in the first two rows
(towards plant side) of the green belt. The tall trees (> 10 m height)
will be planted in the outer three rows (away from plant side).
Plantation Programme
Plantation of trees in and around the company are meant mainly to
reduce air pollution caused by factory emissions, to absorb sound, to
prevent soil erosion and to maintain aesthetic value for healthy living.
Survival rate of trees and post plantation care
Considering the availability of water and general survey of surrounding
area, the survival rate is expected to be around 75%. Moreover, the wire
net guards will be provided to protect the saplings. The same will be
properly manure and watered so that it can grow well.
Page 225
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-9
Planting methodology
The plantation shall be done in pits. Pits of about 50 cm dia shall be dug
in grid of 0.5 m X 0.5 m up to a depth of 0.3 m. The pit shall be refilled
with soil after the planting. The sampling of healthy, nursery raised,
seedlings in polythene containers shall be transported in baskets. Planting
shall be done after first monsoon showers.
The level of soil is about 10 cm above of ground level. The soil around the
plant shall be pressed to form a low through. About 25 gm chemical
fertilizers shall be added in ring of 25 cm radius around the plant.
Watering shall be continued after plantation if any dry spells follows.
Planted area shall be inspected and mortality rate ensured for each
species. The dead and drying plant shall be replaced by fresh seedlings.
Protection of plantation site:
Protection from grazing will be done by erecting tree guards a rounded
planted sapling.
Though the tree suggested for plantation will require very less water,
however during the first year watering will be done twice in a day.
There after watering will be done twice in a week.
The manuring will be done when plantation take up. For this propose
cow dung will be dump in the pit. No other manuring will require for
proposed plantation. Cow dung is easily available in the study area.
Damaged plants will be replaced with new plants.
10.7 RESOURCE CONSERVATION/WASTE MINIMIZATION
The unit introduces modernized techniques with installation of Tail Gas
Treatment Plant. Therefore, wasted heat energy will be recovered in
recycled for various industrial activities. Thus, there will not be any
additional fuel requirement which will step towards resource recovery and
conservation. With tail gas treatment plant there will also be reduction in
pollutant concentration and better quality of air emission will be obtained.
Energy consumption will be reduced from 40 KW/Tonne of production to
26 KW/Tonne.
Page 226
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-10
Main benefit to this technology is conserve resource-raw material around
12% compare to conventional process which resulted to reduced raw
material consumption per unit from 0.5 to 0.44.
Better quality water from Evaporator will also be recovered and reused in
process. This ultimately results in conservation of fresh water
requirement.
The units shall also implement the concept of waste minimization circle.
Good Housekeeping or proper housekeeping practice makes the system
easier and less costly. Some of these are as follows:
Rain water harvesting system shall be adopted to reduce the fresh
water requirement.
Cleaner production technology shall be adopted for the resource
conservation and pollution control.
10.8 ACTION PLAN FOR TRANSPORTATION OF RAW MATERIAL AND
PRODUCTS
The basic raw materials required for the proposed expansion project are
given in Chapter-2 along with source, mode of transport. The raw
materials and their storage quantities may change (to some extent)
depending upon products and market demand. The current practice of
transportation of raw materials and products will be continued for the
proposed expansion project.
Following safety precautions will be taken during transportation:
Supplementary operational requirements for loading, transport,
storage, unloading, handling and storage.
Restrictions, if any, on the mode of transport and any necessary
routing instructions.
Emergency action plan and an indication of the general nature of risk
and safety precautions.
Proper parking of vehicle at designated place.
During the parking, stop the engine of vehicles.
Provide earthing to tanker securely for solvent storage tanker.
Ensure that fire fighting system is available near the place of storage
of hazardous chemicals.
Page 227
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-11
Liquid transportation should be pneumatically.
Before start unloading, check that, there should not be any leakage in
the pipeline.
In case of leakage, immediately attend the leakages and rectify it and
stop the valve of tanker.
After unloading, close the cover properly to avoid any fumes.
Vehicle to be started only after removal of all pipelines connected with
tanker.
10.8.1 Safety Instructions for transportation of hazardous materials:
The name of the chemical along with pictorial sign denoting the
dangerous goods are marked on the vehicle and the packing material.
The name of the transporter, his address and telephone number are
clearly written on the road tanker and on the vehicle.
The important safety precautions are mentioned on the tanker as a
warning label.
Only trained drivers and cleaners are engaged in transport of
hazardous chemicals.
The transporter and manufacturer must ensure the safe transportation
of the material.
10.8.2 Instructions for drivers & Responsibilities of drivers
Before any hazardous substance is transported, the carrier shall -
TERM (Transport Emergency) card should be with driver.
Copy of the statement give to the driver of the vehicle relating to the
substance being transport the hazardous substance.
Ensure that the driver is adequately trained to carry out the
instructions contained in the statement.
A copy of the statement given to him where the information will be
available at all times while the substance to which it relates is being
transported; and
Comply with all instructions contained in the copy of the statement
given to him.
Designation and quantity of the hazardous substance;
Page 228
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-12
Required approval from the PESO in regard to the transport of the
hazardous substance;
The tankers are checked for its fitness and safe condition before
loading.
During loading and unloading, the tanker should be braked and
isolated against any movement, while loading/unloading, use safety
appliances.
Check for leakages from the line connections before starting and
stopping the filling operations.
Drive the vehicles carefully, especially in crowded localities and on
bumpy roads.
Do not apply sudden break.
The tanker should not be parked for long time on the way and
especially in crowded places. Park the vehicle away from residential
areas.
10.8.3 Manner of display of class labels
Where a class label is required to be displayed on a vehicle, it shall be
so positioned that the size of the class label is at an angle of 45
degrees to the vertical and the size of such label shall not be of less
than twenty-five millimeters square which may be divided into two
portions, the upper half portion being reserved for the pictorial symbol
and the lower half for the text. Provided that in the case of smaller
packages a suitable size of the label may be adopted.
Where the class label consists of adhesive material, it shall be water-
proof and where it consists of metal or other substance on which the
pictorial symbol and the text are printed, painted or affixed, they shall
be affixed directly on such material and in every case, the surface of
the vehicle surrounding the label shall be of a color that contrasts
vividly with the background of the class label.
Every class label displayed on a vehicle shall be positioned in such a
manner that it does not obscure any other markings required to be
displayed under any other law.
Page 229
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-13
Every goods carriage carrying any dangerous or hazardous goods shall
display the class label on the appropriate places where anyone can see
easily.
10.9 HEALTH & SAFETY
M/s. Balaji Formalin Pvt. Ltd. will follow occupational health program right
from the start of production. Health hazards associated with occupation
are called occupational hazards. The following check-ups shall be carried
out regularly to avoid occupational hazards:
Pre-employment medical check-up at the time of employment.
Provision of periodic medical check up for all the employees.
To provide necessary first aid facilities, the first aid training shall also
be given to the employees.
Monitoring of occupational hazards like noise, ventilation, chemical
exposure shall be carried out at frequent intervals.
The unit will appoint the medical officer for the regular medical
examination and treatment of the employee.
The following precautions shall be taken to avoid foreseeable accident like
spillage, fire and explosion hazards and to minimize the effect of any such
accident and to combat the emergency at site level in case of emergency.
Various emergency spots in plant area will be identified and kept in
sharp and alert watch.
Use of protective equipments will be regularly checked and will be kept
easily accessible and easily workable during emergency.
Safety installations like available quantity of running water will be
regularly watched.
Fire bucket and hose reels will be provided to withstand the fire or
explosion conditions.
Various types of fire extinguishers such as (Foam type, water type,
CO2 type) will be provide inside the factory premises.
Every pressure vessel will be provided with minimum one or more
pressure relief devices. The design of the valve is made in such a way
that the breakage of any part will not obstruct force discharge of the
liquid under pressure. Moreover, relief valves are tested and a periodic
Page 230
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-14
schedule for their testing shall be maintained. The defective valves will
be removed if found unsafe for the operation.
10.9.1 Possibility of occupational health hazard & its control
An occupational hazard is a thing or situation with the potential to harm
a worker. Occupational hazards can be divided into two categories:
safety hazards that cause accidents that physically injure workers and
health hazards which result in the development of disease. Hazards can
be rated according to the severity of the harm they cause - a significant
hazard being one with the potential to cause a critical injury or death.
In case of M/s. Balaji Formalin Pvt. Ltd., methanol and formaldehyde
will be handled within premiseswhich can enter in the human body by
the way of inhalation of vapour or spray and skin absorption – these are
the commonest method of entry. Skin absorption usually arises from
direct contact of the liquid solvent with the hands and arms of workers
who are cleaning objects manually or handling objects recently dipped
in or coated with substances.
The following precautions shall be taken to avoid foreseeable
accident like spillage, fire and explosion hazards and to
minimize the effect of any such accident and to combat the
emergency at site level in case of emergency.
Various emergency spots in plant area will be identified and kept in
sharp and alert watch.
Protective equipments will be regularly checked and will be kept easily
accessible and easily workable during emergency.
Safety installations like available quantity of running water will be
regularly watched.
Fire bucket and hose reels will be provided to withstand the fire or
explosion conditions.
Various types of fire extinguishers such as (Foam type, water CO2
type, CO2 type) will be provided inside the factory premises.
Every pressure vessel will be provided with minimum one or more
pressure relief devices. The design of the valve is made in such a way
that the breakage of any part will not obstruct force discharge of the
Page 231
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-15
liquid under pressure. Moreover, relief valves are tested and a periodic
schedule for their testing shall be maintained. The defective valves will
be removed if found unsafe for the operation.
10.9.2 Possibility of occupational health hazard, its control &
Occupational surveillance
An occupational hazard is a thing or situation with the potential to harm
a worker. Occupational hazards can be divided into two categories:
safety hazards that cause accidents that physically injure workers, and
health hazards which result in the development of disease. Hazards can
be rated according to the severity of the harm they cause - a significant
hazard being one with the potential to cause a critical injury or death.
Chemical agents: There are possibility to generate gases, vapours and
aerosols (fumes, mists). We will take care to reduce it at optimum
minimum level and advices to workers to use PPE who work in such
identify area.
Noise: Noise is considered as any unwanted sound that may adversely
affect the health and well-being of individuals or populations. Aspects of
noise hazards include total energy of the sound, frequency distribution,
duration of exposure and impulsive noise. Noise might result in acute
effects like communication problems, decreased concentration, and
sleepiness and as a consequence interference with job performance.
Exposure to high levels of noise (usually above 85 dB(A)) over a
significant period of time may cause both temporary and chronic
hearing loss. Permanent hearing loss is the most common occupational
disease in compensation claims.
There will be no high noise level issue. However, unit will identify such
areas like, utilities area and advice to workers to not enter without PPE.
Occupational surveillance involves active programmes to anticipate,
observe, measure, evaluate and control exposures to potential health
hazards in the workplace. Depending upon the occupational
environment and problem, two surveillance methods can be employed:
medical and environmental.
Page 232
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-16
Medical surveillance is used to detect the presence or absence of
adverse health effects for an individual from occupational exposure to
contaminants, by performing medical examinations and appropriate
tests.
Environmental surveillance is used to document potential exposure
to contaminants for a group of employees, by measuring the
concentration of contaminants in the air, in bulk samples of materials
and on surfaces. Medical surveillance is performed because diseases can
be caused or exacerbated by exposure to hazardous substances. So
periodic medical check-up will be carried out.
10.9.3 Preventive Measures
The methods of protecting the work force from exposure to toxic agents
in the workplace apply to the use of solvents:
Segregation of processes using solvents;
Enclosures or special ventilator control of processes;
Good general ventilation-particularly important if the solvent is used
in a confined space;
Personal protection-Protective clothing should be worn, including
gloves, where there is a possibility of absorption through the skin.
Suitable respiratory protection is necessary like Panorama gas mask
with cartridge suitable for the chemicals we will be handling,
Breathing Air Apparatus and Air Hood with instrument air connection.
Gas detector with emergency alarm systems in confined area.
Emergency preparedness plan.
10.10 OCCUPATIONAL HEALTH PROGRAMME
Some of the philosophies underlining the occupational health programme
are discussed below.
M/s. Balaji Formalin Pvt. Ltd. will employ well qualified and experienced
safety Manager and make arrangement for part time doctor for regular
checking of health of the employees. Also, plans to become member of
any local hospital for emergency need. Annual health check for
employees will be carried out and record will be maintained. Regular
Page 233
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-17
training to plant personnel in safety fire fighting and first aid will be
provided.
Unit will maintain a healthy work environment. This will be accomplished
through the identification, evaluation and control of workplace
environmental factors which may cause sickness, impaired health or
significant discomfort and inefficiency among workers. Environmental
factors such as noise, physical hazards toxicity/chemical hazard and
ergonomic hazards will be monitored on a periodic basis to assist in
maintaining a healthy work environment.Workers exposed to noise and
toxic materials will be evaluated against applicable recognised exposure
levels in the Factories Act. Hearing protection aid will be provided to
workers who work in the high noise areas, during construction of the
proposed facilities and also to those who will continue through the life of
the facility.
(A) Exposure of workers with major chemicals
Mainly Methanol and Formaldehyde are used from which workers are
directly exposed. All workers are directly or indirectly comes in contact
with above chemicals, are aware about the hazardousness of such
chemicals and all have provide Personnel protective equipments and also
provide appropriate training for use it.
(B) List of chemicals, their threshold limit and measures
Unit are using Methanol and Formaldehyde. Workers are directly or
indirectly exposed in work area during the handling of these chemicals.
Details of hazardous chemicals characteristics are summarized in
Chapter-7 of RA report. Unit will handle above chemicals with proper
handling process suggested in MSDS. Estimated work area quality with
TWA limit is summarized in Table 2.8(a) of Chapter-2. Measured value
indicates that, exposure of such chemicals are within the Threshold Limit
Values (TLV)/Permission Exposure Levels as per ACGIH recommendation.
(C) Details of Pre-placement and periodical medical monitoring
of workers
Pre-employment Medical Examinations
There are two main purposes of pre-employment medical examinations:
Page 234
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-18
1. To provide base-line health data against which subsequent
changes after employment can be evaluated
This is important for assessment of the effectiveness of preventive
measures at work. For example, where the hearing threshold of a worker,
which is normal before employment in a noisy occupation, is found to
have increased after employment, this possibly indicates noise-induced
hearing loss and a review of the hearing protection measures would be
required. On the other hand, if the pre-employment hearing threshold of
the workers has not been assessed, it would be difficult to ascertain
whether the worker’s high hearing threshold after employment is due to
excessive noise exposure at work or to his own hearing problem before
employment.
Pre-employment health data is also important in substantiating or
negating employees’ compensation claims since it provides evidence of
the health status of claimants before employment.
2. To ensure medical fitness for work
Pre-employment medical examinations identify those persons who are
medically unfit for employment in particular occupations. Persons with
certain underlying medical conditions are particularly vulnerable to the
effects of certain health hazards and are not suitable for employment in
particular occupations. Persons with certain underlying medical conditions
are particularly vulnerable to the effects of certain health hazards and are
not suitable for employment in work with such exposures. For example,
workers with thalassemia (a genetic disease of the blood) should not be
engaged in work involving lead exposure which may aggravate the
anaemia.
Workers may fail to meet the specific health requirements for particular
job so that they cannot undertake the jobs safely without risks to
themselves or others.
Periodic Medical Examinations
Periodic medical examinations aim to detect susceptible workers for
whom corrective actions are required before they develop overt
occupational diseases. The frequency of periodic medical examinations
Page 235
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-19
depends on the nature of the occupational hazards. For most hazardous
exposures, however, these examinations are conducted annually.
Requirements of Medical Examination
The requirements of medical examinations depend on the nature of the
hazardous exposures of workers. In general, the doctor will take a
detailed occupational and medical history, conduct a physical examination
and prescribe a range of ancillary laboratory and/or radiological
investigations such as urine test, blood test, X-ray, lung function test and
audiometric test.
Liver Function Test (LFT)
Clinical examination and Pre-placement medical examination carried out
in every 12 months. Liver function tests including serum bilirubin, alkaline
phosphatase estimations every 12 months are required.
Measures:
Entire materials will be transfer either pneumatically or closed manner
and charging the raw materials in reactor with deep charges so that
chances of un-reacted materials are minimized.
10.10.1 Occupational Health and First aid measures
Unit is using Methanol and Formaldehyde as main raw materials which if
handled in safe ways with all precautions (as detailed in respective
MSDS) will not cause harm to employees. However, in rare case of
exposures, immediate action is to be taken to save life and reduce the
extent of damage. Unit has first aid facilities and calling base ambulance
facilities as and when required. Industry will appoint part time doctor for
periodically health check-up. Instructions for immediate actions to
exposures to some of the chemicals will be given to employees.
10.11 SOCIO-ECONOMIC ACTIVITIES:
Socio-economic development activities refers to voluntary actions
undertaken by company/organization to either improve the living
conditions (economically, socially and environmentally) of local
communities or to reduce the negative effects of the project. Socio-
economic development activities is a concept of organization whereby
organizations serve the interests of society by taking responsibility for the
Page 236
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-20
impact of their activities on customers, employees, shareholders,
communities and the environment in all aspects of their operations.
Unit has identified following activities as a part of CSR under
different heads:
Education
Awarding meritorious school students in SSC & HSC
Providing utensils to schools and anganwadi for Mid-Day Meal
preparation
Science Lab - Equipment & books in libraries for schools
Supports for sport & cultural competitions in schools
Health and family welfare
Malaria eradication camps (collection of blood sample & detection of
virus & free medicine distribution, Blood donation camp)
General Health Camp for men, women & kids
Support for Pulse Polio Immunization camp
Contribution towards primary Health Services depending on local
needs.
Preservation of the Environment and to Sustainable Development
Water harvesting systems in nearby villages.
Landscaping and greenbelt development in and around of the project
site.
Provide sanitation facilities to villagers.
Unit has committed to spend about Rs. 20 Lakhs every year up to five
years of the operation towards various rural up-liftman and community
development programs.
Table 10.1
Budgetary provisions for the next five years (Every Year)
Sr.
No.
Activities Budgetary provision
(Lakhs)
1. Educational activities 7.0
2. Preservation of the Environment and
Sustainable Development
2.5
3. Health and family welfare 2.0
4. Drinking water and sanitation
facilities
7.0
Page 237
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-21
5. Miscellaneous as per the demand of
surrounding villages
1.5
Total 20
10.12 POST-PROJECT ENVIRONMENTAL MONITORING
The post – project environmental monitoring suggested herewith should
be as per the following guideline. The highlights of the integrated
environmental monitoring plan are:
The stack monitoring facilities like ladder, platform and porthole of all
the stacks maintained in good condition.
Regular monitoring of all gaseous emissions from stacks/vents and all
fugitive emissions in the process areas.
