Top Banner
EGYPTAIR EXPRESS Maintenance Inspection Dep. Maintenance Control Manual (MCM)
433

Express Mcm Issue 4 Amend 01 4 Aug 12

Dec 27, 2015

Download

Documents

pknight2010

This file works as Example manual on how an airline operator could keep his aircraft's airworthy.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Express Mcm Issue 4 Amend 01 4 Aug 12

EGYPTAIR EXPRESS Maintenance Inspection Dep.

Maintenance Control Manual

(MCM)

Page 2: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 3: Express Mcm Issue 4 Amend 01 4 Aug 12

EGYPTAIR EXPRESS Maintenance Inspection Dep.

EGYPTAIR EXPRESS

ECAA Air Operator Certificate No. 10

Control No: (........)

EGYPTAIR EXPRESS EGYPTAIR Administration Building Airport Road, Cairo Tel: (202) 26964833 Fax: (202) 26964840

Page 4: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 5: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 6: Express Mcm Issue 4 Amend 01 4 Aug 12

Part (0): General

Page 7: Express Mcm Issue 4 Amend 01 4 Aug 12

This page is intentionally left blank

Page 8: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter : 0.00

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

Index of Part 0

General

0.00 Index

0.01 Record of Amendments

0.02 List of Effective Pages

0.03 Table of Contents

0.04 Abbreviations

0.05 Definitions

0.06 Distribution List

0.07 Commitment Statement

0.08 Management of Maintenance Control Manual

0.09 Procedures for Notification of Changes to ECAA

0.10 Statement of Compliance with ECARs

Page 9: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter : 0.00

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 10: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 11: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 12: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

Document Control

This publication is a controlled document and is prepared for the exclusive use of

EGYPTAIR EXPRESS / AMO staff and shall not be reproduced or used by any other

person, agency, or corporation without the written approval of (Name of the section

responsible for the manual in your department)

The holder of this manual is responsible to keep it updated and to advise (Section/

Department) of any changes affecting status, address or telephone number.

Name of Holder: ---------------------------------------------

Position: ------------------------------------------------

Manual Control Number:

No:   

Page 13: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 14: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 15: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 16: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 17: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 18: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 19: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 20: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 21: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 22: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

0.03 Table of Contents

Part 0 General

0.00 Index

0.01 Record of Amendments

0.02 List of Effective Pages

0.03 Table of Contents

0.04 Abbreviations

0.05 Definitions

0.06 Distribution List

0.07 Commitment Statement

0.08 Management of Maintenance Control Manual

0.09 Procedures of Changes Notification to ECAA

0.10 Statement of Compliance with ECAR

Part 1 Management and Control

1.00 Index

1.01 Management System

1.02 Authorities and Responsibilities

1.03 Provision of Resources (Manpower and Facilities)

1.04 Communication

1.05 Documentation System and Certificates

1.06 Maintenance Records System

1.07 Outsourcing and Product Control

1.08 Qualifications and Training

1.09 Concession Control and Deviation from Organization Procedures

1.10 Quality Assurance

1.11 Aircraft Lease

1.12

Part 2 Maintenance Control

2.00 Index

Page 23: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 4

Issue Date: 4 Aug 2012

2.01 Maintenance Program

2.02 Maintenance Planning

2.03 Maintenance Control and Follow-up

2.04 Parts Removal and Installation

2.05 Deferred Maintenance

2.06 Continuing Airworthiness

2.07 Repairs and Modifications

2.08 Defect Recording and Control

2.09 Reserved

2.10 Aircraft Recorders

2.11 Electronic Navigation Data Management

2.12 Reduced Vertical Separation Minima (RVSM)

2.13 Reporting to the Authority and the OEM Type Certificate Holder

2.14 CAT - II Operations

Part 3 Technical Records

3.00 Index

3.01 Aircraft Technical Log

3.02 Aircraft Maintenance Records

3.03 Fuel and Oil Records

3.04 Airworthiness Directives and Service Bulletins

Part 4 Reserved

Part 5 Aircraft Ground Handling (GRH)

5.00 Index

5.01 Airside Technical Operations

5.02 Aircraft Fuelling

5.03 Aircraft De-icing and Anti-icing

Page 24: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 4

Issue Date: 4 Aug 2012

5.04 Aircraft Mass and Balance Determination Procedure

5.05 Transport of Dangerous Goods by Air

Part 6 Appendices

6.00 Index

6.01 Company Certificates

6.02 Fleet Composition

6.03 Fleet Composition

6.04 Line Stations

6.05 Required Inspection Items

6.06 Quality Audit Checklists List

6.07 Maintenance Contracts

6.08 Approved Suppliers List

6.09 Approved Subcontractors List

6.10 Aircraft Handling at Outstations

6.11 Certifying Staff List

6.12 Requirements for AMO

6.13 Forms

6.14 Sample of Airworthiness Data

Page 25: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 26: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

0.04 ABBREVIATIONS

AC Advisory Circular

A/C Aircraft

A&C Airframe and Engine Category

AD Airworthiness Directive

AFM Aircraft Flight Manual

ALC After Landing Check

AMM Aircraft Maintenance Manual

AMO Approved Maintenance Organizations

AOC Air Operator Certificate

AOT All Operator Telex

APU Auxiliary Power Unit

AR As Required

ATA Air Transport Association

BFE Buyer Furnished Equipment

BRNAV Basic Radio Navigation

C OF A Certificate of Airworthiness

C of R Certificate of Registration

CA Cabin Appearance

CASP Continuous Analysis & Surveillance Program

CAT Category

CDL Configuration Deviation List

CG Center of Gravity

CI Chief Inspector

CM Condition Monitoring

CMEL Customized Minimum Equipment List

CMM Component Maintenance Manual

CMR Certification Maintenance Requirements

CN Consignee De Navigabilite’

CRS Certificate of Release to Service

Page 27: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

CSN Cycles Since New

CSO Cycles Since Overhaul

DD Deferred Defect (Deferred Discrepancy)

DDG Dispatch Deviation Guide

DDL Deferred Defect Logbook

DGAC Direction Générale L’aviation Civile (France)

DTP De-centralizes Technical Publication

EASA European Aviation Safety Agency

ECAA Egyptian Civil Aviation Authority

ECAR Egyptian Civil Aviation Regulations

ECM Engine Condition Monitoring

EO Engineering Order

ECSQM Egyptair Corporation Safty and Quality Manual

ESD Electrostatic Sensitive Devices

ETOPS Extended Range Twin Engine Operations

FAA Federal Aviation Administration (USA)

FAK Fly Away Kit

FAR Federal Aviation Regulations (USA)

FOD Foreign Object Damage

GSE Ground Support Equipment

GOM General Operation Manual

HT Hard Time

IATP International Airline Technical Pool

IAW In Accordance with

IB Information Bulletin

ICAO International Civil Aviation Organization

IFSD In-Flight Shut-Down

ILS Instrument Landing System.

IOCC International Operation Control center

IPC Illustrated Parts Catalogue

JCN Job Control Number

Page 28: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

LAB Laboratory.

LM Line Maintenance

LN Line Number

LOEP List of Effective Pages

LRU Line Replaceable Unit

M & E EGYPTAIR MAINTENANCE AND ENGINEERING

MCC Maintenance Control Center

MCM Maintenance Control Manual

MEL Minimum Equipment List

MGR Manager

MMEL Master Minimum Equipment List

MOE Maintenance Organization Exposition

MPD Maintenance Planning Data/Document

MRB Maintenance Review Board

MSI Maintenance Significant Item

MSR EgyptAir Express Company

MTBR Mean Time Between Removal

NA Not Applicable

NDT Non Destructive Test

NHA Next Higher Assembly

NPA Notice of Proposed Amendment

OEM Original Equipment Manufacturer

OC On Condition

OH Overhaul

OJT On Job Training

PDC Pre-Departure Check

PFR Post Flight Report

PIREP Pilot Report

PMA Parts Manufacturer Approval

PN Part Number

Page 29: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

PRNAV Precise Radio Navigation

QA Quality Assurance

QC Quality Control

QEC Quick Engine Change

QRB Quality Review Board

QVI Quality Verification Inspection

RII Required Inspection Item

RNP Required Navigation Performance

RP Reliability Program

RVSM Reduced Vertical Separation Minimum

SB Service Bulletin

SDR Service Difficulty Report

SFE Seller Furnished Equipment

SL Service Letter

S/N Serial Number

SPM Standard Practices Manual

SR Structure Repair

SRM Structural Repair Manual

ST Soft Time

TAT Turn Around Time

TBC Time Between Calibration

TBO Time Between Overhaul

TECH Technical

TPD Technical Puplication Department

TR Temporary Revision

TSI Time Since Installation

TSN Time Since New

TSO Time Since Overhaul

TSR Time Since Repair

UCL Upper Control Limit

URR Unscheduled Removal Rate

US Unserviceable

VHF Very High Frequency

VOR Very High Frequency Omni-Range Station.

WS Work Shop

Page 30: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 1 of 18

Issue Date: 4 Aug 2012

0.05 Definitions

Air Operator:

Mean any person who undertakes to engage in commercial air transportation in

scheduled and / or unscheduled service over domestic routes, International routes or

combinations thereof.

Air Operator Certificate:

Means a document issued by the Authority certifying that the applicant has been found

to be properly and adequately equipped and capable of conducting a safe operation

under the Egyptian Civil Aviation Regulations

Aircraft Accident:

An occurrence associated with the operation of an aircraft which takes place between

the time any person boards the aircraft with the intention of flight until such time as all

such persons have disembarked, in which:

A. A person is fatally or seriously injured as a result of:

Being in the aircraft, or

Direct contact with any part of the aircraft, including parts which have

become detached from the aircraft, or

Direct exposure to jet blast

Except when the injuries are from natural causes, self-inflicted or

inflicted by other persons, or when the injuries are to stowaways

hiding outside the areas normally available to the passengers and

crew; or

B. The aircraft sustains damage or structural failure which:

Adversely affects the structural strength, performance or flight

characteristics of the aircraft, and

Would normally require major repair or replacement of the affected

component,

Except for engine failure or damage, when the damage is limited to

the engine, its cowlings or accessories; or for damage limited to wing

Page 31: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 2 of 18

Issue Date: 4 Aug 2012

tips, antennas, tires, brakes, fairings, small dents or puncture holes in

the aircraft skin; or

C. The aircraft is missing or is completely inaccessible.

Aircraft Flight Manual:

Means a document containing the limitations, procedures, information, and data

including approved information pertaining to each aircraft of an approved design and

models thereof pertinent to the safe operation of that particular aircraft.

Airframe System:

Any system on the airplane that is not a part of the propulsion system.

Airframe:

Mean the fuselage, booms, nacelles, cowlings, fairing, airfoil surfaces, and landing

gear of an aircraft and their accessories and controls.

Air Navigation:

Mean the operation of aircraft in air space. It includes air transportation operations and

all other operational uses of aircraft in flight.

Air Transport:

Means the operation of Egyptian registered civil aircraft for the purpose of transporting

persons and property.

Airworthiness Data:

Mean any information necessary to ensure that the Aircraft or Aircraft component can

be maintained in a condition such that Airworthiness of the Aircraft, or serviceability of

operations and emergency equipment as appropriate, is assured.

Alteration:

Mean a permanent engineering change to original Airworthiness data.

Appliance:

Means any instrument, mechanism, equipment, part, apparatus, appurtenance, or

accessory, including communications equipment, that is used or intended to be used in

operating or controlling an aircraft in flight, is installed in or attached to the aircraft, and

is not part of an airframe or engine.

Page 32: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 3 of 18

Issue Date: 4 Aug 2012

Approved:

Unless used with reference to another person, means approved by the Egyptian Civil

Aviation Authority.

Approved Maintenance Program:

A program approved by the Original Equipment Manufacturer and/or the applicable

NAA that specifies required maintenance and maintenance intervals for aircraft,

engines and components

Approved Standard:

Means a manufacturing/maintenance/ quality standard approved by the Authority

Approved Data

Approved Data consists of:

Directly applicable Manufactures Manuals and procedural information

Airworthiness information from outside sources which has been cleared by an

operators Engineering Support for applicability and compatibility

Data that has been approved by the applicable NAA

Assembly:

That items fitted, assembled, attached, installed, connected, secured or adjusted in

approved manner

Auditor:

Is the person who has the responsibility for the audit performance, both for internal and

external audits.

Audit Standard:

Is the description of essential characteristics of audits which reflects current thought

and practice.

Auditee:

Is the organization to be audited.

Auditing Organization:

Is a section or function that carries out the audit. The auditor is appointed by the

Quality Assurance Department.

Page 33: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 4 of 18

Issue Date: 4 Aug 2012

Authority:

Means the Egyptian Civil Aviation Authority.

Base Maintenance:

Any maintenance task falling outside the criteria for Line Maintenance.

Bench Check:

A check performed in the affected shop for a suspected malfunction of a unit.

Block Hours:

The number of hours incurred by an aircraft from the moment it first moves for a flight

until it comes to a rest at its intended blocks at the next point of landing or returns to its

departure point prior to take-off.

Cabin Crew:

Means a person assigned to duty in an aircraft passenger cabin for the purpose of

assuring passenger safety during flight time in accordance with the Civil Aviation

Regulations.

Cancellation (Technical):

Elimination of scheduled departure because of a known or suspected malfunction

and/or defect.

Certifying Staff:

Means those personnel who are authorized by the approved maintenance organization

in accordance with a procedure acceptable to the Authority to certify Aircraft and

Aircraft components for release to service.

Certificate of Airworthiness:

Means the Certificate that indicates the issuing authority has determined the aircraft

meets all requirements for certification at date of issue.

Certificated:

Unless used with reference to another person, means certificated and/or validated by

the Authority

Chairman:

Mean the manager who has corporate authority for ensuring that all maintenance

required can be financed and carried out to the standard required by the Authority.

Page 34: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 5 of 18

Issue Date: 4 Aug 2012

Charter flight:

Means any commercial air transport other than scheduled operation conducted by an

approved national domestic of flag air carrier.

Cockpit Crew Member:

Means a pilot, flight engineer, or other airman assigned for duty in an aircraft during

flight time in accordance with the Civil Aviation Regulations.

Commercial Air Transportation:

Means the operation of Egyptian registered aircraft for the purpose of the carriage of

persons or property for compensation or hire.

Commercial Parts:

Material or parts not regulated by a government, and Manufactured to a unique

specification.

Marketed under the identification of the manufacturer.

Subjected to no particular quality control beyond the manufacturer’s voluntary

internal control system.

Not sensitive to airworthiness.

Company Authorization:

Is a license issued by the company I.A.W rules approved by the Authority?

Component:

Means any component part of an aircraft up to and including a complete power plant

and / or any operational / emergency equipment.

Condition:

The physical state of an Item.

Condition Monitoring:

A maintenance process which allows a unit to operate until failure. Condition

monitoring is not permitted for units whose failure has an adverse effect on operational

safety. Removal rate will be monitored and controlled by a surveillance program.

Consumable:

An item that is to be used only once.

Page 35: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 6 of 18

Issue Date: 4 Aug 2012

Contracted AMO:

EGYPTAIR maintenance and engineering (M & E) as an approved maintenance

organization, is the main contracted activity for EGYPTAIR EXPRESS.

Crewmember:

Means a person assigned to perform duty in an aircraft during flight time.

Cycle, Aircraft Operating:

A Completed take-off and landing sequence.

Dangerous goods:

Means articles or substances, which are capable of posing significant risk to health,

safety or property when transported by air.

Deferred Defects/Discrepancies:

Means those defects/ discrepancies found on an Aircraft or Aircraft component that

cannot be corrected during the present repair or maintenance task, will be corrected

during a defined later Aircraft, or Aircraft component maintenance period.

Defect Rectification:

Normally consists of an element of inspection and troubleshooting followed by repair

and replacement of defective item

Defect, Recurring or Repeated:

Such defect in Aircraft that repeats itself three times within 10 consecutive flying days

irrespective of the repair attempts carried out

Delay (Technical):

Technical delays occur when the malfunction of an item, the checking of same or

necessary corrective action, causes the final departure to be delayed by more than a

specified time (usually 15 minutes) after the scheduled departure time.

Deviation:

A specific written authorization, granted prior to a defect acceptance, repair or

manufacture of an item, to depart from a particular performance or design requirement

of a specification, drawing, manufacturer document, or other document, for a specific

number of units and/or for a specific period of time.

Page 36: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 7 of 18

Issue Date: 4 Aug 2012

Dry lease :

Means the lease of an aircraft without flight crew.

Dry operating mass:

The total mass of the aircraft ready for a specific type of operation excluding all usable

fuel and traffic load. This mass includes items such as crew and crew baggage,

catering and removable passenger service equipment, and potable water and lavatory

chemicals

During Flight:

Means the period from the moment the aircraft leaves the surface of the earth on

takeoff until it touches down on landing.

Engine:

The basic engine assembly as supplied by the engine manufacturer.

Engine Shutdown (In-Flight):

Cessation of engine operation for any reason other than training or normal operating

procedures.

Engineering Change:

Means a permanent deviation (alteration) from the original Airworthiness data.

Fail safe:

A design methodology upon which the airworthiness standards are based. It requires

the effect of failures and combination of failures to be considered in defining a safe

design.

Failure:

The inability of unit to perform its intended function within previously specified limits.

Findings:

Is an observation during an audit substantiated by evidence?

Flight:

The entire passage consisting of one or more flight legs, from leaving the airport of

origin to arrival at the airport of final destination.

Page 37: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 8 of 18

Issue Date: 4 Aug 2012

Flight Time:

Means the time from the moment the aircraft first moves for the purpose of flight until

the moment it comes to rest at the next point of landing commonly called "block-to-

block" time.

Functioning:

Operation in the approved manner for achieving such performance as may be specified

Functional Test:

A test carried out on or off the aircraft to verify that the component(s) or system(s)

is/are functioning within the specified limits of the manufacturer.

Hangar:

Means Aircraft maintenance building.

Hazardous Material:

Refer to dangerous goods.

Holdover Time:

The estimated time de-icing or anti-icing fluid will prevent the formation of frost or ice

and accumulation of snow on the protected surfaces of an aircraft. Holdover time

begins when the final application of de-icing / anti-icing fluid commences and expires

when the de-icing / anti-icing fluid applied to the aircraft loses its effectiveness.

Hours, Flying:

The accumulated time between wheels off and wheels on.

Incident Technical:

An event of a technical nature which may be considered to significantly affect the

potential airworthiness of an aircraft associated with its operation

Inspector:

Means an employee authorized to perform assigned inspection functions.

Inspection:

Means the examination of an Aircraft or Aircraft component to establish conformity with

an approved standard.

Page 38: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 9 of 18

Issue Date: 4 Aug 2012

Instrument:

Means a device using an internal mechanism to show visually or aurally the attitude,

altitude, or operation of an aircraft or aircraft part. It includes electronic devices for

automatically controlling an aircraft in flight.

Inoperative:

Means a condition in which equipment is malfunctioning to the event that it does not

accomplish its intended purpose or is not consistently functioning within its design

operating limits or tolerances.

Lease:

Any agreement by a person to furnish an aircraft to another person for compensation or

hire.

