Contents1.Purpose22.IMS Scope23.Integrated Management System
requirements34.Policies35.Management
Commitment36.Responsibilities47.IMS Outline and
Descriptions47.1Context of the Organisation47.2Hazard and Risk
Assessment47.3Determine Legal Obligations57.4Objectives and
Targets57.5Document Control67.6Customer Focus /
Satisfaction67.7Contractor and Supplier Management77.8Audits &
Inspections77.9Management Review77.10Continual Improvement8Appendix
A – IMS Relationship Table9
1. Purpose
The [Insert] Integrated Management Systems (IMS) overview manual
has been written to provide the necessary information, advice,
recommendations and instructions.
The objective of the IMS is to establish the strategy for the
implementation of best practice processes and operations throughout
its business. This strategy has been developed to ensure that all
activities and services provided by or performed within, [Insert]
are conducted in a safe, efficient and consistent manner.
The effectiveness of the IMS can be viewed by but not limited
to:
· Compliance with applicable rules, regulations, standards,
codes and guidelines to which the company subscribes;
· Mitigation of both business and operational risks;
· Safeguarding safety and well-being of employees;
· Customer satisfaction;
· Operational improvements;
· Protection of the environment;
· Public safety, as users of our services; and
· Community and public perception.
The procedures, work instructions, forms, checklists and
operational prompts that document our system are an expression of
the collective knowledge. As much as possible, how we do our
business will be built into our procedures and be supported by
checklists, operational prompts and training. Forms and checklists
are the means by which we are able to prove that we have complied
with our system.
2. IMS Scope
The scope of the integrated management system (IMS) is
applicable to [Insert]
This system has been developed in-line with the requirements of
the following standards:
· ISO 9001:2015 Quality Management Systems
· ISO 14001:2015 Environment Management Systems
· ISO 45001:2018 Safety Management Systems
This has also included consideration for external and internal
issues and the requirements of relevant interested parties that
shape our organisational context, and the delivery of services.
Exclusions:
The following clauses from the standard are not considered
relevant and therefore excluded from the IMS:
· ISO 9001:2015 - 8.3 Design and Development of Products and
Services
· ISO 9001:2015 – 7.1.5.2 Measurement Traceability
3. Integrated Management System requirements
The IMS is designed to meet the requirements of several
management procedures and codes, as well as legal requirements and
company objectives.
4. Policies
The organisations commitment to systematically managing the
integrated management system (IMS) is endorsed by the businesses
Directors and is applied throughout the business.
· Quality and Health, Safety & Environment management
policies distributed and displayed throughout the operations;
· The policies are communicated to all employees;
· The policies displayed clearly states management’s commitment
to improving performance and compliance to relevant legislation;
and
· Management are committed to continual improvement with a focus
of customer satisfaction and a reduction of incidents and
accidents.
5. Management Commitment
The Directors, together with the management team, is responsible
for providing the overall leadership and values of the company. The
management team is also responsible for policy development,
providing the necessary resources required to operate the IMS, for
ensuring the effective implementation and for taking timely action
on any identified deficiencies.
6. Responsibilities
Management shall implement the Company policies and shall
establish, and monitor programmes aimed at the continuous
improvement of performance. The responsibility, authority and
inter-relation of those personnel charged with the implementation
of the IMS shall be defined. Appropriate IMS support resources
shall be available to assist line management to discharge its
responsibilities.
This shall be identified from the following but not limited
to:
· Organisation chart;
· Position descriptions;
· IMS Compliance plan;
· Internal management system audits undertaken by third
parties;
· External management system audit undertaken by accredited
organisations; and
· Annual IMS Management review
The business may also obtain IMS advise and/or support from
competent persons (Internally or externally).
7. IMS Outline and Descriptions7.1Context of the
Organisation
The IMS was developed in conjunction with the external and
internal issues which were relevant to its purpose and that affect
its ability to achieve the intended outcomes. To assist in
identifying these issues the following analyses are undertaken:
· Interested Parties
· Risks and Opportunities
· Strengths, Weakness, Threat and Opportunities (SWOT)
· Political, Economic, Social, Technology, Environmental and
Legal (PESTEL)
These analyses are considered as a ‘live documents’ and
identified actions are reviewed updated on a regular basis.
7.2Hazard and Risk Assessment
Risk management is an integral part of [Insert] practices,
applied at strategic, organisational and operational levels. Risk
management at [Insert] is based on prioritising the elimination of
foreseeable risks, or where this can’t be achieved, applying risk
controls to minimise risk as low as reasonably practical
(ALARP).
