Top Banner
FI WARE O C ll FI-WARE Open Calls Megan Richards DG Information Society and Media DG Information Society and Media European Commission
16

FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Sep 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

FI WARE O C llFI-WARE Open Calls

Megan RichardsDG Information Society and MediaDG Information Society and Media

European Commission

Page 2: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Call 3Call 2Call 1

Future Internet Public Private Partnership - Programme ArchitectureCall 3Call 2

CONCORD: Programme Facilitation & Support

SME InnovationINFINITY: Capacity Building & Infrastructure

FINEST

Obj 1.8 Use Case Trials

Obj 1.9 Capacity Building

SE

S

SMARTAGRIFOOD

INSTANT MOBILITY

FINEST

3rd Call Use Case

Expansion Phase

Up to 5 Trials

j

US

E C

AS

OUTSMART

SAFECITY

FINSENY

PhaseObj 1.8 Use Case Trials

ENVIROFI

FI-CONTENT

U OUTSMART

TF ContinuationFI-WARE Technology Foundation

20112010 2012 2013 2014 2015

2Phase 3Phase 1 Phase 2

Page 3: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

FI-WARE visions o

Suppliers

WholesalersManufacturer

Retailers

GovernmentsConsumers

Future Internet Core Platform

Provisioning – Hosting – Refactoring – Brokering – Consumption

App/Services ecosystem and delivery framework

3

Cloud Hosting Interface to NetworksInternet of Things

Page 4: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

FI WARE Generic EnablersFI-WARE Generic EnablersC Pl tf i t f t h l i l “G i E bl ”• Core Platform comprises a set of technological “Generic Enablers”– General purpose, optimising reusability– Common to several current and future “usage areas”– Provide open (and royalty free) interfaces for development of services

and applications

8 USAGE AREAS

Usage area projects under the PPP

8 USAGE AREAS

Cloud Hosting

App/Service DeliveryDelivery

Support Services

Interface to IoT

Interface to

4

Network

Security, Trust

Dev Tools

Page 5: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

FI WARE Open CallsFI-WARE Open CallsSpecified in Objective 1 7 WP2011 12• Specified in Objective 1.7, WP2011-12

• 30% project budget, € 12.3 millionT ll f € 8 0M d € 4 3M h• Two open calls of € 8.0M and € 4.3M each

• To allow for responding to emerging user needs – due to covering many usage areas, – new technologies, – new business models

• By developing new Generic Enablers by dditi l b fi i iadditional beneficiaries

• Following standard d

5

procedures

Page 6: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

FI WARE Open Call scheduleFI-WARE Open Call scheduleC ll 1 C ll 2Call 1

(€ 8.0M)Call 2

(€ 4.3M)

Call Objectives Mid Dec 2011 End Dec 2012j

Draft of the Call Announcement Mid Dec 2011 End Dec 2012

F ll C ll D t il t EC E d D 2011 Mid J 2013Full Call Details to EC End Dec 2011 Mid Jan 2013

Call Publication Mid Jan 2012 End Jan 2013

Call Opening Mid Jan 2012 End Jan 2013

Call Close End Feb 2012 Begin Mar 2013

Expert Selection, Appointment; Evaluation Feb 2012 Feb/Mar 2013

Evaluation report to EC Mar 2012 Apr 2013

6

Evaluation report to EC Mar 2012 Apr 2013

EC Approval accession new beneficiaries May 2012 May/June 2013

Page 7: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

FI PPP Phase 2 Call 2 coming up

Open 18 Ma to 24 October 2012

FI-PPP Phase 2 – Call 2 coming up

Open 18 May to 24 October 2012 Budget € 80 Mg

Objective 1 8 Use Case Objective 1 9 CapacityObjective 1.8 Use Case Scenario Pilots – Phase 2(5 areas, IPs, €13.5 M each, 2 years, 10% fl ibl )

Objective 1.9 Capacity Building(one IP, €12.5 M, 2 years)

10% flexible)

1. Working experimentation sites2 S l t d t t li ti

1. Integration of identified infrastructures

2 Ad t ti d d2. Selected test applications implemented on these experimentation sites

3 Validation of the Core Platform

2. Adaptation, upgrade and validation of these infrastructures

3. Assembly of a pan-European federation of test and

7

3. Validation of the Core Platform federation of test and experimental infrastructures

Page 8: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Phase 3 in preparationPhase 3 in preparationThe current work programme provides guidance on Phase 3• Provide and maintain a stable infrastructure for the large scale

trials, expand the core platform, the use case specifictrials, expand the core platform, the use case specific functionalities and their demand-driven instantiations.