Lessee:

Is the person to whom aircraft or item is furnished

Lessor:

Is the person furnishing the leased aircraft or item

Life Limited Part:

Any part for which a mandatory replacement limit is specified in the type design, the

instructions for continued Airworthiness, or the maintenance manual.

Life Status:

The accumulated cycles, hours, or any other mandatory replacement limit of Life

Limited Part.

Line Maintenance:

Any maintenance that must be carried out before flight to ensure the aircraft is fit for the

intended flight. It may include:

troubleshooting;

defect rectification;

component replacement with use of external test equipment if required;

component replacement (may include components such as engines and

Propellers);

Page 39: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 10 of 18

Issue Date: 4 Aug 2012

scheduled maintenance and/or checks including visual inspections that will

detect obvious unsatisfactory conditions or discrepancies but do not require

extensive in depth inspection.

It may also include internal structure, systems and power plant items which are

visible through quick opening access panels/doors. Minor repairs and

modifications, which do not require extensive disassembly and can be done by

simple means.

for temporary or occasional cases (ADs, SBs) the Quality Manager may accept

bas maintenance tasks to be performed by a line maintenance organisation

provided all requirements are fulfilled. The Authority will prescribe the conditions

under which these tasks may be performed.

Maintenance:

Means any one or combination of overhaul, repair, inspection, replacement,

modification or defect rectification of an Aircraft or an Aircraft component.

Major Alteration:

“An alteration not listed in the aircraft, aircraft engine, or propeller specification

(1) That might appreciably affect weight, balance, structural strength, performance,

power plant operation ,flight characteristics, or other qualities affecting

Airworthiness, or

(2) That are not done according to accepted practices or can not be done by

elementary operations.”

Major modification or alteration:

Means an alteration or modification approved by the manufacturer, but not listed in the

aircraft or aircraft engine specifications:

That might appreciably affect weight, balance, structural strength, performance,

power plant operation, flight characteristics or other qualities affecting

airworthiness; or

That is not done according to accepted practices or can not be done by

elementary operations

Page 40: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 11 of 18

Issue Date: 4 Aug 2012

Major Repair: means a repair:

That, if improperly done, might appreciably affect weight, balance, structural

strength, performance, power plant operation, flight characteristics or other

qualities affecting Airworthiness; or

That is not done according to accepted practices or can not be done by

elementary operation but following special practices and operation instructions

approved by the manufacturer.

Manufacturer:

Means a company who designs and/or manufactures A/C or A/C components and sells

them

Material:

Any product or part to be used for Aircraft or Aircraft component maintenance without a

specific Original Equipment Manufacturer part number.

Maximum Landing Mass:

The maximum permissible total aircraft mass upon landing under normal

circumstances.

Maximum take-off Mass:

The maximum permissible total aircraft mass at the start of the take-off run.

Maximum Zero Fuel Mass:

The maximum permissible mass of an aircraft with no usable fuel. The mass of the

unusable fuel contained in tanks must be included in the zero fuel mass when it is

explicitly mentioned in the aircraft flight manual limitations

Minor Alteration:

Means an alteration other than a major alteration.

Minor Repair:

Means a repair other than a major repair.

Modification:

Means the alteration of an A/C or A/C component with an approved standard.

Page 41: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 12 of 18

Issue Date: 4 Aug 2012

Module:

An engine (or propeller) Module is a group of engine (or propeller) components defined

by the constructor and designed to be. Replaceable without mechanical or

performance difficulties. It is uniquely identified and amenable to the setting of an

overhaul life separate from other parts of the engine

New Engine:

Means an engine which has not been subjected to in-service operations, essentially

identical in design, materials and methods of construction with one which has been

type certificated.

Non Airworthy Items:

Items which do not affect the safe operation of the aircraft such as, galley equipment

,entertainment systems , passenger convenient items , etc.

Non Compliance:

Is an observed deviation from the existing regulations?

Non Conforming Materials:

Are all parts, processes, documents, activities that are not conforming to the

requirements.

Occurrence (or Incident):

Any technical event, other than an accident, and any other event that in the opinion of

the Authority, the aircraft operator, or the pilot endangered or may endanger the safe

operation of an aircraft. These events are reportable. Such reports are in addition to

other deficiency and discrepancy reports otherwise specially required by these

regulations.

On Condition:

A primary maintenance process having repetitive inspections or tests to determine the

condition of units, systems, or portions of structure with regard to continued service-

ability (corrective action is taken when required by item condition.)

Operational Control (with respect to a flight):

Means the exercise of authority over initiating, conducting, or terminating a flight.

Page 42: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 13 of 18

Issue Date: 4 Aug 2012

Operation of Aircraft:

Means the use of aircraft for the purpose of air navigation. Any person who causes or

authorizes the operation of aircraft, whether with or without the right of legal control (in

the capacity of owner, lessee, or otherwise) of the aircraft, shall be deemed to be

engaged in the operation of aircraft.

Overhaul:

Means the restoration of an aircraft or aircraft component by inspection test, repair

and/or replacement of parts in conformity with the overhaul manual or the detailed

description of this task in the Overhaul Manual. The TSO becomes zero after each

Overhaul.

Pilot Reports:

Any condition which is entered in the technical log by the flight crew which requires

corrective action by maintenance.

Pre-Flight Inspection:

Means the inspection carried out before flight to ensure that the aircraft is fit for the

intended flight. It does not include defect rectification.

Propulsion system:

The airplane propulsion system includes each component that is necessary for

propulsion, components that affect the control of the major propulsion units and

components that affect the safe operation of the major propulsion units.

Quality Assurance:

All those planned and systematic actions necessary to provide adequate confidence

that a product or service will satisfy both the Airworthiness’ Authorities requirements

and any specific company or customer’s requirements for quality.

Quality Audit:

A systematic examination of the acts and decisions by people with respect to quality in

order to independently verify or evaluate and report degree of compliance to the

operational requirements of the quality program, or the specifications or contract

requirements of the product or service.

Page 43: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 14 of 18

Issue Date: 4 Aug 2012

Quality Plan:

A description of all the quality check points in a process to ensure that it proceeds

under controlled conditions in the specified manner and sequence. Controlled

conditions include appropriate controls for materials, production equipment, processes

and procedure, computers, computer software, personnel, and associated supplies,

utilities and environments.

Quality System:

Is the collective plans, activities and events that are provided to ensure that a product,

process, or service will satisfy given needs.

Quality System Audit:

Is a documented activity performed to verify, by examination and evaluations of

objective evidence, that applicable elements of the quality system are appropriate and

have been developed, documented, and effectively implemented in accordance and

conjunction with specified requirements.

Rating:

Means a statement that, as part of a certificate, sets forth-special conditions, privileges,

or limitation.

Reliability:

The probability that a component/system /aircraft will continue to function for a

specified length of time under specified conditions.

Repair:

Means such maintenance action, including replacement as necessary to restore an

inoperative item or aircraft to an operative condition in conformity with an approved

standard.

Repairable:

An item comprising or including replaceable parts, commonly economical to repair, and

subject to be rehabilitated to fully serviceable condition over a period less than the life

of the flight equipment to which it is related.

Repeat Interval:

The maximum permitted period (for all tasks not performed on a sampling basis) that

can separate total completion of a task from its next accomplishment

Page 44: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 15 of 18

Issue Date: 4 Aug 2012

Replacement:

Any work operation which involves the removal and replacement of the same part or

the substitution of an approved alternative part.

Required Inspection Items (RII):

Required inspection items “RII” are defined as those maintenance and alterations items

which if not performed properly, or if improper parts or materials are used, could result

in a failure, malfunction, or defect endangering the safe operation of the aircraft.

Restoration:

The work necessary to return the aircraft component to an approved standard.

Rotable:

An item that can be economically restored to a serviceable condition and, in the normal

course of operation, can be repeatedly rehabilitated to a fully serviceable condition over

a period approximating the life of the flight equipment to which it is related.

Reduced Vertical Separation Minimum (RVSM) Airspace:

The aircraft have been manufactured to the same design, and have

been approved under the same type certificate, amended type

certificate, or supplemental type certificate.

The static system of each aircraft is installed in a manner and position

that is the same as those of the other aircraft in the group. The same

static source error correction is incorporated in each aircraft of the

group.

The avionics units installed in each aircraft to meet the minimum

RVSM equipment requirements of this appendix are:

Manufactured to the same manufacturer specification and have the

same Part number; or

Of a different manufacturer or Part number, if the applicant

demonstrates that the equipment provides equivalent system

performance as prescribed in EAC91-9.

Page 45: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 16 of 18

Issue Date: 4 Aug 2012

Serious incident:

Is an occurrence other than an accident, associated with the operation of an A/C which

affects or could affect the safety of operation involving circumstance indicating that an

accident nearly occurred?

Servicing:

The replenishment of consumable needed to keep an item of an aircraft in operating

condition.

Shelf Life:

The period of time beginning with the date of manufacture/ cure/ assembly and

terminated by a date by which the item must be used or subjected to inspection/ test/

restorative action or disposal action.

Shelf-Life Condition Code.

Material condition code reflecting the remaining shelf-life period of suspense (holding)

condition.

Shop:

Means an Aircraft components maintenance building

Shop Findings:

Recorded observations of shop personnel after shop maintenance repair or overhaul

has been performed.

Significant defect:

Is a defect of Aircraft system or component which if not rectified properly may

jeopardize the safe operation of aircraft?

Special Inspections (S/I):

Means those inspections requested by an alert service bulletin, by telex issued by the

Original Equipment Manufacturer or a fleet campaign requested by EGYPTAIR

Engineering.

Standard Parts:

Parts or material manufactured in complete compliance with an industrial accepted

specification, and,

Include design, manufacturing and uniform identification requirements.

Page 46: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 17 of 18

Issue Date: 4 Aug 2012

Published so that any party may qualify to manufacture the part established industry or

international.

Utilized specification codes should identify the industry or government agency

controlling the design and assignment of part numbers

Subcontractor:

Is either a Component Repair/Overhaul Vendor (ROV) or a Specialized Service Vendor

(SSV?)

Subsystem:

Air Transport Association Specification 100 - Those divisions which permit a system to

be broken into subsystem (portion of a complete system).

Supplier:

Is a company who sells components/ parts which it did not manufacture?

Syllabus:

Means a map containing all relevant information concerning the performed training, per

individual.

System:

Air Transport Association Specification - A system is a combination of interrelated

components arranged so as to perform a specified function.

Technical Standard Order (T.S.O):

It is a technical standard issued by FAA for the manufacture of specified components

used on civil aircraft. Such equipment is manufactured with FAA approval (under

Subpart 0 -FAR 21) and conforms to the minimum performance standard defined in the

T.S.O.

Threshold:

Limit deadline for all tasks not performed on a sampling basis at which the task must

be accomplished for the first time (subsequent accomplished deadlines are obtained by

adding the repeat interval and its multiples to the threshold)

Time between Overhaul:

A specified maximum time interval for which a unit is permitted to operate between

overhauls.

Page 47: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:01 Page 18 of 18

Issue Date: 4 Aug 2012

Time, Hard:

A maintenance process which allows a unit to operate for a specific maximum length of

time before a specific maintenance task must be performed.

Time in service:

Means the time from the moment an aircraft leaves the surface of the earth until it

touches it at the next point of landing.

Time, Operating:

The time period during which the unit is performing its intended function.

Time since Installation:

Time accumulated since a given item was last installed.

Time, Soft:

Is the minimum time interval between restoration of un-failed engine modules, when a

module reaches its declared soft time, it does not necessarily have to be removed from

the engine but will be removed any time there after when the engine is rejected or

removed from the aircraft

Time, Total:

The operating time which a unit has accumulated since manufacture

Training Centre :

Means an organization governed by the applicable requirements of Parts 65, 145, and

147 that provides training, testing, and checking under contract or other arrangement to

certificate holders subject to the requirements of the Egyptian Civil Aviation

Regulations.

Waiver:

A written authorization, to accept an item for service which during production or after

having been submitted for inspection, is found to depart from specified requirements,

but nevertheless is considered suitable for use “as is” or after repair or modification by

an approved method, described or referenced on the waiver.

Wet lease:

Means the lease of an aircraft with flight crew, maintenance and operational control

Page 48: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

0.06 Distribution List

No. Title Quantity Hard copy/ CD Control No.

1 Egyptian Civil Aviation Authority 1 Hard copy 01

2 EGYPTAIR holding Company Chairman and CEO 1 CD 02

3 EGYPTAIR EXPRESS Chairman 1 CD 03

4 EGYPTAIR M & E Accountable Manager 1 CD 04

5 EGYPTAIR Holding Company Quality and Safety Division

1 CD

05

6 EGYPTAIR EXPRESS Quality & Safety Manager 1 CD 06

7 EGYPTAIR EXPRESS Chief Inspector 1 Hard copy/ CD 07

8 EGYPTAIR EXPRESS Maintenance Director 1 CD 08

9 EGYPTAIR EXPRESS Main Library 1 CD 09

10 EGYPTAIR M & E Technical Publications Manager

1 CD

10

11 EGYPTAIR M & E Quality Assurance Director 1 CD 11

12 EGYPTAIR M & E Planning Director 1 CD 12

13 EGYPTAIR M & E Records Manager 1 CD 13

14 EGYPTAIR M & E Maintenance Senior Director 1 CD 14

15 EGYPTAIR M & E Base Maintenance Director 1 CD 15

16 EGYPTAIR M & E Line Maintenance Director 1 CD 16

17 EGYPTAIR M & E Overhaul Senior Director 1 CD 17

18 EGYPTAIR M & E Component Overhaul Director 1 CD 18

19 EGYPTAIR M & E Engineering Director 1 CD 19

20 EGYPTAIR M & E Material Director 1 CD 20

21 EGYPTAIR M & E Stores Manager 1 CD 21

22 EGYPTAIR M & E Outstations Manager 1 CD 22

23 EGYPTAIR M & E Outstations AR CD 23/1 - 23/xx

Page 49: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 50: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 51: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 52: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 10

Issue Date: 15 Apr 2012

0.08 Management of Maintenance Control Manual (MCM)

1. Objective:

The purpose of this procedure is to describe the administrative arrangements for the

development, issue, amendment, distribution of the Maintenance Control Manual.

2. References:

ECAR 121.135.

3. Responsibility:

Chief Inspector

4. Description:

4.1. Definitions:

4.1.1. Maintenance control Manual (MCM): is the manual which applies to

airworthiness activities. .

4.1.2. Policy: A written requirement established by an EGYPTAIR EXPRESS

management which is expected to be complied with by appropriate employee

personnel.

4.1.3. Recommendation: A preferred technique or action described by the

EGYPTAIR EXPRESS which employees are expected to follow whenever

practical.

4.1.4. Procedure: A logical progression of actions and/or decisions in a fixed

sequence which is prescribed by EGYPTAIR EXPRESS to achieve an

objective. In short, a procedure is step by step guidance on how to do

something.

4.1.5. Technique: A method of accomplishing a procedural step or maneuver.

4.2. General:

4.2.1. EGYPTAIR EXPRESS has for the use and guidance of relevant maintenance

and operational personnel, a Maintenance Control Manual that is accepted by

the Authority. MCM contains maintenance policies, procedures and

information.

Page 53: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 10

Issue Date: 15 Apr 2012

4.2.2. A comprehensive description of the scope, structure and functionality of the

management system for maintenance operations is documented in MCM

describing departments, positions, authorities, duties, responsibilities and

interrelation of functions and activities within the system.

4.2.3. Maintenance Control Manual design takes into consideration the human factor

principles and human limitation requirements that includes, but is not limited to:

i. Contains information that is clear, legible and accurately represented;

ii. Is written in a language understood;

iii. Is presented in a logical and consistent format that permits ease of use.

iv. Is readily identifiable and accessible to all stuff;

4.2.4. All amendments to the MCM shall be accepted by ECAA.

4.2.5. A copy of the MCM shall be made available to ECAA to include:

i. All amendments and/or revisions;

ii. Mandatory material, as required, by ECAA.

4.2.6. A copy of the current edition of MCM, or relevant portions thereof, is promptly

made available to all organizations or persons to whom the manual has been

issued and to each organization or person who performs and/or certifies

maintenance work for the EGYPTAIR EXPRESS.

4.2.7. When a portion of MCM is issued, policies and procedures contained therein

shall be sufficiently comprehensive such that all relevant guidance and

information are available to any maintenance organization performing

maintenance for EGYPTAIR EXPRESS under that portion of the manual.

4.2.8. The MCM contains a description of the duties, responsibilities and reporting

relationships within the Quality Assurance Program,

4.2.9. EGYPTAIR EXPRESS personnel shall be familiar with the following manuals:

i. Maintenance control Manual (MCM)

ii. Maintenance outstations handbook.

4.2.10. The stated manuals shall include the duties and responsibilities of each

Manager or Key position. The manual shall also include adequate policy,

Page 54: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 10

Issue Date: 15 Apr 2012

direction, and guidance for the safe and efficient performance of the duties

assigned to each Manager or Key position.

4.2.11. General Specifications:

i. The font to be used throughout the manuals is “Arial” with different sizes

shown on figure 1 (Layout diagram).

ii. All manuals should be in A4 size. All departments who use the A5 size

should have an A4 size of the same manual for office, and other

department's usage.

iii. Every Chapter is preceded by a Table of Content for that Chapter.

iv. When a page is revised, then the footer will have the revision number.

4.2.12. Binder Page Specifications

i. Three rings D shaped, attached to the backside of the manual, instead of

attachment to the spine, for durability;

ii. Color:

a. Logo : Dark Blue

b. Writing : Black

iii. Width of spine must exceed the width of the complete manual paper

contents, taking into consideration future additions and revisions. A choice

of 3, 4, 6 or 8 cm as spine standard width could be used;

4.2.13. Main (Inside) Page Specifications

i. This is the page, where the text is written, so it includes header and footer

only. In order to be able to include the part & chapter number and name in

the header without allowing it to continue to all pages of the chapter;

ii. Paper Size A4 ( no quarto),

iii. Page layout, as shown on page header and footer layout diagrams:

Page 55: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 10

Issue Date: 15 Apr 2012

4.2.14. Page Header Layout Diagram:

MCM Part 1:Management

Chapter 1.07

EGYPTAIR EXPRESS

Maintenance Inspection Department

4.2.15. Page Footer Layout Diagram:

Issue No.: 3 - Amen. No.: 00 Page 4 of 10 Issue Date: Mar 2010

4.2.16. Numbering System used in the Manual

EGYPTAIR EXPRESS MCM follows the following numbering system:

4.3. Manual Classification:

The Manual composed of:

4.3.1. Parts referring to the major divisions of the manual

(e.g. Part 2. Maintenance Control)

0 01 4. 4.1. 4.1.1. iv. a. 1)

Part Number

Chapter

Number

Subsection

Number

Paragraph

Number

Sub

paragraph

Number

Sub-Sub

paragraph

Sub-Sub-

Sub

paragraph

Sub-Sub-

Sub- Sub

paragraph

Chapter Number & Title Font Size: 11

Part Number & Title Font Size: 11

Amendment Number Font Size: 10 Bold

Issue Number & Date Font Size: 10 Bold

Page Number Font Size: 10 Bold

Department Name Font Size: 10 Italic

Company Logo

Manual Name Font Size: 16 Bold

Company Name Font Size: 12Bold

Page 56: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 5 of 10

Issue Date: 15 Apr 2012

4.3.2. Chapters referring to Subpart with a two or three numbers identifier

(e.g. Chapter 2.6 Continuing Airworthiness)

4.3.3. Items, will refer to headings and subheadings within each chapter

(e.g. Item 1: Objective)

4.3.4. Paragraphs that will refer to subdivision of item.

4.4. Manual development:

4.4.1. Chief Inspector creates new procedures or amendments to existing

procedures according to regulatory requirements and organization needs.

