DISTRIBUTION STATEMENT A // APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED F-35 DOC #: 391940 AS BRIEFED: September 2016 F-35 Program Update September 2016 Mr Todd C Mellon, SES Executive Director F-35 Lightning II Program
SLIDE #: 0 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
F-35 Program Update
September 2016 Mr Todd C Mellon, SES
Executive Director F-35 Lightning II Program
SLIDE #: 1 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
F-35 Coalition Composed of 3000+ Aircraft
US Services
Partners
USAF • 1763 F-35A • Multi-role (primary air-to-ground)
fighter to replace the F-16/A-10 • Complement the F-22
US Navy • 340 F-35C • USN – Multi-role, stealthy strike
fighter to complement the F/A-18E/F
USMC • 340 F-35B/F-35C • STOVL fighter to replace the AV-8B
and F/A-18C/D
UK • 138 F-35B
IT • 60 F-35A • 30 F-35B
NL • 37 F-35A
TU • 100 F-35A
CA • TBD
AU • 100 F-35A
DK • 27 F-35A
NO • 52 F-35A
F-35A F-35B F-35C
SLIDE #: 1 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D
Foreign Military Sale (FMS)
• 115 F-35A
F-35 DOC #: 391940 AS BRIEFED: September 2016
SLIDE #: 2 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
F-35 Bed Down Through 2018 As of 17 Sep 2014
*Source Data: Sustainment Beddown Break Down_091114 F-35 Global Deployment
Australia (2)
Williamtown
Italy (7)
Amendola Grottaglie
United Kingdom (9)
RAF Marham
Norway (9)
Orland
FMS (39)
Total: 386 F-35A F-35B F-35C
FWD Deployed USMC (16)
SLIDE #: 3 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
F-35 Program Update
3
• F-35 Program is Transitioning, Growing and Accelerating ◦ Big development ($50B) transitioning to leaner Follow-on Modernization ◦ Production is Growing ◦ Fielding and Sustainment Accelerating
• Weapons System Design Stabilizing; Cost Stable and Coming Down
• Good progress on all fronts…But challenges remain ◦ Autonomic Logistics Information System (ALIS) ◦ Software ◦ Aircraft Modifications (Concurrency) ◦ Reprogramming Labs ◦ Structure / Durability ◦ Escape System
• F-35 is big, complicated and sometimes messy
SLIDE #: 4 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
2015 Key Accomplishments
• Development / Test Begin/Continue Block 3F testing
Completed all Block 2 testing
F-35B Operational Test (OT-1) 1: USS WASP
Completed first operational fleet (VMFA-121, Yuma) weapons drops
Complete Block 3i Weapons Delivery Accuracy events
F-35C Development Test (DT) 2: USS EISENHOWER
Complete Block 3i Flight Test in support of USAF IOC
• Production First LRIP 7 Delivery
Deliver 45 aircraft
• Fielding / Sustainment First two FMSs installed in the F-35 SIM facility Block 2B software released for training Start USAF and Partner pilot training at Luke AFB USMC IOC First Hill AFB Delivery OCONUS component repair RFI Release to Partners
• International UK and NL jets delivered to Edwards for OT Italian FACO facility’s 1st F-35A rollout First TR and NO site activation team visit First Flight of Italian Built F-35A Complete Italian tanker flight testing Complete Australian tanker flight testing First Norwegian F-35A Delivery to Luke AFB Delivery of first F-35A from Italian FACO
SLIDE #: 4
• US Air Force IOC • Israeli AF Deliveries • USMC Deployment (Pacific)
• Operational Test • Navy IOC/Partner Deliveries
Looking Ahead
SLIDE #: 5 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
