Top Banner
July 2010 UMT/OAM/INF/025095 Wireless Management System for UTRAN Feature Planning Guide OAM07
76
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • July 2010 UMT/OAM/INF/025095

    Wireless Management System for

    UTRAN Feature Planning Guide OAM07

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 3 / 76 V01.07 July 2010

    Copyright 2009-2010 by Alcatel-Lucent Technologies. All Rights Reserved.

    About Alcatel-Lucent

    Alcatel-Lucent (Euronext Paris and NYSE: ALU) provides solutions that enable service

    providers, enterprises and governments worldwide, to deliver voice, data and video

    communication services to end-users. As a leader in fixed, mobile and converged broadband

    networking, IP technologies, applications, and services, Alcatel-Lucent offers the end-to-end

    solutions that enable compelling communications services for people at home, at work and on

    the move. For more information, visit Alcatel-Lucent on the Internet: http://www.alcatel-

    lucent.com

    Notice

    At the time of publication, this document reflects the latest information on Alcatel-Lucents

    offer. However, as we are continually enhancing our products and solutions, we recommend

    that on a bi-monthly basis you obtain the latest version of this document from your Alcatel-

    Lucent representative.

    Trademarks

    The following trademarks are used throughout this document:

    Alcatel-Lucent, Alcatel, Lucent Technologies and their respective logos are trademarks and

    service marks of Alcatel-Lucent, Alcatel and Lucent Technologies.

    Sun, Sun Microsystems, the Sun Logo, Java and all Java-based trademarks and logos are

    trademarks or registered trademarks of Sun Microsystems, Inc. in the U.S. and other countries.

    Microsoft, Microsoft Internet Explorer logo, Microsoft Office Compatible logo, NetMeeting,

    Outlook, PowerPoint, Visio, Visual Basic, Windows, Windows logo, Windows NT, and/or other

    Microsoft products referenced are either registered trademarks or trademarks of Microsoft

    Corporation in the U.S. and/or other countries

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 4 / 76 V01.07 July 2010

    PUBLICATION HISTORY

    26 JULY 2008 - Issue 01.01 June 08 / EN, Standard, External

    Creation

    10 DECEMBER 2008 - Issue 01.02 December 08 / EN, Standard, External

    Update

    09 FEBRUARY 2009 - Issue 01.03 February 09 / EN, Standard, External

    Feature Updated:

    34693 - UTRAN NE upgrade improvements (WAUT output report, NodeB wizard)

    34430 - Introduction of next generation WMS Security Framework

    79675 - Per NE Type MIB Build Access Control

    Feature Added:

    34512 - Various UTRAN OAM OE enhancements

    34626 - W-CDMA License Manager evolutions

    36249 - FM Support of Service Router 7750/7710/7705

    81339 WPS Parameter Search

    26 JUNE 2009 - Issue 01.04 June 09 / EN, Standard, External

    Feature Updated:

    34430 - Introduction of next generation WMS Security Framework

    Feature Added:

    36250 - UTRAN Sharing Management evolution

    75785 Selective Backup and Restore

    84327 - WPS Abort ongoing long operations

    89868 - WPS WorkOrder Management Optimization

    23 OCTOBER 2009 - Issue 01.05 October 09 / EN, Standard, External

    Feature Updated:

    34420 - WMS KPI OAM07

    34613 - Additional Service information in UTRAN service view

    36212 - Enhancement of Resource GUI (RSSI display, TX power)

    Feature added:

    89864 Customized iBTS board Insertion/Extraction alarm flow

    90316 - Pre-defined Indicators and User-Defined Reporting on RFO

    90317 - Additional predefined RFO indicators and user defined indicators

    90318 - User-Defined Scenario for Call Classification in RFO

    34605 - NPO Kernel impacts for OAM7.1

    100726 - NPO Kernel Hardware and System Administration - OAM7.1

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 5 / 76 V01.07 July 2010

    97085 - NPO Armoring Step 1

    Feature removed:

    33374 - Introduction of next generation SUN Hardware all new WMS hardware finally

    introduced in OAM06

    20 JANUARY 2010 - Issue 01.06 January 2010 / EN, Standard, External

    Feature Updated:

    34276 Real Time Call Trace Presentation

    75785 Selective Backup and Restore

    90316 - Pre-defined Indicators and User-Defined Reporting on RFO

    90317 - Additional predefined RFO indicators and user defined indicators

    90318 - User-Defined Scenario for Call Classification in RFO

    Feature added:

    97006 RETA Tilt Management

    JULY 2010 - Issue 01.07 July 2010 / EN, Standard, External

    Feature Updated:

    81339 WPS Parameter Search

    Feature added:

    103003 WMS Object Editor Parameter Mask - NEW 110999 - WPS Bulk operations - NEW 89868 - WPS WorkOrder Management Optimization - NEW 93486 - WPS Operational Effectiveness NEW 113599 - WMS CTn processing capacity increase NEW 114390 - Management of Converged RAN modules RRH Multimode 2G/3G NEW 101824 - Management of Converged RAN modules TRX 3G in 2G environment NEW 111199 - WMS essential data backup without restrictive Window NEW

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 6 / 76 V01.07 July 2010

    CONTENTS

    1 INTRODUCTION ................................................................................................8

    1.1 SCOPE OF THIS DOCUMENT.....................................................................................8

    1.2 AUDIENCE FOR THIS DOCUMENT................................................................................8

    1.3 EXPIRY .......................................................................................................8

    2 RELATED DOCUMENTS ........................................................................................9

    2.1 REFERENCE DOCUMENTS.......................................................................................9

    3 OAM ADMINISTRATION...................................................................................... 10

    3.1 OAM SOLUTION HARDWARE, OS AND SCALABILITY .......................................................... 10

    34420 - WMS KPI OAM07......................................................................................10

    3.2 OAM INSTALLATION, UPGRADE AND BACKUP & RESTORE.................................................... 12

    74609 OAM07.0 WMS software upgrade path ............................................................12

    82873 OAM07.1 WMS software upgrade path ............................................................13

    75785 Selective Backup and Restore .....................................................................14

    111199 - WMS essential data backup without restrictive Window .....................................15

    113599 CTn processing capacity increase................................................................16

    4 UTRAN SPECIFIC ............................................................................................. 18

    34608 - OAM Backward compatibility and Upgrade path of UA07 devices ............................18

    82934 - OAM Backward compatibility and Upgrade path of UA07.1 devices ..........................19

    34693 - UTRAN NE upgrade improvements (WAUT output report, NodeB wizard) ...................20

    36250 - UTRAN Sharing Management evolution ..........................................................21

    34626 - W-CDMA License Manager evolutions .............................................................27

    97006 - RETA Tilt Management..............................................................................28

    97005 - WMS support of BTS with unknown software version...........................................30

    92132 - OAM support Multi-Standard BTS (Macro) ........................................................30

    92799 - OAM support Multi-Standard BTS (Distributed)..................................................30

    101824 - Management of Converged RAN modules TRX 3G in 2G environment.....................31

    114390 - Management of Converged RAN modules RRH Multimode 2G/3G .........................32

    5 FAULT MANAGEMENT....................................................................................... 34

    5.1 FIRST ALERT................................................................................................ 34

    34562 - Alarm flow reduction ruleset package............................................................34

    34613 - Additional Service information in UTRAN Service View ........................................35

    36249 - FM Support of Service Router 7750 / 7710 / 7705 ..............................................37

    89864 Customized iBTS board Insertion/Extraction alarm flow.......................................39

    5.2 TROUBLESHOOTING ......................................................................................... 40

    34701 - Java GUI for ATM interface Status & VPI/VCI Occupancy......................................40

    34512 - Various Utran OAM OE enhancements ............................................................41