The performance of air pollution control equipment evaluated based
on these monitoring results.
Water consumption in the complex recorded daily.
Analysis of untreated and treated effluent, before discharge into the
final disposal pipeline carried out regularly.
Performance of effluent treatment plant units evaluated based on
these analysis results.
As far as possible, noise curbed at its source, with the help of acoustic
hood and other such noise reducing equipments.
Regular noise level monitoring to be carried out.
Green belt properly maintained and new plantation programmes
undertaken frequently.
Continued environmental awareness programmes carried out within
the employees and also in the surrounding villages.
Rain water harvesting ponds will be developed within the industrial
premises and encouraged in the surrounding villages too. All possible
back–up and support provided to them.
Ambient Air Quality monitoring
Schemes for monitoring ambient air quality stack emissions and fugitive
emissions are proposed. The ambient air quality monitoring systems are
recommended for monitoring the ground level concentrations and fugitive
emissions around the plant. Balaji Formalin Pvt. Ltd. should install three
Page 238
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-22
monitoring stations around its battery limit (at 1200 as per guideline) for
monitoring SPM, SO2, NOX and HC. The combined data will provide overall
characteristic and emission from the industry.
For this, the following equipment is recommended to be procured or can
higher the services from Environmental consultant by the project
proponent for implementing the above mentioned monitoring schemes:
Noise Environment
Monitoring of noise levels is essential to assess the efficacy of
maintenance schedules undertaken to reduce noise levels and noise
protection measures. A good quality digital sound pressure level meter is
essential for this purpose.
10.13 ENVIRONMENT MANAGEMENT COST ESTIMATE
The management will spend about Rs. 30.0 Lakhs as recurring cost per
annum on the pollution control measure, greenbelt development and
other environment management. Recurring cost is estimated as below:
Table 10.2 Environment Management Cost Estimate
S. No.
Description Recurring Cost Rs.
(Lakh/Annum)
Capital Cost Rs. (Lakhs)
1. Air pollution Control 12.0 55.0
2. Water pollution Control 4.0 32.0
3. Noise pollution 0.5 0.5
4. Environment monitoring &
management
5.0 3.0
5. Occupational Health 3.0 2.0
6. Green belt Development Plan 0.5 2.5
7. Haz. Waste management 3.0 2.0
8. Rain water harvesting system 2.0 3.0
Total cost per annum 30.0 100
10.14 ENVIRONMENT POLICY
Balaji is an existing unit and it has already well developed Environment
Policy approved by the management.
They commit themselves to:
Page 239
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-23
Ensure continuous improvement in environmental performance of
works through protective Environmental management system.
Comply with applicable legal and other requirements related to
environmental aspects.
Conserve the resources particularly water, power by fixing and
improving consumption norms.
Concept of cleaner production is adopted.
Ensure involvement of all employees and contractors in effective
implementation of Environment Management System through training
and awareness.
Promote awareness among local surrounding community for
preservation and maintaining clean environment.
Work procedures and safety instructions are provided to all staff.
Unit also conducts the safety seminars, mock drills and training
programmes for our staff at regular intervals.
10.15 REPORTING SYSTEM OF NON COMPLIANCES/VIOLATIONS OF
ENVIRONMENTAL NORMS
Company will develop reporting systems of non-compliances/ violations of
environmental norms to the management. The mechanism is summarized
below:
1. Identify deviation/non-compliance/violation of environmental norms
as lay down in Consent to operate and letter of Environmental
clearance. Record to communication/complain received from
plausible stake holder.
2. The EHS manager will identify deviation/non-compliance/violation
from failure to comply with statutory requirements.
3. Respond from EHS manager within reasonable time limit to concern
authorities with c/c mark to Technical head.
4. Technical head will take it in action and give necessary guideline to
comply this deviation/ non-compliance/ violation of environmental
norms. Parallel arrange budget for necessary action to comply the
condition.
Page 240
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-24
5. Communication received from the EHS manager will be discussed in
technical management meeting.
6. Board discussion, Decision and Action
The Chairperson will review the information available and take a
decision depending on the seriousness of the violation.
The decision will be taken to ensure the compliance of non-
compliance/violation of environmental norms and it’s safeguarded.
The decision will be taken by consensus and if no consensus is
arrived at, voting will be conducted.
Enlist measures that would undertake to ensure that deviations/
noncompliance /violations of Environmental norms and take care
not to occur same violation in future.
Page 241
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-25
Table 10.3 Design features for minimization of fugitive emissions
Sr.
No.
Equipments Design Features Control
Efficiency %
1 Pumps Seal less design 100
Dual Mechanical Seal 100
2 Valves Seal less Design 100
3 Compressor Dual Mechanical Seal 100
4 Connectors Weld together 100
5 Pressure Relief
Devices
Rupture Disc 100
6 Sampling Connection Closed loop sampling 100
Page 242
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-26
Table 10.4
Environment Monitoring along with Frequency details
Nature of
Analysis
Frequency of analysis
with its analyzer
Parameters
Wastewater
analysis
Monthly by external agency pH, COD, BOD, NH3-N,
TDS, SS, Oil & Grease,
etc.
Stack monitoring of
each stack
Monthly by external agency PM, SO2, NOX
Ambient Air Quality
Monitoring
Monthly for 24 hours or as
per the statutory conditions
by external agency
PM10, PM2.5, SO2, NOX
Noise level Monthly as per the statutory
conditions by external
agency
Nr. Main gate, Process
area etc.
Work zone fugitive
monitoring
Monthly by external agency Dust, VOCs
Health check-up of
workers
As per the statutory
guideline
All workers
Page 243
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 10-27
Figure-10.1
Hierarchical system or Administrative order of the company
General Manager
Office Manager
Director
EHS Manager
Plant Incharge
Chemist Plant
operator
Page 244
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-1
Chapter-11
Summary & Conclusion 11.1 PROJECT DESCRIPTION
M/s. Balaji Formalin Pvt. Ltd. is a working unit at Plot No. 1398, Post:
Moti Bhoyan, Taluka: Kalol, Dist.: Gandhinagar for manufacturing of
Formaldehyde (5000 MTPM). Now, looking to the market demand, unit
intends to enhance its production capacity of Formaldehyde up to 12500
MTPM along with Para Formaldehyde - 835 MTPM and Reprocessing Silver
(Purification of Silver) - 1.5 MTPM.
Expansion will be done in existing plant premises. Unit has obtained EC
from MoEF, New Delhi vide its letter no. J-11011/625/2009-IA II (I),
dated 24.08.2010 and have valid consent to operate issued by GPCB vide
order no. AWH-71755, date of issue 13/07/2015 and valid up to
15/04/2020. 11.1.1 LOCATION OF PROJECT
Details of the project site are as given in following table:
Sr. No. Particulars Details
1. Plant location
Plot No. 1398
Village Moti Bhoyan
Taluka Kalol
District Gandhinagar
State Gujarat
2. Co-ordinates
Latitude 23°09'44.69"N
Longitude 72°26'45.54"E
3. Nearest Habitat Moti Bhoyan-1.45 km
4. Nearest Railway Station Kalol-10.6 km
5. Nearest Airport Ahmedabad-21.2 km
6. Nearest City Ahmedabad-12.0 km
7. Nearest Highway SH 41-10.0 km
Page 245
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-2
11.1.2 PRODUCT PROFILE
Production capacity is given below:
Sr.
No.
Products Existing
Production (MTPM)
Additional
production (MTPM)
Total
production after
expansion (MTPM)
1 Formaldehyde 5000 7500 12500
2 Para formaldehyde 00 835 835
3 Reprocessing of Silver
(Purification of Silver)
00 1.5 1.5
11.1.3 INVESTMENT OF THE PROJECT
Existing cost of project is Rs. 10.0 crores. The estimated cost of the
proposed expansion will be around Rs. 8.0 crores. So after expansion, it
will be tune around Rs. 18.0 crores. Out of this, around Rs. 1.0 crore will
earmark for pollution control measures as capital investment and Rs. 20
lakhs will be recurring cost per annum. Unit is using excess steam
generate from exothermic process reaction resulted to reduce the
operational cost.
11.2 DESCRIPTION OF ENVIRONMENT
11.2.1 BASELINE ENVIRONMENTAL STUDY
To predict the impact of the proposed activities on the surrounding
environment, the current baseline environmental status was studied by
collecting the data and carrying out monitoring for the period of
October-2015 to December-2015. The baseline data for ambient air
quality, surface and ground water quality, noise and soil quality was
collected and analyzed for various parameters.
11.2.2 AIR ENVIRONMENT
The ambient air quality monitoring was carried out at eight AAQM
locations, with a frequency of twice a week, to assess the existing
sub-regional air quality status during the period of October-2015 to
December-2015.
Respirable Dust Sampler & Fine Particular Sampler along with the
analytical methods, prescribed by CPCB was used for carrying out air
quality monitoring. At all these sampling locations; PM10, PM2.5, SO2 and
Page 246
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-3
NOx were monitored on 24-hourly basis to enable the comparison with
ambient air quality standards prescribed by the Central Pollution Control
Board.
The data on concentrations of various pollutants were processed for
different statistical parameters like arithmetic mean, standard deviation,
minimum and maximum concentration and various percentile values.
Particulate Matter (PM10)
An average and 98th percentile value of 24-hourly PM10 values at all the
locations varied between 65.4-74.6 g/m3 and 69.2-79.3 g/m3, which
are well within the stipulated standard of CPCB, 100 g/m3.
Particulate Matter (PM2.5)
An average and 98th percentile value of 24-hourly PM10 values at all the
locations varied between 31.7-37.5 g/m3 and 37.0-41.6 g/m3, which
are well within the stipulated standard of CPCB, 60 g/m3.
Sulphur Dioxide (SO2)
An average and 98th percentile value of 24-hourly SO2 value of arithmetic
mean at all the locations ranged between 18.1-20.9 g/m3 and 20.6-25.2
g/m3 respectively, which are well within the stipulated standards of 80
g/m3.
Oxides of Nitrogen (NOx)
An average and 98th percentile value of 24-hourly NOx value of arithmetic
mean at all the locations ranged between 18.6-22.6 g/m3 and 20.7-26.7
g/m3 respectively, which are much lower than the standards stipulated
by CPCB, i.e. 80 g/m3.
11.2.3 Water Environment
Surface Water Quality
There are surface water bodies like lakes, pond/reservoirs, canal in the
study area. Surface water samples were collected from pond of Piyaj,
Hajipur, Lapkaman, Thol Lake & from Narmada Canal near project site.
Results of the same are given in Chapter-3 of EIA report.
Conclusions: Surface water samples are meet the permissible limit set
by the authority (BIS) for drinking purpose.
Page 247
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-4
Ground Water Quality
Ground water samples have been collected from project site and different
seven villages (Moti Bhoyan, Khatraj, Hajipur, Sherisa, Vadsar, Karoli,
Ganapatpur).
Color: All the samples were colorless meeting desirable norms.
pH: All the samples meet the desirable standards (pH ranges from 7.59
to 7.83).
Total Dissolved Solids (TDS): TDS in samples ranges from 998 mg/L
(Project Site) to 1346 mg/L (Sherisa). All the samples meet the
permissible limit of 2000 mg/L, (If alternate sources of potable water are
not available).
Calcium: Calcium contents in the water ranges from 49 mg/L (Karoli) to
65 mg/L (Moti Bhoyan), all the samples meet the permissible limit of 200
mg/L.
Magnesium: Magnesium content in the water ranges from 39 mg/L
(Hajipur) to 61 mg/L (Sherisa). All the samples meet even the
permissible limit of 100 mg/L (if alternate source of potable water in not
available).
Sulphate: Sulphate content in the water ranges from 18 mg/L (Project
site) to 36 mg/L (Sherisa). All the samples meet the permissible limit of
400 mg/L for drinking water.
Fluoride: Fluoride content in the water ranges from 0.57 mg/L (Moti
Bhoyan) to 0.75 mg/L (Sherisa). All the samples meet the permissible
limit (1.5 mg/L).
Total Alkalinity: Total alkalinity in the water samples ranges from 362
mg/L (Khatraj) to 485 mg/L (Project Site). All the samples are within the
permissible limit of drinking water (600 mg/L) (if alternate source of
portable water is not available).
Other Parameters: Potassium (ranges from 13 mg/L to 22 mg/L),
Sodium (ranges from 289 mg/L to 423 mg/L) and Chloride (ranges from
382 mg/L to 602 mg/L).
Heavy metals like copper, lead, chromium and zinc are found below
detectable limit in all samples.
Page 248
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-5
Conclusions: Ground water samples from villages meet the permissible
limit set by the authority (BIS).
11.2.4 Noise Environment
The Leq values of noise levels during day-time varied from 48.1 dB(A) to
62.2 dB(A). Highest Leq daytime value was recorded at Bus stop
Ganpatpura. The Leq values of noise levels during night time varied from
38.5 dB(A) to 54.6 dB(A). Highest Leq value during night time was
recorded Nr. Project site, which is well within the limit of 70 dB(A)
prescribed for Industry.
11.3 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION
MEASURES
Various sources of pollution and pollution loads were identified. It has
also identified the technologies to be adopted for the mitigation and
control of the same. The sources of pollution in the proposed expansion
project are air emissions from tail gas treatment plant & D G Set; liquid
effluents from RO/DM reject, process (silver refining) & cooling bleed off
and domestic sources; Hazardous wastes generation and noise pollution
from utilities and process equipment.
Impacts on Air quality & Mitigation measures:
The impacts on air quality shall be due to the emissions from Unit. The
impacts are quantified using ISCST3 model. The results indicate marginal
increase in the ambient air quality parameters. The predicted values for
SPM, SO2 & NOx are 2.134 g/m3, 0.672 g/m3 & 0.656 g/m3
respectively. The point of maximum concentration for SPM, SO2, NOx
would be 1.0 km from center of industry in S direction.
With this marginal contribution due to the proposed expansion activities,
the levels of SPM, SO2 and NOX will remain well below the 24-hourly
ambient air quality standards for SO2 & NOx (80 g/m3), PM10 (100
g/m3), PM2.5 (60 g/m3) as prescribed by CPCB.
To mitigate the impact due to the proposed expansion project, unit has
provided APCM and adequate stack height for proper atmosphere
dispersion as per the Pollution Control norms.
Page 249
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-6
Impacts on Water Environment & Mitigation measures:
Total water requirement (Industrial + Domestic + Greenbelt) will be
increased from 129 KLD up to 610 KLD; out of which 535 KLD is fresh
water & 75 KLD is recycle water (condensate from evaporator). Source of
fresh water is Narmada Water supply.
After proposed expansion, total wastewater generation will be increased
from 121.0 KLD. 7.0 KLD will be domestic wastewater which will be
disposed off into soak pit through septic tank.
RO/DM reject, wastewater generated from silver refining & cooling bleed
off will be directly sent to force effect evaporator & then sent to
mechanical evaporator.
Impacts on Noise quality & Mitigation measures:
The noise levels may increase due to the proposed expansion activities.
The impact is found to be insignificant outside the premises. To decrease
the noise pollution impact, unit will provide necessary PPEs like earplugs
or earmuffs to all workers where exposure is 85 dB(A) or more and
selection of any new plant equipment will be made with specification of
low noise levels.
Impacts on Soil & Mitigation measures:
The solid/hazardous wastes generated from the unit may have significant
negative impacts if disposed unsystematically. Hence, appropriate
measures for storage and disposal of solid wastes are adopted as per the
regulatory guidelines and it will be continued after expansion also.
Impacts on Socio Economy & Mitigation measures:
There is a potential for direct/indirect employment for the locals due to
the proposed expansion project. Unit will improve infrastructure facilities
in the villages.
11.4 ENVIRONMENT MONITORING PROGRAMME
The unit has a dedicated Environment, Health and Safety (EHS)
department to monitor and evaluate the environmental performance, and
to supervise the environment management measures. The details of
monitoring are as below.
Page 250
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-7
Environment Monitoring Program
Nature of
Analysis
Frequency of analysis
with its analyzer
Parameters
Wastewater
analysis
Monthly by external agency pH, TDS, SS, Oil &
Grease, etc.
Stack monitoring of
each stack
Monthly by external agency PM, SO2, NOX
Ambient Air Quality
Monitoring
Monthly for 24 hours or as
per the statutory conditions
by external agency
PM10, PM2.5, SO2, NOX
Noise level Monthly as per the statutory
conditions by external
agency
Nr. Main gate, Nr. D. G.
Set, Process area, Raw
material storage area
etc.
Work zone fugitive
monitoring
Monthly by external agency Dust, VOCs
Health check-up of
workers
As per the statutory
guideline
All workers
11.5 ADDITIONAL STUDIES
11.5.1 Risk Assessment
Risk analysis and study have been carried out for identification of
hazards, selection of credible scenarios, Risk Mitigation measures etc. All
the hazardous chemicals will be stored and handled as per MSDS
guidelines. The detail study is prescribed in Chapter-7.
11.6 ENVIRONMENTAL MANAGEMENT PLAN
The EMP is covers the impacts identified and mitigation measures
suggested. The EMP addresses the impacts identified during construction
and operation stages. Impacts during construction stage are temporary
and negligible; impacts during operational phase are permanent &
management plan of impacts identified is detailed below:
Liquid Effluents:
After expansion, total quantity of industrial wastewater generation will be
121.0 KLD which will be sent to force effect Evaporator to separate out
the salts and recover better quality water which will be reused for
cooling. Thus, this step is towards the water conservation. The other
source of wastewater generation is domestic wastewater of 7.0 KLD
which is disposed to soak pit through septic tank.
Page 251
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-8
Water Management
Unit maintains the records for the total water consumption at various
resources.
Condensate water from evaporator will be utilized in utility hence
there will be reduction in fresh water consumption.
Domestic effluent will be disposed off into soak pit through septic
tank.
Air Pollution control measures:
There will not be any process gas emission except tail gas, which will be
emitted after proper burning/incineration in tail gas treatment plant. Tail
gas treatment plant is integral part of process plant. It will be
updated/modify along with process plant after expansion. Hence, after
proposed expansion no stack will be added. The tail gas treatment plant
will be adequate to reduce the pollution of formaldehyde, methanol and
methane to atmosphere. There will also be recycling of combustion heat
which is very effective to reduce pollution discharge and take advantage
of wasted energy.
Unit has installed one D G Set (400 kVA) and going to install additional
one D G Set with capacity of 1000 kVA, which will be treated as stand by
and operated only in case of non-availability of power. HSD is used as a
fuel. Emitted flue gas pollutants will be SPM, SO2 and NOx. Adequate
stack height is provided for proper dispersion of pollutants.
