FACTS
8/13/2019 Facts and Controlls
2/19
FACTS DEVICES??
BENEFITS OF FACTS
MAINTENANCE OF FACTS
OPERATION OF FACTS
IDENTIFICATION OF FACTS
FUTURE ENHANCEMENTS
8/13/2019 Facts and Controlls
3/19
Flexible Alternating Current Transmission System
FACTS as they are generally known, are new devices that improve
transmission systems .
8/13/2019 Facts and Controlls
4/19
1. Static VAR Compensators (SVCs)
2. Thyristor controlled series compensators (TCSCs)
3. STATCOM
4. Unified Power Flow Controller (UPFC)
8/13/2019 Facts and Controlls
5/19
UPFC CIRCUIT DIAGRAM
Benefits of utilizing FACTS devices :
Better utilization of existing transmission system assets
Increased transmission system reliability and availability
Increased dynamic and transient grid
stability and reduction of loop flows
Increased quality of supply for sensitive industries
Environmental benefits
8/13/2019 Facts and Controlls
6/19
TECHNICAL BENEFITS OF MAIN FACT DEVICE
8/13/2019 Facts and Controlls
7/19
VoltageLimits
Low Voltage atheavy loads
Supply ReactivePower
Shunt capacitor,SeriesCapacitor
SVC, TCSC,STATCOM
High voltage atlight load
RemoveReactivePowersupply
Switch EHVLine and\orshuntcapacitor
SVC, TCSC,STATCOM
AbsorbReactivePower
Switch Shuntcapacitor,Shunt
Reactor
SVC,STATCOM
High voltagefollowingoutage
AbsorbReactivePower
Add shuntreactor
SVC,STATCOM
ProtectEquipment
Add arrestor SVC
Low VoltagefollowingOutage
Supply reactive power
Switch Shuntcapacitor,reactor,seriescapacitor
SVC,STATCOM
PreventOverload
Series Reactor,PAR
TCPAR,TCSC
8/13/2019 Facts and Controlls
8/19
ThermalLimits
Line orTransformer
Overload
ReduceOverload
Add line ortransformer
TCSC, UPFC, TCPAR
Add seriesreactor
SVC, TCSC
Tripping ofParallelcircuit (line)
Limit Circuitloading
Add seriesreactor,capacitor
UPFC, TCSC
Loop flows Parallel lineload sharing
Adjust seriesreactance
Add seriescapacitor/reactor
UPFC, TCSC
Adjust phaseangle
Add PAR TCPAR,UPFC
Post-faultsharing
Rearrangenetwork oruseThermal Limit actions
PAR, SeriesCapacitor/Reactor
TCSC,UPFC,SVC,TCPAR
Flow Direction Adjust Phase PAR TCPAR,UPFC
8/13/2019 Facts and Controlls
9/19
Short Circuit Levels Excessive breakerfault currents
Limit Short-circuitcurrents
Add series Reactor, newcircuit breaker
Change Circuit breaker
Add new circuit Breaker
Rearrange network Split Bus
Sub Sync.resonance
Potential Turbine Mitigate Oscillations Series Compensation
8/13/2019 Facts and Controlls
10/19
Investment costs of FACTS devices
a) The devices equipment costs, and (b) The necessary infrastructure costs
STATCOM
SVC
UPFC
T CSC
FSC .
160
140120
10080
60
4020
100 200 300 400 500 100 200 300 400 500
160
140120
10080
60
4020
8/13/2019 Facts and Controlls
11/19
FINANCIAL BENEFITS:
1. Additional sales
2. Additional wheeling charges
3. Avoiding or delaying of investments
8/13/2019 Facts and Controlls
12/19
Maintenance of FACTS devices is minimal and similar to that required for shunt capacitors, reactors
and transformers
The amount of maintenance ranges from 150 to 250 man-hours peryear
Operation of FACTS devices
operated automatically
can be done locally and remotely
8/13/2019 Facts and Controlls
13/19
Steps for the Identification of FACTS
Projects:
Performance Verification
8/13/2019 Facts and Controlls
14/19
Projects
to conduct a detailed network study to investigate the criticalconditions of a grid
For a stable grid, the optimized utilization of the transmission linescould be investigated
an economical study can be performed to compare costs of FACTSdevices or conventional solutions with the achievable benefits.
8/13/2019 Facts and Controlls
15/19
Performance Verification
The design of all FACTS devices should be testedin a transient network analyzer (TNA)
The results of the TNA tests should be consistentwith the results of the network study