First Transatlantic ferry of F-35 in February (by Italy) Begin The Netherlands tanker flight testing Implementation of FY16 PBL (GSS) 1st Fort Worth LRIP 8 delivery First International Deployment to the Netherlands (2 F-35As; May 16) Delivered 12 jets to Hill AFB (minimum for IOC) Complete UK KC-30 Voyager Tanker Testing Denmark approved the acquisition of 27 F-35As First DD250’d FMS Aircraft (Israel – Jun 16, Japan – Sept 16) F-35s appearing at RIAT and Farnborough (2 USAF F-35As, 2 USMC F-35Bs, 1 UK F-35B) • Award LRIPs 9 (57 a/c) & 10 (94 a/c) Developmental Test (DT)-III for F-35C Aug 16: USS GEORGE WASHINGTON USAF IOC Declaration • DT-III for F-35B Oct 16: USS AMERICA • Permanent basing of F-35s Overseas
◦ Italy - Nov 16, Amendola; Israel - Dec 16, Base #28
• Deliver 53 aircraft in 2016 (24 / 53) • USMC Squadron Homeport Change to Japan (Iwakuni) Jan 17 • Block 3F Verification and Mission Effectiveness Testing
Key Accomplishments and Look Ahead 2016 / 2017
FOR OFFIC I AL U S E ON LY / / R E L TO U S A, GB R M OD , ITA M OD , N LD M OD , TU R M N D , C AN D N D , AU S D OD , D N K M OD , and N OR M OD SLIDE #: 5
FOR OFFIC I AL U S E ON LY / / R E L TO U S A, GB R M OD , ITA M OD , N LD M OD , TU R M N D , C AN D N D , AU S D OD , D N K M OD , and N OR M OD SLIDE #: 6 F-35 DOC #: XXXXXX AS BRIEFED: DD MMM YY
Production
SLIDE #: 7 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
Production
• Ramp Is Here
• Supplier Performance Key to Achieving Delivery & Cost Goals
• Block Buy Enables Cost Reduction
SLIDE #: 8 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
Global Production System
The Netherlands
DAP
PHM Consortium Fokker - Elmo
Brookx
Axxiflex Fokker - Aerostructures
Thales Nederlands Thales Cryogenics
Eurocast Dutch Aero
Aeronamic Dutch Space
TNO NLR
Denmark Systematic Software Engineering
Terma
Corena Damco
Danish Aerotech
GPV Trelleborg Sealing Solutions
Italy S3 Log
Electtronica Aster
Piaggio
Rotodyne
Logic Vitrociset
Segundo Mona Selex SI
Oto Melara Moog - SBC
Aerea Selex Galileo
York Alenia
Selex Comms
Turkey Havelsan
TAI ALP Aviation
Aselsan
Vestel
Fokker (TU) Kale Aero
Australia
Goodrich Services GKN
Micreo LTD
BAE Australia
Quickstep Marand
Cablex Ferra
Levett
Aerostaff
Chemring
A.W. Bell Rosebank
TAE
Norway
AIM Norway Kongsberg
Techni Metronor
Natech Kitron
Jotne EPM Technology
Hexagon
Applica
Canada
Composites Atlantic
Ben Machine Mindready
Honeywell
Avcorp
Heroux Devtek Megellan-Bristol
Dishon DY4
ASCO
Casebank
Centra
Strite Interfast
Novatronics
Amphenol Nav-Aids
United Kingdom GE Aviation
Martin Baker
GKN
Rolls Royce Goodrich
BAE SYSTEMS
RDF Beaufort
Cobham
Honeywell
Selex
Raytheon
Rolls Royce
Woodward MPC
GE
GE Aviation
LM Owego
NGC Amherst BAE Systems Controls
General Dynamics ITT Excelis
UTAS BAE IEWS
Times Microwave Pratt & Whitney
ITT Excelis L3 Comm
GE Aviation Systems
LM ISS NG ES
NG
Advanced Technologies
UTAS (HS)
Essex
LM MST
Rockwell Collins Rockwell Collins
VSI
McCormick Selph LM Space Systems
LM Aero-Palmdale GKN NGAS Marvin Moog
Raytheon Parker
Aerospace NGIS ViaSat
Honeywell Honeywell/Cat Alliance
Ball
LM Aero-Ft Worth
UTAS Raytheon Systems
Boeing Eaton BAE
SanminaSCI Honeywell
LM Pinellas LMMST
LM EIS Harris
LM M&FC
General Dynamics Marion Curtiss-Wright, Kidde
Moog, LSI
UTAS (Burnsville)
SLIDE #: 9 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
F-35 Production Summary
9
• 3 Factories: LM in Fort Worth, TX LM/Alenia in Cameri, Italy LM/Mitsubishi in Nagoya, Japan
• Aircraft Prices Coming Down Lot Over Lot:
• In the 2019 F-35A will cost between $80-85 Million
• Quantity Deferrals Have Small Impact on Unit Price:
• 2015 Original Buy Profile (FY16 – FY21): 893 Aircraft • 2016 Estimated Buy Profile (FY16 – FY21): 873 Aircraft • Less than 1% in Change In Price Due to Quantity Change
• Block Buy On The Horizon
SLIDE #: 10 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
$0
$200
$400
$600
$800
$1,000
$1,200
