Project Title Project Status Project Budget/PPR Project Expenses to Date Funding Source Projected Const. Start/ Completion PM Comments Issues Photo Elevator Repair & Replacements / Math Science / Student Services / Language Arts Construction $790,800 $157,802 BC101/ MG100/ CD100 1/2015- 7/2015 Construction has started. This project has a deadline on funding June 2015 2 5 Aera STEM Success Center Design $1,000,000 $61,566 MG100 STEM - RP257 8/21/15 - 2/4/16 Construction Documents submitted to DSA - January 12, 2015. Anticipate review/response from DSA by 5/28/15. Campus Wide Water and Gas Line Replacement Construction $3,920,200 $3,509,984 SRID 6/2013 - 3/2015 WM Lyles starting tie in to all buildings for water and gas. Project is 98% complete. 4 Football Field Practice Lights Design $253,700 $20,897 SRID 8/2015- 10/2015 Construction Documents have been submitted to DSA. Estimated DSA review 160 days from submittal date. Campus Wide Path of Travel Design $438,564 $23,000 SRID CD100 6/2015- 8/2015 Project was submitted to DSA for plan check. Estimated DSA review 160 days from submittal date Prop 39 year 2 Exterior Lights Design $377,503 $6,812 DO102 2/2015- 6/2015 Plans to be ready for advertisement. Working on preparing front end documents. This funding has deadline of June 2016 Fire Alarm Repair Code Compliance Pre Design $1,118,310 $46,278 PFP/CD100 8/2015- 12/2015 API provided a full campus fire alarm device and panel survey. RFP for Engineering services to be issued by 2/5/15.This project has a deadline of submission to DSA before June 2015. Exterior Way Finding Signage Design $122,700 $0 SRID/BC101 6/2015- 8/2015 Consultant is developing specific signage types and locations in coordination with the campus stakeholders Student Services AHU, Chiller Loop Connection, Chiller Removal Project Bid $876,150 $61,416 MG100 10/13 - 12/15 New bid date is 2/10/15. PPR revised to 100% Engineer estimate and is in circulation for signatures. 6 Addition of cooling to the Gymnasium DSA $562,000 $37,173 MG100 9/1/14 - 9/1/15 FA to be designed and implemented as a separate project. This project needs the DSA Application number for the FA project before plans can be DSA approved. 3 Bakersfield College PM: D. Reed, J. DeRosa, K. Mitchel January 31, 2015 Facilities and Construction Group Monthly Report Scheduled Maintenance Projects Schedule Schedule