7th February 2020 V1.3 | Final Auction Report 0 Final Auction Report 2019 three year ahead Capacity Auction (T-3) Delivery year 2022/23 7 th February 2020 V1.3
24

Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Jul 24, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

7th February 2020 V1.3 | Final Auction Report 0

Final Auction Report 2019 three year ahead Capacity Auction (T-3) Delivery year 2022/23

7th February 2020 V1.3

Page 2: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Table of Contents

Executive summary Page 1 Results summary Page 2 Capacity awarded by generating type and primary fuel Page 3 to 4 Capacity procured by delivery year Page 5 Results by CMU Pages 6 to 20

Page 3: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Disclaimer

This document has been prepared by National Grid Electricity System Operator Limited (NGESO) and is provided voluntarily and without charge. Whilst NGESO has taken all reasonable care in preparing this document, no representation or warranty either expressed or implied is made as to the accuracy or completeness of the information that it contains and parties using information within the document should make their own enquiries as to its accuracy and suitability for the purpose for which they use it. Neither NGESO nor any other companies in the National Grid plc group, nor any Directors or employees of any such company shall be liable for any error or misstatement or opinion on which the recipient of this document relies or seeks to rely other than fraudulent misstatement or fraudulent misrepresentation and does not accept any responsibility for any use which is made of the information or the document or (to the extent permitted by law) for any damages or losses incurred.

In the event of any conflict or inconsistency between this document and the Capacity Market Rules, the Electricity Capacity Regulations or the Auction Guidelines, the latter documents take precedence. Capitalised terms used in this document shall have the same meanings given in the Capacity Market Rules.

Confidentiality

This guidance document, and its contents should be considered as confidential in nature, and this document is supplied on this basis. No part of this document may be reproduced in any material form (including photocopying and restoring in any medium or electronic means and whether transiently or incidentally) without the written permission of NGESO.

Copyright National Grid ESO 2020, all rights reserved.

Page 4: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Page 1

Executive Summary

National Grid ESO in its role as EMR Delivery Body is required by the Capacity Market Rules 2014 (Rule 5.10.2) to notify the Secretary of State of the Final Results of the Capacity Market Auction as soon as reasonably practicable following the conclusion of the Capacity Auction. This report discharges that obligation.

The T-3 Capacity Auction for delivery in 2022/23 concluded on 31st January 2020, 12:15 BST. The results of the auction are as follows, where any capacity figure refers to de-rated capacity, unless otherwise stated.

The CMUs to which a Capacity Agreement has been awarded and the duration of those Capacity Agreements are listed in the CMU results section (page 6).

In addition to the results presented above, National Grid ESO is required under Capacity Market Rule 5.10.3 to report any CMUs that were removed from the IT Auction System under Capacity Market Rule 5.3.3. The Auction concluded without any CMUs being removed from the system by National Grid.

The remainder of this report gives further detail on the Capacity Market Auction Clearing, how the Clearing Price was reached and what makes up the capacity that has been procured.

The results of the auction have remained provisional for the period of 8 working days after the completion of the Capacity Market Auction, during which time the Secretary of State may annul the auction on the grounds specified in Regulation 27 of the Electricity Capacity Regulations 2014. This period has now passed and these results are final.

Any T-3 (delivery year 2022/23) data shown within this document originates from the latest Capacity Market Register available at the time this document was published.

Page 5: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Auction Results

Auction and Delivery Year T-3 Auction, Delivery Year 2022/23

Date and time auction cleared 12:15, 31st January 2020

Clearing Price £6.44

Aggregate Capacity of CMUs awarded Capacity Agreements 45058.832 MW

Target Capacity (demand at clearing price) 44868.571 MW

Capacity entering auction and proportion awarded an agreement 58994.694 MW (76.38% awarded an agreement)

Number of CMUs awarded an agreement 375

Number of applicant companies awarded an agreement 136

Number of parent companies awarded an agreement 112

The high level auction results are summarised below including a round by round summary graph. As shown within the round summary, the auction cleared in round 14.

The awarded and exited capacity are summarised below by technology type. Existing CMUs made up 79.75% of the capacity entering the auction and formed both the largest

capacity to exit the auction (49.97%) and the largest capacity to be awarded an agreement (81.91%). Of the total 8423.33MW of new build generation (14.28% of capacity

entering the auction), 36.59% of this capacity was successful in gaining an agreement.

Round 15

Round 14

Round 13

Round 12

Round 11

Round 10

Round 9

Round 8

Round 7

Round 6

Round 5

Round 4

Round 3

Round 2

Round 1

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

0 10,000 20,000 30,000 40,000 50,000 60,000 70,000

Price (£/kW/y)

Capacity (MW)

Supply and Demand Curve

Demand Curve Remaining Capacity

Page 2

Page 6: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Capacity MW % No. CMU Capacity MW % No. CMU

Existing Generating CMU 36907.744 81.91% 271 6963.068 49.97% 48

Coal 880.65 1.95% 2 3693.319 26.50% 8

Combined Cycle Gas Turbine (CCGT) 19870.937 44.10% 35 1823.4 13.08% 5

Combined Heat and Power (CHP) 4288.554 9.52% 76 99.581 0.71% 16

DSR 0 0.00% 0 0 0.00% 0

Energy from Waste 467.633 1.04% 21 0 0.00% 0

Hydro 822.609 1.83% 36 0 0.00% 0

Nuclear 5919.544 13.14% 12 861.744 6.18% 2

OCGT and Reciprocating Engines (Fuel Type - Gas) 0 0.00% 0 0 0.00% 0

Onshore Wind 0 0.00% 0 0 0.00% 0

Open Cycle Gas Turbine (OCGT) 1780.292 3.95% 24 355.748 2.55% 10

Reciprocating engines 439.414 0.98% 50 41.056 0.29% 6

Solar Photovoltaic 0 0.00% 0 0 0.00% 0

Storage 0 0.00% 0 0 0.00% 0

Storage (Duration 0.5h) 1.059 0.00% 1 2.648 0.02% 1

Storage (Duration 1h) 2.528 0.01% 3 0 0.00% 0

Storage (Duration 2h) 0 0.00% 0 0 0.00% 0

Storage (Duration 3h) 0 0.00% 0 0 0.00% 0

Storage (Duration 4h) 0 0.00% 0 0 0.00% 0

Storage (Duration 5.5h) 372.174 0.83% 3 85.572 0.61% 1

Storage (Duration 6h) 1643.998 3.65% 6 0 0.00% 0

Storage (Duration 12h) 418.352 0.93% 4 0 0.00% 0

New Build Generating CMU 319.252 0.71% 38 5341.076 38.33% 130

Coal 0 0.00% 0 0 0.00% 0

Combined Cycle Gas Turbine (CCGT) 0 0.00% 0 2432.7 17.46% 3

Combined Heat and Power (CHP) 5.773 0.01% 2 44.91 0.32% 1

DSR 0 0.00% 0 0 0.00% 0

Energy from Waste 121.765 0.27% 4 41.618 0.30% 2

Hydro 0 0.00% 0 0 0.00% 0

Nuclear 0 0.00% 0 0 0.00% 0

OCGT and Reciprocating Engines (Fuel Type - Gas) 0 0.00% 0 0 0.00% 0

Onshore Wind 14.547 0.03% 5 10.454 0.08% 2

Open Cycle Gas Turbine (OCGT) 0 0.00% 0 1159.705 8.32% 6

Reciprocating engines 150.453 0.33% 23 1221.421 8.76% 86

Solar Photovoltaic 0 0.00% 0 0 0.00% 0

Storage 0 0.00% 0 0 0.00% 0

Storage (Duration 0.5h) 0 0.00% 0 0 0.00% 0

Storage (Duration 1h) 26.714 0.06% 4 118.842 0.85% 13

Storage (Duration 2h) 0 0.00% 0 207.915 1.49% 12

Storage (Duration 3h) 0 0.00% 0 2.972 0.02% 2

Storage (Duration 4h) 0 0.00% 0 100.539 0.72% 3

Storage (Duration 5.5h) 0 0.00% 0 0 0.00% 0

Storage (Duration 6h) 0 0.00% 0 0 0.00% 0

Storage (Duration 12h) 0 0.00% 0 0 0.00% 0

Pre-Refurbishment CMU 1349.5 2.99% 3 495 3.55% 1

Refurbishing Generating CMU 4.749 0.01% 1 0 0.00% 0

Existing Interconnector CMU 3180 7.06% 5 0 0.00% 0

New Build Interconnector CMU 2763 6.13% 3 0 0.00% 0

Proven DSR CMU 124.807 0.28% 13 70.172 0.50% 9

Unproven DSR CMU 409.78 0.91% 41 1066.046 7.65% 92

Awarded and exited capacity by technology type

Breakdown of awarded capacity Breakdown of capacity exiting the auction

Page 3

Page 7: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Please note in the above charts, "Refurbishing Generating CMU" includes bidders who may have aquired either a pre-refurbishing agreement or a post-refurbishing

agreement.

The below charts show the breakdown by the primary fuel type of CMUs that were awarded an agreement and those CMUs who exited the auction above the clearing price.

The below charts show the breakdown by the generating type of CMUs that were awarded an agreement and those CMUs who exited the auction above the clearing price.

