Community Meeting

Renovation Update

APRIL 28, 2021 a t 7 :00pm

Page 2: Falls Church High School

FCPS Design and Construction Godson Nwosu – Coordinator Holli McKinley – Architectural Engineer Andrew Peterson – Civil Engineer

Consultant Team Perkins Eastman Architects LandDesign, Inc. Hunton Andrews Kurth, LLP

2

Project Introduction

Page 3: Falls Church High School

CIP

Planning and Design Funded in the 2017 Bond Construction Funding to be included in the 2021 Bond Referendum

Scope

Full renovation (new floor finishes, walls & ceilings, new doors & windows)

New life safety systems (sprinkler, fire alarm, door access & sound system)

New electrical, mechanical & plumbing systems; new lighting New data and telephone system Additions include aux gym, main gym expansion, physical

education rooms, music suite, library, lecture hall, science labs Cafeteria expansion Academy wing programs (nursing and dental lab) Improve kiss & ride and bus drop off circulation

3

Project Scope

Page 4: Falls Church High School

Permitting Summer 2020-2021

Bid Advertisement Fall 2021

Construction Start (4 years) Fall 2021

Completion Fall 2025

4

Project Timeline

Page 5: Falls Church High School

5

Aerial View – Regional Context

US ROUTE 50

I-495

US ROUTE 50I-4

95

Page 6: Falls Church High School

6

Aerial View – Neighborhood Context

US ROUTE 50

I-495

Page 7: Falls Church High School

7

Aerial View – Site Context

US ROUTE 50

I-495

Page 8: Falls Church High School

8

Proposed Site Plan

FRONT ENTRY

ACADEMY ENTRY

EAST ENTRY

MARC DR

NORTH

WEST ENTRY

Page 9: Falls Church High School

9

Proposed Additions Plan

NORTH

FRONT ENTRY

ACADEMY ENTRY

EAST ENTRY

WEST ENTRY

Page 10: Falls Church High School

10

Proposed First Floor Plan

ACADEMY ENTRY

EAST ENTRY

LIBRARY CAFETERIA

AUDITORIUM

AUX GYM

MAIN GYM

NORTH

WEST ENTRY

CLASSROOMS

FRONT ENTRY

Page 11: Falls Church High School

11

Proposed Second Floor Plan

NORTH

CLASSROOMS

Page 12: Falls Church High School

12

Proposed Building Elevation - Main Entry

Page 13: Falls Church High School

13

Proposed Building Elevation – Academy Entrance

Page 14: Falls Church High School

14

Proposed Building Elevation – Library and Lecture Hall

Page 15: Falls Church High School

15

Proposed Building Elevation - Science Addition

Page 16: Falls Church High School