4.4.2. Chief Inspector will verify the compliance of the existing procedures with the

requirements of the new changes to be incorporated to MCM.

4.4.3. Chief Inspector will collect all proposals, review it, make a final draft and then

arrange for acceptance from Authority

4.4.4. The procedure development will be according to the following

EGYPTAIR EXPRESS guidelines:

i. (1. Objective): Stated clearly unless it is so commonly understood that a

statement of the objective is not necessary.

ii. (2. Reference): Include references to specific ECARs or other authority

publications when appropriate. A reference to regulations or other manual

material is appropriate when it is necessary to clarify the intent of the text or

when it is useful to the user for looking up specific subject matter.

iii. (3. Responsibility): identify the individual / organization responsible for each

step of the procedure.

iv. (4. Description):

Procedures flow in a logical step by step sequence, simple and contain only the

information necessary for accomplishing that procedure, taking in mind the

following considerations:

a. An acceptable method for accomplishing the intended objective.

b. The individual or organization responsible for each step of the procedure

clearly identified.

Page 57: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 6 of 10

Issue Date: 15 Apr 2012

c. The acceptable standards of performance for a procedure are stated if

those standards are not commonly understood or clearly obvious.

d. Since a variety of personnel with differing degrees of expertise are involved

in procedures, adequate information was provided for the least

experienced individual.

e. When a form or checklist is necessary to accomplish the procedure, the

location of that item was indicated in the procedure.

f. Forms: Identify all forms numbers and titles used to implement the

procedure.

4.4.5. Chief Inspector is responsible for developing of MCM and revisions, The

Chief Inspector sign the original copy for initial acceptance before getting

Chairman Acceptance.

4.4.6. After Getting Chairman acceptance, the Chief Inspector shall send the MCM

original copy attached with additional copy to ECAA for final acceptance.

4.4.7. After getting the finial acceptance on the original copy, the Chief Inspector will

send the manual to the contracted AMO main library to arrange for

distribution to all concerned departments / personnel according to the

distribution list.

4.5. MCM Amending:

4.5.1. Maintenance Control Manual will be amended in the following cases; list not

exhaustive:

i. Change in EGYPTAIR EXPRESS maintenance requirements

ii. Change in Authority requirements

iii. Change in EGYPTAIR EXPRESS organization, activities requirements

iv. Results from audits, whether internal or external

v. Any other reason that affects the Maintenance Control Manual conformity

requirements

4.5.2. Amendments shall be accepted from the Authority on the same way as the

manual issue.

Page 58: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 7 of 10

Issue Date: 4 Aug 2012

4.5.3. Amendments that need immediate application may be issued by the Chief

Inspector in the form of Temporary Amendments accepted by the Chief

Inspector. Temporary Amendments shall be processed for accepting from the

Authority after which it will be changed into Permanent Amendments.

Temporary Amendments shall be issued on yellow colored papers

4.5.4. Simple amendments like typing errors may not need to be accepted by the

ECAA.

4.5.5. Only pages shown on the list of effective pages are valid.

4.5.6. A complete review of the adequacy of all existing procedures must be

performed at intervals not to exceed 1 year.

4.5.7. Modified texts will be marked by a vertical bar in the right margin.

4.5.8. Only pages shown on the list of effective pages are valid.

4.5.9. MCM manual holder / user may propose a change to MCM using Form No

(204) and submitting it to Chief Inspector Office

4.6. MCM Updating / Up-keeping:

4.6.1 Each manual copy holder is responsible for performing the updating his copy

of the Manual.

4.6.2 A current copy of the Manual shall be made available to all concerned staff.

4.7. MCM Distribution:

4.7.1. Contracted AMO Technical Publications Department Manager will distribute

the accepted copies to the users, according to the distribution list.

4.7.2. Contracted AMO Technical Publications Department Manager will distribute

copies of all amendments promptly to the users, according to the distribution

list.

4.7.3. Each copy of this manual will have a control number on the manual first

page. A master list including the manual control number cross-reference

location and amendment status will be kept at Chief Inspector office.

4.8. Examples Reasons for Amendment, Amendment Record and Control:

4.8.1. Reason for Amendment may include one or more from the following:

Page 59: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 8 of 10

Issue Date: 4 Aug 2012

i. Complying with the new rules or Regulations;

ii. Complying with amendments in IOSA references;

iii. To incorporate new changes / new procedures;

iv. Changing some names of management personnel;

v. Modification of Organization structure;

vi. Adding new line stations;

vii. Adding new aircraft;

viii. Modifying forms

4.8.2. The record of amendment in chapter 0.1 permits the control of updating the

manual. A list of effective pages will be issued with each revision; so that

each manual can be checked and kept up-to-date.

4.8.3. Each amendment shall have its issue date.

4.8.4. MCM shall have a record of amendment, chapter 0.01 that contains numbers

of permanent and temporary amendments and issue dates and indicates

which amendment number has been incorporated and date of incorporation.

This record also high-light in brief what has been done in these amendment.

4.9. Methods of Presentation and Printing:

4.9.1. The amendment may include complete text of revised procedure with letter

“R” in Status column.

4.9.2. Each amendment will be issued with a table of contents and a list of effective

pages as needed.

4.9.3. The amendment contents will include the amendment No. and the chapter

that have been changed in These amendments

4.9.4. The list of effective pages of the amendment will include only the pages that

have been subjected to change in these amendments, and will be marked by

an aside vertical line

4.9.5. A complete table of content and list of effective pages will be issued in case

of a complete re-issue.

4.10. Holders Commitment:

Page 60: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 9 of 10

Issue Date: 15 Apr 2012

4.10.3. The concerned director / manager (MCM holder) will:

i. Inform his subordinates of any changes in contents.

ii. If changes in contents alter departments’ instructions, he must take

necessary actions to adapt the department’s instructions, methods, training,

equipment, housing, etc. to comply with requirements of this procedure

manual and destroy immediately all obsolete pages

5. Forms:

Form no: 204, MCM change proposal.

Page 61: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 10 of 10

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 62: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.09

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

0.09 Procedure for Notification of Changes to ECAA

1. Objective:

This procedure explains in which occasion EGYPTAIR EXPRESS should inform

ECAA prior to incorporating proposed organizational changes regarding

organization's activities , approval , location and personnel / maintenance contractors

required for continuing airworthiness of the aircraft.

2. References:

ECAR 121.59, 121.83, 121.153, 121.361

3. Responsibility:

Chief Inspector

4. Description:

4.1. General: 

The Chief Inspector is responsible to notify ECAA with any request of evolution for

changes regarding:

4.1.1. The Chairman/CEO.

4.1.2. Any of the senior persons required for the continuing airworthiness

4.1.3. Changes of Approved Locations / Maintenance Bases management;

4.1.4. Changes in Company Activities

4.1.5. Change of Organization Fleet Composition

4.1.6. The maintenance contractor(s).

4.1.7. Change of Line Stations Locations

4.2. Chairman/CEO:

Any change in the post ion of Chairman/CEO will be notified to ECAA by way of

an official letter and a completed ECAA Form. The process must be initiated

within enough time for the ECAA to approve the proposal.

Signature by the new Chairman/CEO of the statement of part (0.2) “Corporate

commitment by the Chairman/CEO of the MCM must be done and transmitted at

the earliest opportunity to ECAA.

Page 63: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.09

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

4.2.1. Disregarding this requirement can cancel the approval of part 121.

4.2.2. New Chairman/CEO must be able to demonstrate to ECAA his basic

understanding of part 121 and his responsibilities as an Chairman/CEO.

4.2.3. Such a change will requires revision of the part (1.1) (Management Personnel)

of the MCM and (1.1) “Management Organization Charts”.

4.3. Senior Nominated Personnel

4.3.1. Notification of the change of EGYPTAIR EXPRESS's Senior Personnel to

ECAA will be executed by the Chief Inspector by way of an official letter and a

completed ECAA Form. The process must be initiated within enough time for

the ECAA to approve the proposal.

4.3.2. Such a change will require revision of the part (1.1) “Management Personnel”

of the MCM and Management Organization Charts

4.4. Changes of Approved Locations/Maintenance Bases

Notification of the change of any of the areas listed below will be executed by the

Chief Inspector by way of an official letter of proposal to ECAA. The process must

be initiated within enough time for ECAA to approve the proposal.

4.4.1. The name of EGYPTAIR EXPRESS.

4.4.2. The location of EGYPTAIR EXPRESS.

4.4.3. Additional locations of EGYPTAIR EXPRESS.

4.4.4. Such a change will require a revision of MCM part (1.4) “Provisions of

Resources At each Address Intended to be approved”..

4.5. Changes in Company Activities

4.5.1. Any changes to the Schedule of Approval will be submitted by the Chief

Inspector on an ECAA Form, detailing variation.

4.5.2. Any change or additions to EGYPTAIR EXPRESS's Scope of Work will be

initiated by the Chief Inspector who will notify ECAA by way of an official letter

and a submission of a draft MCM amendment.

4.5.3. Any changes or additions to EGYPTAIR EXPRESS's working structure, i.e.

disbandment of EGYPTAIR EXPRESS Departments, will be initiated by the

Chief Inspector who will notify ECAA by way of an official letter and a

submission of the draft MCM amendment.

Page 64: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.09

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

4.5.4. EGYPTAIR EXPRESS will ensure that such changes will not be incorporated

until the changes have been assessed and approved by ECAA.

4.6. Change of Organization Fleet Composition:

4.6.1. Any change in the approved Organization Fleet Composition will be notified to

the ECAA by submission of a formal letter.

4.6.2. Such a change will require revision of the “AOC”.

4.7. Change of Approved Maintenance Contractors AMO:

Any change in the approved Maintenance Contractor will be notified to ECAA by

submission of a formal letter. The substituting maintenance contractor must also

be approved by ECAA.

4.8. Change of Line Station Location:

4.8.1. Any change in the line stations locations will be notified to ECAA by

submission of a formal letter.

4.8.2. Such a change will require revision of the “AOC”.

4.9. Access to the Organization

EGYPTAIR EXPRESS will grant access to the organization to ECAA at any time,

in order for ECAA to determine continued compliance with ECAR Parts 121.

5. Forms

N/A

Page 65: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.09

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 66: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 3 Amen. No.: 01 Page 1 of 4

Issue Date: 15 Aug 2010

0.10 Statement of Compliance

This Maintenance Control Manual shall at all times reflect EGYPTAIR EXPRESS means of compliance with all applicable Egyptian Civil Aviation Authority requirements.

ECAR MCM

Part Chapter Item

39.1 3 04

39.3. 3 04

39.5 3 04 4.1.1

39.21 2 13 4.2.3

ECAR MCM

Part Chapter Item

43.3 1 06 4.3

43.5 1 06 4.2.3

43.7

2

2

2

03

07

07

4.3

4.3

4.4

43.9 1

2

03

03

4.2.5

4.2.17

43.11 1

2

06

03

4.2.3

4.3.2

43.13

2

2

03

03

4.3

4.2.26

43.15 1 06 4.2.4

43.17

2

2

03

03

4.2.12

4.2.13

Page 67: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

ECAR MCM

Part Chapter Item

91.12 5 02 4.2

91.23 1

1

11

11

4.6

4.7

91.203 1 05 4.4

91.213 2 05 4.1

91.407 2

2

2

03

07

07

4.2.20

4.3.4

4.3.5

91.413 1 03 4.1.6

91.415 1 03 4.3.11

91.417 1 06 4

91.419 1 06 4.7

91.423 2 10 4.3

91.609 2 10 4.1

91.903 1 09 4.1

ECAR MCM

Part Chapter Item

121.2 0 06

121.3 (c) 1

1

05

05

4.5

4.6

121.6 1 11 4

121.23 1 05 4.5

121.29 1

1

05

05

4.5.6

4.5.7

121.58 1 09 4.1

Page 68: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

121.59 1

1

01

01

4.3

4.5

121.61 1

1

02

02

4.2.4.iv4.2.3.iv

121.71 1

1

02

02

4.2.3.iii

4.2.4.iii

121.73 1 05 4.5.5

121.75 1 05 4.6.4

121.79 1 05 4.6.5

121.81 1 04 4.2.6

121.81 1 03 4.3

121.83 1

0

03

09

4.1

4.1.3

121.135 0 08

121.139 2 05 4.1

121.145 0 08 4.7

121.147 1 05 4.4

121.361 2 03 4.2.1

121.365 2 03 4.6

121.367 2 03 4.1.2

121.369 1 07 4.1.1

121.370 1 10 4.1.2

121.371 1 03 4.2.5

121.373 2 06 4.4

121.374 2 01 4.1

121.375 3 01 4.2

121.376 1 06 4.1

121.377 1 06 4.7

121.380 6 12 5

121.685 6 03

Page 69: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 0:General Chapter 0.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

121.701 3 01 4.1

121.702 2 13 4.2

121.705 1 05 4.2.1

121.707 2 07 4.4

121.709 2 03 4.3

121.703 2 13 4.3

Page 70: Express Mcm Issue 4 Amend 01 4 Aug 12

Part (1): Management and Control

Page 71: Express Mcm Issue 4 Amend 01 4 Aug 12

This page is intentionally left blank

Page 72: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 2

Issue Date: 4 Aug 2012

Index

1.00 Index

1.1 Management System

1.2 Authorities and Responsibilities

1.3 Provisions of Resources

1.4 Communication

1.5 Documentation System

1.6 Maintenance records system

1.7 Outsourcing and Product control

1.8 Qualifications and Training

1.9 Concession Control and Deviation from Organizations Procedures

1.10 Quality Assurance

1.11 Aircraft Lease

1.12 Safety Management In Maintenance Operations

Page 73: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 2

Issue Date: 4 Aug 2012

This page is intentionally left blank

Page 74: Express Mcm Issue 4 Amend 01 4 Aug 12

MCMPart 1:Management

Chapter 1.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 6 Issue Date: 4 Aug 2012

1.01 Management System 1. Objective:

To fulfill the requirements regarding the availability of human resources for

maintenance management

2. References:

ECAR 121.59, 121.369(b),

3. : Responsibility: 3.1. Chairman

3.2. Maintenance Director

3.3. Chief Inspector

4. Description:

4.1. General:

4.1.1. EGYPTAIR EXPRESS has a management system for maintenance

operations that allows continuity throughout its organization structure. This

management system shall ensure:

i. Management of safety and quality in maintenance operations;

ii. Supervision and control of maintenance operations, and other associated

maintenance activities;

iii. Compliance with standards of the EGYPTAIR EXPRESS and requirements

of ECAA and any other relevant authorities whenever applicable (refer to

Clause-4.3 Organization Chart).

4.1.2. EGYPTAIR EXPRESS has management system for maintenance operations;

consists currently of (five) fully qualified personnel. This is to ensure

maintenance of all aircraft is performed in accordance with the applicable

Maintenance Program and all maintenance is carried out in accordance with

policies and procedures contained in the Maintenance Control Manual

(MCM).

Page 75: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 0003 Page 2 of 6

Issue Date: 15 Apr 2012

4.1.3. EGYPTAIR EXPRESS positions that affect the safety and security of

maintenance operations are filled by personnel on the basis of appropriate

knowledge, skills, training and experience appropriate to the position and

according to mentioned prerequisite criteria for each position.

4.1.4. A Plan for delegation of duties within the management system for

maintenance operations is set to ensure the managerial continuity when

operational managers, including nominated post holders, are absent from the

workplace.

4.2. Common Management Responsibilities:

All management positions, regardless of their level within EGYPTAIR EXPRESS,

have common management responsibilities. These responsibilities are considered

an integral part of each management position description. They are as follows:

4.2.1. Human Resources:

To assure the administration of personnel policies and procedures affecting

the proper utilization of their subordinate personnel. These policies and

procedures are concerned with employee selection, orientation, jobs

assignment, compensation discipline and employee benefits such as

vacation and sick leave.

4.2.2. Personnel Development:

To assure the evaluation of the jobs performance of immediate subordinates

in order to assist in improving the performance on current jobs assignment

and in preparing for advancement to positions of higher responsibility. Key

persons will consult with his employees concerning their jobs performance

and assist them in the preparation of plans to improve in performance as

required.

4.2.3. Organization:

To maintain an organization structure that assures effective assignment and

utilization of its Subordinates and to provide for the most efficient conduct of

the responsibilities of its organization.

Page 76: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 0003 Page 3 of 6

Issue Date: 15 Apr 2012

4.2.4. Safety:

To assure that its employees adhere to the safety rules and follow safe job

practices in carrying out their duties. It shall take the necessary steps to ensure

that equipment and facilities are maintained in a safe manner.

4.2.5. Quality Standard:

To assure and be accountable to uphold the Quality Standard throughout the

staff under its control.

4.2.6. Management persons shall have continuous communication channels among

them to improve and implement EGYPTAIR EXPRESS quality systems and

procedure

4.3. Company organization Chart:

The following is the company organizational chart which is established to ensure

the proper performance of stated duties and to show Chains of Responsibility:

Page 77: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 6

Issue Date: 4 Aug 2012

Reporting line

Communication line

Audit Manager Eng/ Omar El Roudy

Records Manager Eng/ Akmal Fikry

Quality Control Manager Eng/ Ali El Gazar

Documentation Manager Eng/ El Said abd El Rahman

Engineering, Planning Manager

Eng/ Samy Said

Maintenance Manager Eng/ Samy Said

Training Manager Eng/ Akmal Fikry

Contract Manager Eng/ El Said abd El Rahman

EGYPTAIR EXPRESS

Chairman

Capt / Helmy Rizk

Chief Inspector Eng/ Omar El Roudy

Maintenance Director Eng/ El Said abd El Rahman

Safety and Quality Manager

Safety Review Board (SRB)

EGYPTAIR CHAIRMAN Accountable Executive

Hossam Kamal

Page 78: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 5 of 6

Issue Date: 4 Aug 2012

4.4. Delegation plan:

4.4.1. Managers may delegate any part of their total task responsibilities to a

subordinate but they remain responsible for the achievement of the whole

task.

4.4.2. During absence of post holders from the work place the following interim

persons shall act in charge as follows::

Title Senior Persons Name Interim Persons Name Interim Persons Title

Chief Inspector ENG/ Omar El Roudy Eng/Ali El Gazar Quality control

Manager

Maintenance

Director

ENG/ El Said

Abd El Rahman Eng/ Samy Said

Contract& Warranty Manager

4.4.3. A notification of such delegation of duties shall be communicated in writing

throughout the management system.

4.5. Notification to Authority:

4.5.1 Names and qualifications of the Chairman, Director of Maintenance and

Chief Inspector shall be notified to ECAA.

4.5.2 Any change or vacancy in any of the above positions shall be notified

promptly to ECAA.

4.5.3 Any absence of the above persons for more than 4 weeks shall be temporary

filled by the delegate. Name and credentials of the delegate shall be

introduced to ECAA.

