Top Banner

of 19

Facts and Controlls

Jun 04, 2018

Download

Documents

Infant Raj
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/13/2019 Facts and Controlls

    1/19

    A presentation on..

    FACTS

  • 8/13/2019 Facts and Controlls

    2/19

    FACTS DEVICES??

    BENEFITS OF FACTS

    MAINTENANCE OF FACTS

    OPERATION OF FACTS

    IDENTIFICATION OF FACTS

    FUTURE ENHANCEMENTS

  • 8/13/2019 Facts and Controlls

    3/19

    Flexible Alternating Current Transmission System

    FACTS as they are generally known, are new devices that improve

    transmission systems .

  • 8/13/2019 Facts and Controlls

    4/19

    1. Static VAR Compensators (SVCs)

    2. Thyristor controlled series compensators (TCSCs)

    3. STATCOM

    4. Unified Power Flow Controller (UPFC)

  • 8/13/2019 Facts and Controlls

    5/19

    UPFC CIRCUIT DIAGRAM

    Benefits of utilizing FACTS devices :

    Better utilization of existing transmission system assets

    Increased transmission system reliability and availability

    Increased dynamic and transient grid

    stability and reduction of loop flows

    Increased quality of supply for sensitive industries

    Environmental benefits

  • 8/13/2019 Facts and Controlls

    6/19

    TECHNICAL BENEFITS OF MAIN FACT DEVICE

  • 8/13/2019 Facts and Controlls

    7/19

    VoltageLimits

    Low Voltage atheavy loads

    Supply ReactivePower

    Shunt capacitor,SeriesCapacitor

    SVC, TCSC,STATCOM

    High voltage atlight load

    RemoveReactivePowersupply

    Switch EHVLine and\orshuntcapacitor

    SVC, TCSC,STATCOM

    AbsorbReactivePower

    Switch Shuntcapacitor,Shunt

    Reactor

    SVC,STATCOM

    High voltagefollowingoutage

    AbsorbReactivePower

    Add shuntreactor

    SVC,STATCOM

    ProtectEquipment

    Add arrestor SVC

    Low VoltagefollowingOutage

    Supply reactive power

    Switch Shuntcapacitor,reactor,seriescapacitor

    SVC,STATCOM

    PreventOverload

    Series Reactor,PAR

    TCPAR,TCSC

  • 8/13/2019 Facts and Controlls

    8/19

    ThermalLimits

    Line orTransformer

    Overload

    ReduceOverload

    Add line ortransformer

    TCSC, UPFC, TCPAR

    Add seriesreactor

    SVC, TCSC

    Tripping ofParallelcircuit (line)

    Limit Circuitloading

    Add seriesreactor,capacitor

    UPFC, TCSC

    Loop flows Parallel lineload sharing

    Adjust seriesreactance

    Add seriescapacitor/reactor

    UPFC, TCSC

    Adjust phaseangle

    Add PAR TCPAR,UPFC

    Post-faultsharing

    Rearrangenetwork oruseThermal Limit actions

    PAR, SeriesCapacitor/Reactor

    TCSC,UPFC,SVC,TCPAR

    Flow Direction Adjust Phase PAR TCPAR,UPFC

  • 8/13/2019 Facts and Controlls

    9/19

    Short Circuit Levels Excessive breakerfault currents

    Limit Short-circuitcurrents

    Add series Reactor, newcircuit breaker

    Change Circuit breaker

    Add new circuit Breaker

    Rearrange network Split Bus

    Sub Sync.resonance

    Potential Turbine Mitigate Oscillations Series Compensation

  • 8/13/2019 Facts and Controlls

    10/19

    Investment costs of FACTS devices

    a) The devices equipment costs, and (b) The necessary infrastructure costs

    STATCOM

    SVC

    UPFC

    T CSC

    FSC .

    160

    140120

    10080

    60

    4020

    100 200 300 400 500 100 200 300 400 500

    160

    140120

    10080

    60

    4020

  • 8/13/2019 Facts and Controlls

    11/19

    FINANCIAL BENEFITS:

    1. Additional sales

    2. Additional wheeling charges

    3. Avoiding or delaying of investments

  • 8/13/2019 Facts and Controlls

    12/19

    Maintenance of FACTS devices is minimal and similar to that required for shunt capacitors, reactors

    and transformers

    The amount of maintenance ranges from 150 to 250 man-hours peryear

    Operation of FACTS devices

    operated automatically

    can be done locally and remotely

  • 8/13/2019 Facts and Controlls

    13/19

    Steps for the Identification of FACTS

    Projects:

    Performance Verification

  • 8/13/2019 Facts and Controlls

    14/19

    Projects

    to conduct a detailed network study to investigate the criticalconditions of a grid

    For a stable grid, the optimized utilization of the transmission linescould be investigated

    an economical study can be performed to compare costs of FACTSdevices or conventional solutions with the achievable benefits.

  • 8/13/2019 Facts and Controlls

    15/19

    Performance Verification

    The design of all FACTS devices should be testedin a transient network analyzer (TNA)

    The results of the TNA tests should be consistentwith the results of the network study

  • 8/13/2019 Facts and Controlls

    16/19

  • 8/13/2019 Facts and Controlls

    17/19

  • 8/13/2019 Facts and Controlls

    18/19

  • 8/13/2019 Facts and Controlls

    19/19