Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca
Federal AviationAdministrationData Comm 1
Federal AviationAdministrationKey Site Timelines
Hal Ludwig &
Pete Muraca
Federal AviationAdministrationData Comm 2
Accomplishments Since Last DCIT
• SLC IOC Declared 8/7/2015• IAH and HOU upgraded to TDLS V.12 SW• HOU TDLS-ERAM Direct Connect Interface is operational• International Flights
– Hyphen issue for non-US Flag carriers will be fixed in release on 9/10– International flights for all carriers only CAF initially (revision by voice
only)– Resolved prior to waterfall.
• Coordinated with first set of waterfall sites –– ZHU ZID ZNY – held first two coord mtgs –
• On track for IOC at MSY, SDF, and EWR.
• Aug. 25 kickoff with second set of waterfall sites (ZLA, ZME, ZBW, ZDV)
Federal AviationAdministrationData Comm 3
SLC Test Status-IOC Declared• Operators Supported Testing leading up to IOC at Salt Lake City
7 FedEx Express (MD11)
7 UPS (B767 & MD11)
7 United Airlines (B737-900)
7 Southwest Airlines (B737-800)
7 Harris Corporation (Falcon 9)
7 US Air Force (KC-135)
Federal AviationAdministrationData Comm 4
Path to ISD2015
10/22
JUL AUG SEPT OCT NOV DEC
ZLC/SLC IOC
8/7
ZHUIAHIOC
9/10
ZHUHOUIOC
9/30
ZLCZTL
Complete
11/30
IOAComplete
12/09
ISD
Phase 3
EAD40
Phase 5
Mil
es
ton
es
V12.0.411/6
EADXX = ERAM
= TDLS
= TIMS
V12.XX
V12.XX
ZLC
SLC
ZTL
Draft v5.1
9/3
Field Activities
ZLC/ZTL Nat’l Site Failover
CPDLC - SLC
ZLC/SLCDFV Dry run& Conduct
Phase 4
8/19
9/10 9/30
ZHU/IAH/HOU DFV Dry Run &
Conduct
IAH/HOU Enhanced CHI
ZHU EAD30 Install
TDLS
9/18
V12.0.512/18
ZLC EAD30 Install
8/7
ARTCC EAD40 Install
8/27
Test onlyT
IMS
You are here
P1 P1
ZHUERAMuplevelto DC
7/6 - 7/9
P0
IAHTEDC
HOUTEDC
7/1
8/13
V12.0.3.xxx9/10
SLCBOI
V12.0.2
V12.0.2Int’l Flights
IAHHOU
7/21
ZL
C/S
LC
TO
& F
M T
estin
g
7/9-11
7/22
SLCBOI
IAH
HOU
7/23-25
9/10
P3
7/29 – 8/5
8/3-4 8/6-8/12
EAD30
7/30 - 8/1
ZL
C/Z
HU
Par
ent/N
at’l
Inte
grat
ion
P4
8/13-17
SLCBOIIAHHOU
SLCBOIIAHHOU
V12.0.27/15
SLCBOI
7/16-18
V12.0.2
TIM
S
V12.0.38/14
SLCBOI
IAHHOU
8/15-17
11/21
Thanksgiving
11/30 12/19
Christmas
1/4
8/18-20
ZTL EAD30 Install
8/17ZTL
Network Connectivity Testing &SSM-220
8/31 9/4
8/5
8/5
Federal AviationAdministrationData Comm 5
KIAH – Carrier DFV Participation Lead-Up Timeline
8/22 - 8/27
Testing w/ Carrier
8/19 - 8/27
May-15 Sep-15
Jun-15 Jul-15 Aug-15 Sep-15
Sep-15Aug-15
8/19 - 8/27
8 /11Final Test Scripts
Provided to Participants
5/18IAH Coordination Meeting
Coordinate Detailed KIAH DFV Schedule
with Participants
8/28 - 9/38/19 - 8/27Dry Run w/ Tech Center Avionics and Carrier
8/19 - 8/21Testing w/ WJHTC
8/28 - 9/3 9/3KIAH IOC
KIAH DFV Dry Run
8/28 - 9/3DFV - File and Fly Flights
KIAH DFV Conduct
9/3
KIAH IOC
Federal AviationAdministrationData Comm 6
KIAH DateTesting Window Tentative
ERAMDispatch
(FPL Filing)
Local Flight Deck
Remote Flight Deck
AOC System
Testing w/ WJHTC
08/19 – 08/21W, Th, F
Mid-ShiftActive and Back-Up
mode
Testing w/ Carrier
08/22 – 08/23Sa, Su
Mid-ShiftActive and Back-Up
mode
Testing w/ Carrier
08/24 – 08/27M, Tu, W, Th
Mid-Shift orDay & Swing
Shift (as Aircraft
avail.)