2015 2016 2017 2018 2019 2020
Valu
e of
requ
irem
ents
($M
)
Month
Production Extension Production Baseline
F-35 Capacity Planning
Must Plan for Full, Integrated Demand
Full Capacity Includes: • Production • Spares • Repairs • Mods
Spares, Repairs, Mods Production Extension Production Baseline
FOR OFFIC I AL U S E ON LY / / R E L TO U S A, GB R M OD , ITA M OD , N LD M OD , TU R M N D , C AN D N D , AU S D OD , D N K M OD , and N OR M OD SLIDE #: 11 F-35 DOC #: XXXXXX AS BRIEFED: DD MMM YY
Sustainment
SLIDE #: 12 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
• Objective of F-35 Global Support Solution is to improve Cost, Schedule, Performance
• F-35 is challenging Industry and Government to find mutually beneficial ways to reduce costs
• F-35 Sustainment Business is under transition to a Performance Based construct
• Opportunities continuing to expand for Product Support Providers of varying capability/scope
Global Sustainment Strategy
SLIDE #: 13 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
Environment and Expectations
SLIDE #: 14 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
Global Sustainment Posture
Australia Engine IDC: 2018 1st Induction: 2019 Company: P&W / TAE
Netherlands Engine Nat’l IDC: 4Q2019 Regional IDC: 2020 1st Induction: 2019 Company: LCW/Std Aero
Turkey Engine IDC: 2018 1st Induction: 2019 Company: ASMC/TEI/PW
Norway Engine Nat’l IDC: 4Q2019 Regional IDC: 2020 1st Induction: 2019 Company: AIM
Japan Engine 2d Regional MROU IDC: 2022 1st Induction: 2022 Company: IHI
On track for Initial Depot Capability (IDC); no major obstacles foreseen Behind schedule; executable recovery plan in place to regain schedule / mitigate risk Behind schedule; No executable recovery plan in place to regain schedule / mitigate risk Contractual requirements complete
Italy Airframe (F-35A/B) IDC: 2018 1st Induction: 2018 Company: ITAF/Finmeccanica
Japan Airframe (F-35A) F-35A: Nagoya F-35B: Iwakuni IDC: 2018 1st Induction: 2018 Company: MHI
Australia Airframe (F-35A) Nat’l IDC: 2018 Regional IDC: 2021 1st Induction: 2021 Company: BAE - AUS
Airframe Assignments Made Dec 2014
OO-ALC Components DP&C-1 Radome-1 Landing Gear Wheels & Brakes HMDS (DMCH) HMDS (HDU) Canopy System S&RES SMS PCD SFDS
IOC: 2012 Company: USG
WR-ALC Component RIO VMC GPS AMS CNI DAS Window EODAS EWCM Lighting
IOC: 2013 Company: USG
OC-ALC Components Fuel Pumps FADEC Actuators Life Support
IOC: 2016 Company: USG / UTAS
FRC-SW Component EPG&CS EPMS EHAS P/M LEFAS
IOC: 2015 Company: USG
OO-ALC OC-ALC
FRC-E Airframe (F-35B) IOC: 2013 Induction: 2013 Company: USG / LM
OC-ALC Engine IOC: 2015 1st Induction: 2015 Company: USG / PW
FRC-E
FRC-SE Component RADAR EOTS Fuel AIS HOTAS
IOC: 2014 Company: USG
FRC-SW FRC-SE
WR-ALC
OO-ALC Airframe (F-35A/B/C) IOC: 2013 1st Induction: 2013 Company: USG / LM
US Government CORE Workload Assignments Sep 2008
FRC-E Lift System IOC: 2022 1st Induction: 2022 Company: USG / Rolls-Royce
Pacific Component Award: Company: TBD
Europe Component Award: Company: TBD
Component Assignments To be made 2016
Engine Assignments Made Dec 2014
R
R
R
R
Y
Y
Y
Y
G
Europe Warehouse Award: Company: TBD
Pacific Warehouse Award: Company: TBD
G
G
G
Supply Warehouse Assignments To be made 2017
FRC-E Components PTMS ADS Hydraulic Pumps IOC: 2018 Company: USG
SLIDE #: 15 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
US and Partners F-35 Site Standup
AS P F O R O F F I C I AL U S E O N LY / / R E L TO U S A, G B R M O D , I TA M O D , N L D M O D , T U R M N D , C AN D N D , AU S D O D , D N K M O D , a n d N O R M O D SLIDE #: 64
MOB 1
Cherry Point 2023
NAS East 2023
LHD X
