Farmer Empowerment through Agricultural Technology and Inform (FEATI) PROCUREMENT PLAN FY 2010 Jakarta 12550 Agency for Agricultural Human Resources Development, Ministry of Agriculture Kantor Pusat Departemen Pertanian Gedung D Jalan Harsono RM No. 3, Ragunan Implementing Agency Badan Pengembangan Sumber Daya Manusia Pertanian, Kementrian Pertanian Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized
34
Embed
Farmer Empowerment through Agricultural Technology and ... · Farmer Empowerment through Agricultural Technology and Information (FEATI) PROCUREMENT PLAN FY 2010 ... Farmer Empowerment
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Farmer Empowerment through Agricultural Technology and Information(FEATI)
PROCUREMENT PLAN FY 2010
Jakarta 12550
Agency for Agricultural Human Resources Development, Ministry of AgricultureKantor Pusat Departemen Pertanian Gedung D
Jalan Harsono RM No. 3, Ragunan
Implementing AgencyBadan Pengembangan Sumber Daya Manusia Pertanian, Kementrian Pertanian
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Farmer Empowerment through Agricultural Technology and Information
I. GENERAL
1. Project Information:
Country: INDONESIABorrower’s Agency: The Ministry of AgricultureProject Name: Farmers Empowerment through Agricultural Technology and Information projectProject ID: P083742Funding: Loan Agreement: March 28, 2007
Credit Agreement: March 28, 2007Closing Date: June 30, 2012
Implementing Agency: Agency for Agriculturral Human Resources Development (AAHRD)
2. Bank’s Approval Date of the Procurement Plan: Original November 7, 2006Revision 17 Dec 07 ________________
3. Date of General Procurement Notice: Original April 22, 2004Revision 1 February 20, 2007Revision 2 February 18, 2008Revision 3 February 24, 2009Revision 4 June 30, 2009Revision 5 February 18, 2010
4. Period Covered by this Procurement Plan: From January 1, 2010 to December 31, 2010
Shopping Contract below $ 25,000(Goods, Works)Direct Contracting All Subject to Bank’s prior approval(Goods, Works)Community Participation None(Goods, Works)
2. Prequalification:
3. Proposed Procedures for CDD Components:Will be included in the Project Management Manual and the FMA Grant Operation Manual.
4. Reference to (if any) Project Operational/Procurement Manual:
5. Any Other Special Procurement Arrangements:N/A
Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist
Goods and Works and Non-Consulting Services.
N/A
Project Operational/Procurement Manual was approved by the Bank on
First Contract for Goods and Works each
(Goods, works and Non Consulting Services
(Goods, works and Non Consulting Services
Specified in the Procurement Plan
For strengthening farmer-driven extension in village, districts and provinces as written in the Project Manual
PROCUREMENT PLAN OF CIVIL WORKS
Procurement Method No. of PlannedPackage USD IDR Eq to USD
NCB - - - -Shopping - - - -TOTAL - - - -
Bank’s Review No. of PlannedPackage USD IDR Eq to USD
Prior Review - - - -Post Review - - - -
TOTAL - - - -
Actual
Actual
Procurement Packages with Methods and Time Schedule
General Information Location New Building Renovation Total
No. Reference No PIU Province District Unit Amount(IDR)
Unit Amount(IDR)
Unit ContractCost (IDR)
Proc.Method(
*)
EstimatedAmount (USD)
Prior Review
Bid Submission
Remarks Contract Signing
NOL to Bid Documents
Invitation for Bids
(IFB)
NOL to BER
1 1 1 FEATI/W-01/10101/10 Sumatera Utara Asahan 2 756,000,000 2 170,000,000 4 926,000,000 NCB 92,600 Yes 15-May-10 14-Jun-10
2 1 FEATI/W-01/10102/10 Sumatera Utara Labuhan Batu
Note:(*) Procurement Methods: ICB, NCB, Others (DC, IAPSO, Community, etc.)(**) No Objection is required only for contracts which are subject to prior review, refer to the Financing Agreement(***) Estimated exchange rate USD 1.00 = IDR10,000 IDR/USD
Page 12
Procurement Packages with Methods and Time Schedule
General Information Location
No. Reference No PIU Province District
18 1 1 FEATI/W-01/11801/10 Kalimantan Barat
Sambas
2 FEATI/W-02/11801/10 Kalimantan Barat
Sambas
2 1 FEATI/W-01/11802/10 Kalimantan Barat
Pontianak
84 packages
Note:(*) Procurement Methods: ICB, NCB, Others (DC, IAPSO, Community, etc.)(**) No Objection is required only for contracts which are subject to prior review, refer to the Financing Agreement(***) Estimated exchange rate USD 1.00 = IDR10,000 IDR/USD
Contract Signing
Page 13
PROCUREMENT PLAN OF COMPUTERS’ SET
Procurement Method No. of PlannedPackage USD IDR Eq to USD
NCB - - - -Shopping - - - -TOTAL - - - -
Bank’s Review No. of PlannedPackage USD IDR Eq to USD
Prior Review - - - -
Post Review - - - -TOTAL - - - -
Actual
Actual
Procurement Packages with Methods and Time Schedule
General Information Provision of ICT Equipment Estimated Cost Planned Actual
No. Reference No PIU Province District Year DescriptionsTotal(IDR) (USD)
Proc Method
Prior Review
(Yes/No)
Contract Signing
