Page 1: Factory plan presentation

Introduction of Affordable HouseFactory Plan

Page 2: Factory plan presentation

we introduce only 2-3 production lines. Why not buy all lines?

The two lines you buy can only producewall panel and floor panel.

All other materials can be bought or partlyimported from China.

If you wall / floor panel production lines,you can:

.Save shipping cost from China ( 25% of goods)

.Save import tax ( check locally)

.Lower house cost (25% lower than all imported)

.Creat more jobs for local labour

.Competative selling price.

.Sell houses faster (double or triple faster than sell riditional houses).To make more houses with fast-assembling sysytem.

Page 3: Factory plan presentation

Height limit:7- 9 floors Waranty 50 years Fast in assembling

Page 4: Factory plan presentation

Process of affordable house purchasing and project loan operation

1. The buyer of house plant come to Beijing to sign cooperation agreement of buying house material processing lines with ZCHTIM - technical and loan introducer. Prepare 10,000 USD for agreement witness and registration of agreement. This is to protect both parties' interest from unfair competition.2.Visit machines factory and see how the they are operated. Decide list of machines to buy.3.Start ordering equipment .( 50% down payment,50% balanceshould be paid before shipping)4.Make up a list of other materials needed for sample house projects. Decide which will be bought locally and which are imported from China.(the purchased lines make wall panel and floor panel)5.Start ordering materials imported from China depend on how many sample houses will be built.6.At the same time , prepare house project loan application. Please refer to related loan document.

Page 5: Factory plan presentation

Wall panel and Floor processing machines and devices quotation / 2 lines

Page 6: Factory plan presentation

House materials Buyer can buy them locally if avaliable

Page 7: Factory plan presentation

Wall Panel and Floor Panel Extrusion Equipments

Wall panel is main material for house walls

Daily out put : : 500 M2 Annua out put ;150,000 M2Power: 380V Raw materials needed:cement, sand, ash from chimney,waste particles, water,etc.

One M2 costs: 2.3 US$Natural sun-dryWorkshop(simple shelter) 2000 M2

Page 8: Factory plan presentation

You can use local steel sheetto make U-shanpe pole

or import sheet from China tomake U-shape pole

This machine is imported from China

about 5,000 US$ FOB

Machines needed in the factorywww.genertec.com.cn

U shape light steel processing

Page 9: Factory plan presentation

Materials imported from China 公司网址: www.XXX.cn

Kitchen cabinet,sink,toilet,shower room can be bought locally or imported from China

Page 10: Factory plan presentation

Door and Window

Door and windowcan be made by import devices(quotation will be given if needed)Or they can be bought locally.

.

Page 11: Factory plan presentation

Comparison of House Cost

Page 12: Factory plan presentation

Master Plan

Thank you