FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility Improvement Project Northern State Parkway to NY Route 25A Towns of Smithtown, Islip & Brookhaven Suffolk County May 2007 Cultural Resources Technical Report Volume II, Appendix K U.S. Department of Transportation Federal Highway Administration NEW YORK STATE DEPARTMENT OF TRANSPORTATION ELIOT SPITZER, Governor ASTRID C. GLYNN, Acting Commissioner
30

FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

Mar 10, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

FINAL DESIGN REPORT/FINALEIS/FINAL SECTION 4(F)

EVALUATION

PIN 0054.05.103NY Route 347 Safety and Mobility Improvement

Project

Northern State Parkway to NY Route 25ATowns of Smithtown, Islip & Brookhaven

Suffolk County

May 2007

Cultural Resources Technical Report

Volume II, Appendix K

U.S. Department of TransportationFederal Highway Administration

NEW YORK STATE DEPARTMENT OF TRANSPORTATIONELIOT SPITZER, Governor ASTRID C. GLYNN, Acting Commissioner

Page 2: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

CULTURAL RESOURCES ASSESSMENT

Table of Contents

Appendix A. Letter from NYSOPRHP, dated July 14, 1995. Appendix B. Letter from New York State Museum, dated October 23, 2006. Appendix C. Correspondence between NYSOPRHP, NYSM and NYSDOT concerning

eligibility of architectural sites. Appendix D. Correspondence between NYSOPRHP, NYSM and NYSDOT concerning

eligibility of archeological sites, MOA, and Data Recovery Plan. Appendix E. NYS OPRHP adverse effect determination & MOA with Findings

Documentation and ACHP recommendations. Appendix F. Letter from ACHP declining further involvement. Appendix G. FHWA Findings Concurrence Request. Appendix H. Sensitive Material Documents1. Appendix I. Letter from FHWA, dated March 29, 2007 [Concurrence with 36 CFR Part 800]

1 Sensitive Material Documents have been excluded from the FEIS and have been made part of the Administrative Record. These documents can not be released under the Freedom of Information Law (FOIL), but can be obtained upon request, when deemed appropriate.

Page 3: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX A: Letter from NYSOPRHP, dated July 14, 1995.

Page 4: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 5: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX B: Letter from New York State Museum, dated October 23, 2006.

Page 6: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 7: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX C: Correspondence between NYSOPRHP, NYSM and NYSDOT concerning eligibility of architectural sites.

Page 8: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 9: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 10: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 11: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX D: Correspondence between NYSOPRHP, NYSM and NYSDOT concerning eligibility of archeological sites, MOA, and Data Recovery Plan.

Page 12: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 13: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 14: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 15: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 16: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX E: NYS OPRHP adverse effect determination & MOA with Findings Documentation and ACHP recommendations.

Page 17: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 18: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 19: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 20: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 21: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 22: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 23: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX F: Letter from ACHP declining further involvement.

Page 24: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 25: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX G: FHWA Findings Concurrence Request.

Page 26: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural
Page 27: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX H: Sensitive Material Documents

Page 28: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

The following documents are confidential and not available for general distribution. 1. Cultural Resources Survey Report, PIN TRN 1.95, RTE 347 Pre-Reconnaissance

Corridor Study, Towns of Smithtown, Islip and Brookhaven Suffolk County, NY (1989) conducted by the New York State Museum (NYSM) on behalf of the New York State Department of Transportation (NYSDOT).

2. Cultural Resources Reconnaissance Survey Report (2005-2006) conducted by NYSM on

behalf of NYSDOT; Including Volume I: Archeological Reconnaissance Survey, Volume II: Architectural Survey and Volume III Project and Architectural Survey Maps.

3. End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary

Gentile NYSDOT October 24, 2006).

4. Cultural Resources Data Recovery Plan for The Naimia (NYSM # 11658) Site (November 2006) prepared by NYSM on behalf of NYSDOT.

5. Cultural Resources Site Examination Report, PIN 0054.05.124, NYS Route 347 from

Northern State Parkway to NYS Route 25A, Town of Smithtown, Suffolk County, New York (April 2007), conducted by NYSM on behalf of NYSDOT.

Page 29: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural

APPENDIX I: Letter from FHWA, dated March 29, 2007

Page 30: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural