Top Banner
S E. Ambrose & R W Rand, INCE Members 1 October 19, 2013 Falmouth Wind Turbine Noise Studies Stephen E. Ambrose Principal Consultant, INCE Board Certified & Robert W. Rand Principal Consultant, INCE Acoustics, Environmental Sound & Industrial Noise Control
112

Falmouth Wind Turbine Noise Studies

Mar 21, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 1

October 19, 2013

Falmouth

Wind Turbine Noise

Studies

Stephen E. Ambrose Principal Consultant, INCE Board Certified

&

Robert W. Rand Principal Consultant, INCE

Acoustics, Environmental Sound

& Industrial Noise Control

Page 2: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 2

Themes considered for this presentation:

Page 3: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 3

Themes considered for this presentation:

1.The last thing we need is another study

Page 4: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 4

Themes considered for this presentation:

1.The last thing we need is another study,

2.Blind eyes and deaf ears

Page 5: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 5

Themes considered for this presentation:

1.The last thing we need is another study,

2.Blind eyes and deaf ears,

3.History of Falmouth wind turbine studies

Page 6: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 6

Themes considered for this presentation:

1.The last thing we need is another study,

2.Blind eyes and deaf ears,

3.History of Falmouth wind turbine studies,

4.Evidence that demands a verdict

Page 7: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 7

Themes considered for this presentation:

1.The last thing we need is another study,

2.Blind eyes and deaf ears,

3.History of Falmouth wind turbine studies,

4.Evidence that demands a verdict,

Winner: “Back to the Future” Acknowledgements: Steven Spielberg, Robert Zemeckis, Michael J Fox,

Christopher Lloyd

Page 8: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 8

Page 9: Falmouth Wind Turbine Noise Studies

This is a true story,

depicted by Marty and Doc.

S E. Ambrose & R W Rand, INCE Members 9

Page 10: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 10

Their mission: identify the

ignored warnings in the

Falmouth wind turbine studies

Page 11: Falmouth Wind Turbine Noise Studies

Only then can Marty and Doc

correct significant warnings in history.

S E. Ambrose & R W Rand, INCE Members 11

Page 12: Falmouth Wind Turbine Noise Studies

That opened rifts into an

alternate universe, where

noisy wind turbines were

permitted to invade homes.

S E. Ambrose & R W Rand, INCE Members 12

Page 13: Falmouth Wind Turbine Noise Studies

The wayback clock is set

NOV 21 2003 0800

S E. Ambrose & R W Rand, INCE Members 13

Page 14: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 14

November 21, 2003

Renewable Energy Research Laboratory

(new name; UMass Wind Energy Center) University of Massachusetts

Department of Mechanical Engineering

Support from Massachusetts Technology Collaborative

First study

Page 15: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 15

Dr. James Manwell

Director

The University of Massachusetts

Wind Energy Center is a leading

institution in wind energy engineering

nationally and internationally. Since

1972 the Center has worked diligently

to maintain and enhance its important

wind energy education programs and

research activities.

Page 16: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 16

Dr. James Manwell

Director

The University of Massachusetts

Wind Energy Center is a leading

institution in wind energy engineering

nationally and internationally. Since

1972 the Center has worked diligently

to maintain and enhance its important

wind energy education programs and

research activities.

Page 17: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 17

NOVEMBER 21, 2003

Page 18: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 18

Page 3

November 2003

Page 19: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 19

Page 3

November 2003

Page 20: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 20

Page 3

November 2003

Page 21: Falmouth Wind Turbine Noise Studies

Doc!

No 10 dB increase,

… won’t be audible?

Wait!!

Marty, how can

this be?

S E. Ambrose & R W Rand, INCE Members 21

Page 22: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 22

Page 3

November 2003

Page 23: Falmouth Wind Turbine Noise Studies

Geez,

they wrote this … with

no measurements,

no calculations …

GREAT SCOTT!!

Marty, YES! they

failed to design to

be good acoustic

neighbors.

S E. Ambrose & R W Rand, INCE Members 23

Page 24: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 24

Summary

Date Report Comment

21 Nov 2003 Preliminary Site Assessment

RERL / Umass

Increase Less Than 10 dB

Minimally Audible

Do Noise Survey

Page 25: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 25

Doc, this report

was researched by

an academic group

that promotes

wind turbines.

Yes, and they

recognized the need

to do an ambient

noise survey, …

MEASUREMENTS !

Page 26: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 26

April 19, 2003 & November 2005

KEMA, Ecology and Environment, Inc. (now part of DNV; an international

risk management company)

Support from Massachusetts Technology Collaborative

Second & Third Studies

Page 27: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 27

Page 28: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 28

6.1.2 Nov. 5 Same Text

Added for 6.1.2 Nov. 5

Page 29: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 29

Public Reaction Flawed 6.1.2 Nov. 5

Added for 6.1.2 Nov. 5

Page 30: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 30

6.1.2 Nov. 5

Modern Turbines Quiet

Added for 6.1.2 Nov. 5

Page 31: Falmouth Wind Turbine Noise Studies

Doc! They're

saying public

noise reaction is

unpredictable??

Marty, it’s

INCREDIBLE!!

They ignored reliable

methods to assess

community noise

reaction!!

S E. Ambrose & R W Rand, INCE Members 31

Page 32: Falmouth Wind Turbine Noise Studies

Noise Complaint Response Levels

dBA above

noise level

criterion

Estimated Community Response

Category Description

0 None No Observed Reaction

5 Little Sporadic Complaints

10 Medium Widespread Complaints

15 Strong Threats of Community Action

20 Very Strong Vigorous Community Action

International Standards Organization ISO 1996-1:2003

Stephen E. Ambrose, INCE Bd.Cert. 32

Page 33: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 33

6.1.2 Nov. 5

Added for 6.1.2 Nov. 5

1 MW turbine 42 dBA at 300-ft

Page 34: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 34

Marty, This is INCREDIBLE! Falmouth’s

property line noise limit is 40 dBA.

42 dBA is

TOO LOUD !!

The’re headed

straight for

TROUBLE !!

Page 35: Falmouth Wind Turbine Noise Studies

Doc, is 42 dBA

true … 1 MW

turbine at 300-ft?

Marty, NO!!

we need to ask Rob.

He MEASURES wind

turbine noise by

DISTANCE.

S E. Ambrose & R W Rand, INCE Members 35

Page 36: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 36

Robert Rand,

Rand Acoustics

300-ft

Measured

57 dBA …

300-ft from

1.5 MW

turbines.

LIGHT

WINDS

Page 37: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 37

6.1.2 Nov. 5

Added for 6.1.2 Nov. 5

40 dBA

Urban

Page 38: Falmouth Wind Turbine Noise Studies

Is Falmouth an

urban environment?

NO!! Hey- let’s

ask Chris for

help.

S E. Ambrose & R W Rand, INCE Members 38

Page 39: Falmouth Wind Turbine Noise Studies

Falmouth’s quietest

nighttime measurement

is 27 dBA. HMMH’s

chart identifies area as

“Quiet Rural Nighttime”

S E. Ambrose & R W Rand, INCE Members 39

Quiet Rural

Nighttime

30 dBA

20 dBA

40 dBA

Page 40: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 40

GE 1.5 MW

Residential

PL = 42 - 44

dBA

Falmouth

Noise Limit

40 dBA

Exceed by 2 - 4 dB !!

Page 41: Falmouth Wind Turbine Noise Studies

Doc! They’re

saying the

Falmouth noise

limit is 40 dBA,

yet they predicted

42- 44 dBA!

GREAT SCOTT!!

You’re CORRECT!

And all presented

without any

MEASUREMENTS!

S E. Ambrose & R W Rand, INCE Members 41

Page 42: Falmouth Wind Turbine Noise Studies

How can they

show this on a

topo map?

Marty, … we can see

this on Figure 17 in

the Feasibility Study.

S E. Ambrose & R W Rand, INCE Members 42

Page 43: Falmouth Wind Turbine Noise Studies

“Consistent with the Town Ordinance,

there should not be excessive noise from

the wind turbine above 40 dB (A) at the

property line of the site.”

Blacksmith Shop Road

S E. Ambrose & R W Rand, INCE Members 43

Wind 1

1.5 MW

Where?

1200-ft from Wind 1

Page 44: Falmouth Wind Turbine Noise Studies

Doc! …

Neighbors live on

Blacksmith Shop

Road. Figure 17

shows noise

levels louder than

40 dBA !

Marty,

we need to ask

Rob for more

MEASUREMENTS!

S E. Ambrose & R W Rand, INCE Members 44

Page 45: Falmouth Wind Turbine Noise Studies

1.5 MW

turbine,

42 dBA at

1200-ft

and

2000-ft

S E. Ambrose & R W Rand, INCE Members 45

Robert Rand,

Rand Acoustics

LIGHT

WINDS

Page 46: Falmouth Wind Turbine Noise Studies

Caution!

Trend line

shows

potential

for 47 dBA

at 1200-ft

S E. Ambrose & R W Rand, INCE Members 46

Robert Rand,

Rand Acoustics

Page 47: Falmouth Wind Turbine Noise Studies

Marty, … measurements

should not be ignored.

They are more reliable

than predictions.

S E. Ambrose & R W Rand, INCE Members 47

Doc,

42, 47 dBA at

1200-ft !!

Measurements are used to

validate predictions.

Page 48: Falmouth Wind Turbine Noise Studies

INCREDIBLE! No one

noticed this in the

Nov. 2005 report.

Wind 1 is TOO LOUD !

… right from the get go!

S E. Ambrose & R W Rand, INCE Members 48

42 dBA is louder

than Falmouth’s 40

dBA noise limit!

Page 49: Falmouth Wind Turbine Noise Studies

Marty, this is why

neighbors can

rely on the state

to protect them.

S E. Ambrose & R W Rand, INCE Members 49

A reviewer will

catch this

MISTAKE !

Page 50: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 50

Page 51: Falmouth Wind Turbine Noise Studies

There were no

plans for the

MassDEP to review

Wind 1 reports.

S E. Ambrose & R W Rand, INCE Members 51

Page 52: Falmouth Wind Turbine Noise Studies

Marty, let’s read

more of the report

and find out.

S E. Ambrose & R W Rand, INCE Members 52

Are Falmouth

planners vigilant

enough to protect ?

Page 53: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 53

Anticipated ?

… Why Not

Predicted ?

Page 54: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 54

Page 55: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 55

Strong Motivation to Approve

Page 56: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 56

100% Very Concerned or Concerned

Page 57: Falmouth Wind Turbine Noise Studies

Yikes! …

How could this be

missed? Everyone

who replied was

CONCERNED about

NOISE !

S E. Ambrose & R W Rand, INCE Members 57

Page 58: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 58

Summary

Date Report Finding / Comment

21 Nov 2003 Preliminary Site Assessment

RERL / UMass

Increase less than 10 dB,

Minimally audible,

Do Noise Survey

19 Apr 2005

Nov 2005

Site Screening Report

Site Feasibility Report

KEMA & Ecology and Environment, Inc.

Noise complaints subjective,

40 dBA limit, Falmouth urban,

Wind 1 predicted 42-44 dBA,

Do Noise Survey

Page 59: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 59

EGADS !

These reports

were done by

groups that

promote wind

turbines !

Marty, this is

INCREDIBLE !!!

They’re unable to admit

that WIND 1 IS TOO LOUD !

Page 60: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 60

September 2010

Harris Miller Miller & Hansen, Inc.

Fourth study

Page 61: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 61

Page 62: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 62

Page 63: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 63

Decipher:

1) Measure wind turbine ON and OFF,

Context of MassDEP compliance.

Page 64: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 64

Decipher:

2) Model wind turbine noise levels,

Determine MassDEP compliance.

Page 65: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 65

Measurements should

be used for compliance.

Let’s look at the

measurement data.

Why measure

noise levels, and

then model for

compliance ?

Page 66: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 66

Turbine ON L90s

34 to 47 dBA

Turbine OFF L90s

27 to 33 dBA

September 2011

10-min avg Nighttime L90 Measurements

Page 67: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 67

Highest Repeated

L90: 46-47 dBA, 8 m/s

Quietest

L90: 27 dBA, 4 m/s

September 2011

Nighttime L90 Measurements

Quietest

L90: 31 dBA, 8 m/s

Page 68: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 68

Highest Repeating

Measured L90:

46-47 dBA, 8 m/s

19-20 dBA diff

Quietest L90:

27 dBA, 4 m/s

September 2011

MassDEP: L90

MassDEP:

37 dBA Lmax

Nighttime L90 Measurements

Page 69: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 69

Doc !

This chart

proves WIND 1

TOO LOUD !

Marty !

This is INCREDIBLE !

Measured WIND 1 L90s

are 9-10 dB higher than

MassDEP’s Lmax limit.

