FUEL USED 5: COND. & CIRC 10: DEVIATION 11: WIRELINE LOG 12: RUN CSG & CMNT 14: NIPPLE UP BOP 15: TEST BOP 16: DRILL STEM TEST 17: PLUGBACK 18: SQUEEZE CMNT 2: DRILLING 3: REAMING 4: CORING 6: TRIPS 7: LUBRICATE RIG 8: REPAIR RIG 9: C/O DRILL LINE 13: WAIT ON CEMENT 19: FISHING 20: DIR. WORK DATE RIG NO. RIG PHONE NUMBER DAYS FR SPUD JOB NO. WELLNAME OPERATOR WEATHER SPUD DATE / TIME WATER SOURCE OPERATIONS @ REPORT TIME DEPTH INCL AZM CREW M / U MANHOURS PAST 24 ACCIDENTS OR NEAR MISSES: PROJECTED TD LAST INSPECTION REPORT REMARKS DEVIATION SURVEYS Total Hours (Today / Well) TIME BREAKDOWN BIT# SIZE TYPE MAKE NOZZLES OUT @ IN @ DRILLED HRS CONDITION R O P SERIAL # BITS LENGTH NO. STANDS WT of COLLARS / DRILLSTRING DRILLING ASSEMBLY ( BHA ) SINGLES HOURS SINCE LAST INSPECTION KELLY DOWN TOTAL DRILL PIPE DIRECTIONS TO MORNING REPORT JOB TYPE WELL TYPE O.D. DETAILS OF OPERATIONS IN SEQUENCE FROM TO HRS CODE 1: RIG UP / DOWN BOILER # HOURS SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS DRLLSTRG Used Today Used This Well DELIVERED TODAY On Hand Fuel Brand RIG FUEL Time Mud Wt IN / OUT Funnel Vis Fl. Loss PV 10 S GEL MUD MTR SERIAL # HRS LAST 24 TOTAL HRS CUM. WELL HRS FOOTAGE LAST 24 TOTAL FOOTAGE TODAY RIG MANAGER SAFETY MEETING TOPICS BOP TEST DATE / PRESSURE LAST CASING SIZE & SET DEPTH RIG COSTS BOP DRILL DATE / TIME DAILY AVERAGE CUMULATIVE CUMULATIVE DAYS CUM. HRS I.D. WELL STATE JOB START DATE DAYS ON JOB EST. RELEASE G.P.S. COORDINATES CROWN-O-MATIC CHECKED OPERATIONS NEXT 24 HRS CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS # STOP CARDS # OF JSA's NEXT CASING SIZE & SET DEPTH DAILY CUM. FILT CK YLD PT 10 M GEL RENTAL S & R ENGINES Co. No. HRS TODAY HRS LAST CHGE HRS ON WELL LOCATION DRILL STRING REMARKS FUEL ADDED TO MUD TODAY EXTRA CREWS / WHY? BOP DRILL DATE / TIME CUM. MUD COSTS CHANGED HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING RIG SAFETY DAYS INSPECTION BY / TITLE SAFETY RATE OFFICE NOTIFIED FROM TO CODE RPM W.O.B. DEPTH DRILLED LAST MEETING DATE RELEASE DATE / TIME AVERAGE KVA DISTRIBUTOR BLOWDOWN VOLUMES MUD OPS SAFETY HTHP FL HTTP FC TIME LOG ROTARY TORQUE pH MF PF CALCIUM CHLORIDES % SOLIDS % LCM % OIL % SAND % H2O Mud Type SHAKER TYPE SCREENS CENTRIFUGES PUMPS RENTAL ITEMS OPERATORS REPRESENTATIVE COUNTY / PARISH LEGAL DESCRIPTION CO. MAN PH NO. BOILER STDBY HRLY DESCRIPTION DAY RT Depth GPM PRESSURE Pump 1 Liner SPM Pump 2 Liner SPM Pump 3 Liner SPM Pump 4 Liner SPM Pump 1 Pump 2 Pump 3 Pump 4 TYPE STROKE HRS Total HRS MAX PSI KILL (SPM) Manufacturer SPR Kill Rate FELDERHOFF BROTHERS DRILLING 20100816 VERTICAL ROCKY SELMAN 940-229-1654 CLEAR Frank Spann 806-777-3049 OPAL RESOURCES, LLC 0 11200 RIG UP Martin TX 1 RIG UP & DRLG 08-15-10 06:00 8-31-10 140 8/7/2010 ROCKY SELMAN/TP 8 116.00 W/TRUCKER ON MOVEING RIG & RIG UP N 32.5275 W -102.208 8-15-10 7-28-10 1000# 8/2/10 / 300 AM 8/1/10 /1.00 PM 8-16-2010 NO-NM OR ACC. 40.00 40.00 8 5/8 2028 0.00 0.00 H2O 10 NO F/S 210 600 1800 1800 600 1 1 12.0 12.0 TEAR DOWN & MOVE RIG RIG UP 24.0 24.0 24.0 24.0 OTHER 0.00 0.00 0.00 0.00 4 1/2 4 1/2 16.6 16.6 G-105 G-105 6 6 XH XH LP2 4272 3914 LP1 1321 12 12 2712 MP2 2956 4427 MP1 2970 4262 DW2 2233 4 4 6178 DWI E2232 4 4 6433 FROM PATRICIA,GO WEST ON 155 16 MI., TURN RIGHT AT BLUE FBDC SIGN, GO .5 MI. TURN LEFT AND FOLLOW RD TO RIG, APPX .5 MI. 1167.00 43.00 43.00 THOMPSON OFF ROAD 1210.00 PASON 75 40 S/M-W/TRUCKER MOVEING RIG 5 MIN- S.M W/ CREW= RIG UP DIESEL=19.5" 1,167.62 GALS JOHN HANCOCK BRIDLE LINE 8-UP & 8 DOWN SWIVEL HR.-0 TON MILE -0 SILP & CUT 100' DRILL LINE M-1000 M-1000 10 10 MAXIUM MAXIUM 24 0.00 0.00 0.00 0.00 US Pason 3.2.23 10 UNIVERSITY 6-14 # 6
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
JOHN HANCOCKJOHN HANCOCKJOHN HANCOCKRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYRONNIE MCCAULEYBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-29TON MILE-105Short one driller - on medical leave
720RS1000M1000
1010
MAXIUMMAXIUM 3
21 45.003.000.000.00
234230
67682924 - 3328 6 115 6 115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
ROT. F/3328 T/3516DEVIATION SURVEY @ 3493 1/2 DEG.CONDITION MUD & CIRCULATEPOOH WITH BIT #1BACK REAM 10 JTS.LUBRICATE RIGSET COM TOHREPAIR COLLAR CLAMPDERRICK HAND REINJURED ARMTOHCLEAN & BREAK BITM/U NEW BITREPAIR PIPE SPINNERTIH WASH & REAMTIGHTEN BOLTS IN DRAWWORKSW/R 120'TIH.