Contract Signing
FEATI/G1-01/10000/08 CPMU 2008 PC, Laptop, Printer, LCD 430,000,000 43,000 NCB No 10-Mar-08 tbaFEATI/G1-01/10000/09 CPMU 2009 Computer Set for Library 315,000,000 31,500 NCB No 11-Mar-09
1 FEATI/G1-01/10100/00 Sumatera Utara Propinsi 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 08-Mar-08 tba1.1 FEATI/G1-01/10101/07 Sumatera Utara Asahan 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 10-Dec-07
FEATI/G1-01/10102/07 Sumatera Utara Lab. Batu 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 26-Nov-07FEATI/G1-01/10103/07 Sumatera Utara Simalungun 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 07-Dec-07FEATI/G1-01/10104/07 Sumatera Utara Tapanuli Selatan 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 30-Oct-07FEATI/G1-01/10105/07 Sumatera Utara Karo 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 05-Nov-07
2 FEATI/G1-01/10200/07 Sumatera Barat 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 20-Nov-072.1 FEATI/G1-01/10201/07 Sumatera Barat Solok 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 06-Dec-07
FEATI/G1-01/10202/07 Sumatera Barat Pesisir Selatan 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 03-Dec-07FEATI/G1-01/10203/07 Sumatera Barat Lima Puluh Kota 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 12-Nov-07FEATI/G1-01/10204/07 Sumatera Barat Padang Pariaman 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 19-Nov-07FEATI/G1-01/10205/07 Sumatera Barat Solok Selatan 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 06-Dec-07
3 FEATI/G1-01/10300/00 Jambi 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No tba3.1 FEATI/G1-01/10301/07 Jambi Merangin 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 03-Dec-07
FEATI/G1-01/10302/00 Jambi Tj. Jabung Barat 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No tba4 FEATI/G1-01/10400/09 Sumatera Selatan 2009 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 08-Mar-08 21-May-09
4.1 FEATI/G1-01/10401/07 Sumatera Selatan Banyuasin 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 23-Oct-075 FEATI/G1-01/10501/07 Banten 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 08-Mar-08 tba
5.1 FEATI/G1-01/10501/07 Banten Serang 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 6-Dec-076 FEATI/G1-01/10600/07 Jawa Barat 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 08-Mar-08 tba
6.1 FEATI/G1-01/10601/07 Jawa Barat Subang 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 12-Nov-07FEATI/G1-01/10602/07 Jawa Barat Indramayu 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping NoFEATI/G1-01/10603/07 Jawa Barat Majalengka 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 26-Nov-07FEATI/G1-01/10604/07 Jawa Barat Garut 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 29-Nov-07FEATI/G1-01/10605/07 Jawa Barat Kuningan 2007 Laptop, Printer and LCD Projector 33,150,000 3,315 Shopping No 08-Mar-08 tbaFEATI/G1-01/10606/07 Jawa Barat Karawang 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 23-Nov-07FEATI/G1-01/10607/10 Jawa Barat Cirebon 2010 Laptop and LCD Projector 40,000,000 4,000 Shopping No 08-Mar-08 tbaFEATI/G1-01/10608/07 Jawa Barat Sukabumi 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 30-Nov-07
7 FEATI/G1-01/10700/07 Jawa Tengah 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 08-Mar-08 08-Aug-08FEATI/G1-01/10701/07 Jawa Tengah Brebes 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 7-Dec-07FEATI/G1-01/10702/07 Jawa Tengah Magelang 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 6-Dec-07FEATI/G1-01/10703/07 Jawa Tengah Batang 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 27-Nov-07FEATI/G1-01/10704/07 Jawa Tengah Temanggung 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 01-Dec-07
8 FEATI/G1-01/10800/07 Jawa Timur 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 08-Mar-08 tbaFEATI/G1-01/10801/07 Jawa Timur Malang 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 20-Oct-07FEATI/G1-01/10802/07 Jawa Timur Tulung Agung 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 05-Dec-07FEATI/G1-01/10803/07 Jawa Timur Tuban 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 30-Nov-07FEATI/G1-01/10804/07 Jawa Timur Kediri 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 14-Dec-07
15
Procurement Packages with Methods and Time Schedule
General Information Provision of ICT Equipment Estimated Cost Planned Actual
No. Reference No PIU Province District Year DescriptionsTotal(IDR) (USD)
Proc Method
Prior Review
(Yes/No)
Contract Signing
Contract Signing
9 FEATI/G1-01/10900/07 Kalimantan Selatan 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 26-Nov-07FEATI/G1-01/10901/07 Kalimantan Selatan Hulu Sungai Selatan 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 04-Dec-07FEATI/G1-01/10902/07 Kalimantan Selatan Hulu Sungai Tengah 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 04-Dec-07FEATI/G1-01/10903/07 Kalimantan Selatan Balangan 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 08-Mar-08 tba
