Top Banner
FERMILAB TEST BEAM FACILITY Aria Soha All Experimenter’s Meeting December 15, 2014
14

F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Dec 27, 2015

Download

Documents

Darcy Grant
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

FERMILAB TEST BEAM FACILITYFERMILAB TEST BEAM FACILITY

Aria SohaAll Experimenter’s Meeting

December 15, 2014

Page 2: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Latest MTest Experiments

http://www-ppd.fnal.gov/FTBF/ 2

T-99227 Users

T-104155 Users

T-101535 Users

Commissioning /beam studies

T-977 Installation25 Users

Page 3: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Latest MCenter Experiments

http://www-ppd.fnal.gov/FTBF/ 3

T-1034 Installation32 Users

Page 4: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

So Far in FY 2014

• 5 Experiment Weeks• 5 Installation weeks• 1 week beam studies• 2 approved TSWs (T-977, T-1059)

http://www-ppd.fnal.gov/FTBF/ 4

Page 5: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Current Status

MTest•T-1015 running now. •Wednesday installing T-1041 (6 sub-experiments)MCenter•LAriaT Installing•Beamline Commissioning

http://www-ppd.fnal.gov/FTBF/ 5

Page 6: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

ADDITIONAL SLIDES

http://www-ppd.fnal.gov/FTBF/ 6

Page 7: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

2014 Facility Upgrades

• MCenter Beamline!• Area for High Rate Trackers (M03)• New Instrumentation– Wire chamber tracking system– Si strip telescope

• Improved Infrastructure– Temperature control– Table control / new tables

http://www-ppd.fnal.gov/FTBF/ 7

Page 8: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

2014 Statistics

• 18 Experiments• 321 Collaborators• 84 Institutions• 20 Countries• 9 New TSW’s

http://www-ppd.fnal.gov/FTBF/ 8

Page 9: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Beam Delivery

• 416,139 Total Fxd Trgt events

• 183,225 MTest beam pulses• 16,496 MCntr beam pulses• MTest Beam Sum: 7.9E15• MCntr Beam Sum: 2.4E16

http://www-ppd.fnal.gov/FTBF/ 9

Page 10: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Weekly Usage

MTest– 48 available beam-weeks– 78 experiment-weeks– 6 weeks of beam studies/

commissioning– 177% Usage

MCenter– 5 available beam-weeks– 0.5 experiment-weeks– 5 weeks of beam studies/

commissioning– 100% Usage

• http://www-ppd.fnal.gov/FTBF/ 10

Page 11: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Experiments (18)

• 9 new TSW’s approved• 11 new experiments started• 7 returning experiments

http://www-ppd.fnal.gov/FTBF/ 11

Page 12: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Experiment Types• T1015 DRO Calorimetry• T1037 FLYSUB-Consortium• T958 FP420 (CMS+ATLAS) Fast Timing Group• T979 Fast Timing w/Cherenkov Counters• T989 DAMIC• T1058 Secondary Emission Calorimeter • T1031 Atlas Tile Calorimeter Electronics• T1036 CMS High Rate Pixel Detector• T1041CMS Forward Calorimetry• T1049 ATLAS large scale TGC• T1056 ATLAS DBM Module Qualification• T992 Radiation-hard Sensors for the SLHC• T1042 Muon g-2 straw tracker• T1018 Spacordion Tungsten Fiber Calorimeter• T1044 sPHENIX• T1048 PHENIX fast TOF• T1054 sPHENIX Pre-Shower Calorimeter• T994 JASMIN

http://www-ppd.fnal.gov/FTBF/ 12

Two Large Neutrino experiments on schedule for FY15: MINERvA & LAriaTTwo Large Neutrino experiments on

schedule for FY15: MINERvA & LAriaT

Page 13: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Institutions (84)

http://www-ppd.fnal.gov/FTBF/ 13

Page 14: F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.

Summary

• Facility is growing at an incredible rate, and is on track to continue

• 321 collaborators this year

• Will likely break 500 next year, with new beamline

• 1.4 FTE for facility management is not enough

http://www-ppd.fnal.gov/FTBF/ 14