    1|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    1

    PROJECT REPORT

    ON

    FEES & LIBRARY MANGEMENT SYSTEM.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    2/96

    2|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    2

    CHAPTER-1page no

    1. Introduction

    1.1 Problem Definition-------------------------------------8

    1.2 Purpose---------------------------------------------------8

    1.3 Project Requirements----------------------------------8

    1.4 Software Requirements--------------------------------8

    1.5 Hardware Requirements-------------------------------8

    CHAPTER-2

    2. System Analysis

    2.1 Identification of need---------------------------10

    2.2 Feasibility study---------------------------------11

    2.3 Project planning---------------------------------13

    2.4 Project scheduling------------------------------14

    2.5 SRS-----------------------------------------------17

    2.6 Software engineering paradigm---------------26

    2.7 Data Models (DFD & ER) ----------------------35

    CHAPTER-3

    3. System Design

    3.1 Introduction--------------------------------------41

    3.2 Database design---------------------------------41

    3.3 User interface design---------------------------43

    3.4 Test cases-----------------------------------------50

    CHAPTER-4

    4. Codings--------------------------------------------------52

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    3/96

    3|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    3

    CHAPTER-5

    5. Testing--------------------------------------------------------82

    5.1 Testing strategies used-----------------------------83

    5.2 Debugging-------------------------------------------84

    CHAPTER-6

    6.1 System Security measures

    6.1 Database/data security------------------------------86

    CHAPTER7

    7.1 Cost Estimation Of The Project--------------------89

    CHAPTER 8

    8.1 Future scopes-----------------------------------------91

    CHAPTER 9

    9.1 Conclusion-----------------------------------------96

    CHAPTER 10

    9.1 Bibliography-----------------------------------------98

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    4/96

    4|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    4

    CHAPTER-1

    1. Introduction

    1.1 Problem Definition

    1.2 Purpose

    1.3 Scope

    1.4 Project Requirements

    1.5 Software Requirements

    1.6 Hardware Requirements

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    5/96

    5|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    5

    1.1Problem Definition:

    The old procedure of library and fees mainly based on the paper work, which

    is very costly and lengthy and is done manually by ink and paper which is very slow.

    It is required to Design of a Computerized Automated Fees & Library Management

    System, to speed up and make it easy to use system for the job seeker and recruiters as

    well.

    1.2Purpose:

    1). Fees and Library Management system supports the student admission and

    registrationprocess, the maintenance of student personal.

    2). Database maintained by this system usually contains the students personal,

    Academic. It focuses on storing and processing (insertion, updating) by using this system.

    1.3Project Requirements:

    ->Automate manual paper work done at the time of searching, issuing, returning

    maintaining student account related to their fees payment and other task related fees and

    library.

    ->Eliminate paper work and save time.

    1.4:Hardware Requirements

    Processor : Intel Pentium and above version

    Speed : 1.20 GHz

    Hard Disk : 20 Gb and above

    Key Board : Standard

    1.5:Software Requirements

    Database : MySQL

    Tools : PHP, HTML, Java Script, j-Query,CSS, Ajax.

    Application :Microsoft word,notepad++, Rapid PHP ,Dreamweaver

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    6/96

    6|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    6

    CHAPTER-2

    2. System Analysis

    2.0RequirementsAnalysis

    2.1 Information Requirements

    2.2 Identification of need

    2.3 Feasibility study

    2.4 Project planning

    2.5 Project scheduling

    2.6 SRS

    2.7 Software engineering paradigm

    2.8 Data Models (DFD & ER)

    System analysis is a process of collecting factual data, understand the process involved,

    identifying problems and recommending feasible suggestions for improving the system

    functioning. This involves studying the business processes, gathering operational data,

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    7/96

    7|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    7

    understand the informational flow, finding out bottlenecks and evolving solutions for

    overcoming the weaknesses of the system. Analysis also includes subdividing of complex

    process involving the entire system, identification of data store and manual processes.

    The major objectives of the system analysis are to find answers for each business process:

    what is being done, why it is done and how it can be improved? It is more of a thinking

    process and involves the creative skills of the system analyst. It attempts to give birth to

    a new efficient system that satisfies the current needs of the user and has scope of the

    future growth within the organizations constraints. The result of this process is a logical

    system design. System analysis is an iterative process that continues until a preferred and

    acceptable system emerges.

    In business, system analysis and design refers to the process of examining a business

    situation with the intent of improving it with a better procedures and methods. It is the

    process of gathering and interpreting the facts, diagnosing problems and using the

    information to recommend improvements to the system.

    Since Fees & Library Management System isan intranetApplication based

    systemsoftware that is why it has to be a user friendly and interactive one. When I started

    to develop Fees & Library Management System, my first work was to understand the

    system. So I discussed the system with my guide and tried to collect some meaningful,factual data about the system which helped me to develop the system. Along with

    collecting data, Iwas trying to identify the problems and its possible solution related to

    the system to be developed. I designed a logical model of the system and broken the

    complex process of the system into some other processes.

    2.0: Requirements Analysis:

    Requirement analysis is usually the first phase of software development project. The

    purpose of this phase is to identify and document the exact requirements for the system.

    The customer, the developer, a marketing organization or any combination of the three

    may perform such study. In case where the requirements are not clear. E.g. for a system

    that has never been done before, many interactions are required between the user and the

    developer. The requirements at this stage are in end user form.

    2.1 Information Requirements:

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    8/96

    8|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    8

    There are four strategies available for determining information requirements.

    They are as follows

    1. Asking.

    2. Deriving from the Existing System.

    3. Synthesizing from the characteristics of the Running System.

    4. Discovering from the experimentation with an Evolving System.

    All the above strategies were used to certain for determining the information requirement

    of the system. Though asking is not a very good strategy, still it is adopted for the purpose,

    as the system had to develop within a very short span of time. Following the askingstrategy, which may be called as pure asking for determining the information

    requirements of the system, several questions have to be asked to the user regarding their

    requirement of the system. In this case, it is assumed that the users are able to structure

    their problem space. After getting the information requirements the system if tried to

    design in such a way that it may satisfy the needs of its users.

    2.2 Identification of need:

    Working of the Present System:-

    In present, a non-online system manages the student record and allowed them or

    called them for library and fees related process. Similarly employers can add by

    administrator at the school. The school then find the defaulter student and

    borrower which are not return their books in time and adding new fees structure

    and new student to school .All thiswork is done manually by hand in bulk of files

    which is hard to operate and hard to maintain.

    Present scenario of a Student in a non-onlineManagement System:-

    1. He or Shecomes to the Library/cash counter.

    2. First of all, he/she takes registration form from reception.

    3. Fills it and submitted to theoffice authorities

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    9/96

    9|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    9

    4. Filled form is first checked and verified by an official person, if there is any mistake

    then it is corrected.

    5. After that he/she mustdeposit registration fees (if applicable) .

    6. After that a registration no. is assigned to students by the office authorities.

    7. Studentsget the receipt of fees deposition.

    When there will be a defaulter whichdidnt pay the fees or didnt return the book

    that he browed which matches the students profile,the official authorities called the

    student or parents to solve the matter.

    Present scenario of an official authority in a non-onlinesystem:-

    1. Theofficial has to keep track and well maintain every transaction.

    2. The official has to verify student profile manually that he is an active member

    of the institution. If the student is an active member of the institution then the

    official try complete the task for which the student comes to official.

    Disadvantages of Present System:-

    1. Require much man power i.e. much efforts, much cost and hard to operate

    andmaintain.

    2. Since, all the work is done in papers so it is very hard to locate a particular

    Student/employer record when it is required.