6.54.0
0.58.00.52.0
0.5
1.01.0
24.0
1.08.02.55.0
5.0
2.52.5
108.0
11.570.0
OTHER
63.5 63.500.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 82 268 0
LP242720241014
LP113212496397
MP229567341209
MP129700811151
DW2223324961387
DW12232241201373
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
291
423516.57
2705.5331.28
100.00073.5
3493 .5*
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3321.00742.983846.00
THOMPSONOFF ROAD
SAFETY MTG:P/U:110,000 S/O:100,000 ROT.:102,000COM. OKBOP DRILL @ 800 AM 1 1/2 MIN.N/M:EMPLOYEE DRIVEING FORK LIFT WITH OUT SEAT BELT ONFUNCTION TESTED C.O.M S/M OVER TOHRIG FUEL 41.5 3,321 GALS
JOHN HANCOCKJOHN HANCOCKJOHN HANCOCKJOHN HANCOCKJOHN HANCOCKBrian WestBrian WestBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-29TON MILE-105Short one driller - on medical leaveneed derrick hand for tonite
800RS1000M1000
1010
MAXIUMMAXIUM 3
21 66.006.000.000.00
234230
67683328 - 3516 6 6 115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100822 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 6 11200
T.I.H W/new bit
Gaines TX 7
DRLG
08-15-10 06:00 8-31-10
5
8-16-10 DUB CASTLEBERRY/FH 93.00
N 32.5275 W -102.208
8-18-108-18-10
1 N/M - hands left v door chains down after connection
4291 775 36.905 21.0
75 77 72 75
0.00
0.00
5.0
0.00
0.00
5.0
1200 10.2 35 7 4 11
F/W 11 890 9.5
NO F/S 210
150,000.12
6
.2
W/WELL
0.00
3474.89 3474.89
60063016301700173018001900
630163017001730180019000600
32710882
0.510.00.50.50.51.011.0
WASHED 60 FEET TO BOTT.DRILL F/3516- T/ 3951LUBRICATE RIG GREASE CROWNDEVIATION SURVEYREPAIR JACK SHAFT CHIANREPAIR CATSHAFT CHAINDRLG 3951' / 4291'
21.00.5
0.51.5
0.5
24.0
1.08.03.06.5
5.5
2.52.5
132.0
12.091.0
OTHER
DRILFORMANCEDRILFORMANCE
221221
7X167X16
1021
22 12 1/4
12 1/4 DF 513DF 513
35163516 4291
435775.00
10210.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 113 237 0
LP24272
241014
LP1132124120421
MP22956
341209
MP12970241051175
DW22233241201411
DW12232241441397
1113121
TELEDRIFT8" DCX.O.6" DC
SHOCK SUBBIT
90.44.80629.25
7.748.83.70121/4
88
6 1/47 3/48
2 3/42 3/8
2 3/833
372
424291.49
3451.0860.65
11895.0
3640376740174202 2.5
2.50.51.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
2290.001031.004877.00
THOMPSONOFF ROAD
3516
3951
3951
4291
D
D
25
23
65
80
S.M. FIRST DAY BACK HANN PLACEMENT & TEAM WORKCHECK C.O.M.FUELFUNCTION TESTED C.O.MS/M OVER WORKING NEW HANDS. JSA ON PINCH POINTS1 N/M NEW HAND LEFT V/D GATE DOWN. ROT118 . PU 119 SO 116.RIG FUEL 31.5 GALLONS 2290
KENNETH BUTLERKENNETH BUTLERKENNETH BUTLERBrian WestBrian WestBrian WestBrian WestBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-29TON MILE-81Short one driller - on medical leaveneed derrick hand for tonite
331 650RS1000M1000
1010
MAXIUMMAXIUM 0
24 90.006.000.000.00
234230
67684291 6 100 6
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
1802.50487.505364.50
THOMPSONOFF ROAD
0.00
4291
4572 4600
D
D
25
23
95
84
s.m. mixing mud & chem. wear all p.pe.check c.o.m.FUNCTION TESTED & SET C.O.M FOR TOHPRETOUR OVER TOH.PINCH POINTS OVERHEAD LOADS & WORKING NEW HANDS.MANNUEL & JARED WALKED OFF @ 845PM1 N/M BREAK OUT LINE BROKE NEARLEY HIT BW.
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100824 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 8 11200
T.I.H W/new bit
Gaines TX 9
DRLG
08-15-10 06:00 8-31-10
7
8-16-10 DUB CASTLEBERRY/FH 108.00
Avoiding accs, running csg, cemnting csg.
N 32.5276 W -102.208
8-18-10 8-19-10 - 120 sec.8-18-10
! near miss
4600 0 0.0
75 77 72 75
0.00
0.00
7.0
0.00
0.00
7.0
0600 T H
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
60070011001130120014001500180018300030
700110011301200140015001800183000300600
1212217122012121321
1.04.00.50.52.01.03.00.56.05.5
R/U CSNG CREW & HELD S/MRUN CASINGHAD S.M. WITH. SUPT. OVER AVIODING ACCIDENTSLUBRICATE RIGRUN CASINGRIG DOWN L.D. MACHINE & CSG CREWHELD S.M. WITH CEMENTERS RIG UP CEMENTERS & CEMENT SURFACE CSG.R/D CEMENTERSW O C. PUT ON NEW ROT CHAIN GUARD. JET & CLEAN PITSCUT CSNG & WELD ON WELL HEAD.
