Purchase Standard 203K (Full) Purchase Limited 203K (Streamline) Refinance Owned > 12 Months Standard 203K (Full) Refinance Owned > 12 Months Limited 203K (Streamline) Refinance Owned < 12 Months Standard 203K (Full) Refinance Owned < 12 Months Limited 203K (Streamlined) Initial Draw at Closing As Complete Appraisal As Is Appraisal* (always required if property flipping criteria met) Draw for Materials Prepaid by Borrower Draw for Materials Prepaid by Borrower or Contractor – verification and approval by HUD Consultant and FGMC required -Repair estimate must show a breakdown of material and labor costs, signed & dated by borrower and contractor -Draw Request Form (9746-A), completed & signed by HUD Consultant, borrower & contractor; Copy of the contract established between the Contractor and the supplier/vendor, and; -Copies of receipts/invoices for order(s) placed with the supplier/vendor for delivery at a later date. Not Required BUT If As Is Appraisal is done, resulting value must be used in calculations Not Required BUT If As Is Appraisal is done, resulting value must be used in calculations Not Required Unless Lien(s) payoff plus total project is more than As Complete appraisal. If As Is Appraisal is completed, must be used in calculations (worksheet will indicate if needed) Not Required Unless Lien(s) payoff plus total project is more than As Complete appraisal. If As Is Appraisal is completed, must be used in calculations (worksheet will indicate if needed) Required Required, Should not include an As Is Value Required, Should not include an As Is Value Required, Should not include an As Is Value Required, Should not include an As Is Value Required, Should not include an As Is Value Required, Should not include an As Is Value Required Draw for Materials Prepaid by Borrower or Contractor- verification required (25% Max) If Special Request Signed by Contractor(s) up to 50% of contract(s) less monies sent for prepaid materials Draw for Materials Prepaid by Borrower Draw for Materials Prepaid by Borrower or Contractor – verification and approval by HUD Consultant and FGMC required -Repair estimate must show a breakdown of material and labor costs, signed & dated by borrower and contractor -Draw Request Form (9746-A), completed & signed by HUD Consultant, borrower & contractor; Copy of the contract established between the Contractor and the supplier/vendor, and; -Copies of receipts/invoices for order(s) placed with the supplier/vendor for delivery at a later date. Draw for Materials Prepaid by Borrower or Contractor- verification required (25% Max) If Special Request Signed by Contractor(s) up to 50% of contract(s) less monies sent for prepaid materials Draw for Materials Prepaid by Borrower Draw for Materials Prepaid by Borrower or Contractor – verification and approval by HUD Consultant and FGMC required -Repair estimate must show a breakdown of material and labor costs, signed & dated by borrower and contractor -Draw Request Form (9746-A), completed & signed by HUD Consultant, borrower & contractor; Copy of the contract established between the Contractor and the supplier/vendor, and; -Copies of receipts/invoices for order(s) placed with the supplier/vendor for delivery at a later date. Draw for Materials Prepaid by Borrower or Contractor- verification required (25% Max) If Special Request Signed by Contractor(s) up to 50% of contract(s) less monies sent for prepaid materials 203k Standard and Limited FGMC Program Reference Guide | v0816 | Page 1 203k Standard and Limited FGMC Program Reference Guide For More Information: ConstructionResourceTeam.com
4

FGMC 203k Standard Limited FGMC Program …...Purchase Standard 203K (Full) Purchase Limited 203K (Streamline) Refinance Owned > 12 Months Standard 203K (Full) Refinance Owned >

Aug 02, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FGMC 203k Standard Limited FGMC Program …...Purchase Standard 203K (Full) Purchase Limited 203K (Streamline) Refinance Owned > 12 Months Standard 203K (Full) Refinance Owned >

Purchase Standard203K (Full)

Purchase Limited203K (Streamline)

Refinance Owned >12 Months Standard

203K (Full)

Refinance Owned > 12Months Limited 203K

(Streamline)

Refinance Owned <12 Months Standard

203K (Full)

Refinance Owned <12 Months Limited203K (Streamlined)

Initial Draw atClosing

As CompleteAppraisal

As Is Appraisal*(always

required ifproperty

flipping criteriamet)

Draw for MaterialsPrepaid by Borrower

Draw for Materials Prepaid by Borrower or Contractor –

verification and approval byHUD Consultant and FGMC

required

-Repair estimate must show a breakdown of material and

labor costs, signed & dated by borrower and contractor

-Draw Request Form (9746-A), completed & signed by HUD

Consultant, borrower & contractor; Copy of the

contract established betweenthe Contractor and the supplier/vendor, and;

-Copies of receipts/invoices for order(s) placed with the

supplier/vendor for delivery at a later date.