Page 70: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 70

HMMH Computed L90 >

Measured 27 to 34 dBA

Page 71: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 71

They could have

averaged L90

background

measurements?

How’d they get a

L90 37.5 dBA for

background with

Wind 1 OFF ?

Page 72: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 72

Marty, you’re on to

something, let’s

Compare Data Tables.

Doc, This

MAKES NO

SENSE !!!

Page 73: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 73

Measured 27 to 34 dBA

Turbine ON Quieter Than OFF

Page 74: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 74

They should not consider

models superior to

measurements. This will

cause more ERRORS !

Model data

conflicts with

measurements.

Page 75: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 75

All Predicted Values

Wind 1 measured 46 dBA

~ 5 dB too low

Page 76: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 76

Wind 1 measured

Measured 27 to 34 46 12 to 19

Predicted Wind 1 Leq quieter than measured L90

Exceeds MassDEP Lmax by 2 to 9 dB

Page 77: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 77

GREAT SCOTT !!

Marty, their tables are

full of ERRORS.

Doc, this confirms

noise model

predictions are no

substitute for real

measurements.

Page 78: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 78

Summary

Date Report Finding / Comment

21 Nov 2003 Preliminary Site Assessment

RERL / UMass

Increase less than 10 dB,

Minimally audible,

Do Noise Survey

19 Apr 2005

Nov 2005

Site Screening Report

Site Feasibility Report

KEMA & Ecology and Environment, Inc.

Noise complaints subjective,

40 dBA limit, Falmouth urban,

Wind 1 predicted 42-44 dBA,

Do Noise Survey

20 Sep 2010 Falmouth Wind Turbine

Noise Study / HMMH

Increase >10 dB, turbines audible

Wind 1 too loud

Page 79: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 79

What’s going on?

Can’t anyone read,

… where’s the

comprehension ?

IMPOSSIBLE !! Don’t

they understand ?

WIND 1 IS TOO LOUD !

Page 80: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 80

June 6, 2010

Noise Control Engineering, Inc.

Fifth study

Page 81: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 81

Page 82: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 82

Page 83: Falmouth Wind Turbine Noise Studies

Again, measured

46 dBA, … Wind 1

too loud.

S E. Ambrose & R W Rand, INCE Members 83

This chart shows

noise levels vs. time

measurements.

Page 84: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 84

19 dB

46 dBA

27 dBA

Page 85: Falmouth Wind Turbine Noise Studies

This is AMAZING !!

Again, measurements-

… Wind 1 too loud !

S E. Ambrose & R W Rand, INCE Members 85

Wind 1 noise levels

are 9 dB above the

MassDEP Lmax

noise limit.

Page 86: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 86

Summary

Date Report Finding / Comment

21 Nov 2003 Preliminary Site Assessment

RERL / UMass

Increase less than 10 dB,

Minimally audible,

Do Noise Survey

19 Apr 2005

Nov 2005

Site Screening Report

Site Feasibility Report

KEMA & Ecology and Environment, Inc.

Noise complaints subjective,

40 dBA limit, Falmouth urban,

Wind 1 predicted 42-44 dBA,

Do Noise Survey

20 Sep 2010 Falmouth Wind Turbine

Noise Study / HMMH

Increase >10 dB, turbines audible

Wind 1 too loud

6 June 2011 Evaluation of Noise Data

Noise Control Engineering Wind 1 too loud

Page 87: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 87

March 15, 2012

DNV KEMA Services for Managing Risk also

(DNV KEMA Energy & Sustainability)

Sixth study

Page 88: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 88

Page 89: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 89

Page 90: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 90

The Massachusetts Clean Energy Technology

Center (MassCEC) retained DNV to provide wind

turbine technology and control system expertise

to the town of Falmouth, Massachusetts.

Mar 15, 2012

Page 91: Falmouth Wind Turbine Noise Studies

What’s going on ?

These are the same

agencies that did the

first site assessment

in 2003!

S E. Ambrose & R W Rand, INCE Members 91

Page 92: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 92

Mar 15, 2012

The support being provided addresses concerns

about noise levels around the two town-operated

wind turbines at the wastewater treatment plant

(WWTP).

Page 93: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 93

Marty! ... You’re right! …

Neighbors can’t be protected

when DNV and KEMA both

support wind energy.