0.5
10.56.0
1.06.0
24.0
6.511.04.06.5
5.5
11.56.0
1.010.52.5
180.0
12.0103.0
OTHER
0.000.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 350 11,025 113 237 0
LP242720241014
LP1132124168469
MP229560461222
MP1297001051175
DW22233101541445
DW12232101781431
121/488
6 1/47 3/48
2 3/42 3/8
2 3/833
107.0
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
0.005364.50
THOMPSONOFF ROAD
0.00
4600 4600
S/M ON RUNNING CASING W/ 3RD PARTY/ TOOLPUSHERS/M W/T.P & SUPER OVER AVOIDING ACCIDENTS/ 100% SAFETY (15MIN.S/M)PRETOUR OVER HELPING WELDER.N/M CATLINE BROKE WHILE TRYIN TO PULL MOUSE HOLE. NO ACC!RIGFUEL 23'' 1,822 GALLONS
KENNETH BUTLERKENNETH BUTLER
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318Short derrick hand & floor hand for tonite
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 115.006.000.000.00
234230
6768
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100825 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 9 11200
T.I.H W/new bit
Gaines TX 10
DRLG
08-15-10 06:00 8-31-10
8
8-16-10 DUB CASTLEBERRY/FH 96.00
Nipple up, !00% tie off, pinch points
6 N 32.5275 W -102.209
8-18-10 8-19-10 - 120 sec.8-18-10
1 N/M -
0 0.0
75 77 72 75
8 5/8 4604
0.00
0.00
8.0
0.00
0.00
8.0
6:00 H2O H2O
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
600630103014301800190021000000100130230400430
630103014301800190021000000100130230400430600
21148141415212115206156
0.54.04.03.51.02.03.01.00.51.01.50.51.5
weld head on test headNIPPLE UP choke manf.stwelded new well head on where b.o.p. hit well headNIPPLE UP B.O.P.NIPPLE UP B.O.P.TEST B.O.P. COLLAR LEAK ON WELLHEADWAIT WELDER TO FIX LEAKWELD ON WELDHEADTEST B.O.P.M/U BHATIH W/SLMTEST B.O.P.TIH W/SLM
3.0
4.0
8.53.0
1.04.5
24.0
6.514.04.010.5
5.5
11.56.08.53.0
2.015.02.5
204.0
12.0103.0
OTHER
D/F 370 5/16. 2/143 7/78 40.000.000.00
4 1/2 16.60 G-105 6 1/4 XH 350
LP24272
241014
LP1132124192493
MP22956
461222
MP12970
1051175
DW2223341581448
DW1223241821434
111
20
111
tele driftstabcollarstabcollars
tri collarbit
5.1129.785.65599.47
8.1130.981.00
6 3/86 1/2
6 1/46 1/86 1/46 1/8
2 .94
2 1/2
2 .43
680.10
107.0
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
1254.00-1254.004110.50
THOMPSONOFF ROAD
0.00
s.m. nipple up & test 100% tie off-hand placementpinch pointsS/M ON NIPPLE UP, N/M AIR HOIST TOOK OFF & LIFTED COLLAR RACK UPRIG FUEL 2O.5'' 1,254
KENNETH BUTLERKENNETH BUTLERBrian WestBrian West
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 127.506.000.000.00
234230
67686 6
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
NM-PUTTING ON HYD. CHAIN ROPE BROKE F.H. ALMOST FULL BACKWARD
0 0.0
75 77 72 75
8 5/8 4604
0.00
0.00
10.0
0.00
0.00
10.0
F/W 11 890 10
NO F/S 210
150,000.12 .2
W/WELL
0.00
3474.89
600
1800
1800
0600
8
8
12.00.00.00.00.00.00.00.00.00.00.012.0
INSTALLED TRANS. CHIANS- HYD. CHIAN CHG. OIL ROT.TABLE- SWIVEL- COMP. AIR COMP.INSTALLED ROT. DRIVE CHIAN REMOUNTED C.O.M. RESET VALVEFIXED AIR LEAK DRILLERS CONSOLECHANGED AIR FILTERS FLORR MTRS. CHECKED & TOPED OFF COOLANT ALL MTRS.CHANGED OUT AIRHOIST INSTALLED ROT. CLUTCH SPROKET & ROT. CHIANPUT TOGETHER TRAN INPUT-HIGH DRUM-LOW DRUM -JACK SHAFT CHIANSINSTALLED NEW HOSE FROM FLOOR AIR COMP. TO AIR TANKCLEANED OUT DRAWORKS - COMPOUND TO INSTALL NEW JACK SHAFT& COMPOUND SPROKETSREMOUNTD LIGHTS LOWER DIR.REPLACED COP. TB. LOW & HIGH DRUM CLUTCHESREPLACED GREASE LINES FOR BEARINGS IN TRANSMISIONSERVICE RIG.REPAIR RIG
24.0
0.024.0
6.514.54.058.0
5.5
11.56.08.53.0
2.015.02.5
252.0
12.0103.0
OTHER
0.000.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH
LP24272
241014
LP1132124216517
MP229560461222
MP1297011051175
DW2223301591449
DW1223201831435
7 7/86 1/46 1/4
6 1/46 1/46 1/46 1/4
2 3/8NA
2 1/42 3/82 1/42 3/8
107.0
4600
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5780.0099.003584.50
THOMPSONOFF ROAD
0.00
S.M. WASHING ON SUB. WEAR ALL P.P.E. 100% TIE OFFFORKLIFT SAFETY GOOD SIGNALS CARRY LOADS AS LOW TO GROUND AS POSSPUTTING HYDROMATIC CHIAN TOGETHER ROPE BROKE FLOORHAND ALLMOSTFELL BACKWARDSFUELDIESEL-5780S/M-CLEANING ON RIG & TIE OFF 100 %
KENNETH BUTLERKENNETH BUTLERKENNETH BUTLERKENNETH BUTLERKENNETH BUTLERJACK FREEMANJACK FREEMANBRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318JOE NAVARRETTE WORK 1-HR. QUIT WALK OFF.