5. Forms:

N/A

Page 79: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 0003 Page 6 of 6

Issue Date: 15 Apr 2012

This Page Intentionally left Blank

Page 80: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 18

Issue Date: 4 Aug 2012

1.02 Authorities and Responsibilities

1. Objective:

To define duties, authorities and responsibilities within the management system for

maintenance operations to ensure that the entire organization works as a system

and not as a group of independent or fragmented units

2. References:

ECAR 121.59, 121.61, 121.369(b),

3. Responsibility:

3.1. Chairman

3.2. Chief Inspector

3.3. Maintenance Director

4. Description

4.1. General.

4.1.1. Responsibility within the management system for maintenance operations is

assigned for liaison with regulatory authorities, original equipment manufacturers

(OEM) and other operationally relevant external entities.

4.2. Management Personnel:

4.2.1. Position: EGYPTAIR HOLDING Chairman and Accountable Executive.

Has the overall responsibilities of the whole EGYPTAIR organization.

4.2.2. Position: EGYPTAIR EXPRESS Chairman:

Is designated by EGYPTAIR HOLDING Chairman Accountable Executive .

i. He is the person having corporate authority for ensuring that all continuing

airworthiness activities and related functions can be financed and carried out

in accordance with :

a. Conditions and restrictions of the AOC; 

b. Applicable regulatory requirements; 

c. The stated standards and requirements of this manual 

Page 81: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 18

Issue Date: 4 Aug 2012

ii. He designates a person to act as Maintenance Director who shall be

responsible to ensure that all maintenance is carried out in accordance with

the maintenance policies and procedures contained in the Maintenance

Control Manual

iii. Designates a person to act as a Chief Inspector who shall be responsible for

the management and supervision for the continuing airworthiness activities.

4.2.3. Position: Safety and Quality Manager:

Refer to SMSM 3.6 for reporting to and duties and responsibilities  

4.2.4. Position: Chief Inspector

i. Reports to: EGYPTAIR EXPRESS Chairman.

ii. Duties and responsibilities of the Chief Inspector:

a. Monitor the overall maintenance operations.

b. Ensure that the management of safety risks in maintenance operations is in compliance with applicable regulations and standards of EGYPTAIR EXPRESS.

c. Develop, amend and establish a safety and quality policy within the Maintenance Control Manual.

d. Operate the following audit programs:

1) An Audit program to ensure that the performed maintenance program and procedures continue to be effective and complying with applicable regulations.

2) An internal audit program to ensure that established safety and quality policy is adequate and implemented within the organization.

3) An audit program of maintenance operations service providers.

e. Issue directives and notices to subcontracted service providers as required.

f. Implement a compliance monitoring feedback to the Chairman to ensure corrective action as necessary.

Page 82: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 18

Issue Date: 4 Aug 2012

g. Act as liaison officer between EGYPTAIR EXPRESS and regulatory authorities;

h. Initially approve all documents relating to maintenance operations before submitting to ECAA;

i. Ensure compliance with quality system functions, procedures, continuing airworthiness and safety of maintenance operations of EGYPTAIR EXPRESS aircraft, through enforcement of standards and regulatory and manufacturers requirements;

j. Ensure that appropriate storage facilities are maintained for parts, material, tools and equipment;

k. Authorize short term escalation and MEL Defect Deferral extension;

l. Maintain oversight of the maintenance safety programs and communicate any deficiencies to the Chairman and the Safety and Quality GM;

m. Review and track trends with respect to occurrence reports, safety related issues and trends and ensure required investigations are timely and properly conducted and documented;

n. Monitor the proper performance of safety audits of maintenance facilities, practices and training;

o. Participate in EGYPTAIR EXPRESS's safety committee meetings and events.

Chief Inspector may delegate any of his duties to managers and section heads of his

directorate. However such delegation does not relieve him of his responsibilities.

iii. Qualifications and Prerequisite of the Chief Inspector:

The Chief Inspector shall satisfy the Authority regarding filling the position of

Chief Inspector. As a minimum, the Chief Inspector shall::

a. Hold a suitable engineering degree;

b. Have a large aircraft maintenance operations experience of fifteen years;

Page 83: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 18

Issue Date: 4 Aug 2012

c. Hold an aircraft maintenance license .

d. Have at least three years experience as being responsible for release of

aircraft to service;

e. Have at least one years experience in a supervisory position in the

performance of maintenance inspection on for the types operated by

EGYPTAIR EXPRESS, of which at least three years recent experience.

f. Have a full understanding of the following materials with respect to the

EGYPTAIR EXPRESS operation:

1) Egyptian Civil Aviation Regulations;

2) Operations Specifications;

3) Aviation safety standards and safe operating practices;

4) Appropriate maintenance inspections and airworthiness requirement;

5) Maintenance Control Manual and related Manuals and documents

iv. Direct Subordinates:

a. Audit Manager

b. Inspection Manager

c. Training Manager

d. Records Manager

4.2.5. Position Audit Manager

Reports to: Chief Inspector

i. Qualifications and Prerequisites of Audit Manager: a. Knowledge:

1) Have a suitable engineering degree.

2) Knowledge of products and services in the area of his responsibility and related methods, sequences, processes and systems.

3) Have an appropriate license.

b. Skills:

1) Computer usage skills.

2) Have a good command of written and spoken English language.

Page 84: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 5 of 18

Issue Date: 4 Aug 2012

c. Training:

Satisfactorily completed the following courses:

1) Course on MCM including responsibilities and privileges of the quality auditors.

2) Course on the effect of human factors and human performance limitations in maintenance.

3) Course on ECAR Part 121 Section L and Part 145 and other related parts.

4) Type courses on the aircraft operated by EGYPTAIR EXPRESS.

5) An Aviation Auditor training course.

d. Experience Has an experience in the field of aircraft maintenance for a period of not less than 5 years.

ii. Duties and Responsibilities of Audit Manager:

a. Perform the internal Audit Program on EGYPTAIR EXPRESS maintenance operations and the Audit Program on maintenance provider(s) and contracted technical handling entities;

b. Perform random checks on service provider's facilities and aircraft as necessary;

c. Monitor day to day activities related to continuous airworthiness management programs and records;

d. Accompany and coordinate with delegations from regulatory agencies and external audit organizations during their visits;

e. Follow up on audits finding and perform spot checks and ensure the remedial corrective and preventive actions are appropriate and implemented;

f. Recommend updates to the company quality manuals.

4.2.6. Position: Inspection Manager

Reports to: Chief Inspector

Page 85: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 6 of 18

Issue Date: 4 Aug 2012

i. Qualifications and Prerequisites of Inspection Manager: a. Knowledge:

1) Have a suitable engineering degree.

2) Knowledge of products and services in the area of his responsibility including related methods, sequences, processes and systems.

3) Have an appropriate license.

b. Skills:

1) Computer usage skills.

2) Have a good command of written and spoken English language.

c. Training:

Satisfactorily completed the following courses:

1) Course on MCM;

2) Course on the effect of human factors and human performance limitations in maintenance;

3) Course on ECAR Part 121 L and Part 145 and the related parts;

4) Approved type courses on the aircraft operated by EGYPTAIR EXPRESS;

d. Experience: Has an experience in the field of large aircraft maintenance for a period not less than 5 years.

ii. Duties and Responsibilities of Inspection Manager

a. Monitor the proper performance of all maintenance operations activities associated with the release to service of aircraft, engines and components of EGYPTAIR EXPRESS;

b. Ensure that a sufficient manpower level necessary to accomplish the Maintenance Program on a timely schedule.

c. Ensure that all work accomplished meets the set standards and the Regulatory Authority requirements.

Page 86: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 7 of 18

Issue Date: 4 Aug 2012

d. Ensure that all Company safety precautions are appropriately defined and followed by staff at all times.

e. Ensure that all housekeeping requirements are appropriately maintained.

f. Ensure that the personnel are properly trained and qualified to perform the work assigned in an efficient manner.

g. Ensure that all documents onboard aircraft are current and complete.

h. Ensure that maintenance facilities are adequately equipped as required to perform the required jobs.

i. Ensure the maintenance of set standards of aircraft cleanliness and appearance.

4.2.7. Position: Training Manager

Reports to: Chief Inspector

i. Qualifications and Prerequisites of Training Manager:

a. Knowledge:

1) Have a suitable engineering degree.

2) Knowledge of products and services in the area of his responsibility including related methods, sequences, processes and systems.

3) Have an appropriate license.

b. Skills:

1) Computer usage skills.

2) Have a good command of written and spoken English language.

c. Training:

Satisfactorily completed the following courses:

1) Course on the MCM.

2) Course on the effect of human factors and human performance limitations in maintenance.

Page 87: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 8 of 18

Issue Date: 4 Aug 2012

3) Course on ECAR Part 121 L, Part 145 and other related parts.

4) An approved suitable aircraft type course.

d. Experience

Has an experience in the field of large aircraft maintenance for a period not less than 3 years.

ii. Duties and Responsibilities of Training Manager:

a. Define training requirements;

b. Prepare annual training plan;

c. Maintain training records;

d. Coordinate Training Programs for contracted training;

e. Conduct and supervise in-house training courses;

f. Administer all other training related issues.

4.2.8. Position: Records Manager

Reports to: Chief Inspector

i. Qualifications and Prerequisites of Records Manager: a. Knowledge:

1) Have a suitable engineering degree. 2) Knowledge of products and services in the area of his responsibility

including related methods, processes and systems. 3) Have an appropriate license.

b. Skills:

1) Computer usage skills.

2) Have a good command of written and spoken English language.

c. Training:

Satisfactorily completed the following courses:

1) Course on MCM.

Page 88: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 9 of 18

Issue Date: 4 Aug 2012

2) Course on the effect of human factors and human performance limitations in maintenance.

3) Course on ECAR Part 121 L and Part 145 and the related parts.

d. Experience Have an experience in the field of aircraft maintenance for a period not less than 3 years.

ii. Duties and Responsibilities of Records Manager:

a. Maintain timely records of aircraft hours and cycles flown to ensure that planned maintenance for airframe, engines and components are scheduled within approved time limitations;

b. Maintain an accurate and complete system of aircraft technical records in compliance with applicable standards and authority requirements;

c. Ensure that the maintenance service provider has an accurate system of aircraft technical records including monitoring of life limited parts process and

records.

4.2.9. Position: Maintenance Director:

i. Reports to: EGYPTAIR EXPRESS Chairman.

In this respect he shall have financial control within his management area and

shall be given adequate recourses for such activities

ii. Duties and responsibilities of the Maintenance Director:

Director of Maintenance is responsible for ensuring that all , Maintenance

operations are conducted in accordance with conditions and restrictions of the

Air Operator Certificate (AOC),and procedures contained in the Maintenance

Control Manual. In doing this, the Director of Maintenance has to:

a. Manage and supervise all maintenance operations

b. Ensure that all maintenance is carried out in accordance with the maintenance policies and procedures contained in the Maintenance Control Manual

Page 89: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 10 of 18

Issue Date: 4 Aug 2012

c. Ensure that Safety and Quality policy established in this MCM are continuously implemented and promoted;

d. Ensure that EGYPTAIR EXPRESS aircraft and operating procedures are in compliance with Authority rules and international standards of airworthiness;

e. Nominate a group of personnel having the responsibility of ensuring that the organization is always in compliance with this manual;

f. Assure compliance with regulatory requirements all over the organization functions;

g. Assume the leadership role to ensure commitment throughout the company to the safety management policy intent and safety requirements;

h. Ensure adequate resources are allocated to different activities within maintenance operations;

i. Ensuring that EGYPTAIR EXPRESS staff are aware and appropriately accountable for the safety performance;

j. Fulfill the requirements of aircraft maintenance through the proper arrangement of maintenance contracts with approved organizations and the follow-up of its execution;

k. Monitor the development of the maintenance program;

l. Ensure maintenance operations carried out by maintenance provider(s) are in full compliance with the following:

1) Conditions and restrictions of the AOC,

2) ECAA requirements, and

3) Standards established by EGYPTAIR EXPRESS in the MCM.

m. Monitor the planning, scheduling and accomplishment of required maintenance according to the time constraints specified in the approved maintenance schedule.

n. Assure the proper dispatch of aircraft, with regard to:

Page 90: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 11 of 18

Issue Date: 4 Aug 2012

1) The control of defects;

2) The availability of spare parts;

3) The conformity with type design;

4) The requirements of ECAA and other applicable operating rules.

o. Represent the interests of EGYPTAIR EXPRESS in technical matters in liaison with maintenance organizations, suppliers, original equipment manufacturers and other external entities.

p. Ensure that suitable facilities and infrastructure are available to affect the management of maintenance operations

q. Follow up components, parts and material owned by EGYPTAIR EXPRESS.

r. Communicate with the Safety and Quality GM regarding maintenance safety issues.

s. Follow up on timely investigations of all maintenance operations occurrences to determine the cause and appropriate actions. Investigations will be documented to allow for tracking and trending.

t. Participate in EGYPTAIR EXPRESS's safety committee meetings and events.

iii. Qualifications and Prerequisites of the Maintenance Director:

The Maintenance director shall satisfy the Authority regarding filling the position of a maintenance director. As a minimum, the Maintenance Director shall:

a. Hold a suitable engineering degree;

b. Have at least fifteen years total experience in the field of large aircraft maintenance;

c. Hold an aircraft maintenance license;

b. Have at least five years experience as being responsible for release of

aircraft to service;

Page 91: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 12 of 18

Issue Date: 4 Aug 2012

c. have at least three years experience in a supervisory position for running

the maintenance activities of the type operated by EGYPTAIR EXPRESS,

d. To the extent of his responsibilities, have a full understanding of the following

materials with respect to the EGYPTAIR EXPRESS operation:

1) Egyptian Civil Aviation Regulations;

2) The EGYPTAIR EXPRESS Operations Specifications;

3) Aviation safety standards and safe operating practices;

4) Appropriate maintenance and airworthiness requirement;

5) Related manuals.

iv. Direct Subordinates:

a. Contract Manager

b. Documentation Manager

c. Engineering and Planning Manager

d. Maintenance Manager

Note: Both Maintenance Director and Chief Inspector are accepted by the ECAA.

Any change or vacancy more than one month in the above positions shall be

notified promptly to the ECAA.

4.2.10. Position: Contract Manager

Reports to: Maintenance Director

i. Qualifications and Prerequisite of Contract Manager:

a. Knowledge:

1) Having a suitable engineering degree. 

2) Knowledge of products / services in the area of his responsibility and

related methods, sequences, processes and systems

3) Have an appropriate license. 

b. Skills: 

1) Computer usage skills

2) Having a good command of written and spoken English language.

c. Training:

Satisfactorily completed the following courses:

1) Course on MCM

Page 92: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 13 of 18

Issue Date: 4 Aug 2012

2) Course on the effect of human factors and human performance limitations

in maintenance

3) Course on Part 121 L and Part 145 and the related parts

4) Passed approved type courses on the aircraft operated by EGYPTAIR

EXPRESS

d. Experience

Has an experience in the field of aircraft maintenance for a period not less

than 3 years.

ii. Duties and Responsibilities:

1) Prepare and administer contracts with the maintenance provider(s).

2) Administer warranty and guarantee programs.

3) Determine spares pooling needs.

4.2.11. Position: Documentation Manager

Reports to: Maintenance Director

i. Qualifications and Prerequisite of Documentation Manager:

a. Knowledge:

1) Having a suitable engineering degree. 

2) Knowledge of products / services in the area of his responsibility and

related methods, sequences, processes and systems

3) Have an appropriate license. 

b. Skills:  

1) Computer usage skills

2) Having a good command of written and spoken English language.

c. Training:

Satisfactorily completed the following courses:

1) Course on MCM.

2) Course on the effect of human factors and human performance limitations

in maintenance

3) Course on Part 121 L and Part 145 and the related parts

4) Passed approved type courses on the aircraft operated by EGYPTAIR

EXPRESS

d. Experience

Page 93: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 14 of 18

Issue Date: 4 Aug 2012

Has an experience in the field of aircraft maintenance for a period not less

than 3 years.

ii. Duties and Responsibilities:

a. Ensure the identification and arrangement for the reception of required

documentation and data from external sources in timely manner to satisfy

operational requirements.

b. Ensure that the Airworthiness Data is current and readily available for use by

maintenance personnel whenever and wherever required for the

performance of maintenance through a preset document supply and

distribution system.

c. Ensure that a list is periodically issued at suitable time intervals and at times

of document changes for all applicable technical data and documentation to

identify the organizational documents, titles and current status of each

document as accepted or approved by the Authority, as applicable.

d. Ensure that the contracted maintenance organization shall have processes to

ensure the content of documentation used directly in the conduct or support

of maintenance operation 

1) Is readily identifiable and accessible to maintenance personnel;

2) Contains information that is clear, legible and accurately represented;

3) Is written in a language understood by maintenance personnel;

4) Is presented in a logical and consistent format that permits ease of use

by maintenance personnel;

4.2.12. Position: Engineering and Planning Manager

Reports to: Maintenance Director

i. Qualifications and Prerequisite of Engineering and Planning Manager

a. Knowledge:

1) Having a suitable engineering degree.

2) Knowledge of products / services in the area of his responsibility and

related methods, sequences, processes and systems

3) Have an appropriate license. 

b. Skills:

1) Computer usage skills

Page 94: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 15 of 18

Issue Date: 4 Aug 2012

2) Having a good command of written and spoken English language.

c. Training:

Satisfactorily completed the following courses:

1) Course on MCM

2) Course on the effect of human factors and human performance limitations

in maintenance

3) Course on Part 121 L and Part 145 and the related parts

4) Passed approved type courses on the aircraft operated by EGYPTAIR

EXPRESS

5) Planning Engineer course

d. Experience

Have an Engineering experience in the aviation field for not less than ten years.

ii. Duties and responsibilities for Engineering Manager:

a. Monitor the issue, approval and implementation of the different maintenance

programs for different aircraft.

b. Ensure and follow up on the accomplishment of all applicable AD’s,

mandatory and alert requirements, modifications, service bulletins and

engineering orders

c. Review all engineering documents for contents and accuracy.

d. Ensure that all changes, modifications and modernization actions performed

on flight equipment shall meet airworthiness criteria and certification

requirements.

e. Ensure that maintenance provider provide correct and current instructions

and approved data, procedures and drawings as required by which

maintenance personnel may perform the required maintenance.

iii. Duties and responsibilities for Planning Manager:

a. Ensure maintaining of timely record of aircraft hours and cycles flown to

ensure that planned maintenance for airframe, engines and components are

scheduled within approved time limitations;

b. Monitor Aircraft Maintenance Programs and assures publications of these

programs in applicable documents;

Page 95: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 16 of 18

Issue Date: 4 Aug 2012

c. Forcasting all fleet maintenance checks of each type according to the

approved Customized Maintenance Program;

d. Monitor and review completion of scheduled work packages..

4.2.13. Position: Maintenance Manager

Reports to: Maintenance Director

i. Qualifications and Prerequisite of Maintenance Manager:

a. Knowledge:

1) Having a suitable engineering degree.