Hazardous/Solid Waste Management:
Entire quantity of hazardous waste will be handled and disposed as per
Hazardous & Other Wastes (Management & Transboundary Movement)
Rules’2016. Salt from evaporation will be disposed to secured TSDF site
for land filling; discarded containers/barrels will be sold to authorized
recyclers. Used oil will be sold to CPCB approved recyclers.
The unit has provided isolated area with impervious flooring for the
storage of hazardous waste. Thus, hazardous waste management system
provided by the unit is adequate and continues after expansion also.
There will not be any major impact on the environment due to hazardous
waste management.
Page 252
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-9
Noise Pollution control measures:
Noise is anticipated from process plant & other machineries, D. G. set,
reactors & vehicular transportation etc. The D. G. shall be kept in a
separate enclosed room with acoustic enclosure. The motors and
compressors shall be mounted properly to ensure the reduction of noise
and vibration. The employees working in noise generating areas shall be
provided with appropriate Personnel Protective Equipments (PPEs). The
greenbelt area is developed within industrial premises and around the
periphery to prevent the noise pollution in surrounding area.
Green Belt Development:
The unit has developed greenbelt area around 1500 m2 in its existing unit
and some more area will be added for greenbelt development outside the
plant boundary. The greenbelt area is around 35% of total land area.
11.7 PROJECT BENEFITS
The proposed project expansion has a potential for employment of
skilled, semi-skilled and unskilled employees during construction phase as
well as operational phase.
11.8 CONCLUSION
Based on the study it is concluded that-
There will be no major impact on water environment as effluent will be
directly sent to forced effect evaporator & then sent to mechanical
evaporator. Condensate from evaporator will be reused for utility i.e.
for cooling. Thus, unit will achieve zero discharge after proposed
expansion.
Domestic wastewater will be disposed in soak pit followed by septic
tank.
No fuel is used for manufacturing because exothermic reaction.
Tail gas treatment plant is installed which reduce the pollution of
formaldehyde, methanol and methane to atmosphere.
To prevent fugitive emission; various step will taken like regular
sprinkling of water and paved road.
Adequate arrangement for handling and disposal of Hazardous/solid
waste will be made as per regulatory norms.
Page 253
San Envirotech Pvt. Ltd.
EIA report of Balaji Formalin Pvt. Ltd. 11-10
Fire protection and safety measures will be provided to take care of
fire and explosion hazard.
Suggestions of qualitative risk analysis study will be followed to
minimize accidents and for safe operations.
Overall, direct and indirect employment opportunities, improvement in basic
infrastructures by development of industry etc. will be observed with
negligible impact on environment.
It can be concluded that after implementation of mitigation measures and
environmental management plan during the construction and operational
phase, there will be negligible impact on the environment.
Page 254
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 12-1
Chapter-12
Disclosure of Consultant engaged Introduction
San Envirotech Pvt. Ltd. (An ISO 9001:2008, 14001:2008 and OHSAS 18001
certified company) is a leading multi-disciplinary testing laboratory in Gujarat.
SEPL provides testing services in the areas of environmental assessment and
analytical testing.
SAN Envirotech Pvt. Ltd. (henceforth SEPL) has started its work in 1990 to
serve the environment as a trustee of a next generation with a small
infrastructure under the dynamic leadership of Dr. Mahendra Sadaria.
During last two decade, SEPL has been taking care of client’s unique problems
and concerns in order to develop cost effective strategies to meet their
regulatory obligations. We focus on strategic planning and comprehensive
solutions to address both the short and long term needs of the clients.
Consequently we have developed long-term relationship with our clients to
provide them the services necessary to meet their changing needs.
To protect and preserve the natural resources on earth for future generation, it
offers extensive consultancy services in the field of environment. With its rich
experience, multidisciplinary expertise and with the support of its state-of the-
art analytical equipments, the services offered by the division are wide ranging
and encompasses entire scope of environment management and monitoring
services. With its emphasis on quality services over the years, it has evolved
itself into a single reference point in India for comprehensive environmental
services.
We conduct analytical works pertaining to various Environmental
Parameters. We perform Effluent treatability studies also. To conduct the
analysis work, we follow National & International Quality Standard and update
our process regularly.
“Quality Assurance Team” always welcomes any suggestion and
feedback, to improve the Quality, Performance and Standards of the
services. These suggestion and feedback are considered for reviewing of the
services and complied immediately.
Page 255
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 12-2
Major Milestones and Accreditation
SEPL is a recognize schedule-II Environmental Auditor appointed by Gujarat
Pollution Control Board as per the directives of the Honorable High Court of
Gujarat. Recognize laboratory under Environment Protection (EP) Act, 1986 by
Government of India (GOI). SEPL has listed as accredited EIA consultant
organization by NABET/QCI for EIA report preparation. The certificate of same
is attached with EIA report. SEPL has necessary manpower and expertise in
various fields and also the required infrastructure facilities to carry out work
related to EIA. Technical experts involved in the preparation of this EIA/EMP
report are given below:
EIA Coordinator:
Name: Dr. Mahendra Sadaria
Signature & Date:
Period of involvement December-2014 to finalization of report
Contact Information: 079-26583077
Functional Area Experts
Functional Areas
Name of the Expert
Involvement (Period and Task**)
December-2014 to finalization of
report
Signature
Air Pollution
Monitoring & Control (AP)
Dr. Mahendra Sadaria
Team Member: Diti Patel,
Henal Mehta
Planning of meteorological AAQM baseline monitoring – schedule of
site visit, site survey, selection of monitoring locations, data
verification & approval, interpretation of baseline condition of air environment. Evaluation of
results of Ambient Air Quality Monitoring (AAQM). Contribution of EIA documentation.
Air Quality
Modeling and Prediction (AQ)
Dr. Mahendra Sadaria
Team Member: Diti Patel
Assessment of pollutant release source, rate. Meteorology file generation, Air quality model
(ISCST-3) run using meteorology data, identifying source & receptor, source inventory, worst case
scenario. Prediction of GLC & plotting isopleths. Study of GLCs obtained from simulation &
calculating cumulative concentration of pollutants in AAQ due to the project. Contribution of EIA
documentation.
Page 256
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 12-3
Functional
Areas
Name of the
Expert
Involvement (Period and Task**)
December-2014 to finalization of report
Signature
Water Pollution (WP)
Dr. Mahendra
Sadaria Team Member:
Diti Patel, Henal Mehta
Site visit, selection of sampling locations, review & interpret GW, SW baseline quality, review &
approve water balance calculation for the project, explore reuse/ recycle options, prediction of
impacts & proposed mitigation measures, explore possibilities for groundwater & surface water
conservation and contribution to EIA documentation.
Ecology and Bio-diversity
Conservation (EB)
Dr. Khyati Chanana
Team Member: Henal Mehta
Site visit for ecology study, planning & scheduling for baseline ecological survey, determining status of
endangered species of flora/fauna, if any, identification of nearest ecologically sensitive area in the
study area. Review of Greenbelt development requirement of the project-suggestion for species, type
of plantation and contribution to EIA documentation.
Solid and Hazardous Waste
Management (SHW)
Dr. Mahendra
Sadaria
Review of generation of existing
Hazardous waste & ascertain compliance with HW rules for storage facilities, generation qty. &
disposal methods, studying adequacy of mitigation measures for
management of hazardous waste. Contribution of EIA documentation.
Socio Economy
(SE)
Shobhana
Sadaria
Site visit, secondary data collection,
evaluation of Socio-Economic status of the study area, assessment of the possible chances to socio-economic
issues arising out of the proposed activity, contribution in EIA documentation.
Land Use (LU) Satish Borad
Development of land use maps of study area, site visit for ground
truth survey, prepare land use classification and determine LULC of the area, prediction of impact on
land use pattern & land cover, Suggest mitigation measures, contribution in EIA report.
Hydrogeology (HG & Geo)
Hardik Patel
Site visit, understanding and representing ground water
conditions, finalization of survey findings, identification of impacts, suggestion of mitigation measures
and contribution of EIA documentation.
Page 257
San Envirotech Pvt. Ltd., Ahmedabad
EIA report of Balaji Formalin Pvt. Ltd. 12-4
Functional
Areas
Name of the
Expert
Involvement (Period and Task**)
December-2014 to finalization of report
Signature
Risk and Hazards
(RH)
Prabhat Kumar
Srivastva
Determine worst & most credible accident scenarios, Identification of modeling scenarios, consequence
modeling, finalization of RA/DMP, documentation and contribution to EIA documentation.
Noise Team Member:
Diti Patel
Site visit, selection of sampling locations, review baseline noise
levels, source & its compliance with permissible limits, contribution to EIA documentation.
Declaration by the Head of the Accredited Consultant Organization/authorized person
I, Dr. Mahendra Sadaria, hereby confirm that the above-mentioned experts are
involved in the preparation of Environmental Impact Assessment Report of Balaji
Formalin Pvt. Ltd., Plot No. 1398, Village: Moti Bhoyan, Tal: Kalol, Dist.: Gandhinagar.
I also confirm that, the consultant organization shall be fully accountable for any
misleading information mentioned in this statement.
Signature:
Name: Dr. Mahendra Sadaria
Designation: Director, Technical
Name of the EIA Consultant organization San Envirotech Pvt. Ltd.
NABET Certificate No. and date NABET/EIA/327/IA14, dated 12th May,
2014
CONTACT DETAILS:
San Envirotech Pvt. Ltd. 424, Medicine Market, Opp. Shefali Cross Road,
Paldi cross Road,
Ahmedabad-380006, Gujarat
Phone: 079-26583077
E-mail: [email protected]
Page 258
Annexure-I
Membership certificate of approve TSDF site
Page 259
ABC
Text Box
A-1
Page 260
Annexure-II
MSDS of haz. Chemicals
Page 261
Our Main Product is FORMALDEHYDE.
SALES SPECIFICATION :
CAS Number 50-00-0 EINECS Number 200-001-8 Chemical Name Formaldehyde Chemical Classification Aldehyde Formula CH2O Molecular Weight 30.03 Shipping Name Formaldehyde Solution Codes/Label Flammable Liquid, Class - 3.1 Hazardous Waste ID No. 5 Hatchem Code 2 SE / 2T UN Number 1198 Description Colourless liquid with characteristic pungent
odour. In the manufacturing of phenolic resins.
artificial silk and cellulose esters, dyes, organic chemicals, glass mirrors,
explosives, disinfectant for dwellings, ship, storage
Product Uses Houses, Utensils, Clothes etc., as a
germicide & fungicide for plants &
vegetables, improving fastness of dyes on fabrics, tanning & preserving hides;,
mordanting & water proofing fabrics; preserving & coagulating rubber latex; in
embalming fluids. Specifications Limits
Carbon Dioxide, % v/v/ Min.
37.00
Moisture, % v/v max. <1.0 * Acidity (as HCOOH), % w/w max.
0.05
Iron , ppm max. 2.00** PH 2.60 - 3.00 * Methanol content may vary as per specific customer's requirement. Hence sp. gr. will also vary accordingly. ** Valid for SS containers & HDPE carboy
packing. Application In the manufacture of explosives,
photographic materials, antiseptic and fumigants; in treatment of pulp & papers;
in cosmetics, fertilizers & fuels; in treatment of fur & hair, mouth wash,
germicidal soap, lavender water & cologne; sterilization of surgical instruments; as food
preservative. Packaging In SS tankers, ISO-containers and in HDPE
Page 262
drums / carboys. This information is based on our present state of knowledge and is
intended to provide general notes on our products and their uses. It should therefore, not be construed as guaranteeing specific properties of
the products described or their suitability for a particular application. Any existing industrial property rights must be observed. The quality of our
product is guaranteed under our General Conditions of Sale. MATERIAL SAFETY DATA SHEET (Accordingto 91/155 EC) 1. IDENTIFICATION OF THE SUBSTANCE / PREPARATION AND OF
THE COMPANY / UNDERTAKING:
Product Details: Trade Name FORMALDEHYDE, 37% SOLN. IN
METHANOL/WATER Manufacturer / Supplier Balaji Formalin Pvt. Ltd.,
Moti Bhoyan, Khatraj, Kalol Road, Tal. Kalol, North Gujarat.
2. COMPOSITION / INFORMATION ON INGREDIENTS: Description CAS No. EINECS Number
Formaldehyde 50-00-0 200-001-8 Methanol 67-56-1 200-659-6 Water 7732-18-5
3. HAZARD IDENTIFICATION: Hazard Description Extremely hazardous product. Harmful if
swallowed or inhaled. Causes severe
irritation or burns to skin, eyes, upper
respiratory tract, gastro-intestinal irritation and burns to mouth and throat Lachrymator
at levels from less than 20 ppm upwards. Chronic Exposure Kidney and Lever Damage. Chrcinogen City (NTP/IARC/OSHO)
Yes
4. FIRST-AID MEASURES: After inhalation Remove to fresh air, restore breathing, get
medical attention. After Skin Contact Remove contaminated clothing, flush with
plenty of water at least for 15 minutes. After Eye Contact Immediately flush opened eye with plenty
of running water for at least 15 minutes. After Swallowing Induce vomiting of conscious patient by
giving plenty of water to drink. Consult physician immediately in case of an
unconscious victim.
5. FIRE-FIGHTING MEASURES:
Page 263
Suitable extinguishing
Agents CO2, Dry Chemical Powder, Water Spray
and Alcohol foam.
6. ACCIDENTAL RELEASE MEASURES: Person-related Safety
Precautions Proper protective equipment and self
contained breathing apparatus with full face piece operated in positive pressure mode.
Measures for
cleaning/collecting Shut off sources of ignition, no flares,
smoking or flames in area. Stop leakage if
possible. Use water spray to reduce vapour. Take up with sand or other non combustible
absorbent and place in to container for disposal according to item 13.
7. HANDLING AND STORAGE: Handling
Information for Safe
handling Avoid breathing vapours, avoid contact with
eyes, skin and clothing. Decontaminate
soiled clothing thoroughly before use. Information about fire and explosion protection
Flammable liquid. Closed containers exposed to heat may explode.
Storage Requirements to be met by
store rooms and receptacles Store in tightly closed containers in a dry,
cool, well ventilated, flammable liquid storage area.
8. EXPOSURE CONTROLS / PROTECTION: 50-00-0 formaldehyde
OES Short term value * 3mg/m
Long term value **1.5 mg m3 * total inhalable vapour, ** permissible exposure Personal Protective
Equipment Self contained breathing apparatus and full
protective clothing Respiratory protection Self contained breathing apparatus. Protection of hands Gloves of natural rubber Eye Protection Safety glasses W/face shield.
9. PHYSICAL AND CHEMICAL PROPERTIES: General Information:
Form Liquid Colour Colourless Odour Pungent odour Change in Condition: Melting Point -- Boiling Point / Boiling range 960 C Flash Point: (TCC) 590C Flammable Limits Upper 73.0% , Lower 7.0% Auto Ignition Temperature 423oC Specific Gravity 1.08 Vapour Density (Air = 1) 1.0
Page 264
Vapour Pressure (MMHG) at
200C 1.3
Solubility /Miscibility with water at 200C
Complete
10. STABILITY & REACTIVITY: This product is stable, strong reducing agent, especially in alkaline
solution. Keep away from strong bases and acids, oxidizing agents, aniline, phenol, isocyanates, anhydride. Combustible lightand air sensitive,
polymerzes spontaneously. Dangerous reactions Carbon monoxide may form on incomplete
combustion. Dangerous Decomposition Products
CO, CO2 & Vapours of formaldehyde
11. TOXICOLIGICAL INFORMATION: Acute toxicity
LD/LC50 Values relevant for
classification Oral/LD 50:100 mg/kg (rat)
SKN LD 50: 270 ul/kg (rabbit) Primary irritant effect: On the Skin Irritating effect (severe) On the eye Irritating effect (Severe) Sensitization Prolonged contact may cause skin
sensitization
12. ECOLOGICAL INFORMATION: Environmental Toxicity The product is expectecd to be slightly toxic
to aquatic life. The LC 50/96 hrs values for
fish are between 10 and 100 mg/l. Environmental Fate The product is expected to be slightly toxic
to aquatic life. The LC 50/96 hrs values for
fish are between 10 and 100
13. DISPOSAL CONDITIONS: Whatever cannot be recycled, should be absorbed in sand or other non
combustible absorbent, containerized and transferred to appropriate and approved waste disposal facility. Dispose waste, containers and unused
contents in accordance with official regulations.
14. TRANSIT INFORMATION: Shipping Name FORMALDEHYDE SOLUTION
UN Number 1198 Class : 3,3.3,8 Packing Group III Label : Flammable Liquid
15. REGULATORY INFORMATION: This Product is extremely hazardous. It is listed as an "ACGIH" 'suspected'
human carcinogen and a "NTP" anticipated human carcinogen. It may cause (mutagenic) reproductive effects.
Page 265
p. 1
3 1 0
He a lt h
Fire
Re a c t iv it y
Pe rs o n a lPro t e c t io n
2
3
0
H
Material Safety Data SheetMethyl alcohol MSDS
Section 1: Chemical Product and Company Identification
Product Name: Methyl alcohol
Catalog Codes: SLM3064, SLM3952
CAS#: 67-56-1
RTECS: PC1400000
TSCA: TSCA 8(b) inventory: Methyl alcohol
CI#: Not applicable.
Synonym: Wood alcohol, Methanol; Methylol; WoodSpirit; Carbinol
Chemical Name: Methanol
Chemical Formula: CH3OH
Contact Information:
Sciencelab.com, Inc.14025 Smith Rd.Houston, Texas 77396
US Sales: 1-800-901-7247International Sales: 1-281-441-4400
Order Online: ScienceLab.com
CHEMTREC (24HR Emergency Telephone), call:1-800-424-9300
International CHEMTREC, call: 1-703-527-3887
For non-emergency assistance, call: 1-281-441-4400
Section 2: Composition and Information on Ingredients
Composition:
Name CAS # % by Weight
Methyl alcohol 67-56-1 100
Toxicological Data on Ingredients: Methyl alcohol: ORAL (LD50): Acute: 5628 mg/kg [Rat]. DERMAL (LD50): Acute: 15800mg/kg [Rabbit]. VAPOR (LC50): Acute: 64000 ppm 4 hours [Rat].
Section 3: Hazards Identification
Potential Acute Health Effects:Hazardous in case of skin contact (irritant), of eye contact (irritant), of ingestion, of inhalation. Slightly hazardous in case ofskin contact (permeator). Severe over-exposure can result in death.
Potential Chronic Health Effects:Slightly hazardous in case of skin contact (sensitizer). CARCINOGENIC EFFECTS: Not available. MUTAGENIC EFFECTS:Mutagenic for mammalian somatic cells. Mutagenic for bacteria and/or yeast. TERATOGENIC EFFECTS: ClassifiedPOSSIBLE for human. DEVELOPMENTAL TOXICITY: Not available. The substance is toxic to eyes. The substance may betoxic to blood, kidneys, liver, brain, peripheral nervous system, upper respiratory tract, skin, central nervous system (CNS),optic nerve. Repeated or prolonged exposure to the substance can produce target organs damage. Repeated exposure to ahighly toxic material may produce general deterioration of health by an accumulation in one or many human organs.