    Proposed System:-

    1. It is automated computerized web based software system.

    2. It uses latest technologies like PHP and MY SQL.

    3. It is easy to operate.

    4. Attractive User Interface

    5. Searching is dynamic, easy and fast

    2.3Feasibility study

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    10/96

    10|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    10

    A feasibility study is undertaken to determine the possibility or probability of

    either improving the existing system or developing a completely new system. It helps to

    obtain an overview of the problem and to get rough assessment of whether feasible

    solution exists. This is essential to avoid committing large resources to a project and then

    repent on it later.

    After studying the proposed system thoroughly and the initial investigation is

    done, we are in a state to determine exactly how the institute system will be looked like

    by defining all the expected performances. Thus, a feasibility study comes into play in

    order to select the best system which will fulfill well the performance requirements. The

    feasibility study basically entails

    Identification

    Description

    Evaluation of the institute system

    Selection of the best system to fulfill the requirements.

    If we carry out the feasibility study thoroughly, it will become convenient for us, on

    the part of the developer to design and implement the system with least effort.

    In fact, many feasibility studies are disillusioned by both the developers as well

    as the users. When for the first time, the feasibility document is being prepared; the

    developer reaches a position that he or she can almost depict the true picture of the

    system. Basically, the feasibility study aims to overlook the confusion occurred during

    the system development. It tends to answer three obvious main questions:

    1) Is there any better way to accomplish which will more effectively fulfill the

    users requirement?

    2) What will be the additional cost that will be incurred /or saving in pursuing

    that particular alternative/those alternatives?

    3) Which one will be recommended?

    A better system need not necessarily the biggest one or will be most visible in

    the business environment. It actually aims to fulfill well the users requirements and

    expectations.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    11/96

    11|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    11

    The feasibility study is needed to

    (1) Answer the question whether a new system is to be installed or not?

    (2) Determine the potential of the existing system.

    (3) Improve the existing system.

    (4) Know what should be embedded in the new system.

    (5) Define the problems and objective involved in a project.

    (6) Avoid costly repairs at a later stage when the system is implemented.

    (7) Avoid crash implementation of a new system.

    (8) Avoid the Hardware Approach i.e. getting a computer first and then deciding how

    to use it.

    There are three aspects in feasibility study portion of the preliminary

    investigation.

    (1) Technical feasibility.

    (2) Economic feasibility and

    (3) Operational feasibility of the project.

    (1) Technical Feasibility

    Technical Feasibility determines whether the work for the project be done with

    the present equipment, current procedures, existing softwares technology and

    available personnel?

    If new technology is needed then what alternatives will be needed in the present

    structure and work ethos?

    This will require a close examination of the present system.

    The technical feasibility should ask questions related to:

    1) Adequacy of available technology.

    2) Adequacy of hardware.

    3) Available of computer.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    12/96

    12|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    12

    4) Operating time and support facilities, etc.

    Technical feasibility determines whether the technology needed for the proposed

    system is available and how it can be integrated within the Fees & Library Management

    System and Technical evaluation must also assess whether the existing system can be

    upgraded to use the new technology and whether the Fees & Library Management

    System has the expertise to use it.

    (2) Economic feasibility:

    Economic feasibility looks at the financial aspects of the project. Economic

    feasibility concerns with the returns from the investments in a project. It determines

    whether it is worthwhile to invest the money in the proposed system. It is not worthwhile

    spending a lot of money on a project for no returns. To carry out an economic feasibility

    for a system, it is necessary to place actual money value against any purchases or

    activities needed to implement the project.

    The Fees & Library Management Systemplans to acquire the necessary hardware

    and software requires for the system and there is no hindrance whether economical or

    otherwise towards its purchase. A brief description of the hardware and software required

    in the system is given later in the report.

    (3) Operational feasibility:

    Operational feasibility covers two aspects. One is the technical performance

    aspect and other is the acceptance within the Fees & Library Management System.

    Operational feasibility determines how the proposed system will fit in the current

    operations and what, if any job restructuring and retraining may be needed to implement

    the system.

    In the system operational feasibility checks, whether the user who is going to use

    the system is able to work with the softwares with which the system is coded and also

    the mind of the user going to use the system. If the user does not understand or is able to

    work on the system further development is of waste.

    2.2.1 Feasibility Report:

    The basic outcome of the feasibility study is the feasibility report .The feasibility

    report is given to the management in order to evaluate the impact of the proposed changes

    on the area(s) .It is nothing but a formal document for the management .It should be brief

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    13/96

    13|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    13

    enough and preferably written in a simple form (non-technical) so that anybody can

    understand it.

    For the feasibility report, no standard format is followed. The analyst usually

    makes it in a format which suits the particular system as well as the management. But,

    generally the feasibility report begins with the summery of all the findings and the

    recommendations. The summery information depicts the highlight of the proposed

    system .The management reviews it later on. The feasibility report basically contains the

    followings:

    Cover letter presents briefly the nature, general findings and the recommendationsto be considered.

    Table of Contents gives the various parts and their respective locations on thereport.

    Overview is the narration of the purpose and scope of the project. It also includes

    the name of the person who did the feasibility study, when it begun, and the othernecessary information that explains well how the study is being carried out.

    Detailed finding gives the method present in the manual system or the proposedsystem (new system).The system efficiency as well as the operating costs is alsogiven here.

    Economic justification contains the study of economic comparisons and anoverview of the cost estimation .A return on investment analysis is also includedhere.

    Recommendations suggest the most beneficial and cost-effective candidatesystem.

    Conclusion gives the other remarks after having the entire study.

    Appendixes documents all the memos and the data compiled during theinvestigation. The appendix is added at the end of the feasibility report.

    2.1.2- Conclusion:

    The above observations made from the feasibility study recommends that the

    proposed computerized Fees and Library management system is feasible for its

    development and implementation.

    2.4Project Planning

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    14/96

    14|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    14

    Once a project is found to be feasible, software project managers

    undertake project planning. Project planning is undertaken and completed before any

    development activity starts. Project planning consists of the following activities:

    1. ESTIMATION: The following project estimates have to be estimated.

    (i) CostHow much is it going to cost to develop the software?

    (ii) DurationHow long is it going to take to develop the product?

    (iii) EffortHow much effort would be required to develop the product?

    The effectiveness of all other planning activities such as scheduling and staffing

    are based on the accuracy of these estimations.

    2. SCHEDULING: After the estimations are made, the schedules for manpower and

    other resources have to be developed.

    2.5Project Scheduling:

    PERT CHART

    The Program (or Project) Evaluation and Review Technique, commonly

    abbreviated PERT, is a model for project management designed to analyze and represent

    the tasks involved in completing a given project. It is commonly used in conjunction withthe critical path method or CPM.

    PERT is a method to analyze the involved tasks in completing a given project,

    especially the time needed to complete each task, and identifying the minimum time

    needed to complete the total project.

    PERT was developed primarily to simplify the planning and scheduling of large

    and complex projects. It was developed for the U.S. Navy Special Projects Office in 1957

    to support the U.S. Navy's Polaris nuclear submarine project.[1]It was able to incorporate

    uncertainty by making it possible to schedule a project while not knowing precisely the

    details and durations of all the activities. It is more of an event-oriented technique rather

    than start- and completion-oriented, and is used more in projects where time, rather than

    cost, is the major factor. It is applied to very large-scale, one-time, complex, non-routine

    infrastructure and Research and Development projects. An example of this was for the

    1968 Winter Olympics in Grenoble which applied PERT from 1965 until the opening ofthe 1968 Games.

    http://en.wikipedia.org/wiki/Pert_Chart#cite_note-0#cite_note-0http://en.wikipedia.org/wiki/Pert_Chart#cite_note-0#cite_note-0http://en.wikipedia.org/wiki/Pert_Chart#cite_note-0#cite_note-0http://en.wikipedia.org/wiki/Pert_Chart#cite_note-0#cite_note-0
  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    15/96

    15|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    15

    This project model was the first of its kind, a revival for scientific management,

    founded by Frederick Taylor (Taylorism) and later refined by Henry Ford (Fordism).