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 152.506.000.000.00
234230
67686
666
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
4857.95823.004506.55
THOMPSONOFF ROAD
0.00
S/M WORKING ON DW/TRIPPING PIPEPU WT, 125,000, SO WT.122,000. ROT. WT. 122,000DIESEL 56' ROT. WT. 127, SO WT. 125, PU WT. 129JSA- MIXING MUD, MAKING CONNECTION
MAKING CONN./NEW HAND ON FLOOR/MIX MUD/RIG SERVICEWORK ON SHAK
2 N 32.5275 W -102.209
8-25-10 8-19-10 - 120 sec.8-26-10
NONE
5512.00 499.00 336.774 15.5
135 139 131 135
8 5/8 4604
550.00
42.31
550.00
13.0
0.00
0.00
13.0
1200 8.8 28 4 3 6
F/W 11 890 10
NO F/S 210
40,000.12
3
.2
W/WELL
0.00
2200.86 5675.75
60011001130120015301600180018001930200023300000
110011301200153016001800
1930200023300000600
27102102
2102102
5.00.50.53.50.52.00.01.50.53.50.50.0
DRILL ACTUAL f-4960-t-5076 ROP 23.2LUBRICATE RIG/BLOCKS-SWIVEL-CROWN-KBDEVIATION SURVEY @ 5001/ 2.5 DEGDRILL ACTUAL F- 5076/ T- 5171 ROP 27DEVIATION SURVEY @ 5097 / 2.5 DEGDRILL ACTUAL F-6171/ T-5220
DRILL ACTUAL F/ 5220 - 5264DEVIATION SURVEY @ 5188 DEG 2.0DRILL ACTUAL F/ 5264 - 5356DEVIATION SURVEY @ 5313 DEG 2.0DRILL ACTUAL F/ 5356 -5512
15.5
0.5
2.0
0.018.0
6.518.55.085.0
9.0
11.56.08.53.0
2.016.52.5
313.0
12.0127.0
OTHER
14.25DRILFORMADRILFORMA
370370
5-16/ 2-145-16/ 2-14
23.530.5
22 7 7/8
7 7/8 DF613R2DF613R2
46004600 5512
620620
36.5043.500.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 351351
138154 197
213 00
LP2427220241014
LP113214240541
MP2295624701246
MP12970241291199
DW22233241831473
DW12232242071459
111
20
111
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
511
42.005512.93
4759.1432.09
135000131.0
5001509751905313 2.0
2.02.52.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3904.51953.445459.99
THOMPSONOFF ROAD
0.00
4960
5220
5220
5512
D
D
25
22
75
75
SAF MTG/MAK CONN /NEW HAND ON FLOORJSA RIG SERVICE/MIX MUDROT 130000/ SO 128000/ PU 132000JSA - STRAPING PIPE, JSA - WORKING ON SHAKERS, DIESEL 47"ROT WT 135, SO WT 131, PU WT 139
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR.-97.50TON MILE 318JOE NAVARRETTE WORK 1-HR. QUIT WALK OFF.
750800
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 190.006.000.000.00
234230
67684960 - 5220
5220 - 551266
66
115115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
DRILL ACTUAL -F/5512-T5575 ROP21LUBRICATE RIGDRILL ACTUAL- F-5575- T-5638 ROP 25DEVIATION SURVEY /5537-2 DEGDRILL ACTUAL F-5638/T-5708TRIPS OUT HOLE MAKE UP BHACUT OFF DRILLING LINE 90 FT.TRIPS IN HOLE
11.0
10.00.5
2.00.5
24
6.525.55.585.0
9.5
11.56.08.53.0
2.016.52.5
332.0
12.0138.0
OTHER
14.25DRILFORMADRILFORMADRILFORMA
370370292
5-16/ 2-145-16/ 2-146X15
45450
223 7 7/8
7 7/87 7/8 DF613R2
DF613R2DF513R
460046005708
570811081108.000
88.50450.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 351351
161161 190
190 00
LP2427218421032
LP113216246547
MP2295624941270
MP12970241531223
DW22233242071497
DW12232242311483
111
20
111
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
532
20.005708.52
4946.9861.84
134000142.0
5537 2
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3268.61635.906095.89
THOMPSONOFF ROAD
0.00
5512
5708
5708 D
D
22
25
75
75
SAFETY MTG-CLEANINGROTWT134000-SOWT128000-PUWT140000DIESEL " RO WT 134 / PU WT 138 / SO WT 130JSA TRIPPING PIPE / JSA CUTTING DRILLING LINE
RICARDO ALANIZRICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR142.50TON MILE41/ CUTT 90 FT.
825850
RS1000M1000
1010
MAXIUMMAXIUM 0
12.5 202.506.000.000.00
234230
67685512 - 5708
5708 - 66
115 66 115
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
Changing radiator fluilds, Changing kelly spinner motors
N 32.5275 W -102.209
8-31-10 8-19-10 - 120 sec.8-26-10
1 incident, 2 N/M
7122 771 34.267 22.5
135 139 131 135
8 5/8 4604
34.38
550.00
16.0
0.00
0.00
16.0
0600 8.9 38 8 5 11 10
F/W 3.1 96.90 8
NO F/S 210
19,000.1.75
7
.2
W/WELL
0.00
7888.14
6001700173018002030210001300200
17001730180020302100013002000600
2102272102
11.00.50.52.50.54.50.54.0
DRILL ACTUAL F- 6351/ T-6752 ROP 39DEVIATION SURVEYDRILL ACTUAL F-6752/ T- 6783DRILL ACTUAL F/ 6783 - 6843LUBRICATE RIG / WORK ON KELLY SPINNERDRILL ACTUAL F/ 6843 - 6966DEVIATION SURVEY @ 6892 DEG 1DRILL ACTUAL F/ 6966 - 7122
22.5
0.5
1.0
24.0
6.526.56.585.0
12.0
11.56.08.53.0
2.017.52.5
380.0
12.0180.5
OTHER
DRILFORMADRILFORMA
292292
6 X 156 X 15
31.542.50
33 7 7/8
7 7/8 DF513RDF513R
57085708
10751414