10 FEATI/G1-01/11000/07 Sulawesi Utara 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping NoFEATI/G1-01/11001/07 Sulawesi Utara Minahasa 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 09-Oct-07FEATI/G1-01/11002/07 Sulawesi Utara Minahasa Selatan 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 11-Oct-07FEATI/G1-01/11003/07 Sulawesi Utara Bolaang Mongondow 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping NoFEATI/G1-01/11004/07 Sulawesi Utara Tomohon 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 11-Oct-07FEATI/G1-01/11005/07 Sulawesi Utara Kep. Sangihe 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 28-Nov-07FEATI/G1-01/11006/07 Sulawesi Utara Minahasa Utara 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 29-Nov-07
11 FEATI/G1-01/11100/07 Sulawesi Selatan 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping NoFEATI/G1-01/11101/07 Sulawesi Selatan Gowa 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping NoFEATI/G1-01/11102/07 Sulawesi Selatan Enrekang 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping NoFEATI/G1-01/11103/07 Sulawesi Selatan Maros 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 15-Nov-07FEATI/G1-01/11104/07 Sulawesi Selatan Bone 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 12-Nov-07FEATI/G1-01/11105/07 Sulawesi Selatan Luwu 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping NoFEATI/G1-01/11106/07 Sulawesi Selatan Sinjai 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 7-Dec-07
12 FEATI/G1-01/11200/08 Sulawesi Tenggara 2008 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 26-Nov-07FEATI/G1-01/11201/08 Sulawesi Tenggara Konawe 2008 Laptop and LCD Projector 39,000,000 3,900 Shopping No 08-Mar-08 24-Sep-09FEATI/G1-01/11201/09 Sulawesi Tenggara Konawe 2009 Laptop (3 units) 39,000,000 3,900 Shopping No 09-Mar-09 24-Nov-09FEATI/G1-01/11202/08 Sulawesi Tenggara Konawe Selatan 2008 Laptop and LCD Projector 43,000,000 4,300 Shopping No 08-Mar-08 tbaFEATI/G1-01/11203/08 Sulawesi Tenggara Muna 2008 Laptop and LCD Projector 43,000,000 4,300 Shopping No 08-Mar-08 30-Jan-08FEATI/G1-01/11203/09 Sulawesi Tenggara Muna 2009 Laptop and LCD Projector 43,000,000 4,300 Shopping No 09-Mar-09 28-Oct-09FEATI/G1-01/11204/08 Sulawesi Tenggara Kolaka 2008 Laptop and LCD Projector 26,859,000 2,686 Shopping No 08-Mar-08 15-Sep-08FEATI/G1-01/11205/08 Sulawesi Tenggara Buton 2008 Laptop and LCD Projector 43,000,000 4,300 Shopping No 08-Mar-08 9-May-08FEATI/G1-01/11205/08 Sulawesi Tenggara Buton 2008 Laptop 30,000,000 3,000 Shopping No 08-Mar-08 12-Nov-08FEATI/G1-01/11205/09 Sulawesi Tenggara Buton 2008 Laptop 30,000,000 3,000 Shopping No 09-Mar-09 12-Oct-09
13 FEATI/G1-01/11300/07 Sulawesi Tengah 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 20-Nov-07FEATI/G1-01/11301/07 Sulawesi Tengah Donggala 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 12-Nov-07
14 FEATI/G1-01/11400/07 Gorontalo 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 7-Dec-07FEATI/G1-01/11401/07 Gorontalo Boalemo 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 27-Dec-07FEATI/G1-01/11402/07 Gorontalo Pahuwato 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 7-Dec-07FEATI/G1-01/11403/07 Gorontalo Bone Bolango 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 9-Nov-07FEATI/G1-01/11404/07 Gorontalo Gorontalo 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 29-Nov-07
15 FEATI/G1-01/11500/07 DI Yogyakarta 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 08-Mar-08 tbaFEATI/G1-01/11501/07 DI Yogyakarta Kulon Progo 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 30-Nov-07FEATI/G1-01/11502/07 DI Yogyakarta Bantul 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 25-Oct-07FEATI/G1-01/11503/07 DI Yogyakarta Gunung Kidul 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 30-Nov-07
16 FEATI/G1-01/11600/07 Nusa Tenggara Barat 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 31-Oct-07
16
Procurement Packages with Methods and Time Schedule
General Information Provision of ICT Equipment Estimated Cost Planned Actual
No. Reference No PIU Province District Year DescriptionsTotal(IDR) (USD)
Proc Method
Prior Review
(Yes/No)
Contract Signing
Contract Signing
FEATI/G1-01/11601/07 Nusa Tenggara Barat Lombok Barat 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 27-Oct-07FEATI/G1-01/11602/07 Nusa Tenggara Barat Bima 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 02-Nov-07FEATI/G1-01/11603/07 Nusa Tenggara Barat Dompu 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 01-Nov-07FEATI/G1-01/11604/07 Nusa Tenggara Barat Sumbawa 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 21-Nov-07FEATI/G1-01/11605/07 Nusa Tenggara Barat Lombok Tengah 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No