    DuPont Corporationscritical path method was invented at roughly the same time as

    PERT.

    GANTT CHART:

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    16/96

    16|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    16

    A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts

    illustrate the start and finish dates of the terminal elements and summary elements of a

    project. Terminal elements and summary elements comprise the work breakdown

    structure of the project. Some Gantt charts also show the dependency (i.e., precedence

    network) relationships between activities. Gantt charts can be used to show current

    schedule status using percent-complete shadings and a vertical "TODAY" line as shown

    here.

    Although now regarded as a common charting technique, Gantt charts were

    considered revolutionary when they were introduced. In recognition of Henry Gantt's

    contributions, the Henry Laurence Gantt Medal is awarded for distinguished achievement

    in management and in community service. This chart is used also in Information

    Technology to represent data that have been collected.

    A common error made by those who equate Gantt chart design with project design

    is that they attempt to define the project work breakdown structure at the same time that

    they define schedule activities. This practice makes it very difficult to follow the 100%

    Rule. Instead the WBS should be fully defined to follow the 100% Rule, and then the

    project schedule can be designed.

    Although a Gantt chart is useful and valuable for small projects that fit on a single

    sheet or screen, they can become quite unwieldy for projects with more than about 30

    activities. Larger Gantt charts may not be suitable for most computer displays. A related

    criticism is that Gantt charts communicate relatively little information per unit area of

    display. That is, projects are often considerably more complex than can be communicated

    effectively with a Gantt chart. Gantt charts only represent part of the triple constraints

    (cost, time and scope) of projects, because they focus primarily on schedule management.

    Moreover, Gantt charts do not represent the size of a project or the relative size of work

    elements, therefore the magnitude of a behind-schedule condition is easily miss

    communicated. If two projects are the same number of days behind schedule, the larger

    project has a larger impact on resource utilization, yet the Gantt does not represent this

    difference.

    1.Initial Investigation

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    17/96

    17|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    17

    (30 hrs)

    2.Feasibility Study

    (30 hrs)

    3.System Analysis

    (100 hrs)

    4.System Design

    (250 hrs)

    5.Coding

    (360 hrs)

    6.Testing

    (30 hrs)

    7.Implementation

    (20 hrs)

    8.Post Implementation

    (30 hrs)

    9.Finish

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    18/96

    18|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    18

    2.6 SOFTWARE REQUIREMENTS

    SPECIFICATION

    FEES & LIBRARY MANAGEMENT SYSTEM

    2.6.1. Introduction

    Fees & Library Management System is the process of maintaining library and fees

    payment systemusing electronic resources, in particular the intranet. Institution and

    official have moved much of their different process online so as to improve the speed by

    which student details and different transections can perform smoothly. Using database

    technologies, and fees allotment process and search engines, employers can now makefees payment in a fraction of the time previously which is not possible. Using aFees &

    Library Management System may potentially save the employer time as usually they can

    take to perform in the several task of library like keep track of every book of library and

    addition of new book and the list of borrower and list of that were not return and penalty

    because of late return and deletion or addition of new member to the library and as well

    as keep track of every student that are under the institution which are not paid their

    monthly fees and keep track of every penny that comes from the students and maintain

    the record in database .

    The intranet, which helps the institute to add many numbers of terminals to the main

    server and can get immediate feedback, has become the major source of potential

    fordifferentprocess of the institute. And the server keeps all the records in database and

    gives access to the authorities to different official and member of that institution.

    In terms of institution theintranet has radically changed their existing function from the

    organizational and their member's perspective. Conventional methods of library &

    finance department processes are readily acknowledged as being time-consuming with

    high costs and limited geographic reach. However, this process through Local host

    provides coverage and ease. Likewise, the speedy integration of the intranet into differentprocesses is primarily recognized due to the intranet's unrivalled communications

    capabilities, which enable employee and member for communications through this

    system.

    The first step for admin to add librarian and official is to register themselves

    directly to the system through a custom registration form. After successfully registering

    themselves, member can update their profile, view employersprofile, search book, add

    book collect fees etc. Similarly student firstly registered themselves and then they have

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    19/96

    19|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    19

    to pay the fees.After that they can access the facilities etc.Administrator of the system

    manages the student and employers account and introduce fees and penalties.

    2.6.1.1 Purpose

    The purpose of this SRS document is to specify software requirements of the Fees

    & Library Management System for the convergence software solution. It is intended to

    be a complete specification of what functionality the system application provides. The

    main purpose of the system is to automate the task carried out by different peoples for

    finding books, collect fees, and different process of the institution. Specific design and

    implementation details will be specified in a future document.

    2.6.1.2 Project Scope

    This projects aim is to automate the system, pre-checking the inclusion of all

    book, students and feesautomatically. These help the librarian to perform every task of

    the library and also help the finance department solve their problems. The data used by

    the system is stored in a database that will be the center of all information held about

    student and employers and the base for the remainder of the process after the initial

    registration has been made. This enables things to be simplified and considerably

    quickened, making the everyprocess of the school involved easier. It supports the current

    process but centralizes it and makes it possible for decisions to be made earlier and easier

    way.

    2.6.1.2.1 Goals

    The main goal of the system is to automate the process carried out in the

    organization(School) with improved performance and realize the vision of paperless

    libraryand finance application(for students) searching etc. Some of the goals of the

    system are listed below:

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    20/96

    20|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    20

    Manage large number of students/employers/fees/books details.

    Manage all details of books/penalty/fees/memberthat isregistered.

    View all the details of the student, books, fees and employers.

    Create the statistical reports to facilitate the finance department work.

    Reduce the work load of the official staff for every process of library and

    finance should be very effective rather than direct methods.

    Activities like modification, deletion of records should be easier.

    2.6.1.2.2 Objectives of the Proposed System:

    The main objective of FEES & LIBRARY MANAGEMENT SYSTEM isto develop

    a system through which a user/student can search various books for his/her and also

    borrow them. Similarly Employers need to be registered in the system. After that the

    employers can have the permission to make the transaction of library and finance.

    Similarly they can view all details too.

    The Fees & Library Management System is a package to be used by institute to improve

    the efficiency of school process. The Fees & Library Management System to be

    developed benefits greatly the members. The system provides book catalogue and

    information to members and helps them find and borrow the book from library. The

    Admin and employers can keep the book catalogue updated all the time so that the book

    seekers get the updated information all thetime.

    The aim of the proposed system is to address the limitations of the current system. The

    requirements for the system have been gathered from the defects recorded in the past and

    also based on the feedback from users of previous metrics tools. Following are the

    objectives of the proposed system:

    Reach to students.One of the important objectives of the Fees & Library

    Management System to is communicated with all the book seekers and employers.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    21/96

    21|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    21

    Reducing time in activities. Reduce the time taken to process the

    applications/registration of book seekers/employers/fees payer, view the

    book available in the library by the book seekers, view the information of

    student by employers, verify and view student profile, inform them for

    the fees etc.

    Centralized data handling. Transfer the data smoothly inside and between

    different branches of the school involved and handle the data centralized

    way.

    Paperless Booksearching, Feesprocess, employee searching defaulter

    viewing with reduced manpower. Reduce the manpower needed to

    perform all the job libraryprocess, Fees process and administration task

    by reducing the paper works needed.