Active and Back-Up
mode
CarrierFile and Fly
08/28 – 09/03F, Sa, Su, M, Tu, W, Th
Normal OpsActive and Back-up
mode
IOC 9/3
Note: Mid-Shift is 2200-0300 or 0500 (Local)
Federal AviationAdministrationData Comm 7
IAH Test Status• Conduct DFV field testing @ IAH with the following major carriers
and test facilities:– UPS – UAL– FDX – FAA Technical Center Bench Avionics (B757 / 767, B737)
Federal AviationAdministrationData Comm 8
KHOU – Carrier DFV Participation Lead-Up Timeline
8/27 - 9/2
Testing w/ Carrier
8/24 - 9/2
May-15 Oct-15
Jun-15 Jul-15 Aug-15 Sep-15 Oct-15
9/3 - 9/10
9/10KHOU IOC
Sep-15Aug-15
8/24 - 9/2
7/9Final Test Scripts
Provided to Participants
5/12KHOU Coordination Meeting
Coordinate Detailed KHOU DFV Schedule
with Participants
8/24 - 9/2Dry Run w/ Tech Center Avionics and Carrier
9/3 - 9/10
KHOU DFV Conduct
9/3 - 9/10
DFV - File and Fly Flights
8/24 - 8/26Testing w/ WJHTC
9/10KHOU IOC
KHOU DFV Dry -Run KHOU DFV Conduct
Federal AviationAdministrationData Comm 9
KHOU DateTesting Window
TentativeERAM
Dispatch (FPL
Filing)
Local Flight Deck
Remote Flight Deck
AOC System
Testing w/ WJHTC
08/24 – 08/26M, Tu, W
Mid-ShiftActive and Back-Up
mode
Testing w/ Carrier
08/27 – 08/28Th, F
Mid-ShiftActive and Back-Up
mode
Testing w/ Carrier
08/29 – 09/02Sa, Su, M, Tu, W
Mid-Shift or Day & Swing
Shift (as Aircraft
avail.)
Active and Back-Up
mode
CarrierFile and Fly
009/03 – 09/10Th, F, Sa, Su, M, Tu, W, Th
Normal OpsActive and Back-up
mode
IOC 9/10
Note: Mid-Shift is 2200-0300 or 0500 (Local)
Federal AviationAdministrationData Comm 10
HOU Test Status• Conduct DFV field testing @ HOU with the following major
carriers:– UPS – SWA – UAL– FDX – FAA Technical Center Bench Avionics (B757 / 767, B737)
Federal AviationAdministrationData Comm 11
AOC Interface Scorecard
• Completed testing with UPS, FDX, and UAL• Working with USAF TACC to test Interface• SWA working based on SLC testing.
Federal AviationAdministrationData Comm 12
Discussion Items
• TDLS Updated IRD Review– IRD Rev A has NAS CCB approval
• Interface is available for test (WJHTC and IFCET)– IRD Rev B NAS CCB approval
• SDB Inputs– Web interface activation delayed for additional testing.
• SLC Daily Test Coordination Meeting Feedback