273

5

38

3

134

41

36907.744

3180

319.252

2763124.807

1354.749409.78

Capacity awarded

Existing Generating CMU Existing Interconnector CMU New Build Generating CMU New Build Interconnector CMU

Proven DSR CMU Refurbishing Generating CMU Unproven DSR CMU

Capacity awarded:45,058.832 MW

CMUs awarded:375

49

130

9

1

92

6963.0685341.076

70.172

495

1066.046Capacity exited

Capacity exited:13,935.362 MW

CMUs exited:280

25

9

53

198

36

8

12

7

13

25

880.65

317.371

319.134

532.079

27242.438

822.609

5943

5919.54430.122

2434.524 589.398Capacity awarded

Coal Coal mine methane Diesel Distillate DSR

Gas Hydro Interconnector Nuclear Onshore Wind

Capacity awarded:45,058.832 MW

CMUs awarded:375

2

101130

2

231 12

37.992

1136.218

7603.235

861.74410.454

432.916

85.572

41.618

Capacity exited

Capacity exited:13,935.362 MW

CMUs exited:280

Page 4

Page 8: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Delivery Year T-4 18/19 T-4 19/20 T-4 20/21 TR 16/17EA & TA

17/18T1 18/19 T-4 21/22 T-1 19/20 T-3 22/23 T-1 20/21 T-4 23/24 Total

2016 - - - 620.347 - - - - - - - 620.347

2017 - - - - 54709.962 - - - - - - 54709.962

2018 47523.426 - - - - 5728.133 - - - - - 53251.559

2019 760.296 46223.928 - - - - - 3626.196 - - - 50610.42

2020 760.296 870.737 52397.564 - - - - - - - - 54028.597

2021 741.574 870.737 2640.509 - - - 50416.609 - - - - 54669.429

2022 741.574 870.737 2640.509 - - - 659.184 - 45058.832 - - 49970.836

2023 741.574 870.737 2640.509 - - - 659.184 - 214.984 - - 5126.988

2024 741.574 870.737 2640.509 - - - 651.969 - 214.984 - - 5119.773

2025 741.574 870.737 2640.509 - - - 651.24 - 212.083 - - 5116.143

2026 741.574 870.737 2640.509 - - - 651.24 - 212.083 - - 5116.143

2027 741.574 870.737 2640.509 - - - 651.24 - 212.083 - - 5116.143

2028 741.574 870.737 2640.509 - - - 651.24 - 212.083 - - 5116.143

2029 741.574 870.737 2640.509 - - - 651.24 - 212.083 - - 5116.143

2030 741.574 870.737 2640.509 - - - 651.24 - 212.083 - - 5116.143

2031 741.574 870.737 2640.509 - - - 651.24 - 212.083 - - 5116.143

2032 709.282 870.737 2607.112 - - - 651.24 - 212.083 - - 5050.454

2033 - 857.817 2607.112 - - - 649.63 - 212.083 - - 4326.642

2034 - - 2607.112 - - - 649.63 - 208.114 - - 3464.856

2035 - - - - - - 641.488 - 208.114 - - 849.602

2036 - - - - - - - - 208.114 - - 208.114

2037 - - - - - - - - - - - 0

Capacity procured by Delivery Year

The maximum duration for Capacity Agreement received in the T-3 Auction is 15 years. The capacity procured for the period of 2016 to 2037 is shown below, by auction.

0

10,000

20,000

30,000

40,000

50,000

60,000

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037

Cap

acity (

MW

)

Delivery Year

Capacity procured by Delivery Year

T-4 18/19 T-4 19/20 T-4 20/21 EA & TA 17/18 T1 18/19 T-4 21/22

T-1 19/20 TR 16/17 T-3 22/23 T-1 20/21 T-4 23/24

Page 5

Page 9: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0038 Yes New Build Generating CMU 3.799 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0068 Yes New Build Generating CMU 3.799 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR2162 Yes New Build Generating CMU 3.799 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR2137 Yes New Build Generating CMU 3.849 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR2113 Yes New Build Generating CMU 4.815 15 Gas

Aggregated Micro Power Infrastructure 2 PLC AMPIL 2 ASSET LIMITED VILLA3 Yes Existing Generating CMU 2.849 1 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0081 Yes New Build Generating CMU 3.799 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0111 Yes New Build Generating CMU 4.749 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0073 Yes New Build Generating CMU 3.799 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0074 Yes New Build Generating CMU 2.375 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0017 Yes New Build Generating CMU 5.699 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0039 Yes New Build Generating CMU 4.815 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0062 Yes New Build Generating CMU 3.799 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0016 Yes New Build Generating CMU 3.799 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0003 Yes New Build Generating CMU 1.9 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0112 Yes New Build Generating CMU 3.799 15 Gas

Aggregated Micro Power Infrastructure 2 plc URBAN RESERVE (ASSETCO) LIMITED UR0108 Yes New Build Generating CMU 2.185 15 Gas

Agrona Power Limited Northwich Power Limited NORT19 Yes Existing Generating CMU 5.509 1 Gas

Alkane Energy Limited Alkane Energy UK Limited AUKWHT Yes Existing Generating CMU 2.066 1 Gas

Alkane Energy Limited Alkane Energy UK Limited AUKCM2 Yes Existing Generating CMU 2.023 1 Coal mine methane

Alkane Energy Limited Alkane Energy UK Limited AUKCM3 Yes Existing Generating CMU 4.047 1 Coal mine methane

Alkane Energy Limited Alkane Energy UK Limited AUK022 Yes Existing Generating CMU 6.224 1 Gas

Alkane Energy Limited Alkane Energy UK Limited AUK024 Yes Existing Generating CMU 3.561 1 Gas

Alkane Energy Limited Alkane Energy UK Limited AUK029 Yes Existing Generating CMU 9.6 1 Gas

Alkane Energy Limited Regent Park Energy Limited ARP004 Yes Existing Generating CMU 5.197 1 Gas

Alkane Energy Limited Regent Park Energy Limited ARP002 No Existing Generating CMU 4.381 1 Gas

Alkane Energy Limited Regent Park Energy Limited ARP005 Yes Existing Generating CMU 4.605 1 Gas

Alkane Energy Limited Regent Park Energy Limited ARPMLT Yes Existing Generating CMU 4.046 1 Coal mine methane

Alkane Energy Limited Regent Park Energy Limited ARPACH Yes Existing Generating CMU 2.023 1 Gas

Alkane Energy Limited Regent Park Energy Limited ARPDC1 Yes Existing Generating CMU 9.178 1 Gas

Alkane Energy Limited Regent Park Energy Limited ARP023 Yes Existing Generating CMU 5.042 1 Gas

Alkane Energy Limited Alkane Energy UK Limited AUK003 No Existing Generating CMU 2.129 1 Gas

Alkane Energy Limited Alkane Energy UK Limited AUKWRS No Existing Generating CMU 2.07 1 Gas

Alpiq Holding AG Flexitricity Limited F19003 Yes Existing Generating CMU 4.893 1 Gas

Alpiq Holding AG Flexitricity Limited F19004 Yes Existing Generating CMU 6.134 1 Gas

Alpiq Holding AG Flexitricity Limited F19019 Yes Existing Generating CMU 3.083 1 Gas

Alpiq Holding AG Flexitricity Limited F19029 Yes Existing Generating CMU 3.077 1 Gas

Alpiq Holding AG Flexitricity Limited F19039 Yes Existing Generating CMU 3.012 1 Gas

Alpiq Holding AG Flexitricity Limited F19109 Yes Existing Generating CMU 2.817 1 Gas

Alpiq Holding AG Flexitricity Limited F19110 Yes Existing Generating CMU 2.7 1 Gas

Alpiq Holding AG Flexitricity Limited F19008 No Existing Generating CMU 5.85 1 Gas

Alpiq Holding AG Flexitricity Limited F19108 Yes Existing Generating CMU 3.51 1 Gas

Alpiq Holding AG Flexitricity Limited F19040 Yes Proven DSR CMU 3.446 1 DSR

Alpiq Holding AG Flexitricity Limited F19042 Yes Proven DSR CMU 11.905 1 DSR

Please note in the below charts, "Refurbishing Generating CMU" includes bidders who may have aquired either a pre-refurbishing agreement or a post-refurbishing agreement.

Page 6

Page 10: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

Alpiq Holding AG Flexitricity Limited F19043 Yes Proven DSR CMU 11.937 1 DSR

Alpiq Holding AG Flexitricity Limited F19072 Yes Proven DSR CMU 2.584 1 DSR

Alpiq Holding AG Flexitricity Limited F19073 Yes Proven DSR CMU 3.876 1 DSR

Alpiq Holding AG Flexitricity Limited F19076 No Proven DSR CMU 5.4 1 DSR

Alpiq Holding AG Flexitricity Limited F19077 No Proven DSR CMU 10.206 1 DSR

Alpiq Holding AG Flexitricity Limited F19081 No Proven DSR CMU 5.816 1 DSR

Alpiq Holding AG Flexitricity Limited F19086 Yes Unproven DSR CMU 2.584 1 DSR

Alpiq Holding AG Flexitricity Limited F18001 Yes Existing Generating CMU 8.1 1 Gas

Alpiq Holding AG Flexitricity Limited F18005 Yes Existing Generating CMU 5.4 1 Gas

Alpiq Holding AG Flexitricity Limited F18006 No Existing Generating CMU 12.938 1 Gas

Alpiq Holding AG Flexitricity Limited F18007 Yes Existing Generating CMU 3.25 1 Gas

Alpiq Holding AG Flexitricity Limited F18009 No Existing Generating CMU 4.05 1 Gas

Alpiq Holding AG Flexitricity Limited F18010 No Existing Generating CMU 2.7 1 Gas

Alpiq Holding AG Flexitricity Limited F18011 Yes Existing Generating CMU 2.7 1 Gas

Alpiq Holding AG Flexitricity Limited F18014 Yes Existing Generating CMU 2.364 1 Gas

Alpiq Holding AG Flexitricity Limited F18033 Yes Existing Generating CMU 4.21 1 Gas

Alpiq Holding AG Flexitricity Limited F18034 Yes Existing Generating CMU 3.02 1 Gas

Alpiq Holding AG Flexitricity Limited F18036 Yes Existing Generating CMU 3.658 1 Gas

Alpiq Holding AG Flexitricity Limited F18024 Yes Existing Generating CMU 3.457 1 Gas

Alpiq Holding AG Flexitricity Limited F19027 Yes Existing Generating CMU 9 1 Gas

Alpiq Holding AG Flexitricity Limited F19002 Yes Existing Generating CMU 5.031 1 Gas

Amber Energy Storage Limited AMBER ENERGY STORAGE XL LIMITED AMB019 No New Build Generating CMU 21.222 15 Storage - Battery

Anesco Asset Management Limited Hulley Road Energy Storage Limited ADSHU2 Yes Unproven DSR CMU 17.228 1 DSR

Anesco Asset Management Three Limited Lascar Battery Storage Limited ADSLS1 Yes Unproven DSR CMU 17.228 1 DSR

Anesco Asset Management Three Limited Clayhill Solar Limited ADSCHL Yes Unproven DSR CMU 5.168 1 DSR

Anesco Asset Management Three Limited Larport Energy Storage Limited ADSLA2 Yes Unproven DSR CMU 16.797 1 DSR

Anesco Bidco 2 Limited Anesco Battery Solutions Limited ADABS2 Yes Unproven DSR CMU 4.481 1 DSR

Anesco Bidco 2 Limited Anesco Battery Solutions Limited ADABS1 Yes Unproven DSR CMU 4.652 1 DSR

Angaston Power Limited Kiln Power Limited KILN19 Yes Existing Generating CMU 15.006 1 Gas

Apus Energy Limited Portsdown Power Limited PORT19 No New Build Generating CMU 18.806 15 Gas

Apus Energy Limited Farnborough Power Limited FARN19 No New Build Generating CMU 15.007 15 Gas

Apus Energy Limited Nursling Power Limited NURS19 No New Build Generating CMU 18.806 15 Gas