Hazards relating to the business’s activities, processes,
products or services may be identified as part of completing, or
during the review of:
· Workplace inspections;
· HSE Conversations/Observations;
· Stakeholder input, surveys, direct feedback from employees,
contractors, or other relevant persons;
· Incident reporting processes e.g. accidents, near misses and
hazards;
· Risk assessments, safe work method statements (SWMS) and risk
registers;
· Environmental impact/aspect registers;
· Internal management system audits undertaken by third
parties;
· External management system audit undertaken by accredited
organisations;
· Relevant legislation, code of practices or standards; and
· Consultation with regulators, industry partners or via
industry forums / HSE alerts.
The Company’s hazard and risk management process is further
documented in the Hazard and Risk Management Plan which includes
the following:
· Risk evaluation process – Hazard identification, analysis and
assessment, evaluation and controls, control effectiveness, post
evaluation control and risk treatment;
· Monitoring and review processes;
· Management of change; and
· Company risk matrix including the likelihood and consequence
descriptors.
7.3Determine Legal Obligations
The Directors will co-ordinate the identification and review of
current applicable laws and other pertinent requirements relevant
to both office and project related activities that [Insert]
undertake.
This identification process will include a review of the
relevant acts, regulations, licences, permits, etc. Sources of
information used to identify requirements which may include:
· Relevant HSE laws, regulations and policies;
· Licences, permits, approvals and consents including
commitments made in referrals, environment and social impact
assessment (ESIA’s) and documentation provided to the authorities
to obtain these consents;
· Relevant industry standards, codes of practice and applicable
guidelines;
· Internal management system audits undertaken by third
parties;
· External management system audit undertaken by accredited
organisations;
· Third party services provided by HSE professionals; and
· Subscriptions to relevant regulators i.e. Worksafe, Standards
of Australia, EPA;
Relevant legislation has been identified and can be accessed in
the legislation register which is also reviewed on a periodic basis
in-line with the IMS Compliance plan.
7.4Objectives and Targets
The Company has established objectives and targets which are
documented in the HSEQ Objectives and Targets. The HSEQ objectives
and targets are measurable, achievable and establish the approach
to managing and improving HSE performance.
Performance against these objectives and targets are monitored
through various methods which may include:
· Executive management meetings;
· IMS Compliance plan;
· Annual IMS Management review;
· Internal management system audits undertaken by third parties;
and
· External management system audit undertaken by accredited
organisations.
7.5Document Control
All documentation and data applicable to the IMS shall be as far
as practicable be standardised and controlled in accordance with
the document control procedure.
All documents and data that form part of the system shall
be:
· legible;
· uniquely identified;
· maintained in an orderly and accessible manner; and
· Retrievable (previous versions).
The IMS is an electronically produced word processing system of
documents which is copied and available to relevant employees in a
read only format. All documents, procedures, forms, etc. which
comprise the IMS may be printed off but are uncontrolled
copies.
IMS documents are version and data controlled all hard copies
must be verified against the documents on the IMS site for
validity.
Where required records shall be maintained and shall be
accessible to appropriate personnel, storage shall be secure and
safe. All records shall be accurate and legible and must be
complete in every detail.
7.6Customer Focus / Satisfaction
In line with the company’s policies, it is [Insert] objective to
provide customers with the level of service they require by
identifying their needs and meeting them with the aim of enhancing
customer’s satisfaction. They shall ensure that there are effective
arrangements in place for communicating with customers in relation
to:
· Service delivery;
· Enquiries and contracts including changes and amendments;
and
· Customer feedback, including customer complaints.
One of the measurements of the performance of the IMS is that
the company shall monitor information relating to the customer’s
perception as to whether their requirements are being met and the
level of customer satisfaction.
The Company shall liaise with the customer to ensure that the
specified requirements are properly understood and can be met as
part of the management process relevant to the specific
project.
There are a number of methods in which are currently utilised to
monitor the customers perceptions of the degree to which their
needs and expectations have been fulfilled:
· Client feedback forms;
· Internal audit project review criteria;
· Post-delivery project review criteria;
· Complaints and compliments;
· Non-conformance and incident reporting;
· Schedule of deliverables;
· Monthly executive and Management team meetings; and
· Annual IMS Management reviews;
7.7Contractor and Supplier Management
Contractors and supplier’s performance shall be re-evaluated on
an annual basis and a decision is to be made whether they’ll
continue being engaged by the business.
