Page 1
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 1/12
Mat'l Labor Total
CARRIER DUCTED TYPE
40RM012/38HDS012 2 sets 355,950.00 711,900.00Php 711,900.00Php 5.9325
CARRIER WINDOW TYPE
WCARP24ED 9 units 31,200.00 280,800.00 280,800.00 2.3400
MITSUBISHI ELECTRIC
(SPLIT-TYPE)
PK-4FAKLD/ PU-4TJSA.TH 6 sets 102,680.00 616,080.00 616,080.00 5.1340
PC-4GAKD/ PU-4TJSA.TH 2 sets 98,600.00 197,200.00 197,200.00 1.6433
MITSUBISHI ELECTRIC
(ACCESSORIES)
CMY-Y62-G-E 179 units 7,500.00 1,342,500.00 1,342,500.00 11.1875
BONDS
Downpayment Bond 40,067.32 40,067.32 40,067.32 0.3339
Performance Bond 45,778.02 45,778.02 45,778.02 0.3815
Guarantee Bond 20,487.83 20,487.83 20,487.83 0.1707
CARI 58,813.50 58,813.50 58,813.50 0.490
SUB - TOTAL ( I ) 3,313,626.67Php 3,313,626.67Php 27.6136
Descri tion QTY UNIT Amount % Wei htMat'l Labor Total
Mobilization / Demobilization 1 lot60,000.00 60,000.00 60,000.00 0.5000
Temporary Facilities 1 lot 30,000.00 10,000.00 40,000.00 40,000.00 0.3333
Representation 1 lot 30,000.00 30,000.00 30,000.00 0.2500
Submittals / Shop Drawings 1 lot70,000.00 70,000.00 70,000.00 0.5833
As Built Plans 1 lot 75,000.00 75,000.00 75,000.00 0.6250
Utilities (Water / Electricity &
Housekeeping)1 lot
15,000.00 5,000.00 20,000.00 20,000.00 0.1667
Testing Commissioning (Labor) 1 lot70,000.00 70,000.00 70,000.00 0.5833
Overhead & Contingecies 1 lot 427,204.45 427,204.45 427,204.45 3.5600
SUB - TOTAL ( II ) 792,204.45Php 792,204.45Php 6.6017
Mat'l Labor Total
6TH FLOOR
Copper Tube 5/8" 340 ft 261.00 88,740.00 88,740.00 0.7395
Copper Tube 1/2" 190 ft 188.40 35,796.00 35,796.00 0.2983
Copper Tube 3/8" 340 ft 109.00 37,060.00 37,060.00 0.3088
Copper Tube 1/4" 190 ft 116.75 22,182.50 22,182.50 0.1849
Copper Elbow 5/8" 48 pcs 93.00 4,464.00 4,464.00 0.0372
Copper Elbow 1/2" 24 pcs 71.64 1,719.36 1,719.36 0.0143
Copper Elbow 3/8" 48 pcs 66.50 3,192.00 3,192.00 0.0266
Copper Elbow 1/4" 24 pcs 62.00 1,488.00 1,488.00 0.0124
Copper Coupling 5/8" 34 pcs 66.50 2,261.00 2,261.00 0.0188
Copper Coupling 1/2" 19 pcs 55.00 1,045.00 1,045.00 0.0087Copper Coupling 3/8" 34 pcs 55.00 1,870.00 1,870.00 0.0156
Rubber Insulation 5/8" x 1' Thickness 57 L/6 711.13 40,534.41 40,534.41 0.3378
Rubber Insulation 1/2" x 1' Thickness 32 L/6 660.71 21,142.72 21,142.72 0.1762
Rubber Insulation 3/8" x 1' Thickness 57 L/6 581.11 33,123.27 33,123.27 0.2760
Rubber Insulation 1/4" x 3/4' Thickness 32 L/6 323.72 10,359.04 10,359.04 0.0863
EMT Pipe 1/2" 53 L/10 399.00 21,147.00 21,147.00 0.1762
EMT Elbow 1/2" 48 pcs 66.34 3,184.32 3,184.32 0.0265
EMT Coupling 1/2" 150 pcs 39.80 5,970.00 5,970.00 0.0498
G.I. Wire # 16 10 Kgs 172.48 1,724.80 1,724.80 0.0144
Tox With Metal screw #8 80 pcs 14.00 1,120.00 1,120.00 0.0093
Fullthread 3/8" 14 L/10 317.49 4,444.86 4,444.86 0.0370
Nuts 3/8" 70 pcs 5.50 385.00 385.00 0.0032
Washer 3/8" 70 pcs 5.50 385.00 385.00 0.0032
Anchor Grip 3/8" 70 pcs 39.80 2,786.00 2,786.00 0.0232
Flat Bar 1/8" x 1" 4 pcs 400.00 1,600.00 1,600.00 0.0133Paint 1 Lot 400.00 400.00 400.00 0.0033
Access Valve 16 pcs 119.50 1,912.00 1,912.00 0.0159
Nitrogen 2 cyl 1,460.00 2,920.00 2,920.00 0.0243
Silver Rod 80 pcs 40.00 3,200.00 3,200.00 0.0267
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.0232
Hacksaw Blade 2 pcs 172.48 344.96 344.96 0.0029
Junction Box 24 pcs 66.50 1,596.00 1,596.00 0.0133
II GENERAL REQUIREMENTS
Itemized Cost Breakdown