    36212 Enhancement of Resource GUI (RSSI display, TX power) ......................................42

    6 CONFIGURATION MANAGEMENT .......................................................................... 44

    6.1 ON-LINE CONFIGURATION MANAGEMENT .................................................................... 44

    30934 Activation Manager Enhancements: Pause/Resume Sessions ..................................44

    103003 WMS Object Editor Parameter Mask .............................................................45

    6.2 OFF-LINE CONFIGURATION MANAGEMENT ................................................................... 46

    74608 One Step Node B Renaming ........................................................................46

    81339 WPS Parameter Search .............................................................................47

    110999 - WPS Bulk operations ...............................................................................49

    84327 WPS Abort ongoing long operations ...............................................................50

    89868 - WPS WorkOrder Management Optimization......................................................51

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 7 / 76 V01.07 July 2010

    93486 - WPS Operational Effectiveness ....................................................................51

    7 PERFORMANCE MANAGEMENT............................................................................. 53

    7.1 OPERATIONAL PERFORMANCE ............................................................................... 53

    20972 - WMS Real-Time Performance Monitoring application ..........................................53

    34276 Real Time Call Trace Presentation................................................................56

    36182 OAM support UTRAN Counter capacity improvement...........................................57

    7.2 RADIO FREQUENCY OPTIMIZER .............................................................................. 58

    34601 RFO : Adaptation to UA07 ..........................................................................58

    82930 RFO : Adaptation to UA07.1........................................................................59

    90316 - Pre-defined Indicators and User-Defined Reporting on RFO &

    90317 - Additional predefined RFO indicators and user defined indicators...........................59

    90318 - User-Defined Scenario for Call Classification in RFO ...........................................61

    7.3 WIRELESS QUALITY ANALYZER .............................................................................. 62

    34600 - WQA adaptation to UA07 ...........................................................................62

    82874 - WQA adaptation to UA07.1.........................................................................63

    79676- WQA support of multi ROC..........................................................................64

    7.4 NETWORK PERFORMANCE OPTIMIZER ........................................................................ 65

    34604 - NPO support of UA7.0, associated metrics and service indicators............................65

    82933 - NPO support of UA7.1, associated metrics and service indicators............................66

    34605 - NPO Kernel impacts for OAM7.1...................................................................66

    100726 - NPO Kernel Hardware and System Administration - OAM7.1.................................68

    97085 - NPO Armoring Step 1................................................................................69

    8 SECURITY MANAGEMENT ................................................................................... 70

    34430 - Introduction of next generation WMS Security Framework ....................................70

    79675 - Per NE Type MIB Build Access Control ............................................................71

    9 ABBREVIATIONS AND DEFINITIONS ....................................................................... 73

    9.1 ABBREVIATIONS ............................................................................................. 73

    9.2 DEFINITIONS ................................................................................................ 74

    APPENDIX 1 - RELEASE DELIVERY / OPTIONALITY ........................................................... 75

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 8 / 76 V01.07 July 2010

    1 INTRODUCTION

    1.1 Scope of this document

    The OAM07 (Operation, Administration, Maintenance and Provisioning) Feature

    Planning Guide provides a features-level description of OAM07.0 and OAM07.1

    features available within the Wireless Management System product suite.

    This is a delta document. It does not list neither described the features delivered in

    previous releases (please refer to [R3], [R4], [R5], [R6], [R7], [R8], [R9] and [R10]

    documents).

    Each feature description includes the feature title, reference number, and the

    following information:

    Feature Description

    Feature Benefits

    Dependencies (Hardware, Software, Feature, Inter-working, Devices and

    Standards)

    Impacted Systems

    Restrictions/Limitations

    Engineering Impacts

    Operational Requirements (Counters, Configuration Management and

    Parameters, Fault Management and Alarms)

    1.2 Audience for this document

    The OAM07 Feature Planning Guide is intended for Alcatel-Lucent clients and UMTS

    functional groups. This document is intended for engineers specialized in OAM.

    1.3 Expiry

    This document is released every two months and readers should obtain the latest

    version prior to use. This document version (01.07 July 2010) has no expiration date.

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 9 / 76 V01.07 July 2010

    2 RELATED DOCUMENTS

    2.1 Reference documents

    [R1] UMT/OAM/INF/000005 WMS Customer Product Overview

    [R2] UMT/OAM/INF/000009 WMS Architecture, Hardware Strategy and Requirements

    [R3] UMT/OAM/INF/000007 WMS Feature Planning Guide OAM01

    [R4] UMT/OAM/INF/000011 WMS Feature Planning Guide OAM02

    [R5] UMT/OAM/INF/000035 WMS Feature Planning Guide OAM03

    [R6] UMT/OAM/INF/008782 WMS Feature Planning Guide OAM04.1

    [R7] UMT/OAM/INF/011038 WMS Feature Planning Guide OAM04.2

    [R7] UMT/OAM/INF/011587 WMS Feature Planning Guide OAM05.0

    [R8] NMS/COM/INF/018121 WMS Feature Planning Guide OAM05.1

    [R9] UMT/OAM/INF/021834 WMS Feature Planning Guide OAM05.2

    [R10] UMT/OAM/INF/021269 WMS Feature Planning Guide OAM06.0

    [R11] UMT/SYS/INF/025020 UA07 Access Network Feature Planning Guide

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 10 / 76 V01.07 July 2010

    3 OAM ADMINISTRATION

    3.1 OAM Solution Hardware, OS and Scalability

    34420 - WMS KPI OAM07

    FEATURE DESCRIPTION

    This feature describes the expected system performances of each of the WMS Main

    Server types and NPO server types in OAM07.

    WMS Main Server:

    A Main Server SE T5220 or Netra 240 (existing deployments) configuration

    will manage up to 150 BTS, 900 cells and 5 concurrent user sessions

    A primary Main Server Netra T5440-2cpu will manage up to 700 BTS, 4200

    cells and respectively 30 concurrent user sessions. A dual Main Server Netra

    T5440-2cpu ROC will manage 1400 BTS, 8400 cells and 60 concurrent user

    sessions

    A primary Main Server SF V890-4cpu (existing deployments) will manage up

    to 700 BTS, 4200 cells and respectively 20 concurrent user sessions. A dual

    Main Server SF V890-4cpu ROC will manage 1400 BTS, 8400 cells and 40

    concurrent user sessions

    A primary Main Server SE M5000-4cpu or SFE4900-8cpu (existing

    deployments) will manage 2000 BTS, 12k cells and 40 concurrent user

    sessions. A dual Main Server SEM5000-4cpu or SFE4900-8cpu ROC will manage

    4000 BTS, 24k cells and 80 concurrent user sessions

    A primary Main Server SE M5000-8cpu will manage 4000 BTS, 24k cells and 70

    concurrent user sessions. A dual Main Server SE M5000-8cpu ROC will manage

    8000 BTS, 48k cells and 140 concurrent user sessions

    A primary Main Server SFE4900-12cpu (existing deployments) will manage

    3000 BTS, 18k cells and 50 concurrent user sessions. A dual Main Server

    SFE4900-12cpu ROC will manage 6000 BTS, 36k cells and 100 concurrent user

    sessions

    NPO Server:

    a 3G NPO T5220-1cpu will manage up to 1400 cells

    a 3G NPO M4000-2cpu will manage up to 9000 cells

    a 3G NPO M4000-4cpu will manage up to 18000 cells

    For existing deployments:

    o a 3G NPO N240-4cpu will manage up to 1400 cells

    o a 3G NPO V490-2cpu / SE3510 will manage up to 4500 cells

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 11 / 76 V01.07 July 2010

    o a 3G NPO V490-4cpu / SE3510 will manage up to 9000 cells

    o a dual clustered 3G NPO 2* V490-4cpu / SE3510 will manage up to

    18000 cells

    FEATURE BENEFITS

    The WMS and NPO server portfolio provide the scalability required for customer

    network deployments, from small server especially suited for labs and trials up to

    high capacity server solutions.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    For existing SUN SF V880 and SF E4800 customers, as a consequence of the OAM06.0

    feature 33421 - Co-resident FCPS Main Servers, the WMS Main Server capacity is the

    following:

    SF V880 4 CPU: a maximum of 550 BTS and 3.3k cells are supported per Main

    Server

    SF E4800 8 CPU: a maximum of 1600 BTS and 9.6K cells are supported per Main

    Server

    SF E4800 12 CPU: a maximum of 2400 BTS and 14.4k cells are supported per

    Main Server

    OAM07.1 is the last software release to support the SUN SF V880 server and the SUN

    SF E4800 server.