17 FEATI/G1-01/11700/07 Nusa Tenggara Timur 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping NoFEATI/G1-01/11701/07 Nusa Tenggara Timur Manggarai 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 10-Dec-07FEATI/G1-01/11702/07 Nusa Tenggara Timur Sumba Timur 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 4-Dec-07FEATI/G1-01/11703/00 Nusa Tenggara Timur Ngada Laptop and LCD Projector 47,800,000 4,780 Shopping No 08-Mar-08 tbaFEATI/G1-01/11704/07 Nusa Tenggara Timur Ende 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 12-Nov-07FEATI/G1-01/11705/07 Nusa Tenggara Timur Sumba Barat 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 03-Dec-07FEATI/G1-01/11706/07 Nusa Tenggara Timur Belu 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 14-Nov-07
18 FEATI/G1-01/11800/07 Kalimantan Barat 2007 Personal Computer (PC) and Printer 21,500,000 2,150 Shopping No 19-Nov-07FEATI/G1-01/11801/08 Kalimantan Barat Sambas 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 08-Mar-08 08-Mar-08FEATI/G1-01/11802/07 Kalimantan Barat Pontianak 2007 Laptop and LCD Projector 43,000,000 4,300 Shopping No 26-Nov-07
TOTAL 3,532,309,000 353,231
Note:(*) Procurement Methods: ICB, NCB, Others (DC, IAPSO, Community, etc.)(**) No Objection is required only for contracts which are subject to prior review, refer to the Financing AgreementEstimated exchange rate USD 1.00 = IDR
17
Procurement Method No. of PlannedPackage USD IDR Eq to USD
NCB - - - -Shopping - - - -TOTAL - - - -
Bank’s Review No. of PlannedPackage USD IDR Eq to USD
Procurement Packages with Methods and Time Schedule
General Information Provision of Books for Library/Printed Materials Planned Actual
No. Reference No Province District Year Descriptions
Total (IDR)
Proc. Method
Estimated Amount
(USD)
Prior Review
(Yes/No)
Remarks of Proposal
Contract Signing
NOL to Bid Documents
Invitation for Bids
(IFB)NOL to BER
Contract Signing
1 1 FEATI/G2-01/10101/11 Sumatera Utara Asahan 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A2 FEATI/G2-01/10102/07 Lab. Batu 2007 Books for Library 7,000,000 Shopping 700 No 26-Nov-07 N/A N/A 26-Nov-073 FEATI/G2-01/10103/07 Simalungun 2007 Books for Library 7,000,000 Shopping 700 No 07-Dec-07 N/A N/A 07-Dec-074 FEATI/G2-01/10104/07 Tapanuli Selatan 2008 Books for Library 7,000,000 Shopping 700 No N/A N/A5 FEATI/G2-01/10105/07 Karo 2007 Books for Library 7,000,000 Shopping 700 No 08-Nov-07 N/A N/A 08-Nov-07
2 1 FEATI/G2-01/10201/11 Sumatera Barat Solok 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A2 FEATI/G2-01/10202/07 Pesisir Selatan 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 03-Dec-073 FEATI/G2-01/10203/07 Lima Puluh Kota 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A4 FEATI/G2-01/10204/07 Padang Pariaman 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 26-Nov-075 FEATI/G2-01/10205/07 Solok Selatan 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 6-Nov-07
3 1 FEATI/G2-01/10301/07 Jamibi Merangin 2007 Books for Library 7,000,000 DC 700 No N/A N/A 10-Nov-082 FEATI/G2-01/10302/10 Tj. Jabung Barat 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A
4 1 FEATI/G2-01/10401/07 Sumatera Selatan Banyuasin 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 23-Oct-075 1 FEATI/G2-01/10501/07 Banten Serang 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 6-Dec-076 1 FEATI/G2-01/10601/07 Jawa Barat Subang 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 12-Nov-07
2 FEATI/G2-01/10602/11 Indramayu 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A3 FEATI/G2-01/10603/07 Majalengka 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 30-Nov-074 FEATI/G2-01/10604/07 Garut 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 29-Nov-075 FEATI/G2-01/10605/11 Kuningan 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A6 FEATI/G2-01/10606/10 Karawang 2010 Books for Library 10,000,000 Shopping 1,000 No N/A N/A7 FEATI/G2-01/10607/11 Cirebon 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A8 FEATI/G2-01/10608/07 Sukabumi 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 30-Nov-07
7 1 FEATI/G2-01/10701/07 Jawa Tengah Brebes 2007 Books for Library 7,000,000 Shopping 700 No 07-Dec-07 N/A N/A 7-Dec-072 FEATI/G2-01/10702/11 Magelang 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A3 FEATI/G2-01/10703/07 Batang 2007 Books for Library 7,000,000 Shopping 700 No 27-Nov-07 N/A N/A 27-Nov-074 FEATI/G2-01/10704/07 Temanggung 2007 Books for Library 7,000,000 Shopping 700 No 01-Dec-07 N/A N/A 1-Dec-07
8 1 FEATI/G2-01/10801/11 Jawa Timur Malang 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A2 FEATI/G2-01/10802/11 Tulung Agung 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A3 FEATI/G2-01/10803/11 Tuban 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A4 FEATI/G2-01/10804/11 Kediri 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A