February 22, 2012 - March 20, 2013
% WeightDescription
% Weight
UNIT
Unit Cost
Amount
THE ADDRESS - Wack Wack Mandaluyong City
CP-08A Supply and Delivery of A/C Equipment (Common Areas) & Installation of Pi
I EQUIPMENT
III INSTALLATION
1 lot
Description QTY UNITUnit Cost
Unit CostAmountQTY
Page 2
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 2/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Polyethelene Tape 18 rolls 133.00 2,394.00 2,394.00 0.020
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 67,895.98 67,895.98 67,895.98 0.565
431,347.20 PhP 431,347.20 PhP 3.594
7TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
8TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
9TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
SUBTOTAL
SUBTOTAL
SUBTOTAL
Page 3
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 3/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
10TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
11TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
SUBTOTAL
SUBTOTAL
Page 4
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 4/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
12TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
14TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
SUBTOTAL
SUBTOTAL
Page 5
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 5/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
15TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
16TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
17TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
SUBTOTAL
SUBTOTAL
SUBTOTAL
Page 6
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 6/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
18TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
19TH FLOOR
Copper Tube 5/8" 220 ft 261.00 57,420.00 57,420.00 0.478
Copper Tube 1/2" 95 ft 188.40 17,898.00 17,898.00 0.149
Copper Tube 3/8" 220 ft 109.00 23,980.00 23,980.00 0.199
Copper Tube 1/4" 95 ft 116.75 11,091.25 11,091.25 0.092
Copper Elbow 5/8" 21 pcs 93.00 1,953.00 1,953.00 0.016
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 16 L/6 660.71 10,571.36 10,571.36 0.088
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 16 L/6 323.72 5,179.52 5,179.52 0.043
EMT Pipe 1/2" 32 L/10 399.00 12,768.00 12,768.00 0.106
EMT Elbow 1/2" 36 pcs 66.34 2,388.24 2,388.24 0.019
EMT Coupling 1/2" 104 pcs 39.80 4,139.20 4,139.20 0.034
SUBTOTAL
SUBTOTAL
Page 7
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 7/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
272,883.25 PhP 272,883.25 PhP 2.274
20TH FLOOR
Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465
Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125
Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194
Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077
Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003
Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009
Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213
Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077
Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174
Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037
EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099
EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028
EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 7 pcs 119.50 836.50 836.50 0.007
