Family Justice Center Feasibility Study – Final Report BRANDON J. WILSON, OFFICER EL PASO COUNTY STRATEGIC INITIATIVES DIVISION MAY 19, 2020
12

Feasibility Study Final Report 5.19 - El Paso County, Colorado

Dec 05, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Family Justice Center Feasibility Study –Final ReportBRANDON   J .  WILSON,  OFFICER

EL  PASO  COUNTY  STRATEGIC   IN IT IATIVES  DIVIS ION

MAY  19,  2020

Page 2: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Outline

2

PROJECT TIMELINE METHODOLOGY CONCLUSIONS RECOMMENDED ACTION

WHAT’S NEXT? QUESTIONS/COMMENTS

Page 3: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Project Timeline

3

Trip to Fort Worth, TX to attend NACo Winter Conference

Dec. 2017

Former County Administrator Henry Yankowski asked me to give a presentation to the CJCC about the concept of a family justice center

Feb. 2018

Met with former Commissioner Daryl Glenn and county leadership to discuss the potential of conducting a feasibility study to determine the need/desire for a family justice center in El Paso County

Mar. 2018

Presented to the CJCC’s Strategic Planning Committee and requested the committee’s endorsement to present the idea of a feasibility study to CJCC at its next meeting

May 2018

Presented to the CJCC and requested endorsement to conduct a feasibility study to determine the need/desire for a family justice center in El Paso County

May 2018

Family Justice Center Feasibility Study Scope Statement finalized and RFP initiated

July 2018

Page 4: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Project Timeline

4

TESSA awarded contract for the feasibility study and subcontracted research component of the feasibility study

Oct. 2018

TESSA ends relationship with subcontractor and initiates process to select a new subcontractor to complete the research portion of the feasibility study

Mar. 2019

Elevated Insights selected by TESSA to complete the research portion of the feasibility study

June 2019

Elevated Insights delivered its ‘Final Report’ to TESSA and El Paso County

Nov. 2019

Page 5: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Methodology

5

Page 6: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Conclusions

6

Page 7: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Conclusions

7

Page 8: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Recommended Action

8

Page 9: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Recommended Action

9

Page 10: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Recommended Action

10

Page 11: Feasibility Study Final Report 5.19 - El Paso County, Colorado

So… What’s Next?

11

Page 12: Feasibility Study Final Report 5.19 - El Paso County, Colorado

Questions/Comments?

12