Not Required BUT IfAs Is Appraisal is

done, resulting valuemust be used in

calculations

Not Required BUT IfAs Is Appraisal is

done, resulting valuemust be used in

calculations

Not Required UnlessLien(s) payoff plus

total project is morethan As Completeappraisal. If As Is

Appraisal iscompleted, must beused in calculations

(worksheet willindicate if needed)

Not Required UnlessLien(s) payoff plus

total project is morethan As Completeappraisal. If As Is

Appraisal iscompleted, must beused in calculations

(worksheet willindicate if needed)

Required

Required, Should notinclude an As Is Value

Required, Should notinclude an As Is Value

Required, Should notinclude an As Is Value

Required, Should notinclude an As Is Value

Required, Should notinclude an As Is Value

Required, Should notinclude an As Is Value

Required

Draw for Materials Prepaid by Borrower or Contractor-

verification required (25% Max)

If Special Request Signed by Contractor(s) up to

50% of contract(s) less monies sent for prepaid materials

Draw for MaterialsPrepaid by Borrower

Draw for Materials Prepaid by Borrower or Contractor –

verification and approval byHUD Consultant and FGMC

required

-Repair estimate must show a breakdown of material and

labor costs, signed & dated by borrower and contractor

-Draw Request Form (9746-A), completed & signed by HUD

Consultant, borrower & contractor; Copy of the

contract established betweenthe Contractor and the supplier/vendor, and;

-Copies of receipts/invoices for order(s) placed with the

supplier/vendor for delivery at a later date.

Draw for Materials Prepaid by Borrower or Contractor-

verification required (25% Max)

If Special Request Signed by Contractor(s) up to

50% of contract(s) less monies sent for prepaid materials

Draw for MaterialsPrepaid by Borrower

Draw for Materials Prepaid by Borrower or Contractor –

verification and approval byHUD Consultant and FGMC

required

-Repair estimate must show a breakdown of material and

labor costs, signed & dated by borrower and contractor

-Draw Request Form (9746-A), completed & signed by HUD

Consultant, borrower & contractor; Copy of the

contract established betweenthe Contractor and the supplier/vendor, and;

-Copies of receipts/invoices for order(s) placed with the

supplier/vendor for delivery at a later date.

Draw for Materials Prepaid by Borrower or Contractor-

verification required (25% Max)

If Special Request Signed by Contractor(s) up to

50% of contract(s) less monies sent for prepaid materials

203k Standard and Limited FGMC Program Reference Guide | v0816 | Page 1

203k Standard and LimitedFGMC Program Reference Guide

For More Information: ConstructionResourceTeam.com

Page 2: FGMC 203k Standard Limited FGMC Program …...Purchase Standard 203K (Full) Purchase Limited 203K (Streamline) Refinance Owned > 12 Months Standard 203K (Full) Refinance Owned >

Cost of Work Not less than $5K

1 GC and 1 SpecialtyContractor; No Self

Build/Help

Total Project(including costs,

contingency and fees)not to exceed $35K;

no minimum

Total Project(including costs,

contingency and fees)not to exceed $35K;

no minimum

Total Project(including costs,

contingency and fees)not to exceed $35K;

no minimum

Up to 5 Contractors(profile and

disclosures for each);No Self Build/Help

Up to 5 Contractors(profile and

disclosures for each);No Self Build/Help

Up to 5 Contractors(profile and

disclosures for each);No Self Build/Help

No Luxury Items; InGround Pool Repair is

Allowed

No Luxury Items; InGround Pool Repair is

Allowed

No Luxury Items; InGround Pool Repair is

Allowed

No Structural Work;No Luxury Items; In

Ground Pool Repair isAllowed; Project work

must finish within 6months, If Projectprevents Borrower

occupancy more than15 days must be done

as Standard 203K

Not less than $5K

1 GC and 1 SpecialtyContractor; No Self

Build/Help

No Structural Work;No Luxury Items; In

Ground Pool Repair isAllowed; Project work

must finish within 6months, If Projectprevents Borrower

occupancy more than15 days must be done

as Standard 203K

Not less than $5K

1 GC and 1 SpecialtyContractor; No Self

Build/Help

No Structural Work;No Luxury Items; In

Ground Pool Repair isAllowed; Project work

must finish within 6months, If Projectprevents Borrower

occupancy more than15 days must be done

as Standard 203K

Max Number ofContractors

Project Work

Purchase Standard203K (Full)