Section 4: First Aid Measures
Page 266
p. 2
Eye Contact:Check for and remove any contact lenses. Immediately flush eyes with running water for at least 15 minutes, keeping eyelidsopen. Cold water may be used. Get medical attention.
Skin Contact:In case of contact, immediately flush skin with plenty of water for at least 15 minutes while removing contaminated clothingand shoes. Cover the irritated skin with an emollient. Cold water may be used.Wash clothing before reuse. Thoroughly cleanshoes before reuse. Get medical attention immediately.
Serious Skin Contact:Wash with a disinfectant soap and cover the contaminated skin with an anti-bacterial cream. Seek immediate medicalattention.
Inhalation:If inhaled, remove to fresh air. If not breathing, give artificial respiration. If breathing is difficult, give oxygen. Get medicalattention immediately.
Serious Inhalation:Evacuate the victim to a safe area as soon as possible. Loosen tight clothing such as a collar, tie, belt or waistband. Ifbreathing is difficult, administer oxygen. If the victim is not breathing, perform mouth-to-mouth resuscitation. WARNING: It maybe hazardous to the person providing aid to give mouth-to-mouth resuscitation when the inhaled material is toxic, infectious orcorrosive. Seek immediate medical attention.
Ingestion:If swallowed, do not induce vomiting unless directed to do so by medical personnel. Never give anything by mouth to anunconscious person. Loosen tight clothing such as a collar, tie, belt or waistband. Get medical attention immediately.
Serious Ingestion: Not available.
Section 5: Fire and Explosion Data
Flammability of the Product: Flammable.
Auto-Ignition Temperature: 464°C (867.2°F)
Flash Points: CLOSED CUP: 12°C (53.6°F). OPEN CUP: 16°C (60.8°F).
Flammable Limits: LOWER: 6% UPPER: 36.5%
Products of Combustion: These products are carbon oxides (CO, CO2).
Fire Hazards in Presence of Various Substances:Highly flammable in presence of open flames and sparks, of heat. Non-flammable in presence of shocks.
Explosion Hazards in Presence of Various Substances:Risks of explosion of the product in presence of mechanical impact: Not available. Explosive in presence of open flames andsparks, of heat.
Fire Fighting Media and Instructions:Flammable liquid, soluble or dispersed in water. SMALL FIRE: Use DRY chemical powder. LARGE FIRE: Use alcohol foam,water spray or fog.
Special Remarks on Fire Hazards:Explosive in the form of vapor when exposed to heat or flame. Vapor may travel considerable distance to source of ignitionand flash back. When heated to decomposition, it emits acrid smoke and irritating fumes. CAUTION: MAY BURN WITH NEARINVISIBLE FLAME
Special Remarks on Explosion Hazards:Forms an explosive mixture with air due to its low flash point. Explosive when mixed with Choroform + sodium methoxide anddiethyl zinc. It boils violently and explodes.
Section 6: Accidental Release Measures
Page 267
p. 3
Small Spill:Dilute with water and mop up, or absorb with an inert dry material and place in an appropriate waste disposal container.
Large Spill:Flammable liquid. Poisonous liquid. Keep away from heat. Keep away from sources of ignition. Stop leak if without risk.Absorb with DRY earth, sand or other non-combustible material. Do not get water inside container. Do not touch spilledmaterial. Use water spray to reduce vapors. Prevent entry into sewers, basements or confined areas; dike if needed. Callfor assistance on disposal. Be careful that the product is not present at a concentration level above TLV. Check TLV on theMSDS and with local authorities.
Section 7: Handling and Storage
Precautions:Keep locked up.. Keep away from heat. Keep away from sources of ignition. Ground all equipment containing material. Donot ingest. Do not breathe gas/fumes/ vapor/spray. Wear suitable protective clothing. In case of insufficient ventilation, wearsuitable respiratory equipment. If ingested, seek medical advice immediately and show the container or the label. Avoidcontact with skin and eyes. Keep away from incompatibles such as oxidizing agents, metals, acids.
Storage:Store in a segregated and approved area. Keep container in a cool, well-ventilated area. Keep container tightly closed andsealed until ready for use. Avoid all possible sources of ignition (spark or flame).
Section 8: Exposure Controls/Personal Protection
Engineering Controls:Provide exhaust ventilation or other engineering controls to keep the airborne concentrations of vapors below their respectivethreshold limit value. Ensure that eyewash stations and safety showers are proximal to the work-station location.
Personal Protection:Splash goggles. Lab coat. Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Gloves.
Personal Protection in Case of a Large Spill:Splash goggles. Full suit. Vapor respirator. Boots. Gloves. A self contained breathing apparatus should be used to avoidinhalation of the product. Suggested protective clothing might not be sufficient; consult a specialist BEFORE handling thisproduct.
Exposure Limits:TWA: 200 from OSHA (PEL) [United States] TWA: 200 STEL: 250 (ppm) from ACGIH (TLV) [United States] [1999] STEL: 250from NIOSH [United States] TWA: 200 STEL: 250 (ppm) from NIOSH SKIN TWA: 200 STEL: 250 (ppm) [Canada] Consultlocal authorities for acceptable exposure limits.
Section 9: Physical and Chemical Properties
Physical state and appearance: Liquid.
Odor: Alcohol like. Pungent when crude.
Taste: Not available.
Molecular Weight: 32.04 g/mole
Color: Colorless.
pH (1% soln/water): Not available.
Boiling Point: 64.5°C (148.1°F)
Melting Point: -97.8°C (-144°F)
Critical Temperature: 240°C (464°F)
Page 268
p. 4
Specific Gravity: 0.7915 (Water = 1)
Vapor Pressure: 12.3 kPa (@ 20°C)
Vapor Density: 1.11 (Air = 1)
Volatility: Not available.
Odor Threshold: 100 ppm
Water/Oil Dist. Coeff.: The product is more soluble in water; log(oil/water) = -0.8
Ionicity (in Water): Non-ionic.
Dispersion Properties: See solubility in water.
Solubility: Easily soluble in cold water, hot water.
Section 10: Stability and Reactivity Data
Stability: The product is stable.
Instability Temperature: Not available.
Conditions of Instability: Heat, ingnition sources, incompatible materials
Incompatibility with various substances: Reactive with oxidizing agents, metals, acids.
Corrosivity: Non-corrosive in presence of glass.
Special Remarks on Reactivity:Can react vigorously with oxidizers. Violent reaction with alkyl aluminum salts, acetyl bromide, chloroform + sodium methoxide,chromic anhydride, cyanuirc chlorite, lead perchlorate, phosphorous trioxide, nitric acid. Exothermic reaction with sodiumhydroxide + chloroform. Incompatible with beryllium dihydride, metals (potassium and magnesium), oxidants (bariumperchlorate, bromine, sodium hypochlorite, chlorine, hydrogen peroxide), potassium tert-butoxide, carbon tetrachloride, alkalimetals, metals (aluminum, potassium magnesium, zinc), and dichlormethane. Rapid autocatalytic dissolution of aluminum,magnesium or zinc in 9:1 methanol + carbon tetrachloride - sufficiently vigorous to be rated as potentially hazardous. Mayattack some plastics, rubber, and coatings.
Special Remarks on Corrosivity: Not available.
Polymerization: Will not occur.
Section 11: Toxicological Information
Routes of Entry: Absorbed through skin. Eye contact. Inhalation. Ingestion.
Toxicity to Animals:WARNING: THE LC50 VALUES HEREUNDER ARE ESTIMATED ON THE BASIS OF A 4-HOUR EXPOSURE. Acute oraltoxicity (LD50): 5628 mg/kg [Rat]. Acute dermal toxicity (LD50): 15800 mg/kg [Rabbit]. Acute toxicity of the vapor (LC50):64000 4 hours [Rat].
Chronic Effects on Humans:MUTAGENIC EFFECTS: Mutagenic for mammalian somatic cells. Mutagenic for bacteria and/or yeast. TERATOGENICEFFECTS: Classified POSSIBLE for human. Causes damage to the following organs: eyes. May cause damage to thefollowing organs: blood, kidneys, liver, brain, peripheral nervous system, upper respiratory tract, skin, central nervous system(CNS), optic nerve.
Other Toxic Effects on Humans:Hazardous in case of skin contact (irritant), of ingestion, of inhalation. Slightly hazardous in case of skin contact (permeator).
Special Remarks on Toxicity to Animals: Not available.
Special Remarks on Chronic Effects on Humans:
Page 269
p. 5
Passes through the placental barrier. May affect genetic material. May cause birth defects and adverse reproductiveeffects(paternal and maternal effects and fetotoxicity ) based on animal studies.
Special Remarks on other Toxic Effects on Humans:
Section 12: Ecological Information
Ecotoxicity: Ecotoxicity in water (LC50): 29400 mg/l 96 hours [Fathead Minnow].
BOD5 and COD: Not available.
Products of Biodegradation:Possibly hazardous short term degradation products are not likely. However, long term degradation products may arise.
Toxicity of the Products of Biodegradation: The products of degradation are less toxic than the product itself.
Special Remarks on the Products of Biodegradation:Methanol in water is rapidly biodegraded and volatilized. Aquatic hydrolysis, oxidation, photolysis, adsorption to sediment, andbioconcentration are not significant fate processes. The half-life of methanol in surfact water ranges from 24 hrs. to 168 hrs.Based on its vapor pressure, methanol exists almost entirely in the vapor phase in the ambient atmosphere. It is degraded byreaction with photochemically produced hydroxyl radicals and has an estimated half-life of 17.8 days. Methanol is physicallyremoved from air by rain due to its solubility. Methanol can react with NO2 in pollulted to form methyl nitrate. The half-life ofmethanol in air ranges from 71 hrs. (3 days) to 713 hrs. (29.7 days) based on photooxidation half-life in air.
Section 13: Disposal Considerations
Waste Disposal:Waste must be disposed of in accordance with federal, state and local environmental control regulations.
Section 14: Transport Information
DOT Classification: CLASS 3: Flammable liquid.
Identification: : Methyl alcohol UNNA: 1230 PG: II
Special Provisions for Transport: Not available.
Section 15: Other Regulatory Information
Federal and State Regulations:Connecticut hazardous material survey.: Methyl alcohol Illinois toxic substances disclosure to employee act: Methyl alcoholIllinois chemical safety act: Methyl alcohol New York release reporting list: Methyl alcohol Rhode Island RTK hazardoussubstances: Methyl alcohol Pennsylvania RTK: Methyl alcohol Minnesota: Methyl alcohol Massachusetts RTK: Methylalcohol Massachusetts spill list: Methyl alcohol New Jersey: Methyl alcohol New Jersey spill list: Methyl alcohol Louisianaspill reporting: Methyl alcohol California Directors List of Hazardous Substances (8CCR 339): Methyl alcohol TennesseHazardous Right to Know : Methyl alcohol TSCA 8(b) inventory: Methyl alcohol SARA 313 toxic chemical notification andrelease reporting: Methyl alcohol CERCLA: Hazardous substances.: Methyl alcohol: 5000 lbs. (2268 kg)
Other Regulations:OSHA: Hazardous by definition of Hazard Communication Standard (29 CFR 1910.1200). EINECS: This product is on theEuropean Inventory of Existing Commercial Chemical Substances.
Other Classifications:
WHMIS (Canada):CLASS B-2: Flammable liquid with a flash point lower than 37.8°C (100°F). CLASS D-1B: Material causing immediate andserious toxic effects (TOXIC). CLASS D-2A: Material causing other toxic effects (VERY TOXIC). Class D-2B: Material causingother toxic effects (TOXIC).
Page 270
p. 6
DSCL (EEC):R11- Highly flammable. R23/24/25- Toxic by inhalation, in contact with skin and if swallowed. R39- Danger of very seriousirreversible effects. R39/23/24/25- Toxic: danger of very serious irreversible effects through inhalation, in contact with skin andif swallowed. S7- Keep container tightly closed. S16- Keep away from sources of ignition - No smoking. S36/37- Wear suitableprotective clothing and gloves. S45- In case of accident or if you feel unwell, seek medical advice immediately (show the labelwhere possible).
HMIS (U.S.A.):
Health Hazard: 2
Fire Hazard: 3
Reactivity: 0
Personal Protection: h
National Fire Protection Association (U.S.A.):
Health: 1
Flammability: 3
Reactivity: 0
Specific hazard:
Protective Equipment:Gloves. Lab coat. Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Wear appropriate respiratorwhen ventilation is inadequate. Splash goggles.
Section 16: Other Information
References:-SAX, N.I. Dangerous Properties of Indutrial Materials. Toronto, Van Nostrand Reinold, 6e ed. 1984. -Material safetydata sheet emitted by: la Commission de la Santé et de la Sécurité du Travail du Québec. -Hawley, G.G.. TheCondensed Chemical Dictionary, 11e ed., New York N.Y., Van Nostrand Reinold, 1987. LOLI, HSDB, RTECS, HAZARDTEXT,REPROTOX databases
Other Special Considerations: Not available.
Created: 10/10/2005 08:23 PM
Last Updated: 05/21/2013 12:00 PM
The information above is believed to be accurate and represents the best information currently available to us. However, wemake no warranty of merchantability or any other warranty, express or implied, with respect to such information, and we assumeno liability resulting from its use. Users should make their own investigations to determine the suitability of the information fortheir particular purposes. In no event shall ScienceLab.com be liable for any claims, losses, or damages of any third party or forlost profits or any special, indirect, incidental, consequential or exemplary damages, howsoever arising, even if ScienceLab.comhas been advised of the possibility of such damages.
Page 271
Annexure-III Compliance report of RO-MoEF, Bhopal
Page 272
~ 4 h j r P i t MINISTRY OF ENVIRQNMENT, FREST & CLIMATE CHANGE
SPEEB POST * wikw, dffw 49, Regianat Oftice, Western Region, "* * m'*
"Kendriya Pwyavaran Ehavan" fGm * 30-s/Link Road No. 3
E-5, 4 R a v i Shankar Nagar, * (90~~Whopd-462QI 6 [M.P.) Telefm: 0755-2465054
E-mail: [email protected] m: 4E.07.20E6
-. - aa
m: Expansion with modernization of Formaldehyde (1,500 TFM to 5,000 TPM) manufaciaring unit at plot na. 135)ttS Post- Moti Bhoyan, Taluka- Kalab District - Gandlzinagar, Gujarat by Mfs BalajE Formatin f i t . Et& reg. -
I
mf: Ministry's letter no J-1 IO t 1h52SRQ09-1A.Il (I) dated 24.08.2QlQ .
33- 'w'
:- The General Manager, MMA Balajl Formakin Put. Ltd., t 388, Moti Bhoyan, Nr. Multi Tech Ltd., Post: Mati Bhoyan, Taluka Katal, district Gandhinagar Gujarat - 382 72 1 - far information.
- - - A ._-*_ _ _ _ ---_&a - .-,"--" .-
Page 273
Manit~ring the Impkmentatian af Envirarmentat Safeguards Ministm af Environment Fwest & Climate Change
Western Region, Regional Office, Bhapal MQNITQbRR\IG REPORT
PART - I DATA SBEET
1 1. ( Project type: River- valley/ Mining/ Endusrry / 1 : [ Industry 1
- -. -- -. 2.
- . -
t
3. j Clearance letter (s]IC?M No. k dak
-.-
:
: : :
:
:
4.
5.
I
2.
Thermal I NuckeariQther (specify) Name of the project _ __ -.....-A
--. ..- .. - -
' plat no, 1398, Post- M d i Bhoyan, Tatuka- Katst District - Gandh'imgar, Gltjarat by Mh Balaji Focmatln Pa. Ltd J- 1 E 0 1 1 f62V20Q9-LA I1 0 dated 24.08.201Q
'
~a'nclkina~ar. ,,. Gtbjarat
Latibde: 23'9'45.77" NiLongitude: 72?26'45.77̂ ~
. Ws Balaji Formdin Put. Ltd., 1398, Moti Bhoyan, Nr. Rama Multi Tech &d., Past: Moti Bhoyan, Tatuka Katol, District GandhEnagar Getjarat - 382 321 Concerned Person : Mahendra Gupt& : -I- 91 - 93777 32830
Location: a) District (s) b) State (s) c} Latituddtongitude ---
' Ad&ess for corwpandence a. Address of the Concerned Project Chief
Engineer (with Pin Code & telaphatdteteld fax hurnbe~s)
c) RC ratid1RR and the year a f assessment
t
: .:.. -Expansion- - w k b mode&a%i~n -of Farmldehyde (1,500 TFM to 5,OOQ TPM) manufacturing unit at
2
6.
7.
, 8.
- : : :
: : :
. :
b. Address of the Executive Prorjeca Engineer d M a n a s _&ti~ Pbu2ade .& tekephonel &led
-- -TEzffms63]~ , SaIient features
L f a. Of the project , b. Ofthe EMP Breakup afthe pr~ject area
' a. Submergenee area: forest & non-Forest b. Others
: Breakup of the project afiected poputathn with enurneration af Ehme IosCng houseddwe.Lting units only agriculturat lasrd only, both dwekting units &. ag~iculrurd land & landless ~aborers/artIsms. 1
Alk~cation ofexpenditure for EMP : -. -- -.
I - -
Rs. Ti;B i a E i E 3 iakh and h. 30.5 t&h have been spent. under various heads of the ersvirsnment management $an.
t>) Attocation made far EMP with item .wise'and : year wise break-up -- 1-
:
-
Benetlt cost Ratio : I O % per anntlm Year of assessment : 20 I4
Estimated Cost : Rs. 7.0 Cr. ' Revised Estimated Cost : Rs. 8 Cr.
Year ~f Price ReFerence : 201 0 ,
40- - . _ -. _-._ -. ---- _.__<
:- -"
Formaldehyde plant with capacity of 5000 a) Fully Atrtomatic phnt b) Zero Liquid Discharge Total tad is non-forest area. Tot$ pbt area of $281 m2. Construetian of unit
, cavered 1143 m2. The open area available at unit is : 1438 m2. Total [and is non-agriculti~re and hence affected population is Nil.
9.
r ;
-- - -
' Financia1 detaiks: ~ a) Project cost as ariginaEEy planned and
subsequent revised estimates and the year of price reference
:
4
Page 274
. .
Land fsr n~n-farmtry use --.. 1 I. The status of clear fekllng in non-forest areas (Such : Not Applicable because Total land is non-
10.
