Top Banner
Presented to: By: Date: Federal Aviation Administration Continuous Descent Arrivals (CDA) Workshop #2 FAA Operational Evolution Plan (OEP): Version 8 – CDA Core & Ring elements EIPT Ops Panel & guests Sandy Liu, FAA Office of Environment & Energy April 18, 2006
16

Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

Oct 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

Presented to:

By:

Date:

Federal AviationAdministration

Continuous Descent

Arrivals (CDA)

Workshop #2

FAA Operational Evolution

Plan (OEP): Version 8 –

CDA Core & Ring elements

EIPT Ops Panel & guests

Sandy Liu, FAA Office of Environment & Energy

April 18, 2006

Page 2: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

2 2Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

Continuous Descent Arrival (CDA)

• Define CDA

• UPS Programs:

- Environmental benefits

- Supplemental Flight Efficiencies (by

Airline Ops Cntr)

• Proposed Core (implementation) & report

to Ring (R&D)

• FLOW-4: FY07 LOB commitment to CDA

“Concept of Operations” development

Page 3: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

3 3Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

CDA ProcedureCDA ProcedureH

eig

ht

Streaming/Sequencing Spacing Monitoring Intervention

Descent from Cruise Initial Approach Low Noise Descent Leg Missed App.

Low Noise

Conventional

FAF

Wake Vertex

Separation

4 - 6 nm•Intermediate

metering point

•Initial separation

established

Hei

gh

t

Streaming/Sequencing Spacing Monitoring Intervention

Descent from Cruise Initial Approach Low Noise Descent Leg Missed App.

Low Noise

Conventional

FAF

Wake Vertex

Separation

4 - 6 nm•Intermediate

metering point

•Initial separation

established

Conceptual CDAConceptual CDA

Demonstrated CDADemonstrated CDA

Non-CDANon-CDA

CDACDA

Page 4: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

4 4Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

CDA - Definition (USA)

A CDA is an flight procedure where the vertical

profile of an arrival has been optimized so that it

can be flown with engines “idle” from a high

altitude (potentially from cruise) until touch down

on the runway.

i.e. Standard Terminal Arrival (STAR) with an optimized vertical

profile.

Does not include “step downs” or intermediate

level flight operations as in current STARs.

Page 5: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

5 5Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

http://www.faa.gov/programs/oep/index.htm

Page 6: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

6 6Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

OEP CDA CoordinationOEP CDA Coordination

CORE: (Primary Office of Delivery: Carl Burleson)

• CDA procedures can follow the “Special” process.

• The AOC approach to enhancing efficient aircraft“Streaming” is transparent to FAA and viable.

RING: (POD: James McDaniel – Safe Flight - 21)

• Advance and demonstrate CDA for high trafficconditions:

– Prescribe CDA safe separation at LAX

– CDA design for use in Corner Post at ATL

• Investigate the CDA “Pilot Discretion”opportunities within NAS.

• Coordinate CDA experience with industry throughworkshops.

Page 7: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

7 7Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

Core StatusCore Status

• UPS “Special” application for basic CDAprocedure at Louisville airport is under FAAreview for acceptance. Targetapproval/implementation 4th Qtr 06.

• UPS Arrival Stream Modernization – AOC toaircraft uplink with speed guidance whileenroute. Target implementation 4th Qtr 07.Initial testing on May 8-11, 2006 todemonstrate and assess performance withuplink capability.

Page 8: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

8 8Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

ATM Flow EfficiencyHard dateOEP Commitments: Target date Completed Slip date

20142006 2007 2008 2009 2010 2011 2012 2013 2015Fiscal Year

FLOW-4: EfficientArrival Streams

DR

AF

T

09/06“Special” Nighttime Low

Traffic CDA at SDF

Enhanced Streaming forCDA at SDF

09/07

Page 9: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

9 9Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

Ring StatusRing Status

• Basic CDA procedures being adapted forhigh traffic situations and the broader “pilotdiscretion” opportunities.

• Pursuing “Concept of Operation”development for CDA to initiate in FY07 withLOB support from AJT, AVS, and AGC.

Page 10: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

10 10Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

Page 11: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

11 11Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

FINDINGS FINDINGS ––Noise Exposure ContourNoise Exposure Contour

Before Before

After After

CDA reduces noiseCDA reduces noise

impact area.impact area.

Page 12: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

12 12Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

FINDINGS FINDINGS –– Fuel Burn Fuel Burn

CDA reduced the average fuel consumed.CDA reduced the average fuel consumed.

2200

2400

2600

2800

3000

3200

3400

B767 STD B767 CDA B757 STD B757 CDA

Fu

el

fro

m 1

80

nm

to

35

L,

lb All aircraft at cruise altitude 180

nautical miles from runw ay. Values

corrected for w ind and merge point.~350 lbs*~350 lbs*

savingssavings

~100+ lbs*~100+ lbs*

savingssavings

* * The significant savings indicated are well above the variability of the measured data. However, the absolute savings shownThe significant savings indicated are well above the variability of the measured data. However, the absolute savings shown

are only representative samplings and are dependent on the specific aircraft configuration, operations, and weather factors.are only representative samplings and are dependent on the specific aircraft configuration, operations, and weather factors.

Page 13: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

13 13Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

FINDINGS FINDINGS –– Flight time Flight time

1700

1750

1800

1850

1900

1950

2000

B767 STD B767 CDA B757 STD B757 CDA

Tim

e f

rom

18

0 n

m t

o 3

5L

, s

ec

CDA reduced the average time to flyCDA reduced the average time to fly

(from last 180 nautical mile to runway).(from last 180 nautical mile to runway).

~ 2.5 minutes~ 2.5 minutes

savings*savings*

~ 2 minutes~ 2 minutes

Savings*Savings*

* * The significant savings indicated are well above the variability of the measured data. However, the absolute savings shownThe significant savings indicated are well above the variability of the measured data. However, the absolute savings shown

are only representative samplings and are dependent on the specific aircraft configuration, operations, and weather factors.are only representative samplings and are dependent on the specific aircraft configuration, operations, and weather factors.

Page 14: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

14 14Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

Preliminary UPS Cost/Benefit

Page 15: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

15 15Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

Flight Procedures Management ProgramFlight Procedures Management Program

(Order 8260.43A) - continued (Order 8260.43A) - continued

Priority:

1- correct safety deficiency

2- new installed nav aid or runaway

3- FAA initiative (Flight Plan)FAA initiative (Flight Plan)

4- airport w/ no existing IFR

5- reduction in TO/landing minima

6- eliminate requirement for NOTAM

7- flow improvement

8- other benefits (new criteria or noise reductionnoise reduction)

9- Public procedures

10- Special Special or Private procedure

RAISE PRIORITYRAISE PRIORITY

Page 16: Federal Aviation Continuous Descent Administration ... · Continuous Descent Arrivals (CDA) Workshop #2 April 18-19, 2006 in Atlanta, GA Ring Status • Basic CDA procedures being

16 16Federal AviationAdministration

Continuous Descent Arrivals (CDA) Workshop #2

April 18-19, 2006 in Atlanta, GA

CDA Workshop II – Outcome Goals

1. Identify a preliminary list of 10 operators and

airports with low traffic that could benefit from

CDA “pilot discretion” procedures.

2. Agree that two options practical to pursue:

– Procedural (VNAV) approach

– “Special” charted procedure

3. Feedback to TARGETS (adapt CDA

characteristics)

4. Agree on a data format/set to support business

and procedure application submissions.