Purchase Limited203K (Streamline)

Refinance Owned >12 Months Standard

203K (Full)

Refinance Owned > 12Months Limited 203K

(Streamline)

Refinance Owned <12 Months Standard

203K (Full)

Refinance Owned <12 Months Limited203K (Streamlined)

203k Standard and Limited FGMC Program Reference Guide | v0816| Page 2

203k Standard and LimitedFGMC Program Reference Guide

For More Information: ConstructionResourceTeam.com

Page 3: FGMC 203k Standard Limited FGMC Program …...Purchase Standard 203K (Full) Purchase Limited 203K (Streamline) Refinance Owned > 12 Months Standard 203K (Full) Refinance Owned >

# of Draws

Contingency

Occupancy Type

As Determined by theProject Consultant;

10% Holdback on eachdraw

Required; Minimum is 10% and Maximum is 20% If Utilities are not on then minimum contingency of 15% required

Owner Occupied Only;1-4 Unit

Owner Occupied Only;1-4 Unit

Owner Occupied Only;1-4 Unit

Owner Occupied Only;1-4 Unit

Owner Occupied Only;1-4 Unit

Owner Occupied Only;1-4 Unit

Allowed, up to 6months payments, but

not more thanmonths required for

project

2 per contractor;Typically one Depositand One Final Draw; Ifcontractor will requiremore than two draws,

project must goStandard not Limited

203K

Not Allowed

Allowed, up to 6months payments, but

not more thanmonths required for

project

Not Allowed

Allowed, up to 6months payments, but

not more thanmonths required for

project

Not Allowed

RequiredNot Required, If

Utilized then cost cannot be financed

RequiredNot Required, If

Utilized then cost cannot be financed

RequiredNot Required, If

Utilized then cost cannot be financed

As Determined by theProject Consultant;

10% Holdback on eachdraw

2 per contractor;Typically one Depositand One Final Draw; Ifcontractor will requiremore than two draws,

project must goStandard not Limited

203K

2 per contractor;Typically one Depositand One Final Draw; Ifcontractor will requiremore than two draws,

project must goStandard not Limited

203K

As Determined by theProject Consultant;

10% Holdback on eachdraw

PaymentReserve

203K Consultant

Purchase Standard203K (Full)

Purchase Limited203K (Streamline)

Refinance Owned >12 Months Standard

203K (Full)

Refinance Owned > 12Months Limited 203K

(Streamline)

Refinance Owned <12 Months Standard

203K (Full)

Refinance Owned <12 Months Limited203K (Streamlined)

203k Standard and Limited FGMC Program Reference Guide | v0816 | Page 3

203k Standard and LimitedFGMC Program Reference Guide

For More Information: ConstructionResourceTeam.com

Page 4: FGMC 203k Standard Limited FGMC Program …...Purchase Standard 203K (Full) Purchase Limited 203K (Streamline) Refinance Owned > 12 Months Standard 203K (Full) Refinance Owned >

Identity ofInterest

(Borrower,Contractor,Consultant)

Sale between familymembers allowed; No

other instances ofIdentity of Interest orConflict of Interests

between Partiesallowed

Sale between familymembers allowed; No

other instances ofIdentity of Interest orConflict of Interests

between Partiesallowed

Sale between familymembers allowed; No

other instances ofIdentity of Interest orConflict of Interests

between Partiesallowed

Sale between familymembers allowed; No

other instances ofIdentity of Interest orConflict of Interests

between Partiesallowed

Sale between familymembers allowed; No

other instances ofIdentity of Interest orConflict of Interests

between Partiesallowed

Sale between familymembers allowed; No

other instances ofIdentity of Interest orConflict of Interests

between Partiesallowed

Max ProjectTerm 6 Months

6 months, Projectcannot displace borrower'sfrom property more than

15 days

6 Months6 months, Project

cannot displace borrower'sfrom property more than

15 days

6 Months6 months, Project

cannot displace borrower'sfrom property more than

15 days

Purchase Standard203K (Full)

Purchase Limited203K (Streamline)

Refinance Owned >12 Months Standard

203K (Full)

Refinance Owned > 12Months Limited 203K

(Streamline)

Refinance Owned <12 Months Standard

203K (Full)

Refinance Owned <12 Months Limited203K (Streamlined)

203k Standard and Limited FGMC Program Reference Guide | v0816 | Page 4

203k Standard and LimitedFGMC Program Reference Guide

For More Information: ConstructionResourceTeam.com