    Cost cutting. Reduce the cost involved in the library and fees process.

    Operational efficiency. Improve the operational efficiency by improving

    the quality of the process.

    2.6.1.3 Benefits of the system

    As with most real world activities, there are numerous benefits to using a software

    system for Fees and Library management system. The most apparent to this project is the

    unification of the entire process. Another benefit of a software system is the use of a

    central database. This database is the basis for all actions in the system and can be trivially

    updated and used to aid in al l of the systems processes, meaning all of the required

    information is stored in one central location and thus is easily accessible. This is a far

    more reasonable storage method than a paper-based file system, where the time of

    traveling to and physically searching the records for the required information could be a

    burden. Human error could also be a factor in that mistakes could be made in the filing

    process which would not occur in a well written database system and mistakes or changes

    on physical records can be messy to correct. Software systems are also much faster at

    performing certain tasks than humans, meaning that time can be saved performing

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    22/96

    22|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    22

    processes. This also means that these tasks can be done solely by the system, freeing up

    those involved to perform more important tasks. In the long term, if methods or minor

    details concerning the admissions process at department changes, this can be reflected in

    potentially minor changes to the code of the system, to retrain employees rather than

    having regarding the new practices.

    2.6.1.4 Overview

    SRS will include two sections.

    Overall Description will describe major components of the system,

    interconnection and external interfaces.

    Specific Requirements will describe the functions of actors, their role in the

    system and constraints.

    2.6.1.4.1 Overall Description: Figure 1: Model of the System

    Local server Employer

    Database

    Student

    Administrator

    Reporting

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    23/96

    23|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    23

    2.6.2 Memory Constraints

    Hardware memory: The growth of university is unpredictable; to resolve the

    future problems occurs while enhancing the system is controlled by larger memory aspossible. So the memory constraint in the server side is extended up to 500GB.

    2.6.3 Site Adaptation requirements

    No site adaptation is necessary in this project. Because theFees & Library

    Management System is portable. The entire system is transported to wherever it is

    needed. No external dependenciesare in place and operation of the system will never

    change due to location.

    2.6.4 User Classes and Characteristics

    User Characteristics:

    The job seeker/employer should have the basic idea to operate (use) the system and he/she

    already has the experience to work in the internet (browser). Default Language is English.

    User Classes:Some of the users identified for this system through use case analysis are listed below:

    Students

    Employers

    Administrators

    Design and Implementation Constraints

    Some of the design and implementation constraints identified are listed below:

    Student can view their profile by log in with their password and ids and can

    view previous transection information, search book and reserve book etc.but cannot edit

    other profiles, do not have any access to employersprofile.

    Similarly employer can log in with their password and ids and canedit student profile.

    Payment facility may be restricted if the schooldontwant this facility for some

    reasons.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    24/96

    24|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    24

    This system is not support distributed database Facility.

    Assumptions and Dependencies

    Some functions are already created and informations available for use.

    Roles and responsibilities are already established.

    Administrator is already created.

    Apportioning of Requirements :

    It is possible in the future that a few additional features be implemented into this system.

    Management System: This will allow the system to manage effectively the

    other resources in the easiest way.

    Training Facility: This will allow effectively train the staffs and improve the

    quality of service of school.

    OtherSchool department also included to the system : This will help the

    school whole management system under the one system.

    2.6.5 System Requirements and Analysis:

    The following sections will introduce the numerous requirements of the system

    from the point of view of different users and will introduce a number of decisions that

    have been made regarding implementation. These sections also attempt to somewhat

    describe the role of each user group in the system, discussing their individual roles

    through the functions they can perform.

    User Interface

    The user interface for this system will have to be simple and clear. Most

    importantly, the ages must be easy to read, easy to understand and accessible. The color

    scheme should be appropriate to provide familiarity with the student, employer and there

    should be no contrast issues.

    Screen name Description

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    25/96

    25|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    25

    Log_in Log into the system as an

    Administrator/Student/Employer

    Student/Employer

    registration

    Here student/employer details are

    entered by the Administrator.View Here student/employer can view

    his/her profiles and admin can

    view both student and employer

    profiles.

    Update fees status Here admin can update fees status

    of school.

    Edit Here employee can

    updateinformation of student and

    other prospect that related to

    library.

    Invoice Here employer can

    generatepayment Invoice

    Borrow Here student can borrow book

    from library of their choice which

    they neededView Borrowers Here employer can viewborrower

    details

    Return Here student can return books and

    give penalty if any.

    Add book Here employer add new book in

    library.

    Search book Here employer can search book

    Student/Employer View Functionality:

    Registration:Student/Employer will register by admin providing the system

    with a way to associate a user to their registration(s). This will enable the system to

    display personalized information

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    26/96

    26|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    26

    Registration System: The registration process will be as straightforward as

    possible, using an intuitive form layout, with the necessary information being completed

    in stages. When regarding supplementary documentation, such as photograph etc.,these

    could be uploaded through the form in digital format, upon which it will be saved to the

    database and associated with the registration, being accessible by administrator of the

    system.

    Administrator View Functionality:

    Complete information Access: Viewing all of the recently submitted

    information details is something the administrator will do on a regular basis. A list of all

    the submitted information forms, able to delete and update that informationsrelated to

    the system.

    Addand Delete and Allot: This will help the administrator to add new fees, book,

    employee, student, class, sec etc. and allot different fees structure to different class for

    different month and year.

    System:

    Validation: On the completion of each form in the system, the system will use

    a set of validation functions to ensure that information is of the right type in each field.

    2.6.6 Supplementary Requirements

    Immediate Feedback: The System must try to answer all the queries of the

    student/employers and it should provide immediate feedback after getting any request

    from the student/employers.

    Reduce the Cost of Admission Process: The main aim of the System is to

    reduce the cost needed for book, student searching, borrowing, returning, fees payment,

    searching defaulter etc.Process, so it automatically reduces the manual power needed to

    perform the entire task and improve the quality of the work.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    27/96

    27|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    27

    Make the Interface Simple as Possible: The System must provide the simple

    and easy interface for beginners and also provide facilities for technical peoples who are

    using the system. The interface must be simple as possible.

    Reduced Time: To perform any task time is one of the important factors to

    consider. If the system not utilize properly time, than the entire aim of system is fails and

    the system is fails to reach its goal. So time take to process all these activities should be

    less but the output should be effective.

    Make the System as Global Unit: The System must provide facilities to tie

    up with any other existing system and transformation of messages between that other

    existing system should be not depend upon any other server architecture and any other

    platform.

    Other Nonfunctional Requirements:

    Performance Requirements

    Some Performance requirements identified is listed below:

    The database shall be able to accommodate a minimum of 50000 records of

    student and employers.

    The software shall support use of multiple users at a time.

    There are no other specific performance requirements that will affect development.

    Security Requirements:Some of the factors that are identified to protect the software from accidental or

    malicious access, use, modification, destruction, or disclosure are described below.

    Specific requirements in this area could include the need to:

    Keep specific log or history data sets

    Restrict communications between some areas of the program

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    28/96

    28|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    28

    Communication needs to be restricted when the application is validating the

    user or license.

    Keep daily backup that will help the if anything happen to the local server.

    Reliability

    Some of the attributes identified for the reliability is listed below:

    All data storage for user variables will be committed to the database at the time

    of entry.

    Data corruption is prevented by applying the possible backup procedures and

    techniques.

    2.7 Software Engineering Paradigm applied

    The Software Engineering Paradigm or the Software Development Strategy

    applied in the Fees and Library Management System is the ITERATIVE WATERFALL

    MODEL.