    The SF V250 server is no more supported in OAM07.1

    ENGINEERING IMPACTS

    From OAM06.0 on, a WMS Main server Alarm History waiting queue defense

    mechanism is implemented. This mechanism will discard alarms, under rare

    conditions, if the waiting queue grows too large to prevent out of memory errors.

    Linked to the behavior of the SUN UltraSparc T2 CPUs (high level of multi-threading

    but at lower frequency than previous generation of SUN Sparc CPU), some

    configuration management operations on large RNC configurations (like e.g. build

    offline) may take a longer time than on the SF V890 server.

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 12 / 76 V01.07 July 2010

    3.2 OAM Installation, Upgrade and Backup & Restore

    74609 OAM07.0 WMS software upgrade path

    FEATURE DESCRIPTION

    WMS software upgrade path from OAM06.0 to OAM07.0 for UTRAN customers.

    FEATURE BENEFITS

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature takes into account the migration to the new WMS Security Component

    (feature 34430).

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    W-CDMAOAM5.2

    W-CDMAOAM6.0

    Full

    Upgrade

    ProptimaNPO NPO

    W-CDMAOAM7.0

    NPO

    Full

    Upgrade

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 13 / 76 V01.07 July 2010

    82873 OAM07.1 WMS software upgrade path

    FEATURE DESCRIPTION

    WMS software upgrade path from OAM07.0 to OAM07.1 for UTRAN customers, as

    described in the picture below.

    The following upgrade paths are supported:

    OAM06.0 to OAM07.1

    OAM07.0 to OAM07.1

    FEATURE BENEFITS

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    For OAM06 to OAM07.1 software upgrade, the minimum starting point if OAM06.0.5

    MNCL.

    W-CDMAOAM6.0

    NPO

    W-CDMAOAM07.0

    NPO

    Full

    Upgrade

    W-CDMAOAM07.1

    NPO

    Full

    Upgrade

    Full

    Upgrade

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 14 / 76 V01.07 July 2010

    75785 Selective Backup and Restore

    FEATURE DESCRIPTION

    The goal of this feature is to have a more flexible solution for the backup and

    restore of essential and non essential data on local tape drive.

    Instead of doing of backup / restore of all modules of essential / non essential data,

    the improvement will allow to backup on demand all, or a selection of modules, and

    restore them in the same way.

    The modules chosen are the ones which might change regularly due to customer

    operations. For example the selection applies to WICL development, historical fault

    browser data, audit trail data, SDA data.

    This flexibility can be used for the implementation of Disaster Recovery solutions.

    The explicit selective list is:

    SRE: NE software loads

    databases

    jobserver database (access job history, details of CM operations on the network)

    notification server database (OA&M applications notifications)

    job scheduler database

    WPS workspace repository information database

    east west interface database (optional)

    access: UTRAN GUI

    WICL: passport views, WICL data

    HFB: HFB alarms database

    NE configuration data,

    BTS 1120 configuration data

    FEATURE BENEFITS

    Improved flexibility of the WMS backup and restore solution for the local backup and

    restore on tape drive solution.

    Centralized backup and restore solutions such as Symantec Veritas Netbackup

    support this type of flexibility already.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 15 / 76 V01.07 July 2010

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    111199 - WMS essential data backup without restrictive Window

    FEATURE DESCRIPTION

    In OAM06, in order to guarantee the consistency of the WMS essential data during

    backup, a lock is put on the following operations, during a 10 to 15 minute period

    called the restriction window

    CM operation

    WICL

    layout edition

    With this new feature, the WMS system behavior is changed to remove this short

    restriction window period

    Principles:

    Always have a consistent copy of the database and use this copy for the Backup

    When a backup is on-going, WOs can be executed in the meantime without

    restriction. They will be taken into account at the next backup session

    Even when WOs are on-going, if a backup is requested, it will run and backup

    the current consistent copy of the database

    Key operational impacts:

    The coherence is guaranteed at node level, not inter node level

    Impact on the configuration management KPI as a copy of the database will be

    regularly done

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 16 / 76 V01.07 July 2010

    FEATURE BENEFITS

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    113599 CTn processing capacity increase

    FEATURE DESCRIPTION

    A series of enhancements has been implemented to increase the capacity to process

    CTn call traces on the WMS servers, and to protect the servers against congestion

    cases, i.e. when the user-defined CT sessions overload the WMS.

    The WMS processing throughput has been increased, allowing WMS to process more

    input per second without using more CPU or memory.

    The policy for defence against congestion has been modified to not sacrifice latency

    over exhaustiveness. By triggering data loss, WMS now provides CTn data quickly.

    FEATURE BENEFITS

    The enhancements added to the CTn processing allow WMS to handle up to 20M calls

    per day w/o delay on a large server in a given context (see limitations section). XML

    CTn data are made available one publication period after collection end.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature is in the Plan Of Intent for OAM07.1.3

    Feature

    Interworking

    Devices

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 17 / 76 V01.07 July 2010

    Standards

    RESTRICTIONS/LIMITATIONS

    The CTn processing of 20M calls per day on a large WMS server assumes a typical

    traffic model for CTn data where each busy hour call generates on average 11 CTn

    records, with an average call duration under 1min, and 3 busy hours per day.

    Facing a more aggressive traffic model, the WMS server might initiate CTn data loss

    to protect itself from data overload.

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 18 / 76 V01.07 July 2010

    4 UTRAN SPECIFIC

    34608 - OAM Backward compatibility and Upgrade path of UA07 devices

    FEATURE DESCRIPTION

    This feature provides the support of the newly introduced UA07.0 release and the

    backward compatibility from the previous UTRAN software release for the WMS Main

    Servers. The following UTRAN upgrade paths are supported:

    For the 9370 RNC upgrade, the following upgrade types are supported:

    With new MIB

    With Current MIB

    FEATURE BENEFITS

    These features ensure smooth transition from UA release to UA release, allowing

    flexibility into the upgrade strategy by providing direct upgrade path.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    The MSS based POC supported configurations correspond to precise MSS7k and

    MSS15k based POC models that were supported in OAM5.2 with a PCR7.2.

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    Under OAM07.0, supported UTRAN upgrade paths

    RNCUA5.1

    RNCUA6.0

    Inter release UpgradeIntra release Upgrade

    With MIBWithout MIB

    With MIBWithout MIB

    RNCUA7.0

    With MIBWithout MIB

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 19 / 76 V01.07 July 2010

    82934 - OAM Backward compatibility and Upgrade path of UA07.1 devices

    FEATURE DESCRIPTION

    This feature provides the support of the newly introduced UA07.1 release and the

    backward compatibility from the previous UTRAN software release for the WMS Main

    Servers.

    The following UTRAN upgrade paths are supported:

    For the 9370 RNC upgrade, the following upgrade types are supported:

    With new MIB

    With Current MIB

    FEATURE BENEFITS

    These features ensure smooth transition from UA release to UA release, allowing

    flexibility into the upgrade strategy by providing direct upgrade path.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    The MSS based POC supported configurations correspond to precise MSS7k and

    MSS15k based POC models that were supported in OAM5.2 with a PCR7.2.