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
264,558.90 PhP 264,558.90 PhP 2.204
21ST FLOOR
Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465
Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125
Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194
Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077
Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003
Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009
Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213
Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077
Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174
Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037
EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099
EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028
EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001 Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 7 pcs 119.50 836.50 836.50 0.007
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
SUBTOTAL
SUBTOTAL
Page 8
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 8/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
264,558.90 PhP 264,558.90 PhP 2.204
22ND FLOOR
Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465
Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125
Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194
Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077
Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003
Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009
Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213
Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077
Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174
Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037
EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099
EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028
EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 7 pcs 119.50 836.50 836.50 0.007
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
264,558.90 PhP 264,558.90 PhP 2.204
23RD FLOOR
Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465
Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125
Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194
Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077
Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003
Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009
Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213
Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077
Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174
Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037
EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099
EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028
EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 7 pcs 119.50 836.50 836.50 0.007
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
264,558.90 PhP 264,558.90 PhP 2.204
24TH FLOOR
Copper Tube 5/8" 214 ft 261.00 55,854.00 55,854.00 0.465
Copper Tube 1/2" 80 ft 188.40 15,072.00 15,072.00 0.125
Copper Tube 3/8" 214 ft 109.00 23,326.00 23,326.00 0.194
Copper Tube 1/4" 80 ft 116.75 9,340.00 9,340.00 0.077
Copper Elbow 5/8" 30 pcs 93.00 2,790.00 2,790.00 0.023
SUBTOTAL
SUBTOTAL
SUBTOTAL
Page 9
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 9/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 30 pcs 66.50 1,995.00 1,995.00 0.016