Associated British Foods PLC British Sugar plc BSBU20 Yes Existing Generating CMU 55.545 1 Gas

Associated British Foods PLC British Sugar plc BSWI20 Yes Existing Generating CMU 41.4 1 Gas

Baglan Generating Limited Baglan Operations Limited 22BG02 No Existing Generating CMU 30.394 1 Gas

Baglan Generating Limited Baglan Operations Limited 22BG01 No Refurbishing Generating CMU 495 15 Gas

Balance Power Projects Limited SOUGH POWER LTD SOUG23 No New Build Generating CMU 6.649 15 Gas

BALANCE POWER PROJECTS LIMITED BALANCE POWER PROJECTS LIMITED EYRE23 Yes New Build Generating CMU 6.649 15 Gas

Balance Power Projects Limited FULSCOT POWER LTD FULS23 No New Build Generating CMU 7.18 15 Gas

Balance Power Projects Limited INGS LANE POWER LTD INGS23 No New Build Generating CMU 6.649 15 Gas

BayWa r.e. UK (Developments) Limited Crookedstane Windfarm Limited CRO001 Yes New Build Generating CMU 2.083 15 Onshore Wind

BayWa r.e. UK (Developments) Limited Inverclyde Renewables LLP INV001 Yes New Build Generating CMU 1.968 15 Onshore Wind

Bfg Projects Limited NOTTINGHAM ROAD ENERGY CENTRE LIMITED SCE004 No New Build Generating CMU 5.699 15 Gas

Calabrese Limited Loddon Power Limited LODD19 Yes Existing Generating CMU 15.007 1 Gas

Calon Energy (Severn) Limited Severn Power Limited 22SV10 Yes Existing Generating CMU 382 1 Gas

Calon Energy (Severn) Limited Severn Power Limited 22SV20 Yes Existing Generating CMU 382 1 Gas

Cargill UK Holdings Ltd Cargill PLC CarGe4 Yes Existing Generating CMU 27.39 1 Gas

Page 7

Page 11: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

Catria Limited Clyne Power Limited CLYN19 Yes Existing Generating CMU 15.007 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES38 Yes Existing Generating CMU 2.043 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES-4 Yes Existing Generating CMU 6.351 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES-3 No Existing Generating CMU 1.997 1 Gas

Centrica Plc Centrica PB Limited 5RES15 Yes Existing Generating CMU 237.396 1 Gas

Centrica Plc Centrica Brigg Limited 5RES-9 No Existing Generating CMU 94.03 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES20 Yes Existing Generating CMU 35.919 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES21 Yes Existing Generating CMU 5.391 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES22 Yes Existing Generating CMU 5.711 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES17 Yes Existing Generating CMU 7.399 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES-5 Yes Existing Generating CMU 7.131 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES27 Yes Existing Generating CMU 9.781 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES25 Yes Existing Generating CMU 5.36 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES26 Yes Existing Generating CMU 5.731 1 Gas

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES-8 Yes Proven DSR CMU 2.988 1 DSR

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES39 Yes Unproven DSR CMU 2.916 1 DSR

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES32 Yes Unproven DSR CMU 10.337 1 DSR

Centrica plc Centrica Business Solutions UK Optimisation Limite 5RES31 Yes Existing Generating CMU 38.7 1 Gas

Choctaw Limited Ogmore Power Limited OGMO19 Yes Existing Generating CMU 15.007 1 Gas

Clearstone Energy CSE21 Limited C21ST0 No New Build Generating CMU 47.015 15 Gas

Clearstone Energy Limited CS12 Limited C12NT0 No New Build Generating CMU 47.015 15 Gas

Cnim Development Sa Hanford Waste Services Limited Stok19 Yes Existing Generating CMU 9.182 1 Waste

COGENERATION SOLUTIONS LIMITED COGENERATION SOLUTIONS LIMITED Cavrd5 Yes Existing Generating CMU 7.598 1 Gas

Conrad Energy (Holdings) Limited Conrad (Flint) Limited CDFLI2 No New Build Generating CMU 4.749 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDYEO2 No New Build Generating CMU 14.247 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDWOO2 No New Build Generating CMU 6.174 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDPLY2 No New Build Generating CMU 4.749 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDLAG2 No New Build Generating CMU 4.037 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDWHI2 No New Build Generating CMU 7.124 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDLOW2 No New Build Generating CMU 7.124 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDFOR2 No New Build Generating CMU 3.799 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDSUN2 No New Build Generating CMU 4.749 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDNES2 No New Build Generating CMU 1.9 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDHAW2 No New Build Generating CMU 2.375 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDWRA2 No New Build Generating CMU 4.749 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDWRB2 No New Build Generating CMU 4.654 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDFLB2 No New Build Generating CMU 2.375 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDCAE1 No New Build Generating CMU 4.749 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDRUN1 No New Build Generating CMU 4.274 15 Gas

Conrad Energy (Holdings) Limited CONRAD ENERGY (DEVELOPMENTS) LIMITED CDAPP1 No New Build Generating CMU 4.749 15 Gas

Conrad Energy (Holdings) Limited Blackwater Power Limited BL2019 No New Build Generating CMU 13.107 15 Gas

Conrad Energy (Holdings) Limited Thundersley Power Limited TH2019 No New Build Generating CMU 13.107 15 Gas

Conrad Energy (Holdings) Limited Sittingbourne Power Limited SITTI2 No New Build Generating CMU 11.398 15 Gas

Conrad Energy (Holdings) Limited Conrad (Sandycroft) Limited CDSDC2 No New Build Generating CMU 4.749 15 Gas

Conrad Energy (Holdings) Limited Conrad (Dunkeswell) Limited CDDUN2 No New Build Generating CMU 1.783 15 Storage - Battery

Conrad Energy (Holdings) Limited Conrad (Dunkeswell) Limited CDDKB2 No New Build Generating CMU 1.189 15 Storage - Battery

Page 8

Page 12: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

Conrad Energy (Holdings) Limited Conrad (Calne) Limited CDCAL2 No New Build Generating CMU 5.599 15 Gas

Conrad Energy (Holdings) Limited Conrad (Ampthill) Limited CDAMP2 No New Build Generating CMU 5.699 15 Gas

Conrad Energy (Holdings) Limited Conrad (Matching) Limited CDMAT2 No New Build Generating CMU 5.699 15 Gas

Corus Group Limited Tata Steel UK Limited TS19_4 Yes Existing Generating CMU 18.356 1 Gas

Cory Riverside Holdings Limited Riverside Resource Recovery Limited RRRF21 Yes Existing Generating CMU 62.979 1 Waste

Daisy No 2 Limited Daisy No 2 Limited LITT22 No New Build Generating CMU 20.414 15 Storage - Battery

Distributed Generators Limited Distributed Generators Limited elms03 Yes Existing Generating CMU 4.749 1 Gas

Drax Smart Generation HoldCo Limited Drax Power Limited DX0619 No Existing Generating CMU 549.017 1 Coal

Drax Smart Generation HoldCo Limited Drax Power Limited DX0519 No Existing Generating CMU 547.881 1 Coal

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited DX19KE Yes Existing Generating CMU 21.516 1 Hydro

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited DX19GL Yes Existing Generating CMU 21.516 1 Hydro

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited DX19TO Yes Existing Generating CMU 29.586 1 Hydro

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited DX19DC Yes Existing Generating CMU 724.5 1 Gas

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited 19CRU1 Yes Existing Generating CMU 114.096 1 Storage - Pumped

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited 19CRU2 Yes Existing Generating CMU 114.096 1 Storage - Pumped

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited 19CRU3 Yes Existing Generating CMU 95.08 1 Storage - Pumped

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited 19CRU4 Yes Existing Generating CMU 95.08 1 Storage - Pumped

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited DX19RH Yes Existing Generating CMU 643.5 1 Gas

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited DX19SH Yes Existing Generating CMU 382.5 1 Gas

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited DX19BL No Existing Generating CMU 54 1 Gas

Drax Smart Generation Holdco Limited Drax Generation Enterprise Limited DX19D2 No New Build Generating CMU 1620 15 Gas

Drax Smart Generation HoldCo Limited Drax Power Limited DX0919 Yes Existing Generating CMU 30.394 1 Distillate

Drax Smart Generation HoldCo Limited Drax Power Limited DX1019 Yes Existing Generating CMU 30.394 1 Distillate

Drax Smart Generation HoldCo Limited Drax Power Limited DX1219 Yes Existing Generating CMU 30.394 1 Distillate

Drax Smart Generation HoldCo Limited Progress Power Limited PPL_19 No New Build Generating CMU 283.99 15 Gas

Drax Smart Generation HoldCo Limited Hirwaun Power Limited HPL_19 No New Build Generating CMU 283.99 15 Gas

Drax Smart Generation HoldCo Limited Millbrook Power Limited MPL_19 No New Build Generating CMU 283.99 15 Gas

Drax Smart Generation HoldCo Limited Abergelli Power Limited APL_19 No New Build Generating CMU 283.99 15 Gas

E.ON UK CHP LIMITED Citigen (London) Limited CIT003 Yes Existing Generating CMU 7.594 1 Gas