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    Under OAM07.1, UTRAN upgrade paths

    RNCUA6.0

    RNCUA7.0

    Inter release UpgradeIntra release Upgrade

    With MIBWithout MIB

    With MIBWithout MIB

    RNCUA7.1

    With MIBWithout MIB

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 20 / 76 V01.07 July 2010

    34693 - UTRAN NE upgrade improvements (WAUT output report, NodeB

    wizard)

    FEATURE DESCRIPTION

    This feature provides multiple various enhancements of the RNC and of the NodeB

    upgrade procedure. Starting with this release:

    The WAUT tool is enhanced and provides now an upgrade report in a tabular

    format containing for each parameter, its previous value, its new value and if the

    parameter is new / updated or deleted.

    Two reports are issued: one for the RNC and one for all the NodeBs. The RNC report

    is tagged with the RNC id, date and time of the generation. The NodeB report is

    tagged with date and time of the generation

    Usual export functions are supported: print and CSV export.

    The NodeB software download and activation wizard is enhanced with the two

    following changes:

    The Network Element type on which this software is applicable to (iBTS sub-

    family, OneBTS sub-family, Micro/Pico BTS), is added in the software

    selection window

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 21 / 76 V01.07 July 2010

    The Network Element type is added in the network selection window as well

    FEATURE BENEFITS

    The enhancements in the NodeB software download and activation wizard allows the

    OAM operator to sort per Network Element type in these two windows and by such

    simplify and ease the upgrade wizard.

    The WAUT reporting new capabilities speed up the RNC upgrade process by

    dramatically simplifying the preparation phase.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    36250 - UTRAN Sharing Management evolution

    FEATURE DESCRIPTION

    Operator main drivers for introduction of the UTRAN sharing feature include:

    Reduces Cost for operator by decreasing OPEX and low value capital outlay

    Improves Time To Revenue by providing faster service to a greater population

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 22 / 76 V01.07 July 2010

    Reduces Business Risk which gives a more favorable view from Banking

    community

    Therefore, operators of same countries are currently negotiating an association to

    share their expenses while extending their current coverage to fill their government

    contractual commitments.

    Different management models for the support of Utran sharing feature can be

    imagined:

    Report base model

    Data segregation model

    Data segregation and Resource Based Access Control (ResBAC) per PLMNid model

    Report base and Resource Based Access Control (ResBAC) per PLMNid model

    The business model for Utran sharing management retained by Alcatel-Lucent is the

    Report base and Resource Based Access Control (ResBAC) per PLMNid model. It is

    implemented in OAM07.1 release and will be enhanced in future releases based on

    customer feedbacks.

    The following example covers the case of 3 operators sharing (however, the Alcatel-

    Lucent Utran sharing solution supports up to 4 operators).

    A neutral operator (in this example the GREY operator) is responsible for all network

    operations including installation, maintenance, upgrades, parameters optimization

    of all part of the shared network. It includes the common parameters and the

    dedicated parameters modification / optimization linked to RED, BLUE and ORANGE

    operators), etc.

    WMSData

    Cell

    Data

    Cell

    Data

    Cell

    Data

    Common

    WPS

    SDA

    Operator

    Red

    Operator

    Blue

    Operator

    Orange

    File Repository server

    Change Control Board

    All partners define the features list to

    activate, decide new deployment, site

    to share / no more share, etc

    Daily / on Demand Reports per PLMNid Performance Counters report Cell Availability report Configuration report

    Lis t of key features per R NS / NodeB / Cell

    NPO

    WQA

    RFO

    Resource based Access Control per PLMNid

    RW RO

    Auditors can

    request on

    demand report

    and Access to

    their dedicated

    resources using

    ResBAC

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 23 / 76 V01.07 July 2010

    A Change Control Board structure has to be put in place between all partners to

    define the features list to activate, decide new deployments, sites to share or

    unshared, common parameters values, etc.

    This GREY operator is responsible for reporting to the RED, BLUE and ORANGE

    operators multiple reports such as Quality of Service reports to ensure to the RED,

    BLUE and ORANGE operators of their investment and return of profitability. It

    includes:

    Performance counters reports

    Cell availability reports

    Configuration reports

    RED, BLUE and ORANGE operators have access to the GREY operator operational

    centre. Each empowered person of the RED, BLUE and ORANGE operators is

    activating their dedicated work-orders (or CIQ based). The GREY operator is

    deciding of the most appropriate common PURPLE parameters based on the data

    received from the RED, BLUE and ORANGE operators and according to the decision

    taken during the Change Control Board meeting.

    It has to be noted that the GREY operator role can be handled by one of the RED,

    BLUE or ORANGE operators.

    In more detail, this feature is providing:

    Resource based Access Control per PLMNid function (ResBAC)

    The ResBAC function on WMS consists to allow different access right for different

    people on different resources.

    - The read only access right for the RED, BLUE and ORANGE operators to

    all resources (RED, BLUE ORANGE, PURPLE).

    - The read/write access right for the RED, BLUE and ORANGE operators to

    their dedicated RED, BLUE and ORANGE resources.

    - The read/write access right for the GREY operator to all parameter

    resources (RED, BLUE, ORANGE, PURPLE).

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 24 / 76 V01.07 July 2010

    Daily / on demand Reports per PLMNid

    Three types of reports are provided for Configuration, Performance and Availability

    management.

    - Performance report

    Operators can already define Object zones, Topology Classifications and

    Working zones per PLMNid with NPO.

    - Availability report

    For UTRAN sharing the current SDA snapshots has been extended with

    the two parameters (mobileCountryCode and mobileNetworkCode) that

    are required to compute the reports based on PLMNId. Both Service

    Availability report

    and Nodal

    Availability report

    per PLMNid are

    supported.

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 25 / 76 V01.07 July 2010

    - Configuration report

    Shared network operators have the ability to export the current

    configuration to HTML per PLMNId. This can be scheduled on a daily

    basis and provides a high level view of the activated features on RNC /

    NodeB / FDDCells and BTSEquipment.

    The generated CM reports are located on the WMS server

    (/opt/nortel/data/utran_sharing/cm_reports/CM-Report()-

    PLMN.html) and can be pushed by the GREY operator to the

    share file repository server. Each ORANGE, Red and BLUE operators can

    then retrieve their dedicated CM reports.

    RNC configuration report

    Update of RRM parameters during SRLR

    Compressed Mode by Higher Layer Scheduling (HLS)

    Extension of Iur capabilities

    MAC-d PDU size management for HSDPA

    GBR on HSDPA

    Support of Transport Bearer Replacement on SRNC

    HSUPA over Iur

    E-DCH Macro Diversity Support

    AMR mode change during the call

    UA06 Parameter Distribution

    Pre-emption process for DCH and HSDPA/HSUPA

    Unified RRM Step 2 : Cell Load information exchange between 2G and 3G

    MAC-e Scheduler evolutions

    EAGCH Power Control

    UA06 Always-On developments

    SRB on E-DCH during call

    Compound neighbour list developments (intrafrequency)

    Intra-Frequency Inter-RNC HHO without Iur

    Broadcast of SIB4

    Operator

    Red

    Operator

    Blue

    Operator

    Orange

    File Repository server

    Daily / on Demand Reports p er PLMNid

    Performance Counters report Cell Availability report Configurat ion report

    Lis t of key features per R NS / NodeB / CellWMSData

    Cell

    Data

    Cell

    Data

    Cell

    Data

    Common

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 26 / 76 V01.07 July 2010

    Broadcast of SIB12

    RRC connection re-establishment developments

    Defense mechanism for UEs not supporting CM with HSPA

    FDDCell configuration report

    Multi-carrier PA Power Pooling

    Compound neighbour list developments (intrafrequency)

    Broadcast of SIB4

    Broadcast of SIB12

    High RSSI Node B alarm

    IFREQ/IRAT Compound Neighbour lists

    NodeB configuration report

    Node B soft shutdown

    Hybrid Iub support on RNC

    MAC-e Scheduler evolutions

    BTS configuration report

    Node B Security UA06 Developments

    Multi-mode BBUs

    Iub bandwidth limitation for E-DCH

    HSUPA UE categories 4 to 6

    HSPA congestion detection & notification

    Dynamic HS-DSCH BLER target adjustment

    HS-DSCH Power Adjustment Evolution

    EAGCH Power Control

    15 min Node B counters

    Multi-carrier PA Power Pooling

    FEATURE BENEFITS

    The feature enhanced the current solution with this simple and pragmatic approach

    of the management of Utran sharing network.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature is delivered in OAM07.1.

