Top Banner
FAC Recommendation Update Medium Priority Assessments Roman Carter, Manager – Reliability Assurance October 3, 2012
13

FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

Jul 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

FAC Recommendation Update Medium Priority Assessments Roman Carter, Manager – Reliability Assurance October 3, 2012

Page 2: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

2 RELIABILITY | ACCOUNTABILITY

Background on Alert:

• A vegetation contact by a Transmission Owner identified actual field conditions that varied significantly from design assumptions – to the point where some facility ratings were considered inaccurate or in question.

• Follow-up resulted in the conclusion that this situation was not restricted to one entity or region.

• As a result, NERC issued an Alert Recommendation to proactively identify other such conditions and promote corrective actions.

FAC Recommendation Background

Page 3: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

3 RELIABILITY | ACCOUNTABILITY

FAC Alert Milestones: • October 7, 2010 – Original Alert issued

• October 28, 2010 and November 29, 2010 – Informational webinars

• November 30, 2010 – Revised Alert and Gerry Cauley Letter

• January 14, 2011 – Q&A document issued

• April 26, 2011 – Assessment Plan Review Criteria issued

• May 12, 2011 – Webinar: Discussed Assessment Plan Review Criteria and reporting by owners

• June 16, 2011 – Published webinar participant Q&A

FAC Recommendation Update

Page 4: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

4 RELIABILITY | ACCOUNTABILITY

FAC Alert Milestones: • July 15, 2011 – First “high” priority assessment due date

• September 22, 2011 webinar- results from July 2011 report

• January 15, 2012- Second assessment report on high priority transmission lines submitted by transmission owners.

• March 20, 2012- Update webinar provided to industry for the second “high priority” owner assessments performed.

• October 3, 2012 – First of two medium update webinars provided to Industry.

FAC Recommendation Milestones

Page 5: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

5 RELIABILITY | ACCOUNTABILITY

High Priority Assessment Responses:

• All High Priority Lines have been assessed

• Approximately 6,900 circuits were assessed

• Approximately 84,000 miles of line were assessed

• Approximately 10,000 discrepancies were discovered

• Approximately 52 percent have been mitigated as of July 17, 2012

Recap of High Priority Assessment

Page 6: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

6 RELIABILITY | ACCOUNTABILITY

FAC Recommendation Update

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

FRCC MRO NPCC RFC SERC SPP TRE WECC

14% 18%

32%

18%

60%

5% 8% 10%

Percent of Assessed Medium Circuits with Discrepancies Through July, 2012

Page 7: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

7 RELIABILITY | ACCOUNTABILITY

FAC Recommendation Update

37%

46%

52%

60% 60%

49%

67%

58%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

FRCC MRO NPCC RFC SERC SPP TRE WECC

Percent of Miles Assessed for Medium Priority Lines Through July 2012

Page 8: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

8 RELIABILITY | ACCOUNTABILITY

FAC Recommendation Update

Field Inspection 9%

Ground Survey 13%

LiDAR / PLS-CADD 58%

Combination of Methods

20%

Medium: Top Inspection Types

Page 9: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

9 RELIABILITY | ACCOUNTABILITY

FAC Recommendation Update

Combination of Remediation Types

56%

Removed Object or Graded

18%

Raised Transmission Structure

17%

Transmission Structure Installed

5%

Derated 4%

Medium: Top 5 Remediation Categories

Page 10: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

10 RELIABILITY | ACCOUNTABILITY

FAC Recommendation Update

Complete 38%

In Progress 52%

Not Started 10%

Medium: Remediation Status Breakdown

Page 11: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

11 RELIABILITY | ACCOUNTABILITY

FAC Recommendation Update

Clearance to Underbuild

19%

Conductor-Conductor Clearance

4%

Ground / Structure Clearance

72%

Combination of Listed Types

4% Transmission

Crossing 1%

Medium: Top 5 Discrepancy Categories

Page 12: FAC Recommendation Update - NERC Ratings Alert DL/October_… · FAC Recommendation Update . Medium Priority Assessments . Roman Carter, Manager – Reliability Assurance . ... •

12 RELIABILITY | ACCOUNTABILITY

Medium Assessment Summary

• 83 percent response rate in providing summaries of their first medium priority assessment.

• Approximately 28 percent of the total medium priority transmission circuits were assessed

• Completed assessments account for slightly more than 56 percent of the total of medium priority miles

• Nearly 5,700 discrepancies discovered

• Approximately 38 percent of the registered entities who have assessed their medium transmission facilities have completed their mitigation plans.