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 21 pcs 66.50 1,396.50 1,396.50 0.011
Copper Coupling 1/2" 8 pcs 55.00 440.00 440.00 0.003
Copper Coupling 3/8" 21 pcs 55.00 1,155.00 1,155.00 0.009
Rubber Insulation 5/8" x 1' Thickness 36 L/6 711.13 25,600.68 25,600.68 0.213
Rubber Insulation 1/2" x 1' Thickness 14 L/6 660.71 9,249.94 9,249.94 0.077
Rubber Insulation 3/8" x 1' Thickness 36 L/6 581.11 20,919.96 20,919.96 0.174
Rubber Insulation 1/4" x 3/4' Thickness 14 L/6 323.72 4,532.08 4,532.08 0.037
EMT Pipe 1/2" 30 L/10 399.00 11,970.00 11,970.00 0.099
EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028
EMT Coupling 1/2" 132 pcs 39.80 5,253.60 5,253.60 0.043
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 7 pcs 119.50 836.50 836.50 0.007
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
264,558.90 PhP 264,558.90 PhP 2.204
25TH FLOOR
Copper Tube 5/8" 260 ft 261.00 67,860.00 67,860.00 0.565
Copper Tube 1/2" 85 ft 188.40 16,014.00 16,014.00 0.133
Copper Tube 3/8" 260 ft 109.00 28,340.00 28,340.00 0.236
Copper Tube 1/4" 85 ft 116.75 9,923.75 9,923.75 0.082
Copper Elbow 5/8" 36 pcs 93.00 3,348.00 3,348.00 0.027
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 36 pcs 66.50 2,394.00 2,394.00 0.020
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 26 pcs 66.50 1,729.00 1,729.00 0.014
Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 26 pcs 55.00 1,430.00 1,430.00 0.011
Rubber Insulation 5/8" x 1' Thickness 44 L/6 711.13 31,289.72 31,289.72 0.260
Rubber Insulation 1/2" x 1' Thickness 15 L/6 660.71 9,910.65 9,910.65 0.082
Rubber Insulation 3/8" x 1' Thickness 44 L/6 581.11 25,568.84 25,568.84 0.213
Rubber Insulation 1/4" x 3/4' Thickness 15 L/6 323.72 4,855.80 4,855.80 0.040
EMT Pipe 1/2" 35 L/10 399.00 13,965.00 13,965.00 0.116
EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028
EMT Coupling 1/2" 137 pcs 39.80 5,452.60 5,452.60 0.045
G.I. Wire # 16 6 Kgs 172.48 1,034.88 1,034.88 0.008
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 12 rolls 133.00 1,596.00 1,596.00 0.013
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
299,515.48 PhP 299,515.48 PhP 2.496
26TH FLOOR
Copper Tube 5/8" 260 ft 261.00 67,860.00 67,860.00 0.565
Copper Tube 1/2" 85 ft 188.40 16,014.00 16,014.00 0.133
Copper Tube 3/8" 260 ft 109.00 28,340.00 28,340.00 0.236
Copper Tube 1/4" 85 ft 116.75 9,923.75 9,923.75 0.082
Copper Elbow 5/8" 36 pcs 93.00 3,348.00 3,348.00 0.027
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 36 pcs 66.50 2,394.00 2,394.00 0.020
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 26 pcs 66.50 1,729.00 1,729.00 0.014Copper Coupling 1/2" 9 pcs 55.00 495.00 495.00 0.004
Copper Coupling 3/8" 26 pcs 55.00 1,430.00 1,430.00 0.011
Rubber Insulation 5/8" x 1' Thickness 44 L/6 711.13 31,289.72 31,289.72 0.260
Rubber Insulation 1/2" x 1' Thickness 15 L/6 660.71 9,910.65 9,910.65 0.082
Rubber Insulation 3/8" x 1' Thickness 44 L/6 581.11 25,568.84 25,568.84 0.213
Rubber Insulation 1/4" x 3/4' Thickness 15 L/6 323.72 4,855.80 4,855.80 0.040
EMT Pipe 1/2" 35 L/10 399.00 13,965.00 13,965.00 0.116
EMT Elbow 1/2" 51 pcs 66.34 3,383.34 3,383.34 0.028
SUBTOTAL
SUBTOTAL
Page 10
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 10/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
EMT Coupling 1/2" 137 pcs 39.80 5,452.60 5,452.60 0.045
G.I. Wire # 16 6 Kgs 172.48 1,034.88 1,034.88 0.008
