FEL and linac plans at MAX IV laboratory Francesca Curbis Accelerator Physics, Lund University MAX IV laboratory
Apr 01, 2015
FEL and linac plans at MAX IV laboratory
Francesca CurbisAccelerator Physics, Lund University
MAX IV laboratory
1/31/2013F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
1.5 GeV ring (96 m)
3 GeV Storage ring (528 m)
Short Pulse Facility (SPF)
(Free Electron Laser) ?
Linear accelerator (ca 250 m long)
The MAX IV project
F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
MAX IV accelerators
1/31/2013
SPF hallLinac tunnel
F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient dayMAX IV site July 2012
Buildings
1/31/20131/31/2013F.Curbis, Linac and FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient dayMAX IV site July 2012
Buildings
1/31/2013F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
Klystron tunnel
BC2 & undulator hall
F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
MAV IV injector
1/31/2013
Photo cathode RF-gun (1.6 cell, Cu, UCLA-Radiabeam/Elettra type) SPFThermionic RF-gun (BaO, MAX-lab type) Ring injection
39 S-band structuresSLEDDouble-coupled (2 pcs/klystron)100 Hz
Double achromat Bunch compressors (”self linearising” with T566+ sextupoles for tuning): positive (fixed) R56, compression varied with RF phase
Linac layout
1/31/2013F.Curbis, Linac and FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
L2A L2B L3A L3B
L4A L4B L7A L7B L8A
L8B
L18B BC2
3000 MeV
Extraction1.5 GeV
Extraction3 GeV
Photo cathode RF gun
Kicker & septum
Kicker & septum
SPF
Diagnostics
DiagnosticsL18A
L0 L1A L1B
BC1260 MeV
F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
Two possible operation modes
1/31/2013
high Ipeak -SPF I ~ 18 kA (100 pC)Δt ~ 10 fs FWHM
ɛ ~ 2.5 mm mrad dE/E ~ 0.25 %
FEL kick of, 24th of October 2012, Sara Thorin
low ɛ -FEL
ɛ ~ 0.45 mm mrad (slice)dE/E ~ 0.025 %
Δt ~ 20 fs FWHM
I ~ 3.5 kA
Background/ motivation
• Why a FEL in Lund?– Many years of development in CHG, linac
technology, RF guns, photocathodes & lasers, bunch compressors, MAX IV linac
– Swedish strong user community – Agreement between MAX IV laboratory, Uppsala U,
Stockholm U, SLU, FEL center Stockholm-Uppsala, Lund Laser Center for a X-ray FEL
– Steering committee Swedish scientific case
1/31/2013F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
Two scenarios for a FEL
1/31/2013F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
10 m
28 m
50 m 36 m
FemtoMAX
“Quick” FEL
“Full” FEL
Keep energy 1 nm
SPF beam
Presented by S. Werin at Workshop on the Science and Technology of 4th Generation Light Sources Based on Superconducting Technology, Stockholm , 26-27 November 2012
Increase energy1 Å
Improved beam
The “quick” FEL
1/31/2013F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
10 m
28 m
50 m 36 m
FemtoMAX
“Quick” FELFull FEL
Emittance (norm) 0.5 mm mRad
Peak current 2.5 kA
Pulse length (FWHM) 20 fs
Energy spread 2.5e-4
Energy 3.5 GeV
4.2 KeV (3 Å)1.5 1011 ph/pulse
100 Hz
1D model estimate
Presented by S. Werin at Workshop on the Science and Technology of 4th Generation Light Sources Based on Superconducting Technology, Stockholm , 26-27 November 2012
The “full” FEL
1/31/2013F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
28 m
50 m 36 m
FemtoMAX
+1 GeV
Wavelength 2 ÅFlux >1012 ph/pulsePeak power ~ 100 GWStability by seeding Focus 1 um (beamline)Tapering
Energy 4 GeV (g=7827)Energy spread (sE/E) 2*10-4
Emittance, norm 0.15 mm mRadUndulator period 16 mmUndulator K 1.6Photon wavelength <3 ÅBeta (average) 7 mCurrent, peak 3 kA
0 20 40 60 80 100 120 1400
100200300400500600
Power(GW)
Length (m)
Pow
er (G
W)
seed taperundulators beamline
~80 m ~75 m ~150 m
Presented by S. Werin at Workshop on the Science and Technology of 4th Generation Light Sources Based on Superconducting Technology, Stockholm , 26-27 November 2012
Path to the “full” FEL
• Parameter space under investigation• Start-to-end simulations being initiated– Investigations on the RF gun, bunch compressors,
FEL schemes (self seeding, tapering)
• Linac extension not defined (S-band? X-band?)
1/31/2013F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
1/31/2013F.Curbis, FEL plans at MAX IV laboratory ------ CLIC workshop, High gradient day
Thanks for your attention