' . : ' d) Whether (c) includes the cost of EM as shown
in the above . ' e) Actual expenditure incurred on project so far
f) Actual expenditure incurred on EMF so far
Forest land requirement a. The status of approval for diversion of forest
I
[ Rearing, Copy of Advertisement, Environment ~k~&i-20@9 1 1
13. 14.
15.
- I support for site visits. Date: Letter &om RQ
- Yes 6) includes the cost of EMP
1 :
Dare RepEy from PA .
Actual Expenditure inc~ured on the project so far : 9.5 Cr. Actual expenditure incurred on the environmental plans so far : Rs. 144.0 lakh.
Not Applicable
Reason for the cfetay if the project is yet t~ start. Dates of site visits a. The dates on which the pmject was monitored
by the ROr on previous occasions, if any b. Date &site visits for this monitoring repm
. Details ofcorrespondence with PA for obtaining act , on pkansAnf~rmtion on status of compliance ~CI
safeguards ather than the sautine letters f ~ r logistic
25. EO.2k10 from GPCB, Remmnaendation ofpubfic 1 18.1.201 I Infbrmation submitted.
- -- - -
1. $, \ ,
Y\ \
- - i - -
( Statement ofSludge disposal etc submitted. I - - 1 27.7.2015 Copy of CC&A, EC, Objectian Ce~tificete, I
:
:
'
: -
- - - & Fmm-V req.
- - - - - - _ __ - - - - -- -_ __ _ _ -- submitted. 15.32014 Copy of CC&A, EC, Objection Certificate* Statement of Sludge disposat etc sitbrnitted. 22.82014 Copy sf CC&A, EC$ Objecfi~n Certificate,
' Statement of Sludge disposal etc submitted.
I Statement of Sfudge disposal etc submitted. - 1 t 1.2.201 6 Copy of CCdA, EC, Objection Certificate,
Not applicable since plant already in praduction.
--'
. Monitoring Report Visit : Wh June, 2016 As above '
(.
-
c 15. f ! .20 15 _ _Copy of CC&A, EC, Objection Certificate, Statement ofsludge-' dispo~ak- ere
16.1 201 5 Copy of @C&A, EC, Objection Certificate,
-- - -
- - Statement of sfudge disposal etc submine&
I
28.4.2016 Copies of CTEKTO, proposed expansion, feasibikity r e p o r t s I E ~ ~ B , show came noticesdct~sure Far last five years, detaib of cst~rt case2 detaits of EMP (sub head wise), Compkiance &e analytical mpaa for last tlve years, point wise comptian~e of canditions, Chsonofo~~~f-gv~ts-~~~isuw~c;&~f TOR an& Konitoring schedule af stack, ambient air3 noise & water quatit<. -
l7.5.2Qk6 Copy oFCTE/UO, EIAEMP, Shw cause notices, details of court ease, dates of cammencement of work, expenditure incurred an EMP, Drrly filed data sheet, Point wise comptiance af conditions, Chronal~gy of events for issirance of TOR & Monitoring sehedute of stack submitted.
*--
- -
24.6.20 Ld Revise Data sheet, Revised EC compliance report, Analjsis repart, Drat EIA report with projea details & production data submitted.
Page 275
, PART-H&nI . a
DESCRIWIVE REPORT ON STATUS QF COMPLIANCE TO CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
Q.M. No.: J-1 &OlI6625/2OQSb-lA.EE (&) dated 24.08.2010 I SPECIFIC CETNDITIONS: I
scrubbeys and stacks sf adequate height as per CPCB guide& ines shal i be provided ea control gaseous emissi.~ns w &in permissi bte limits as per norms prescribed by the GPCB or prescribed in the E (P) Rules whichever are
: incinerator instalked to reduce RSPM !eve!. AH ! the emission gas passes through Incinerator. P A informed that Pottution Control System has not failed icnti! now assitred not to restart the unit if *
: any o.f siystem~f&~twEast ane yewdata- provided- I and found within norms of GPCB.
i .
_ _ _ _
1 ( i i .
more stringent. The Natianal AAQ. Emission standards issued
Efforts shall to reduce RSPM Levels in the ambient air and a time bound action pkan shall be submitted. At m time, the emission levels shall ga beyond the prescribed standards. [n the event ~f failwe af any g&&~n~con~eoLs~tem .-- _------ adopted b the unit, the respective unit shalt not
by the Ministry vide G.S,R No. 826(E) dated
he restarted until the colxtrsl measures are ' rectified to achieve the desired efficiency. Adequate pollution control measures including
incinerated through Incinerator. Gases 'after t~eatrnent are discharged through prescribed norms. Last one year data provided and found
within norms af GPCB.
Therefore, condition comp l fed.
Air quality emission mortitoring is done on the monthly basis. Reports of last one year provided.
Therefore, condition comphed.
Tail gas passes through Scrubber and then
I 1 1 dh 1 1.2089 shat l be €01 towed. 1 Condition complied. iv. 1 Scrubber shalt be instatled to ccsntral prseess 1 Serubbe~ Installed for contr~tling Fugitive
t
- - - -
K.
emissim at project site. In plant controt measures for checking fugitive ernissians from all the uulnerabke sources sk!l .- be p.av3e$, ---
.-Ftqitrhe-XnT ShiEl be comtr~kled by provided closed storage, closed handling & conveyance of chemicalslaaterid, rnulti cyclone separator and water spoinleting system.
. Dust suppression system including water ; sprinkling system shall be provided at lwding
emission gases. Dust Suppression system not : requised at loading & urdaadbng area as the final _.gsneb.hle~~&kiq~~,i&Ek:A-~~fo~rnt&t~~~~66~~~ generated and there is no direct contact with chemical as the entire system from input to outpuk is closed one. Condition complied. However, the PA was asked to monitor dust
, generatian and if it is found necessary, dust suppression system may have to be instalbd
3
I wtoading areas to cantrol dust emissions. 1 For further control of fugitive emission, fo'oliowing steps shall be faIkobved; t . Ciosecf handking system shall be pcavided
for chemicals. 2. c ~ d e ~ e g shall be provided aver
reactor.
3. System of Leak detection and repair af purnpLpipeline based on preventive maintenance.
4. The acids shall be taken from starage tanks to reast~r.s a h ~ ~ ~ ~ g h eFased pipeline. Storage tanks 'shalt be vented through trap receiver and condenser operated on chilled water. Cathodic protection shall be provided to the underground soivent storage tanks.
1. Closed Loop adopted.
: 2. PA informed t b t kff LJX Condenser not required as Water is being used as cooling media. 3. Stand by prrmp/rnotar for each pilrnp installed to take care during shut down/maintenance.
4. PA- ht~md-- thah -no acid is used- in-fKe mmufacturing process directly knee the PA informed that this cclnditian does not apply. Therefore, the objectives are reported fi~lfilled stl,though prescribed technological methods differ. Therefore, condition complied.
Page 276
vii.
\
',
\ '.
Monitoring of Methanol & Formaldehyde along with other relevant parameters like PMlo, PM2.j, SO2, NQx, MC and VOCs in work zone environment, product, raw material sto~age area etc, shall be ew~ied. -out cqgula~ky m& cecclds maintained. The emission shall conform to the
DG Set gaseous emissions discharged through stack height.
Total Acoustic EncIosure available to DG SET so noise pol tution is under permissible fimits.
vi.
~onditiohs complied. Analysis Reports of PMlo, PMz.5, S02, have deen submitted and found within GFCB norms.
: Condition complied : - - - -- - .-
viii.
The gaseous emissions from DG set shaft be , dispersed th~oltgh stack height as per CPCB standards. Acoustic enclosure shall be pr~vided to the DG sets to mitigate In the noise pollution.
.
' including result of monitored data on its
limits imposed by EPCB. : The campmy. sheit upload the status of c~mptieraee ef the stipulated EC conditions,
b. Reactor a d so-Event handtin, pump -- shall - haw mechanical seals to prevent leakages.
PA informed that Monthly data of GPCB uploaded reguktrty on GPCB ~ebsite. Compliance Report- of ambient levels sent to
b. All Pivmps have got Mechanical. seat
c. The candenser shatl be provided with sufficient HTA and residence time so as ta achieve more than 95% recovwy.
d. SaLvents shall be stored in a separate space specified with all safety measures.
:
web& and shall update the same periodically. It shdI sirnz~kmeoushy b sent to the fPO of MQEF, the respaetive zonal ofice of CPCB' and the GPCB. ~heievals of PMlo, PMZ5, S02, MOx and VOCs (ambient gate sf the company and at important public places. Sotvent management shaH be as fallaws:
a. ' Reactor *ha[[ he someet& &, &itleg brine condenser system.
: c. No Solvent Recovery process adopted
d. Separate Space provided for Solvent Storage
I e. Praper eat-thing shall be provided in at[ the
e tectricaf equipmeat wherever salue~t handling is done.
Bhopal RO on half yearly basis. Display board ' maintained on the main gate of Factory p~emises. Dtrring disctrssian, PA informed rhat they da nat have web portal. Therefore, condition not complied.
e'
The PA rep~rted as fallows:
a. As ceoting water is circulated, Chilled condenser system is not required.
! e. Earthing provided to all equipments
' f. Entire plant sha[L be flame proof. The solvent storage t d s shall be provided with breather valve to prevent bsses.
f- All motors in the plant are flame mot PA uses seal Pat in place of breather valve for ssiuent.
x. -'
~ndustrial waste water shall be evaporated through MEE after treatment.
~ ~ t d - w a ~ ~ q u i ~ e r n e ~ t from Marmada -__ _ i . canal ' not exceed 104 rn3/day and prior permission shall be obtained from the concerned department.
MEE insfalled for waste eva para tion. Septic Tanks instaued for domestic waste water.
Thi~s, conditions camplied, PA informed that 4&iier requirement far 5000 TPM never exceeds 104 m!/day.- - -L- A.
Page 277
I
xi.
..- , --
,
i
Liquid waste water was not famd in the . premises and FA informed they achieved ZLB.
PA infarmed that septic'tmk and soak pits have been put in place.
L
The Coinoany shall harvest cainwater h m the
xiii.
As proposed, 'zera' dischargeshall be strictly implemented and no wastewater shall be discharged outside the premises. Damestic wastewater shall begeated in septic tank f ~ ~ ~ ~ ~ e d by soak pit. $
Therefore, conetitioas complied. Rain waker is coliected from rooftop md stored
xii.
- - cotleetion storage and dispasal of h ~ w d ~ waste under the bam.&aua waste (Management* Handling d Tram-houndmy macement) Rules, 2008 and amendments !time to time for
: to; meet. any ernepgency. No driver is ahwed to
the PA for fult
The campany sMl obtain authorization for . FA -is a member of Saurashta Envito Prajacts Put Ltd- - Bhachau. Fire Fighting system along with adequate hases and header t~ teaoh each comer of plant installed.
rnalragement sf 4 - d ~ ~ wastes and prior pemissi~n &an G 6 B &&Il be obtained for . disposal of s0Edh-u waste in the TSDF. The cancemed aamgam& shall undertake.
rwftops 6f the buildings and storm water drains to recharge the ~ o u n d water and use the same water.
-. - - - - . - - . . -
' High catarlflc organic residues shall be sent to cement industries for burning in the kib or disp~sed off@ nearby TSDF site.
~ ~ t d i t i o n complied. : Evaporatioa residuak ace disposed to TSDF. The
C
, Condition
' in a separate tank and reused in ihe process. Idowever PA lnfonned that they haw not faund
: it feasibb to re~harge ground water as the ---- I --C.-CC---I- - - - - .-- ; qiZiEWy ts uerj kss. C~nditisn c~mpfied.
' Evaporaticon oesid~ds are disposed €a TSDF. . The PA is a member of Saurashtra Enviro , Projects f i t Ltd. - Bhackau.
!
Page 278
1 1 ramr materials or as raw materiat substitutes 1 process \ in other processes. I
c. Use of automated f2ling to; minimize spi tlage,
d. Use of Close Feed system i n t ~ batch 'reactors.
I I health. ~indibiali~ not complied.
e. Venting equipment thmugh vapor recovery ea emplied
C. Complied
d. Complied
xxi.
~eteciion aF $mt spscies s k t l be as per the cpca g~bi~ifiw, c.
-- - - 'S ---L-=--- - - -
Pravision shall. k.made fat* the housing for the c~nst~uctian hbaur withim the site with at1 necessary i~lifias&uctur& and &c#itbs such as fud f ~ r cooking% rn~b21e rerib& m~biEe sewage treatment piant, safe drinkfts-8 watek medical health care, edehe e t ~ . The h~usbgrnay he in rhe form €If te@l@~~&)t S t P U b N t€b be C B ~ Q V ~
after the carnpteiern of ohe praject- Alt the construction wastes shd br managed so that there is no impaet an the sumot6nding'
4.
/ i '\
'. Grqen belt &&I be developed in 1,500 m' (35%) to mitigate the impact o f air emisskns.
: baundary wall hss been earmarked for plantation where, smtL size pkants ooulrf he seen. 'She atea -is fw less-than requlnd 1,200 m2. PA has fcnocC I the area ta prevent from browsing hy anirG6i : Therefbe* &bB compliance as per candition not yak achieved, PA w s asked m eompk fo'opohwith. N Q ~ eiompEad.
' Na txbrkstnwlltan lsbors ever 'accmm~dateQ in factory premises'during construction activities. The PA informed that the taborers came Fram their pEaw, w o ~ k ~ d in the day and left the same day. At1 bmic facilities prczvided to labors at the time of constructian.
complied*
*a .
t . GENERAIL CONBITfQN& f
"wide; the Q E ~ boundary, a 12Oi13Qm long end & € m ~ d 2 .m wide strip pacauet to one
,
,
. i. . -The%A shall adhere to t& a&pwkiti~ns made by - - . .. the GP@I:-- -- - --
- .
Lpamte report of camptiance~ to be p~odu~edisubmitted and compffnge ctzfi@&te -.; TBa
from GPCB to be produced. GPCB has issued show cause mi'~e pointing out d~ficien~y and nan compliancei Zn tespect of certain csnditian in
' 2@i I . C~hditian nat sappkied.
Page 279
The PA has not ma& any expansion or mademizatioa ist the p h t since 2M0.
1
I
Compl bd.
5,
ground levet concen&aPi&ns are anticipated. The werid1 noise tefeeks im md'woundr the plant
: are shall be kept weid yIthht the standuds by ' providing noise c ~ p t r ~ t IeasuFes including acoustic h ~ ~ d s , silence% md~$ures etc. an aN sources of noise ge~tep@an. T F ~ ambient noise
i I(3:veL &dl confcrm ta &he @mdards prescribed ; ritef~i Environment tion) on) AEC. 1986 , biesaJZ989 viz. 7s Q B A ' f ! timer an4 70 Dba.
Nb further expansion or madi~cations in the I plant &abi be carried out without prim appt~ml of the MOB!?. In ease uf'.devi&ions or ak&mti~ns in the pcaje* propokai fmm those submitted: to &is Ministry for clearances a @esh reference shdl be made to the Ministy to assess the adequacy of conditions imIjosed and ta add additi~nal enviranmental protection
iii.
>
SiIencem, Enebsures provided at adequate places like DG !SETs B~Qw~s. Howe~er, &emwed data to show tpat the levels are witbin standapds ca@M flnE ba show. This is t~ he. measured as per the conditien and data t~ be prod~ced.
r. C~nditiarr not complied. I
I measms required* any. I 1 The lacatlons of AAQ t~onitoring statians shall Be decided in ---- c o ~ ~ ~ with the -SKI3 (SPG~) m& &&aft Be e n s u ~ d that at teat-em statkrrs is EthsWkd h the upwhd and dowfiwind d i ~ c r i ~ n as welt as where mdmurn
The PA needs to comply with this at the mliest ; ineons~1tatbwitk~GECB. - .- - ' f.
' Not c~rnplied.
t I (night t h e j. I
I I to the Ministry. . I management plan. 3 I
- e m A .+ ?
, 'Fhe PA submitted that m mount afRs. 37 l a b s 38 takh, 31.5 lakh and Rs. 30.5 lakh have been
I spent under various heads af the enviranmed
1 I Zmpaeedr.
v.
: vi.
. . All chi moormnendations madidin k t E W W in tespea of eillviranmneataf maittgeaem~, rbk : mitigation measures and public hearing miatin8
1 to the project shat l &Is@ be implemented. ,
vii. The eompt~lly shall undartske all nlevt.int
' The ampany shdl also camply with dl the enviranmentat pE.arecritm meautes and saFe@awrds propose in the documents submitted
. . HQWW& h e PA did not submit status GR
cornmiheat made during publ2c h e a r i ~ and rislc mitigation measures. PM1y C~mblied. PA has infamed that LooaI administration plays
measures f ~ r improving the saeia-eeonamie conditions ~f the surnatmding area. CSR activities witl be wd&&n by inuoIvhg lacal
w%.8' 3 -t#~~iw&& be pmiueed by ananging repuhad
& be / €mi;ilifig. ~ R & ' Q E ~ ' not ~ ~ m p l i e d .
Training shall be impatad& dl employees on safety and heah aspects &@hemicals handling. Pre-empioyment and rotati- periadicaf me&~aI
: examinations for all empifxyees shall be
constructive r~Ce in the CSR, wtivities. The ' compmy does not seem to haye done anything , on its awn on this. They need to eomply at the
+
,: Training is repoeted b be integral pa% of the - company's recruiting process a d str'tctty , foltawed. However* m d~curnenfary evidence pmduoed. Necessuy remrd and ~mrn-iw
viii.
i
-
, viPLages and dni~btration. [ earliest and rep8E.t details. at c.orng)tie&. - : The company shsIr undertake: mob .---..- is member - of Smtej Endpbst~irPb--.*A~ew-+-~ &~elQpmen&Lrneasu~tes ineku&ti;$ c~tni%*3@fy ociatian and reportedly activeIy pwticipale welfare measures in the project area for the the bet€~meint of community. However, no averall irngravernent af the envk~nment. Ec detaits i~etuding expenditure could be
ided. Mot c~mpEie4.
[
--
Page 280
I ix. 1 A sepate Environmental ',Management ceU [ Management cell has not been set up. '&is is ta 1 I equipped with 1IC @edged tabaratory faciMties be im#lementad. PA infarmed &at Third party shall be set up to cmy out the Envimnm;ental I I~lspections cmied aht arr monthly kgis. This is I
x. ~ans~rnent &d oni it or-bB haiof ls . - [ noi in line with the stipukfion. Ndt complied.
; The cornparty shall earmark adequate f i d s to The FA submitted that an arn~uat afRsi 37 Laleh, irnpiement &G conditions stiPuiated by the MOEF as welt as the State G~vernment along with the impternentation schedule for all the conditi~ns stipulated herein. The h d s sa emanked for envbnment
' the dr&ect propanent to concerned ~ruzch%$fa€, ZiBa P&adBhrEeinE~ipal Corporation, U~bw 1~ca6 hdy &the P~eal. NGQ ifmy, @om w h ~ suggestia&peese~ttation& .if my, wet& maeiue6 white jw~eessing the'prfaPod.