Tox With Metal screw #8 40 pcs 14.00 560.00 560.00 0.004
Fullthread 3/8" 8 L/10 317.49 2,539.92 2,539.92 0.021
Nuts 3/8" 40 pcs 5.50 220.00 220.00 0.001
Washer 3/8" 40 pcs 5.50 220.00 220.00 0.001
Anchor Grip 3/8" 40 pcs 39.80 1,592.00 1,592.00 0.013
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 12 rolls 133.00 1,596.00 1,596.00 0.013
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
299,515.48 PhP 299,515.48 PhP 2.496
27TH FLOOR
Copper Tube 5/8" 218 ft 261.00 56,898.00 56,898.00 0.474
Copper Tube 1/2" 72 ft 188.40 13,564.80 13,564.80 0.113
Copper Tube 3/8" 218 ft 109.00 23,762.00 23,762.00 0.198
Copper Tube 1/4" 72 ft 116.75 8,406.00 8,406.00 0.070
Copper Elbow 5/8" 36 pcs 93.00 3,348.00 3,348.00 0.027
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 36 pcs 66.50 2,394.00 2,394.00 0.020
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 7 pcs 55.00 385.00 385.00 0.003
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 12 L/6 660.71 7,928.52 7,928.52 0.066
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 12 L/6 323.72 3,884.64 3,884.64 0.032
EMT Pipe 1/2" 29 L/10 399.00 11,571.00 11,571.00 0.096
EMT Elbow 1/2" 42 pcs 66.34 2,786.28 2,786.28 0.023
EMT Coupling 1/2" 113 pcs 39.80 4,497.40 4,497.40 0.037
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 36 pcs 14.00 504.00 504.00 0.004
Fullthread 3/8" 7 L/10 317.49 2,222.43 2,222.43 0.018
Nuts 3/8" 36 pcs 5.50 198.00 198.00 0.001
Washer 3/8" 36 pcs 5.50 198.00 198.00 0.001
Anchor Grip 3/8" 36 pcs 39.80 1,432.80 1,432.80 0.011
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
262,452.13 PhP 262,452.13 PhP 2.187
28TH FLOOR
Copper Tube 5/8" 218 ft 261.00 56,898.00 56,898.00 0.474
Copper Tube 1/2" 72 ft 188.40 13,564.80 13,564.80 0.113
Copper Tube 3/8" 218 ft 109.00 23,762.00 23,762.00 0.198
Copper Tube 1/4" 72 ft 116.75 8,406.00 8,406.00 0.070
Copper Elbow 5/8" 36 pcs 93.00 3,348.00 3,348.00 0.027
Copper Elbow 1/2" 15 pcs 71.64 1,074.60 1,074.60 0.009
Copper Elbow 3/8" 36 pcs 66.50 2,394.00 2,394.00 0.020
Copper Elbow 1/4" 15 pcs 62.00 930.00 930.00 0.007
Copper Coupling 5/8" 22 pcs 66.50 1,463.00 1,463.00 0.012
Copper Coupling 1/2" 7 pcs 55.00 385.00 385.00 0.003
Copper Coupling 3/8" 22 pcs 55.00 1,210.00 1,210.00 0.010
Rubber Insulation 5/8" x 1' Thickness 37 L/6 711.13 26,311.81 26,311.81 0.219
Rubber Insulation 1/2" x 1' Thickness 12 L/6 660.71 7,928.52 7,928.52 0.066
Rubber Insulation 3/8" x 1' Thickness 37 L/6 581.11 21,501.07 21,501.07 0.179
Rubber Insulation 1/4" x 3/4' Thickness 12 L/6 323.72 3,884.64 3,884.64 0.032
EMT Pipe 1/2" 29 L/10 399.00 11,571.00 11,571.00 0.096
EMT Elbow 1/2" 42 pcs 66.34 2,786.28 2,786.28 0.023
EMT Coupling 1/2" 113 pcs 39.80 4,497.40 4,497.40 0.037
G.I. Wire # 16 5 Kgs 172.48 862.40 862.40 0.007
Tox With Metal screw #8 36 pcs 14.00 504.00 504.00 0.004
Fullthread 3/8" 7 L/10 317.49 2,222.43 2,222.43 0.018
Nuts 3/8" 36 pcs 5.50 198.00 198.00 0.001Washer 3/8" 36 pcs 5.50 198.00 198.00 0.001
Anchor Grip 3/8" 36 pcs 39.80 1,432.80 1,432.80 0.011
Flat Bar 1/8" x 1" 2 pcs 400.00 800.00 800.00 0.006
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 14 pcs 119.50 1,673.00 1,673.00 0.013
Nitrogen 3 cyl 1,460.00 4,380.00 4,380.00 0.036
Silver Rod 70 pcs 40.00 2,800.00 2,800.00 0.023
SUBTOTAL
SUBTOTAL
Page 11
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 11/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Oxy-Acethylene 1 set 2,787.00 2,787.00 2,787.00 0.023