This is undertaken in the supplier evaluation spread sheet which
includes the following criteria:
· Safety performance (Incidents);
· Environment performance (Incidents);
· Insurances (Public liability, professional indemnity and
workers compensation);
· Certifications (Quality, Safety and Environment);
· Service level agreements (SLA);
· Performance of services; and
· Competitive pricing.
7.8Audits & Inspections
To ensure compliance with [Insert] IMS and relevant legislative
requirements, the following may be undertaken but not limited
to:
· Internal management system audits undertaken by third
parties;
· External management system audit undertaken by accredited
organisations;
· HSE Observations;
· HSE Office inspections;
· Internal project audits & reviews; and
· HSE audits undertaken by third party professionals (Project
specific as required)
An audit schedule shall be developed and tracked in the IMS
Compliance plan.
7.9Management Review
Senior management shall review the effectiveness of the IMS on
an annual basis with the outcomes documented. This forms an
integral part of the on-going planning of the business to ensure
continuous improvement and assist in identifying gaps/improvements
which require attention.
The systems reviews will be undertaken in-line with the
following standards requirements:
· ISO 9001:2015 - Quality Management systems;
· ISO 45001:2018 – Occupational Health & Safety Management
systems; and
· ISO 14001:2015 – Environment Management systems.
Example of content which will be covered in the review:
The status of actions from previous management reviews;
Changes in external and internal issues that are relevant to the
quality, safety and environment management systems;
Information on the performance and effectiveness of the quality,
safety and environment management systems;
Customer satisfaction and feedback from interested parties;
The extent to which quality, safety and environment objectives
have been achieved;
Process performance and conformity of products and services;
Nonconformities and corrective actions;
Monitoring and measurement results;
Audit results – internal and external;
The performance of external providers;
the needs and expectations of interested parties, including
compliance obligations; and
Consultation and participation of workers.
The adequacy of resources;
Review of the Policies;
The effectiveness of actions taken to address risks and
opportunities; and
Opportunities for continual improvement.
7.10Continual Improvement
The IMS is based on Schewart’s ‘Plan, Do, Check, Act’ (PDCA)
cycle and includes systems and responsibilities for achieving
predetermined levels of continuous improvement.
It is necessary to identify ‘critical to business’ improvements
as part of the ongoing viability of [Insert]. Continual improvement
is established on a risk and value basis which is matched to our
ability and resource to achieve such improvements.
There are various processes implemented to ensure continual
improvement, but not limited to:
· Internal management system audits undertaken by third parties
(As required);
· External management system audit undertaken by accredited
organisations;
· Annual IMS Management reviews;
· Executive management and team meetings;
· IMS Compliance plan;
· HSEQ Objectives & Targets
· HSE Observations;
· HSE Office inspections;
· Internal project audits & reviews; and
HSEQ INTEGRATED MANAGEMENT
MANUAL
HSEQ INTEGRATED MANAGEMENT SYSTEM
Manual
· HSE audits undertaken by third party professionals (Project
specific as required)
Document No
FT-FM-0008
Issue Date
09/04/2019
Page
1 of 1
Revision No:
1
Any printed copy of this document is only current on the day
printing and thereafter is to be verified before use. The
controlled version of this document is available on the shared
drive. Date printed 5/5/2017 10:14:00 am
Document No
FT-FM-0008
Issue Date
09/04/2019
Page
1 of 1
Revision No:
1
Any printed copy of this document is only current on the day
printing and thereafter is to be verified before use. The
controlled version of this document is available on the shared
drive. Date printed 5/5/2017 10:14:00 am
Appendix A – IMS Relationship Table
Clause
Standard
Requirement
Reference
4
9001
14001
45001