9 1 FEATI/G2-01/10901/07 Kalimantan Selatan Hulu Sungai Selatan 2007 Books for Library 7,000,000 Shopping 700 No 04-Dec-07 N/A N/A 4-Dec-072 FEATI/G2-01/10902/07 Hulu Sungai Tengah 2007 Books for Library 7,000,000 Shopping 700 No 04-Dec-07 N/A N/A 4-Dec-073 FEATI/G2-01/10903/11 Balangan 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A
10 1 FEATI/G2-01/10001/11 Sulawesi Utara Minahasa 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A2 FEATI/G2-01/10002/11 Minahasa Selatan 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A3 FEATI/G2-01/10003/11 Bolaang Mongondow 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A4 FEATI/G2-01/10004/11 Tomohon 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A5 FEATI/G2-01/10005/11 Kep. Sangihe 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A6 FEATI/G2-01/10006/11 Minahasa Utara 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A
19
Procurement Packages with Methods and Time Schedule
General Information Provision of Books for Library/Printed Materials Planned Actual
No. Reference No Province District Year Descriptions
Total (IDR)
Proc. Method
Estimated Amount
(USD)
Prior Review
(Yes/No)
Remarks of Proposal
Contract Signing
NOL to Bid Documents
Invitation for Bids
(IFB)NOL to BER
Contract Signing
11 1 FEATI/G2-01/11001/11 Sulawesi Selatan Gowa 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A2 FEATI/G2-01/11002/11 Enrekang 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A3 FEATI/G2-01/11003/07 Maros 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 19-Nov-074 FEATI/G2-01/11004/07 Bone 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 06-Dec-075 FEATI/G2-01/11005/07 Luwu 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 17-Dec-076 FEATI/G2-01/11006/07 Sinjai 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 14-Dec-07
12 1 FEATI/G2-01/11201/11 Sulawesi Tenggara Konawe 2011 Books for Library 7,000,000 Shopping 700 No 03-Jan-00 N/A N/A2 FEATI/G2-01/11202/11 Konawe Selatan 2011 Books for Library 7,000,000 Shopping 700 No 03-Jan-00 N/A N/A3 FEATI/G2-01/11203/08 Muna 2008 Books for Library 7,000,000 Shopping 700 No 03-Jan-00 N/A N/A 15-Jul-084 FEATI/G2-01/11204/11 Kolaka 2011 Books for Library 7,000,000 Shopping 700 No 03-Jan-00 N/A N/A5 FEATI/G2-01/11205/07 Buton 2007 Books for Library 7,000,000 Shopping 700 No 31-Oct-07 N/A N/A 31-Oct-07
13 1 FEATI/G2-01/11301/09 Sulawesi Tengah Donggala 2009 Books for Library 7,000,000 Shopping 700 No N/A N/A 28-Aug-0914 1 FEATI/G2-01/11401/07 Gorontalo Boalemo 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A 13-Jul-07
2 FEATI/G2-01/11402/11 Pahuwato 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A3 FEATI/G2-01/11403/11 Bone Bolango 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A4 FEATI/G2-01/11404/11 Gorontalo 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A
15 1 FEATI/G2-01/11501/07 DI Yogyakarta Kulon Progo 2007 Books for Library 7,000,000 Shopping 700 No 30-Nov-07 N/A N/A 30-Nov-072 FEATI/G2-01/11502/07 Bantul 2007 Books for Library 7,000,000 Shopping 700 No 27-Dec-07 N/A N/A 27-Dec-073 FEATI/G2-01/11503/07 Gunung Kidul 2007 Books for Library 7,000,000 Shopping 700 No 29-Nov-07 N/A N/A 29-Nov-07
16 1 FEATI/G2-01/11601/07 Nusa Tenggara Barat Lombok Barat 2007 Books for Library 7,000,000 Shopping 700 No 10-Nov-07 N/A N/A 10-Nov-072 FEATI/G2-01/11602/07 Bima 2007 Books for Library 7,000,000 Shopping 700 No 20-Nov-07 N/A N/A 20-Nov-073 FEATI/G2-01/11603/07 Dompu 2007 Books for Library 7,000,000 Shopping 700 No 14-Nov-07 N/A N/A 14-Nov-074 FEATI/G2-01/11604/09 Sumbawa 2009 Books for Library 7,000,000 Shopping 700 No N/A N/A 04-Dec-095 FEATI/G2-01/11605/07 Lombok Tengah 2007 Books for Library 7,000,000 Shopping 700 No 03-Jan-00 N/A N/A 18-Dec-07
17 1 FEATI/G2-01/11701/09 Nusa Tenggara Timur Manggarai 2009 Books for Library 7,000,000 Shopping 700 No N/A N/A2 FEATI/G2-01/11702/11 Sumba Timur 2011 Books for Library 7,000,000 Shopping 700 No N/A N/A3 FEATI/G2-01/11703/09 Ngada 2009 Books for Library 7,000,000 Shopping 700 No N/A N/A4 FEATI/G2-01/11704/09 Ende 2009 Books for Library 7,000,000 Shopping 700 No N/A N/A5 FEATI/G2-01/11705/11 Sumba Barat 2010 Books for Library 7,000,000 Shopping 700 No N/A N/A6 FEATI/G2-01/11706/11 Belu 2010 Books for Library 7,000,000 Shopping 700 No N/A N/A
18 1 FEATI/G2-01/11801/11 Kalimantan Barat Sambas 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A2 FEATI/G2-01/11802/11 Pontianak 2007 Books for Library 7,000,000 Shopping 700 No N/A N/A
71 500,000,000 50,000
Note:(*) Procurement Methods: ICB, NCB, Others (DC, IAPSO, Community, etc.)(**) No Objection is required only for contracts which are subject to prior review, refer to the Financing AgreementEstimated exchange rate USD 1.00 = IDR
20
PROCUREMENT PLAN OF FURNITURES FOR BPP
Procurement Method No. of Planned
Package USD IDR Eq to USD
NCB - - - -Shopping - - - -TOTAL - - - -