    An iterative waterfall model does not attempt to start with a full specification ofrequirements. Instead, development begins by specifying and implementing just part of

    the software, which can then be reviewed in order to identify further requirements. This

    process is then repeated, producing a new version of the software for each cycle of the

    model.

    In the iterative waterfall model, we work iterativelywe create rough product

    or product piece in one iteration, then review it and improve it in next iteration and so on

    until its finished.

    Feasibility

    Study

    Requirements analysis

    And specification

    Design

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    29/96

    29|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    29

    This model contains 6 phases:

    1. Feasibility study

    The feasibility study activity involves the analysis of the problem andcollection

    of the relevant information relating to the product. The main aim of the feasibility

    study is to determine whether it would be financially andtechnically feasible to

    develop the product.

    2.Requirement analysis and specification

    The goal of this phase is to understand the exact requirements of thecustomer and

    to document them properly. (SRS)

    3. System Design

    The goal of this phase is to transform the requirement specification into astructure

    that is suitable for implementation in some programming language.

    4. Testing

    During this phase the design is tested in small modules in isolation from rest of

    the software product. Then all the modules are integrated together and tested.

    5. Implementation

    Release of software inaugurates the operation and life cycle phase of theoperation.The phases always occur in this order and do not overlap.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    30/96

    30|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    30

    2.8 DATA MODELS

    Data Flow Diagram:-

    DFD is the one among the various methods to show the flow of the data

    within the project. In this type of representation, the entities are

    represented with the help of rectangular b ox and the process is represented

    with the help of rounded rectan gle or circle. The dataflow is represented

    by means of the arrow wi th the indicat io n of the direc ti on of flow with

    the help of the arrow pointer. The data files are shown with the help of

    rectangle box with one side open. The data flow diagrams are the tools in

    the top-down approach, moves from general requirements to more specific

    requirements, illustrating the process, movement, and the storage of data

    in the system. In DFDs, processes are first identified and then the data

    flow between the processes are isolated and derived. Thus processes are

    focal point of the DFD. Data Flow Diagrams themselves stress the flow

    and transformation of the data within a system.

    A DFD is also known as bubble chart, has the purpose of defining the

    system requirement and it functionally decomposes the requirement specification

    down to the lowest level of detail. It is a graphical tool used describe and analyse the

    movement of data through the systemmanual or automatedincluding the process

    , stores of data and delays in the system .The bubbles represent the data

    transformations and the line represents the flow of data in the system. The following

    diagram illustrates the notations and symbols used to construct the DFD.

    DFD Symbols:-

    1.

    External Entity:

    The producer or the consumer of information that resides outsides the bound of

    the system to be modelled. The following rectangular shape denotes it.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    31/96

    31|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    31

    2.

    Process:

    It is the agent that performs the transformation of information from one state to

    another. The following shape denotes it.

    3.

    The Data Flow

    A data flow connects the output of an object or process to the input of another

    object or process. The arrows denote flow of intermediate data value within a

    computation. The arrowhead indicated the direction of flow of data.

    4. Data Store

    A repository of data is a passive object within a DFD for later access. A data store

    does not generate any operations on its own but merely responds to requests to

    store and access data. The following shape denotes it.

    Context diagram

    STUDENT EMPLOYEE

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    32/96

    32|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    32

    search Book. /

    reserveAcknowledgement

    Get result/Feedback search student./fee list

    Search book/fees payment

    Manages all function/ Manages all process/

    Search Get result

    1-level DFD

    Request for login

    Login response

    Request for login send login details

    Login response

    Fees & Library

    management

    system

    Administrator

    Student

    employee

    0.1

    Data store

    OUT PUT

    LOGIN

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    33/96

    33|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    33

    Request for login

    Login response

    Request for book

    Valid response send details

    response

    Request lib process

    Valid response

    Request fee process sends necessary details

    Valid response

    Request for changing password

    Valid response

    request for changing password

    Valid response

    2-level-DFD (library)

    Search book /

    Employee

    Admin

    Student

    librarian

    0.2

    FEES

    0.3

    Change password

    0.4

    Admin

    Data store

    Data store

    Data storeSend necessary

    details

    Student

    Search

    0.2.1

    RESERVE

    Book table

    request

    Search result

    Upload

    resume

    Request for reserve the book

    library

    replyEmployee

    student

    Valid response

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    34/96

    34|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    34

    Reply messages

    2-LEVEL- DFD (Fees)

    UPDATE

    0.2.5

    ADD

    0.2.4

    Transection

    0.2.3

    Reserve

    Borrowing table

    Data store

    APPLY JOBS

    Request

    Book Information

    Reserve request

    Request for transection

    confirmed

    Reply of the request

    Add request

    Update request

    Update member/book/class/penalty

    Add new member/book/class/penalty

    Borrow / return book

    Confirmation message

    Add

    0.3.1

    Add fees/ employee

    Add fees

    fees

    Request result

    ADMIN

    Reply messages

    Re l messa es

    Reply of the request

    Fee added

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    35/96

    35|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    35

    E-R Diagram:

    ER Diagram (DEFINITION)

    ADMIN

    Add employee

    Update

    0.3.2

    view

    0.3.3

    Fee

    payment

    0.3.4

    PRINT

    0.3.5

    employee

    Request for update

    updated

    Finddefaulter/fee/student

    / employee

    payment

    student

    fee

    Payment information

    payment details

    Request fee/student/defaulter/emp

    Profile details

    Profile details

    Fee payment

    Update request

    Print details

    Print invoice

    Generating reports

    Output

    Update employee

    Employee added

    Update result

    Employee

    result

    Finddefaulter

    result

    result

    Request details

    Print student

    list

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    36/96

    36|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    36

    The most important consideration in designing the database is how to information

    will be used. The various application and procedures that will be used the database

    introduces the requirements upon the structure of data.

    In a relational database, representation of data and data relationship is a collection

    of tables. Each table has one or more columns.

    The first step in creating a database is designing it. First plan what we require and

    what data they will contain. It also determines how the tables were created. This is a very

    important step and deserves careful considerations.

    It should determine what things we want to store information about (entities) and

    how these things are related (relationship). A useful technique in designing the database

    is to draw a picture of the tables. This graphical display of database is called an Entity

    Relationship Diagram (E-R Diagram). Usually, each box in E-R Diagram corresponds to

    a foreign key.

    An Entity A Primary Key

    A Partial Relationship

    A Relationship

    An Attribut

    c-id C_name Bname

    book -

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    37/96

    37|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    37

    1n m

    mmm

    n

    n

    n

    n m

    n 1

    mn

    Book

    student

    employee

    Add

    Add

    Category have copies

    name

    class

    Roll no

    section

    emp-

    emp-

    qualificati

    emp-id

    pay

    fees

    F_AmountF_ID

    details

    DATE

    S_i

    retur

    Issue

    collect

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    38/96

    38|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    38

    CHAPTER-3

    3. System Design

    3.1 Introduction

    3.2 Database design

    3.3 User interface design

    3.4 Modular Description

    3.5 Test cases

    3.1 INTRODUCTION

    The most creative and challenging phase of system life cycle is system design.

    The system design describes the final system and the process by which it is developed. It

    refers to technical specification that will be applied in implementing the candidate

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    39/96

    39|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    39

    system. Designing the software means to plan how various part of the software are going

    to meet the desired goals. It should be done the performance of the entire system. As a

    result it may take more processing time, more coding and extra workload.

    System design is a how to approach to the creation of the new system. This

    important phase is composed of several steps. It provides the procedural details necessary

    for implementing the system recommended in the feasibility. It gives emphasis on

    translating the performance requirements to design specifications. System design goes

    through two phases of developmentLogical design and Physical design.