51.5062.500.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 206 145 0
LP242720521042
LP1132124284585
MP2295601181294
MP12970242011271
DW22233242551545
DW12232242791531
111
20
111
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
682
427122.01
6338.4061.91
147000184.5
628066816892 1
1.5.5
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
1476.86863.757887.64
THOMPSONOFF ROAD
0.00
6351
6783
6783
7122
D
D
20
23
80
75
SAFETY MTG CONNECTIONSJSA CLEANING RIG/MOVING PIPE WITH FORKLIFTROT WT. 146000/ SO WT 140000/ PU WT. 150000ROT WT 147, SO WT 142, PU WT 153, DIESEL 23"JSA - CHANGING PIPE SPINNER MOTORS, JSA - CHANGING RADIATOR FLUIDN/M - tongs almost hit handN-M - hands left v door gate down
Placing drill pipe in mouse hole, making connection
N 32.5275 W -102.209
8-31-10 8-19-10 - 120 sec.8-26-10
N/M - Hand almost stepped in kelly shuck
7710 588 28.683 20.5
135 139 131 135
8 5/8 4604
32.35
550.00
17.0
0.00
0.00
17.0
0600 8.6 32
F/W 3.1 96.90 10
NO F/S 210
19,000.1.75 .2
W/WELL
0.00
7888.14
600800830100011301630170018000100
0200
8008301000113016301700180001000200
0600
2728210225
2
2.00.51.51.55.00.51.07.01.00.00.04.0
DRILL ACTUAL F-7122/ T-7183 ROP 30.5LUBRICATE RIGDRILL ACTUAL F- 7183 / T-7245 ROP 41.3REPAIR RIG/ WORK ON KELLY SPINNERSDRILL ACTUAL F- 7245 / T- 7370 ROP 25DEVIATION SURVEYDRILL ACTUAL F- 7370 / T-7401DRILL ACTUAL F/ 7401 - 7585CONDITION MUD & CIRCULATE (LOST RETURNS @ 758585 BBLS LOST DOWN HOLE ( RETURNS LOST @ 0100 RETURNED @ 0200)WORKED STRING 2 TIMES BEFORE FULL RETURNS (HEAVY RAIN LIGHTNING)DRILL ACTUAL F/ 7585 - 7710
20.5
1.0
0.51.5
0.5
0.024.0
7.526.57.086.5
12.5
11.56.08.53.0
2.017.52.5
404.0
12.0201.0
OTHER
DRILFORMA 292 6 X 15 5263
3 7 7/8 DF513R 5708 1693 114.5063.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 225 126 0
LP2427224761066
LP113210284585
MP22956241421318
MP1297002011271
DW22233242791569
DW12232243031555
TELEDRIFT3PT REAMERD.C.3PT REAMERD.C.
Tri CollarBIT
5.1229.785.60599.41
8.1130.98.70
75
427710.79
6989.09
154000205.0
7299 1
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5376.75-3899.893987.75
THOMPSONOFF ROAD
0.00
7122
7401
7401
7710
D
D
22
24
80
75
SAFETYMTG DANGEROUS ANIMALSJSA - MIXING MUD, DIESEL 61"ROT WT 154, SO WT 150, PU WT 158.
RICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR162.50TON MILE - 95
800900
RS1000M1000
1010
MAXIUMMAXIUM 0
24 263.006.000.000.00
234230
67687122 - 7401
7401 - 771066 100
66
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100904 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 19 11200
DRILLING 51 FT. AN HR.
Gaines TX 20
DRILLING
08-15-10 06:00 8-31-10
18
8-16-10 DUB CASTLEBERRY/FH 102.00
N 32.527 W -102.208
8-31-10 8-19-10 - 120 sec.8-26-10
7961 251 27.889 9.0
135 139 131 135
8 5/8 4604
30.56
550.00
18.0
0.00
0.00
18.0
1700
F/W 3.1 96.90 10
NO F/S 210
19,000.1.75 .2
W/WELL
0.00
7888.14
60070073093010001600180023000030
700730930100016001800230000300600
27210266216
1.00.52.00.56.02.05.01.55.5
DRILL ACTUAL F- 7710 / T- 7742 ROP 32LUBRICATE RIGDRILL ACTUAL F- 7742 / T- 7804 ROP 31DEVIATION SURVEYDRILL ACTUAL F- 7804 / T-7961 ROP 26.1T.O.O.HT. O. H. FOR BITLAY DOWN/PICK UP B.H.A./CHECK TELLIDRIFT/SWAP TLDMAKE UP BIT / T.I.H. / PICK UP KELLY BREAK CIRCULATION / T.I.H.
9.0
12.50.5
0.5
1.5
24.0
7.539.07.586.5
13.0
11.56.08.53.0
2.019.02.5
428.0
12.0210.0
OTHER
DRILFORMAQUANTEC
2927128754
6 X 156 X 15
7234 7 7/8
7 7/8 DF513RQ506FX
57087961
2253 186.50
0.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 225 126 0
LP24272241001090
LP113210284585
MP2295661481324
MP1297002011271
DW22233243031593
DW12232243271579
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
BIT SUBBIT
5.1229.785.65599.41
8.114.041.00
653.11
214.0
7804 1
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
4700.20676.554664.30
THOMPSONOFF ROAD
0.00
ROT WT -162000/ SO WT 158000/ PU WT 170000SAFTY MEETING / TRIPPING PIPENEAR MISS / TONGS COME OFF DRILL PIPE ALMOST HIT HANDDIESEL - 54 1/2
JACK FREEMANJACK FREEMANJACK FREEMANJACK FREEMAN
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR168.50TON MILE - 95
850RS1000M1000
1010
MAXIUMMAXIUM 0
24 287.006.000.000.00
234230
67687710 - 7961 6 6
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100905 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJASON SPANN 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 20 11200
DRILLING 51 FT. AN HR.