• Run large scale trials populated with a variety of applications h ll i th ll l tf d i th i bilit f thchallenging the overall platform, and proving the viability of the

concept.• Prove the value of services mash-up across use cases as the p

bases for a new dimension of services and application.• Involve SMEs at large as developers and providers of services

and applicationsand applications.

8

Page 9: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Backup slides

Page 10: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Implementation RoadmapImplementation Roadmap

Call 1 (20 July – 2 December 2010) – budget 90 MEuro Technology Foundation (one IP, 41 MEuro, 3 years, 30% flexible) Use Case Scenarios – Phase 1 (7-8 areas, IP, 5 MEuro, 2 years) Capacity Building (one CSA, 3 MEuro, 3 years) Programme support (one CSA 6 MEuro 5 years) Programme support (one CSA, 6 MEuro, 5 years)

Call 2 (18 May – 24 October 2012) – budget 80 MEuro Use Case Scenarios Pilots – Phase 2 (5 areas, IP, 13.5 MEuro,

2 years, 10 % flexible) Capacity Building (one IP 12 5 MEuro 2 years) Capacity Building (one IP, 12.5 MEuro, 2 years)

Call 3 (later 2013) – budget 130 MEuro

10

Devoted to the expansion and enlargement of many testbeds and pilots (several areas, ~100 MEuro, 2 years)

Page 11: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

T dToday:

11

Page 12: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Main milestones in FI-WAREa esto es

1212

Page 13: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Open call procedureOpe ca p ocedu e

The budget devoted to the Open Calls is 12.300.000 €, or 30% of total funding. The expected distribution of this budget between the two planned Open Calls is about

13

8.000.000 € in the first Open Call and 4.300.000 € in the second Open Call.

Page 14: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Grant AgreementgArticle II.35 “Competitive Calls”

• Publication of open call in ≥1 international journal and in 3 different national newspapers in 3 different countriesp p

• Wide advertising • Publication and advertising follow EC instructions and g

guidance notes• Call open for ≥ 5 weeks after last publication• Evaluation with ‘standard FP7 criteria’ and with

assistance of ≥ 2 independent experts

14ftp://ftp.cordis.europa.eu/pub/fp7/docs/fp7-ga-annex2-v6_en.pdf

Page 15: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Call Information/DetailsCall Information/DetailsD il d f k( ) b i d d b f• Detailed account of task(s) to be carried out, and number of successful proposers in each task

• Any restrictions on participation in any part of the cally p p y p– Note: existing beneficiaries are excluded

• Funding available for each task• Guide for Applicants• Consortium Agreement• Specific to the FI-PPP: Programme Agreement too• Specific to the FI-PPP: Programme Agreement too• Coordinates of a help facility• Submission

– Deadline– Email address

Call identifier

15

– Call identifier

http://ec.europa.eu/information_society/activities/foi/lead/fippp/Guidance_note_for_project_coordinators_planning_a_competitive_call.doc

Page 16: FI-WARE O C llWARE Open Calls · 2016. 3. 21. · FI-WARE Open CallsWARE Open Calls • Specified in Objective 1 7 WP2011Specified in Objective 1.7, WP2011-12 • 30% project budget,

Evaluation and selectionEvaluation and selection‘S d d FP7 i i ’• ‘Standard FP7 criteria’– Scientific and/or technological excellence– Quality and efficiency of the implementation and the managementy y p g– Potential impact through the development, dissemination and use of

project results• With assistance of ≥ 2 independent experts• With assistance of ≥ 2 independent experts• Within 2 weeks of call closure• Selection of highest ranked proposal(s) for each taskg p p ( )

– Exceptions possible but unlikely; EC approval needed• Participation and funding of new partners is subject to FP7 rules

R ti t EC f l• Reporting to EC for approval• Accession to grant agreement by successful proposer(s)

16http://ec.europa.eu/information_society/activities/foi/lead/fippp/Guidance_note_for_proj

ect_coordinators_planning_a_competitive_call.doc