FABRICATION OF STEEL COMPOSITE GIRDER DETAILS OF WORK EXECUTED BY SANFILED (INDIA) LIMITED S. No. Name & Description of work Contract awarding authority Authority under whom work executed Date of Award of the contract Agreement No. & Date Cost of Work (Rs.) Status 1 Fabrication, supply & Site supervision work of Steel Composite Girder for Railway Mumbai division ROB of KM-22/11-12 for Nardana Town bypass NH-3 NHAI/ Sadbav Engineering Ltd., Ahmedabad NHAI/ Sadbav Engineering Ltd., Ahmedabad 16.01.12 16.01.12 1,13,63,202/- Completed 2 Fabrication & supply of Steel Composite Girder with site supervision of ROB at Shobhapur Gate in lieu pf L.C. No. 318/SPL at KM994/5-6 on JBP-KTE Section of Jabalpur Division of West Central Railway WCR, Jabalpur/ Sundrani Infrasturcture Co., Jabalpur WCR, Jabalpur/ Sundrani Infrasturcture Co., Jabalpur 11.10.12 Dtd 11.10.12 MOU dtd. 11.10.12 68,53,860/- Completed 3. Fabrication of Steel Composite Girder for Bridge No. 582 between Indore & Lokman Nagar Station for Western Railway. Dy. CE, Western Railway, Indore/ Vijay Kumar Roopchandani Dy. CE, Western Railway, Indore/ Vijay Kumar Roopchandani DTD. 31.10.12 3,58,04,440/- Completed 4. Fabrication of Steel Composite Girder for Construction of ROB in Level crossing no. 259, at Rajendra Nagar Near Indore Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani DTD. 28.15.13 1,92,79,677/- Completed 5. Fabrication of Steel Composite Girder for Construction of ROB at LC No. 256 between ROW & MHOW near Indore Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani Dy. CE, western Railway, Indore/ Vijay Kumar Roopchandani DTD. 26.10.13 1,12,24,644/- Completed 6. Fabrication of 06 Nos. 20.4 restricted Height Girder (25 T Loading standard) based on RDSO/B-11040; Additional work awarded for Fabrication of 01 no. 20.4 restricted height girder based on RDSO Drawing NO. RDSO/B-11041 DEN (East) North Central Railway, Jhansi ADEN, Mahoba 27.09.13 A/W/E/254 dtd 19.12.2013 1,23,57,784.30 Completed/ Additional work is in progress Cont….2/