Gaines TX 21
DRILLING
08-15-10 06:00 8-31-10
19
8-16-10 DUB CASTLEBERRY/FH 114.00
1st day back, tripping in hole, pinch points, pulling & setting slips, connections
5 N 32.5274 W -102.209
8-31-10 9-4-10 - 8-26-10
2 Near Misses
8710 749 33.663 22.25
135 139 131 135
8 5/8 4604
28.95
550.00
19.0
0.00
0.00
19.0
0600 8.3 34 6 2 7
F/W 3 970 10.5
NO F/S 210
15,0002120.1.75
4
.2
W/WELL
0.00
7888.14
60070014001430180023450000
700140014301800234500000600
62722102
1.07.00.53.55.750.256.0
T.i.h.DRILL f/ 7961- t/ 8211LUBRICATE RIGDRILL f/8211- t/8304DRLG F /8304 -8491DEVIATION SURVEY @8491 1 1/2DRLG F /8491 -8710
22.25
1.00.5
0.25
24.0
7.540.08.086.5
13.25
11.56.08.53.0
2.019.02.5
452.0
12.0232.25
OTHER
QUANTECQUANTEC
71287547128754
6 X 156 X 15 22.5
44 7 7/8
7 7/8 Q506FXQ506FX
79617961 714
0.0022.500.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 257 94 0
LP24272
1001090
LP1132124308609
MP22956241721348
MP12970
2011271
DW22233243271617
DW12232243511603
111
20
111
TELEDRIFTREAMER6" DCREAMER6" DC
BIT SUBBIT
5.1229.785.65599.41
8.114.041.00
852
428679.57
7921.2163.25
165000236.25
799682428492
11
1 1/2
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3904.51795.695459.99
THOMPSONOFF ROAD
0.00
7961
8304
8304
8710
D
D
20
21
70
70
s.m. first day back t.i.h. hand placement pinchpoints pulling & setting slips use legs not backnear miss breaking jam nut on brakes pipe wrench sliped allmosthit floorhandSAFTY MEETING - MAKEING CONECTION / CLEANINGNEAR MISS - PULLING CELLAR JET HOSE OFF BOTTOM OF CELLAR FLOORDIESEL -47 INCHES
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3006.72897.796357.78
THOMPSONOFF ROAD
0.00
8710
9020
9020
9361
D
D
12
16
75
75
S.M. FORKLIFT SAFETY & GENERAL CLEANINGfuel - 43" - 3479.81 galSAFTY MEETING - CHIPPING AND GRINDINGNEAR MISS - HAND WAS GRINDING WITH BAGIE SHIRT ON WHEEL SLIPED OFFHAND RAil ALMOST CATCHING SHIRTDIESEL - 38 1/2
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100907 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTFrank Spann 806-777-3049
OPAL RESOURCES, LLC
08-16-10 21:30 22 11200
Out of hole waiting on tools
Gaines TX 23
Fishing
08-15-10 06:00 8-31-10
21
9-4--10 Glen Glass 96.00
Pinch points, Hand placement, picking up drill pipe, Proper PPE
N 32.5275 W -102.208
8-31-10 9-4-10 - 8-26-10
1 Near Miss
9895 534 35.6 15.0
135 139 131 135
8 5/8 4604
26.19
550.00
21.0
0.00
0.00
21.0
1800 8.4 30 2 1 2 N/A N/A
F/W 1.5 98.50 9
NO F/S 210
2,6002960.1.25
1
.2
W/WELL
0.00
7888.14
6001630170018001800213023300430
163017001800
2130233004300600
272
25621
10.50.51.00.03.52.05.01.5
DRLG F / 9361 -9708LUBRICATE RIGDRILL f/ 9708- t/ 9739
DRLG F / 9739 - 9895 / LOST 50K WHILE REAMING TO BOTTOMCIRCULATE SWEEPT.O.H - 94 STANDS AND A DOUBBLEWAIT ON COLLARS
15.0
2.05.00.5
1.5
0.024.0
9.545.09.086.5
14.0
11.56.08.53.0
2.020.52.5
500.0
12.0270.0
OTHER
QUANTEC 7128754 6 X 15 45.560.5
4 7 7/8 Q506FX 7961 1934 113.5060.500.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 11056.50 278 73 0
LP24272241301120
LP113210326627
MP2295631931369
MP1297002071277
DW22233243751665
DW12232243991651
111
201
111
TELEDRIFTREAMER6" DCREAMER6" DCD.P.
BIT SUBBIT
5.1229.785.65599.4130.51
8.114.041.00
981
429894.97
913831.35
179000274.0
95559667 0.5
1
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
2141.70865.027222.80
THOMPSONOFF ROAD
0.00
9361
9739
9739
9895
D
D
12
16
75
75
S/M ON HAND PLACEMENT/PROPER P.P.E/T.P PRESENT....fuel 34 inches 2593DIESEL ON LOCATIONSAFTY MEETING - PICKING UP DRILL PIPENEAR MISS - HAND WAS CLEANING PAINT BRUSH THINNER FEEL OFF WIRELINE MACHINE ALMOST SPLASHED FACE.DIESEL - 30 INCHES
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
FELDERHOFF BROTHERS DRILLING 20100908 VERTICAL
SEC. 14, BLK. 6, SUR. UL
Jimmy Hancock 940-634-0071 HOTJason Spann 806-544-9392
OPAL RESOURCES, LLC
08-16-10 21:30 23 11200
POOH W/drill collars
Gaines TX 24
Tripping
08-15-10 06:00 8-31-10
22
9-4--10 Glen Glass 100.00
N 32.5275 W -102.209
8-31-10 9-4-10 - 8-26-10
1 Near Miss
9897.00 2.00 0.0 0
135 139 131 135
8 5/8 4604
25.00
550.00
22.0
0.00
0.00
22.0
F/W 1.5 98.50 9
NO F/S 210
2,6002960.1.25 .2
W/WELL
0.00
7888.14
60063070080015301630180002000330
630700800153016301800020003300600
192119636666
0.50.51.07.51.01.58.01.52.5
BROKE TWISTED OFF D.P. L.D. 2 JTS. D.P.PICK UP OVER SHOT JARS& SUBSW.O. 4 1/2 GRAF.& DRILLCOLLORSMAKE UP FISHING TOOLS STRAP & CAL. D.C. P.U. D.C.T.I.H.WASHED DOWN TO FISH LATCHED ON TO FISHT.O.H.T.O.H. TO FISHT.O.H. WITH SIX 6INCH D.C. AND REST OF FISH / LAY DOWN FISHING TOOLST.O.H.
