Fashion Fast and Accurate with Pick to Light Citi Trends System Overview: For more information, visit bastiansolutions.com or call (800) 772-0464 Citi Trends Fashion for Less is a value priced family apparel retailer with over 200 stores in the south- east, mid-Atlantic region and Texas. Citi Trends’ success as a value retailer resulted in the need to expand their original distribution center in Darlington, SC. The original distribution center utilized a very manual flow through process with little on-site storage other than work-in-progress, which caused accuracy and productivity to be less than desired. Bastian Solutions needed to keep the original system operational while expanding and improving operations.
2
Embed
Fashion Fast and Accurate with Pick to Light€¦ · Citi Trends System Overview: For more information, visit bastiansolutions.com or call (800) 772-0464 Citi Trends Fashion for Less
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Fashion Fast and Accurate with Pick to Light
Citi Trends
System Overview:
For more information, visit bastiansolutions.com or call (800) 772-0464
Citi Trends Fashion for Less is a value priced family apparel retailer with over 200 stores in the south-east, mid-Atlantic region and Texas. Citi Trends’ success as a value retailer resulted in the need to expand their original distribution center in Darlington, SC. The original distribution center utilized a very manual flow through process with little on-site storage other than work-in-progress, which caused accuracy and productivity to be less than desired. Bastian Solutions needed to keep the original system operational while expanding and improving operations.
Fashion Fast and Accurate with Pick to Light
Citi Trends
For more information, visit bastiansolutions.com or call (800) 772-0464
Business Challenges:• The DC utilized a very manual flow through process with lit-
tle on-site storage other than work-in-progress. This caused
accuracy and productivity to be less than desired.
• The expansion and modification of the Darlington Distribu-
tion Center needed to meet Citi Trends growth goal of 800
retail stores.
• Bastian needed to keep current system operational while
expanding and improving operations.
• The original Darlington DC was outfitted with a used con-
veyor system which was never properly installed or fully
operational.
Results:• Bastian reworked/configured approximately 6108 feet of
existing conveyor, and installed/integrated approximately
4389 feet of used conveyor to reduce Citi Trends costs.
• Bastian exceeded System Design Rates for both the Pack
Sorter and the Shipping Sorter.
• Citi Trends is experiencing increased efficiency and im-
proved ergonomics.
• The project was completed on-time and under budget with-