Context of the Organisation
4.1
Understanding the organisation and its context
Context analysis spreadsheet (Interested parties & PESTEL
analysis)
4.2
Understanding the needs and expectations of interested
parties
Context analysis spreadsheet (Interested parties analysis)
4.3
Determining the scope of the Quality management system
Determining the scope of the OH&S management system
Determining the scope of the Environment management system
IMS Overview Manual – Section 2 (IMS Scope)
Context analysis spreadsheet (Interested parties analysis)
4.4
Quality management system and it's processes
OH&S management system
Environmental management system
[Insert – Process maps]
5
9001
14001
45001
Leadership
5.1
Leadership and commitment
IMS Overview Manual – Section 5 (Management commitment)
5.1.2
Customer Focus
IMS Overview Manual – Section 7.6 (Customer focus /
satisfaction)
5.2
Establishing and Communicating the Quality Policy
OHS Policy
Environmental Policy
IMS Overview Manual – Section 4 (Policies)
HSE Management Plan – Section 3 (Policies)
Quality Policy
Health, Safety and Environment Policy
Annual Management Systems review
5.3
Organizational roles, responsibilities and authorities
IMS Overview Manual – Section 6 (Responsibilities)
IMS Overview Manual – Appendix A (IMS Responsibility table)
HSE Management Plan – Section 5.2 (Organisation roles and
responsibilities)
Organisation Chart
Position Descriptions
5.4
Consultation and participation of workers
HSE Management Plan – Section 5.6 (Communication and
consultation)
Monthly team and Director meetings
Internal HSE newsletters/emails
HSEQ notice board
Induction & Training sessions
6
9001
14001
45001
Planning
6.1.1
General – Actions to address risks and opportunities
Context analysis spreadsheet (Risk and Opportunities)
Monthly team and Director meetings
IMS Overview Manual – Section 7.1 (Context of the
organisation)
6.1.2
Environmental Aspects
HSE Management Plan – 5.9 (Environmental Aspects and
Impacts)
Environmental Management plans (Project specific)
Risk Management Plan
HSE Risk Register
6.1.2.1
Hazard identification and assessment of risks and
opportunities
IMS Overview Manual – Section 7.2 (Hazard and risk
assessment)
HSE Management Plan – Section 5.3 (Risk and hazard
identification, assessment and control)
Hazard and Risk Management Plan 4.2 (Hazard identification)
Emergency Management Plan
Risk/Hazard registers (Project specific)
HSE Risk Register
Incident and non-conformance form
HSE Job Observation Checklist
HSE Office Checklist
Corrective Action Register
Safe Work Method Statement (SWMS)
Internal/External Audits
Monthly Team meetings
6.1.2.2
Assessment of OH&S Risks to the OHS Management system
Context analysis spreadsheet (Risk and Opportunities)
Monthly team and Director meetings
IMS Overview Manual – Section 7.1 (Context of the
organisation)
6.1.2.3
Assessment of OH&S Opportunities to the Management
system
Context analysis spreadsheet (Risk and Opportunities)
Monthly team and Director meetings
IMS Overview Manual – Section 7.1 (Context of the
organisation)
6.1.3
Determination of legal requirements and other requirements
Compliance Obligations
IMS Overview Manual – Section 7.3 (Determine legal
obligations)
HSE Management plan – Section 5.8 (legal and other
obligations)
Legislation register
Subscriptions to relevant regulators i.e. Worksafe, Standards of
Australia, EPA
Internal and external management system audits undertaken by
third parties
6.1.4
Planning action
IMS Compliance Plan
Monthly Executive Management Meetings
Annual Management Systems Review
Emergency Management Plan
Emergency Drill Log
Internal and external management system audits undertaken by
third parties
6.2.1
Quality objectives
OH&S objectives
Environmental Objectives
IMS Overview manual section 7.4 (Objectives and Targets)
HSE Management plan – Section 5.1 (Health, Safety and
Environment objectives and targets)
Health, Safety and Environment Policy
HSEQ Objectives and Targets
IMS Compliance Plan
Annual Management Systems review
Monthly Director meetings
6.2.2
Planning actions to achieve objectives
·
6.3
Planning of changes
Annual Management Systems review
Monthly Director and team meetings
Communications i.e. emails, noticeboard etc.