Page 94: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 94

… ambient sound levels based on only one

condition understates the range of possible

ambient noise levels at receptors and when

problematic conditions might occur.

Page 95: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 95

Based on these observations, DNV suggests that

additional measurements be made to understand better

under what conditions neighbors of the Falmouth wind

turbines experience which noise levels and when state

or local noise guidelines might be exceeded.

Page 96: Falmouth Wind Turbine Noise Studies

Doc, … 9 years after

the first study, they

are still asking for

more noise

measurements??

S E. Ambrose & R W Rand, INCE Members 96

Page 97: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 97

Marty! ... This is proof ! …

They do not know how to be

GOOD ACOUSTIC NEIGHBORS !

Page 98: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 98

Summary

Date Report Finding / Comment

21 Nov 2003 Preliminary Site Assessment

RERL / UMass

Increase less than 10 dB,

Minimally audible,

Do Noise Survey

19 Apr 2005

Nov 2005

Site Screening Report

Site Feasibility Report

KEMA & Ecology and Environment, Inc.

Noise complaints subjective,

40 dBA limit, Falmouth urban,

Wind 1 predicted 42-44 dBA,

Do Noise Survey

20 Sep 2010 Falmouth Wind Turbine Noise

Study / HMMH

Increase >10 dB, turbines audible

Wind 1 too loud. More Measurements

6 June 2011 Evaluation of Noise Data

Noise Control Engineering

Wind 1 too loud

More Measurements

15 Mar 2012 DNV Review Mitigation Report

Wind 1 & Wind 2

More Measurements to understand

why there are complaints

Page 99: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 99

November 29, 2012

Massachusetts Department

of Environmental Protection

Seventh study

Page 100: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 100

MassDEP Letter

To: Falmouth BOS

Sound Sampling Study

November 29, 2012

Page 101: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 101

“… day time … two wind

turbines do not exceed 10 dB

threshold established in

MassDEP’s Noise Policy”

November 29, 2012

Page 102: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 102

Doc, again,

… Noise Regulation,

… Noise Guideline,

… Noise Policy, ... I

am confused?

Marty, Regulation

means Law,

whereas, Guideline,

Policy implies less.

Page 103: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 103

“… (9 am through 4:00 pm)

is considerered “worst case”

in establishing the

background noise levels, …”

November 29, 2012

Page 104: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 104

Daytime makes

NO SENSE !

Complaints

occur at NIGHT !

Marty, nobody wants

to stay up and witness

measurements in the

dark at 2 am.

Page 105: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 105

Summary

Date Report Finding / Comment

21 Nov 2003 Preliminary Site Assessment

RERL / UMass

Increase less than 10 dB,

Minimally audible,

Do Noise Survey

19 Apr 2005

Nov 2005

Site Screening Report

Site Feasibility Report

KEMA & Ecology and Environment, Inc.

Noise complaints subjective,

40 dBA limit, Falmouth urban,

Wind 1 predicted 42-44 dBA,

Do Noise Survey

20 Sep 2010 Falmouth Wind Turbine Noise

Study / HMMH

Increase >10 dB, turbines audible

Wind 1 too loud More Measurements

6 June 2011 Evaluation of Noise Data

Noise Control Engineering

Wind 1 too loud

More Measurements

15 Mar 2012 DNV Review Mitigation Report

Wind 1 & Wind 2

More Measurements to understand

why there are complaints

29 Nov 2012 MassDEP Letter Daytime “worst case”

Noise Increase < 10 dB

Page 106: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 106

Doc! This is proof,

neighbors are

protected by blind

eyes and deaf ears.

Marty, you’re right,

these reports all

present evidence that

demands a verdict.

Page 107: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 107

Community Response Prediction

Pederson & Waye 2004

No Observed Ellect Level

Lowest Observed

Adverse Effect Level

Page 108: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 108

Community Response Prediction

Falmouth

L90 Nite

Existing

Page 109: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 109

Community Response Prediction

Existing

Predicted

Page 110: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 110

Community Response Prediction

Existing

Measured

Predicted

Page 111: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 111

Page 112: Falmouth Wind Turbine Noise Studies

S E. Ambrose & R W Rand, INCE Members 112

Thank You

Stephen E. Ambrose Principal Consultant, INCE Board Certified

&

Robert W. Rand Principal Consultant, INCE

Acoustics, Environmental Sound

& Industrial Noise Control