External Use Streamlining Product Development at Applied Materials With Siemens PLM and Microsoft
External Use
Streamlining Product Development at Applied Materials With Siemens PLM and Microsoft
External Use
2
Author’s InformationHerman Harwell, Senior Member in Design For Excellence (DFx) Group of Applied Materials Global Operations Manufacturing Engineering Organization (GOME)
200mm – 300mm Wafer Semiconductor Processing Systems
External Use
3
Applied Materials OverviewApplied Materials is the global leader in Nanomanufacturing Technology™
solutions with a broad portfolio of innovative equipment, service and software products for the fabrication of semiconductor chips, flat panels, solar photovoltaic cells, flexible electronics and energy efficient glass.
Results for Third Quarter of Fiscal 2007
· Net Sales: $2.56 billion
· Net Income: $474 million
· EPS: $0.34
· New Orders: $2.28 billion
Flat Panel Display Processing Systems 200mm – 300mm Wafer Inspection Systems
External Use
4
Product Development RoadmapPeople Driven Framework
Research
and Plan
ConceptDesign/Develop
Validate/Source
Market/ Promote
Produce/Sell
Support/Retire
Management
Idea management
Project and portfolio management
Regulatory compliance
Configuration management
Sales and marketing Customer needs Product marketing and publishing
R&D and Engineering
Requirements management
Design data creation
Visualization and digital mockup
Product structure record
Engineering change management
Sourcing Direct material sourcing
Mfg Manufacturing process management
Customer Service
Aftermarket support
EOL
External Use
5
New Product Development Challenges
Common Issues In New Product Development– Design Issue capture mostly done with Excel spreadsheets– Issue closure difficult to track at all project levels (many ad hoc)– No consistent process for design issue identification in WIP– Design project management varies by business group & size– Lotus Notes databases most often utilized tool for design task
tracking (EWR/PRIME/HSR/SPS)– Lack of consistent approach with PLC phase task deliverables– Few people proficient in use of all the new tools TcE/TcVis/NX– E-mail most often used tool to notify team members of project
issues or changes– Supplier collaboration is needed earlier in design process– Cross-Functional team members aren’t involved early enough to
identify design changes needed
External Use
6
Product Planning Process PPP Mature ProductsVolume Manufacturing VM Product Development Process PDP
Alpha
Stage
BetaStage
Gamma Stage 81 2 4 6 753SM
RPRS
PDSS
Vol Mfg
Mature Product
Validation (Gamma) Build• Strategy Validation• BOM(97% Accurate)• Tooling/Fixture Validation• Engineering Issues Closed• Work Center Train Plan Complete• Field NC Goals Met
Pre-Build Requirements• Strategies
• Manufacturing• Test• Sourcing
Managed (1st Beta) Build• OMS/SOE Verification• Train the “Trainer” Started• Engineering Issues Verification• Digital Validation - DV
PLC Product Development Roadmap
TcCommunity-Based Activities:
Use Case Roadmap for TcCommunity supporting PLC Deliverables & Tasks
Controlled (2nd Beta) Build• Strategy Verification
• Cost Goals Achieved• MIT Goals Achieved
• BOM (EVAL Status)• Material Status @ EVAL• Critical Parts FAI’d
• OMS/SOE Released @ EVAL• Tool/Fixture Implementation• Engineering Issue List Addressed• Train the “Trainer” Completed• Field NC Input
Engineering (Alpha) Build• Strategy Trial• BOM (Draft)• OMS/SOE Draft• Tool/Fixture Trial• Initial Engineering Issue List• Virtual Build - VB
Detail Product Design• BOM (Preliminary)• Preliminary OMS/SOE• Preliminary Tool/Fixture• Critical Parts List• PLC Task Assignments• Digital Mockup -
DMU
External Use
7
Utilize Teamcenter Community in Design ReviewsConduct DMU activities on WIP design data in TcEngineering
regardless of geographic location (PLC deliverables in Phase 4)Capture design issues and disposition them before design freeze and
procurement of physical materialsProvide extended design team with non-CAD tools to enable design
reviews using most current TcEngineering data
Utilize Teamcenter Community in global design environmentEngage a product development team during PLC Phase 4 to conduct
DMU tasks using TcCommunity, TcEngineering & TcVisualization toolsHave the team execute the Visualization process workflow and it’s
discrete tasks utilizing the capabilities of TcC, TcE & TcVisEvaluate TcCommunity performance when combined with TcE & TcVis
against existing processes with only TcE and TcVis tools.