2) Knowledge of products / services in the area of his responsibility and

related methods, sequences, processes and systems

3) Have an appropriate license.

b. Skills:

1) Computer usage skills

2) Having a good command of written and spoken English language.

c. Training:

Satisfactorily completed the following courses:

1) Course on MCM

2) Course on the effect of human factors and human performance limitations

in maintenance

3) Course on Part 121 L and Part 145 and the related parts

4) Passed approved type courses on the aircraft operated by EGYPTAIR

EXPRESS

e. Experience

Have an aircraft / component maintenance experience for at least 3 years on

large aircrafts

i. Duties and Responsibilities:

a. ,Ensure maintenance operations carried out by maintenance provider are full

compliance with the following:

1) ECAA requirements;

2) Standards established by EGYPTAIR EXPRESS in MCM.

3) Conditions and restrictions of the AOC;

4) Standards established by manufactures

Page 96: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 17 of 18

Issue Date: 4 Aug 2012

b. Assure the proper dispatch of aircraft, with regard to:

1) The requirements of ECAA and other applicable operating rules

2) The conformity with type design

3) The control of defects The availability of spare parts

c. Ensure that all housekeeping requirements are maintained.

d. Ensure that Hangar is adequately equipped with tools and equipment

required to perform the job

e. Maintain a standard of aircraft cleanliness and appearance.

5. Forms:

N.A

Page 97: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 18 of 18

Issue Date: 4 Aug 2012

This Page Intentionally left Blank

Page 98: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 4

Issue Date: 4 Aug 2012

1.03 Provisions of Resources

1. Objective:

To define the Resources requirements for EGYPTAIR EXPRESS maintenance

management and quality monitoring personnel

2. References:

ECAR 121.369(d) and 121.369(b)

3. Responsibility: 3.1. Chairman

3.2. Maintenance Director

4. Description:

4.1. Facility Requirements for maintenance management and quality monitoring

EGYPTAIR EXPRESS identifies, provides and maintains the infrastructure

necessary to produce safe and secure operations, to include support facilities,

services and equipment, This include

4.1.1. Office accommodation at EGYPTAIR Headquarter.

4.1.2. Offices at the Maintenance Contractor Facilities.

4.1.3. The above offices are provided with sufficient communication facilities

(telephones, facsimile machines and online computers).

4.1.4. The above rooms have:

i. Adequate lighting.

ii. Adequate air conditioning.

iii. Low noise level.

iv. Adequate cleanliness, noise and pollution

4.2. Manpower Resources

4.2.1. EGYPTAIR EXPRESS management personnel currently consists of (five)

fully qualified personnel. This is to ensure maintenance of all aircraft is

Page 99: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 4

Issue Date: 4 Aug 2012

maintenance is carried out in accordance with policies and procedures

contained in the Maintenance Control Manual..

4.2.2. Any position within EGYPTAIR EXPRESS maintenance organization its

maintenance operations is subject to a selection criteria that assures that

the selected personnel possess the knowledge, skills, training and

experience appropriate to the relevant position they hold. A prerequisite

criterion is set against which candidates are evaluated to ensure

personnel are appropriately qualified for all positions including

management positions

4.2.3. To ensure EGYPTAIR EXPRESS organizational stability, EGYPTAIR

EXPRESS shall maintain sufficient staff of permanent employees.

4.3. Requirements of Clauses 4.1 and 4.2 above shall be applicable for EGYPTAIR

MAINTENANCE AND ENGINEERING as the Maintenance Contractor for all

EGYPTAIR EXPRESS maintenance operations.

4.4. EGYPTAIR MAINTENANCE & ENGINEERING shall specifically have the

necessary facilities, workspace, equipment, personnel, supporting services and

work environment as necessary to ensure the implementation of the following

management and control functions:

4.4.1. the initial development of the maintenance schedule;

4.4.2. scheduling maintenance, elementary work and servicing to be performed within

the time constraints specified in the approved maintenance schedule;

4.4.3. scheduling the accomplishment of Airworthiness Directives (ADs);

4.4.4. operation of an evaluation program to ensure that all required procedures

and, in particular the maintenance schedule, continue to be effective and

in compliance with the applicable regulations;

4.4.5. the proper dispatch of aircraft, with regard to:

i. control of defects;

ii. availability of spare parts;

iii. conformity with the type design;

iv. Requirements of other applicable operating rules.

4.5. For Certifying (Release to Service) staff the following shall be met:

Page 100: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

4.5.1. Certifying (Release to Service) staff shall be certificated by authorized persons

according to ECAR Part 65 or an equivalent standard accepted by the ECAA,

and ECAR Part 145.

4.5.2. Required inspection item personnel, or personnel performing duplicate

inspections shall be independent from related production functions, at least

during the time of performing inspection work.

4.5.3. Staff shall be able to show relevant knowledge, background and appropriate

experience related to aircraft continuing airworthiness.

4.5.4. All staff shall have appropriate initial and continuation training to perform their

allocated tasks.

4.5.5. The qualification of all personnel involved in continuing airworthiness

management shall be appropriately recorded. Records shall include name,

employee number, birth date, title, training, initial and continuous, qualifications,

authorizations of certifying personnel and personnel performing required

inspection functions.

4.5.6. At least 50% percent of the required task force shall be permanent employees.

4.5.7. All maintenance personnel shall be relieved from duty for a period of at least 24

consecutive hours during any seven consecutive days or the equivalent thereof

within any one month.

4.5.8. All Certifying (Release to Service) staff shall be subjected to a program to

prevent the use of prohibited drugs and misuse of Alcohol.

4.5.9. Each of the certifying staff shall be given a written document describing the

extent of his responsibilities, authorities and inspection limitations and validity.

Such document shall be available for inspection upon request by authorized

4.5.10. Representatives from EGYPTAIR EXPRESS, within a maximum period of 24

hours.

4.6. Inspection authority (ECAA)

EGYPTAIR EXPRESS shall allow ECAA or its representative, at any time or place,

to make inspections or tests to determine compliance with Egyptian Law number

Page 101: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

28, the Egyptian Civil Aviation Regulations, operating certificate and operations

specifications, or eligibility to continue to hold certificate

5. Forms N/A

Page 102: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

1.04 Communication

1. Objective:

Ensure effective exchange of operationally relevant information throughout the

management system for maintenance operations and with each maintenance

organization that performs maintenance for EGYPTAIR EXPRESS.

2. References:

121.369(d)

3. Responsibility:

3.1. Maintenance Director

3.2. Chief Inspector.

4. Description:

EGYPTAIR EXPRESS shall have a communication system that enables and ensures

an effective exchange of operationally relevant information throughout the

management system for maintenance operations and with each maintenance

organization that performs maintenance for EGYPTAIR EXPRESS

The communication system facilitate the reporting of operational deficiencies,

hazards or concerns by operational personnel

The communication system consists of:

4.1. Telephones,

4.2. Facsimile machines

4.3. Online computers

4.4. Meetings

4.4.1. Daily Meeting (Daily work load plan)

i. Objective of this meeting is to discuss the daily work load and technical delays.

ii. Attendances:

1) Maintenance Director

2) AMO Maintenance Director.

3) AMO scheduling and planning director.

4) AMO line maintenance managers.

Page 103: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4Amen. No.: 01 Page 2 of 2

Issue Date: 4 Aug 2012

i. Objective of this meeting is to discuss weekly Technical delays, define the

root causes with Contracted AMO to resolve problems as will as to have the

current status of aircraft maintenance.

ii. Attendances:

1) The Maintenance Contractor Accountable Manager

2) All concerned managers of The Maintenance Contractor

3) EGYPTAIR EXPRESS Maintenance Director

4.4.3. Monthly meeting : (Reliability Control Board (RCB) meeting)

i. Objective of this meeting is to:

1) Monitoring on a continuous basis repetitive incidents and defects occurring

in flight or found during maintenance, highlighting any that are repetitive

or that appear significant. All items identified as repeated discrepancies

shall be highlighted for the purpose of tracking and follow-up.

2) Monitoring on a continuous basis carry forward defects.

3) Analyzing unscheduled component removals, shop findings and the

performance of aircraft systems for use as part of the maintenance

program efficiency .

ii. Attendances:

1) The Maintenance Contractor Accountable Manager

2) All concerned managers of The Maintenance Contractor

3) EGYPTAIR EXPRESS Chief Inspector

4.4.4. A quality Management review meeting shall be made periodically (once each

six months) headed by EGYPTAIR EXPRESS Chairman and attended by

senior managers and managers of maintenance operational activities for

evaluation of audit outputs, findings, progresses, corrective and preventive

actions and the compliance with set requirements.

4.4.5. Half yearly meeting : (EGYPTAIR Holding company Safety Board)

4.5. Information bulletins which will be distributed to whom it may concern

5. Forms

Form . 210 Information Bulletin

Page 104: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 18

Issue Date: 15 Apr 2012

1.05 Documentation System

1. Objective:

To set the policy for handling Airworthiness (Maintenance) Data, documents and

procedure for issue and/or renewal of aircraft certificates.

2. References:

ECAR 39.1, 39.3, 39.5, 91.203.

ECAR 121.3(c), 121.23, 121.73, 121.75, 121.79, 121.135, Appendix K

3. Responsibility

3.1. Chief Inspector: to apply to ECAA for A/Cs certifacates issuing and renewal

3.2. Maintenance Director: to ensure that the contracted maintenance organization

have a management and control system for documentation and technical data

used directly in the conduct or support of maintenance operations

4. Description:

4.1. Airworthiness Data:

4.1.1. Airworthiness Data includes all technical data used during aircraft

maintenance. Airworthiness data shall be accepted or approved by

ECAA (approved Data). Airworthiness Data issued by Type Certificate

Holder data and Supplemental Type Certificate Holder are considered

as accepted by ECAA.

4.1.2. Airworthiness Data includes, but not limited to:

i. Manufactures Airworthiness Data.

a. Maintenance Planning Document (MPD)

b. Aircraft maintenance manual(AMM)

c. Structural repair manual (SRM)

d. Illustrated Parts Catalogues (IPC).

e. Component maintenance manual (CMM)

Page 105: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 18

Issue Date: 15 Apr 2012

f. Engine maintenance manual (EMM)

g. Alert/recommended service bulletins (inspections or modifications) (SBs)

h. Aircraft flight manuals (AFM)

i. Master minimum equipment list (MMEL)

j. Miscellaneous publications.

k. Service bulletins (inspection or modifications) (SB's)

l. Service letters/field notes/maintenance tips …etc (SL, FN, MT)

ii. Authorities Data:

a. Airworthiness directives(AD's)

b. Egyptian Civil Aviation Regulations (ECAR).

c. Egyptian Aviation Circulars (EAC)

iii. EGYPTAIR EXPRESS originated technical data and controlled by chief

inspector

a. Maintenance Control manual (MCM).

b. Outstation Hand Book

c. Customized Maintenance Programs (MP)

d. Customized minimum equipment list (MEL)

4.2. Contracted maintenance organization documentation and technical data

4.2.1. EGYPTAIR EXPRESS has assigned EGYPTAIR MAINTENANCE AND

ENGINEERING to obtain and assess all Continuing Airworthiness information

as mentioned in 4.1.2

4.2.2. Maintenance director shall ensure that EGYPTAIR MAINTENANCE AND

ENGINEERING has a management and control system for documentation and

technical data used directly in the conduct or support of maintenance

operations that include processes for:

i. Identifying the current version of maintenance documents;

Page 106: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 18

Issue Date: 15 Apr 2012

ii. Distribution list to ensure the availability of the current version of applicable

maintenance documentation and technical data:

a. In all areas where maintenance is conducted;

b. To external maintenance organizations that perform maintenance for EGYPTAIR

EXPRESS.

iii. Review and revision as necessary to maintain the currency of information

contained in maintenance documents;

iv. Retention of engineering and maintenance documents that permits easy

reference and accessibility;

v. Identification and control of obsolete and/or reproduced documents;

vi. Retention and dissemination of documentation received from external

sources, to include manuals and documents from ECAA and original

equipment manufacturers.

4.2.3. The requested and purchased documents and their future continuing revision

are copied and delivered by TPD to the DTP of the requesting user (with the

acknowledgement of receipt) as well as to the TPD for archiving. DTP sends it

to its requesting user.

4.2.4. Responsible for the procurement in proper time, release, recording,

distribution and revision of the documentation that is needed to maintain

aircraft and aircraft components / tools and equipment

4.2.5. Ensure that the latest versions of documentation are always available to users.

4.2.6. Documentation may be provided by vendors / manufacturers either hard copy,

via electronic media or by subscribing through website.

4.2.7. Lists of valid documentation are to be kept, thus enabling the user to check the

revision status of the documents he is using.

4.2.8. In cases of doubt and before they use the documentation, users are to check

against the list of valid documentation that the documents they are using for

the work are valid, suitable for the intended purpose and, where applicable,

specific to an individual customer. If necessary, users are to ask the TPD

whether the documentation is up to date.

Page 107: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 18

Issue Date: 15 Apr 2012

4.2.9. Technical documentation in the object of this described procedure includes the

following characteristic:

i. Documents will be registered, centrally distributed and revision controlled,

ii. Documents will be provided for general access to the technical staff.

iii. Distribution List

4.2.10. A list of technical publications is established in the AMO engineering

directorate and handled in the TPD. This form records all documents which

should be kept in the TPD and to where they will be distributed.

4.2.11. A distribution list of EGYPTAIR EXPRESS originated technical data is

established in the Document

4.2.12. The administration of the distribution list (includes addition and cancellation

of users as well as the correction of user document relation) is the task of

each DTP and is centrally controlled by TPD with engineering consultation or

Chief Inspector for TPDL revising.

4.2.13. Administration of Distribution List:

i. DTP carries out the administration of distribution list to ensure document

distribution and document revision

ii. Revisions will be delivered with an acknowledgement receipt

4.2.14. Revision Control: Technical Publication department is responsible to issue an

updated list describing the current revision status of each controlled

publications. This list will be distributed to all DTP libraries and will be

accessible to all technical staff. Each DTP librarian is responsible to maintain

the current revision status list issued by TPD. The TPD is responsible for the

document revision intervals to be under control.

4.2.15. The user has the obligation for using relevant revised documents only. In

case of doubt the user has to check the status of revision via his DTP or

TPD.

4.2.16. Guarantee of Quality: TPD is responsible for the content of documentation

used directly in the conduct or support of maintenance operations:

i. Contains information that is clear, legible and accurate;

ii. Is presented in a format appropriate for appropriate for use by maintenance

personnel;

Page 108: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 5 of 18

Issue Date: 15 Apr 2012

iii. Is accepted or approved by ECAA, if applicable.

4.2.17. TPD is responsible for the quality guarantee for the entire technical

publication process.

4.2.18. The TPD procures, hold and control all referenced information and employs

computer systems in liaison with information technology to ensure flow of

referenced information.

4.2.19. All referenced information borrowed from the TPD shall be entered in the

borrowing log book, signed by the borrowing party and shall be returned to

the library within the specified time limit

4.2.20. In the event a manager wishes to keep a document which is obsolete for

personal reference, the manager shall return the obsolete document to the

library with a written request. The library staff will confirm no further updates

are available, stamp the document as, “UNCONTROLLED COPY” and

remove its library reference number. The document will be then returned to

the manager for his / her reference.

4.2.21. All drawings withdrawn from the TPD shall be checked by the end users

against the TPD control index to ensure the latest revision status. Drawings

observed not to be at the latest revision shall be reported to TPD with a

request to purchase when necessary.

4.2.22. The TPD / DTP’s staff are responsible for monitoring the loan register. Initiate

follow-up to borrowers for manuals not returned to the library that exceeds

the loan period. Disciplinary action shall be taken in case of breaches

4.2.23. TPD manager / DTP’s supervisors are responsible for the control and

maintaining current technical data in a good environmental condition.

4.2.24. Technical Publication Control:

Upon receipt of Technical Publications or revisions at (TPD), the following is

to be done:

i. Master Index Card (Vendor Control Card) will be checked. If not in existence,

then a new card to be issued.

ii. Cross check publications issue or revisions date with Manufacturer

Publication Index Manual, and or Vendor on annual basis.

Page 109: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 6 of 18

Issue Date: 15 Apr 2012

iii. Check with the index, mark index and sign Vendor Control Card. Stamp the

received copies and distribute them.

iv. Control of “loose” documented that is not held within a manual.

v. Each “loose” documented procedure that is not held within a manual

includes:

vi. A title page that identifies the operational applicability and functionality;

vii. Identification of the date(s) of issue and date of effectiveness;

viii. Reference numbers for the content;

ix. A distribution list;

x. Identification of responsibility for authorizing the document

4.2.25. Temporary Revisions Control:

i. Temporary loose-leaf revisions to the various manuals sent to all holders of

such documents are to be filed in binders.

ii. Dividers within the manuals subdivide them into sections for filing respective

temporary revisions on Maintenance Manual, Wiring, and Engines. etc… as

applicable.

iii. Whenever a temporary revision is received from the (TPD) it will be checked

and the affected ATA be marked with the circle around the ATA number. The

circle is used in order to alert future users, that a temporary revision is filed in

the binder.

4.2.26. Electronic Manual Control

i. Download the up-dated data.

ii. Re-produce the downloaded data on CD and mark it with Revision number

highlighted by temporary revision.

iii. Record the person who downloaded the data, date at which data was

downloaded and documents which will be affected.

iv. Identify the CD with the user or control number.

v. Distribute the data to Intranet, DTP’s and End users.

vi. The end user will be responsible to reflect the revision on the affected manual.

4.2.27. To preclude the loss of documents due to hardware or software failures, the

electronic system is programmed to create back-up files on a schedule that

Page 110: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 7 of 18

Issue Date: 15 Apr 2012

ensures records are never lost. To ensure retrieval of archived documents,

applicable hardware and/or software is retained after it has been replaced

4.2.28. Computer documents backups shall be updated promptly whenever a

change or amendment of its source is made. They shall also be stored in a

safe place away from the area in which the original computers are located.

4.2.29. The contracted maintenance organization shall ensure retention and

dissemination of documentation received from external sources

4.2.30. For “loose” documented that is not held within a manual it should have:

i. Title page that identifies the operational applicability and functionality;

ii. Identification of the date(s) of issue and date of effectiveness;

iii. Reference numbers for the content

iv. Distribution list

v. Identification of responsibility for authorizing the document

4.2.31. Publications control:

The procedure for controlling the Aircraft Publications at each respective

section is the responsibility of each head section.

In case of any missing revisions or out dated manuals, the respective

section will write to Technical Publications Department (TPD) in order to

initiate a corrective action and such manual will be isolated to prevent its

usage until confirmation is received.

4.3. Quality Documents:

4.3.1. The following documents constitute Organization Quality Documents. And

shall be published, distributed and amended:

i. Maintenance Control Manual,

ii. Egyptian Civil Aviation Regulation

iii. Maintenance Organization Exposition for EGYPTAIR M&E as a main

maintenance provider

iv. Outstations Handbook

4.3.2. Quality Documents that are related to the implementation of the Maintenance

Control Manual and issued by the maintenance provider (EGYPTAIR M&E)

Page 111: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 8 of 18

Issue Date: 15 Apr 2012

shall in no way contradict with the Maintenance Control Manual. If exists any

difference, the Maintenance Control Manual shall prevail.