Hacksaw Blade 1 pcs 172.48 172.48 172.48 0.001
Junction Box 15 pcs 66.50 997.50 997.50 0.008
Polyethelene Tape 10 rolls 133.00 1,330.00 1,330.00 0.011
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 49,605.42 49,605.42 49,605.42 0.413
262,452.13 PhP 262,452.13 PhP 2.187
29TH FLOOR
Copper Tube 5/8" 513 ft 261.00 133,893.00 133,893.00 1.115
Copper Tube 1/2" 135 ft 188.40 25,434.00 25,434.00 0.212
Copper Tube 3/8" 513 ft 109.00 55,917.00 55,917.00 0.466
Copper Tube 1/4" 135 ft 116.75 15,761.25 15,761.25 0.131
Copper Elbow 5/8" 54 pcs 93.00 5,022.00 5,022.00 0.041
Copper Elbow 1/2" 54 pcs 71.64 3,868.56 3,868.56 0.032
Copper Elbow 3/8" 54 pcs 66.50 3,591.00 3,591.00 0.029
Copper Elbow 1/4" 54 pcs 62.00 3,348.00 3,348.00 0.027
Copper Coupling 5/8" 51 pcs 66.50 3,391.50 3,391.50 0.028
Copper Coupling 1/2" 13 pcs 55.00 715.00 715.00 0.006
Copper Coupling 3/8" 51 pcs 55.00 2,805.00 2,805.00 0.023
Rubber Insulation 5/8" x 1' Thickness 86 L/6 711.13 61,157.18 61,157.18 0.509
Rubber Insulation 1/2" x 1' Thickness 23 L/6 660.71 15,196.33 15,196.33 0.126
Rubber Insulation 3/8" x 1' Thickness 86 L/6 581.11 49,975.46 49,975.46 0.416
Rubber Insulation 1/4" x 3/4' Thickness 23 L/6 323.72 7,445.56 7,445.56 0.062
EMT Pipe 1/2" 65 L/10 399.00 25,935.00 25,935.00 0.216
EMT Elbow 1/2" 75 pcs 66.34 4,975.50 4,975.50 0.041
EMT Coupling 1/2" 215 pcs 39.80 8,557.00 8,557.00 0.071
G.I. Wire # 16 10 Kgs 172.48 1,724.80 1,724.80 0.014
Tox With Metal screw #8 80 pcs 14.00 1,120.00 1,120.00 0.009
Fullthread 3/8" 16 L/10 317.49 5,079.84 5,079.84 0.042
Nuts 3/8" 80 pcs 5.50 440.00 440.00 0.003
Washer 3/8" 80 pcs 5.50 440.00 440.00 0.003
Anchor Grip 3/8" 80 pcs 39.80 3,184.00 3,184.00 0.026
Flat Bar 1/8" x 1" 4 pcs 400.00 1,600.00 1,600.00 0.013
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 30 pcs 119.50 3,585.00 3,585.00 0.029
Nitrogen 5 cyl 1,460.00 7,300.00 7,300.00 0.060
Silver Rod 150 pcs 40.00 6,000.00 6,000.00 0.050
Oxy-Acethylene 2 set 2,787.00 5,574.00 5,574.00 0.046
Hacksaw Blade 2 pcs 172.48 344.96 344.96 0.002
Junction Box 45 pcs 66.50 2,992.50 2,992.50 0.024
Polyethelene Tape 22 rolls 133.00 2,926.00 2,926.00 0.024
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 95,519.88 95,519.88 95,519.88 0.796
565,392.30 PhP 565,392.30 PhP 4.711
30TH FLOOR
Copper Tube 5/8" 514 ft 261.00 134,154.00 134,154.00 1.118
Copper Tube 1/2" 118 ft 188.40 22,231.20 22,231.20 0.185
Copper Tube 3/8" 514 ft 109.00 56,026.00 56,026.00 0.466
Copper Tube 1/4" 118 ft 116.75 13,776.50 13,776.50 0.114
Copper Elbow 5/8" 84 pcs 93.00 7,812.00 7,812.00 0.065
Copper Elbow 1/2" 39 pcs 71.64 2,793.96 2,793.96 0.023
Copper Elbow 3/8" 84 pcs 66.50 5,586.00 5,586.00 0.046
Copper Elbow 1/4" 39 pcs 62.00 2,418.00 2,418.00 0.020
Copper Coupling 5/8" 51 pcs 66.50 3,391.50 3,391.50 0.028
Copper Coupling 1/2" 12 pcs 55.00 660.00 660.00 0.005
Copper Coupling 3/8" 51 pcs 55.00 2,805.00 2,805.00 0.023
Rubber Insulation 5/8" x 1' Thickness 86 L/6 711.13 61,157.18 61,157.18 0.509
Rubber Insulation 1/2" x 1' Thickness 20 L/6 660.71 13,214.20 13,214.20 0.110
Rubber Insulation 3/8" x 1' Thickness 86 L/6 581.11 49,975.46 49,975.46 0.416
Rubber Insulation 1/4" x 3/4' Thickness 20 L/6 323.72 6,474.40 6,474.40 0.054
EMT Pipe 1/2" 64 L/10 399.00 25,536.00 25,536.00 0.212
EMT Elbow 1/2" 129 pcs 66.34 8,557.86 8,557.86 0.071