E.ON UK Plc E.ON UK Plc DSR047 No Unproven DSR CMU 2 1 DSR

E.ON UK Plc E.ON UK Plc DSR049 No Unproven DSR CMU 3 1 DSR

E.ON UK Plc E.ON UK Plc DSR050 No Unproven DSR CMU 4 1 DSR

E.ON UK Plc E.ON UK Plc DSR051 No Unproven DSR CMU 2 1 DSR

E.ON UK Plc E.ON UK Plc DSR053 No Unproven DSR CMU 5 1 DSR

E.ON UK Plc E.ON UK Plc DSR054 No Unproven DSR CMU 2.5 1 DSR

E.ON UK Plc E.ON UK Plc DSR055 Yes Unproven DSR CMU 2 1 DSR

E.ON UK Plc E.ON UK Plc DSR056 No Unproven DSR CMU 2 1 DSR

E.ON UK Plc E.ON UK Plc DSR057 No Proven DSR CMU 3.5 1 DSR

E.ON UK Plc E.ON UK Plc DSR058 No Proven DSR CMU 4 1 DSR

E.ON UK Plc E.ON UK Plc DSR059 No Proven DSR CMU 8 1 DSR

E.ON UK Plc E.ON UK Plc OSG003 No Existing Generating CMU 2.44 1 Gas

E.ON UK Plc E.ON UK Plc CEN006 Yes Existing Generating CMU 2.487 1 Gas

E.ON UK Plc E.ON UK Plc BVC001 Yes Existing Generating CMU 3.471 1 Gas

E.ON UK PLC E.ON UK CHP Limited POL003 Yes Existing Generating CMU 27.526 1 Gas

E.ON UK Plc E.ON UK Plc QMC002 Yes Existing Generating CMU 4.26 1 Gas

E.ON UK Plc E.ON UK Plc CEN005 Yes Existing Generating CMU 1.977 1 Gas

E.ON UK Plc E.ON UK Plc AGG001 Yes Existing Generating CMU 2.598 1 Gas

Page 9

Page 13: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

E.ON UK Plc E.ON UK Plc DSR032 No Unproven DSR CMU 23 1 DSR

E.ON UK Plc E.ON UK Plc DSR035 No Unproven DSR CMU 2.4 1 DSR

E.ON UK Plc E.ON UK Plc DSR036 No Unproven DSR CMU 26 1 DSR

E.ON UK Plc E.ON UK Plc DSR037 No Unproven DSR CMU 17 1 DSR

E.ON UK Plc E.ON UK Plc DSR038 No Unproven DSR CMU 8 1 DSR

E.ON UK Plc E.ON UK Plc DSR040 No Unproven DSR CMU 43 1 DSR

E.ON UK Plc E.ON UK Plc DSR041 No Unproven DSR CMU 25 1 DSR

E.ON UK Plc E.ON UK Plc DSR042 Yes Unproven DSR CMU 2 1 DSR

E.ON UK Plc E.ON UK Plc DSR043 No Unproven DSR CMU 2.5 1 DSR

E.ON UK Plc E.ON UK Plc DSR044 No Unproven DSR CMU 12 1 DSR

E.ON UK Plc E.ON UK Plc DSR045 Yes Unproven DSR CMU 6 1 DSR

E.ON UK Plc E.ON UK Plc DSR046 No Unproven DSR CMU 6 1 DSR

EcoDev Group Ltd Johnsons Generators Limited SHE22A No New Build Generating CMU 18.996 15 Gas

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WB3-19 Yes Existing Generating CMU 415.35 1 Gas

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WA1-19 No Existing Generating CMU 428.793 1 Coal

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited DN2119 Yes Existing Generating CMU 445.922 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited DN2219 Yes Existing Generating CMU 449.388 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited HR1-19 Yes Existing Generating CMU 497.933 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited HR2-19 Yes Existing Generating CMU 498.513 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited HY1119 Yes Existing Generating CMU 483.259 1 Nuclear

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WG1-19 No Existing Generating CMU 18.996 1 Distillate

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WG4-19 No Existing Generating CMU 18.996 1 Distillate

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited HY1219 Yes Existing Generating CMU 468.639 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited HY2719 Yes Existing Generating CMU 522.884 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited HY2819 Yes Existing Generating CMU 521.302 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited HP7-19 No Existing Generating CMU 433.922 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited HP8-19 No Existing Generating CMU 427.822 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited SZ1-19 Yes Existing Generating CMU 500.315 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited SZ2-19 Yes Existing Generating CMU 500.315 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited TN1-19 Yes Existing Generating CMU 508.907 1 Nuclear

EDF Energy Holdings Limited EDF Energy Nuclear Generation Limited TN2-19 Yes Existing Generating CMU 522.167 1 Nuclear

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WA2-19 No Existing Generating CMU 428.964 1 Coal

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WA3-19 No Existing Generating CMU 428.964 1 Coal

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WA4-19 No Existing Generating CMU 429.05 1 Coal

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WB1-19 Yes Existing Generating CMU 415.35 1 Gas

EDF Energy Holdings Limited EDF Energy (Thermal Generation) Limited WB2-19 Yes Existing Generating CMU 415.35 1 Gas

EDF Energy Limited EDF Energy Customers Limited DR203E No Unproven DSR CMU 4.307 1 DSR

EDF Energy Limited EDF Energy Customers Limited DR203F No Unproven DSR CMU 4.307 1 DSR

EDF Energy Limited EDF Energy Customers Limited DR203G No Unproven DSR CMU 8.614 1 DSR

EDF Energy Limited EDF Energy Customers Limited DR203H No Unproven DSR CMU 8.614 1 DSR

EDF Energy Limited EDF Energy Customers Limited DR203A No Unproven DSR CMU 5.338 1 DSR

EDF Energy Limited EDF Energy Customers Limited DR203B No Unproven DSR CMU 7.5 1 DSR

EDF Energy Limited EDF Energy Customers Limited DR203C No Unproven DSR CMU 4.307 1 DSR

EDF Energy Limited EDF Energy Customers Limited DR203D No Unproven DSR CMU 4.307 1 DSR

Eelpower (Opco2) Limited Winchester Power Limited WINP22 Yes Unproven DSR CMU 8.614 1 DSR

Eelpower (Opco4) Limited Rock Energy Storage Limited ROCK22 Yes Proven DSR CMU 16.438 1 DSR

Eelpower Limited EELPOWER (OPCO6) LIMITED WORM22Yes Unproven DSR CMU 6.891 1 DSR

Page 10

Page 14: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

EirGrid plc EirGrid Interconnector Designated Activity Company EWIC18 Yes Existing Interconnector CMU 280 1 Interconnector

Enel S.p.A. TYNEMOUTH ENERGY STORAGE LIMITED ENEL02 No Existing Generating CMU 2.648 1 Storage - Battery

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR41 Yes Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR42 Yes Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR43 Yes Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR44 Yes Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR45 Yes Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR46 Yes Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN33 No Existing Generating CMU 3.997 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN34 No Existing Generating CMU 3.6 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN22 No Existing Generating CMU 10.001 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN21 No Existing Generating CMU 8.003 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN20 No Existing Generating CMU 6.535 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN17 No Existing Generating CMU 6.201 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN24 No Existing Generating CMU 5.261 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN25 No Existing Generating CMU 5.208 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NGEN32 No Existing Generating CMU 5.5 1 Gas

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR13 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR14 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR15 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR16 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR17 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR18 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR19 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR20 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR21 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR22 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR23 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR24 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR25 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR26 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR27 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR28 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR29 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR30 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR31 No Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR32 Yes Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR33 Yes Unproven DSR CMU 21.535 1 DSR

ENEL X INTERNATIONAL S.R.L. Enel X UK Limited NDSR34 Yes Unproven DSR CMU 21.535 1 DSR

ENGIE UK Holding (Services) Limited East London Energy Limited CES106 Yes Existing Generating CMU 2.603 1 Gas

ENGIE UK Holding (Services) Limited Birmingham District Energy Company Limited CES310 Yes Existing Generating CMU 2.58 1 Gas

ENGIE UK Holding (Services) Limited Birmingham District Energy Company Limited CES410 Yes Existing Generating CMU 1.881 1 Gas

ENGIE UK Holding (Services) Limited Leicester District Energy Company Limited CES208 Yes Existing Generating CMU 4.123 1 Gas

ENGIE UK Holding (Services) Limited East London Energy Limited CES107 Yes Existing Generating CMU 3.744 1 Gas

ENGIE UK Holding (Services) Limited Excel District Energy Company Limited CES204 Yes Existing Generating CMU 2.268 1 Gas

ENGIE UK Holding (Services) Limited Southampton Geothermal Heating Company Limited CES209 Yes Existing Generating CMU 6.061 1 Gas

EP UK Investments Ltd EP Langage Limited EPLAGA Yes Existing Generating CMU 814.5 1 Gas

Page 11

Page 15: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

EP UK Investments Ltd EP SHB Limited EPSHBA Yes Existing Generating CMU 1260 1 Gas

Erg S.P.A CREAG RIABHACH WIND FARM LTD CRWF01 No New Build Generating CMU 6.355 15 Onshore Wind

ESB ASSET DEVELOPMENT UK LIMITED ESB SOLAR (NORTHERN IRELAND) LIMITED MFARM1 Yes Existing Generating CMU 1.495 1 Storage - Battery

ESBII UK LIMITED Corby Power Limited CRBY-1 No Existing Generating CMU 366.3 1 Gas

ESBII UK LIMITED Carrington Power Limited CGTN01 Yes Existing Generating CMU 409.68 1 Gas

ESBII UK LIMITED Carrington Power Limited CGTN02 Yes Existing Generating CMU 413.16 1 Gas

Esus Reserve Power Ltd St Asaph Power Limited STAS19 Yes Existing Generating CMU 15.007 1 Gas

Ethical Power Ltd Fishpond Energy Limited ASH019 No New Build Generating CMU 9 15 Gas

FCC (E+M) Holdings Limited FCC (E&M) Limited FCCMI1 Yes Existing Generating CMU 12.872 1 Waste

FCC Buckinghamshire Holdings Limited FCC Buckinghamshire Limited FCCBU2 Yes Existing Generating CMU 23.34 1 Waste

First Hydro Holdings Company First Hydro Company D4_193 Yes Existing Generating CMU 273.989 1 Storage - Pumped

First Hydro Holdings Company First Hydro Company D5_193 Yes Existing Generating CMU 273.989 1 Storage - Pumped

First Hydro Holdings Company First Hydro Company D6_193 Yes Existing Generating CMU 273.989 1 Storage - Pumped

First Hydro Holdings Company First Hydro Company F3_193 Yes Existing Generating CMU 85.572 1 Storage - Pumped

First Hydro Holdings Company First Hydro Company F4_193 No Existing Generating CMU 85.572 1 Storage - Pumped

First Hydro Holdings Company First Hydro Company D1_193 Yes Existing Generating CMU 274.021 1 Storage - Pumped

First Hydro Holdings Company First Hydro Company D2_193 Yes Existing Generating CMU 274.021 1 Storage - Pumped

First Hydro Holdings Company First Hydro Company D3_193 Yes Existing Generating CMU 273.989 1 Storage - Pumped

FLINT TO CELL LIMITED FLINT TO CELL LIMITED Finwy3 Yes Existing Generating CMU 4.749 1 Gas

FORESIGHT ENERGY STORAGE LIMITED FS NEVENDON LIMITED NEV462 Yes Existing Generating CMU 1.059 1 Storage - Battery

Forsa Energy (Drumcross) Holdings Limited Drumcross Generation Limited SPWR53 No New Build Generating CMU 18.901 15 Gas

Forsa Energy (Erskine) Holdings Limited Erskine Generation Limited SPWR76 No New Build Generating CMU 18.901 15 Gas

Forsa Energy CM Holdings Limited Caledon Green Generation Limited SPWR61 No New Build Generating CMU 18.901 15 Gas

Forsa Energy CM Holdings Limited Abercorn Road Generation Limited SPWR56 No New Build Generating CMU 18.996 15 Gas

Forsa Energy Gas Acquisitions Holdco 2 Limited Hartmoor Holdings Limited SPWR82 No New Build Generating CMU 8.548 15 Gas