39 laleh, 31.5 la& and Rs. 305 kkh have beer0 spent un&r various heads of the envir~nment
: management plan. H~wewer, the originel EMP and funds requires as per stiputation by state
. Gavt couU not be provided hy the PA. - -
xi. are futly aware about our current activities and future plmnistg, Hawever, as per the conditian the PA ne& t~ famdly send a: G Q ~ Y to ail eoncernecf, whieh they did not do. Nire csrnplkd*
I -'
xii. The grmjmt pr!~pa&int shall &a srrbmit 'sb ' The PA is sending six monthly reports b MOEF ' miunhly report oh the status of oompk6e of - Bhopal ONLY. Also it has been npartud that
managernen~~I.Lu~on - - -_ -__ eantroi he85IfPBS -- - ' s k i t not be diverted for any other puqase. .
A cam orf the ektrttne Eetter shall be sent by
mandated shall be submi@e& t~ the, concerned SPcB as pmsrihed awfbr the ~ n v i ~ o m e n t
i (Protaetba] R w 198% as amended sulseq~ntt~~ sCr$:@ &Q b puikon the ueMte ~f the company atong with ' the status of camplianee of EC cod&ttEans md shall atsQ be
- /
-.,_I " Pmfy _ _ coonp.IIaB. - - - - -
The PA infarmed that all concerned authorities
Tk iofprm@on k~wever, not beilng sent t@ RQ, ~ca'@F. Aka it has ken cep~fled that the s~nrptmy &-s cot have a website*
Partly c ~ m p t ied. 1 sent io the rapec@ve -RQ d UQW by +mil. -
-
- - has been accatded EC by the Ministry and copies af the EC we waikabk with the SPCBkommia~e mg rnw &SQ be seen a h
' website sf the Mhis~ty at Erttpilenvf~r.nic.in. This shalt be adbsraked w i ~ h seven days fiom the date af issue of the cteamnce letter, at l&t
l in twa t d newse,ap@ra that ace wide& re@~a qfwhiqh one shalt in
ge cio--tb@ '=ilfGafitg concerned a copy af the same shalt be firwarded t~ the conceme.d RQ afthe Mmistq.
/ aiu.
,
, 1
: 1
.
; V
- ..-.-
' ~ a t ~~&pl ied-
;
xu,
The PA &dl hfam the pobk 16at the project . The PR kfivrned that this has been complied.
-
1 The PA shall iafom the Rv as well as the Ministry, the date: a.f financial dosure and &a! approvat of the project by the concerned
Page 281
I . Imptemmtatt'r"~n sf Conditi~ns: Campliance af environment clearantie conditions is generally goad- To sum up, 2t catldiians we fully c~mptied and 12 zue not complied. Of the 13 not ccarnpfkd conditions,
.. co~ditions There has been-part compliance in respect of 4 conations. -.+ &Ihd ta fn"EtCte ~ec~~sary aotion tci achieve comptimce in respect ~f the
2. The FA was requested ta concentrate and focus on grben belt devet~~rnent, CSR activities, setting up of e~viranmental ceI2 hakd consuEtatian with GPCB and CPCB on fixation of Air Quality Monkwing Station (GAQ) and ascertaiiing adequaey af stack height, commencement of noise leuel manitsring, conductance of training afthe operating regutar medical check-up af staffs along 6th maintaining records ta ensure frlt camptiam ofthese: conditions as per EC stlputations.
The PA Noted and assured t~ satisfy every ' conditi~n.
Camptied. The PA Noted .and assured to satisfy every condition. Complied.
-- ' --
Paints we11 n~tfzd and complied under CC&A ' and authorizati~n &am GPCB.
. :
' 8
9
10
I I
3. Court Cases and show causdclg$urr notices: PA submitted that there ts no court case against the project on environmentat issues. It: has been seen that show cause notice was issued b-y GPCB to the !.!nit in September, 201 1. 'The PA is to submit the latest status as to how many such notices have been issued to them by GPCBhy any other statutory: agencies, PA's reply there to and Einal outcame thereofi
@ Scientist &F'
auth~rity and the date of start of the project. The Ministry may m k e *or suspend the clearancet if implementati~n of any of the ab~ve conditians is not sat~sfact~ry.
The Ministry reserves the rQht b stipulate additi~nai conditions, if found, necessary. The company in a time bound manner will
, implement these eandl~ons. Any appeal against this EC shalk fie with the natiana! appetlate Autherity, if preferreda within a period a€ 3Q BBys as @Tiribed under sa~tfon t 1 ~f the National Environment Appellate
- Ald$ority Aeb 1993.. The\ahove condition will be enforceda intel.iaNa! under the provision ofthe;: Water (Prevention & Corrtr~l of Wafer PaBu~kn) Ace, 1981, the Environment (Protection] Act, ? 986 M ~ d ~ u s . Wastes @tanagement and Handling) Ruless 2QQaI2Q08 and the pubk Liabitity insurs$ce AcG 1'891 dong with theair amendments and rut=,
Page 282
Annexure-IV Photographs of existing plant site including existing
greenbelt
Page 283
Photographs
Existing plant photographs
Page 285
Photographs of Greenbelt
Page 287
Annexure-V Land documents
Page 292
Annexure-VI Copy of Environmental Clearance (EC)
Page 293
; . !
F. No. J-ll0ll/62512009-IA II (I) Government of India
Ministry of Environment and Forests (I.A. Division)
Paryavaran Bhawan CGO Complex, Lodhi Road
New Delhi -110 003
E-mail: [email protected] Telefax: 011: 24367668
Dated 24'" August, 2010
To,
Shri Mukesh Gupta M/s Balaji Formalin Pvt. Ltd. 302. Devarc Complex, Beside Fun Republic Cinema S. G. Road, Ahmedabad (Gujarat).
E-mail : [email protected] ; Fax: 079-40087172
Subject: Expansion with Modernization of Formaldehyde (1.500 TPM to 5,000 TPM) Manufacturing Unit at Plot no. 1398, Nr. Rama Multi Tech Ltd., Post Moti Bhoyan, Taluka Kalol, District Gandhinagar, Gujarat by M/s Balaji Formalin Pvt. Ltd.- Environmental Clearance reg.
Ref. Your letter no. nil dated 11"' May, 2010.
Sir,
Kindly refer your letter no. nil dated l11h May, 2010 alongwith project documents including Form I. Terms of References, Pre-feasibility Report. EIAfEMP Report alongwith public hearing report regarding above mentioned project.
2.0 The Ministry of Environment and Forests has examined the applir;ation. It is noted that proposal is for expansion with modernization of Formaldehyde manufacturing unit capacity (1500 TPM to 5000 TPM) at Plot no. 1398, Nr. Rama Multi Tecl1 Ltd., Post Moti Bhoyan. Taluka Kalol. District Gandhinagar. Gujaral. No nationa,! parklwild life sanctuary/reserve forest is located within 10 km radius of the project site. Total project area is 4,281 m2. Total project cost is Rs. 7.00 Crores. No litigation/court case is pending against the project.
3.0 The tail gas containing 18 to 20 % hydrogen and small amount of formaldehyde, methanol and methane will be incinerated and waste gases will be discharged through adequate stack height. Existing bOiler will be replaced by tail gas treatment unit. Waste heat will be recovered from process and tail gas treatment and utilized in MEE for evaporation. Water requirement from Narmada canal will be 104 m'/day. Industrial waste water will be evaporated through MEE after treatment. Domestic wastewater (2.5 KLD) will be disposed through septic tank/soak pit. 'Zero' discharge will be adopted and no effluent will be discharged outside the premises.
·4, . 4.0 The synthetic organic chemical manufacturing units located out Side the notified industrial areas are listed at serial no. 5(f) of schedule of EtA Notification, 2006 under "A" category and apprised at central level.
5.0 Public hearing of the project was held on 4'h May, 2010. fI/" .
•
Page 294
2
6.0 The proposal was considered by the Expert Appraisal Committee-2 (/ncf:Jstry) in its 11'" meeting held on 9'" June. 2010. The Committee recommended the proposal for environmental clearance.
7.0 Based on the information submitted by the project proponent. the Ministry of Environment and Forests hereby accords environmental clearance to above project under the provisions of EIA Notification dated 14'" September 2006 subject to the compliance of the following Specific and General Conditions:
A. SPECIFIC CONDITIONS:
i) Efforts shall be made to reduce RSPM levels in the ambient air and a time bound action plan shall be submitted. At no time, the emission levels shall go beyond the prescribed standards. In the event of failure of any pollution control system adopted by the unit, the respective unit shall not be restarted until the control measures are rectified to achieve the desired efficiency. ,
ii) Adequate pollution control measures including scrubbers and stacks of adequate height as per CPCB guidelines shall be provided to control gaseous emissions within permissible limits as per norms prescribed by the GPCB or prescribed in the E(P) Rules whichever are more stringent.
iii) The National Ambient Air Quality Emission Standards issued by the Ministry vide G.S.R. No. 826(E) dated 16'" November. 2009 shall be followed.
iv) Scrubber shall be installed to' control process emissiOn at project site. In plant control measures for checking fugitive emissions from all the vulnerable sources shall be prOVided. Fugitive emissions shall be controlled by providing closed storage. closed handling & conveyance of chemicals/materials. multi cyclone separator and water sprinkling system. Dust suppression system including water sprinkling system shall be provided at loading and unloading areas to control dust emissions.
v) For further control offugitive emission. following steps shall be followed:
1. Closed handling system shall be provided for chemicals.
2. Reflux condenser shall be provided over reactor.
3. System of leak detection and repair of pump/pipeline based on preventive maintenance.
4. The acids shall be taken from storage tanks to reactors through closed pipeline. Storage tanks shall be vented through trap receiver and condenser operated on chilled water. Cathodic protection shall be provided to the underground solvent storage tanks.
vi) The gaseous emissions from DG set s~..l?e dispersed through stack height as per CPCB standards. Acoustic enclosure' shall be provided te. the DG sets to mitigate the noise pollution.
vii) Monitoring of Methanol & Formaldehyde alongwith other relevant parameters like PM,o. PM,s, SO,. NO •. HC and VOCs in work zone environment, product, raw materials storage area etc. shall be carried out regularly and records maintained. The emissions shall conform to the limits imposed by GPCB.
viii) The company shall uploa~ the status of compliance of the stipulated environmental clearance' conditions, including results of monitored data on its website and shall update the same periodically. II shall simultaneously be sent to ~
Page 295
3
the Regional office of MOEF, the respective Zonal office of CPCB and the Gujarat Pollution Control Board. The levels of PM 1O, PM25, 802, NOx and VOCs (ambient levels) shall be monitored and displayed at a convenient location near the main gate of the company and at important public places.
ix) Solvent management shall be as follows :
a. Reactor shall be connected to chilled brine condenser system
b. Reactor and solvent handling pump shall have mechanical seals to prevent leakages.
c. The condensers shall be provided with sufficient HTA and residence time so as to achieve more than 95% recovery
d. Solvents shall measures.
be stored in a separate space specified with all safety
e. Proper earthing shall be provided in all the electrical equipment wherever solvent handling is done.
f. Entire plant shall be flame proof. The solvent storage t3nksshall be provided with breather valve to prevent losses.
x) Total water requirement from Narmada canal shall not exceed 104 m'jday and prior permission shall be obtained from the concerned department Industrial waste water shall be evaporated through MEE after treatment As proposed, 'zero' discharge shall be strictly implemented and no wastewater shall be discharged outside the premises. Domestic wastewater shall be treated in septic tank followed by soak pit.
xi) The Company shall harvest rainwater from the rooftops of the buildings and storm water· drains to· recharge the ground water and use the same water for the process activities of the project to conserve fresh water.
xii)
xiii)
High calorific organic residues shall be sent to cement industries for burning In the kiln or disposed off to nearby TSDF site.
~
The Company shall obtain Authorization for collection, storage and disposal of hazardous waste under the Hazardous Waste (ManagE;ment, Handling and Trans boundary Movement) Rules, 2008 and amendments time to time for management of hazardous wastes and prior permission from GPCB shall be obtained for disposal of solid' hazardous waste in the TSDF. The concerned company shall undertake measures for fire fighting faCilities in case of emergency.
xiv) The Company shall strictly comply with the rules and guidelines under Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 as amended in October, 1994 <,'lnd January, 2000. All transportation of hazardous chemicals shall be as pertlie Motor Vehicle Act (MVA), 1989.
xv) Hazardous chemicals shall be stored in tanks, drums, carboys etc. Flame arresters shall be provided on tank farm. Solvent transfer shall be done by pumps.
xvi) During transfer of materials, spillages shall be avoided and garland drains be constructed to avoid mixing of accidental spillages with domestic wastewater and storm water drains.
xvii) The company shall undertake following ~ minimization measures :
a. Metering and control of quantities of active ingredients to minimize waste.
b. Reuse of by-products from the process as raw materials or as raw material substitutes in other processes.V·
•
Page 296
I
4
c. Use of automated filling to minimize spillage.
d. Use of Close Feed system into batch reactors.
e. Venting equipment through vapour recovery system.
f. Use of high pressure hoses for equipment clearing to reduce wastewater generation.
xviii) The unit stlall make the arrangement for protection of possible fire hazards during manufacturing process in material handling. Fire fighting system should be as per the OISD 117 norms
xix) Usage of Personnel Protective Equipments (PPEs) by all employees! workers shall be ensured.
xx) Occupational health surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act.
xxi) Green belt shall be developed in 1,500 m2 (35 %) to mitigate the impact of air emissions. Selection of plant species shall be as per the CPCB guidelines.
xxii) Provision shall be made for the housing for the construction labour within the site with ali necessary infrastructure and facitities such as fuel for cooking, mobile toilets, mObile sewage treatment plant, safe drinking water, medical health care, crEliche etc. The housing may be in the form of temporary structure to be removed after the completion of the project. All the construction wastes shall be managed so that there is no impact on the surrounding environment.
B. GENERAL CONDITIONS:
The project authorities shall strictly adhere to the stipulations made by the Gujarat Pollution Control Board.
ii. No further expansion or modifications in the plant shall be carried out without prior approval of the Ministry of Environment and Forests. In case of deviations or alterations in the project proposal from those submitted to this Ministry for
. clearance, a fresh reference shall be made to the Ministry to assess the adequacy of conditions imposed and to add additional environmental protection measures required, if any.
iii. The locations of ambient air quality monitoring stations shall be decided in consuHation with the State Pollution Control Board (SPCB) and it shall be ensured that at leas! one stations is installed in the upwind and downwind direction as well as where maximum ground level concentrations are anticipated.
iv. The overall noise levels In and around the plant area shall be kept well within the standards by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient noise levels shall conform to the standards prescribed under Environment (Protection) Act, 1986 Rules, 1989 viz. 75 dBA (da •., .e) and 70 dBA (nigl1ttime).
v. Training shall be imparted to all employees on safety and health aspects of chemicals handling. Pre-employment and routine periodical medical examinations for all employees shall be undertaken on regular basis. Training to all employees' on handling of chemicals shall be imparted.
vi. The company shall also comply with all the environmental protection measures and safeguards proposed in the documents submitted to the Ministry. All the recommendations made in the EIAIEMP in respect of environmental management, risk mitigation measures and public hearing relating to the project shall also be implemented. V
Page 297
5
vii. The company shall undertake all relevant measures for improving the socio-economic conditions of the surrounding area, CSR activities will be undertaken by involving local villages and administration
viii, The company shall undertake eco-developmental measures including community welfare measures in the project area for the overall improvement of the environment
ix, A separate Environmental Management Cell equipped with full fledged laboratory facilities shall be set up to carry out the Environmental Management and Monitoring functions,
x, The company shall earmark adequate funds to implemeni the conditions stipulated by the Ministry of Environment and ForeSts as well as the State Government along with the implementation schedule for all the conditions stipulated herein. The funds so earmarked for environmerit management! pollution control measures shall not be diverted for any other purpose,
xi. A copy of the clearance letter shall be sent by the project proponent to concerned Panchayat, Zila Parisad/Municipal Corporation, Urban local Body and the local NGO; if any, from who suggestions/ representations, if any, were received while processing the proposal.
xii. The project proponent shall also submit six monthly reports on the status of compliance of the stipulated Environmental Clearance conditions including results of monitored data (both in hard copies as weI! as bye-mail) to the respective Regional Office of MoEF, the respective Zonal Office of CPCB and the Gujarat Pollution Control Board. A copy of Environmental Clearance and six monthly compliance status report shall be posted on the website of the company,
xiii. The environl11ental statement for each financial year ending 31 S1 March in Form-Vas is mandated shall be submitted to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental clearance conditions and shall also be senfto the respective Regional Offices of MoEF by a-mail.
xiv, The project proponent shall inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the SPCB/Committee and may also be seen at Website of the Ministry at http://envfoLnic.in.This shall be advertised within seven days from the date of issue of the clearance letter, at least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the concerned Regional Office of the Ministry.
xv. The project authorities shall inform the Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of start of the project.
8.0 The Ministry may revoke or suspend the clearance, if implementation of any of the above conditions is not satisfactory,
9,0 The Ministry reserves the right to stipulate ~ltional conditions, if found necessary, The company in a time bound manner will implement t~e conditions, .
10.0 Any appeal against this environmental clearance shall :Ue with the National Appellate Authority, if preferred, within a period of 30 dayspreSCribed under section 11 of the National Environment Appellate Authority Act, 1997,
•
Page 298
6
11.0 The above conditions will be enforced, inter-alia under the provisions of the Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention &. Control of Water Pollution) Act, 1981, the Environment (Protection) Act, 1986 Hazardous Wastes (Management and Handling) Rules, 2003/ 2008 and the Public Liability Insurance Act, 1991 along with their amendments and rules.
~~ (Dr. ? B. Rastogi)
Scientist 'F'
Copy to :
1. The Secrela~, Environment & Forests Department, Government of GUjarat, Sachivalaya, 8 Floor, Gandhi Nagar - 382 010, GUjarat.
2. The Chief Conservator of Forests (Westem Zone), Ministry of Environment & Forests, - Regional Office, E-5, Arera Colony, Link Road -3, Bhopal-462 016, MP.
3. The Chairman, Central Pollution Control Board Parivesh Bhavan, CBD-cum-Office Complex, East A~un Nagar, New Delhi 110032.