El Centro 2025 Miramar 2023
Tindal 2021
Cold Lake 2019
Decimomannu 2019
ITS Cavour 2019
Volkel 2021 Burlington 2019
Eskisehir 2022 Malatya 2019
Konya 2022
PACAF 2021
Iwakuni 2017 Kadena 2017
Williamtown 2018
Grottaglie 2018
Skrydstrup 2022
Leeuwarden 2019 Amendola 2016
Ghedi 2022
Orland 2017
USAF CONUS Hill 2015 OPS5 2022
Eglin 2011
Edwards 2013
Lemoore 2016 CVN X
Luke 2014 Yuma 2012
Nellis 2013 Ft. Worth
FRC-E 2013
Beaufort 2014
Pax
CVN72 2021
LHD1 2015
Lakenheath 2020 Marham 2018
HMS Queen Elizabeth Bagotville 2020
F-35A F-35B F-35C As of 31Dec2017
– – –
15 Bases 3 LHDs, 1 CVN 255 A/C
As of September 2016 As of 31Dec2020 – 8 Bases – 21 Bases – 1 LHD – 4 LHDs, 4 CVNs – 175 A/C – 619 A/C
As of 31Dec2023 –37 Bases –7 LHDs, 5 CVNs – 1,132 A/C
Eielson 2019
Global Support Solution 2019 Business Model
Organization
Global Footprint
Key Characteristics
F O R O F F I C I AL U S E O N LY / / R E L TO U S A, G B R M O D , I TA M O D , N L D M O D , T U R M N D , C AN D N D , AU S D O D , D N K M O D , a n d N O R M O D SLIDE #: 16
SLIDE #: 17 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
• PSM: JPO ◦ Maintains independence, fairness and balance across Partnership ◦ Affordable Global Sustainment tailored to Partner’s needs
• HPSI: Hybrid Government and Industry • PSP: Mix of Organic and Commercial ◦ “Best value” with USG(PSM) to define constraints
• Warfighter: Tailored Solution
• Strategic Goal: F-35 must transform to Performance Based Outcomes ◦ Warfighter needs dictate it ◦ Must enable reduction in O&S costs ◦ Will require change in the PSM, HPSI, PSP and Warfighter from the
way we do business today
Global Support Solution (GSS) 2019-23
SLIDE #: 18 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
F-35 Global Support Solution
• Independence
PSI Attributes Benefits and Objectives
• Accountability
• Performance
• Cost Reduction Mechanism
• Ensuring fair and open sourcing, competition and selection of organic and commercial PSP activities
• Ensuring collaboration across government, warfighter and industry elements of HPSI
• Performance/cost metrics are owned by a combination of warfighter, industry and the JPO
• Eliminate non-value add cost
• Incentives, rewards and remedies require alternative approaches for this stage of the F-35 lifecycle
HPSI Lead
PSPs
WARFIGHTER
PSM
HPSI Logistics Capability
Delivery
HPSI In-Service Integration
High-Level Metrics: AVA, ME, FMC, $$$
GSS
Enterprise Management
Maintenance Delivery Stream
Supply Chain Delivery Stream
Sustaining Engineering Delivery Stream
Training Delivery Stream
PSPs
PSPs
PSPs
PSP
PSP
HPSI
Requirements Constraints $$$
Sustainment Information Systems PSPs
SLIDE #: 19 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
HPSI Challenge
A Successful HPSI will: • Leverage OEM Sustaining Engineering and Data • Continuously Innovate To Improve Performance • Partner With Organic Depots in PBL Environment • Increase Materiel Availability • Maintain Competitive Environment A Successful PSP will: • Work with PSI to achieve Performance and Cost Goals • Continuously Innovate To Improve Performance • Understand their impact on Air Vehicle Availability • Improve System and Subsystem Reliability • Reduce Required Inventory Levels • Continuously Reduce Life-Cycle Costs
SLIDE #: 20 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
• F-35 PSP construct based on constant competition
• PSPs range in capabilities - from single commodity or service to a broad range of product support elements
• Some PSPs are within specific geographic areas, others have extensive networks providing global support
