Top Banner
Fairfax County Board of Supervisors Transportation Sub- Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert Morris Tim Brown
17

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Mar 27, 2015

Download

Documents

Stephanie James
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Fairfax CountyBoard of Supervisors

Transportation Sub-CommitteeBriefing

Federal Highway AdministrationEastern Federal Lands Highway Division

Robert MorrisTim Brown

Page 2: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Area Projects Administered byEastern Federal Lands

• Fairfax County Parkway (Phases I – IV)• Interstate 95 Defense Access Roads (DAR)

Ramps• Mulligan Road (Route 1-Telegraph Road

Connector Road)• Route 1 Widening (Future)

Page 3: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Fairfax County Parkway Projects

Page 4: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Fairfax County Parkway -Phases I and II

Page 5: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Fairfax County Parkway–Phases I and IICurrent Status• Awarded contract in September 2008.• Started construction in April 2009.• Open the Fairfax County Parkway in

September 2010.• Project complete by the end of 2010.

Page 6: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Fullerto

n Road

Fullerto

n Road

Ramp

C

Ramp

CFairfax County Parkway

Fairfax County Parkway

Defense

Defense

AccessAccess

RoadRoad

Boudinot

Boudinot

DriveDrive

Fulle

rton

Road

Fulle

rton

Road

N

Future South Loop Road (by Others)

Future South Loop Road (by Others)

Boudinot DriveBoudinot Drive

Accotink Creek

Accotink Creek

Fairfax County Parkway -Phase IV

Loop B

Boudinot Drive

Ramp ‘D’ – B693

B604

Page 7: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Fairfax County Parkway -Phase IV

Boudinot Drive Interchange•$22.8M in ARRA funds awarded in June 2009•Construction began in Jan 2010•Scheduled for completion in July 2011

Page 8: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Fairfax County Parkway -Phase III

Page 9: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Fairfax County Parkway -Phase IIIProposedDesign Concept – Benefits1.Improved traffic operations at redesigned intersection.2.Separation of local traffic on Hooes Road from ramp traffic.3.Shorter, lower bridge over Parkway, located farther away from homeowners.4.Eliminated clearing of trees for SWM Pond #2.5.Expanded length of sound walls.

Page 10: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Belvoir North Area – DAR Ramps

Page 11: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Belvoir North Area – DAR RampsI-95 South Ramp

• Bid Option 2 in Phase I and II design-build contract.

• Interchange Modification Report approved by VDOT and FHWA in April 2010.

• Completion by end of 2010.

I-95 HOV Ramp• Design-Bid-Build Project• Interchange Justification

Report approved by VDOT in July; FHWA approval pending.

• Advertisement of construction contract in early 2011.

• Completion in 2012.

Page 12: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Mulligan Road Project

Page 13: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Mulligan Road Project – Phase I• Clearing, grading, drainage, and base course for the full 4-lane

section of Mulligan Road• Shared use path from Pole Road to Telegraph Road.• Bridges over Kingman Road and Piney Run.• Construction of Phase I is underway and is scheduled for

completion by the end of 2010.• Mulligan Road will not be opened to traffic after completion

of this phase.

Page 14: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Mulligan Road – Phase I Construction Progress

• Grading of Mulligan Road nearing completion

• Kingman Road Bridge – Sidewalk and Bridge Rail work remains

• Piney Run Bridge – Girders have been placed; deck pours in August

Page 15: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Mulligan Road Project – Phase II• Realignment of the intersection of Mount Vernon Memorial

Highway, Old Mill Road, and Richmond Highway (US Route 1).• Widen Old Mill Road from 2-lanes to 4-lanes between US

Route 1 and Pole Road.• Construct paving, bridge, and curb work on Mulligan Road

from Pole Road to Telegraph Road.• Widen Telegraph Road from 2-lanes to 4-lanes between

Beulah Street and Leaf Road including the Piney Run Bridge.• Mitigation work associated with the Woodlawn property

(National Trust for Historic Preservation).

Page 16: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Mulligan Road – Phase IICurrent Status

• Final Design Review in August 2010.

• Right-of-Way Acquisition in Process.

• Advertisement of Construction Contract in Jan 2011.

• Award of Construction Contract in April 2011.

Page 17: Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.

Thank you!

Questions?