FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS
30

FAIR LAWN BOARD OF EDUCATION

Jan 11, 2016

Download

Documents

chessa

FAIR LAWN BOARD OF EDUCATION. BUILDINGS & GROUNDS ACCOMPLISHMENTS. SASSO FIELD New Turf Field Installed. Sasso Field Painted buildings & new tent. Sasso Field Lightning Detector. SASSO FIELD. New cameras Installed Sealed blacktop under bleachers. High School A-gym Floor Refinished. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FAIR LAWN BOARD OF EDUCATION

FAIR LAWN BOARD OF EDUCATION

BUILDINGS & GROUNDS

ACCOMPLISHMENTS

Page 2: FAIR LAWN BOARD OF EDUCATION

SASSO FIELDNew Turf Field Installed

Page 3: FAIR LAWN BOARD OF EDUCATION

Sasso Field Painted buildings & new tent

Page 4: FAIR LAWN BOARD OF EDUCATION

Sasso Field Lightning Detector

Page 5: FAIR LAWN BOARD OF EDUCATION

SASSO FIELD

• New cameras Installed• Sealed blacktop under bleachers

Page 6: FAIR LAWN BOARD OF EDUCATION

High School A-gym Floor Refinished

Page 7: FAIR LAWN BOARD OF EDUCATION

FAIR LAWN HIGH SCHOOL

B-WING CAFETERIA

ROOF

Page 8: FAIR LAWN BOARD OF EDUCATION

HIGH SCHOOL

• Abated 3 classrooms (Rms B120, B122, B204)• Painted 5 classrooms• Retiled A-wing girls’ bathroom• HS Stage Lighting• HS Lighting (pending)• Auditorium underground conduit, carpeted

aisles

Page 9: FAIR LAWN BOARD OF EDUCATION

Memorial – Completed installation of windows on west side of building

Page 10: FAIR LAWN BOARD OF EDUCATION

Memorial SchoolPainted lockers on 1st and 2nd floor

Page 11: FAIR LAWN BOARD OF EDUCATION

MEMORIAL SCHOOL – Trimmed trees back from field

Page 12: FAIR LAWN BOARD OF EDUCATION

Memorial SchoolTrimmed trees back from steps

Page 13: FAIR LAWN BOARD OF EDUCATION

MEMORIAL SCHOOL

• Installed new energy efficient LED lights in auditorium

• Rm 214 – converted from storeroom to classroom instruction

• Auditorium – rebuilt exhaust fan• Repaired terrazzo floor outside main office

Page 14: FAIR LAWN BOARD OF EDUCATION

THOMAS JEFFERSON SCHOOL

Repaved & striped front lotWidened exit driveway to allow right & left turns upon exiting

Page 15: FAIR LAWN BOARD OF EDUCATION

THOMAS JEFFERSON SCHOOL

• Painted lockers and installed new lockers on 1st floor

• Carpeted 5 offices in Child Study Team room• Boys’ locker bathroom and boys’ room by Rm 119

– installed new floor drains & waterless urinals• Installed wireless clock system• Rm 116 – abated floor and installed VCT tile

Page 16: FAIR LAWN BOARD OF EDUCATION

EDISON SCHOOL

Moved sign from HS and installed at

Edison

Page 17: FAIR LAWN BOARD OF EDUCATION

EDISON SCHOOL

• Paving of front lot and re-striping for bus access (pending)

• Repaired windows

Page 18: FAIR LAWN BOARD OF EDUCATION

FORREST SCHOOL

• Installed VCT tile in 4 classrooms• Moved KECO from Forrest to Edison School

Page 19: FAIR LAWN BOARD OF EDUCATION

Lyncrest School Canopy, Ceiling & LED lights

Page 20: FAIR LAWN BOARD OF EDUCATION

MILNES SCHOOLRefurbished 2 storm drains in rear parking lot and repaved.

Page 21: FAIR LAWN BOARD OF EDUCATION

INSTALLED CHAIRLIFT

AT

MILNES SCHOOL

Page 22: FAIR LAWN BOARD OF EDUCATION

Radburn School

Kindergarten WindowsInstalled new

energy efficient thermopane

windows

Page 23: FAIR LAWN BOARD OF EDUCATION

RADBURN SCHOOL

• Converted music room to new kindergarten room on ground floor

• Installed new security gate on ground floor by new addition lobby

• Ground floor boys’ room in stairwell – installed new floor drains and waterless urinals

Page 24: FAIR LAWN BOARD OF EDUCATION

Warren Point SchoolInstalled new digital sign on

Broadway

Page 25: FAIR LAWN BOARD OF EDUCATION

Warren Point SchoolMilled and repaved teacher parking lot and installed new security

gates

Page 26: FAIR LAWN BOARD OF EDUCATION

Warren Point SchoolInstalled 100 cubic yards of mulch on playground

Page 27: FAIR LAWN BOARD OF EDUCATION

Warren Point SchoolInstalled new Fire Doors in old wing-1st floor

Page 28: FAIR LAWN BOARD OF EDUCATION

Westmoreland SchoolInstalled energy efficient thermopane windows in gym

Page 29: FAIR LAWN BOARD OF EDUCATION

WESTMORELAND SCHOOL

• Replacement of bathroom partitions (pending)

Page 30: FAIR LAWN BOARD OF EDUCATION

DISTRICT

• Installed security locks in all school buildings• Room numbers stenciled on exterior windows

in all school buildings• Purchased maintenance truck• Purchase of leaf vacuum (pending)• Purchase of salt spreader (pending)