Collaboration Objectives
External Use
8
Applied’s New Product Development Tools
PLM System – All Tools are Integrated via TeamCenter
VisMockup§ 3D Clearance Analysis
(Static & Dynamic)§ Animation/Motion Authoring§ 3D Model Filters & Groups§ VisVSA Analysis
(PMI Verify – Tolerance Simulations & Stack Up)
§ VisJack – Classic Jack Analysis (Serviceability – Ergo – Safety – Access Evaluation & Viewing)
§ Path Planning Authoring (Component & Assembly Extraction – Installation Analysis)
VisViewPro§ JT 3D Model/Structure Viewing§ Alt Hierarchy Authoring
(Mfg Build Sequence – Reports)§ 3D Model Section Viewing§ 3D Model Measurement§ 3D Model Markup
(JT models w/TcE Identification)§ VisPublish Authoring
(OMS - Assembly Documents)§ Visual Issue Authoring
(Linked to TcE Models)§ 2D Drawing Overlay & Compare§ 2D Drawing Redlining & Markup
Web§ Design Issues Management.
(Closed Loop Corrective Action)§ PLC Tasks Management
(External Linked Spreadsheet)§ Tools For Internal Multi-Site TcE
Dynamic Design Collaboration§ Tools For External Supplier
Static TcE Design Collaboration (i-Series Embedded Viewer)
§ PLC Deliverables Library (Linked PLC Documentation)
§ Conferencing Server Options (AppShare Or VisConference)
Portal - Web§ Design Data Management
(WIP & Release Designs)§ 3D Solid Models Revisions§ 2D Drawings Revisions§ Manufacturing Documents Library§ Commercial Part Library§ Product Structure BoMs
(Product Core & Options Config)§ Multi-Site Design Data Sources§ Release Data Management§ Part Number Issuance Workflow§ Part Status Workflows§ Document Status Workflows
Portal§ 3D Model Authoring
(NX parts & assemblies)§ Model As Master Authoring
(GD&T – PMI data content)§ JT 3D Model Creation
(Attributes - PMI data content)§ 2D Drawing Authoring
(NX dwg - .cgm)§ Assembly Structure Authoring
(Multiple Product Configurations)§ Large Model Management
(Load Options & View Options)§ CAD Data Import & Export
TcVisualization TcCommunity TcEngineering UG - NXDirect
Integration
External Use
9
New Product Development Process Deliverables
Governance By The Applied Materials PLC Phase Gated Development Model
Identified Use Cases** For TcCommunity Applications– Phase 3: Product Definition (Program Charter)
3 Deliverables [4 Tasks with 6** Sub-Tasks]– Phase 4: Alpha Development
9 Deliverables [18 Tasks with 56** Sub-Tasks]– Phase 5: Beta Development
7 Deliverables [19 Tasks with 59** Sub-Tasks]
External Use
10
Applied Materials Visualization Process: DMU
External Use
11
TcCommunity Deployment Configuration
3
1
2
4
5
6
78
AMAT Community Home Login Page
External Use
12
3
1 2
TcCommunity Deployment Configuration
AMAT Community Home Login Page (cont.)
