1 Training Purposes Only JEM FACET 31407 JMU-081116 (Ver. 1.1) Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors and sub contractors only for the purposes of fulfilling the cooperating agency’s responsibilities under the Space Station Intergovernmental Agreement (IGA) and Memorandum of Understanding (MOU). It shall not be used for any other purpose, nor disclosed or retransferred to any other entity or government without prior written permission of the Japan Aerospace Exploration Agency (JAXA). Facet Experiment JEM FACET 31407 Instructo r: Takashi Yamasaki Yuki Kawai Ta kuya Takami ([email protected]p) ([email protected]) ([email protected])
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Notice : This technical data is furnished on the condition that it will be used by and disclosed to the receiving Cooperating agency and its contractors and sub contractors only for the purposes of fulfilling the cooperating agency’s responsibilities under the Space Station Intergovernmental Agreement (IGA) and Memorandum of Understanding (MOU). It shall not be used for any other purpose, nor disclosed or retransferred to any other entity or government without prior written permission of the Japan Aerospace Exploration Agency (JAXA).
2 Specimen cells(Glass windows areon top and bottom (in total 4 windows))
Facet Cell installed in SCOF
6 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
:Crew operation necessary.
:Crew operation as required.
:Ground operation.
LEGEND:
Facet Cell Installation
Optical Adjustment (ground)
Optical Adjustment (crew)
Experiment
SCOF Cable Connection
MMA/MLT ActivationSCOF Activation
Facet Cell Removal
- Activate UDC and MMA/MLT.
- Deactivate UDC and MMA/MLT.
MMA/MLT DeactivationSCOF Deactivation
MMA Data Acquisition
IPU Video Downlink
Secondary Power Off
- Install Facet Cell in SCOF.
*
*
- Connect SCOF Payload Bus Cable and IPU User Video Cables.
IPU Activation
IPU Deactivation
Facet Operations Overview
- Flip down Secondary Power Off switch of SCOF per ground request. Only if ground cannot power off SCOF while temperature of seed crystal is reaching 34 degrees Celsius.
- Adjust focus, field of view, and interference fringes of SCOF if ground is difficult to adjust.
- Remove and trash Facet Cell.
Facet Cell Reorientation
- Rotate Facet Cell to change samples.
* Repeat experiment as ground changes experiment parameters.
7 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Key points during Facet Operations
Category Key points
Crew Safety Verify glass windows of Facet Cell are NOT broken or cracked through Ziplock bag and Tape to prevent crew exposure to broken glass hazard.
Time Critical Operation N/A
Dos and Don’ts Do not damage glass window with alignment pins while handling Facet Cell in SCOF.
Difficulty in Ops. N/A
Possible Mis-Ops. N/A
8 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Acronyms
IPUMMAODFSCOFUDC
Image Processing UnitMicro-gravity Measurement ApparatusOperations Data FileSolution Crystallization Observation FacilityUtility DC/DC Converter unit
9 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Appendix
Images/Diagrams
10 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Facet Cell (Birds eye)
11 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Facet Cell (top)
12 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Facet Cell (bottom)
13 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Facet Cable
14 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)
Facet Cell (Inside)
15 Training Purposes OnlyJEM FACET 31407 JMU-081116 (Ver. 1.1)