4.4. Documents On-board Aircraft:

The following documents should be presented on-board the aircraft in the

correct condition, and validity:

4.4.1. Documents

i. Registration certificate, issued by ECAA, original copy.

ii. An appropriate and current Airworthiness certificate,

Note: master copy, for aircraft undergoing a flight test after maintenance,

airworthiness certificate may be replaced by a special flight permit

approved by the Authority.

iii. Noise certificate, issued by ECAA, original copy.

iv. A true copy of the Air Operator certificate, issued by ECAA.

v. Certificate of radio station, issued by Egyptian telecommunication

authority,

vi. Insurance certificate, issued by an appropriate insurance company, a

photocopy.

vii. Permission of aircraft to fly or land in the Egyptian territories issued by

ECAA, master copy

4.4.2. Manuals

i. original copy The approved aircraft flight manual

ii. The company related manuals

iii. The operations specifications, a copy.

iv. Aircraft operation manual, or flight crew operations manual, as applicable

v. Copy of aircraft airworthiness Data

vi. A copy of Minimum equipment list

vii. CDL,

viii. Weight and Balance Manual including aircraft last approved weighing

report.

4.4.3. Additional information and forms

Page 112: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 9 of 18

Issue Date: 15 Apr 2012

i. Aircraft Technical Log including last executed letter check, line

maintenance checks, and certificate of release to service

ii. N/A

iii. Deferred defect Log.

iv. Cabin log and deferred cabin item log.

v. Passenger information and emergencies briefing cards at the back of each

seat

4.5. Air Operator Certificate (AOC)

4.5.1. EGYPTAIR EXPRESS Air Operator Certificate (AOC) is authorize

EGYPTAIR EXPRESS to conduct commercial air transport operations in

accordance with the operations specifications authorizations, limitations,

and procedures for technical and operational activities

4.5.2. The operations specifications that are issued with the AOC are a part of

that certificate

4.5.3. The Air Operator Certificate (AOC) shall contain the following:

i. Unique AOC number, as issued by the State of the Operator.

ii. Date after which the AOC ceases being valid (dd-mm-yyyy).

iii. EGYPTAIR EXPRESS registered name.

iv. EGYPTAIR EXPRESS trading name ,if different. Insert “Dba” before

the trading name (for “Doing business as”).

v. The contact details include the telephone and fax numbers,

including the country code, and the e-mail address at which

operational management can be contacted without undue delay for

issues related to flight operations, airworthiness, flight and cabin

crew competency, dangerous goods and other matters as

appropriate.

vi. EGYPTAIR EXPRESS principal place of business address.

vii. EGYPTAIR EXPRESS principal place of business telephone and fax

details, including the country code. E-mail to be provided if available

viii. The controlled document, carried on board, in which the contact

details are listed, with the appropriate paragraph or page reference.

Page 113: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 10 of 18

Issue Date: 15 Apr 2012

E.g.: “Contact details … are listed in the operations Manual,

Gen/Basic, Chapter 1, 1.1”; or “…are listed in an attachment to this

document”.

ix. Operator registered name.

x. reference to the appropriate Egyptian Civil Aviation Regulations (

ECARs )

xi. Issuance date of the AOC (dd-mm-yyyy).

xii. Title, name and signature of the ECAA representative. In addition,

an official stamp applied on the AOC

4.5.4. In no way shall any part of the MCM be contradicting with the EGYPTAIR

EXPRESS Operation Specification.

4.5.5. Availability of certificate and Operations Specifications

i. EGYPTAIR EXPRESS shall make operating certificate and operations

specifications available for inspections at principal operations office;

ii. EGYPTAIR EXPRESS shall have on board of each aircraft a certified true

copy of operating certificate and operations specifications

4.5.6. Validity of AOC

Unless being surrendered or revoked by ECAA, The AOC remains valid as

long as it is renewed yearly and EGYPTAIR EXPRESS remains in

compliance with the regulatory requirements, ECAA representatives are

allowed to carry out the necessary review for the organization, and all ECAA

findings, as requested, are appropriately carried out.

4.5.7. If ECAA suspends or revokes EGYPTAIR EXPRESS AOC, the certificate

shall be returned to the ECAA, immediately

4.5.8. Limitations of the AOC:

The Air Operator Certificate shall be read in conjunction with and be

bounded by the limitations in the Operations Specifications

4.6. Operations Specifications

4.6.1. Chief Inspector is responsibil for preparing and applying for Operations

Specifications technical amendments approval

4.6.2. Operations Specifications shall be issued for each aircraft model

Page 114: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 11 of 18

Issue Date: 15 Apr 2012

4.6.3. For each aircraft model in EGYPTAIR EXPRESS fleet, identified by aircraft

make, model and series, the following list of authorizations, conditions and

limitations shall be included: ECAA contact details, operator name and AOC

number, date of issue and signature of the ECAA representative, aircraft

model, types and area of operations, special limitations and authorizations.

4.6.4. The Operations Specifications shall contain the following :

i. Telephone and fax contact details of ECAA, including the country code. E-

mail to be provided if available.

ii. AOC number.

iii. EGYPTAIR EXPRESS registered name and the trading name,

iv. The trading name (for “Doing business as”).

v. Issuance date of the operations specifications (dd-mm-yyyy) and signature

of the ECAA representative.

vi. Aircraft make, model and series, or master series, if a series has been

designated (e.g. ERJ170- LR100).

vii. Other type of transportation to be specified (e.g. emergency medical

service).

viii. Listing of geographical area(s) of authorized operation (by geographical

coordinates or specific routes, flight information region or national or

regional boundaries).

ix. Listing of applicable special limitations (e.g. VFR only, Day only, etc.).

x. List in this column the most permissive criteria for each approval or the

approval type (with appropriate criteria).

xi. Applicable precision approach category: CAT I, II, IIIA, IIIB or IIIC. Insertion

of minimum RVR in meters and Decision Height in feet. One line is used per

listed approach category.

xii. Approved minimum take-off RVR in meters. One line per approval may be

used if different approvals are granted.

xiii. Not Applicable (N/A) box may be checked only if the aircraft maximum

ceiling is below FL290.

xiv. N/A

Page 115: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 12 of 18

Issue Date: 15 Apr 2012

xv. The threshold distance may also be listed (in nm), as well as the engine

type.

xvi. Performance-based Navigation (PBN): one line is used for each PBN

specifications authorization (e.g.RNAV 10, RNAV 1, RNP 4,…), with

appropriate limitations or conditions listed in the “Specific Approvals”

and/or “Remarks” columns.

xvii. Limitations, conditions and regulatory basis for operational approval

associated with the Performance- based Navigation specifications (e.g.

GNSS, DME/DME/IRU …).

xviii. Name of the person/organization, responsible for ensuring that the

continuing airworthiness of the aircraft is maintained and the regulation

which requires the work, i.e. within the AOC regulation or a specific

approval (e.g. EC2042/2003, Part M, and Subpart G).

xix. Other authorizations or data can be entered using one line (or one multi-line

block) per authorization (e.g. special approach authorization, MNPS,

approved navigation performance, etc.).

4.6.5. Amendments to the Operations Specifications

i. In case of a required amendment, EGYPTAIR EXPRESS submits to

ECAA, in writing, necessary information, views and documents regarding

the proposed amendment, in due time, for approval and issue on

respective form.

ii. If ECAA finds that an amendment is an emergency requiring immediate

action for the sake of aviation safety, this amendment shall be applied

promptly.

iii. Copy of the Operations Specifications will be kept at the Chief Inspector

office.

iv. EGYPTAIR EXPRESS is responsible to keep its copy to the latest revision.

4.7. Aircraft Certificates

Before proceeding for requiring the issuance of any aircraft certificate from

ECAA the aircraft type certificate shall be either validated or accepted by ECAA.

Page 116: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 13 of 18

Issue Date: 15 Apr 2012

For an aircraft type that is to be used within Arab Republic of Egypt for the first

time, type and supplmental type certificate data sheets shall be forwarded to

ECAA for validation or acceptance.

4.7.1. Certificate of Registration:

i. EGYPTAIR EXPRESS shall make a certificate of registration for each

aircraft according to ECAA requirements.

ii. An application containing the necessary information for the issue

Certificate of Registration

iii. Follow up on the certificate issue and compliance with regulatory

requirements is the Chief Inspector responsibility

iv. Any fees required by ECAA will be handled by the Chief Inspector Office.

v. The master copy of the aircraft registration certificate shall be retained on-

board the specific aircraft.

vi. A copy of the certificate is to be retained within aircraft records.

vii. The application for registration certificate issue shall be forwarded to

ECAA via the Chief Inspector. A copy of the type certification data sheet is

to be attached to the application if the aircraft type has not for previously

entered in the Egyptian registry.

viii. The following documents are to be attached to the application for

certificate of registration issue:

a. A copy of A/C purchase contract.

b. A copy of the insurance certificate.

c. A copy of A/C weight and balance report.

d. A copy of certificate of origin.

e. A copy of foreign Noise certificate.

f. A copy of Export license.

g. Certificate of registration is not renewable:

4.7.2. Airworthiness Certificate:

i. An aircraft shall not fly if the certificate of airworthiness expiration date is

invalid; or

Page 117: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 14 of 18

Issue Date: 15 Apr 2012

a. The continuing airworthiness of the aircraft or any component fitted to it

does not meet the regulatory requirements, or;

b. The aircraft does not remain in conformity with the approved type design;

or

c. The aircraft has been operated beyond the limitations of its approved

flight manual or the airworthiness certificate without appropriate action

being taken; or

d. The aircraft has been involved in an accident or incident that affects the

airworthiness of the aircraft, without subsequent appropriate action to

restore airworthiness; or

e. A major modification or major repair has not been appropriately

approved.

ii. Issue of Airworthiness Certificate:

To issue an airworthiness certificate for an aircraft the following documents

are required

a. Export C of A or valid C of A for used aircraft

b. Approved flight manual

c. Current weight and balance report

d. Aircraft minimum equipment list

e. Cabin configuration

f. Maintenance program data

g. Manufacturer’s manuals

h. Compass correction card

i. Radio station license

j. Status of aircraft configuration

k. List of deviations from approved specifications

l. List of safety equipment.

m. Noise certificate.

Page 118: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 15 of 18

Issue Date: 15 Apr 2012

Note: For used A/C and in addition to the above items, the following records should be

provided :

a. Last major check carried out

b. Last check carried out

c. List of incidents and accidents.

d. Major repairs carried out

e. List and status of aircraft, routable and life-limited parts

f. Reports of flight tests carried out

iii. Renewal of Airworthiness Certificate:

a. Apply to ECAA for renewal of an existing certificate of Airworthiness on

respective form one month before expiry date

b. Attach relevant documents justifying that all requirements are satisfied,

c. Carry out an Airworthiness review/inspection on the aircraft,

d. Allow ECAA to carry out an Airworthiness review/inspection on the

aircraft,

e. Have all maintenance, as requested, carried out,

f. Unless limited by ECAA, the certificate of Airworthiness is valid for one

year.

g. To renew an Airworthiness certificate for an aircraft, the following

documents are required:

h. Performed maintenance checks during the last year

i. Last major check carried out

j. List of incidents and accidents during the last year.

k. Major repairs carried out during the last year

l. AD compliance status

m. Status of life-limited parts

n. Reports of flight tests carried out.

o. Any fees required by ECAA will be handled by the Chief Inspector

Office.

Page 119: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 16 of 18

Issue Date: 15 Apr 2012

p. After issuing or, renewal, the master copy of certificate of Airworthiness,

it will be kept on board the concerned aircraft and a copy will be filed in

the aircraft file at the Records Section.

q. If a repair or an alteration results in a change in the aircraft operating

limitations or flight data contained in the approved flight manual, those

operating limitations or flight data shall be appropriately approved

4.7.3. Insurance Certificate:

i. EGYPTAIR EXPRESS shall make a fleet certificate of insurance on all its

aircraft. Certificate shall contain necessary aircraft data.

ii. Follow up on the renewal/extension/re-issue and compliance with

regulatory requirements is the Chief Inspector responsibility.

iii. A copy of the aircraft insurance certificate will be retained on-board each

aircraft.

iv. The certificate is renewed annually.

4.7.4. Radio License:

i. EGYPTAIR EXPRESS shall make for each aircraft a radio certificate.

Certificate shall contain necessary aircraft and aircraft radio equipment

data.

ii. Follow up on the renewal/modification/re-issue and compliance with

regulatory requirements is the Chief Inspector responsibility.

iii. The master copy of the aircraft radio certificate will be retained on-board

the specific aircraft.

iv. The Certificate contains technical details about authorized on-board radio

equipment, output powers and frequencies.

v. A copy of the certificate is to be retained within aircraft records.

vi. The certificate is renewed annually

4.7.5. Noise Certificate:

i. EGYPTAIR EXPRESS shall make for each aircraft a Noise certificate.

Noise Certificate shall contain necessary aircraft data regarding aircraft

noise and weights with regard to ICAO Annex 16.

Page 120: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 17 of 18

Issue Date: 15 Apr 2012

ii. Follow up on the certificate issue or modification and compliance with

regulatory requirements is the Chief Inspector responsibility.

iii. The master copy of the aircraft noise certificate will be retained on-board

the specific aircraft.

iv. A copy of the certificate is to be retained within aircraft records.

v. Noise certificate is not renewable.

4.7.6. Permission for Aircraft to Fly or land in Egyptian Territories:

i. EGYPTAIR EXPRESS shall make for each aircraft a certificate authorizing

the aircraft to fly or land within the Egyptian territories.

ii. An application containing the necessary information for the issue or

renewal of Permission for aircraft to fly within or land in Egyptian territories

iii. Form shall be submitted to ECAA at least one month before date set for

start of operations for new issues and fifteen days before expiry date for

renewal.

iv. Any fees required by ECAA shall be handled by the Chief Inspector Office

v. Follow up on the certificate issue or renewal and compliance with

regulatory requirements is the Chief Inspector responsibility.

vi. Certificate is renewed yearly.

vii. The master copy of this certificate will be retained on-board the specific

aircraft.

viii. A copy of the certificate is to be retained within aircraft records.

4.8. Airworthiness Data follow up procedure :

4.8.1. Monthly check on manufacturs website shall be carried out by EGYPTAIR

EXPRESS Engineering Manager to stand on the latest issued Documents

4.8.2. A copy of Documents list from contracted A M O. Technical documents and

publications department shall be sent to engineering directory

4.8.3. Engineering Manager shall make a comparison between both above sources

to assure that all Documents issued by manufacturs were received by

maintenance contracted

Page 121: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 18 of 18

Issue Date: 15 Apr 2012

5. Forms:

N/A

Page 122: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:00 Page 1 of 8

Issue Date: 15 Apr 2012

1. 06 Maintenance Records System

1. Objective:

EGYPTAIR EXPRESS has a records system that ensures the fulfillment of operational

requirements is documented and retained,

2. References:

ECAR 43.13, 15, ECAR 91.417, 419& ECAR 121.376

3. Responsibility:

Function is subcontracted under the responsibility of the Chief Inspector

4. Description:

4. 1. General

Maintenance records are but not limited to:

4.1.1. Records used as the basis for issuing the Certificate of release to Service

(CRS) including the CRS for the aircraft/component and provide objective

evidence that the aircraft/component has been maintained correctly, and all

requirments for the singnig of maintenance release have been met .Using

methods techniques, and practices acceptable to ECAA. Such records include

also the CRS issued during maintenance work carried out by an approved

suppliers or the Maintenance Contractor

4.1.2. The total time and flight cycles, as appropriate, of the aircraft, engines,

components,

4.1.3. The time and flight cycles as appropriate, since last overhaul of the aircraft or

aircraft component subjected to an overhaul life;

4.1.4. The current status of all life-limited aircraft components indicates the component

life limitation, total number of hours, accumulated cycles or calendar time and

the number of hours/cycles/time remaining before the required expiry time of the

component is reached

4.1.5. The current aircraft inspection status such that compliance with the approved

EGYPTAIR EXPRESS aircraft maintenance program .

Page 123: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:00 Page 2 of 8

Issue Date: 15 Apr 2012

4.1.6. The current status of Airworthiness Directives (AD) identifies the applicable ADs

including revision or amendment numbers. Where an AD is generally applicable

to the aircraft or component type but is not applicable to the particular aircraft or

component, this is identified. The AD status includes the date on which the AD

was accomplished. If the AD is controlled by flight hours or flight cycles, it

includes the aircraft or engine or component total flight hours or cycles, as

appropriate. For repetitive ADs, only the last application is recorded in the AD

status. The status also specifies which part of a multi-part AD has been

accomplished and the method, where a choice is available in the AD.

4.1.7. Details of current modifications and repairs require substantiating data

supporting compliance with the airworthiness requirements. This can be in the

form of a Supplemental Type Certificate, Service Bulletin, Structural Repair

Manual or similar approved document. If the airworthiness data for modification

and repair is produced by EGYPTAIR MAINTENANCE AND ENGINEERING

according to relevant authority requirements, all necessary documentation and /

or approvals shall be retained. Scheduled maintenance requirements following

STC incorporation are to be clearly identified. Substantiating data including

drawings, instructions, reports, tests,… etc are to be retained as well

4. 2. Chief inspector responsibility

4.2.1. Insure the Maintenance Contractor maintaining the technical records as

Contractually agreed and are subjected to standardized processes for :

i. Identification;

ii. Legibility;

iii. Maintenance;

iv. Retention and retrieval;

v. Protection and security;

vi. Disposal /,transfer. deletion (for electronic records), and archiving

4.2.2. The level of detail shall be sufficient to determine, with reference to the

records, whether all the items of scheduled and unscheduled work including

troubleshooting, conform to the relevant data. This includes references to

the data applied (AMM,EM, TSM, WDM … etc.), if such data are not already

indicated in the (CRS).

Page 124: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:00 Page 3 of 8

Issue Date: 15 Apr 2012

4.2.3. Maintenance record entries: The person approving or disapproving the

release to service of an aircraft, airframe, aircraft engine, appliance, or

component part after any inspection performed in accordance with the

approved maintenance program, shall make an entry in the maintenance

record of that equipment containing the following information:

i. The type of inspection and a brief description of the inspection;  

ii. The  date  of  the  inspection  and  aircraft  total  time  in  service,  if  that  total  time  is  not 

tracked under an ECAA approved method; 

iii. The signature, the license number, and type of license held by the person approving or 

disapproving  for  release  to  service,  the  aircraft,  airframe,  aircraft  engine,  appliance, 

component part, or portions thereof; and 

iv. If the aircraft is found to be airworthy and approved for release to service, the following 

or  a  similarly worded  statement  should be used:  "I  certify  that  this  aircraft has been 

inspected  in  accordance  with  (insert  type  per  approved  maintenance  program) 

inspection and was determined to be in airworthy condition”. 

4.2.4. Maintenance records falsification, reproduction, or alteration

i. No person may make or cause to be made:

a. Any fraudulent or intentionally false entry in any record or report that is

required to be made, kept, or used to show compliance with any

requirement under this Part;

b. Any reproduction, for fraudulent purpose, of any record or report required

under this Part; or

c. Any alteration, for fraudulent purpose, of any record or report required

under this Part.

ii. The commission by any person of an act prohibited under paragraph (i) of

this section is a basis for suspending or revoking the applicable airman

license, operator certification, maintenance organization approval, or

production certificate, authorization, approval or product or process

specification issued by the ECAA and held by that person or company

4.2.5 The aircraft records will be filed and stored in such a manner that the

records will be readily accessible to authorized personnel.