4
5
External Use
13
6
1
2
3
4
5
7
8
PLC Program’s Design Review Workspace (Home Tab)
TcCommunity Deployment Configuration
External Use
14
6
1
2
3
4
5
PLC Program’s Design Review Workspace (My Workspace Tab)
TcCommunity Deployment Configuration
External Use
15
MARKUP CONTENT CONSISTS OF 3-ELEMENTS:OBSERVATION [O]; RECOMMENDATION [R]; FEEDBACK [F]
2D DRAWING VISUAL ISSUE2D DRAWING & MARKUP ARE STORED IN TCE:VISUAL ISSUES ARE CREATED AND STORED IN TCCOMMUNITY DATABASE
2D MARKUPS ARE POSITIONED OUTSIDE THE DRAWING:ALL MARKUPS ARE MERGED & POSITIONED OUTSIDE THE DRAWING BORDER TO ALLOW READABILITY
2D Drawing Issues Tracking Prior To Product MRP Release
Applied DMU 2D Drawing Review Example
External Use
16
Closed Loop Corrective Action Process
4
VisualIssue 1
23
Team Conference For Review Date
Visual Issue Dispositioned(Facilitator)
Resolution Due Date Assigned
[Due Date]
Reason for Issue
[Observation]
Proposed solution
[Recommendation]
Assign To A Team Conference
[Review Date]
T1
End
Create Routing Slip Link ToVisual Issue
(1- Res Owner)(2- VI Owner)(3-Facilitator)
Visual Issue ResolutionCompletedApproved
[Res Owner]
Resolution Of Visual Issue
VerifiedApproved(VI Owner)
Resolution Determined
[Feedback]
Resolution Owner Identified
[Assigned To]
T2
Visual Issue Resolution Verified& Status Changed
Closed[VI Owner]
Task Assignment Scope From
Facilitator UsingReview Module
(Reviewer)
Visual Issue Form With
Audit History& Routing Slip Dispositions
PLC Deliverable From Task Assignment(Reviewer)
Lotus Notes
Disposition Of Visual Issue
CompleteApproved(Facilitator)
Visual Issue Actions Complete& Content Frozen
Locked[Facilitator]
Visual Issue Resolution
ImplementedCAD a/o TcE[Res Owner]
Dispositioned Visual Issue
Status ChangedResolved[VI Owner]
Reviewer Finds Problem; Creates
Visual IssueActive
(VI Owner)
Email Notification Approval Status
(Res Owner)(VI Owner)(Facilitator)
Start
Product Design Issues Tracking Prior To MRP Release
External Use
17
Closed Loop Corrective Action Process
ROUTING SLIP APPROVAL:STATUS OF EACH REVIEWER IN THE ORDER OF REVIEW
LINK TO VISUAL ISSUE CONTENT
CLCA HISTORY STORED IN VISUAL ISSUE
CLCA HISTORY FOR ROUTING SLIP:
VISUAL ISSUE PROVIDES EVIDENCE OF ALL ACTIONS:FROM DISCOVERY OF ISSUE, THROUGH RESOLUTION OR FINAL DISPOSITION, TO VERIFICATION AND CLOSING OF ISSUE.
Product Design Issues Tracking Prior To MRP Release
External Use
18
TcC Resource Usage Efficiencies– Lowest Administration Burden
Design Review Sites & Workspaces DMU Roles Established Within TcC Managed Review Tasks Assignments Managed Review Scope & Agendas TcC Event Links in Lotus Notes eMail
– Lowest Data Management Burden DMU Data Linked To TcE, Not Copied DMU BOM Synced To TcE Eng_BOM All TcE Sites Accessible Within TcC
– Lowest PLC Deliverables Burden PLC Deliverables Doc Libraries in TcC TcE Item Issues Linked To PLC Docs
– Lowest Issues Management Burden Visual Issue Data Capture & Tracking Visual Issues Link To TcE Design Data Issue Routing Via Lotus Notes email Issue Reporting, Rollups & Dashboards
– Highest Reviewer Time Availability 83% Increase Over Vis-Based Reviews 175% Increase Over CAD-Based
Basis: Equal Resource Allocation / Method / Assembly Reviewed (Avg.)
0
10
20
30
40
50
60
% of Total; C
umulative A
ll Categories = 100%
Administration Data Management PLC Tasks Issue Management Review Effort
Resource Burden In Each DMU Method Evaluated
TcCommunity's ApplicationAdvantages In Each Virtual
Design Review Category
TcC-Based
TcVis-Based
CAD-Based
New Product Development IntegrationTcCommunity Return On Investment
External Use
Future Direction
Applied Materials Roadmap– Deploy Teamcenter
Engineering 2007 during FY 2008
– Deploy Microsoft Office SharePoint Server (MOSS) during FY 2009
– Deploy Teamcenter Community 2007 on MOSS during FY2009
19
External Use
20
Thank You,Herman Harwell