    3.2 DATABASE DESIGN

    Usually a collection of interrelated is refer to as database. The database

    contains information about the one particular enterprise. Database is design to manage a

    large volume of information. The management of data involves both the definition of

    structures for the storage of information and provision for mechanism manipulation of

    information. In addition the database is system must provide for safety information stored

    in the database, despite system crashes or unauthorized access.The detailed description

    and usage of each table described briefly in the following section.

    3.2.1 List Of Database Table:

    a)Table name: userlogin

    Field name Data type Size Constraints

    Login_id Integer 11 primary

    Std_id Integer 11 Not null

    Name Varchar 40 Not null

    U_name Varchar 40 Not null

    pw Varchar 50 Not null

    b)Table name: user

    Field name Data type Size Constraints

    id integer 11 Primary key

    username Varchar 50 Not nullpassword Varchar 50 Not null

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    40/96

    40|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    40

    c)Table name: Type

    Field name Data type Size Constraints

    id Integer 11 Primary keyKey_skills Varchar 50 Not null

    d)Table name: section

    Field name Data type Size Constraints

    sec_id Integer 20 Primary key

    Sec Varchar 30 Not null

    Class Varchar 15 Not null

    e)Table name: receipt

    Field name Data type Size Constraints

    receipt_id Integer 20 Primary key

    student_id Integer 20 Foreign key

    accno Varchar 40 Not null

    Borrow_id Varchar 20 Not null

    Date_due Varchar 20 Not null

    Date_return Varchar 20 Not null

    Totaldays Integer 10 Not null

    Totalpays integer 10 Not null

    f)Table name: payment

    Field name Data type Size Constraintspay_id Integer 20 Primary key

    amount integer 20 Not null

    g)Table name: bookreserve

    Field name Data type Size Constraints

    resId Integer 11 Primary key

    Accno Integer 30 Not null

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    41/96

    41|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    41

    Std_id Integer 30 Not null

    timer integer 30 Not null

    timeget integer 30 Not null

    Status Varchar 30 Not null

    h)Table name: book

    Field name Data type Size Constraints

    book_id Integer 40 Primary key

    accno Integer 30 Not_null

    Book_subject Varchar 30 Not null

    Book_title Varchar 30 Not null

    Book_class Varchar 30 Not null

    Author1 Varchar 50 Not null

    Author2 Varchar 50 null

    Author3 Varchar 50 null

    Author4 Varchar 50 null

    Book_pub Varchar 40 Not null

    Book_copies Varchar 30 Not null

    isbn Varchar 80 Not null

    copyright varchar 50 Not null

    status varchar 50 Not null

    i)Table name: borrow

    Field name Data type Size Constraints

    borrow_id Integer 20 primary key

    accno Varchar 50 Foreign key

    Class id integer 10 Foreign key

    Std_id integer 10 Foreign key

    Date borrow Date(system) Not null

    Due date date 20 Not null

    Date return date 20 Not null

    Status Varchar 20 Not nullamount integer 10 Not null

    item Varchar 20 Not null

    j)Table name: borrower

    Field name Data type Size Constraints

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    42/96

    42|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    42

    std_id Integer 40 Primary key

    Fname Varchar 80 Not null

    Lname Varchar 20 Not null

    Gender Varchar 30 Not null

    Address Varchar 25 Not null

    Contact number Varchar 30 Not null

    Country Varchar 20 Not null

    Photo Varchar 20 Not null

    Type Varchar 25 Not null

    Section Varchar 10 Not null

    Class Varchar 15 Not null

    Status Varchar 25 Not null

    Dateadded date 20 Not null

    Sy Varchar 30 Not null

    k)Table name:admin

    Field name Data type Size Constraints

    User_name Varchar 50 Not null

    Password Varchar 50 Not null

    U_id integer 15 Primary key

    Email Varchar 50 Not null

    L) Table naeme: fees

    Field name Data type Size Constraints

    fees_name Varchar 50 Not null

    amount Varchar 50 Not null

    fees_id integer 15 Primary key

    details varchar 200 Not null

    3.3 USER INTERFACE DESIGN

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    43/96

    43|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    43

    The first step in the user interface design activity focuses on the preparation of

    input and the design of output reports in a form acceptable to the user.

    User interface design consists of two steps input design and output design.

    INPUT DESIGN

    Input designing is a crucial part of any system design. Inaccurate input data are

    the most common cause of error in data processing. Data entry can be control by input

    design. Input design is the design phase; the expanded data flow diagram identifies

    logical data flows, data stores, sources and destinations. The goal of designing input data

    is to make data entry as easy as possible. In the case of Fees & Library Management

    System muchemphasis has been given to this phase. To reduce input errors, either the

    users are provided with choices to choose from, or invalid inputs are restricted. Here the

    chances of entering invalid data are minimal.

    While entering data, the operators need to know the following:

    The field that is required to be fills up.

    Field sequences, which most match that in the source document

    The format in which data field is entered.

    Keeping in view the user requirements, the inputs screens have been designed and

    developed for easy and error free data entry. Based on the various types of inputs to be

    fed to the computer in using the proposed system, all input screens have been designed

    in real mode (GUI).

    The details of all input screens are shown as follows:

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    44/96

    44|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    44

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    45/96

    45|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    45

    OUTPUT DESIGN

    Computer output is the most important and direct source of information to the

    user. Efficient, intelligible output design should improve the systems relationship with

    the user and help in decision making. A major form of output is a hard copy from the

    printer. The output screens for displaying the information have been designed in such a

    way that maximum information can be viewed using minimum effort and time.

    The details of all output screens are shown as follows:

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    46/96

    46|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    46

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    47/96

    47|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    47

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    48/96

    48|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    48

    3.5TEST CASES

    UNIT TEST CASES

    Unit testing verifies the smallest module of the software designed. Using this

    testing the entire module can be debugged very easily. The relative complexity of test

    and the errors detected as a result its limited by the constrained scrap established for unit

    testing. The relative complexity of test and the errors detected as a result its limited by

    the constrained scrap established for unit testing.

    Unit testing is considered an adjunct to the coding step. After source code has

    been developed and verified for the syntax connection, unit test case designed starts.

    SYSTEM TEST CASES

    In the testing process the Demo versions of the software i.e. actual replica of the

    existing system will be installed so that the users can use it as they like and give their

    valuable suggestion and advice. There after security can be incorporated in the system.

    In this phase we will be using both alpha and beta test, which will enable the user to check

    the whole system thoroughly. The said Demo version software can be used for a period

    of 15 days to 1 month and during this period only training of the proposed software will

    be imported. This phase will allow the entire user to use the system in a much more

    efficient way.

