Lidwala Consulting Engineers (SA) (Pty) Ltd Hendrina Ash Dam EIA: Draft Scoping Report 2 June 2011 Chapter 4: Project Alternatives EIA Ref Number: 12/12/20/2175 4-14 Figure 4.6: Combined Social Sensitivity (Max Wins) Figure 4.7: Combined Social Sensitivity (no factor)
2

Figure 4.6: Combined Social Sensitivity (Max Wins) · 2013. 8. 30. · Lidwala Consulting Engineers (SA) (Pty) Ltd Hendrina Ash Dam EIA: Draft Scoping Report 2 June 2011 Chapter 4:

Oct 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Figure 4.6: Combined Social Sensitivity (Max Wins) · 2013. 8. 30. · Lidwala Consulting Engineers (SA) (Pty) Ltd Hendrina Ash Dam EIA: Draft Scoping Report 2 June 2011 Chapter 4:

Lidwala Consulting Engineers (SA) (Pty) Ltd

Hendrina Ash Dam EIA: Draft Scoping Report 2 June 2011 Chapter 4: Project Alternatives EIA Ref Number: 12/12/20/2175

4-14

Figure 4.6: Combined Social Sensitivity (Max Wins)

Figure 4.7: Combined Social Sensitivity (no factor)

Page 2: Figure 4.6: Combined Social Sensitivity (Max Wins) · 2013. 8. 30. · Lidwala Consulting Engineers (SA) (Pty) Ltd Hendrina Ash Dam EIA: Draft Scoping Report 2 June 2011 Chapter 4:

Lidwala Consulting Engineers (SA) (Pty) Ltd

Hendrina Ash Dam EIA: Draft Scoping Report 2 June 2011 Chapter 4: Project Alternatives EIA Ref Number: 12/12/20/2175

4-15

• Final Combined Sensitivity Maps

Figure 4.8 to 4.13 are the results of overlaying the social, biophysical and technical input

maps together, thereby illustrating the overall environmental sensitivity of the area. These

maps have been done both with and without the influence of the technical / cost layer in order

to ensure that this aspect did not overshadow / influence the outcome of the mapping

process.

Figure 4.8: Overall Environmental Sensitivity (Max Wins – without technical / cost)