Bank’s Review No. of PlannedPackage USD IDR Eq to USD
Procurement Packages with Methods and Time ScheduleOffice Furnitures for New and Renovated BPP BuildingGeneral Information New Buildings Renovation Total
No. Reference No PIU Province District Year Cost (IDR) Cost (IDR) Unit Total Cost (IDR) Procurement Method
Estimated Amount (USD)
Prior Review
(Yes/No)
Remarks of Proposal
1 1 FEATI/G3-01/10101/10 Sumatera Utara Asahan [8,4] 2010 135,000,000 40,000,000 13 175,000,000 Shopping 17,500 No2 FEATI/G3-01/10102/10 Labuhan Batu 2010 135,000,000 60,000,000 15 195,000,000 Shopping 19,500 No3 FEATI/G3-01/10103/10 Simalungun 2010 45,000,000 50,000,000 8 95,000,000 Shopping 9,500 No4 FEATI/G3-01/10104/00 Tapanuli Selatan N/A - - - - - 0 -5 FEATI/G3-01/10105/10 Karo [7,5] 2010 105,000,000 60,000,000 13 165,000,000 Shopping 16,500 No
2 1 FEATI/G3-01/10201/10 Sumatera Barat Solok [9,2] 2010 180,000,000 20,000,000 14 200,000,000 Shopping 20,000 No2 FEATI/G3-01/10202/10 Pesisir Selatan 2010 75,000,000 70,000,000 12 145,000,000 Shopping 14,500 No3 FEATI/G3-01/10203/10 Lima Puluh Kota [5,0] 2010 75,000,000 80,000,000 13 155,000,000 Shopping 15,500 No4 FEATI/G3-01/10204/10 Padang Pariaman [8,3] 2010 150,000,000 50,000,000 15 200,000,000 Shopping 20,000 No5 FEATI/G3-01/10205/10 Solok Selatan 2010 75,000,000 - 5 75,000,000 Shopping 7,500 No
3 1 FEATI/G3-01/10301/10 Jambi Merangin 2010 60,000,000 20,000,000 6 80,000,000 Shopping 8,000 No2 FEATI/G3-01/10302/10 Tanjung Jabung Barat 2010 45,000,000 40,000,000 7 85,000,000 Shopping 8,500 No
4 1 FEATI/G3-10/10401/10 Sumatera Selatan Banyuasin 2010 90,000,000 - 6 90,000,000 Shopping 9,000 No5 1 FEATI/G3-01/10501/10 Banten Serang N/A - - - - - 0 -6 1 FEATI/G3-01/10601/10 Jawa Barat Subang 2010 150,000,000 50,000,000 15 200,000,000 Shopping 20,000 No
9 1 FEATI/G3-01/11001/10 Kalimantan Selatan Hulu Sungai Selatan 2010 45,000,000 40,000,000 7 85,000,000 Shopping 8,500 No2 FEATI/G3-01/11002/10 Hulu Sungai Tengah 2010 60,000,000 - 4 60,000,000 Shopping 6,000 No3 FEATI/G3-01/11003/10 Balangan 2010 45,000,000 20,000,000 5 65,000,000 Shopping 6,500 No
Procurement Packages with Methods and Time ScheduleOffice Furnitures for New and Renovated BPP BuildingGeneral Information
No. Reference No PIU Province District
1 1 FEATI/G3-01/10101/10 Sumatera Utara Asahan [8,4]2 FEATI/G3-01/10102/10 Labuhan Batu3 FEATI/G3-01/10103/10 Simalungun4 FEATI/G3-01/10104/00 Tapanuli Selatan5 FEATI/G3-01/10105/10 Karo [7,5]
2 1 FEATI/G3-01/10201/10 Sumatera Barat Solok [9,2]2 FEATI/G3-01/10202/10 Pesisir Selatan3 FEATI/G3-01/10203/10 Lima Puluh Kota [5,0]4 FEATI/G3-01/10204/10 Padang Pariaman [8,3]5 FEATI/G3-01/10205/10 Solok Selatan
3 1 FEATI/G3-01/10301/10 Jambi Merangin2 FEATI/G3-01/10302/10 Tanjung Jabung Barat
4 1 FEATI/G3-10/10401/10 Sumatera Selatan Banyuasin5 1 FEATI/G3-01/10501/10 Banten Serang 6 1 FEATI/G3-01/10601/10 Jawa Barat Subang
Procurement Packages with Methods and Time ScheduleOffice Furnitures for New and Renovated BPP BuildingGeneral Information
No. Reference No PIU Province District
1 1 FEATI/G3-01/10101/10 Sumatera Utara Asahan [8,4]2 FEATI/G3-01/10102/10 Labuhan Batu3 FEATI/G3-01/10103/10 Simalungun4 FEATI/G3-01/10104/00 Tapanuli Selatan5 FEATI/G3-01/10105/10 Karo [7,5]
2 1 FEATI/G3-01/10201/10 Sumatera Barat Solok [9,2]2 FEATI/G3-01/10202/10 Pesisir Selatan3 FEATI/G3-01/10203/10 Lima Puluh Kota [5,0]4 FEATI/G3-01/10204/10 Padang Pariaman [8,3]5 FEATI/G3-01/10205/10 Solok Selatan
3 1 FEATI/G3-01/10301/10 Jambi Merangin2 FEATI/G3-01/10302/10 Tanjung Jabung Barat
4 1 FEATI/G3-10/10401/10 Sumatera Selatan Banyuasin5 1 FEATI/G3-01/10501/10 Banten Serang 6 1 FEATI/G3-01/10601/10 Jawa Barat Subang
7 1 FEATI/G3-01/10701/10 Jawa Tengah Brebes2 FEATI/G3-01/10702/10 Magelang 3 FEATI/G3-01/10703/10 Batang4 FEATI/G3-01/10704/10 Temanggung
8 1 FEATI/G3-01/11001/10 Jawa Timur Malang 2 FEATI/G3-01/11002/10 Tulung Agung3 FEATI/G3-01/11003/10 Tuban4 FEATI/G3-01/11004/10 Kediri
9 1 FEATI/G3-01/11001/10 Kalimantan Selatan Hulu Sungai Selatan2 FEATI/G3-01/11002/10 Hulu Sungai Tengah3 FEATI/G3-01/11003/10 Balangan
10 1 FEATI/G3-01/11101/10 Sulawesi Utara Minahasa2 FEATI/G3-01/11102/10 Minahasa Selatan3 FEATI/G3-01/11103/10 Bolaang Mongondow4 FEATI/G3-01/11104/10 Tomohon5 FEATI/G3-01/11105/10 Kep Sangihe6 FEATI/G3-10/11106/10 Minahasa Utara
11 1 FEATI/G3-01/11101/10 Sulawesi Selatan Gowa 2 FEATI/G3-01/11102/10 Enrekang 3 FEATI/G3-01/11103/10 Maros 4 FEATI/G3-01/11104/10 Bone5 FEATI/G3-01/11105/10 Luwu
Page 24
Procurement Packages with Methods and Time ScheduleOffice Furnitures for New and Renovated BPP BuildingGeneral Information New Buildings Renovation Total
No. Reference No PIU Province District Year Cost (IDR) Cost (IDR) Unit Total Cost (IDR) Procurement Method
Estimated Amount (USD)
Prior Review
(Yes/No)
Remarks of Proposal