EMT Coupling 1/2" 322 pcs 39.80 12,815.60 12,815.60 0.106
G.I. Wire # 16 11 Kgs 172.48 1,897.28 1,897.28 0.015
Tox With Metal screw #8 80 pcs 14.00 1,120.00 1,120.00 0.009
Fullthread 3/8" 16 L/10 317.49 5,079.84 5,079.84 0.042
Nuts 3/8" 80 pcs 5.50 440.00 440.00 0.003
Washer 3/8" 80 pcs 5.50 440.00 440.00 0.003
Anchor Grip 3/8" 80 pcs 39.80 3,184.00 3,184.00 0.026
Flat Bar 1/8" x 1" 4 pcs 400.00 1,600.00 1,600.00 0.013
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 30 pcs 119.50 3,585.00 3,585.00 0.029
Nitrogen 5 cyl 1,460.00 7,300.00 7,300.00 0.060
Silver Rod 150 pcs 40.00 6,000.00 6,000.00 0.050
Oxy-Acethylene 3 set 2,787.00 8,361.00 8,361.00 0.069
Hacksaw Blade 2 pcs 172.48 344.96 344.96 0.002
Junction Box 39 pcs 66.50 2,593.50 2,593.50 0.021
Polyethelene Tape 22 rolls 133.00 2,926.00 2,926.00 0.024
Rugby 1 bot 172.98 172.98 172.98 0.001Labor 1 lot 95,519.88 95,519.88 95,519.88 0.796
570,349.30 PhP 570,349.30 PhP 4.752
PENTHOUSE
Copper Tube 5/8" 437 ft 261.00 114,057.00 114,057.00 0.950
Copper Tube 1/2" 269 ft 188.40 50,679.60 50,679.60 0.422
Copper Tube 3/8" 437 ft 109.00 47,633.00 47,633.00 0.396
Copper Tube 1/4" 269 ft 116.75 31,405.75 31,405.75 0.261
SUBTOTAL
SUBTOTAL
SUBTOTAL
Page 12
7/27/2019 feb-march BOQ II (1)222222222222222222.xls
http://slidepdf.com/reader/full/feb-march-boq-ii-1222222222222222222xls 12/12
Mat'l Labor Total% WeightAmountDescription QTY UNIT
Unit Cost
Copper Elbow 5/8" 126 pcs 93.00 11,718.00 11,718.00 0.097
Copper Elbow 1/2" 42 pcs 71.64 3,008.88 3,008.88 0.025
Copper Elbow 3/8" 126 pcs 66.50 8,379.00 8,379.00 0.069
Copper Elbow 1/4" 42 pcs 62.00 2,604.00 2,604.00 0.021
Copper Coupling 5/8" 43 pcs 66.50 2,859.50 2,859.50 0.023
Copper Coupling 1/2" 27 pcs 55.00 1,485.00 1,485.00 0.012
Copper Coupling 3/8" 43 pcs 55.00 2,365.00 2,365.00 0.019
Rubber Insulation 5/8" x 1' Thickness 73 L/6 711.13 51,912.49 51,912.49 0.432
Rubber Insulation 1/2" x 1' Thickness 45 L/6 660.71 29,731.95 29,731.95 0.247
Rubber Insulation 3/8" x 1' Thickness 73 L/6 581.11 42,421.03 42,421.03 0.353
Rubber Insulation 1/4" x 3/4' Thickness 46 L/6 323.72 14,891.12 14,891.12 0.124
EMT Pipe 1/2" 71 L/10 399.00 28,329.00 28,329.00 0.236
EMT Elbow 1/2" 126 pcs 66.34 8,358.84 8,358.84 0.069
EMT Coupling 1/2" 323 pcs 39.80 12,855.40 12,855.40 0.107
G.I. Wire # 16 12 Kgs 172.48 2,069.76 2,069.76 0.017
Tox With Metal screw #8 88 pcs 14.00 1,232.00 1,232.00 0.010
Fullthread 3/8" 18 L/10 317.49 5,714.82 5,714.82 0.047
Nuts 3/8" 88 pcs 5.50 484.00 484.00 0.004
Washer 3/8" 88 pcs 5.50 484.00 484.00 0.004
Anchor Grip 3/8" 88 pcs 39.80 3,502.40 3,502.40 0.029
Flat Bar 1/8" x 1" 5 pcs 400.00 2,000.00 2,000.00 0.016
Paint 1 Lot 400.00 400.00 400.00 0.003
Access Valve 28 pcs 119.50 3,346.00 3,346.00 0.027
Nitrogen 4 cyl 1,460.00 5,840.00 5,840.00 0.048
Silver Rod 140 pcs 40.00 5,600.00 5,600.00 0.046
Oxy-Acethylene 3 set 2,787.00 8,361.00 8,361.00 0.069
Hacksaw Blade 2 pcs 172.48 344.96 344.96 0.002
Junction Box 42 pcs 66.50 2,793.00 2,793.00 0.023
Polyethelene Tape 24 rolls 133.00 3,192.00 3,192.00 0.026
Rugby 1 bot 172.98 172.98 172.98 0.001
Labor 1 lot 95,519.88 95,519.88 95,519.88 0.796
605,751.36 PhP 605,751.36 PhP 5.047
SUB - TOTAL ( III )
GRAND TOTAL 100.00
PREPARED BY: NOTED BY: CONFORMED BY
Ma. Diana Rose D. Japone Francis O. Velarde
7,894,168.88PhP
(Equipment, General requirements & Installation) 12,000,000.00PhP
SUBTOTAL
(Installation)