Forsa Energy Gas Acquisitions Holdco 3 Ltd Carrington Generation Limited SPWR74 No New Build Generating CMU 37.992 15 Gas

Gas Generation Coatbridge Limited Gas Generation Coatbridge Limited COA004 No New Build Generating CMU 18.996 15 Gas

Gas Generation Retford Road Limited Gas Generation Retford Road Limited RET003 No New Build Generating CMU 18.996 15 Gas

General Electricity Holdings Ltd KiWi Power Ltd KIWI73 No Unproven DSR CMU 9.915 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KIWI75 No Unproven DSR CMU 29.744 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KIWI78 No Unproven DSR CMU 11.898 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KIWI83 No Unproven DSR CMU 29.744 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KIWI84 No Unproven DSR CMU 29.744 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KIWI87 No Unproven DSR CMU 19.829 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KPB005 Yes New Build Generating CMU 5.393 15 Storage - Battery

General Electricity Holdings Ltd KiWi Power Ltd KIWI88 No Unproven DSR CMU 11.898 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KPDR04 No Unproven DSR CMU 29.744 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KPDR06 No Unproven DSR CMU 16.855 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KPDR12 No Proven DSR CMU 26.703 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KPDR13 Yes Proven DSR CMU 14.372 1 DSR

General Electricity Holdings Ltd KiWi Power Ltd KPEG42 Yes Existing Generating CMU 1.863 1 Gas

General Electricity Holdings Ltd KiWi Power Ltd KPEG47 Yes Existing Generating CMU 3.638 1 Gas

General Electricity Holdings Ltd KiWi Power Ltd KPEG48 Yes Existing Generating CMU 3.306 1 Gas

General Electricity Holdings Ltd KiWi Power Ltd KPEG49 Yes Existing Generating CMU 3.013 1 Gas

Get Elec Limited ElecLink Limited ElecL3 Yes New Build Interconnector CMU 750 1 Interconnector

GFPII Limited Ornate Power Limited VI5026 No New Build Generating CMU 18.996 15 Gas

Glass Leaf Power Limited Glass Leaf Power Limited BRAN19 Yes Existing Generating CMU 3 1 Gas

Page 12

Page 16: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

Gloucestershire County Council Gloucestershire County Council JAVP19 Yes New Build Generating CMU 17.934 15 Waste

GREEN PEAK GENERATION LIMITED GREEN PEAK GENERATION LIMITED Lilly5 Yes Existing Generating CMU 7.124 1 Gas

Greenspan Energy Limited Greenspan Contractors Limited ABCN03 Yes Existing Generating CMU 3.799 1 Gas

Greenspan Energy Limited Greenspan Nifty Fifty Limited WPKA03 Yes New Build Generating CMU 3.799 1 Gas

Greenspan Energy Limited Greenspan Nifty Fifty Limited WPKB03 Yes New Build Generating CMU 3.799 1 Gas

GridBeyond Limited GridBeyond Limited END032 Yes Unproven DSR CMU 3.062 1 DSR

GridBeyond Limited GridBeyond Limited GBD010 Yes Existing Generating CMU 5.001 1 Gas

GridBeyond Limited GridBeyond Limited GBD009 No Existing Generating CMU 15.3 1 Gas

GridBeyond Limited GridBeyond Limited END005 No Unproven DSR CMU 3.291 1 DSR

GridBeyond Limited GridBeyond Limited END006 No Unproven DSR CMU 5.97 1 DSR

GridBeyond Limited GridBeyond Limited END008 No Unproven DSR CMU 4.307 1 DSR

GridBeyond Limited GridBeyond Limited END009 No Unproven DSR CMU 3.678 1 DSR

GridBeyond Limited GridBeyond Limited END010 No Unproven DSR CMU 3.378 1 DSR

GridBeyond Limited GridBeyond Limited END013 No Unproven DSR CMU 4.307 1 DSR

GridBeyond Limited GridBeyond Limited END015 Yes Unproven DSR CMU 3.446 1 DSR

GridBeyond Limited GridBeyond Limited END016 Yes Unproven DSR CMU 3.446 1 DSR

GridBeyond Limited GridBeyond Limited END017 Yes Unproven DSR CMU 3.446 1 DSR

GridBeyond Limited GridBeyond Limited END018 Yes Unproven DSR CMU 3.446 1 DSR

GridBeyond Limited GridBeyond Limited GBD001 Yes Proven DSR CMU 2.84 1 DSR

GridBeyond Limited GridBeyond Limited END027 Yes Unproven DSR CMU 4.947 1 DSR

GridBeyond Limited GridBeyond Limited END028 Yes Unproven DSR CMU 6.017 1 DSR

GridBeyond Limited GridBeyond Limited END029 Yes Unproven DSR CMU 5.817 1 DSR

GridBeyond Limited GridBeyond Limited END030 Yes Unproven DSR CMU 9.107 1 DSR

GridBeyond Limited GridBeyond Limited END031 Yes Unproven DSR CMU 4.347 1 DSR

GridReserve Ltd GridReserve Ltd BBBS19 No New Build Generating CMU 6.387 15 Storage - Battery

Harmony BD Limited Harmony BD Limited BROA22 No New Build Generating CMU 4.253 15 Storage - Battery

Harmony BF Limited Harmony BF Limited BUMP22 No New Build Generating CMU 20.414 15 Storage - Battery

Harmony CF Limited Harmony CF Limited CHAP22 No New Build Generating CMU 20.414 15 Storage - Battery

Harmony CS Limited Harmony CS Limited CONTSM No New Build Generating CMU 13.61 15 Storage - Battery

Harmony CTF 2 Limited Harmony CTF 2 Limited CTF222 No New Build Generating CMU 20.414 15 Storage - Battery

Harmony CTF Limited Harmony CTF Limited CLAYTS No New Build Generating CMU 20.414 15 Storage - Battery

Harmony HB Limited Harmony HB Limited HLBATS No New Build Generating CMU 2.977 15 Storage - Battery

Hartree Partners Power Holdings (UK) Limited RYDBERG DEVELOPMENT COMPANY LIMITED PETE05 No New Build Generating CMU 3.799 15 Gas

Hartree Partners Power Holdings (UK) Limited RYDBERG DEVELOPMENT COMPANY LIMITED KEND12 No New Build Generating CMU 18.996 1 Gas

Hartree Partners Power Holdings (UK) Limited RYDBERG DEVELOPMENT COMPANY LIMITED EXCA05 No New Build Generating CMU 5.699 15 Gas

Hartree Partners Power Holdings (UK) Limited RYDBERG DEVELOPMENT COMPANY LIMITED SUND05 No New Build Generating CMU 5.699 15 Gas

Hartree Partners Power Holdings (UK) Limited RYDBERG DEVELOPMENT COMPANY LIMITED SUTT15 No New Build Generating CMU 3.799 15 Gas

Hartree Partners Power Holdings (UK) Limited RYDBERG DEVELOPMENT COMPANY LIMITED SUTT16 No New Build Generating CMU 7.598 15 Gas

Hartree Partners Power Holdings (UK) Limited RYDBERG DEVELOPMENT COMPANY LIMITED MARY06 No New Build Generating CMU 7.598 1 Gas

Hartree Partners Power Holdings (UK) Limited RYDBERG DEVELOPMENT COMPANY LIMITED MERL08 No New Build Generating CMU 9.498 15 Gas

HC ESS4 Limited HC ESS4 Limited LONG19 No New Build Generating CMU 10.466 15 Storage - Battery

HC ESS6 Limited HC ESS6 Limited WKMK19 No New Build Generating CMU 10.68 15 Storage - Battery

HC ESS7 Limited HC ESS7 Limited TH5C19 No New Build Generating CMU 10.68 15 Storage - Battery

HC ESS7 Limited GH ESS7 LIMITED TH2C19 No New Build Generating CMU 4.272 15 Storage - Battery

HD001KIR LTD HD001KIR LTD KIRK22 No New Build Generating CMU 47.015 15 Gas

HD888CAP LIMITED HD888CAP LIMITED CAPN22 No New Build Generating CMU 47.015 15 Gas

Hooton Bio Power Limited Hooton Bio Power Limited HoBPL3 Yes New Build Generating CMU 23.169 15 Waste

Page 13

Page 17: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

INEOS Industries Holdings Limited Grangemouth CHP Limited GCHPLB Yes Existing Generating CMU 127.8 1 Gas

Infinis Energy Management Limited Infinis Alternative Energies Limited AIN006 Yes New Build Generating CMU 2.901 3 Gas

Innogy Renewables UK Limited Glen Kyllachy Wind Farm Limited GKWF02 Yes New Build Generating CMU 4.059 15 Onshore Wind

Innogy SE NPOWER LIMITED EHQ003 No Unproven DSR CMU 8.614 1 DSR

Innogy SE NPOWER LIMITED EHQ013 Yes Existing Generating CMU 0.854 1 Storage - Battery

Innogy SE NPOWER LIMITED EHQ004 No Unproven DSR CMU 8.614 1 DSR

Innogy SE NPOWER LIMITED EHQ005 No Unproven DSR CMU 4.307 1 DSR

Innogy SE NPOWER LIMITED EHQ006 No Unproven DSR CMU 4.307 1 DSR

Innogy SE NPOWER LIMITED EHQ007 No Unproven DSR CMU 4.307 1 DSR

Innogy SE NPOWER LIMITED EHQ014 No Unproven DSR CMU 4.307 1 DSR

Innogy SE NPOWER LIMITED EHQ015 No Unproven DSR CMU 3.445 1 DSR

Innogy SE NPOWER LIMITED EHQ016 No Unproven DSR CMU 7.753 1 DSR

Innogy SE NPOWER LIMITED EHQ017 No Unproven DSR CMU 1.723 1 DSR

Innogy SE NPOWER LIMITED EHQ018 No Unproven DSR CMU 1.723 1 DSR

Innogy SE NPOWER LIMITED EHQ019 No Unproven DSR CMU 1.723 1 DSR

Innogy SE NPOWER LIMITED EHQ020 No Unproven DSR CMU 1.723 1 DSR

Innogy SE NPOWER LIMITED EHQ021 No Unproven DSR CMU 1.723 1 DSR

Innogy SE NPOWER LIMITED EHQ002 No Unproven DSR CMU 8.614 1 DSR

Inovyn Limited INOVYN ChlorVinyls Limited INO200 Yes Unproven DSR CMU 43.07 1 DSR

Inovyn Limited INOVYN ChlorVinyls Limited INV100 No Existing Generating CMU 9.09 1 Gas