4. The Chairman, Gujarat State Pollution Control Board, Paryavaran Bhawan, Sector 10 A, Gandhi Nagar-382 043, Gujarat.
5. Monitoring Cell,. Ministry of Environment and Forests, Paryallaran Bhavan, eGO Complex, New Delhi.
6. Guard File/Monitoring File/Record File. ~~1>II" (Dr. P. B. Rastogi)
• Scientist 'F'
Page 299
Annexure-VII Narmada water usage permission
Page 300
ABC
Text Box
A-36
Page 301
Annexure-VIII Health checkup record of workers
Page 314
Annexure-IX Questionnaire for industry sector
Page 315
Industry Sector Projects
QUESTIONNAIRE FOR ENVIRONMENTAL APPRAISAL
(INDUSTRY SECTOR PROJECTS)
I. General Information
A. Name of the Project : Balaji Formalin Pvt. Ltd.
1. Existing project/proposed project/
expansion project/modernization project : Expansion project
2. If Existing/expansion/
modernization project, whether
environmental clearance
has been obtained : Yes
B. Plant Capacity (TPA) : Formaldehyde-500 MTPM to
12500 MTPM
Para Formaldehyde-835 MTPM
Reprocessing of Silver-1.5 MTPM
C. Location
Village Tehsil District State
Moti Bhoyan Kalol Gandhinagar Gujarat
D. Geographical Information
1. Latitude
2. Longitude
3. Elevation above Mean
Sea Level (metres)
4. Total Area envisaged for setting up
of project (in ha.)
5. Nature of terrain (hilly, valley, plains,
Coastal plains etc.)
6. Nature of Soil (sandy, clayey, sandy
loam etc.).
7. Permeability (cm/sec)
E. Alternate sites considered
No alternatives for site is consider.
23009’44.69” N
72026’45.54” E
55.4 m
4281 m2
Plains
Sandy
3.16
Note 1: All information given in the form of annexures should be part of this file itself.
Annexures as separate files will not be accepted.
Note 2: Please enter x in appropriate box where answer is Yes/No
Page 316
Industry Sector Projects
F. Reasons for selecting the proposed site based on comparative evaluation of
environmental considerations.
Balaji Formalin Pvt. Ltd. is an existing unit at Plot No. 1398, Village: Moti Bhoyan,
Taluka: Kalol, Dist. Gandhinagar, Gujarat. Unit now proposed to expand its existing
production capacity with addition of new products.
Features justifying the location are summarized below:
Availability of suitable and adequate land for proposed expansion;
Availability of all basic facilities like infrastructure, communication, medical
facilities, fuel, water, power, unskilled & skilled manpower, raw materials,
road network etc.
Considering market demand and economic viability, proponent has decided
to expand capacities of its existing products.
Nearest city is Ahmedabad, which is 21.2 km away from the location, and
having good connectivity with other parts of the country by road, rail & air.
Availability of good communication and transportation facilities.
No National park or wildlife habitat falls within 10 km radial distance from
proposed project site.
No critically polluted area falls within 10 km radius.
No R & R will be required
The location of project is best suited to expand its activities. So no alternative for site is
analyzed.
II. Environmental Setting
A. Current land usage of the proposed project site area (in hectares)
1. Notified Industrial Area/Estate
2. Agricultural
Irrigated
Unirrigated
3. Homestead
4. Forest
5. Grazing
6. Fallow
8. Mangroves
9. Others (Pl. specify)
Total
NA
NA
4281 m2
NA
NA
NA
NA
NA
NA
7. Marshy
NA
4281 m2
Page 317
Industry Sector Projects
B. Please indicate area earmarked for each of the following (in ha.)
1. Plant Facilities
2. Ash Disposal
3. Storage (Fuel)
4. Storage (RM & Finished product)
5. Storage (Hazardous Waste)
6. Utilities
7. Storage (Others)
8. Approach Road(s)
9. Township
10. Green Belt
11. Others (Parking, office)
Total
C. Is the proposed site located in a low-lying area?
Yes No
If yes,
1. Level before filling (above MSL, in metres) ___________________
2. Level after filling (above MSL in metres) _____________________
Quantity of Fill Material
required (in cum.)
Source
D. Proximity to sea/water bodies:
Sea Other Water bodies like
River/creek/lake etc.
(Please specify)
Distance of site*
boundary (in m)
More than 50 km -
Distance of plant
facilities (in m)
More than 50 km -
* From highest flood line/high tide line
√
924 m2
0
--
864 m2
--
365 m2
--
438 m2
--
1500 m2
4281 m2
190 m2
Page 318
Industry Sector Projects
E. Whether any of the following exist within 7 km. of the periphery of the project site. If
so, please indicate aerial distance and the name of the eco-system as given under the
Table.
S.
No.
Name Area falling within
7 km periphery of
project (ha.)
Aerial Distance
(in km.)
1 National Park/ Wildlife
Sanctuary
- - -
2 Tiger Reserve/Elephant
Reserve/ Turtle Nesting
Ground
- - -
3 Core Zone of Biosphere
Reserve
- - -
4 Habitat for migratory birds Thol - 3.8 km
5 Lakes/Reservoir/Dams Thol - 3.8 km
6 Stream/Rivers - - -
7 Estuary/Sea - - -
8 Mangroves - - -
9 Mountains/Hills - - -
10 Notified Archaeological
sites
- - -
11 Any other Archaeological
sites
- - -
12 Industries/Thermal Power
Plants
- - -
13 Defense Installation - - -
14 Airports Ahmedabad - 21.2 km
15 Railway Lines* Kalol - 10.6 km
16 National / State
Highways*
SH-41 - 10.0 km
* 0.5 km from Railway lines/ National / State Highway should be maintained.
F. Description of the flora/vegetation within 7 km under following headings.
1. Agricultural crops: Dangar, Juvar, Bajri, corn etc.
2. Commercial crops: Dangar, Juvar, Bajri, corn etc.
3. Plantation: Ambo, Amli, Limdo, Babul etc.
4. Natural Vegetation/Forest Type: --
5. Grass Lands: Around 12%
6. Endangered species: No
7. Endemic species: No
8. Others (Please Specify): --
Page 319
Industry Sector Projects
G. Description of fauna (non-domesticated) within 7 km under following headings.
1. Total listing of faunal elements- 35 species
2. Endemic fauna species - Nil
3. Endangered Species- Nil
4. Migratory species- Nil, most of are native
5. Route of migratory species of birds and mammals - Nil, most of are native
6. Details of aquatic fauna (if applicable) - No
III. Meteorological Parameters
A. Seasonal-Monitoring Data (continuous monitoring for one full season except monsoon
should be carried out)
1. Temperature (in 0C)
(a) Maximum ‒ 400C (b) Minimum ‒ 13
0C (c) Mean ‒ 28.3
0C
2. Rain fall (in mm) - No rainfall during study period
(a) Maximum - ___ (b) Minimum - ___ (c) Mean - ___
3. Mean value of humidity (in %) ‒ 30.6%
4. Inversion occurrence
(a) In percentage (b) Height in meters 100-1000 mtr.
5. Seasonal Wind-rose pattern (16 points on compass scale)
Pls. refer figure 3.7, page no. 3.48 of chapter-3 of EIA report for wind rose.
6. Hourly Mean Meteorological data (based on one full season data collected at
site required as input for air quality modeling)
Hour Low/Medium
Cloud amount
(in OCTAS)
Wind
Speed in
(Km/h)
Predominant
wind
direction
Ambient air
temperature
(in deg K)
Hourly
stability
Mixing
depth
(in m)
1. 14.5 NNW 303 5 100
2. 11.3 ENE 301 5 100
3. 11.3 N 301 5 100
4. 11.3 N 301 5 100
5. 12.9 ENE 297 5 200
6. 12.9 ENE 297 5 200
7. 12.9 ENE 300 5 200
8. 12.9 ENE 305 2 300
9. 12.9 ENE 305 2 300
10. 12.9 ENE 305 2 500
11. 9.7 E 310 2 500
Page 320
Industry Sector Projects
12. 9.7 E 310 2 800
13. 9.7 E 310 2 1000
14. 0.0 ENE 310 2 1000
15. 0 ENE 310 2 1000
16. 0.0 ENE 310 2 1000
17. 0.0 ENE 304 2 1000
18. 0.0 ENE 304 5 700
19. 0.0 ENE 304 5 700
20. 9.7 NNW 303 5 700
21. 9.7 NNW 303 5 400
22. 9.7 NNW 303 5 100
23. 14.5 NNW 303 5 100
24. 14.5 NNW 303 5 100
Attach additional sheet as required.
IV. Ambient Air Quality Data
[Frequency of Monitoring should be as per guidelines of CPCB and monitoring should cover
one full season (excluding monsoon)]
A. Season and period for which monitoring has been carried out ‒ Oct-15 to Dec-15)
B. Frequency of sampling - Twice a week for one location
C. Number of samples collected at each site:
Date,
Time &
Location
Wind
Direction
& Speed
24 hourly Concentration as
monitored (in g/m3)
SPM, RPM, SO2, NOx, CO
Permissible
Standard
(As per EPA/
SPCB consent)
Remarks
(Name of the
instrument and
sensitivity)
Pls. refer table 3.9 to 3.12 of chapter-3 of EIA report.
D. 24 hourly concentrations (in g/m3)
Project site
Pollutant (s) Maximum Minimum Mean 98%
PM10 77.4 61.8 70.7 77.2
PM2.5 40.6 28.4 35.0 40.2
SO2 26.0 16.3 19.9 25.2
NOx 27.6 18.3 22.2 26.7
Moti Bhoyan
Pollutant (s) Maximum Minimum Mean 98%
PM10 78.2 64.5 73.0 78.0
PM2.5 37.7 29.0 33.5 37.1
SO2 22.9 13.0 19.4 22.7
NOx 22.0 14.6 19.2 21.9
Khatraj
Pollutant (s) Maximum Minimum Mean 98%
PM10 69.3 61.6 65.4 69.2
PM2.5 41.7 34.0 37.5 41.6
SO2 22.6 14.4 19.2 22.5
NOx 24.6 16.6 21.1 24.4
Page 321
Industry Sector Projects
Ganapatpura
Pollutant (s) Maximum Minimum Mean 98%
PM10 77.8 67.7 73.9 77.6
PM2.5 39.4 30.7 35.3 39.2
SO2 21.1 13.9 18.1 20.9
NOx 20.8 14.3 18.6 20.7
Karoli
Pollutant (s) Maximum Minimum Mean 98%
PM10 77.4 64.0 69.9 76.3
PM2.5 37.1 32.2 34.9 37.0
SO2 20.7 15.1 18.1 20.6
NOx 23.9 17.4 21.2 23.7
Bhimasan
Pollutant (s) Maximum Minimum Mean 98%
PM10 71.6 60.5 67.9 71.6
PM2.5 37.6 33.1 35.5 37.6
SO2 23.9 18.8 20.9 23.9
NOx 25.2 20.2 22.6 25.0
Sherisa
Pollutant (s) Maximum Minimum Mean 98%
PM10 79.8 70.9 74.6 79.3
PM2.5 40.0 31.2 34.5 39.2
SO2 23.6 18.0 19.9 23.5
NOx 25.9 18.1 21.5 25.4
Jethlaj
Pollutant (s) Maximum Minimum Mean 98%
PM10 78.7 63.2 72.5 78.4
PM2.5 38.2 27.3 31.7 38.0
SO2 21.6 14.1 18.1 21.5
NOx 24.8 16.3 20.8 24.7
D. Specific air pollution issues in the project area.
Not observed any issue.
V. Manufacturing Process details
A. Raw materials (including process chemicals, catalysts, & additives).
List of raw materials to
be used at all stages of
manufacture
Physical and
chemical nature
of raw material
Quantity
(tonnes/month)
full production
capacity
Source of
materials
Means of
transportation
(Source to storage site)
with justification
Pls. refer table 2.6, page no. 2-20 of chapter-2
B. Brief description of the process : Pls. refer sec. 2.10 of
EIA report for mfg.
process details
C. Details of process technology know how/collaboration : Self develop process
Page 322
Industry Sector Projects
D. Production profile (tonnes/year):
Name of Products, Byproducts
and Intermediate Products
Existing
(MT/
month)
Proposed activity
(new/ modernization/
expansion)
(MT/ month)
Total
(MT/
month)
Main Products
Formaldehyde 5000 7500 12500
Para Formaldehyde 00 835 835
Reprocessing of Silver
(Purification of Silver)
00 1.5 1.5
A. By-Products
1. -- -- -- --
2.
C. Intermediate Products
1.
2.
-- -- --
E. Means of transportation of raw material and final products
Means of Transport Raw material Final Product
(in TPA) (in TPA)
1. Road
2. Rail
3. Pipeline
4. Others, Please specify
VI. Water
A. Water Requirement (cum/day)
Purpose Avg.
Demand
Peak
Demand
Source Type Treated /
untreated/Fresh/
Recycled
Remarks
1. Project
(i) Process
(ii) Cooling water
(iii) DM water
(iv) Dust
Suppression
(v) Drinking
(vi) Green Belt
(vii) Fire Service
(viii) Others
2. Township
(i) Green Belt
(ii) Drinking
268.0
205+75*
50.0
--
8.0
4.0
00
268.0
205+75*
50.0
--
8.0
4.0
00
Narmada
water
supply
*75 KLD
recycled water
68100
160038
Page 323
Industry Sector Projects
(iii) Others
(Please
specify)
TOTAL
610.0
610.0
B. Source of Raw Water Supply
S. No. Source Cu.m./hr. Cu.m./day
1 Sea -- --
2 River -- --
3 Groundwater -- --
4 Other surface water bodies
(Narmada Water supply)
-- 535
C. Lean Season flow in case of surface water source (cusecs/cumecs): -
D. Groundwater (a) Recharge Rate/Withdrawal rate
1. Ground water level (metres)
(i) Pre monsoon
(ii) Post monsoon
(to be obtained from Central/State Ground water authorities)
E. Competing Users of the Water Source:
S.
No.
Usage Present Consumption
(cu.m/day)
Addition Proposed
as per local plan
Total
Surface Ground Surface Ground Surface Ground
1 Irrigation 85% Negligible 85%
2 Industry 5% 5%
3 Drinking 5% 5%
4 Others (Please
specify)
5% 5%
Total 100% 100%
F. Physico - chemical analysis of Raw Water at intake point: Pls. refer chapter-3 of EIA
report.
G. Physico - chemical analysis of treated water to be used in project/township.:
Our is zero discharge proposal hence characteristics of untreated and treated
effluent may not require.
H. Wastewater Management
1. Description of wastewater treatment plan with flow chart.
RO/DM reject, wastewater generated from silver refining & cooling bleed off
will be directly sent to force effect evaporator & then sent to mechanical
evaporator.
35 mtr.
25 mtr.
Page 324
Industry Sector Projects
2. Characteristics of discharge stream(s) before and after treatment:
Our is zero discharge proposal hence characteristics of untreated and
treated effluent may not require.
3 Daily discharge (m3/day) from different sources
(a) Plant Operation
(b) Workshop
(c) D.M. Plant Effluent
(e) Other (Utility)
Total
4. Quantity of water recycled
(a) (in %)
(b) (in cum/day)
5. Details of recycling mechanism: Condensate from evaporator will be
recycled in cooling.
6. Mode of final discharge/disposal of treated effluent: Zero discharge
Mode Length (in m.) Quantity (in m3/day)
(i) Open Channel - -
(ii) Pipeline - -
(iii) Others - -
Total -
7. Point of final discharge: No discharge of effluent anywhere
Final Point Quantity discharged (in m3/day)
(i) Green belt within the plant/township --
(ii) Agricultural Land --
(iii) Fallow Land --
(iv) Forest Land --
(v) River/Stream --
(vi) Lake --
(vii) Estuary --
(viii) Sea --
Total --
8. Lean season flow rate in case of discharge in a river/stream (cusecs): NA
9. Downstream users of water (in case of river, reservoir, lake) (cusecs): NA
(a) Human
1.0
-
50.0
7.0
128.0
-
75.0
(d) Domestic
70.0
Page 325
Industry Sector Projects
(b) Irrigation
(c) Industry
(d) Others (Pl. specify)
10. Analysis of river water 100 metres upstream of discharge point and 100 metres
downstream of discharge point (except in rainy/monsoon season) along with details
of aquatic life.
We are not going to discharge w/w in river hence not applicable.
11. What is the predicted impact on water quality of the receiving body due to
discharge? (Briefly state the prediction tool adopted).
We are not going to discharge w/w in river hence not applicable.
VII. Solid Waste Management
A. Details
S.
No.
Source Qty. (TPM) Form (Sludge/
Dry/ Slurry etc.)
Composition
1 Raw water treatment plant -
2 ETP waste --
3 Process (Gypsum) --
4 Iron sludge --
5 MEE salt 15 MT/month
6 Incineration Ash/Ash
from spray dryer
--
7 Used Oil 50 lit/yr.
8 Discarded Containers/
Barrels
1000 Nos./yr.
B. If waste(s) contain any hazardous/toxic substance/radioactive materials or heavy
metals, provide data and proposed precautionary measures. --
C. What are the possibilities of recovery and recycling of wastes?
--
D. Possible users of Solid Waste (s).
No solid waste generation
E. Method of disposal of solid waste (s).
Method Qty. (TPM)
1. Landfill
2. Incineration
3. Recovery
4. Downstream users
15 MTPM
--
--
--
Page 326
Industry Sector Projects
F. In case of landfill - Not applicable, we are not going to create our own land fill site
1. Is solid waste amenable for Yes No
landfill
2. Dimensions of landfill
3. Life of landfill years
4. Proposed precautionary and mitigative measures along with design features
G. In case of incineration: Not applicable
1. Details of incinerator
(i) Type
(ii) Size
(iii) Capacity
(iv) Fuel
2. Likely composition and quantum of emissions: NA
S. No. Composition Quantity (in cu.m/hr.)
VIII. Noise Pollution Control and Management
Pls. refer chapter-3 of EIA report.
A. Source
B. Level at Source (dB)
C. Level at project boundary Capacity (dB)
D. Abatement measures (give source-wise details)
IX. Fuel/Energy Requirements
A. Total Power Requirement (MW)
Project Township Other (pl. specify) Total
Present
(in existing)
400 kVA - - 400 kVA
Proposed 950 kVA - - 950 kVA
Total 1350 kVA - - 1350 kVA
B. Source of Power (MW)
SEB/Grid Captive power plant DG Sets
Present SEB - 400 kVA -- 400 kVA
Proposed SEB - 950 kVA -- 1000 kVA
Total 1350 kVA -- 1400 kVA
C. Details of Fuel used
S.
No.
Fuel Daily Consumption (TPD) Calorific value
(Kcals/kg)
% Ash % Sulphur
Existing Proposed
1 Gas - - - - -
Page 327
Industry Sector Projects
2
3
4
5
6
7
Naphtha
HSD
Fuel Oil
Coal
Lignite
Other (Pl.
specify)
-
45 lit/hr.
-
-
-
-
110 lit/hr.
