Phase II VTA’s BART Silicon Valley Phase II Project is a six-mile, four-station extension that will bring BART train service from Berryessa/North San José through downtown San José to the City of Santa Clara. The Phase II Project is planned to include an approximately five-mile tunnel, three underground stations (Alum Rock/28th Street, Downtown San José, Diridon), one ground-level station (Santa Clara), as well as general and maintenance facilities. Continued on the reverse side FACT SHEET: VTA’s BART Silicon Valley Phase II Extension Project VTA Board Approved Project & Certified Final SEIR April 5, 2018 Engineering & Pre-Construction Environmental Clearance 2018 2019 2020 2021 2022 FTA Issued Record of Decision June 4, 2018 Receive FTA Full Funding Grant Agreement Submit Application for FTA Full Funding Grant Agreement Current planning schedule is based on securing funds through FTA’s Expedited Project Delivery Pilot Program. Program Overview VTA’s BART Silicon Valley Program provides transportation improvements in the corridor that extends from the southern border of Alameda County in the City of Fremont, through the cities of Milpitas, San José, and Santa Clara in Santa Clara County. These improvements include a 16-mile, six-station extension of the Bay Area Rapid Transit (BART) system that is being managed and funded by the Santa Clara Valley Transportation Authority (VTA) in cooperation with BART. VTA’s BART Silicon Valley Extension is being constructed in two phases. Phase I (Berryessa Extension), currently under construction, extends 10 miles south from the Warm Springs/South Fremont station and adds two new stations: Milpitas and Berryessa/North San José. McKee Rd 13th St 19th St 11th St 10th St 4th St 1st St Market St 24th St E Santa Clara St W Santa Clara St W Hedding St N 1st St Coleman Ave NOT TO SCALE N Mineta San José International Airport E Taylor St Newhall Maintenance Facility 680 680 280 880 87 101 101 880 SANTA CLARA STATION DOWNTOWN SAN JOS É STATION DIRIDON STATION ALUM ROCK/ 28TH STREET STATION BERRYESSA/ NORTH SAN JOSÉ STATION Stockton Avenue Ventilation Facility 13th Street Ventilation Facility Phase I Alignment Phase II Ground-Level Alignment Phase II Single-Bore Tunnel Alignment LEGEND BART-Phase2-Overview-042219