Inovyn Limited INOVYN ChlorVinyls Limited VID100 Yes Existing Generating CMU 40.331 1 Waste

INTERGEN PROJECTS (UK) LIMITED Spalding Energy Company, Ltd. IGSP19 Yes Existing Generating CMU 855 1 Gas

INTERGEN PROJECTS (UK) LIMITED Rocksavage Power Company, Ltd. IGRK19 Yes Existing Generating CMU 747 1 Gas

INTERGEN PROJECTS (UK) LIMITED Coryton Energy Company, Ltd. IGCE19 Yes Existing Generating CMU 720 1 Gas

Iona Ei (General Partner) 3 Llp AEROSPACE ENERGY UK LIMITED AeroCM Yes Unproven DSR CMU 2.508 1 Gas

IQ Power Holdings Limited Indian Queens Power Limited IQ_194 Yes Existing Generating CMU 132.972 1 Diesel

Kabardin Limited Bury Power Limited BURY19 Yes Existing Generating CMU 18.711 1 Gas

Kent Energy Limited Kent Enviropower Limited FCCAL2 Yes Existing Generating CMU 30.479 1 Waste

Keystone Power Limited Keystone Power Limited KEYDT3 No New Build Generating CMU 4.272 15 Storage - Battery

Liberty Speciality Steels Uk Ltd Speciality Steel UK Limited SS2019 Yes Proven DSR CMU 33.469 1 DSR

LondonEnergy Ltd LondonEnergy Ltd LEL_19 Yes Existing Generating CMU 32.44 1 Waste

Low Carbon Flexible Generation Limited Friars Gate Flexi Limited FRIAR2 No New Build Generating CMU 19.946 15 Gas

LOWER MINETY ENERGY LIMITED LOWER MINETY ENERGY LIMITED LMES01 No New Build Generating CMU 10.659 15 Storage - Battery

Magnus Assets One Limited Keekle Power Limited KeNurs Yes New Build Generating CMU 7.117 15 Storage - Battery

Mercia Power Response (Holdings) Limited FRP MERCIA HOLDCO LIMITED FRPFUL No New Build Generating CMU 9.765 15 Gas

Mercia Power Response (Holdings) Limited FRP MERCIA HOLDCO LIMITED FRPLR3 No New Build Generating CMU 9.3 15 Gas

Mercia Power Response (Holdings) Limited FRP MERCIA HOLDCO LIMITED FRPCSL No New Build Generating CMU 7.44 15 Gas

Mercia Power Response (Holdings) Limited FRP MERCIA HOLDCO LIMITED FRPODR No New Build Generating CMU 2.79 15 Gas

Mercia Power Response (Holdings) Limited FRP MERCIA HOLDCO LIMITED FRPWEL No New Build Generating CMU 8.37 15 Gas

Mercia Waste Management Limited Mercia Waste Management Limited MWM001Yes Existing Generating CMU 16.835 1 Waste

MINETY BATTERY STORAGE LIMITED MINETY BATTERY STORAGE LIMITED MBSS01 No New Build Generating CMU 12.325 15 Storage - Battery

Morpheat Limited Shovel Ready 7 Limited vent03 Yes Existing Generating CMU 8.073 1 Gas

MOYLE INTERCONNECTOR (FINANCING) PUBLIC LIMITED COMPANY Moyle Interconnector Limited Moyle5 Yes Existing Interconnector CMU 280 1 Interconnector

Multifuel Energy Limited Ferrybridge MFE 2 Limited FM2-23 Yes New Build Generating CMU 66.074 1 Waste

Multifuel Energy Limited Ferrybridge MFE Limited FM1-22 Yes Existing Generating CMU 66.106 1 Waste

MWAT Limited MWAT Limited MWWG20No New Build Generating CMU 5.699 15 Gas

MWAT Limited MWAT Limited MWDE19 No New Build Generating CMU 4.749 15 Gas

Page 14

Page 18: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

MWAT Limited MWAT Limited MWWG19No New Build Generating CMU 9.451 15 Gas

National Grid Holdings One plc National Grid Interconnectors Limited IFA_19 Yes Existing Interconnector CMU 1380 1 Interconnector

National Grid Interconnector Holdings Limited National Grid North Sea Link Limited NSL_19 Yes New Build Interconnector CMU 1232 1 Interconnector

National Grid Interconnector Holdings Limited National Grid IFA2 Limited IFA219 Yes New Build Interconnector CMU 781 1 Interconnector

NATIONAL GRID INTERCONNECTOR HOLDINGS LIMITED BRITNED DEVELOPMENT LIMITED Brit19 Yes Existing Interconnector CMU 660 1 Interconnector

National Grid Interconnector Holdings Limited NEMO LINK LIMITED NEMO19 Yes Existing Interconnector CMU 580 1 Interconnector

Northumberland Energy Recovery Holdings Ltd Northumberland Energy Recovery Limited SUEZ23 Yes Existing Generating CMU 9.207 1 Waste

Nuclear Decommissioning Authority Nuclear Decommissioning Authority NDAMAN Yes Existing Generating CMU 25.47 1 Hydro

P3P MANAGEMENT HOLDINGS LIMITED P3P Energy Management Limited BREH19 Yes Existing Generating CMU 13.5 1 Gas

P3P PARTNERS LLP P3P Energy Management AE Limited CASQ19 Yes Existing Generating CMU 3.038 1 Gas

Pantechnicon Capital Limited Teesside Hire Limited TEES19 Yes Existing Generating CMU 5.94 1 Gas

Parc Adfer Holdings No 2 Ltd PARC ADFER LIMITED PaAd19 Yes New Build Generating CMU 14.588 1 Waste

Pineywoods Power Limited Hull Reserve Power Limited HULL19 No Existing Generating CMU 19.756 1 Gas

PIVOT POWER LIMITED PIVOT POWER BATTERY CO. LIMITED PPBCOW Yes New Build Generating CMU 7.102 1 Storage - Battery

PIVOT POWER LIMITED PIVOT POWER BATTERY CO. LIMITED PPBKEM Yes New Build Generating CMU 7.102 1 Storage - Battery

POWER UP GENERATION LIMITED POWER UP GENERATION LIMITED PUG002 Yes Existing Generating CMU 5.494 1 Gas

PUTNEY POWER LIMITED PUTNEY POWER LIMITED Copse4 Yes Existing Generating CMU 8.073 1 Gas

RE Projects Development Limited Hatton Farm Energy Limited HOO222 No New Build Generating CMU 4.749 15 Gas

RE Projects Development Limited Botley Energy Limited BOT222 No New Build Generating CMU 18.996 15 Gas

Red Poll Power Limited Wharf Power Limited WHAR19 Yes Existing Generating CMU 15.007 1 Gas

Red Rose Infrastructure Limited Harworth Power (Generation) Limited HPGL19 Yes Existing Generating CMU 3.8 1 Coal mine methane

Renewable Energy Systems Limited Aberarder Wind Farm LLP ABWF50 No New Build Generating CMU 4.099 15 Onshore Wind

RWE Generation UK Holdings Limited RWE Generation UK plc CHEN19 No New Build Generating CMU 18.996 15 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc P21811 Yes Existing Generating CMU 427.5 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc P21831 Yes Existing Generating CMU 427.5 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc P21841 Yes Existing Generating CMU 427.5 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc P21851 Yes Existing Generating CMU 427.5 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc ST2181 Yes Existing Generating CMU 417.6 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc ST2182 Yes Existing Generating CMU 417.6 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc ST2183 Yes Existing Generating CMU 417.6 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc ST2184 Yes Existing Generating CMU 417.6 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc P21821 Yes Existing Generating CMU 427.5 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc SEL218 No Existing Generating CMU 54 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc GYR218 Yes Existing Generating CMU 369 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc DB2185 Yes Existing Generating CMU 720 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc CHG218 No Existing Generating CMU 43.186 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc CW2181 Yes Existing Generating CMU 66.486 1 Distillate

RWE Generation UK Holdings Limited RWE Generation UK plc CW2182 Yes Existing Generating CMU 66.486 1 Distillate

RWE Generation UK Holdings Limited RWE Generation UK plc DD2181 Yes Existing Generating CMU 23.745 1 Distillate

RWE Generation UK Holdings Limited RWE Generation UK plc DD2182 Yes Existing Generating CMU 23.745 1 Distillate

RWE Generation UK Holdings Limited RWE Generation UK plc DD2183 Yes Existing Generating CMU 23.745 1 Distillate

RWE Generation UK Holdings Limited RWE Generation UK plc DD2184 Yes Existing Generating CMU 23.745 1 Distillate

RWE Generation UK Holdings Limited RWE Generation UK plc LBA218 Yes Existing Generating CMU 698.745 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc DB2186 Yes Existing Generating CMU 675 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc HYT218 Yes Existing Generating CMU 44.91 1 Gas

RWE Generation UK Holdings Limited RWE Generation UK plc GRMB19 No New Build Generating CMU 18.996 15 Gas

Page 15

Page 19: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

SCCL Holdings Limited Saltend Cogeneration Company Limited S2_194 Yes Existing Generating CMU 367.65 1 Gas

SCCL Holdings Limited Saltend Cogeneration Company Limited S3_194 Yes Existing Generating CMU 365.4 1 Gas

SCCL Holdings Limited Saltend Cogeneration Company Limited S1_194 Yes Existing Generating CMU 366.9 1 Gas

SCOTTISHPOWER RENEWABLE ENERGY LIMITED SCOTTISHPOWER RENEWABLES (UK) LIMITED HLYWF1 Yes New Build Generating CMU 2.337 15 Onshore Wind

SCOTTISHPOWER RENEWABLE ENERGY LIMITED SCOTTISHPOWER RENEWABLES (UK) LIMITED WLBAT1 No New Build Generating CMU 10.68 15 Storage - Battery

SCOTTISHPOWER RENEWABLE ENERGY LIMITED SCOTTISHPOWER RENEWABLES (UK) LIMITED BAT3WF Yes New Build Generating CMU 4.1 15 Onshore Wind

Seabank Power Limited Seabank Power Limited SEA1_2 Yes Existing Generating CMU 1132.2 1 Gas

SEDG (MINERS) LTD SEDG (MINERS) LTD MIN22A No New Build Generating CMU 18.996 15 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR02 Yes Existing Generating CMU 9.498 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR03 Yes Existing Generating CMU 9.498 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR04 Yes Existing Generating CMU 9.498 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR05 Yes Existing Generating CMU 8.867 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR06 Yes Existing Generating CMU 9.498 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR07 No Existing Generating CMU 3.63 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR08 Yes Existing Generating CMU 9.213 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR09 Yes Existing Generating CMU 8.144 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR10 Yes Existing Generating CMU 9.036 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR11 Yes Existing Generating CMU 9.413 1 Gas