Page 125: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:00 Page 4 of 8

Issue Date: 15 Apr 2012

4.2.6 The filing and storage system shall promote: - with ease of retrieval,

accessibility, and adequate controls.

4.2.7. When records will be maintained in a computer system, it shall have a back-up

system, which is to be updated within 24 hours of any maintenance. Each

terminal shall contain safeguards program against the ability of unauthorized

personnel to alter the database.

4.2.7 In outstations: the certifying staff will keep the maintenance records in the

outstations and send it on monthly bases to Cairo main base to be kept in

the maintenance records department

4. 3. Records maintaining program

4.3.1. EGYPTAIR EXPRESS shall regularly conduct an audit process to insure

that the following maintenance records are maintained by the Maintenance

Contractor;

i. Total time in service (accumulated hours, calendar times and cycles, as

appropriate, and those remaining before any life expiry is reached) of the

aircraft, engines and all life-limited components;

ii. Current status of compliance with all mandatory continuing airworthiness

information;

iii. Appropriate details of modifications and repairs;

iv. Time in service (hours, calendar time and cycles, as appropriate,) since last

overhaul of the aircraft, engines or its components subject to a mandatory

overhaul life;

v. Current aircraft status of compliance with the Maintenance Program;

vi. Detailed maintenance records to show that all requirements for signing of a

certificate of release to service have been met..

4.3.2. The Maintenance Contractor shall be committed to provide EGYPTAIR

EXPRESS with regular and eventual reports to support the continuous

airworthiness monitoring of the A/C. These reports include and are not

limited to the following:

Page 126: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:00 Page 5 of 8

Issue Date: 15 Apr 2012

Ser. Report type Frequency

i. Technical delay reports; Promptly

ii. Reliability reports including dispatch, sys. and components;

Monthly

iii. Copy of technical log pages; Daily

iv. Status of deferred defects including reasons for deferral; Daily

v.

Draft copy of BOW for maintenance events; proposed and executed and any additional work carried out outside this BOW; for acceptance by EGYPTAIR EXPRESS.

2 weeks in advance of each maintenance

event

vi. Periodic MP compliance status; Quarterly

vii. Requests for short term escalation due time; 1 day before due time

viii. ADs standard for Aircraft, Engines and Equipment; Promptly

ix. ADs compliance status for Aircraft, Engines and Equipment

Monthly

x. SBs and modification compliance status for Aircraft, engines and equipment;

Quarterly

xi. LLP and TCI intervals compliance status; Quarterly

xii. Copy of post maintenance events summary report; 2 weeks after each event

xiii. Details of modifications and repairs 2 weeks after execution

xiv. Maintenance events forecast plan; Quarterly

xv. Updating of Aircraft Hours and Cycles; Daily

xvi. Fortnight status report. Bi-weekly

4. 4. Methods of Records Retention

4.4.1. Maintenance records will be a paper record maintained as follows:

i. Paper records will be of robust material to withstand normal handling and filing

ensures records can remain legible throughout the required retention period.

ii. Paper records will be stored safely from fire, flood, theft and alteration.

iii. Access to the paper records will be restricted to the authorized personnel and

the Technical Records Section personnel.

iv. Upon work completion, all records will be maintained in the Records Section

and EGYPTAIR EXPRESS will be provided with a copy of each CRS and any

specific approved repair/modification.

Page 127: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:00 Page 6 of 8

Issue Date: 15 Apr 2012

v. All records shall be scanned in due time and kept on CDs as back up and are

to be stored in a different location from those containing the original records in

a safe storage environment and for the same required retention period.

4.4.2. Component Maintenance Record

The respective records section of the overhaul workshop is responsible to

i. retain all records generated during the accomplishment of the component

maintenance.

ii. These records including a copy of EASA Form One (JAA Form One)

are stored in a designated area that is fire proof & access controlled.

iii. The records are segregated by serial numbers.

4.4.3. Maintenance Records Retention Duration

Record Type Retention Period

i. Records containing total time in service, calendar time, flying times and cycles, as appropriate, of the aircraft, engines and life limited components

From birth until 24 months after withdrawal from service

ii. Notwithstanding item 1 above, records containing flying times and cycles, as appropriate, since last overhaul of the components subjected to an overhaul life

Until such work is carried out so that the component life is zeroed again

iii. Records containing all detailed maintenance in respect of life limited component and parts

From birth until 24 months after withdrawal from service

iv. Records containing all detailed maintenance in respect of the aircraft and any aircraft component fitted thereto,

Until work carried out is repeated , but not less than 12 months

v. Records containing the aircraft inspection status such that compliance with approved maintenance program can be established.

From birth until 24 months after withdrawal from service

vi. Records containing the current status of airworthiness directives AD's applicable to the aircraft and aircraft components.

From birth until 24 months after withdrawal from service

vii. Records containing details of accomplished

service bulletins SB's, modifications and repairs to the aircraft, engines, and aircraft major components.

From birth until 24 months after withdrawal from service

viii. TLB pages including oil & fuel records, DDL& NRC’s

24 months

ix. AD/CN compliance cards for aircraft and aircraft components(dirty finger print)

x. SB/EO/SIL compliance cards for aircraft and aircraft components (dirty finger print).

From birth until 24 months after withdrawal from service

From birth until 24 months after withdrawal from service

Page 128: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:00 Page 7 of 8

Issue Date: 15 Apr 2012

xi. Records required to sign a maintenance release

Notwithstanding above time limits, 12 months

xii. Quality audit reports

24 months

xiii. when an aircraft becomes involved in an accident or incident, the related flight recorder records and, to the extent possible, the associated flight recorders are preserved and retained in safe custody

pending disposition in accordance with the appropriate investigation

4. 5. Retrieval of Lost or Destroyed Records

4.5.1. Any records irrecoverably lost or destroyed will be reconstructed on a case by

case basis using other records maintained by the repair facilities.

4.5.2. A statement may be made in the new record describing the loss and

establishing the time in service based on the research of records maintained at

the repair facilities or with reference to concerned

4.5.3. The reconstructed records will be submitted to the ECAA authority for

acceptance.

4. 6. Termination or Cessation of an Activity

In case of termination or cessation of an activity of the Maintenance Contractor,

all the technical records related to that activity shall be transferred to EGYPTAIR

EXPRESS

4. 7. Records transfer

4.7.1. When an aircraft is permanently transferred from EGYPTAIR EXPRESS to

another certificate holder the following records shall also be permanently

transferred:

i. All detailed maintenance records in respect of the aircraft and any aircraft

component fitted thereto;

ii. The current aircraft inspection status such that compliance with the approved

certificate holder's aircraft maintenance program can be established;

iii. The current status of airworthiness directives applicable to the aircraft and

aircraft components; and

iv. Details of current modifications and repairs to the aircraft, engine(s), and any

other aircraft component vital to flight safety

v. Delivery inspection.

Page 129: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.:00 Page 8 of 8

Issue Date: 15 Apr 2012

vi. S/B incorporated.

vii. Time on life limits and life limited parts.

viii. Last scheduled check including structural inspection document.

ix. Part numbers and Serial numbers of installed equipment.

x. The applicable approved maintenance program

xi. Justification for the performance of the required maintenance.

xii. Certification of release to service.

xiii. Procedure to receive and respond to mandatory continuing airworthiness

information received from the state of design or the state of registry and

should clearly identify the person responsible for these data.

xiv. Prior to initiation of the transfer, representatives of both parties should co-

ordinate the scope and content of the TLB.

4.7.2. When an aircraft is temporary transferred from EGYPTAIR EXPRESS to another

certificate holder then the above records shall be made available to the new

operator.

5. Forms

N/A

Page 130: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 3 Amen. No.: 03 Page 1 of 6

Issue Date: 15 Apr 2012

1.07 Outsourcing and Product Control

1. Objective:

1.1. To set policy for subcontracting continuing airworthiness requirements to an

Approved Maintenance Organization (AMO).

1.2. To assure that component installed on A/C is obtained from an Authority approved

or accepted suppliers

1.3. To set monitoring and control processes for maintenance contract, to ensure the

maintenance Contractor that performs maintenance :

1.3.1. Complies with applicable regulations and requirements.

1.3.2. Have procedures that are acceptable to the ECAA granting the approval.

1.3.3. Performs all maintenance in accordance with requirements of EGYPTAIR

EXPRESS.

2. References:

2.1. ECAR 43.17 and ECAR 121.367, 121.369.

3. Responsibility:

3. 1. Maintenance Director for contract making and implementation.

3. 2. Chief Inspector for requirements review, and activity audit.

4. Description:

4 1. Contracted Maintenance Activities:

4.1.1. Maintenance agreement shall be executed between EGYPTAIR EXPRESS

and Maintenance Contractor (EGYPTAIR MAINTENANCE AND

ENGINEERING) to perform maintenance functions for EGYPTAIR EXPRESS,

such maintenance agreement:

i. Specify all maintenance requirements and define all tasks to be performed

,A.D’s are completed on time, service bulletins are analyzed and decisions

taken on accomplishment and all work, including non-mandatory

modifications, is carried out in accordance with approved data and to the

latest standards.

Page 131: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 6

Issue Date: 4 Aug 2012

ii. Comply with the procedures governing maintenance arrangements, as

specified in the MCM.

iii. Clear, unambiguous and sufficiently detailed specification of work and

assignment of responsibilities are to ensure that no misunderstanding can

arise between EGYPTAIR EXPRESS and AMO.

4.1.2. Contracted AMO shall have procedures that are acceptable to ECAA

4.1.3. Aircraft is maintained according to a continuous Airworthiness maintenance

program. Refer to Part 02 Chapter 01.

4.1.4. All tasks defined in the maintenance agreement with each external

maintenance organization that performs maintenance functions for EGYPTAIR

EXPRESS are completed in accordance with the maintenance agreement and

within the required time constraints

4.1.5. Contracted AMO has a detailed information with respect to all locations where

aircraft maintenance is to be performed (Ref. to 6.04 Line stations locations)

4.1.6. The Maintenance Contractor shall maintain a listing of external providers of

maintenance services and products, to include:

i. Organizations that are currently approved to perform maintenance on the

EGYPTAIR EXPRESS Aircraft, engines, components and/or parts;

ii. Vendors that are currently approved to supply parts, components and other

materials for use in maintenance of the aircraft. .

4.1.7. Maintenance Director shall monitor maintenance activities to ensure the

Contracted AMO

i. Complies with ECAA regulations and safety and quality requirements;

ii. Has procedures that are acceptable to ECAA;

iii. Performs all maintenance in accordance with requirements of EGYPTAIR

EXPRESS.

By assigning representative in line maintenance and during A/C conducted in

base maintenance

4 2. Contracted Continuous Airworthiness Management Service:

4.2.1. The Contracted AMO shall perform the Contracted Continuous Airworthiness

Management activities for EGYPTAIR EXPRESS. Contracted Continuous

Airworthiness Management activities include the following list:

Page 132: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 6

Issue Date: 4 Aug 2012

i. Aircraft Technical Log Utilization;

ii. MEL Application (Commercial Air transport).

iii. Aircraft Maintenance Program - Development Amendment and Approval ;

iv. Time and Continuing Airworthiness Records , Retention;

v. Accomplishment and Control of Airworthiness Directives;

vi. Analysis of the Effectiveness of the Maintenance Program(s);

vii. Implementation of Non Mandatory Modification Embodiment Policy;

viii. Major Modification Standards;

ix. Defects Reports;

x. Engineering Activity;

xi. Reliability Program;

xii. Monitoring of Continuing Airworthiness Management Activities;

xiii. Monitoring of Effectiveness of the Maintenance Program(s);

xiv. Monitoring that all Maintenance is Carried out by an Appropriate

Maintenance Organization;

xv. Monitoring that all Contracted maintenance is carried out in Accordance with

the Contract, including Subcontractors used by the Maintenance Contractor;

xvi. Maintenance Contractor Selection Procedure;

xvii. Quality Audit of Aircraft.

4.2.2. The AMO shall have, for the use and guidance of its relevant maintenance

personnel, an appropriate manual for the use and guidance of its personnel

addressing the above items in 4.2.1 as a minimum

4 3. Material Purchasing

Maintenance Director shall insure that Contracted AMO has a purchasing program

to ensure:

4.2.1. Aircraft parts and materials are only obtained from approved sources;

4.2.2. Certification documentation requirements are specified (refer to 2.04 table 1)

4.2.3. Traceability and or appropriate certificate to an approved supplier for used or

surplus parts;

4.2.4. a statement of conformity or certification test results is required for hardware

and raw materials, such as extrusions, sheet or bar stock;

Page 133: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 6

Issue Date: 4 Aug 2012

4.2.5. Inventory storage of consumable material is managed to ensure traceability of

batch control.

4 4. Selection of material suppliers:

Maintenance Director shall insure that the potential material suppliers are selected

as follows:

4.3.1 Class (A): Original Equipment Manufacturer (OEM).

4.3.2 Class (B): Suppliers referred to in OEM technical documents or approved by

OEM.

4.3.3 Class (C): Accepted EXPRESS or approved or accepted repair stations.

4.3.4 The selection will be limited only if the national Airworthiness' authority

governing the EXPRESS or repair stations / maintenance workshop of a level

is acceptable to ECAA.

4.3.5 Class (D): Surplus parts dealers; limited only if the surplus parts dealer

provides only appropriately certificated new parts which have been

manufactured by the OEM or by a manufacturer approved by the OEM

4 5. Authorization Grant to Use Supplier

4.4.1. Class A and Class B Suppliers are considered as an accepted supplier.

4.4.2. the Maintenance Contractor QA Director shall evaluate the Class C and D

suppliers using Supplier’s questionnaire.

4.4.3. For Class C Suppliers; by reviewing the received questionnaire from a Class C

Supplier, Contracted AMO QA Director may determine if the Supplier is

satisfactory or he needs an audit.

4.4.4. For Class D potential suppliers and evaluation will be made based on

Supplier’s pre-audit quality questionnaire and / or Quality audit performed for

the supplier. If the evaluation is accepted, authorization to use the supplier will

be granted and the list of approved suppliers will be accordingly amended.

4 6. Monitoring of Supplier Performance:

Suppliers will be continuously monitored through nonconformities and

discrepancies collected during operation.

4 7. Treatment of Suspected Unapproved Parts “Bogus Parts”

Page 134: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 5 of 6

Issue Date: 4 Aug 2012

4.7.1. Definition: Suspected Unapproved Part / Bogus Part is an aircraft component

that was not manufactured or not maintained or not released in accordance

with approved procedures or that does not conform to an approved type

design or standards.

4.7.2. Parts that are suspected to be unapproved shall be quarantined until being

definitively clarified

4.7.3. Handling of Incoming Notifications and Information on Suspected Unapproved

Parts all external and internal received notifications and information on

suspected unapproved parts received must be passed to the Contracted AMO

QA Director

4.7.4. The Maintenance Contractor QA Director shall take necessary investigations

and corrective actions if EGYPTAIR EXPRESS aircraft or components are

affected.

4.7.5. QA Director shall inform ECAA about any received or discovered suspected

unapproved part

4 8. Purchasing Documentation and Recording:

The Maintenance Contractor must take necessary actions to keep a complete

record system relating to Purchasing, approved and quarantined suppliers and

material.

4 9. Training of maintenance service providers:

Whenever required, EGYPTAIR EXPRESS shall provide the required training on

its processes and procedures including its documentation, certification,

recording requirements and other relevant paper work to different service

providers. EGYPTAIR EXPRESS allows such service providers to cascade the

training to concerned personnel, EGYPTAIR EXPRESS authorizes its

contracted AMO to provide such training to other service providers as needed.

This is to be assured by carrying out the necessary surveillance and / or auditing

or otherwise.

5. Forms N/A

Page 135: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 3 Amen. No.: 03 Page 6 of 6

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 136: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

1.08 Qualifications and Training

1. Objective:

To set a training policy for EGYPTAIR EXPRESS technical staff, this ensures that

each person is fully informed about procedures, techniques and equipment in use

and is competent to perform his duties.

2. References:

ECAR 121.380

3. Responsibility

Function is subcontracted under the responsibility of the Chief Inspector.

4. Description:

4.1. Maintenance management training:

4.1.1. The Chief Inspector shall ensure that all directorate personnel will have

training on MCM according to training plane.

4.1.2. Training Manager shall prepare annual training plan Form T1 approved by

chief inspector.

4.1.3. Chief Inspector shall ensure that appropriate training is to be made for

auditors

4.1.4. All training will be recorded& documented

4.1.5. All technical training shall be done at EGYPTAIR Training Centre.

4.1.6. Training files are updated and kept by training manager.

4.1.7. Training files shall contain refreshing courses, human factors, auditing,

etc...

4.1.8. Training files shall retained for two years after leaving company

4.2. Training Program:

4.2.1. Technical Training shall be carried out at approved training centers

according to approved training courses, and records shall reflect details

of such training.

4.2.2. The approved training program shall include training on knowledge and

skills related to human factors and human performance limitations

Page 137: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

including co-ordination with other maintenance personnel and flight

crew.

4.2.3. The program for continuation training lists all certifying personnel and when

training will take place, the elements of such training and an indication it

was carried out reasonably on time as planned. Such information is

subsequently transferred to the certifying personnel record.

4.2.4. Continuation training shall be on an interval not to exceed 24 months.

4.2.5. Appropriate training is to be made for engineering, training and planning

staff

4.2.6. Appropriate training and qualification program shall be made for auditors

used in the QA Program

4.3. Training Records:

4.3.1. Training record system shall include training and qualification requirements

for personnel. The system shall ensure:

i. Identification;

ii. Legibility;

iii. Maintenance;

iv. Retention and retrieval;

v. Protection and security;

vi. Disposition (disposal/transfer).

4.3.2. Technical Director keeps records of the initial, recurrent, continuation and

specific training and qualifications awarded current status for all technical

personnel.

4.3.3. Records contain the following information:

i. Name (full name).

ii. Employee code.

iii. Date of birth.

iv. Basic training.

v. Initial, specific, recurrent & continuation training.

vi. Human factors Initial, recurrent & continuation training

vii. Audit Initial, recurrent & continuation training

Page 138: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

viii. Any other training

4.3.4. The records are to be kept to assure data protection requirements.

4.3.5. Process of creation, updating, control and retention of a record is the

responsibility of Technical Director

4.3.6. Data Protection

Technical Director is responsible for taking appropriate measures for

secure handling and storage of records in such a manner that:

i. Persons authorized to access the system should be maintained to the

minimum

ii. To ensure that records cannot be altered in an unauthorized manner.

iii. Confidential records have to be secured and protected against

unauthorized access.

iv. Lost records are to be reconstructed and identified, using known

records standards.

v. Electronic or the hard copy files using the employee code (payroll

number). . These files updated as long as the employee is working with

EGYPTAIR EXPRESS

5. Forms:

Form no: T1

Page 139: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 140: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.09

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

1.09 Concession Control and Deviation

From Organization Procedure

1. Objective:

To set the policy for applying for waivers and deviations from set procedures regarding

maintenance when there is an unavoidable need for such.