-
-
-
D. Source of Fuel (Distance in km)
1. Port
2. Mine
3. Refinery
4. Storage depot/Terminal
E. Mode of Transportation of fuel to site
1. Trucks (numbers/day)
2. Pipeline (length in km.)
3. Railway Wagons (numbers/day)
X. Atmospheric Emissions
A. Flue gas characteristics (SPM, SO2, NOx, CO)
S. No. Pollutant Source of
Emission
Emission rate
(kg/hr)
Concentration in flue
gas (g/m3)
1 SPM Stack
attached to
D G Set
0.043 0.08
2 RPM
3 SO2 0.013 0.025
4 NOx 0.016 0.0
1 SPM Stack
attached to
D G Set
0.105 0.110
2 RPM
3 SO2 0.033 0.035
4 NOx 0.029 0.030
B. Size distribution of SPM at the top of the stack
S. No. Range % by weight
1
2
3
4
Micron
1-10 Micron
10-20 Micron
<20 Micron
12-14
Page 328
Industry Sector Projects
C. Stack emission Details (All the stacks attached to process units, Boilers, captive power
plant, D.G. Sets, Incinerator both for existing and proposed activity).
Plant
section
& units*
Stack
No.
Height
from
ground
level
(m)
Internal
Diamete
r (Top)
(m)
Emission
Rate
(kg/hr)*
Temp. of
Exhaust
Gases
(deg K)
Exit
Velocity
(m/sec)
Exhaust Gas
Temp Density Specific
Heat
Volumetric
Flow
(m3)
Existing
D G set
(400
kVA)
1st 11 0.225 SPM:
0.043
SO2: 0.013
NOx:
0.016
453 15 453 - 536.50
m3/hr.
Proposed
D G set
(1000
kVA)
2nd
11 0.30 SPM:
0.105
SO2: 0.033
NOx:
0.029
475 15 475 - 953.78
m3/hr.
*Note: Please indicate the specific section to which the stack is attached. For e.g.: Process section,
D.G. Set, Boiler, Power Plant, incinerator etc.
Emission rate (kg/hr.) for each pollutant (SPM, SO2, NOx) etc. should be specified.
D. Details of fugitive emissions (Indicate the points of fugitive emissions and quantities
estimated).
Source of fugitive emission
Fugitive emission of VOCs is likely to emit from production activities. There are
also chances of the fugitive emission due to handling of raw materials and from
process.
Pls. refer table 2.8(a), page no. 2-22 of chapter-2 of EIA report quantities of
fugitive emission.
E. Predicted impact on air quality (as per CPCB Guidelines for conducting the air quality
modeling).
Pls. refer chapter-4 of EIA report.
XI. Pollution load statement (Applicable to Expansion and Modernization Projects only)
Parameter Existing
Plant
Proposed
Expansion/Modernization
Total Remarks
1. Land area (ha)
2. Raw water (m3/day)
3. Power (MW)
4. Waste water (effluent
generation) (m3/day)
a. Process
b. Domestic
5. Air emissions
(gms/hr.)
a. SPM
b. CO
4182 m2
123.0
400 kVA
30.0
2.5
--
475.0
950 kVA
91.0
4.5
4182 m2
598.0
1350 kVA
121.0
7.0
No
addition
of land.
Expansion
will be
done in
existing
premises.
Page 329
Industry Sector Projects
c. SO2
d. NOx
e. Others (like HC, Cl2,
NH3 etc.)
6. Hazardous Chemical
Storage (give item-wise)
7. Solid waste
(TPD)
a. Non- Hazardous
b. Hazardous
Salt-5
MTPM
Dis.
container
-500
nos./yr.
Used oil-
50 lit/yr.
Salt-10 MTPM
Dis. container-500 nos./yr.
Used oil---
Salt-15
MTPM
Dis.
container-
1000
nos./yr.
Used oil-
50 lit/yr.
XII. Storage of chemicals (inflammable/explosive/hazardous/toxic substances)
S.
No.
Name Number
of
Storage’s
Capacity
(TPD)
Physical and
Chemical
Composition
Consumpt
ion
(in TPD)
Maximum
Quantity of
storage at
any point of
time
Source
of
Supply
Means of
transpor-
tation
Pls. refer table no. 7.1, page no. 7-3 of chapter-7 of EIA report.
XII. Occupational Health and Industrial Hygiene.
Pls. refer chapter - 7 & 10 of EIA report.
A. What are the major occupational health and safety hazards anticipated. (Explain briefly).
B. What provisions have been made/propose to be made to conform to health/safety
requirements. (Explain briefly).
C. Details of personal protective equipment provided/to be provided to the workers.
D. Details of proposed measures for control of fugitive emission/odour nuisance from
different sources.
E. Details of fire protection and safety measures envisaged to take care of fire and explosion
hazards.
XIV. Pollution Control Aspects
A. Details of Pollution Control Systems:
S. No. Existing Proposed to be installed
i) Air Tail gas treatment plant --
ii) Water Forced effect evaporator --
iii) Noise Acoustic enclosure to
noise generating
equipments
Acoustic enclosure to noise
generating equipments
iv) Solid Waste Separate storage area with
impervious platform
Separate storage area with
impervious platform
B. Efficiency of each pollution control equipment/system installed.
1. Existing Units
S. No. Name of the System
Equipment
Design Efficiency % Present Working
efficiency %
1
2
Page 330
Industry Sector Projects
2. Proposed Project
S. No. Name of the System Equipment Design Efficiency %
1
2
XV. Green Belt Plan
A. Total area of project/township (in ha.)
B. Area already afforested (for existing projects), in ha.
C. Area proposed to be afforested (in ha.)
D. Plant species proposed
1. Indigenous
2. Exotic
E. Width of green belt (minimum, in m.)
1. Along plant boundary
2. Roads and avenues within the plant
3. Ash Dike
4. Township
5. Other-ornamental, garden spaces
6. Commercial plantations etc.
F. Trees planted & proposed Nos.
1. Planted
2. Survival rate
3. List of species planted
4. Proposed
5. List of Species
XVI. Construction Phase Management Aspects
A. Estimated duration of construction in months
B. Number of persons to be employed for construction
1. Peak
2. Average
1500 m2
--
Indigenous
4 to 7 m
1 m
-
-
2 m
-
Pl. refer ch. 10
4 months
40
20
4281 m2
75%
Pl. refer ch. 10
Pl. refer ch. 10
Pl. refer ch. 3
Page 331
Industry Sector Projects
C. What provision has been made for the sewage treatment for the construction
workers?
Soak pit
D. How the fuel (kerosene/wood, etc.) requirement of labour force will be met to avoid
cutting of trees from the adjoining areas.
We will provide kerosene to family of workers.
E. Proposed Health care Measures with emphasis on protection from endemic
diseases.
Part time doctor will be appointed.
F. Educational and other social welfare measures proposed.
XVII. Human Settlement: Pls. refer chapter-3 of EIA report.
S.
No.
Aerial distance from the periphery of the site
Up to 500 m from
periphery
500 m to 3000 m
from the periphery
3000 m to 7000 m
from the periphery
1 Population
Pls. refer chapter-3 of EIA report 2 Number of
Houses
3 Present
Occupational
Pattern
XVIII. Rehabilitation & Resettlement Plan (Wherever applicable)
A. Village(s) affected by the project: Not applicable as there is no Rehabilitation &
Resettlement is involved
S.
No.
Village (Tribal/Others) Population Occupation Average Income
per annum
B. Population to be displaced: Not applicable as there is no Rehabilitation & Resettlement
is involved
S.
No.
Name of Village Population
Land oustees
only
Homestead oustees
only
Land and Homestead
oustees
C. Salient features of Rehabilitation Plan. - Not applicable as there is no Rehabilitation &
Resettlement is involved
(i) Site where the people are proposed to be resettled
(ii) Facilities proposed at the resettlement site
(iii) Compensation package
(iv) Agency/Authority responsible for their resettlement.
Page 332
Industry Sector Projects
XIX. Expenditure on Environmental Measures
A. Capital cost of the project (as proposed to approved by the funding agency/ financial
Institutions.
(Rs. Lakhs)
B. Cost of environmental protection measures (Rs. Lakhs)
S. No. Recurring Cost per annum Capital Cost
1 Air Pollution Control 12.0 55
2 Water Pollution Control 4.0 32
3 Noise Pollution Control 0.5 0.5
4 Environment Monitoring
and Management
5.0 3
5 Reclamation borrow/
mined area
-- 0
6 Occupational Health 3.0 2
7 Green Belt 0.5 2.5
8 Others (Rain water
harvesting system & Haz.
Waste management)
5.0 5
Total 30.0 lakhs 100 lakhs
C. Details of organizational set up/cell for environmental management and
monitoring.
Pls. refer figure 10.1, page no. 10-27 of chapter-10 of EIA report.
D. Details of community welfare/peripheral development programmes envisaged/
being undertaken by the project proponent:
Pls. refer chapter-10 of EIA report for CSR activities.
XX. Public Hearing details:
A. Date of Advertisement:
B. Newspapers in which the advertisement appeared
(with copies)
C. Date of Hearing
D. Panel Present
E. List of public present along with address and occupation
F. Summary/details of public hearing report
S.
No.
Issues raised Recommendation
of panel
Response of Project
Proponents
1. Thakor Chunthaji Ramsang, Moti Bhoyan He asked that- At present how much quantity
of formaldehyde is producing?
You have Environment
clearance for existing unit. The
--
Representative of the company inform that currently unit producing 5000 MT/Month (max) Formaldehyde.
We are regularly submitting compliances
100 Lakhs
06.04.2016
Indian Express &
Divya Bhaskar
09.05.2016
RO-GPCB, Gandhinagar
& Additional District
Magistrate, Gnadhinagar
Details are given in
Minutes of public Hearing
Page 333
Industry Sector Projects
date of submission of compliance report for last three years.
Environment clearance is obtained for the existing unit on 24/08/2010, whereas Consent No. AWH.71755, Dt. 13/09/2015 was obtained from GPCB. That means Industry have operated the plant from year 2010-July 2012 without obtain GPCB consent? Submit the details of How many Products were produced and how much the quantity of each product during this time (Aug’10-July’15).
Provide validity of Environmental Clearance obtained for Existing unit.
Provide the details of tree plantation after expansion.
Provide the area of block No.
1398.how much area is covered for existing construction.
When N.A is obtained for Block No. 1398?
Any permission is obtained
from the Authority like Gram Panchayat-Moti Bhoyan, Taluka Panchayat Jilla Panchayat –Gandhinagar or Collector of Gandhinagar for proposed expansion?
Which type of work done for
social welfare activities in last three years? How much fund expanse for this activity during three years?
report of EC to Regional office, MoEF&CC, Bhopal at interval of six months.
We have renewed our consent to operate on 13.09.2015 and we have obtained consent to operate with same capacity from GPCB. During this period we were produced same product Formaldehyde with max production capacity of 5000 MT/Month.
We have obtained EC on
24/08/2010 with validity of 5 years for its implementation. During this time, we have established our plant and obtained CTE & CTO & not violate EC Condition.
We have around 150 trees planted in our premises which include Palm tree, Jasud, Madhukamini, Chandani, exsora pink, exsora red etc.
We have 4281 Sqm net in Block No. 1398. Around 60%of area is covered under construction.
We have obtained N.A permission for block no. 1398 dt: 20/12/2004.
We will obtain required permissions for proposed expansion from Authority like Gram Panchayat-Moti Bhoyan, Taluka Panchayat Jilla Panchayat –Gandhinagar or Collector of Gandhinagar before start our project activity.
Being a small unit, some CSR activities carried out by us and committed to more focus on CSR work in upcoming period.
Page 334
Industry Sector Projects
Give details of how many local people get employment for existing unit? Give details of each local employment with their address.
How you meet your water
requirement for Existing plant? Thol lake Bird Sanctuary is 3
km away from the project site which is not included in study and this is very serious matter.
How much solid waste is
generated per month and where it is dispose? Give details.
Is there ETP at present operation? If yes, then provide its capacity.
How many Showcase Notices,
Closure Notices etc. obtain for existing unit under Air Act-1981& EPA-1986? Give the reasons of notices.
Unit is providing employment around 40 employees those who are coming from Gandhinagar and Ahmadabad district. Summary of name of employee and there village is attach herewith.
Currently we are fulfilling our water demand from water supply of Narmada Nigam.
Unit is not using any fuel in the plant and achieves Zero discharge hence major environmental impact is localized. There is no any adverse impact envisage on Bird of Thol lake hence detail impact study is not carried out.
Currently we are disposed of industrial solid waste at Saurashtra Environment Project Pvt. Ltd Bhachau.
There is no waste water generation from process only waste water generate from Cooling tower and Boiling, it it will be evaporate to achieve zero discharge. Hence ETP is not required in our unit.
Still we have received three notices from GPCB one is dt: 7/09/2011, second: 05/12/2012 & third one on dt: 06/02/2013. We have immediately take actions to comply non-compliance of notices.
The data and information given in this Performa are true to the best of my knowledge and belief.
Date: 28.07.2016 Signature of the Applicant with full name
& address.
Place: Moti Bhoyan
Given under the seal of organization
on behalf of whom the applicant
is signing.
Page 335
Industry Sector Projects
LIST OF DOCUMENTS TO BE ATTACHED WITH THE QUESTIONNAIRE
(Industry Sector Projects)
S. No. Documents to be Attached
1. Topographic map of the site indicating contours (1:2500 scale)
2. Topographic map covering 7 kms radius from the periphery of the site indicating
main features
3. Wind rose diagram of the site (Seasonal)
4. Wind rose diagram of the site (Artificial)
5. Site map indicating the positions of ambient air quality monitoring stations vis-à-
vis wind direction
6. Flow sheet of the process adopted indicating mass input/output, brief description
of the process including technological and engineering details
7. Alternative technologies considered along with details of criteria used for selecting
the technology and results of evaluation
8. Approval of ground water board/ irrigation department/ Municipality etc. for
supply of water
9. Mass balance for water used by the project in a flow chart
10. Flow chart for waste water treatment with mass balance
11. Site map indicating solid waste disposal facilities
12. Approval of electricity connection and supply of electricity
13. Lay out map of the plant showing the position of stacks for deciding the inter stack
distance
14. Site map indicating the storage facilities
15. Approval of Chief controller of explosives for lay out and storage of hazardous
substances
16. Layout of green belt indicating width on all sides, trees, lawns and bushes
17. Copy of advertisement issued in respect of public hearing
18. No objection certificate from the pollution control board
19 In case of proposals for expansion copies of renewals of consent from SPCB /
PCC
20. In case of expansion proposal copy of approval of factory inspector
21. Copy of the application submitted to the State Government for the forest clearance
in case diversion of forest land is involved
22. Comments/Observations/Recommendation of Chief Wildlife Warden in case
wildlife habitat/ migration path exists within 25 kilometers of the project site
23. Hydrogeological report in case ground water is to be used and/or the area is
drought prone or the waste water is likely to be discharged on land
24. Environmental Audit report for the previous two years in case of expansion of
existing undertaking.
25. In case the proposal involves installations in coastal zone, copy of the application
forwarded by the State Government
Page 336
Annexure-X NABET/QCI certificate
Page 337
NABET/EIA/327/IA14 The Director San Envirotech Pvt. Ltd. 424, Medicine Market, Opp. Shefali Centre, Paldi Cross Road, Paldi, Ahmeda bad-380007 (Kind Attention: Dr. Mahendra Sadaria)
May 12,2014
Dear Sir,
QCI - NABET Scheme for Accreditation of EIA Consultaht Omanization
. his is with reference to yquiapplication to QCI - NABET for ~ccreditation a* ElA Consultant Organization. t.'
We are pleased to inform you that based on Document & Office Assessments, the Accreditation Committee has recommended provisional accreditation of your organization as per the scope given in Annexure II and Ill. Also find attached'herewith the following:
a. Results of various aspects of assessment of your organization (Annexure I). b. Non-Conformances/Observations/Alerts issued after Initial Assessment (Annexure IV). c. Detailed Terms & Conditions of accreditation (Annexure V): d. Guidelines for addressing Non-Conformances/ Observations/ Alerts (Annexure VI). e. or mat to be followed for'mentioning the names of the experts involved in EIA reports prepared by . .
San Envirotech Pvt. Ltd. (Annexure VII).
~lease'confirm the correctness of spellings of the names of the e~~erts'mentioned in Annexure: Ill. Please also check the QCI website for the Minutes of the Accreditation Committee Meeting January 22 and February 13, 2014 for observations related to your application, for compliance. You are advised to visit QCI website t o check clarifications on the.Scheme issued from time to time for necessary actions at your '
.
end.
' The accreditation of your organization will be for a period of three years starting-December 21, 2013, the date of ofice assessment. The continuation of the accreditation will be confirmed based on surveillance assessment to be carried out after 18 months from the date of initial accreditation. Surveillance assessment will be conducted t o ensure compliance with NABET Scheme including . the . details mentioned ,
in your Quality ~ a n u a l and the terms & conditions mentioned in Annexure V. .
May we request you for your confirmation of acceptance of the terms and conditions attached. Compliance to above will enable us to issue you the requisite accreditation certificate.
We thank you for your esteemed support in making this Scheme successful and for your participation in this national cause.
Thanks and best regards, . .
Yours sincerely,
C m
(vip\n Sahni) C.E.O.
Institution of Engineers Build~ng, 2nd Floor, Bahadur Shah Zafar Marg, New Delhi - 110 002, India Te!. : +W -11-2337 9321. 2337 8057 Fax . +91-11-2332 3415 e-mail : [email protected] Website : www.qcin.org
Page 338
QCI Scheme for ADMditation of EIA Consultant Organizations
Scope of Accreditation Annexure I k
Name of the Consultant: San Endattech Pvt, Ltd. 424, Medicine Market, Opp. Shefati Centre,Paidi Cross Road, Paldi, Ahmedabad-380007
I I 4 ( Thermal Power Plants t. I
', . ..
1 1 21 1 drugs and intermediates excluding drug formulations, rubbers; basic organic chemicals, other synthetic organic chemicals
51. No.
2
3
and chemical intehedlates) . , ' Building and larde construction projects including shopping malls,
Sector No.
9
l7
r
Total = Seetors* i
38
I *Sectors allocated to individual EIA ~a)rdimtors w e mentioned in ~nnexure 111. 1
Name of Sector i
Cement Plants Pesticides industry and pesticide specific intermediates (excluding formulations) Synthetic organic chemicals industry (dyes & dye intermediates, bulk
& (Vip~n Sahni)
C.E.O.
Category A/B
B.
A
multiplexes, co~mercial. complexes, housing estates, hospitals, institutions 1
San Envirotech Pvt. Ltd., Ahmedabad
B
Page 339
Annexure-XI Terms of Reference (TOR) letter