IMS Compliance plan
7
9001
14001
45001
Support
7.1.1
7.1
Resources
IMS Overview Manual – Section 6 (Responsibilities)
HSE Management Plan - Section 5.2 (Organisational roles and
responsibilities)
Director - Position Description
Organisation Chart
Annual Management systems review
Monthly Director Meetings
Internal and external management system audits undertaken by
third parties
7.1.2
People
IMS Overview Manual – Section 5 (Management commitment)
Director – Position Descriptions
Organisation Chart
Annual Management systems review
Monthly Director Meetings
Internal and external management system audits undertaken by
third parties
7.1.3
Infrastructure
Monthly Director meetings
Annual Management Systems review
Context analysis spreadsheet (Interested parties, SWOT, PESTEL,
Risks and Opportunities)
7.1.4
Environment for the operation of process
Monthly Director meetings
Monthly staff meetings
Annual Management Systems review
Context analysis spreadsheet (Interested parties, SWOT, PESTEL,
Risks and Opportunities)
Project resourcing and utilisation chart
Quarterly social activities
7.1.5.1
Monitoring and measuring – General
Project resourcing and utilisation chart
Schedule of deliverables spreadsheet
Internal project audit criteria
IMS Compliance plan
Client progress reports (Project specific)
7.1.5.2
Monitoring and measuring – Measurement traceability
Not required – Excluded from Scope
7.1.6
Operational Knowledge
Lessons learnt database
Internal project audit criteria
Client feedback forms
Monthly Director meetings
Monthly Team meetings
7.2
Competence
HSE Management plan – Section 5.5 (Training, competency and
induction)
Qualifications and skills matrix
Company induction checklist
Site safety induction (Project/site specific)
7.3
Awareness
Company induction checklist
Monthly Director and team meetings
Company noticeboard
7.4.1
Communication – General
HSE Management plan – Section 5.6 (Communication and
consultation)
Monthly Director and Team meetings
Internal Company HSE emails and newsletters
HSEQ notice board
Annual Management systems reviews
Client meetings (Project specific)
Company and external safety inductions and training
7.4.2
Internal communication
7.4.3
External communication
7.5.1
Documented information – General
IMS Overview Manual – Section 7.5 (Document Control)
7.5.2
Creating and updating
7.5.3
Control of documented information
8
9001
14001
45001
Operation
8.1
8.1.1
Operational planning and control – General
IMS Overview Manual
8.1.2
Eliminating hazards and reducing OH&S risks
HSE Management plan – Section 5.3 (Risk & Hazard
identification, assessment and control)
Hazard and Risk Management Plan – Section 4.4 (Evaluate and
Control)
HSE Hazard Register
Incident and Non-Conformance form
8.1.3
Management of change
HSE Management Plan – Section 5.6 (Communication and
Consultation)
HSE Management Plan – Section 5.7 (Management of change)
Monthly Director and Team meetings
Internal Company HSE emails and newsletters
HSEQ notice board
Annual Management systems reviews
Client meetings (Project specific)
8.1.4.1
Procurement
HSE Management Plan – Section 5.14 (Subcontractor / Consultant
Procurement)
Monthly Director and Team meetings
Annual management systems reviews
Supplier evaluation and re-evaluation matrix
Project group meetings
Client meetings and/or progress meetings
8.1.4.2
Contractors
HSE Management Plan – Section 5.14 (Subcontractor / Consultant
Procurement)
Monthly Director and Team meetings
Annual management systems reviews
Supplier evaluation and re-evaluation matrix
Project group meetings
Client meetings and/or progress meetings
8.1.4.3
Outsourcing
HSE Management Plan – Section 5.15 (Supervision and Management
of Contractors and Suppliers)
Monthly Director and Team meetings
Annual management systems reviews
Supplier evaluation and re-evaluation matrix
Project group meetings
Client meetings and/or progress meetings
8.2.1
Customer communication
IMS Overview Manual – Section 7.6 (Customer Focus /
Satisfaction)
Client feedback forms
Internal audit project review criteria
Post-delivery project review criteria
Complaints and compliments
Non-conformance and incident reporting
Project group meetings
Client meetings and/or progress meetings
8.2
Emergency preparedness and response
HSE Management Plan – Section 5.13 (Emergency Management and
First Aid)
Emergency Management Plan
Office Emergency Evacuation Drill log
IMS Compliance plan
Qualifications and Skills Matrix
HSE Office inspection checklist
HSE Hazard Register
Induction Summary
8.2.2
Determining the requirements for products and services
Client Scope of service / contract
QMP - [Insert process]
8.2.3
Review of the requirements for products and services
Client Scope of service / contract
Internal audit project review criteria
Post-delivery project review criteria
Monthly Director and Team meetings
Project group meetings
Client meetings and/or progress meetings
Client feedback forms
QMP - [Insert process]
8.2.4
Changes to requirements for products and services
Project group meetings
Client meetings and/or progress meetings
Project management process (Variations)
QMP - [Insert process]
8.3.1
Design and development of products and services - General