    The design tests for software and other engineered products can be as challenging

    as the initial design of the product itself. The objectives of the testing are the finding of

    errors with a minimum amount of time and effort.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    49/96

    49|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    49

    CHAPTER-4

    4.Coding

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    50/96

    50|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    50

    CODEING:

    .asss{ background:#3B5998; height:30px; color:#FFF; text-align:center; font-size:15px;

    font-family:Verdana, Geneva, sans-serif; font-weight:bold; }

    .jade{border:1px #333 solid; margin-top:20px;}

    .trint:nth-child(2n+1){

    background-color:#CCC;}

    .trint:hover{ background:#E5E5E5;}

    jQuery(function($){

    $("#water").Watermark("Add Class I");

    });

    jQuery(function($){

    $("#water1").Watermark("Add Class II");

    });

    jQuery(function($){

    $("#water2").Watermark("Add Class III");

    });

    jQuery(function($){

    $("#water3").Watermark("Add Class IV");

    });

    jQuery(function($){

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    51/96

    51|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    51

    $("#water4").Watermark("Add Class V");

    });

    jQuery(function($){

    $("#water5").Watermark("Add Class VI");

    });

    jQuery(function($){

    $("#water6").Watermark("Add Class VII");

    });

    jQuery(function($){

    $("#water7").Watermark("Add Class VIII");

    });

    jQuery(function($){

    $("#water8").Watermark("Add Class IX");

    });

    jQuery(function($){

    $("#water9").Watermark("Add Class X");

    });

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    52/96

    52|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    52

    Change Year/Section

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    53/96

    53|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    53

    $row2=mysql_fetch_array($edit2);

    }

    if(isset($_GET['edit3'])){

    $edit3=mysql_query("select * from tblsection where sec_id=$_GET[sec_id]");

    $row3=mysql_fetch_array($edit3);

    }

    ?>

    Class I

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    54/96

    54|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    54

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    55/96

    55|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    55

    Class II

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    56/96

    56|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    56

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    57/96

    57|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    57

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    58/96

    58|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    58

    Cancel

    Class IV

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    59/96

    59|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    59

    while($type=mysql_fetch_array($rsclass)){ ?>

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    60/96

    60|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    60

    Class V

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    61/96

    61|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    61

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    62/96

    62|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    62

    Class VI

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    63/96

    63|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    63

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    64/96

    64|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    64

    Class VII

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    65/96

    65|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    65

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    66/96

    66|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    66

    Class VIII

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    67/96

    67|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    67

    Cancel

    Class IX

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    68/96

    68|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    68

    $sqlclass="SELECT * FROM tblsection where yr_id='IX'";

    $rsclass=mysql_query($sqlclass);

    while($type=mysql_fetch_array($rsclass)){ ?>

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    69/96

    69|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    69

    Class X

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    70/96

    70|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    70

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    71/96

    71|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    71

    Fees Admin

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    72/96

    72|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    72

    #line-chart {

    height:300px;

    width:800px;

    margin: 0px auto;

    margin-top: 1em;

    }

    .brand { font-family: georgia, serif; }

    .brand .first {

    color: #ccc;

    font-style: italic;

    }

    .brand .second {

    color: #fff;

    font-weight: bold;

    }

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    73/96

    73|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    73

    $strSQL="SELECT * from invoice_table where month='$month' AND

    yr='$year'";

    $objQuery=mysql_query($strSQL);

    while($r=mysql_fetch_array($objQuery))

    {

    $stdid=$r['std_id'];

    $strSQL="SELECT * from stdinformation where std_id!='$stdid'";

    $objQuery = mysql_query($strSQL) or die ("Error Query [".$strSQL."]");

    $Num_Rows = mysql_num_rows($objQuery);

    // Per Page

    if($_GET["Page_per"]){

    $Per_Page =$_GET["Page_per"];

    }

    else

    {

    $Per_Page =5;

    }

    $Page = $_GET["Page"];

    if(!($_GET["Page"] ))

    {

    $Page=1;

    }

    $First_Page = 1;

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    74/96

    74|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    74

    $Prev_Page = $Page-1;

    $Next_Page = $Page+1;

    $Last_Page = ceil($Num_Rows/$Per_Page);

    $Page_Start = (($Per_Page*$Page)-$Per_Page);

    if($Num_Rows

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    75/96

    75|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    75

    $objQuery = mysql_query($strSQL);

    if (mysql_num_rows($objQuery)>0)

    {

    while($objResult = mysql_fetch_array($objQuery))

    {

    ?>

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    76/96

    76|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    76

    ?>

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    77/96

    77|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    77

    {

    echo "" ?>

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    78/96

    78|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    78

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    79/96

    79|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    79

    CHAPTER-5

    5. Testing

    5.1 Testing strategies used

    5.2 Debugging

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    80/96

    80|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    80

    5. TESTING

    Software testing is a critical element of software quality assurance and represents

    the ultimate review of specification, design and coding. In fact, testing is the one step in

    the software engineering process that could be viewed as destructive rather thanconstructive.

    A strategy for software testing integrates software test case design methods into a well-

    planned series of steps that result in the successful construction of software. Testing is

    the set of activities that can be planned in advance and conducted systematically. The

    underlying motivation of program testing is to affirm software quality with methods that

    can economically and effectively applied to both strategic to both large and small-scale

    systems

    TESTING OBJECTIVE:

    The testing objectives are summarized in the following three steps:

    1. Testing is a process of executing a program with the intent of

    finding an error.

    2. A good test case is one that has a high probability of finding an

    as yet undiscovered error.

    3. A successful test is the one that uncover an as yet undiscovered

    error.

    Our objective is to design tests that systematically uncover different classes of errors

    and do so with a minimum amount of time and effort.

    TESTING PRINCIPLE:

    All tests should be traceable to customer requirement.

    Tests should be planned long before testing begins that is the test-

    planning can begin as soon as the requirement model is complete.

    Testing should begin in the small and progress towards testing in the large. The first

    plan and executed generally focus on individual program modules. As the testing

    progresses, testing shifts focus in an attempt to find errors in integrated clusters of

    modules and ultimately in the entire system.

    The number of path permutations for even a moderately sized program is exceptionallylarge. For this reason, it is impossible to execute every combination of paths during

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    81/96

    81|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    81

    testing. It is possible, however to adequately cover program logic and to ensure that all

    conditions in the procedural design have been exercised. To be more effective, testing

    has highest probability of finding the errors.

    The following are the attributes of a good test::

    1. A good test has the high probability of finding the errors.

    2. A good test is not redundant.

    3. A good test should be best of breed.

    4. A good test should be neither too simple nor too complex.

    This process has two parts:

    (a) Planning: This involves writing and reviewing unit, integration,functional, validation and acceptance test plans.

    (b) Execution: This involves executing these test plans, measuring,

    collecting data and verifying if it meets the quality criteria set in the Quality Plan.

    Data collected is used to make appropriate changes in the plans related to development

    and testing.

    The quality of a product or item can be achieved by ensuring that the product meets the

    requirements by planning and conducting the following tests at various stages.

    5.1 STRATEGIC APPROACH TO SOFTWARE TESTING

    The software engineering process can be viewed as a spiral. Initially, system

    engineering defines the role of software and leads to software requirement analysis where

    the information domain, functions, behavior, performance, constraints and validation

    criteria for software are established. Moving inward along the spiral, we come to design

    and finally to coding. To develop computer software we spiral in along streamlines that

    decrease the level of abstraction on each turn.

    A strategy for software testing may also be viewed in the context of the spiral.

    Unit testing begins at the vertex of the spiral and concentrates on each unit of the software

    as implemented in source code. Testing progresses by moving outward along the spiralto integration testing , where the focus is on the design and the construction of the

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    82/96

    82|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    82

    software architecture. Taking another turn on outward on the spiral we encounter

    validation testing where requirements established as part of software requirements

    analysis are validated against the software that has been constructed. Finally we arrive at

    system testing, where the software and other system elements are tested as a whole.

    Table Given below outlines the tests that were performed on the system to ensure

    correctness and unearth errors, which were subsequently debugged.

    Table shows the Tests Conducted on theFees & Library Management System.

    UNIT TESTING

    Unit Testing will be done to test field validations, navigation, functionality of the

    programs and its blocks. These tests are applied on various functions within each program

    and other critical program blocks.

    MODULE TESTING

    Module testing will be done to test the interaction between the various programs

    within one module. It checks the functionality of each program with relation to other

    programs within the same module. It then tests the overall functionality of each module.

    INTEGRATION TESTING

    TestingPhase

    Objectives

    UnitTesting

    The various functions within each program andthe program blocks are tested for proper working.