SEMBCORP ENERGY UK LIMITED Sembcorp Utilities (UK) Limited S22GT3 No New Build Generating CMU 44.91 15 Gas

SEMBCORP ENERGY UK LIMITED Sembcorp Utilities (UK) Limited S22GT1 Yes Existing Generating CMU 37.8 1 Gas

SEMBCORP ENERGY UK LIMITED Sembcorp Utilities (UK) Limited S22GT2 Yes Existing Generating CMU 37.242 1 Gas

SEMBCORP ENERGY UK LIMITED Sembcorp Utilities (UK) Limited S22ST1 Yes Existing Generating CMU 19.828 1 Gas

SEMBCORP ENERGY UK LIMITED UK Power Reserve Limited T3PR01 Yes Existing Generating CMU 9.498 1 Gas

Shell Petroleum Company Limited(The) Limejump Ltd DSR311 Yes Unproven DSR CMU 1.723 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR312 Yes Unproven DSR CMU 2.627 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR322 No Unproven DSR CMU 16.367 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR321 No Unproven DSR CMU 3.446 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd EXL101 Yes Existing Generating CMU 13.239 1 Gas

Shell Petroleum Company Limited(The) Limejump Ltd EXL102 Yes Existing Generating CMU 7.47 1 Gas

Shell Petroleum Company Limited(The) Limejump Ltd EXL100 Yes Existing Generating CMU 2.52 1 Gas

Shell Petroleum Company Limited(The) Limejump Ltd EXL103 Yes Existing Generating CMU 3.015 1 Gas

Shell Petroleum Company Limited(The) Limejump Ltd DSR305 No Proven DSR CMU 3.101 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR303 Yes Proven DSR CMU 16.367 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR304 Yes Proven DSR CMU 2.585 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR320 No Proven DSR CMU 3.446 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR306 No Unproven DSR CMU 5.168 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR313 No Unproven DSR CMU 1.723 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR314 Yes Unproven DSR CMU 2.584 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR317 No Unproven DSR CMU 5.168 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR318 No Unproven DSR CMU 8.614 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR307 Yes Unproven DSR CMU 3.446 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR308 Yes Unproven DSR CMU 2.584 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR310 Yes Unproven DSR CMU 3.446 1 DSR

Shell Petroleum Company Limited(The) Limejump Ltd DSR319 No Unproven DSR CMU 3.446 1 DSR

Shorthorn Power Limited Culvery Power Limited CULV19 Yes Existing Generating CMU 13.107 1 Gas

Shukco 327 Ltd SUEZ RECYCLING AND RECOVERY KIRKLEES LTD SUEZ21 Yes Existing Generating CMU 9.096 1 Waste

SIMEC Lochaber Hydropower 2 Limited SIMEC Lochaber Hydropower 2 Limited SLH2G3 Yes Existing Generating CMU 13.506 1 Hydro

Page 16

Page 20: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

SIMEC Lochaber Hydropower 2 Limited SIMEC Lochaber Hydropower 2 Limited SLH2G4 Yes Existing Generating CMU 14.554 1 Hydro

SIMEC Lochaber Hydropower 2 Limited SIMEC Lochaber Hydropower 2 Limited SLH2G5 Yes Existing Generating CMU 14.553 1 Hydro

SIMEC Lochaber Hydropower 2 Limited SIMEC Lochaber Hydropower 2 Limited SLH2G1 Yes Existing Generating CMU 14.553 1 Hydro

SIMEC Lochaber Hydropower 2 Limited SIMEC Lochaber Hydropower 2 Limited SLH2G2 Yes Existing Generating CMU 14.554 1 Hydro

Siriusdev (Fylands) Ltd Siriusdev (Fylands) Ltd FYLD22 No New Build Generating CMU 9.498 15 Gas

Siriusdev (Fylands) Ltd Siriusdev (Fylands) Ltd FYLD2B No New Build Generating CMU 18.996 15 Gas

SmartestEnergy Limited SmartestEnergy Limited SE2210 No Unproven DSR CMU 5 1 DSR

SmartestEnergy Limited SmartestEnergy Limited SE2211 No Unproven DSR CMU 3 1 DSR

SmartestEnergy Limited SmartestEnergy Limited SE2203 No Unproven DSR CMU 15 1 DSR

SmartestEnergy Limited SmartestEnergy Limited SE2204 No Unproven DSR CMU 15 1 DSR

SmartestEnergy Limited SmartestEnergy Limited SE2206 No Unproven DSR CMU 10 1 DSR

SmartestEnergy Limited SmartestEnergy Limited SE2208 No Unproven DSR CMU 7 1 DSR

SmartestEnergy Limited SmartestEnergy Limited SE2209 No Unproven DSR CMU 5 1 DSR

South Tyne & Wear Energy Recovery Holdings Ltd South Tyne and Wear Energy Recovery Limited SUEZ24 Yes Existing Generating CMU 19.997 1 Waste

SpectrumReserve2 Ltd SpectrumReserve2 Ltd DWBS19 No New Build Generating CMU 6.387 15 Storage - Battery

SSE Generation Limited SSEPG (Operations) Limited CHP22D Yes Existing Generating CMU 9.498 1 Gas

SSE Generation Limited SSEPG (Operations) Limited BUR22D No Existing Generating CMU 44.679 1 Gas

SSE Generation Limited SSEPG (Operations) Limited CHC22D No Existing Generating CMU 44.679 1 Gas

SSE Generation Limited Keadby Generation Limited KEA22D No Existing Generating CMU 28.494 1 Gas

SSE Generation Limited Medway Power Limited MED22D No Existing Generating CMU 661.5 1 Gas

SSE Generation Limited Keadby Generation Limited KEA22D No Existing Generating CMU 687.6 1 Gas

SSE Generation Limited Keadby Generation Limited KD222D No New Build Generating CMU 803.7 15 Gas

SSE plc SSE Energy Supply Limited SE222D No Unproven DSR CMU 8.614 1 DSR

SSE plc SSE Energy Supply Limited SE322D No Unproven DSR CMU 8.614 1 DSR

SSE plc SSE Energy Supply Limited SE422D No Unproven DSR CMU 8.614 1 DSR

SSE plc SSE Energy Supply Limited SE522D No Unproven DSR CMU 8.614 1 DSR

SSE plc SSE Generation Limited FY122D Yes Existing Generating CMU 143.982 1 Storage - Pumped

SSE plc SSE Generation Limited FY222D Yes Existing Generating CMU 142.62 1 Storage - Pumped

SSE plc SSE Generation Limited CLA22D Yes Existing Generating CMU 37.219 1 Hydro

SSE plc SSE Generation Limited CLU22D Yes Existing Generating CMU 54.964 1 Hydro

SSE plc SSE Generation Limited DE122D Yes Existing Generating CMU 17.058 1 Hydro

SSE plc SSE Generation Limited DE222D Yes Existing Generating CMU 17.051 1 Hydro

SSE plc SSE Generation Limited ER122D Yes Existing Generating CMU 22.594 1 Hydro

SSE plc SSE Generation Limited ER222D Yes Existing Generating CMU 22.5 1 Hydro

SSE plc SSE Generation Limited ER322D Yes Existing Generating CMU 22.616 1 Hydro

SSE plc SSE Generation Limited FA122D Yes Existing Generating CMU 20.62 1 Hydro

SSE plc SSE Generation Limited FA222D Yes Existing Generating CMU 20.62 1 Hydro

SSE plc SSE Generation Limited FA322D Yes Existing Generating CMU 20.62 1 Hydro

SSE plc SSE Generation Limited GLN22D Yes Existing Generating CMU 35.6 1 Hydro

SSE plc SSE Generation Limited INW22D Yes Existing Generating CMU 24.206 1 Hydro

SSE plc SSE Generation Limited LUI22D Yes Existing Generating CMU 30.481 1 Hydro

SSE plc SSE Generation Limited LO122D Yes Existing Generating CMU 20.733 1 Hydro

SSE plc SSE Generation Limited LO222D Yes Existing Generating CMU 21.123 1 Hydro

SSE plc SSE Generation Limited RN122D Yes Existing Generating CMU 14.344 1 Hydro

SSE plc SSE Generation Limited RN222D Yes Existing Generating CMU 14.344 1 Hydro

SSE plc SSE Generation Limited RN322D Yes Existing Generating CMU 14.344 1 Hydro

SSE plc SSE Generation Limited SL122D Yes Existing Generating CMU 35.86 1 Hydro

Page 17

Page 21: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

SSE plc SSE Generation Limited SL222D Yes Existing Generating CMU 36.659 1 Hydro

SSE plc SSE Generation Limited SL322D Yes Existing Generating CMU 35.86 1 Hydro

SSE plc SSE Generation Limited SL422D Yes Existing Generating CMU 29.136 1 Hydro

SSE plc SSE Generation Limited TM122D Yes Existing Generating CMU 16.579 1 Hydro

SSE plc SSE Generation Limited TM222D Yes Existing Generating CMU 16.796 1 Hydro

SSE plc SSE Energy Supply Limited SE622D No Unproven DSR CMU 8.614 1 DSR

SSE plc SSE Generation Limited PH122D Yes Existing Generating CMU 1064.037 1 Gas

SSE plc SSE Energy Supply Limited MWD22DYes Existing Generating CMU 828 1 Gas

Statera Energy Limited Penwortham Storage Limited SEL044 No New Build Generating CMU 10.678 15 Storage - Battery

Statera Energy Limited West Didsbury Storage Limited SEL045 No New Build Generating CMU 10.678 15 Storage - Battery

Statera Energy Limited Dollymans Storage Limited SEL063 No New Build Generating CMU 10.678 15 Storage - Battery

Statera Energy Limited Saltholme South Power Limited SEL056 No New Build Generating CMU 47.481 15 Gas

Statera Energy Limited Dollymans Power Limited SEL039 No New Build Generating CMU 47.481 15 Gas

Statera Energy Limited Melksham East Storage Limited SEL047 No New Build Generating CMU 21.261 15 Storage - Battery

Statera Energy Limited Melksham West Storage Limited SEL048 No New Build Generating CMU 21.261 15 Storage - Battery

Statera Energy Limited Minety North Storage Limited SEL050 No New Build Generating CMU 21.261 15 Storage - Battery

Statera Energy Limited Ravensworth Power Limited SEL040 No New Build Generating CMU 47.481 15 Gas

Statera Energy Limited Saltholme North Power Limited SEL055 No New Build Generating CMU 47.481 15 Gas

Statera Energy Limited Abham Storage Limited SEL041 No New Build Generating CMU 33.513 15 Storage - Battery