Not required – Excluded from Scope
8.3.2
Design and development planning
Not required – Excluded from Scope
8.3.3
Design and development input
Not required – Excluded from Scope
8.3.4
Design and development controls
Not required – Excluded from Scope
8.3.5
Design and development outputs
Not required – Excluded from Scope
8.3.6
Design and development changes
Not required – Excluded from Scope
8.4.1
Control of externally provided processes, products and
services
IMS Overview manual – Section 7.7 (Contractor and Supplier
management)
Annual management systems reviews
Supplier evaluation and re-evaluation matrix
IMS Compliance plan
8.4.2
Type and extent of control
Internal audit project review criteria
Post-delivery project review criteria
Project group meetings
Client meetings and/or progress meetings
Client feedback forms
Incident and non-conformance form
8.4.3
Information for external providers
Contractor Scope of service / contract
Project group meetings
Client meetings and/or progress meetings
QMP - [Insert process]
8.5.1
Control of production and services provision
Client Scope of service / contract
Internal audit project review criteria
Post-delivery project review criteria
Monthly Director and Team meetings
Project group meetings
Client meetings and/or progress meetings
Client feedback forms
Schedule of deliverables
8.5.2
Identification and traceability
Project group meetings
Client meetings and/or progress meetings
Schedule of deliverables
QMP - [Insert process]
8.5.3
Property belonging to customers and external providers
Internal IT systems – Overseen by third party provider
8.5.4
Preservation
Project Deliverables
IT system file structure - Project data
8.5.5
Post-delivery services
Client feedback forms
Post-delivery project review criteria
8.5.6
Control of changes
QMP - [Insert process] i.e. Project variations
8.6
Release of products and services
QMP - [Insert process] i.e. Release progress and final
reports
8.7
Control of nonconforming outputs
Project group meetings
Client meetings and/or progress meetings
Schedule of deliverables
Incident and non-conformance form
9
9001
14001
45001
Performance Evaluation
9.1.1
Monitoring, measurement, analysis and evaluation – General
Annual Management system reviews
Monthly Director and Team meetings
Project group meetings
Client meetings and/or progress meetings
HSE Observation forms
Incident and Non-Conformance forms
HSEQ Objectives and Targets
Internal and External audits
9.1.2
Customer satisfaction
Evaluation of compliance
IMS Overview Manual – Section 7.6 (Customer Focus /
Satisfaction)
Client feedback forms
Internal audit project review criteria
Post-delivery project review criteria
Complaints and compliments
Non-conformance and incident reporting
Monthly executive and Management team meetings
Schedule of deliverables
Annual management systems reviews
9.1.3
Analysis and evaluation
Annual IMS Management reviews
Context Analysis spreadsheet (Risks and Opportunities)
Corrective action register
Supplier evaluation and re-evaluation matrix
Monthly Director and Team meetings
Project group meetings
Client meetings and/or progress meetings
Client feedback forms
Corrective action register
9.2.1
Internal audit – General
IMS Overview manual – Section 7.8 (Audits and Inspections)
HSE Management Plan – Section 5.12 (Audits and Inspections)
Internal project audits and reviews
IMS Compliance plan (Internal audit schedule)
9.2.2
Internal audit programme
IMS Overview manual – Section 7.8 (Audits and Inspections)
HSE Management Plan – Section 5.12 (Audits and Inspections)
Internal project audits and reviews
IMS Compliance plan (Internal audit schedule)
HSE Objectives and Targets
Corrective action register
9.3
Management review
Annual Management systems review
IMS Overview manual – Section 7.9 (Management Review)
HSE Management Plan – Section 5.16 (HSE Management Systems
Review)
9.3.2
Management review inputs
9.3.3
Management review outputs
10
9001
14001
45001
Improvement
10.1
General
Context analysis spreadsheet (Interested parties, SWOT, PESTEL,
Risk & Opportunities)
Executive Management and team meetings
Lessons learnt database
Annual Management systems review
10.2
Incident, nonconformity and corrective action
HSE Management Plan – Section 5.4 (Incident, Hazard and Near
Miss reporting)
Risk Management plan
Incident and Non-Conformance form
Corrective action register
Executive management and team meetings
10.3
Continual improvement
IMS Overview Manual – Section 7.10 (Continual Improvement)
External and internal management system audits
Annual Management systems reviews
Executive management and team meetings
IMS Compliance plan
HSEQ Objectives & Targets
HSE Observation forms
HSE Office inspection checklists
Internal project audits & reviews
HSE audits (Project specific as required)
IMS Overview Manual
Forms / Checklists
Standard Operating Procedures
Company Policies
System Management Procedures
Records
Document No
FT-FM-0008
Issue Date
09/04/2019
Page
1 of 1
Revision No:
1
Any printed copy of this document is only current on the day
printing and thereafter is to be verified before use. The
controlled version of this document is available on the shared
drive. Date printed 5/5/2017 10:14:00 am