    ModuleTesting

    A module is composed of various programsRelated to that module. Module testing is done tocheck the module functionality and interaction

    between units within a module

    IntegrationTesting

    Integration testing is done to test the functionality and interfacing betweenthe modules.

    AcceptanceTesting

    Acceptance testing is done after implementation tocheck if the system runs successfully in theuser environment/site.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    83/96

    83|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    83

    Integration testing is done to test the functionality and interfacing between the

    modules. The system is built up of various modules, which work together to automate the

    activities of the Fees & Library Management System management system. These

    modules should work together in a seamless way to achieve the desired results.

    Integration testing will test for this property of the modules. The modules display a cause

    and effect relationship, if data in one module is changed, then it affects the data to change

    in some other module also. Integration testing needs to check if the modifications do not

    adversely affect some other modules.

    ACCEPTANCE TESTING

    Acceptance testing was done after the implementation of the system. The

    acceptance testing will check if the system works correctly in the user environment and

    if the entire user specified functionalities are present. It also tests if the system adheres to

    the company policies and quality standard.

    5.2 DEBUGGING

    Debugging occurs as a consequence of successful testing. That is, when a test

    case uncover an error, debugging can and should be an orderly process that result in the

    removal of the error. Although debugging can should be an orderly process, it is still very

    much an art.

    The debugging process will always have one of the two outcomes:

    The cause will be found, corrected, and removed, or

    The cause will not be found

    The software was tested thoroughly before implementation and when errors were

    found they were corrected and removed.

    After a through testing of the different aspect of the system as described above

    the system is ready for implementation.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    84/96

    84|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    84

    CHAPTER-6

    6.1 System Security measures

    (Implementation of security for the project

    developed)

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    85/96

    85|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    85

    6.1 INTRODUCTION:

    Definition:

    The system security problem can be divided into four related issues-

    1.

    Security2. Integrity3.

    Privacy4. Confidentiality

    1.Security:

    It refers to the technical innovations and procedures applied to the hardware and the

    operating system to protect against deliberate and accidental damages from a defined

    threat. In contrast, data security is the protection of data from loss, disclose, modificationand destruction.

    2.Integrity:

    It refers to the proper functioning of the hardware and programs, appropriate physical

    security and satisfy against external threats such as eavesdropping and wiretapping. In

    comparison ,data integrity makes sure that data do not differ from original form and have

    not been accidentally disclosed, altered or destroyed.

    3. Privacy:

    It defines the right of the users and the organizations to determine what information they

    are willing to share with or accept from others and how the organization can be protected

    against unwelcome ,unfair or excessive dissemination of information about it.

    4.Confidentiality:

    The term confidentiality is the special status given to the sensitive information in a

    database to minimize the possible disclosure of information that characterizes its need for

    protection. System security is the technical means of providing such protection .In

    contrast , privacy is basically a procedure of how the information available are used.

    Data privacy and security are issues that go beyond the scope of system development.

    They are actually a social concern . An organization that depends heavily on the use of

    databases requires special control to maintain viable information.

    These controls are classified into three general categories-

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    86/96

    86|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    86

    (i)

    Physical Security.

    (ii)Database Security.

    (iii)Application Security.

    (iv)Operating System Level Security:

    (i) Physical Security:

    It refers the security or protection from fire ,flood or the other physical

    damages.Physical security is the protection of personnel, hardware, programs,

    networks, and data from physical circumstances and events that could cause serious

    losses or damage to an enterprise, agency, or institution. This includes protection from

    fire, natural disasters, burglary, theft, vandalism, and terrorism.There are three main

    components to physical security. First, obstacles can be placed in the way of potential

    attackers and sites can be hardened against accidents and environmental disasters. Such

    measures can include multiple locks, fencing, walls, fireproof safes, and water

    sprinklers. Second, surveillance and notification systems can be put in place, such as

    lighting, heat sensors, smoke detectors, intrusion detectors, alarms, and cameras. Third,

    methods can be implemented to apprehend attackers (preferably before any damage has

    been done) and to recover quickly from accidents, fires, or natural disasters.

    (ii)Database/data security:

    Registration level authentication and authorization mechanisms should be

    considered as an effective means of providing database security. Registration and

    authorization provides abstraction .The primary benefit of abstraction is that of a single

    sign on capability across multiple databases and database platforms. A single sign-on

    system should store the database users credentials (login id and password), and

    authenticate to the database on behalf of the user.Database security concerns the use of a

    broad range of information security controls to protect databases (potentially including

    the data, the database applications or stored functions, the database systems, the database

    servers and the associated network links) against compromises of their confidentiality,

    integrity and availability. It involves various types or categories of controls, such as

    technical, procedural/administrative and physical. Database security is a specialist topic

    within the broader realms of computer security, information securityand risk

    management.

    (iii)Application Security:

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    87/96

    87|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    87

    It refers to the control measures of the application software through passwords,

    encryption and monitoring users on a regular basis. The client was given the application

    software in floppies or compact disk, so that if some of the files get corrupted accidentally

    or intentionally, the whole system can again be loaded from backup disks and the

    database can be recovered back. Application security is the use of software, hardware,and procedural methods to protect applications from external threats. Once an

    afterthought in software design, security is becoming an increasingly important concern

    during development as applications become more frequently accessible over networks

    and are, as a result, vulnerable to a wide variety of threats. Security measures built into

    applications and a sound application security routine minimize the likelihood that

    unauthorized code will be able to manipulate applications to access, steal, modify, or

    delete sensitive data.

    (iv) Operating System Level Security:

    In most operating environment there is lack of audit trails in most off shelf

    software package. It is difficult to reconstruct transaction for audit purpose. As more

    personal computers are linked to company mainframe so, remote users can access data,

    the potential increase for alerting the data deliberately or by mistake.

    It is becoming so obvious that the personal computer is adding security problems to

    system installations. With the use of microcomputer the corporate environment, the

    potential for misuse of information becomes enormous. Many of todays operating

    system contains password; a would-be theft can copy at will.

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    88/96

    88|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    88

    CHAPTER 7:

    COST ESTIMATION OF THE PROJECT

    7.1 Cost Estimation Of The Project

  • 7/26/2019 FEES & LIBRARY MANGEMENT SYSTEM.

    89/96

    89|P a g e FEES & LIBRARY MANGEMENT SYSTEM.

    89

    Estimation of the cost for the development of the software is done using the

    COCOMO (ConstructiveCost estimation Model). COCOMO is a heuristic estimation

    technique.

    The COCOMO Model was proposed by Boehm, 1981. Boehm postulated that any

    software development project can be classified into any one of the following three

    categories based on the development complexity: organic, semidetached and embedded.

    1. Organic : We can consider a development project to be organic type, if the project

    deals with developing a well-understood application program, the size of the

    development team is reasonably small and the team members are experienced in

    developing similar type of projects.

    2. Semidetached : A development project can be considered to be of semidetached

    type , if the development team consists of a mixture of experienced and inexperienced

    staff. Team members may have limited experience on related systems but may be

    unfamiliar with some aspects of the system being developed.

    3. Embedded : A development project is considered to be of embedded type, if the

    software being developed is strongly coupled to complex hardware, or if stringent

    regulations on the operational procedure exist.

    BASIC COCOMO MODEL

    The basic COCOMO model gives an approximate estimate of the project parameters.

    The basic COCOMO estimation model is given by the following expressions:

    Effort =a1 * (KLOC)a2 PM

    Tdev = b1* (Effort)b2Months

    Where,

    (a) KLOC is the estimated size of the software product expressed in Kilo Lines of Code.