    Feature

    Interworking

    Devices

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 27 / 76 V01.07 July 2010

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    34626 - W-CDMA License Manager evolutions

    FEATURE DESCRIPTION

    This feature provides multiple various enhancements of the W-CDMA License

    Manager:

    Automatic schedulable generation of report export for post-processing analysis

    purpose. Includes the warnings information tag for a better pro-active

    management of the licenses

    The Warning thresholds are now user configurable. Those thresholds are global

    for all licenses

    Email Notification: An email can be sent automatically sent periodically at a

    fixed time in the day and / or if the warning threshold is crossed. The email

    contains the list of all license types that have crossed a threshold. The email

    addresses are configurable by the end user

    FEATURE BENEFITS

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    No more !

    Warning !Schedule Snapshots

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 28 / 76 V01.07 July 2010

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    97006 - RETA Tilt Management

    FEATURE DESCRIPTION

    WMS is updated with the following enhancements to allow the management of the

    electrical tilt in the context of NodeB deployed with RRH configuration:

    A new tab is added in the Equipment monitor to display the RETA AISG devices

    information

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 29 / 76 V01.07 July 2010

    From the Shelf Level display, the user has the possibility to launch some actions

    in context such as CALIBRATE, RESET, etc. The operations are also available

    through the command line interface

    The RETA inventory information is provided as part of the NodeB inventory

    procedure

    FEATURE BENEFITS

    Customer benefits to be able to manage AISG based devices embedded in the

    Alcatel-Lucent RRH.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature is delivered in OAM07.1

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 30 / 76 V01.07 July 2010

    97005 - WMS support of BTS with unknown software version

    FEATURE DESCRIPTION

    This feature provides the proper management by WMS for the case of a BTS deployed

    with an old software version not compatible with WMS level of backward

    compatibility.

    The use cases in the context of OAM7.1 are:

    - new BTS from factory loaded with UA05.1 software

    - spare iCCM card with UA05.1 software or older software

    FEATURE BENEFITS

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    The feature is applicable for iBTS type only.

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    92132 - OAM support Multi-Standard BTS (Macro)

    92799 - OAM support Multi-Standard BTS (Distributed)

    FEATURE DESCRIPTION

    The OAM support of these new NodeB types introduced in UA7.1.3 is consistent with

    currently supported Alcatel-Lucent NodeBs.

    Fault Mgt: Shelf Level Display, OSI state window, Notification log tool, alarm

    browser, HFB, etc

    Configuration Mgt: Thru WPS, Object editor and WICL

    Performance Mgt: Collection of new counters and support of NPO

    FEATURE BENEFITS

    IMPACTED SYSTEMS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 31 / 76 V01.07 July 2010

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    This BTS type is anly available in the US market

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    101824 - Management of Converged RAN modules TRX 3G in 2G

    environment

    FEATURE DESCRIPTION

    The feature provides the support of the converged RAN module MC-TRX in the

    following configuration:

    MC-TRX 3G in a 2G environment

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 32 / 76 V01.07 July 2010

    In this context, a WMS operator is able to perform the following tasks:

    - Supervision / First alert

    alarms / states from the MC-TRX function

    Reset of the MC-TRX function

    - Configuration management

    Power setup of the 3G part of the MC-TRX power

    Software download of the MC-TRX function

    - Inventory management of the MC-TRX

    - Performance management of the MC-TRX

    FEATURE BENEFITS

    All MC-TRXs (2G or 3G) being physically connected to both the Sumx card thru the

    backplane and to the CCM card thru CPRI, no site re-visit are required when

    migrated a MC-TRX from 2G to 3G.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    The common modules of this converged BTS, such as the AN (Antenna Network

    module), are managed fully by the OMC-R 2G.

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    114390 - Management of Converged RAN modules RRH Multimode 2G/3G

    FEATURE DESCRIPTION

    The RRH2x40-09 (also called MC RRH900: Multi Carrier Remote Radio Head 900) is a

    new powerful remote radio head. The RRH2x40-09 is for 3GPP Band VIII (900MHz)

    and supports 2x40W composite output power over a 25MHz bandwidth.

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 33 / 76 V01.07 July 2010

    The RRH2x40-09 can be deployed in a mixed WCDMA and GSM environment, and

    supports up to 2 WCDMA carriers on one power amplifier and several GSM carriers on

    the other amplifier.

    In WMS, an operator is able to perform the following tasks:

    - Supervision / First alert

    alarms / states from the RRH2x40-09 3G functions

    handling of alarms / states from the TMA and AN modules

    relevant to 3G

    - Configuration management

    Power setup of the 3G part of a RRH2x40-09

    - Inventory management of the RRH2x40-09

    - Performance management of the RRH2x40-09

    FEATURE BENEFITS

    WMS allows the operator to manage the 3G part of the 2G/3G multi-carrier

    RRH2x40-09.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature is in the Plan Of Intent for OAM07.1.3

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    The software management and module reset of the RRH2x40-09 is performed from

    the 9153 OMC-R.

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    Because the RRH2x40-09 is a 2G/3G multi-carrier module, the software management

    and module reset need to be carefully planned in order to minimize the service

    impacts on the 2G and 3G networks. Therefore the teams responsible for the

    management of each network need to work together. To effectively manage multi-

    carrier modules, adequate processes need to be identified, taking into account the

    organizations, processes, and tools specific to each customer.

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 34 / 76 V01.07 July 2010

    5 FAULT MANAGEMENT

    5.1 First Alert

    34562 - Alarm flow reduction ruleset package

    FEATURE DESCRIPTION

    WMS provides a robust Fault Management solution capable of handling thousands of

    alarms generated by the managed network elements. All alarms are however not

    relevant for all operators, as each operator has his own supervision strategy.

    WMS offers since OAM03 (completed in OAM04) a powerful Advanced alarm

    management mechanism for customizing the alarm flow. Rules, implemented

    through a GUI, are applied to the alarm flow and define a so-called managed alarm

    stream to which each individual user (including 3GPP agent) can subscribe or not.

    Rules are based upon the following functions:

    Alarm inhibit

    Alarm delay

    Alarm toggling

    Alarm thresholding

    Severity change

    Auto acknowledgment

    Send SMS

    Send mail

    Action on alarm

    This feature requests that a recommended set of rules is delivered with the product,

    in the form of documentation, in the UTRAN supervision guidelines document.

    Those rules and the way to implement them using the advanced alarm management

    GUI is explicitly described in order for the operators to easily apply a first level of

    filtering to the alarm stream, such that alarms presented to the alarm manager GUI

    are consistent and relevant ones.

    The recommended set of rules provides:

    Alarm Inhibition rules

    Alarm Severity Change rules

    Alarm Severity Change & Threshold rules

    Method for automatic purge of aging alarms

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 35 / 76 V01.07 July 2010

    The rules are described in the UTRAN Supervision Guidelines document

    (UMT/SYS/INF/007308).