• Commercial PSPs are in direct competition with US DoD and Partner Nation organic support capabilities
• Innovation from industry will be required to improve program performance and cost, in a performance-based environment
Product Support Provider (PSP) Attributes
Best Value will Ultimately Determine Provider Selection
Rockwell LM Aero US TRANSCOM FRC(E) OO-ALC etc
Product Support Providers Organic and Commercial PSP competitive selected on t, $ and Ao Perf
SLIDE #: 21 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
Regional Split Functional Split
1 Enterprise Management
2 Sustaining Engineering
3 Training 4 Maintenance 5 Supply Chain
PSP Landscape Configuration Options
PSP Responsibility
NA EUR APAC
Regional / Functional Split
NA EUR APAC
4
3
2
1
4
3
2
1
NA EUR APAC
Final solution will be a combination of above configurations depending on market ability to meet capability requirements and best value
4
5
3
2
1
5
4
5
3
2
1
SLIDE #: 22 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
FRC-SW
FRC-SE
OC-ALC
WR-ALC
Airframe - 2012 DP&C - 2013, 2017 LDG - 2014 Radome - 2014 Canopy System - 2017 HMDS - Ph. 1&2, 2017 S&RES - 2017 SMS(FRIU/MRIU) - 2018 CS&E - ~2020 PCD - ~2020 SFDS - ~2020 AME - ~2020 Canopy Actuator - ~2020 Canopy Trans - ~2020 Gun - ~2020
F135 - 2013 - 2015 Life Support System - ~2020
RIO - 2014 & 2016 VMC - 2013 GPS - 2015 EW/CM - 2017 Lighting - ~2020 CNI - ~2020 AMS - ~2020 DAS Window - ~2020 EODAS - ~2020 ICP - ~2020 Cockpit Equip - ~2020 Common Components - ~2020 TNS - ~2020 INS - ~2020
Airframe - 2012 ADS - ~2020 Hyd. Pumps - ~2020 PTMS - 2018, ~2020 AC Contactor - ~2020 Ejection Seat - ~2020 Filter Modules - ~2020 EMA - ~2020 Ice Detection - ~2020 Rudder Pedal - ~2020 TMS Fan - ~2020 Lift Fan - 2022
Nose Wheel - 2016 EHAS-M - 2018 EHAS-P - 2017 EPG&C - 2017 EPMS - 2017 LEFAS - 2018 Arresting Gear - ~2020 WFAS - ~2020 WBDDS - ~2020
RADAR - 2014 & 2017 EOTS - 2018 Fuel - 2018 AIS - ~2020 HOTAS - ~2020 CSMU - ~2020 F135 - 2026 EPG&CS (AESG) - ~2020
CCSD
ICP (DSM) - ~2020
US Core Depot Source of Repair Assignments Workload Induction (Year)
OO-ALC
FRC-E
SLIDE #: 23 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D F-35 DOC #: 391940 AS BRIEFED: September 2016
Components • Alternate Mission System (AMS) - Enhanced Data Transfer Cartridge • Canopy – Canopy Assembly • Electrical Hydraulic Actuator System (EHAS) – Flaperon Electronics Unit (EU),
Horizontal Stab Actuator (EHA) • Ejection Seat – Ejection seat assembly • EODAS - DAS Sensor • Electrical Power Generation System (EPG&CS) – Inverter Convertor Controller,
non-linear Invertor, Engine Starter Generator (ESG) • Electrical Power Mgmt. Sys. (EPMS) – Power Distribution Cntr., Battery (28VDC),
Battery (270VDC), 270V Battery Charger, Electrical Distribution Unit • Electronics Warfare (EW) – Counter Measures Controller • Fuel – 270V Boost Pump • Helmet Mounted Display Sys. (HMDS) – Display Mgmt. Computer/Helmet (DMC/H) • Integrated Core Processor (ICP) – Fiber Channel Switch, Signal Processor in/out,
Data Security Module, Signal processor, General Processor • Wheel & Brake – Main Wheel, Brake Assembly • Leading Edge Flap Actuator Sys. (LEFAS) – in-line Power Drive Unit • Panoramic Cockpit Display (PCD) – Electronics Unit (EU), Display Unit • Power thermal Mgmt. Sys. (PTMS) – IPP Turbomachine, Controller, Stopper Motor
Shutoff Valve, PAO Controller Pump • Thermal Mgmt. Sys. Fan – Fan • Remote Input/Output (RIO) – Unit • Vehicle Mgmt. Sys. - Unit
Building Global Sustainment Posture 2016 Global Component Assignment Process
Component Strategy • Analysis indicates grouping certain components by common repair/test set/skills can result in lifecycle cost savings
