• Electricity (No electricity) • Wind heavy wind • traffic condition medium/ heavy condition • No Pedestrian • Adjunct structure • 1 METER LEVEL DIFFERENCE AT LEFT SIDE OF PRINCES EXIST PRINCES FREEWAY PRINCES EXIST 3m 16m 10m 2975 1424 TRUCK CAR SPEED SITE DIMENSION DRIVING DIRECTION VEHICLE TYPE&AVERAGE DIMENSION SITE VEGETATION 7AM, 0⁰ 10AM, 15⁰ 12AM, 29⁰ 15AM, 15⁰ 17AM, 5⁰ WINTER SEASON SUN POSITION SUMMER SEASON SUN POSITION 5AM, 0⁰ 9AM, 45⁰ 12PM, 70⁰ 15PM, 50⁰ 17PM, 29⁰ 18PM, 13⁰ 19PM, 6⁰ ‘SOMETHING NEW’ SCALE 1: 2000 “SOMETHING NEW” is an epitome of a city in terms of its large scale and dynamics. The project was involved new technology specifi- cally parametric design generates new design notion and interpretation of Gateway project. Driven innovative idea will announce the en- try point into metropolitan Melbourne, at the western interchange and forming a gateway to the city. The project creates a unique view with its height as well as granting a visual access through to the interior and exterior of the design. Experience of various materials during the design process, as a result, 795 pieces of welded steel mesh work together with the overlapping design to perform as a new visual icon for the highway for Wyndham City Council. ideas: learning from the past generating new concept Spacing of layers: 200mm Number of layers : 26 Rod ø 12mm Length: 2400mm; Quantity: 11520; Span: 780mm Welded mesh in plan Welded mesh in elevation Night view day view raining- water shadow effect rusting overlaping mesh MODEL EXPERIEMENT Square Adding layers expandig dimension different experience (3 parts) developing entries details of the entry scale changing overlapping trim creating space “rolling in the deep” tunnel adding layers simplify enclosure ABPL 30048 ARCHITECTURE DESIGN STUDIO AIR DEGUO HOU 387313, YIFANG YIN 387291, SABRINA SHUK KWAN FUNG 374433, JUNYAN QI 345247 timeline in the gateway internal experience site plan shadow effect construction