    FEATURE BENEFITS

    Recommended alarm management rules delivered as part of WMS product

    documentation, enabling operators to customize WMS in a few clicks for efficient

    network supervision.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    34613 - Additional Service information in UTRAN Service View

    FEATURE DESCRIPTION

    This feature adds four columns in the UTRAN service view window (introduced in

    OAM06.0) in order to display more accurately the cell statuses by taking into account

    additional information:

    disabled degraded/disabled failed

    enabled degraded which corresponds to a partial outage

    enabled, availability status = empty, control status= suspended, which

    corresponds to suspended service

    enabled, availability status = empty, control status= part of service locked

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 36 / 76 V01.07 July 2010

    The operator selects the columns he wants to display in the UTRAN Service View

    window.

    In addition the fddCell HSPA resource state information is displayed in the

    Equipment Monitor.

    FEATURE BENEFITS

    This finer granularity provides a better view on the global service offered by the

    network, as it allows to represent a degradation linked to cell in bad operational

    states or barred.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 37 / 76 V01.07 July 2010

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    36249 - FM Support of Service Router 7750 / 7710 / 7705

    FEATURE DESCRIPTION

    Subset of Alarms from the 7750/7710/7705 are consolidated and managed by the

    existing WMS toolset, thru the EMS 5620 SAM.

    On the WMS GUI, the user is seeing one icon representing the Transport Node 7750,

    7710 and 7705.

    Alarms events from these NE are handled and managed by the existing WMS toolset,

    therefore the following fault management functions are available:

    The Network Banner and Network Health Indicator, which provide network alarm

    status and summary alarm counts

    The Resource Browser, which graphically shows alarms on the network map or in

    a grid view format

    The Alarm Manager, which provides a list of active alarms: The alarm manager

    displays the component attribute, as well as the probable cause and additional

    text attributes. The Alarm Manager supports persistent user preferences so that

    operators re-launch of the alarm manager will result in its display in the same

    way it was left in the previous session. Sorting of information within the alarm

    manager columns is also supported.

    9 alarms rule set (option): alarm filtering, supporting both alarm delay and

    inhibit capabilities of the alarm stream, modification of severity, maintenance

    mode, send SMS and email upon reception of most important alarms, launch

    customized script, temporal correlation to allow consolidation of an alarm type

    which is being raised multiple times on a particular component.

    Managed and un-managed alarm stream switch off/on for ease of supervision

    Audible alarm

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 38 / 76 V01.07 July 2010

    The Historical Fault Browser (option) assists with historical analysis, incident

    reporting and customer impact analysis with a Web based GUI Browser which

    include advanced filtering and export capabilities.

    The 3GPP R6 FM IRP (option)

    In context launch of the 5620 SAM EMS

    FEATURE BENEFITS

    The following are the key benefits offered by this feature:

    Device Discovery

    Layouts

    First Alert Fault Management (in both Resource Browser and Alarm Manager)

    In-context reach-through to the devices or any associated EMS as appropriate

    from the desktop

    Support of northbound CORBA Fault and NE Discovery OSS Interfaces

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices 7750 SR, 7710 SR, 7705 SAR

    Standards

    RESTRICTIONS/LIMITATIONS

    This feature integrates a subset of these devices alarms mainly service impacting

    category. The exact list will be described in the relevant ALTP documents.

    Topological View with map

    JMS

    ReachThru

    WMS

    5620 SAM

    7750RNCNodeB

    Alarm Browser

    7710 7705 5620 SAM 7.07750 SR 7.0, 7710 SR 7.0, 7705 SAR 2.0

    EnhancedAlarmMgt

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 39 / 76 V01.07 July 2010

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    The EMS of the Transport Node 7750 SR / 7710 SR / 7705 SAR is called the 5620 SAM.

    It is required to be deployed on its dedicated hardware machine. The functions such

    as NE configuration, NE performance, NE security and NE administration are handled

    by the EMS 5620 SAM.

    89864 Customized iBTS board Insertion/Extraction alarm flow

    FEATURE DESCRIPTION

    Starting OAM5.1, WMS is converting automatically the board insertion / extraction

    states received from the iBTS into alarms visible in the alarm window.

    This feature allows the operator to turn on/off this conversion mechanism as willing

    by its operational model on a per ROC basis.

    If the operator decides to switch on the conversion mechanism, the iBTS states

    are visible in the Notification Log tool and converted as alarms in the alarm

    window.

    If the operator decides to switch off the conversion mechanism, the iBTS states

    are visible in the Notification Log tool and no more in the alarm window.

    The switch can be performed on-line and does not affect neither the supervision nor

    the configuration operations. It is implemented thru WICL scripts that can be run by

    the operator manually or scheduled using the job scheduling functions of WMS. Per

    default the switch is set as on (alarm conversion on).

    FEATURE BENEFITS

    This feature gives to the operator the flexibility to decide based on these

    operational model if these specific board insertion / extraction iBTS states are

    converted in alarm or not.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 40 / 76 V01.07 July 2010

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    5.2 TroubleShooting

    34701 - Java GUI for ATM interface Status & VPI/VCI Occupancy

    FEATURE DESCRIPTION

    The Operational Effectiveness GUIs for ATM interface status and VPI/VCI occupancy

    rate introduced in OAM05.2 as WICLET based GUI are migrated to Java GUIs.

    An example of screenshot is provided below.

    The previously deployed WICLET based GUI are removed from the OAM07 software

    load delivery.

    FEATURE BENEFITS

    The migration to a Java solution improves the performance of the ATM interface

    status and VPI/VCI occupancy rate GUIs.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 41 / 76 V01.07 July 2010

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    34512 - Various Utran OAM OE enhancements

    FEATURE DESCRIPTION

    This feature provides multiple operational enhancements of the WMS application.

    Session manager:

    o After workorder analysis, if the activation requires a lock action, the

    type field is set to ONLINE (LOCKS) instead of ONLINE. The

    state can be changed from ONLINE (LOCKS) to CRITICAL in the same

    fashion it is currently possible to set from ONLINE to CRITICAL

    o In order to enhance the usability of the session managers summary

    panel, the link opening the report for each line of the activation

    summary is added to the cells in the column Validate result. This

    allows shortening the mouse movement to open, the report, and keep

    the focus on the table when the report pop-up is closed

    Object editor: wildcard search introduced in the search field

    Equipment monitor: the parameters value display table can be exported in .csv

    format and printed.

    Command manager: The logs tab is opened per default when the command

    manager window is launched and new Help is added.

    A Wiclet for RNC Counter list is now provided to ease the RNC counter list setup.

    Addition of GUI Launch points from the WMS desktop for Neighboring and new

    RNC counter list Wiclets

    FEATURE BENEFITS

    It eases day to day operator tasks and therefore increases operator efficiency.

    Session manager: new ONLINE (LOCKS)

    indicator

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 42 / 76 V01.07 July 2010

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    36212 Enhancement of Resource GUI (RSSI display, TX power)

    FEATURE DESCRIPTION

    This feature enhances the WMS Logical and Physical Resource GUI by adding within

    the Node B view the TX power and RSSI information, as illustrated in the picture

    below. The new ETS Radio Power tab is provided in the GUI.

    FEATURE BENEFITS

    This feature provides additional value added information in the WMS Logical and

    Physical Resource GUI.

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 43 / 76 V01.07 July 2010

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 44 / 76 V01.07 July 2010

    6 CONFIGURATION MANAGEMENT

    6.1 On-Line Configuration Management

    30934 Activation Manager Enhancements: Pause/Resume Sessions

    FEATURE DESCRIPTION

    This feature provides the possibility to release the Network Elements involved in an

    Activation Session whatever was their activation status (even during activation

    phase).

    At the release action, the activation manager will automatically generates

    Fallback/Resume WorkOrders (a separated WorkOrder for each released NE) and the

    associated sessions (Multi WorkOrders session). The fallback and resume sessions will

    be ready to be launched.

    FEATURE BENEFITS

    With these improvements, the user will be able to release some Network Elements

    locked due to their involvement in an activation session and enable other sessions or

    other activities to be launched on these Network Elements (Lock/Unlock). The user

    can resume the activation later on or fallback the released Network Elements to

    reach their initial status.

