Coup previously under LISS management. This is now a clearfell coupe as the research trial has ended. Adjacency between coupes is unavoidable due to coupes felled after DNB infection. Hilltop to be felled in first phase to fit wider landscape. Phase three coupe that will be restocked with 12ha of broadleaves as the site conditions are more favourable. This along with 2.7ha of open ground will allow this plan area to meet minimum UKFS standards for broadleaves and open space within a woodland. There is a weight and volume restriction on this section of public road. Consultation will take place with Moray council road engineers before any harvesting operation is undertaken. Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right [2020]. All rights reserved. Ordnance Survey Licence number [100021242]. © Getmapping Plc and Bluesky International Limited 2020. 0 500 1000 1500 2000 Meters Phase Years Volume from thinning and clearfell (m 3 / year) 1 2020 - 2024 4440 2 2025 - 2029 4788 Road restriction Forest Roads - Classification Felled Quarry Open Phase 1 (2020 - 2024) Phase 2 (2025 - 2029) Phase 3 (2030 - 2034) Phase 4 (2035 - 2039) Phase 5 (2040 - 2044) Phase 6 (2045 - 2049) After 2054 Long term retention Scale 1:15,000 @ A3 East Region Date May 2020 O.S. Grid reference NJ 456 627 Maud and Carnoch Map 4 Mangement