1.0
21.0
1.5
0.5
24.0
9.566.09.086.5
14.0
11.56.08.53.0
1.52.021.02.5
524.0
13.0270.0
OTHER
0.000.000.000.00
4 1/2 16.60 G 105 6 1/4 XH 351 11056.50 278 73 0
LP24272241541144
LP113210326627
MP2295601931369
MP1297002071277
DW22233243991689
DW12232244231675
275.0
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
1754.88386.827609.62
THOMPSONOFF ROAD
0.00
S.M. P.UP FISHING TOOL - T.I.H. HAND PLACEMENTPINCH PIONTSA WORKING WITH 3rd RARTYS.M. - T.O.H.NEAR MISS - BREAKING FISHING TOOL DOWN IN MOUSE HOLE TONG BROKEAROUND CAME ALMOST HITTING DRILLERDIESEL - 26 INCHES
T.O.H.L.D. 6 D.C.& CLEAN CUTTINGS OUT OF STABILIZERSCHANGED OUT B.H.A. & T.I.H. TO 4600 FEET STRAP IN HOLElay down bent d.p. out or dir.slip & cut 120 ft. drlg. lineLUBRICATE RIGT.i.h.T.I.HPICK UP SINGLES WHICH WERE LD OUT OF DERRICK FOR FISHIN G & BENTWASH & REAM F/ 9570' 9889' --- LOST CIRC WASH TO BOTTOM & MIX LCM TO REGAIN CIRDRLG F / 9889 - 9982 FULL RETURNS @ 9890'DEVIATION SURVEY@9982 1 1/2 DEG.DRLG F / 9982 - 10075DEVIATION SURVEY@ 10075 1 1/2 DEG.DRLG F / 10075 -10170
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
5580.26174.627784.24
THOMPSONOFF ROAD
0.00
4000.00
9889 10170 D 1275
S.M. HANDEL B.H.A.- T.I.H. check c.o.m.S.M. - TRIPPING IN THE HOLENEAR MISS -PICKING UP A JOINT OF DRILL PIPE PIPE ROLLED OF CATWALK ALMOST HITTING HANDDIESEL -63" IN.
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
4647.46932.808717.04
THOMPSONOFF ROAD
0.00
10170
10602
10602
10975
D
D
18
20
75
75
S/M WEAR ALL P.P.E. GOOD COMN. TEAM WORKREPLACED 3 SWABS 1 VALVE- PONY ROD # 2 PUMPS.M. PICKING UP DRILL PIPENEAR MISS - MOTOR HAND WAS WALKING UP BACK STEPS ABOUT THETHIRD STEP SLIPED ALMOST FALLING DOWNDIESEL -54S.W. 210 / P.W. 224 / R.W. 208
WAIT ON FISHING TOOLSSTRAP PIPE-LOAD RACKSHANG SHEVE CLOSE TO CROWNFISHING-CUT WIRELINE/BUILD ROPESOCKET-SINKER BARSFISHING/PULL TESTT.I.H /20 STANDS DRILL PIPE 12 SINGLESCONDITION MUD/JETTED PITS MUD CONTAMINATED-HIGH CLORIDES/LIVE OILT.O.O.HFISHINGTRIP OUT OPF THE HOLE WITH OVERSHOTBREAK DOWN FISHING TOOLSCUT WIRE LINE IN TWO AND RESPLICE, COME OUT OF THE HOLE WITH WIRELINE AND TOOLSTRIP IN THE HOLERIG UP LAYDOWN MACHINETRIP OUT OF THE HOLE LAYING DOWNWAIT ON CASERSRUN CASING & CEMEN
4.57.5
2.5
1.5
4.0
3.01.0
24
17.095.510.586.52.014.759.011.56.08.53.0
5.52.041.53.5
642.5
13.0310.752.0
OTHER
0.000.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 350350 11056.50
11056.50 00 350
350 00
LP24272242741264
LP113210326627
MP22956243131489
MP12970243271397
DW22233245191809
DW12232245431795
315.75
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
3058.94367.8810305.56
THOMPSONOFF ROAD
0.00
SAFETY MTG / T.I.H.DIESEL 41"JSA - LAYING DOWN PIPE, JSA - RIGGING UP LAY DOWNDIESEL 39"
RICARDO ALANIZRICARDO ALANIZ
BRIDLE LINE 8-DOWN & 8 -UPSWIVEL HR -257.25TON MILE -493
RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
67686
666
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
RUN CASINGWASH TO BOTTOMRIG DN LAYDN TRUCK AND CASING CREWCONDITION MUD & CIRCULATECEMENTING / O - TEX / PLUG DOWN 2245NIPPLE DOWN / SET SLIPS / 146KJET PITS / RIG DOWN
8.5
2.5
12.5
0.5
24
19.595.510.586.52.014.759.024.06.08.53.0
5.52.042.03.5
661.0
13.0310.755.0
OTHER
0.000.000.000.00
4 1/24 1/2 16.60
16.60 G 105G 105
6 1/46 1/4 XH
XH 350350 11056.50
11056.50 00 350
350 00
LP24272242981288
LP113210326627
MP22956243371513
MP12970243511421
DW22233245431833
DW12232245671819
315.75
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
FROM PATRICIA GO WEST 16 MI.TURNRIGHT AT BLUE FBDC SIGN GO .5 MI.TURN LEFT AND FOLLOW RD. TO RIG
2441.22203.5210923.28
THOMPSONOFF ROAD
0.00
5 PULLED THREADS ON PIN END OF COLLAR
BRIDLE LINE 9-DOWN & 8 -UPSWIVEL HR -257.25TON MILE -645
RS1000M1000
1010
MAXIUMMAXIUM 0
0 299.0066.000.000.00
234230
6768
US Pason 3.2.23
10
UNIVERSITY 6-14 #6
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-20-10 DAY: 1OBJECTIVE: PREPARE FOR FRAC CONTRACTOR: SUPERVISOR: MARCO DAVIS DC:$ 6250 CC:$ 6250UNIT SIZE: SPM: STROKE LENGTH: BIG D $2500ANDREWS ANCHOR $1250J-W WIRELINE $2500
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDBIG D CLEAN LOCATION AFTER DRILLING RIG MOVED. ANDREWS ANCHOR SET UP THE DEAD MANS.R/U J-W WIRELINE TO RAN GAUGE RING BECAUSE WELL DOES NOT HAVE A DV TOOL. TAGGED UP 11140'. TOP OF FLOAT 11227'. RIH WIT 4.5" GAUGE RING. SDFN
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-21-10 DAY: 2OBJECTIVE: PREPARE FOR FRAC CONTRACTOR: SUPERVISOR: RODNEY LONG DC:$ 5,950.00 CC:$ 12,200.00UNIT SIZE: SPM: STROKE LENGTH: J&J $ 4,000.00 BASIC $ 750.00LOMAC $ 1,200.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDMIRU J&J WELL SERVICE INSTALL BOP, SET TBG RACKS, UNLOAD AND TALLY TBG. PU AND RIH W/ 4 3/4", 6-3 1/8"DRILL COLLARS, X-OVER AND 2 3/8" N-80 TBG. TIH TO 11,145', PU SWIVEL, BREAK CIRCULATION BEGIN DRILLINGCEMENT TO 11,207', PU OFF BTTM, CIRCULATE CLEAN, SDON.
