Extreme Makeover –Part II The Nitty Gritty
16

Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Dec 17, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Extreme Makeover –Part II

The Nitty Gritty

Page 2: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Renovation Project Phases

• Conceptual Design

• Schematic Design

• Design Development

• Construction Documents

• Construction

• Occupancy

Plan temporary location

Plan move to temporary location

Plan move back to library

Page 3: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Conceptual Design

• Review space allocated

• Review adjacencies• Review security and

sightlines

 

Technology Center Reference

Stacks

Reference Desk

 

Teen Zone

Page 4: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Schematic Design

• Rooms begin to take shape

• Furniture and equipment tested on plan

• Cost estimate

• Exiting and security

• Circulation

• Acoustics

• Construction documents for temporary facility?

Page 5: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Design Development

• Lighting and light control

• HVAC

• Power, data, and wireless

• Mechanical system

• Disabled access

• Furniture and equipment reviewed

• Cost estimate

• Select finish materials

Page 6: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Construction Documents

• Architect & engineer coordination

• Bidding documents

• Furniture and equipment specifications

• Final cost estimate

• Specifications

• Locate storage for library materials during renovation

Page 7: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

The Big Decision: To Move or Not to Move

• Living in a renovation

• Cost implications

• Furniture and Equipment issues

• Staff issues

• Alternate locations

Page 8: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Delivering Service During Your Renovation

• Close your doors– refer to neighboring library

• Lease space

• Live with it– open with limited service

• Bookmobile service

• Temporary facility

Page 9: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

                                                                                   

http://www.resuncorp.com/resun/temporary-shelter.htm

http://www.comarkbuilding.com/modulargovernmentbuilding.html

www.vanguardmodular.com

www.mobilemodularrents.com

Page 10: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

The Temp• Schematic, design development and construction

documents• ADA compliance• Lighting• Fire and life safety

– sprinklers– emergency exits and lighting

• Signage• Rest rooms• Telephone, electrical power, network • Security system

Page 11: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Renovating the Temp

• Double joists

• Ramping for ADA

• Interior partitions

• Rest rooms & drinking fountains

• Carpet

• Lighting

• Shelving installation

• Sprinklers

Page 12: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Scheduling the Temp1. Order the modular units

2. Renovate the units for library use

3. Mobilize for move (www.ala.org/library/fact14.html)

4. Collections moved

5. Furniture and equipment installed

6. Signage

7. Network and systems

Page 13: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Back to Your Renovation• Be available

– job walks– job meetings– requests for information (RFI)– submittals

• Furniture ordered• Technology ordered• Community public relations

– http://www.flossmoorlibrary.org/libraryupdate.htm (Flossmoor Library)– http://www.geocities.com/ncpl_2005/. (National City)– Los Angeles Public Library (fill in website)

Page 14: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Moving In: Taking Occupancy

• Professional movers– cost to move books

• Approximately $.25 to $.50 per book with movers

– furniture and equipment moving

• Use of volunteers– use book truck– purchase cartons $2.00 and up

• 20 inch cubes, 30 inch cubes

Page 15: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Furniture and Equipment DeliveryInclude in bid documents• Deliver and install• Unpack or uncrate• Set in place• Level and gang together• Wipe off• Touch up• Test• Wire lamps and shorten cords• Remove debris

Page 16: Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.

Occupancy….continued• Signage, graphics & art work

• Floor plans, maps & publications

• Staff orientation

• Training in use of new equipment

• Installation & testing of technology

• Punch list

• Cleaning (!)