    All the resume/fallback automatically generated sessions will be listed in the

    session tree list enabling the user to easily resume or fallback the released Network

    Elements.

    This feature will bring more flexibility to the activation activities in terms of user

    collaboration and in terms of session management with the enhanced release,

    resume and fallback capabilities.

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 45 / 76 V01.07 July 2010

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    103003 WMS Object Editor Parameter Mask

    FEATURE DESCRIPTION

    With this feature, the object editor user will be allowed to modify only a subset of

    parameters while the remaining ones will be grayed in the GUI and read-only.

    The selection of the subset of the grayed/read-only parameters is done using Mask

    mechanism. The operator specifies the mask using a CSV file which gathers all the

    parameters which should be grayed and read only.

    The default behavior is not to have an applied Mask in the object editor.

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 46 / 76 V01.07 July 2010

    FEATURE BENEFITS

    This feature aims to reduce the risk of erroneous manipulation of parameters in the

    object editor by making some parameters read only.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    6.2 Off-Line Configuration Management

    74608 One Step Node B Renaming

    FEATURE DESCRIPTION

    This feature provides the possibility to rename a Node B and associated components

    in a single action thru a dedicated standalone operation that the user can launch by

    selecting the Node B object. The modification of the Node Bs userlabel will be

    propagated properly to the BTSEquipment, the FDDCell, Site and other

    components that could be impacted by the Node B renaming (e.g. Iub VCC

    CorrelationTag).

    FEATURE BENEFITS

    In the previous releases, WPS provides a renaming interface for each object: Node B,

    FDDCell, BTSEquipment and site. However, to comply with engineering rules, a Node

    B renaming requires several individual actions to update all related objects and

    attributes.

    This operation makes the Node B renaming less time consuming by allowing the

    propagation of the new name to other related components. The WPS Rules and

    Checks integrated in this operation ensure that this propagation is done properly to

    all the associated objects and attributes and recommendations are respected for all

    the user labels and attributes (tags, etc).

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 47 / 76 V01.07 July 2010

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    81339 WPS Parameter Search

    FEATURE DESCRIPTION

    WPS provides already an object search capability: The Find tool is used to search a

    character string but not attributes.

    In addition to the search described above and provided in the previous releases, this

    feature enables the user to search for parameters. The user could enter partial

    parameter name (minimum three characters) and the search engine will list all the

    corresponding parameters. The user could select one of the listed parameters in

    order to find it.

    Automatic propagation of a NodeB name change onto associated

    fddcells, BTSEquipment and site with the following rule:

    - BTSEquipment.userlabel = NodeB.userlabel

    - Fddcell.userlabel = concatenate (nodeB.userlabel, _ , fddcell.rdnId)

    - optional: site.userlabel = NodeB.userlabel

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 48 / 76 V01.07 July 2010

    This search will be available for the network tree, the WorkOrders, datasets and

    templates.

    FEATURE BENEFITS

    This feature will ease the parameter search in WPS by providing an intuitive

    parameter search GUI and by allowing the selection of the parameters/objects

    without an advanced knowledge of the data model.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 49 / 76 V01.07 July 2010

    110999 - WPS Bulk operations

    FEATURE DESCRIPTION

    In the previous WPS release complex tasks was accomplished using the WPS wizards

    by launching a set of defined operations for each impacted NE. The main complex

    operations are:

    NodeB reparenting

    NodeB Add

    Iub Creation

    E1/T1 addition

    With this new feature the operator will be able to perform the above operations in a

    Bulk mode without having to launch WPS operations one by one for each NE and

    without having to enter manually the wizards inputs. The inputs of the Bulk

    operations are gathered in excel sheets containing all the needed information for

    the operation. The format of the input file (input file template could be generated

    automatically by WPS).

    FEATURE BENEFITS

    The Bulk operation will reduce drastically the time for the offline preparation of

    complex operations and avoid errors which could occur while entering manually the

    operations inputs.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Import of input file

    Input file template generation

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 50 / 76 V01.07 July 2010

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    84327 WPS Abort ongoing long operations

    FEATURE DESCRIPTION

    This feature will provide the possibility to abort long operations especially for big

    size networks. The abort will be available for import snapshots and on-going check

    sessions.

    The user will have to save the Workspace in order to make the abort available

    while importing snapshots.

    FEATURE BENEFITS

    This feature avoids the lost of time, by allowing the user to abort some operations

    taking long time to be accomplished especially for big size networks.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 51 / 76 V01.07 July 2010

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    89868 - WPS WorkOrder Management Optimization

    FEATURE DESCRIPTION

    This feature will avoid the import of the snapshot when the user manages the

    WorkOrders (re-compute planning view after inhibition, set WorkOrder as current,

    delete WorkOrder). Instead of re-importing the full snapshot for this operation, WPS

    imports only the impacted NEs which saves drastically the time of the operations.

    FEATURE BENEFITS

    By avoiding the import of the full snapshot, this feature will reduce the time lost

    when managing WorkOrders especially for big size networks.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    93486 - WPS Operational Effectiveness

    FEATURE DESCRIPTION

    This feature brings some enhancements which will be very useful for WPS users

    daily operations (indicate the check profile in the check session report, propose to

    create a new workorder each time the user launches the wizard, column selection,

    etc). The main enhancement is to enable the propagation of the templates with

    their Subtree (template propagation was available without subtree).

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 52 / 76 V01.07 July 2010

    FEATURE BENEFITS

    This feature brings some enhancements which will be very useful for WPS users

    daily operations. The propagation with Subtree is very useful for the Bulk

    propagation of some default/recommended configuration.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 53 / 76 V01.07 July 2010

    7 PERFORMANCE MANAGEMENT

    7.1 Operational Performance

    20972 - WMS Real-Time Performance Monitoring application

    FEATURE DESCRIPTION

    WMS solution will be extended to include a Real Time Counters Monitoring

    framework to be launched from the NSP desktop.

    Real Time performance activity for UTRAN can be split the following way:

    1. Selection of a zone to monitor (Network Element list with a limited number

    of Network Elements) through a GUI

    2. Activation of a fixed list of counters on Network Elements

    3. Real Time Counters collection from the Network Elements by WMS

    4. Real Time Counters mediation into 3GPP format

    5. Computation of synthetic counters

    6. Presentation of real time counters in a user friendly GUI : table and graphs

    as presented on the next page of this document

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 54 / 76 V01.07 July 2010

    Example of Tabular View

    Example of Graphical View

    Granularity of collection is fixed and set to 3 minutes with an end to end reporting

    latency of about 1 minute.

    The following list of counter families is covered by this feature:

    Call Attempts Total, CS & PS

    Successful Call Setups Total, CS & PS

    Call Setup Success Rate Total, CS & PS

    Drop Calls Total, CS & PS

    Drop Call Rate Total, CS & PS

    Total Traffic, CS & PS (Erlang)

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 55 / 76 V01.07 July 2010

    FEATURE BENEFITS

    From a general manner, the benefits of this feature are to be able to visualize

    UTRAN synthetic counters values and evolution as soon as available from the

    Network Elements (from a limited number of Network Elements and cells).

    UTRAN synthetic counters refer to metrics calculated on WMS server based on raw

    counters reported by the RNC.

    This allows users to understand immediate network behavior when changes occur on

    the network.

    The following use cases have been identified:

    Special events management

    Customers want to be able to follow up special events such as concerts,

    sports events or large public meetings, i.e. to be able to monitor places

    where many people meet temporarily.

    The real time monitoring function will allow monitoring of a limited number

    of cells of Key Quality Indicators during several hours.

    Control of Local parameter change

    In other cases, customer need to be able to evaluate very quickly the results

    from the modification of a parameter (under few cells or a RNC), from the

    installation of a new site, etc.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    The list of counters displayed is not configurable by the user. Only some RNC CN

    counters are used by this feature.