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-22-10 DAY: 2OBJECTIVE: PREPARE FOR FRAC CONTRACTOR: SUPERVISOR: RODNEY LONG DC:$ 5,950.00 CC:$ 12,200.00UNIT SIZE: SPM: STROKE LENGTH: J&J $ 4,000.00 BASIC $ 750.00LOMAC $ 1,200.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDMIRU J&J WELL SERVICE INSTALL BOP, SET TBG RACKS, UNLOAD AND TALLY TBG. PU AND RIH W/ 4 3/4", 6-3 1/8"DRILL COLLARS, X-OVER AND 2 3/8" N-80 TBG. TIH TO 11,145', PU SWIVEL, BREAK CIRCULATION BEGIN DRILLINGCEMENT TO 11,207', PU OFF BTTM, CIRCULATE CLEAN, SDON.
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-23-10 DAY: 3OBJECTIVE: PREPARE FOR FRAC CONTRACTOR: SUPERVISOR: RODNEY LONG DC:$ 7,350.00 CC:$ 19,550.00UNIT SIZE: SPM: STROKE LENGTH: J&J $ 3,500.00 BASIC $ 750.00LOMAC $700.00J&W WELLHEAD $1,200.00BASIN TESTERS $ 1,200.00ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDOPEN BOP, TIH TO 11,207', PU SWIVEL, BREAK CIRCULATION, DRILL 20' OF CEMENT TO 11,227' CIRCULATE CLEANRACK SWIVEL, POOH LAYING DOWN ALL TBG, DRILL COLLARS, AND BIT, RDSU, REMOVE EQUIPMENT FROMLOCATION, ND BOP, NU FRAC STACK, RU BASIN TESTERS, TEST STACK TO 6000PSI, TEST IS GOOD. SDON
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-24-10 DAY: 4OBJECTIVE: CBL & PERF CONTRACTOR: J-W WIRELINESUPERVISOR: RODNEY LONG DC:$ CC:$ 19,550.00UNIT SIZE: SPM: STROKE LENGTH: J-W WIRELINE$KEY$ 750.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDMIRU J-W WIRELINE, PU AND RIH W/ GR-CCL-CBL, TO 11,252', RU KEY, PRESSURE UP CASING TO 1000PSI, PULLCBL UNDER PRESSURE, FIND TOC @ 7,560', REPORT FINDINGS TO OFFICE. RD KEY, POOH W/ LOGGING TOOLSPU AND RIH W/ PERFORATING GUNS, SHOOT FIRST STAGE AS DIRECTED FROM 11,089' TO 10,736', 120 SHOTS4-JSPF. POOH W/ GUNS, SDON
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL: UNIV BLK6-14#6 DATE:9-27-10 DAY: 1OBJECTIVE: NEW COMPLETION CONTRACTOR: FRAC TECHSUPERVISOR: Oscar Dominguez DC:$ CC:$ UNIT SIZE: SPM: STROKE LENGTH: J&W $ 5,900.00BASIC $ 750.00MUSTANG$ 500.00
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
TP-BP-
CIBP-
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMED
5 TH STAGE L. Spraybrerry B. W/4 SPF9350-9518BREAK DOWN PERFSW/ 48 BBLS 15% HCL, 2047 BBLS FLUID 203821LBS 20/40 SAND AVG PRESS=2805PSI AVG RATE=60.1 BPM
10TH STAGE Clearfork C. W/4 SPF 7857-7944 BREAK DOWN PERFSW/ 0BBLS. 15% HCL86BBLS FLUID 0 LBS. 20/40 SAND AVG PRESS=713 AVG RATE=10 bpmSD due to pressure communication on 8-5/8" casing, 75 psi climbing. CBL log indicates no cement above 7580'.Set safety plug @ 7357'.
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-29-10 DAY: 1OBJECTIVE: DRILL FRAC. PLUGS CONTRACTOR: J&JSUPERVISOR: BRYAN DC:$ 7100 CC:$ 7100UNIT SIZE: SPM: STROKE LENGTH: J-J$7100
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
* S-Same, N-New, I-Inspected, T-Tested, U-Used
WORK PERFORMEDMIRU. J&J WSR. AND PS. PU. RIH. NW/ 4 3/4 HURRICANE BIT. AND TBG. TAG PLUG #1 @ 7354' DRILL PLUG IN 30MIN. TAG @ 7962' WASH 2' SAND TO PLUG #2 @ 7964' DRILL PLUG IN 60 MIN. TAG @ 8286' WASH 2' SAND TO PLUG #3 @ 8288' DRILL PLUG IN 80 MIN. CIRC. CLEAN POOH. ABOVE PERFS. SION.
OPAL RESOURCESDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-14 #6 DATE: 9-30-10 DAY: 2OBJECTIVE: DRILL FRAC. PLUGS CONTRACTOR: J&JSUPERVISOR: BRYAN DC:$ 7100 CC:$ 14200UNIT SIZE: SPM: STROKE LENGTH: J-J$7100\
ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Status* Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts S-N-I-T-U Set at; Tension; etc.
WORK PERFORMEDRIH. TAG PLUG#4 @ 8549' DRILL PLUG IN 40 MIN. TAG @ 8880' WASH 60' SAND TO PLUG #5 @ 8940' DRILL PLUG IN40 MIN. TAG PLUG #6 @ 9321' NO SAND DRILL PLUG IN 70 MIN. TAG @ 9525' WASH 15' SAND TO PLUG #7 @ 9540'DRILL PLUG IN 60 MIN. TAG @ 9845' WASH 19' SAND TO PLUG #8 @ 9864' DRILL PLUG IN 30 MIN. TAG @ 10100'WASH 90' SAND TO PLUG #9 @ 10190' DRILL PLUG IN 30 MIN. TAG @ 10676' WASH 4' SAND TO PLUG #10 @ 10680'DRILL PLUG IN 15 MIN. WASH SAND TO PBTD. 11252' CIRC. CLEAN. POOH. ABOVE PERFS. RD. J&J. LEFT WELL FLOWING TO EMPTY TEST TANKS AT 9PM. 26/64 CHOKE TBG. PSI. 250, CSG. PSI. 380. RECOVERED 3200 BBLSLOAD DURING THE DRILLING OF PLUGS. -18161 LOAD TO REC.