6 FEATI/G3-01/11106/10 Sinjai 2010 120,000,000 10,000,000 9 130,000,000 Shopping 13,000 No12 1 FEATI/G3-01/11201/10 Sulawesi Tenggara Konawe 2010 90,000,000 50,000,000 11 140,000,000 Shopping 14,000 No
15 1 FEATI/G3-01/11501/10 DI Yogyakarta Kulon Progo 2 FEATI/G3-01/11502/10 Bantul 3 FEATI/G3-01/11503/10 Gunung Kidul
16 1 FEATI/G3-01/11601/10 Nusa Tenggara Barat Lombok Barat [9,0]2 FEATI/G3-01/11602/10 Bima 3 FEATI/G3-01/11603/10 Dompu 4 FEATI/G3-01/11604/10 Sumbawa5 FEATI/G3-01/11605/10 Lombok Tengah
17 1 FEATI/G3-01/11701/10 Nusa Tenggara Timur Manggarai 2 FEATI/G3-01/11702/10 Sumba Timur [3,4]3 FEATI/G3-01/11703/10 Ngada4 FEATI/G3-01/11704/10 Ende5 FEATI/G3-01/11705/10 Sumba Barat [4,0]6 FEATI/G3-01/11706/10 Belu
18 1 FEATI/G3-01/11801/10 Kalimantan Timur Sambas2 FEATI/G3-01/11802/10 Pontianak [5,4]
15 1 FEATI/G3-01/11501/10 DI Yogyakarta Kulon Progo 2 FEATI/G3-01/11502/10 Bantul 3 FEATI/G3-01/11503/10 Gunung Kidul
16 1 FEATI/G3-01/11601/10 Nusa Tenggara Barat Lombok Barat [9,0]2 FEATI/G3-01/11602/10 Bima 3 FEATI/G3-01/11603/10 Dompu 4 FEATI/G3-01/11604/10 Sumbawa5 FEATI/G3-01/11605/10 Lombok Tengah
17 1 FEATI/G3-01/11701/10 Nusa Tenggara Timur Manggarai 2 FEATI/G3-01/11702/10 Sumba Timur [3,4]3 FEATI/G3-01/11703/10 Ngada4 FEATI/G3-01/11704/10 Ende5 FEATI/G3-01/11705/10 Sumba Barat [4,0]6 FEATI/G3-01/11706/10 Belu
18 1 FEATI/G3-01/11801/10 Kalimantan Timur Sambas2 FEATI/G3-01/11802/10 Pontianak [5,4]
71 Districts
Note:
Page 27
PROCUREMENT PLAN OF OFFICE EQUIPMENT FOR BPP
Procurement Method No. of PlannedPackage USD IDR Eq to USD
NCB - - - -Shopping - - - -TOTAL - - - -
Bank’s Review No. of PlannedPackage USD IDR Eq to USD
Procurement Packages with Methods and Time ScheduleProvision of Equipment for BPP BuildingGeneral Information New BPP Renovation BPP
No. Reference No PIU Province District Year Cost (IDR) Cost (IDR) Unit Cost (IDR) Proc Method
Est.Amount (USD)
Prior Review
(Yes/No)
Bid Submsn
Remarks of Proposal
1 1 FEATI/G4-01/10101/10 Sumatera Utara Asahan [8,4] 2010 72,000,000 32,000,000 13 104,000,000 Shopping 10,400 No 20-Mar-102 FEATI/G4-01/10102/10 Labuhan Batu [9,4] 2010 72,000,000 48,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-103 FEATI/G4-01/10103/10 Simalungun 2010 24,000,000 40,000,000 8 64,000,000 Shopping 6,400 No 20-Mar-104 FEATI/G4-01/10104/00 Tapanuli Selatan 2010 - - - - - 0 -5 FEATI/G4-01/10105/10 Karo [7,5] 2010 56,000,000 48,000,000 13 104,000,000 Shopping 10,400 No 20-Mar-10
2 1 FEATI/G4-01/10201110 Sumatera Barat Solok [9,2] 2010 96,000,000 16,000,000 14 112,000,000 Shopping 11,200 No 20-Mar-102 FEATI/G4-01/10202/10 Pesisir Selatan 2010 40,000,000 56,000,000 12 96,000,000 Shopping 9,600 No 20-Mar-103 FEATI/G4-01/10203/10 Lima Puluh Kota [5,0] 2010 40,000,000 64,000,000 13 104,000,000 Shopping 10,400 No 20-Mar-104 FEATI/G4-10/10204/10 Padang Pariaman 2010 80,000,000 40,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-105 FEATI/G4-10/10205/00 Solok Selatan 2010 - - - - - 0 - 20-Mar-10
3 1 FEATI/G4-01/10301/10 Jamibi Merangin 2010 32,000,000 16,000,000 6 48,000,000 Shopping 4,800 No 20-Mar-102 FEATI/G4-01/10302/10 Tanjung Jabung Barat 2010 24,000,000 32,000,000 7 56,000,000 Shopping 5,600 No 20-Mar-10
4 1 FEATI/G4-01/10401/10 Sumatera Selatan Banyuasin 2010 88,000,000 - 11 88,000,000 Shopping 8,800 No 20-Mar-105 1 FEATI/G4-01/10501/10 Banten Serang 2010 - - - - - 0 - 20-Mar-106 1 FEATI/G4-01/10601/10 Jawa Barat Subang 2010 80,000,000 40,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-10
2 FEATI/G4-01/10602/10 Indramayu 2010 104,000,000 16,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-103 FEATI/G4-01/10603/10 Majalengka 2010 96,000,000 24,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-104 FEATI/G4-01/10604/10 Garut 2010 80,000,000 40,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-105 FEATI/G4-01/10605/10 Kuningan 2010 96,000,000 24,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-106 FEATI/G4-01/10606/10 Karawang 2010 80,000,000 - 10 80,000,000 Shopping 8,000 No 20-Mar-107 FEATI/G4-01/10607/10 Cirebon 2010 80,000,000 40,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-108 FEATI/G4-01/10608/10 Sukabumi 2010 80,000,000 16,000,000 12 96,000,000 Shopping 9,600 No 20-Mar-10
7 1 FEATI/G4-01/10701/10 Jawa Tengah Brebes 2010 48,000,000 72,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-102 FEATI/G4-01/10702/10 Magelang 2010 25,000,000 - 5 25,000,000 Shopping 2,500 No 20-Mar-103 FEATI/G4-01/10703/10 Batang 2010 48,000,000 64,000,000 14 112,000,000 Shopping 11,200 No 20-Mar-104 FEATI/G4-01/10704/10 Temanggung 2010 24,000,000 - 3 24,000,000 Shopping 2,400 No 20-Mar-10
8 1 FEATI/G4-01/10801/10 Jawa Timur Malang 2010 96,000,000 - 12 96,000,000 Shopping 9,600 No 20-Mar-102 FEATI/G4-01/10802/10 Tulung Agung 2010 80,000,000 24,000,000 13 104,000,000 Shopping 10,400 No 20-Mar-103 FEATI/G4-01/10803/10 Tuban 2010 40,000,000 56,000,000 12 96,000,000 Shopping 9,600 No 20-Mar-104 FEATI/G4-01/10804/10 Kediri 2010 56,000,000 - 7 56,000,000 Shopping 5,600 No 20-Mar-10