Statera Energy Limited Enderby Storage Limited SEL042 No New Build Generating CMU 33.513 15 Storage - Battery

Statera Energy Limited Grendon Storage Limited SEL043 No New Build Generating CMU 33.513 15 Storage - Battery

Statkraft AS Statkraft Markets GmbH RHE3_5 Yes Existing Generating CMU 19.759 1 Hydro

Statkraft AS Statkraft Markets GmbH RHE1_5 Yes Existing Generating CMU 11.629 1 Hydro

Statkraft AS Statkraft Markets GmbH RHE2_5 Yes Existing Generating CMU 19.486 1 Hydro

Suez Recycling And Recovery Holdings Uk Ltd SUEZ RECYCLING AND RECOVERY UK LTD SUEZ18 No New Build Generating CMU 9.01 7 Waste

Suez Recycling And Recovery North East Ltd SUEZ RECYCLING AND RECOVERY TEES VALLEY LTD SUEZ22 Yes Existing Generating CMU 17.284 1 Waste

Suez Recycling And Recovery UK Ltd SUEZ RECYCLING AND RECOVERY SUFFOLK LTD SUEZ25 Yes Existing Generating CMU 20.01 1 Waste

Suncredit Project Holdings Ltd GRANGE MILL ENERGY CENTRE LIMITED GMEC01 No New Build Generating CMU 5.699 15 Gas

Suncredit Project Holdings Ltd CHESTON ROAD ENERGY CENTRE LIMITED CREC01 No New Build Generating CMU 5.699 15 Gas

Suncredit Project Holdings Ltd BELVEDERE ENERGY CENTRE LIMITED BECL01 No New Build Generating CMU 5.699 15 Gas

Suncredit Project Holdings Ltd SHAWHOUSE ENERGY CENTRE LIMITED SHEC01 No New Build Generating CMU 18.996 15 Gas

Suncredit Project Holdings Ltd SHAWHOUSE ENERGY CENTRE LIMITED SHEC02 No New Build Generating CMU 3.799 15 Gas

Sutton Bridge Power Systems (London) Limited Sutton Bridge Power Generation 22SB01 Yes Existing Generating CMU 765 1 Gas

SWB Power Ltd SWB Power Ltd RECF23 Yes New Build Generating CMU 7.18 15 Gas

SWB Power Ltd SWB Power Ltd ROCH23 No New Build Generating CMU 7.124 15 Gas

TATA CHEMICALS EUROPE LIMITED Winnington CHP Limited 2CHPWN Yes Existing Generating CMU 85.934 1 Gas

Teralba Power Limited Irwell Power Limited IRWE19 Yes Existing Generating CMU 14.912 1 Gas

The Fern Power Company Limited Westwood Power Limited WEST19 No New Build Generating CMU 18.996 15 Gas

The Fern Power Company Limited Dafen Reserve Power Limited DAFE19 Yes Existing Generating CMU 9.308 1 Gas

Thermal Generation Limited Shovel Ready 6 Limited amyjn2 Yes Existing Generating CMU 6.649 1 Gas

Uniper Holding GmbH Uniper Global Commodities SE KILH12 Yes Existing Generating CMU 295.388 1 Gas

Uniper Holding GmbH Uniper Global Commodities SE RTGT02 No Existing Generating CMU 16.147 1 Diesel

Uniper Holding GmbH Uniper Global Commodities SE RTGT04 No Existing Generating CMU 16.147 1 Diesel

Uniper Holding GmbH Uniper Global Commodities SE GRGT11 Yes Existing Generating CMU 26.308 1 Diesel

Uniper Holding GmbH Uniper Global Commodities SE GRGT14 Yes Existing Generating CMU 25.358 1 Diesel

Uniper Holding GmbH Uniper Global Commodities SE TAYL52 Yes Existing Generating CMU 70.166 1 Diesel

Uniper Holding GmbH Uniper Global Commodities SE TAYL53 Yes Existing Generating CMU 62.567 1 Diesel

Page 18

Page 22: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

Uniper Holding GmbH Uniper Global Commodities SE RATS32 Yes Existing Generating CMU 440.325 1 Coal

Uniper Holding GmbH Uniper Global Commodities SE CDCL21 Yes Existing Generating CMU 405 1 Gas

Uniper Holding GmbH Uniper UK Limited CNQP15 Yes Refurbishing Generating CMU 675 1 Gas

Uniper Holding GmbH Uniper UK Limited CNQP13 Yes Refurbishing Generating CMU 337 1 Gas

Uniper Holding GmbH Uniper UK Limited CNQP14 Yes Refurbishing Generating CMU 337.5 1 Gas

Uniper Holding GmbH Uniper Global Commodities SE EECL21 Yes Existing Generating CMU 405 1 Gas

Uniper Holding GmbH Uniper Global Commodities SE RATS33 Yes Existing Generating CMU 440.325 1 Coal

Uniper Holding GmbH Uniper Global Commodities SE RATS34 No Existing Generating CMU 440.325 1 Coal

Uniper Holding GmbH Uniper Global Commodities SE RATS31 No Existing Generating CMU 440.325 1 Coal

Uniper Holding GmbH Uniper Global Commodities SE GRAI16 Yes Existing Generating CMU 421.2 1 Gas

Uniper Holding GmbH Uniper Global Commodities SE GRAI17 Yes Existing Generating CMU 421.2 1 Gas

Uniper Holding GmbH Uniper Global Commodities SE GRAI18 Yes Existing Generating CMU 421.2 1 Gas

Uniper Holding GmbH Uniper Global Commodities SE KILH11 Yes Existing Generating CMU 295.388 1 Gas

Utility I Ltd Utility I Ltd LhoH19 Yes New Build Generating CMU 1.804 1 Gas

Valloire Power Limited Marden Power Limited MARD19 Yes Existing Generating CMU 18.711 1 Gas

Vaynol Power Limited Immingham Power Limited IM2019 Yes Existing Generating CMU 15.007 1 Gas

VEOLIA ENVIRONNEMENT SA Veolia UK Limited CHERF5 Yes Existing Generating CMU 6.217 1 Waste

VEOLIA ENVIRONNEMENT SA Veolia UK Limited NEWH05 Yes Existing Generating CMU 15.03 1 Waste

VEOLIA ENVIRONNEMENT SA Veolia UK Limited STAF05 Yes Existing Generating CMU 23.186 1 Waste

VEOLIA ENVIRONNEMENT SA Veolia UK Limited POERF5 Yes Existing Generating CMU 12.357 1 Waste

VEOLIA ENVIRONNEMENT SA Veolia UK Limited MAERF5 Yes Existing Generating CMU 10.366 1 Waste

VEOLIA ENVIRONNEMENT SA Veolia UK Limited BHRLH5 Yes Existing Generating CMU 6.508 1 Gas

VEOLIA ENVIRONNEMENT SA Veolia UK Limited ELIL03 Yes Existing Generating CMU 6.126 1 Gas

VEOLIA ENVIRONNEMENT SA Veolia UK Limited SGH005 Yes Existing Generating CMU 3.558 1 Gas

VEOLIA ENVIRONNEMENT SA Veolia UK Limited VES005 Yes Proven DSR CMU 2 1 DSR

Viridor Waste Limited Viridor Waste Management Limited AVON19 No New Build Generating CMU 32.608 15 Waste

Viridor Waste Limited Viridor Waste Management Limited HEAT19 Yes Refurbishing Generating CMU 4.749 1 Gas

Viridor Waste Limited Viridor Waste Management Limited EXET19 Yes Existing Generating CMU 3.349 1 Waste

Viridor Waste Limited Viridor Waste Management Limited CARD18 Yes Existing Generating CMU 26.97 1 Waste

Vital Holdings Limited VITAL ENERGI SOLUTIONS LIMITED VIT201 Yes New Build Generating CMU 3.969 12 Gas

Vital Holdings Limited VITAL ENERGI SOLUTIONS LIMITED VIT208 Yes Existing Generating CMU 3.506 1 Gas

Vital Holdings Limited VITAL ENERGI SOLUTIONS LIMITED VIT207 Yes Existing Generating CMU 3.339 1 Gas

VPI Distributed Generation Limited VPI Immingham Energy Park A Limited VDG002 No New Build Generating CMU 47.49 15 Gas

VPI Holding Limited VPI Immingham LLP ICHP07 Yes Existing Generating CMU 1188 1 Gas

Vpower Group International Holdings Limited VP Flexgen Limited KIL22A No New Build Generating CMU 18.996 15 Gas

Vpower Group International Holdings Limited VP Flexgen Limited HUL22A Yes New Build Generating CMU 18.806 15 Gas

Vpower Group International Holdings Limited VP Flexgen Limited HUL22B Yes New Build Generating CMU 46.54 15 Gas

Vpower Group International Holdings Limited VP Flexgen Limited ALDE22 No New Build Generating CMU 18.996 15 Gas

Vpower Group International Holdings Limited VP Flexgen Limited WARN22 No New Build Generating CMU 18.996 15 Gas

Walker & Son (Hauliers) Limited Walker & Son (Hauliers) Limited DIN22B No New Build Generating CMU 9.498 15 Gas

Whitetower Holdings UK Limited Whitetower Energy Limited HEAR4b Yes Existing Generating CMU 39.974 1 Gas

Whitetower Holdings UK Limited Whitetower Energy Limited DERBY4 Yes Existing Generating CMU 44.964 1 Gas

Whitetower Holdings UK Limited Whitetower Energy Limited VKING4 Yes Existing Generating CMU 39.936 1 Gas

Whitetower Holdings UK Limited Whitetower Energy Limited CROYD4 Yes Existing Generating CMU 41.088 1 Gas

Whitetower Holdings UK Limited Whitetower Energy Limited HEAR4a Yes Existing Generating CMU 39.974 1 Gas

Woodlawn Power Limited Warrington Power Limited WARR19 Yes Existing Generating CMU 15.007 1 Gas

Yili Limited Wolverhampton Power Ltd WOLV19 Yes Existing Generating CMU 15.007 1 Gas

Page 19

Page 23: Final Auction Report Markets Document... · 2020-02-07 · Final Auction Results T-3 Auction 2019 (DY 22/23) Disclaimer This document has been prepared by National Grid Electricity

Final Auction Results T-3 Auction 2019 (DY 22/23)

Parent Company Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW) Duration (Years) Fuel Type

Ylem Group Limited Biogas Technology Limited BLAU19 No New Build Generating CMU 6.269 15 Gas

Ylem Group Limited Biogas Technology Limited LANG23 No New Build Generating CMU 5.699 15 Gas

Ylem Group Limited Biogas Technology Limited SUTT22 No New Build Generating CMU 2.849 3 Gas