◦ Avionics, Hydro-mechanical, Support Equipment, Plus Warehousing at Component Repair Sites • Partners and their Industries asked to propose “groupings” which provide “best value”
◦ 2-step RFI process • Additional RFIs will be released as F-35 program needs dictate
Actions Coordinate Program Instruction (PI) and Request for
Information (RFI) with Regional Capabilities Working Group Members
2 Step RFI Process: 1. RFI #1 - Released: Nov 2015 / Inputs Received: Feb 2016
- General interest - Grouping options
2. RFI #2 - Released: Mar 2016 / Due: Aug 2016 - Best value inputs
Non Air Vehicle and Warehousing RFI released August 2016, responses due February 2017
• JPO to adjudicate and provide capability assignment recommendation to OSD, October 2016
• OSD Decision will be published in November 2016 • Component Contract RFP to LM January 2017 for Depot
Maintenance Activation Planning and Execution; contract award early CY2018
SLIDE #: 24 D IS TR IB U TI ON S TATE M E N T A / / AP P R OV E D FOR P U B LIC R E LE AS E ; D IS TR IB U TI ON IS U N LIM ITE D
Delivering the F-35 to the Warfighter
F O R O F F I C I A L U S E O N LY / / R E L T O U S A , G B R M O D , I TA M O D , N L D M O D , T U R M N D , C A N D N D , A U S D O D , D N K M O D , a n d N O R M O D SLIDE #: 25 F-35 DOC #: 391940 AS BRIEFED: September 2016
Acronyms
ACE Annual Cost Estimate ALAC Autonomic Logistics Advisory Council ALIS Autonomic Logistics Information System ATLAS Advanced Technical / Logistics Application System AW Air Worthiness BCA Business Case Analysis BR Business Rule CDRL Contract Data Requirements List CI Continuous Improvement CoA Course of Action CONOP Concept of Operations CONUS Continental United States DLA Defense Logistics Agency DLR Depot Level Repairable DoD Department of Defense DSOR Declared (or Draft) Statement Of Requirement FDC Full Depot Capability FIAR Financial Improvement and Audit Readiness FMS Foreign Military Sales FoM Follow-on Modernization FRP Full Rate Production GSS Global Support Solution HW Hardware IDC Initial Depot Capability IDE Integrated Data Environment IER Information Exchange Request or Requirement IOC Initial Operating Capability ISI In-Service Integration IT Information Technology ITAR International Traffic in Arms Regulation (22 CFR 120-130) JAFAN Joint Air Force, Army, Navy (DoD) JESB JSF Executive Steering Board JPO Joint Program Office JTD Joint service Technical Data LCD Logistics Capability Delivery
LCSP Life Cycle Sustainment Plan LIST Lightning II Information Support Tool LORA Level of Repairs Analysis LRIP Low Rate Initial Production MRO&U Maintenance, Repair, Overhaul and Update OCONUS Outside the Continental United States OMIT Operations, Maintenance, Installation, and Training PB President's Budget PBA Performance Based Agreement PBC Performance Based Contracting PBL Performance Based Logistics PCOL Procurement Contract Officer Letter PDR Preliminary Design Review PHM Prognostics and Health Management POM Program Objective(s) Memorandum PSA Product Support Agreement PSI Product Support Integrator PSM Product Support Manager PSP Product Support Provider RFP Request for Proposal RFI Request for Information SAG Sustainment Advisory Group SCM Supply Chain Management SDD System Development and Demonstration SE Support Equipment SLA Service Level Agreement SOI Standard Operating Instruction SPMS Sustainment Performance Monitoring (or Management) System SW Software TMS Training Management System TSSC Training System Support Center TTD&EC Taxes, Tariffs, Duties, & Export Control WF Warfighter WSPD Weapon Systems Planning Document