9 1 FEATI/G4-01/10901/10 Kalimantan Selatan Hulu Sungai Selatan [0,3] 2010 24,000,000 32,000,000 7 56,000,000 Shopping 5,600 No 20-Mar-102 FEATI/G4-01/10902/10 Hulu Sungai Tengah 2010 40,000,000 - 5 40,000,000 Shopping 4,000 No 20-Mar-103 FEATI/G4-01/10903/10 Balangan 2010 24,000,000 16,000,000 5 40,000,000 Shopping 4,000 No 20-Mar-10
10 1 FEATI/G4-01/11101/10 Sulawesi Utara Minahasa 2010 96,000,000 24,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-102 FEATI/G4-01/11102/10 Minahasa Selatan 2010 96,000,000 24,000,000 15 120,000,000 Shopping 12,000 No 20-Mar-103 FEATI/G4-01/11103/10 Bolaang Mongondow 2010 48,000,000 32,000,000 10 80,000,000 Shopping 8,000 No 20-Mar-104 FEATI/G4-01/11104/10 Tomohon 2010 24,000,000 - 3 24,000,000 Shopping 2,400 No 20-Mar-105 FEATI/G4-01/11105/10 Kep Sangihe 2010 90,000,000 45,000,000 9 135,000,000 Shopping 13,500 No 20-Mar-106 FEATI/G4-10/11106/10 Minahasa Utara 2010 56,000,000 - 7 56,000,000 Shopping 5,600 No 20-Mar-10
11 1 FEATI/G4-01/11101/00 Sulawesi Selatan Gowa 2010 - - - - - 0 -2 FEATI/G4-01/11102/00 Enrekang 2010 - - - - - 0 -3 FEATI/G4-01/11103/10 Maros 2010 90,000,000 90,000,000 12 180,000,000 Shopping 18,000 No 15-Sep-084 FEATI/G4-01/11104/10 Bone 2010 150,000,000 50,000,000 15 200,000,000 Shopping 20,000 No 20-Mar-105 FEATI/G4-01/11105/10 Luwu 2010 240,000,000 150,000,000 13 390,000,000 NCB 39,000 No 20-Mar-106 FEATI/G4-10/11106/10 Sinjai 2010 160,000,000 20,000,000 9 180,000,000 Shopping 18,000 No 20-Mar-10
12 1 FEATI/G4-01/11201/10 Sulawesi Tenggara Konawe 2010 72,000,000 60,000,000 11 132,000,000 Shopping 13,200 No 20-Mar-10
Total BPP
Page 29
Procurement Packages with Methods and Time ScheduleProvision of Equipment for BPP BuildingGeneral Information
No. Reference No PIU Province District
1 1 FEATI/G4-01/10101/10 Sumatera Utara Asahan [8,4]2 FEATI/G4-01/10102/10 Labuhan Batu [9,4]3 FEATI/G4-01/10103/10 Simalungun4 FEATI/G4-01/10104/00 Tapanuli Selatan5 FEATI/G4-01/10105/10 Karo [7,5]
2 1 FEATI/G4-01/10201110 Sumatera Barat Solok [9,2]2 FEATI/G4-01/10202/10 Pesisir Selatan3 FEATI/G4-01/10203/10 Lima Puluh Kota [5,0]4 FEATI/G4-10/10204/10 Padang Pariaman5 FEATI/G4-10/10205/00 Solok Selatan
3 1 FEATI/G4-01/10301/10 Jamibi Merangin2 FEATI/G4-01/10302/10 Tanjung Jabung Barat
4 1 FEATI/G4-01/10401/10 Sumatera Selatan Banyuasin5 1 FEATI/G4-01/10501/10 Banten Serang 6 1 FEATI/G4-01/10601/10 Jawa Barat Subang
Procurement Packages with Methods and Time ScheduleProvision of Equipment for BPP BuildingGeneral Information
No. Reference No PIU Province District
1 1 FEATI/G4-01/10101/10 Sumatera Utara Asahan [8,4]2 FEATI/G4-01/10102/10 Labuhan Batu [9,4]3 FEATI/G4-01/10103/10 Simalungun4 FEATI/G4-01/10104/00 Tapanuli Selatan5 FEATI/G4-01/10105/10 Karo [7,5]
2 1 FEATI/G4-01/10201110 Sumatera Barat Solok [9,2]2 FEATI/G4-01/10202/10 Pesisir Selatan3 FEATI/G4-01/10203/10 Lima Puluh Kota [5,0]4 FEATI/G4-10/10204/10 Padang Pariaman5 FEATI/G4-10/10205/00 Solok Selatan
3 1 FEATI/G4-01/10301/10 Jamibi Merangin2 FEATI/G4-01/10302/10 Tanjung Jabung Barat
4 1 FEATI/G4-01/10401/10 Sumatera Selatan Banyuasin5 1 FEATI/G4-01/10501/10 Banten Serang 6 1 FEATI/G4-01/10601/10 Jawa Barat Subang
13 1 FEATI/G4-01/11301/10 Sulawesi Tengah Donggala 14 1 FEATI/G4-01/11401/10 Gorontalo Boalemo
2 FEATI/G4-01/11402/10 Pohuwato [4,0] revisi3 FEATI/G4-01/11403/10 Bone Bolango4 FEATI/G4-01/11404/10 Gorontalo
15 1 FEATI/G4-01/11501/10 DI Yogyakarta Kulon Progo 2 FEATI/G4-01/11502/10 Bantul 3 FEATI/G4-01/11503/10 Gunung Kidul
16 1 FEATI/G4-01/11601/10 Nusa Tenggara Barat Lombok Barat [9,0]2 FEATI/G4-01/11602/10 Bima 3 FEATI/G4-01/11603/10 Dompu 4 FEATI/G4-01/11604/10 Sumbawa5 FEATI/G4-01/11605/10 Lombok Tengah
17 1 FEATI/G4-01/11701/10 Nusa Tenggara Timur Manggarai 2 FEATI/G4-01/11702/10 Sumba Timur [5,9]3 FEATI/G4-01/11703/10 Ngada4 FEATI/G4-01/11704/10 Ende5 FEATI/G4-01/11705/10 Sumba Barat [4,0]6 FEATI/G4-01/11706/10 Belu
18 1 FEATI/G4-01/11801/10 Kalimantan Barat Sambas2 FEATI/G4-01/11802/10 Pontianak
13 1 FEATI/G4-01/11301/10 Sulawesi Tengah Donggala 14 1 FEATI/G4-01/11401/10 Gorontalo Boalemo
2 FEATI/G4-01/11402/10 Pohuwato [4,0] revisi3 FEATI/G4-01/11403/10 Bone Bolango4 FEATI/G4-01/11404/10 Gorontalo
15 1 FEATI/G4-01/11501/10 DI Yogyakarta Kulon Progo 2 FEATI/G4-01/11502/10 Bantul 3 FEATI/G4-01/11503/10 Gunung Kidul
16 1 FEATI/G4-01/11601/10 Nusa Tenggara Barat Lombok Barat [9,0]2 FEATI/G4-01/11602/10 Bima 3 FEATI/G4-01/11603/10 Dompu 4 FEATI/G4-01/11604/10 Sumbawa5 FEATI/G4-01/11605/10 Lombok Tengah
17 1 FEATI/G4-01/11701/10 Nusa Tenggara Timur Manggarai 2 FEATI/G4-01/11702/10 Sumba Timur [5,9]3 FEATI/G4-01/11703/10 Ngada4 FEATI/G4-01/11704/10 Ende5 FEATI/G4-01/11705/10 Sumba Barat [4,0]6 FEATI/G4-01/11706/10 Belu
18 1 FEATI/G4-01/11801/10 Kalimantan Barat Sambas2 FEATI/G4-01/11802/10 Pontianak