FRENCH FORT BLDG M CONTEXT CONCEPT UNDERPASS FORM-EXTENTED FORM (EXISTING)
Aug 13, 2015
UP
UP
UP
1A110
1A112
1A114
1A114
1A115
Retail4
Retail2
Market3
Lobby1
1/8" = 1'-0"1 Level 1
0' 4' 8' 16' 32'
1ST FLOOR 1-8” = 1’ - 0”
EGRESS
EGRESS
LOBBY MARKET RETAIL RETAIL HALL
RESTROOMS
UNDERPASS
RAMP
PARKING
N
DNUP
UP
UP
Lounge
Library
open to below
1/8" = 1'-0"1 Level 2
1-8” = 1’ - 0” 2ND FLOOR
LIBRARY
BRIDGE
RESIDENT UNITS
RESIDENT UNITS
LIVINGBEDROOMKITCHENPANTRY/WASH RMBATHROOM
800 - 820 SQ. FT PER UNIT
12
23
4
5
12345
N
GROUND LEVEL0' - 0"
Level 214' - 0"
Level 329' - 0"
Level 444' - 0"
Roof58' - 6 17/32"
1/8" = 1'-0"1 South West Elevation
SOUTH WEST
NORTHWEST
1-8” = 1’ - 0”
GROUND LEVEL0' - 0"
Level 214' - 0"
Level 329' - 0"
Level 444' - 0"
Roof58' - 6 17/32"
GROUND LEVEL0' - 0"
Level 214' - 0"
Level 329' - 0"
Level 444' - 0"
1A110
Roof58' - 6 17/32"
1/8" = 1'-0"1 West
0' 4' 8' 16' 32'
EAST
WEST
GROUND LEVEL0' - 0"
Cast in channel to slab edge
Insulated Infill Panel
Galvanized Channel for Balusters
Precast Concrete Slab
EPDM Membrane
Laminated Glass Balustrade
Cementitious Soffit Panel
2mm Aluminum Over-Cladding
1"Rigid Insulation
6 Mil Polyethylene under slab
Concrete Foundation
Backfill
Air Fill at panel joints
Steel Dowel
Concrete Strip Footing
Weather Sill
Cast in place Anchor
Tapered Wood Blocking
Parapet Construction
1/2" Rigid Fibre Board
Single Ply in Asphalt Vapor Barrier
2' Concrete Roof
3/8" = 1'-0"1 Wall Section Detail
DNUPLounge
Residences
Residences
----
WALL SECTION 3-8” = 1’-0”ENLARGED FLOOR PLAN SECOND FLOOR 3-8” = 1’-0”