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 56 / 76 V01.07 July 2010

    34276 Real Time Call Trace Presentation

    FEATURE DESCRIPTION

    In some cases, cells do not behave correctly and provide very bad quality with no

    usual reason, providing severe service impact to end users. Alarms and Counters

    cannot help find the root cause of the problem and the only way to troubleshoot is

    to send a drive tester on site performing pre-defined call scenarios while

    troubleshooter activates a Call Trace session on this user.

    Looking at the call flow with messaging content and/or evolution of call KPI on time

    graphs, troubleshooter is able to find out what is going wrong and put things back in

    order. Due to the impact on service, troubleshooter needs to be able to see call flow

    refreshed in real time (some seconds after message really occurs on network).

    With this feature, UTRAN messaging for specific mobiles are traced in real time

    trough a direct connection with the RNC through IP/UDP protocol.

    The overall latency of the solution should be between 10 to 15 seconds.

    The Graphical User Interface provided for this feature will be located on the WMS

    client and the user shall be able to see the following items:

    Call Message Flow

    Failure Message Identification

    Message Content Display

    Call Active Set

    List Of Established RAB

    Off-Line Replay Mechanism

    FEATURE BENEFITS

    This feature allows customers to debug some problems linked to specific users or

    mobiles in a matter of minutes.

    IMPACTED SYSTEMS

    DEPENDENCIES

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 57 / 76 V01.07 July 2010

    Hardware

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    Real Time CTb session only with activation on dedicated UE_ID on a maximum of two

    simultaneous calls per RNC.

    ENGINEERING IMPACTS

    Real time call trace traffic is relying on UDP. A specific UDP port number is used and

    the traffic is between the RNC and the WMS client directly.

    In case of Citrix server usage, a Virtual IP address pool has to be used on the Citrix

    server to allocated individual virtual Citrix IP addresses on a per session basis.

    OPERATIONAL REQUIREMENTS

    36182 OAM support UTRAN Counter capacity improvement

    FEATURE DESCRIPTION

    In OAM06 release, a counters list management mechanism provided users with

    flexibility to select counters to be activated or not. This feature proposes users to

    be more assisted in the selection of counters to be activated, and allow for

    activation at screening level.

    As a matter of fact, as there is now the possibility to filter out individual

    counter/screening pairs, and in order to facilitate filtering the counter list, the

    format of the CSV file used for counter list activation/de-activation has evolved to

    include the screening filed and some additional information about the the family of

    the counter.

    The action for the activation of a new counter list is done through a WICL script.

    A Wiclet for RNC Counter list will be provided in OAM 7.1 to ease the RNC counter

    list setup and is tracked by FRS 34512 - Various UTRAN OAM OE enhancements.

    FEATURE BENEFITS

    This feature allows customers to get full flexibility at counter/screening level for

    RNC counters list definition.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 58 / 76 V01.07 July 2010

    Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    7.2 Radio Frequency Optimizer

    34601 RFO : Adaptation to UA07

    FEATURE DESCRIPTION

    This feature keeps track of the adaptation required on RFO to be able to work in

    OAM07 in front of UA07, and also during upgrade of the OAM system (including RFO)

    to OAM07 release.

    Moreover, Microsoft WindowsTM Vista will be supported in complement of the already

    existing supported OS configurations.

    FEATURE BENEFITS

    This feature provides support of UA07 call trace format.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    RFO software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 59 / 76 V01.07 July 2010

    82930 RFO : Adaptation to UA07.1

    FEATURE DESCRIPTION

    This feature keeps track of the adaptation required on RFO to be able to work in

    OAM07.1 in front of UA07.1, and also during upgrade of the OAM system (including

    RFO) to OAM07.1 release.

    FEATURE BENEFITS

    This feature provides support of UA07.1 call trace format.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature is delivered in OAM07.1.

    RFO software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    90316 - Pre-defined Indicators and User-Defined Reporting on RFO &

    90317 - Additional predefined RFO indicators and user defined indicators

    FEATURE DESCRIPTION

    A set of pre-defined indicators are delivered within RFO and the user will be able to

    create his own reports either on per call either on a per cell basis. Those reports will

    be able to be deployed on several platforms thanks to export/import functionalities.

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 60 / 76 V01.07 July 2010

    FEATURE BENEFITS

    This feature allows the user to create its own reports based on pre-defined KPI

    delivered in RFO product. This feature is licensed with the RFO Professional Edition.

    IMPACTED SYSTEMS

    RFO software

    DEPENDENCIES

    Hardware

    Software

    90316: the feature is delivered in OAM07.0

    90317: the feature is delivered in OAM7.1

    These features are part of the RFO Professional Edition

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 61 / 76 V01.07 July 2010

    90318 - User-Defined Scenario for Call Classification in RFO

    FEATURE DESCRIPTION

    The user will be able to create its own custom scenario, in order to identify either

    before data integration either afterwards, a list of calls according to the sequence

    of the message defined and KPI based on the number of time the sequence was

    detected per call, average time between two sequences of messages, etc.

    FEATURE BENEFITS

    This feature allows accessing to enhanced troubleshooting functionalities and

    automating some root cause analysis scenarios into RFO product. This feature is

    licensed with the RFO Professional Edition.

    IMPACTED SYSTEMS

    RFO software

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    This feature is part of the RFO Professional Edition

    Feature

    Interworking

    Devices

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 62 / 76 V01.07 July 2010

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

    7.3 Wireless Quality Analyzer

    34600 - WQA adaptation to UA07

    FEATURE DESCRIPTION

    This feature keeps track of the adaptation required on WQA modules to be able to

    work in OAM07 in front of UA07, and also during upgrade to UA07.

    During upgrades to UA07, WQA will be able to show reports on the nodes working in

    UTRAN release prior to the upgrade, and also on the UA07 nodes.

    Moreover, Microsoft WindowsTM Vista for PC client and Windows 2008 Server for WQA

    server will be supported in complement of already existing supported operating

    system configurations.

    FEATURE BENEFITS

    This feature allows customer to continue using WQA modules in OAM07 in front of

    UA07.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    WQA Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 63 / 76 V01.07 July 2010

    82874 - WQA adaptation to UA07.1

    FEATURE DESCRIPTION

    This feature keeps track of the adaptation required on WQA modules to be able to

    work in OAM07.1 in front of UA07.1, and also during upgrade to UA07.1.

    During upgrades to UA07.1, WQA will be able to show reports on the nodes working

    in UTRAN release prior to the upgrade, and also on the UA07.1 nodes.

    FEATURE BENEFITS

    This feature allows customer to continue using WQA modules in OAM07.1 in front of

    UA07.1.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    This feature will be delivered in OAM07.1.

    WQA Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

    ENGINEERING IMPACTS

    OPERATIONAL REQUIREMENTS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Proprietary

    UMT/OAM/INF/025095 - 64 / 76 V01.07 July 2010

    79676- WQA support of multi ROC

    FEATURE DESCRIPTION

    This feature provides the support of several WMS ROCs by one (1) single WQA server

    meanwhile the current limit in terms of number of cells is respected.

    In OAM7.0 release, the WQA server will be able then to manage 4000 cells

    dispatched on several ROCs (up to 5 ROCs).

    The WQA server will be able to manage in parallel the integration of data coming

    from several WMS data sources and present them in consolidated reports.

    The communication between the WQA server and the ROC server(s) is done by SFTP

    (secure FTP) or FTP.

    FEATURE BENEFITS

    This feature allows customers to benefit from support of multi-ROC within the

    current limit in number of cells of 4000 cells per WQA.

    IMPACTED SYSTEMS

    DEPENDENCIES

    Hardware

    Software

    WQA Software

    Feature

    Interworking

    Devices

    Standards

    RESTRICTIONS/LIMITATIONS

  • WMS FOR W-CDMA FPG OAM07 JULY 2010

    Alcatel-Lucent Propr