2. References:

ECAR 91 903,905 ECAR 121.58

3. Responsibility:

Chief Inspector for processing with Authority

4. Description

4.1. If need calls for a deviation from a set requirement and such requirement relates to

an approved document or Airworthiness data, the person-in-charge shall apply for

such deviation using form 205 to the Chief Inspector. The deviation shall be

justified and necessary documents attached. Chief Inspector shall study the

required deviation. A “No Technical Objection” may be needed from the relevant

type certificate holder. Chief Inspector shall proceed to obtain Authority approval

on requested deviation(s).

4.2. It is not allowed to implement any deviation before such approval is granted.

4.3. Records regarding all granted deviations shall be appropriately filed and kept

within the Aircraft Records. A copy will be maintained at the Chief Inspector office.

4.4. Deviation records shall contain the following data:

i. Name of applicant

ii. A deviation number; such number shall be put sequentially

iii. Description so as to the area of application of deviation; aircraft, aircraft

component or document and duration, if any

iv. Date

v. Deviation details.

Page 141: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.09

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

vi. Engineering comments

vii. Used references.

viii. Classification, so as to major or minor.

5. Forms: 1. Deviation / Waiver Request Form 205.

Page 142: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 22

Issue Date: 15 Apr 2012

1.10 Quality Assurance

1. Objective:

To describe how the quality monitoring functions are carried out.

2. References:

ECAR 121.365, 121.370.

3. Responsibility:

3.1. Chairman

3.2. Chief Inspector.

4. Description:

4.1. General:

4.1.1. The quality assurance program that provides for auditing of all functions of

the management system for maintenance operations to ensure EGYPTAIR

EXPRESS:

i. complies with ECAA regulations, and all activities are performed in

accordance with the accepted MCM, requirements;

ii. Satisfying stated maintenance operations needs;

iii. Identifying undesirable conditions and areas requiring improvement;

iv. Identifying hazards in maintenance operations. [SMS] .

4.1.2. Monitoring that AMO and all contracted maintenance is carried out in

accordance with the following:

i. The contract

ii. ECAA regulations and requirements;

iii. Procedures that are acceptable to the ECAA approval;

iv. MCM requirements

4.1.3. Monitoring that all referenced procedures remain applicable and effective.

4.1.4. Audit program includes:

i. Audit initiation, including scope and objectives;

ii. Planning and preparation, including audit plan and checklist development;

iii. Observation and gathering of evidence;

iv. Analysis, findings, actions;

Page 143: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 22

Issue Date: 15 Apr 2012

v. Reporting and audit summary;

vi. Follow-up and close out.

4.1.5. Addressing findings that result from audits of maintenance management

system functions, shall be studied in detail to ensure the following:

i. Determination of the root cause(s) of findings;

ii. Development of corrective or preventive action, as appropriate, to

address the finding(s);

iii. Implementation of corrective or preventive action in a timely manner in

appropriate areas of maintenance operations;

iv. Evaluation of corrective or preventive action to determine effectiveness,

necessary re-audits may be made to assure fulfillment of the above.

4.1.6. To ensure effective compliance with the maintenance activities, the following

elements should be covered:

i. Product sampling: one aircraft or more (25% of each type) shall be partially

inspected while maintenance work is undergone

ii. Defect sampling: a monitoring of a defect rectification is to be done at least

once weekly.

iii. Concession sampling e.g the extensions to scheduled maintenance: : this is

to be done by EGYPTAIR EXPRESS according to Operation Specification

Requirements and monthly reported to ECAA.

iv. On-time maintenance sampling: the monitoring of maintenance intervals

(flying hours, calendar time, flight cycles) for aircraft and their components;

this is done through auditing on maintenance record

v. Sampling reports of un-airworthy conditions and maintenance errors All un-

airworthy conditions and maintenance errors are revised by C.I.

4.1.7. An independent quality audit program shall consist of routine sample checks

of all aspects of the approved maintenance organization's ability to carry out

all maintenance to the required standards. This process includes:

i. Product sampling, as this is the end result of the maintenance process, which

represents an objective overview of the complete maintenance –related

activities; product sampling is intended to complement the requirement for

Page 144: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 22

Issue Date: 4 Aug 2012

certifying personnel to be satisfied that all required maintenance has been

properly carried out before the issue of the certificate of release to service.

ii. A percentage of random audits carried out on a sample basis when

maintenance is being carried out; random audits include audits done during

the night for those organizations that work at night.

iii. Quality feedback system that ensure all findings resulting from the

independent quality audits of the organization are properly investigated and

corrected in a timely manner :

iv. Independent quality audit reports are sent to the relevant department(s) for

rectification action proposing target rectification dates ;

v. Rectification dates are discussed with such department(s) before the quality

department or nominated quality auditor confirms dates in the report ;

vi. The relevant department(s) rectifies findings within agreed rectification dates

and informs the quality department or nominated quality auditor of the

completion of such rectifications.

4.1.8. The Accountable Manager of the Maintenance Organization shall be kept

informed of the safety issues and the extent of compliance with authority

requirements.

4.1.9. A Management review meeting shall be made periodically (once each six

months) headed by EGYPTAIR EXPRESS Chairman and attended by senior

managers and managers of maintenance operational activities for evaluation

of audit outputs, findings, progresses, corrective and preventive actions and

the compliance with set requirements.

4.1.10. All records pertaining to the independent quality and the quality feedback

system are required to be retained for at least two years after the date of

closure of the finding to which they refer, or for such periods as to support

changes to the audit time periods, whichever is longer.

4.1.11. This QA Program shall not be based on a system of end product inspection,

but upon periodic verifications of all aspects of the systems and practices

used for the control of maintenance to ensure compliance with regulations

and with EGYPTAIR EXPRESS approved procedures.

Page 145: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 22

Issue Date: 15 Apr 2012

4.1.13. The aim of the program is to provide an unbiased picture of the AMO

performance to verify that activities comply with the MCM and confirm that

the systems and procedures described in the MOE remain effective and

achieving the AMO requirements .

4.1.14. The program flexibility shall be maintained and adapt itself continuously to all

current ECAA rules.

4.1.15. The auditor shall have sufficient skills to uncover concealed problems,

carefully define them, and give some indications to their causes.

4.1.16. The auditor shall be able to furnish enough detailed facts on which a course

of corrective actions can rely.

4.2. Internal Auditing Process:

4.2.1. The management system identifies, provides and maintains the infrastructure

necessary to produce safe and secure operations, to include support

facilities, services and equipment appropriate for the area, such as the

following:

i. Buildings, workspaces and associated utilities;

ii. Facilities for people in the organization;

iii. Support services, including transportation and communication.

4.2.2. Likewise, the management system ensures a work environment that has a

positive influence on motivation, satisfaction and performance of personnel in

order to maximize safe and secure operations. A suitable work environment

satisfies human and physical factors and considers:

i. Safety rules and guidance, including the use of protective equipment;

ii. Workplace location(s);

iii. Workplace temperature, humidity, light, air flow;

iv. Cleanliness, noise or pollution

4.2.3. The availability of the facilities, personnel, equipment and other resources as

necessary for Monitoring Maintenance provider on the following functions:

i. The initial development of the maintenance schedule

ii. Scheduling maintenance, elementary work and servicing to be performed

within the time constraints specified in the approved maintenance schedule;

Page 146: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 5 of 22

Issue Date: 4 Aug 2012

iii. Scheduling the accomplishment of Airworthiness Directives(ADs); operation

of an evaluation program to ensure that all required procedures

iv. And, in particular the maintenance schedule, continue to be effective and in

compliance with the applicable regulations;

v. The proper dispatch of aircraft, with regard to:

a. Control of defects;

b. Availability of spare parts;

c. Conformity with the type design;

d. Requirements of other applicable operating rules.

4.2.4. The availability of the personnel for:

i. Liaison with approved maintenance organizations for the performance of

maintenance;

ii. Development and update of the Maintenance Control Manual

4.2.5. Management and control system for documentation and technical data

4.2.6. Staff training

4.2.7. Records (Personnel and Aircraft)

4.3. Audit for Contracted AMO to fulfill the following requirements:

4.3.1. The approval certificates are valid as per Ch (6.12-Clause 1.1.iv) and 1.2.

The management system identifies, provides and maintains the infrastructure

necessary to produce safe and secure operations, to include maintenance

support facilities, services and equipment appropriate for the area, such as:

i. Buildings, workspaces and associated utilities;

ii. Facilities for people in the organization;

iii. Support equipment, including tools, hardware and software;

iv. Support services, including transportation and communication.

v. Likewise, the management system ensures a work environment that has a

positive influence on motivation, satisfaction and performance of personnel in

order to maximize safe and secure operations. a suitable work environment

satisfies human and physical factors and considers:

a. Safety rules and guidance, including the use of protective equipment.

b. Security rules and guidance to secure aircraft during and after checks.

c. Workplace location(s);

Page 147: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 6 of 22

Issue Date: 15 Apr 2012

d. Workplace temperature, humidity, light, air flow;

e. Cleanliness, noise or pollution

4.3.2. The availability of the facilities, personnel, equipment and other resources as

necessary for the implementation of the following management and control

functions:

i. The initial development of the maintenance schedule;

ii. Scheduling maintenance, elementary work and servicing to be performed

within the time constraints specified in the approved maintenance schedule;

iii. Scheduling the accomplishment of Airworthiness Directives (ADs);

iv. Operation of an evaluation program to ensure that all required procedures

and, in particular the maintenance schedule, continue to be effective and in

compliance with the applicable regulations;

v. The proper dispatch of aircraft, with regard to:

a. Control of defects;

b. Availability of spare parts;

c. Conformity with the type design;

d. Requirements of other applicable operating rules.

4.3.3. Has a manager with appropriate qualifications, acceptable to ECAA, who is

responsible for the management and supervision of the maintenance refer to

Ch6.12 Clause 2.1).

4.3.4. Has nominated appropriate personnel with responsibilities for ensuring the

maintenance organization is in compliance with the requirements for an

approved maintenance organization as accepted by ECAA ,refer to Ch. 6.12

Clause 2.2.).

4.3.5. Has the necessary personnel to plan, perform, supervise, inspect and

release the maintenance work to be performed(6.12.2.2.4)

4.3.6. Has an independent Quality Assurance (QA) Program (6.12-3)that:

i. Monitors compliance with ECAA regulations, requirements and the

Maintenance Procedures Manual (MOE) of the AMO;

ii. Addresses the specific requirements of the Operator, as specified in the

maintenance agreement;

iii. Comprises the specifications and control processes as follows:

Page 148: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 7 of 22

Issue Date: 15 Apr 2012

a. An internal audit and surveillance program

b. An established audit schedule ;

c. A record of audit findings and corrective and/or preventive actions;

d. Assurance of appropriate corrective action ;

e. All elements necessary to confirm the maintenance organization is in

compliance with the applicable regulations and the MCM ;

f. The QA program confirms all referenced procedures remain applicable

and effective Control processes :

g. An audit program , using the published checklists that cover all aspects

of the maintenance organization technical activities , conducted within 12

months following the date that the operating certificate is issued;

h. Reviewing audit reports conducted at intervals established in the

approved MOE;

i. Records of findings of compliance and non-compliance resulting from the

evaluations.

j. Procedures to ensure the findings of the audits are communicated to

Chairman and made available to EGYPTAIR EXPRESS ;

k. Where appropriate , immediate and long-term actions to correct the root

cause of each non- compliance noted ;

l. Follow-up procedures to ensure necessary corrective/preventive actions (

both immediate and long-term ) implemented by the Maintenance

Organization are effective

m. A record-keeping system to ensure details of audit findings, corrective

actions, preventive actions and follow-up are recorded and that the

records are retained for two complete evaluation cycles.

iv. Is under the sole control of the Quality Manager or the person assigned

managerial responsibility for the program.

v. The quality system shall enable the AMO to ensure it can deliver a safe

product and remain at all times in compliance with the requirements.

4.3.7. Has a process for periodic review of the QA Program by the Quality Manager

or the person assigned managerial responsibility for the program for the

purpose of ensuring compliance with current requirements of the

Page 149: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 8 of 22

Issue Date: 15 Apr 2012

Maintenance Program and the MCM as referred in MCM Ch.(6.12-

.Clause3.1.12)

4.3.8. Has a process to immediately report to EGYPTAIR EXPRESS any defects,

un-airworthy conditions, failures or malfunctions as specified in Ch. 2.13

Clause4.2.3

4.3.9. Utilizes maintenance personnel whose competence has been established in

accordance with a procedure and to a level acceptable to the ECAA ,and

according to Ch. 6.12 Clause 4.1.1

4.3.10. Utilizes appropriately licensed/authorized maintenance personnel to sign the

certificate of release to service. Such personnel shall have met the ECAA

requirements with respect to age, knowledge, experience and, when

required, medical fitness and skill according to Ch. 6.12 Clause -4.2

4.3.11. Has a training program as per Ch. 6.1 Clause -5:

i. Assures all maintenance personnel receive initial, continuation and any

additional training appropriate to individual assigned tasks and

responsibilities that includes training in the knowledge and skills related to

human performance, including coordination with other maintenance

personnel and with flight crew.

ii. Assures maintenance personnel with technical responsibilities have the

requisite knowledge of regulations, standards and procedures in accordance

with requirements in the MCM

iii. Provides for continuation training for all maintenance personnel on an interval

not to exceed 24 months, which may be reduced to a lesser interval based

on findings generated by the QA Program.

4.3.12. Has a training and qualification program for auditors used in the QA Program.

4.3.13. Has training program that provides for initial and continuation training for

receiving inspectors.

4.3.14. Has the basic facilities and work environment, appropriate for the

maintenance tasks to be performed, to include as in 6.12-6.1 :

i. A place of business, with a fixed address;

ii. Communications equipment/software, such as telephones, facsimile

machines and others;

Page 150: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 9 of 22

Issue Date: 15 Apr 2012

iii. Any devices used to establish when a particular aircraft requires

maintenance.

iv. A secure, dry storage area to retain aircraft technical records.

4.3.15. Management and control system for documentation and technical data used

directly

i. A means of identifying the published status of maintenance documents

ii. A distribution process that ensures availability of the current version of

applicable maintenance documentation and technical data to appropriate

personnel in all areas where maintenance is performed;

iii. Review and revision as necessary to maintain the currency of information

contained in the MOE and maintenance documents;

iv. Retention of documents that permits easy reference and accessibility;

v. Identification and control of obsolete and/or reproduced documents;

vi. Reception of documentation and/or data from external sources to ensure

information is received in time to satisfy operational requirements;

vii. Retention and dissemination of documentation received from external

sources.

4.3.16. Processes to ensure the content of documentation used directly in the

conduct or support of maintenance operations:

i. Is readily identifiable and accessible to maintenance personnel;

ii. Contains information that is clear, legible and accurately represented;

iii. Is written in a language understood by maintenance personnel;

iv. Is presented in a logical and consistent format that permits ease of use by

maintenance personnel;

v. Is accepted or approved by ECAA,

4.3.17. Has facilities suitable for the storage of parts, equipment, tools and material

under conditions that provide security and prevent deterioration of and

damage to stored items, as 6.12-6.4 to include:

i. Clean work areas, including management offices;

ii. Parts and material properly identified and stored;

iii. Oxygen and other high-pressure bottles properly identified and stored;

iv. Flammable, toxic or volatile materials properly identified and stored;

Page 151: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 10 of 22

Issue Date: 15 Apr 2012

v. Equipment identified and protected

4.3.18. A records system that ensures the fulfillment of operational requirements is

documented and retained, including training and qualification requirements

for maintenance personnel. Such system shall be in accordance with

requirements of ECAA, and provide for the management of records to

ensure:

i. Identification;

ii. Legibility;

iii. Maintenance;

iv. Retention and retrieval;

v. Protection and security;

vi. Disposition (disposal/transfer)

4.3.19. Ensure all modifications and repairs carried out comply with airworthiness

requirements acceptable to ECAA and procedures are established to ensure

that technical records supporting compliance with the airworthiness

requirements are retained.

4.3.20. The defect recording system includes a method to clearly highlight recurring

defects to flight crews and the maintenance organization at all bases where

the aircraft is operated. Contracted AMO is responsible for identifying

recurring defects and notifying maintenance personnel, in order to avoid the

duplication of unsuccessful attempts at rectification.

4.3.21. Have a program to ensure the following maintenance records are maintained:

i. Total time in service (hours, calendar time and cycles, as appropriate,) of the

aircraft, engines and all life-limited components;

ii. Current status of compliance with all mandatory continuing airworthiness

information; appropriate details of modifications and repairs;

iii. Time in service (hours, calendar time and cycles, as appropriate,) since last

overhaul of the aircraft, engines or its components subject to a mandatory

overhaul life;

iv. Current aircraft status of compliance with the Maintenance Program;

v. Detailed maintenance records to show that all requirements for signing of a

maintenance release have been met.

Page 152: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 11 of 22

Issue Date: 15 Apr 2012

vi. AD/CN compliance cards for aircraft and aircraft components

vii. SB/EO/SIL compliance cards for aircraft and aircraft components.

4.3.22. Records in the above are retained as mentioned in Ch1.06 Clause 4.4.3

4.3.23. The completed aircraft technical log pages are retained to provide a

continuous record of the last six months of operations

4.3.24. Has an accepted MOE that contains, as a minimum refer to MCM Ch. 6.12

Clause 8):):

i. The name and location of the AMO;

ii. The date of issue and period of validity of the approval;

iii. The scope of the approval

iv. Has a process to amend the MOE as necessary to keep the information

contained therein up-to-date

v. Has a process to furnish copies of all amendments to the MOE promptly to all

organizations or persons to whom the manual has been issued

4.3.25. Has the necessary technical data, equipment, tools and material to perform

the work for which the maintenance organization has been approved, as per

MCM Ch. 6.12 Clause to include:

i. Equipment and tools necessary to comply with the work specified in the

agreement between EGYPTAIR EXPRESS and the maintenance

organization;

ii. Sufficient supplies and spare parts to ensure timely rectification of defects

with regard to the Minimum Equipment List (CMEL) provisions and in

accordance with service level agreements.

iii. Tools and equipment, as specified in the Approved Data, can be made

available when needed. Tools and equipment, which require to be

controlled in terms of servicing or calibration to measure specified

dimensions and torque figures, are to be clearly identified and listed in a

control register

iv. Sufficient aircraft access equipment and inspection platforms/docking such

that the aircraft may be properly inspected.

v. The supplies necessary to perform maintenance work refer to readily

available raw material and aircraft components, in accordance with the

Page 153: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 12 of 22

Issue Date: 15 Apr 2012

manufacturer's recommendations, unless the organization has an

established spares provisioning procedure

4.3.26. Has a shelf-life program for applicable stored items, which includes a

requirement for the shelf-life limit to be controlled and displayed as per MCM

Ch.6.12 Clause -6.4)

4.3.27. Has a receiving inspection process as per MCM Ch. 6.12 Clause -6.5 that:

i. Assures incoming material has the required certification documentation and

traceability;

ii. Includes a process for verification of incoming part tags to ensure information

on the tag (e.g., part name, part number, serial number, modification and/or

any other applicable reference information) matches the corresponding

information on the part

4.3.28. Has a secure quarantine area for rejected parts and materials awaiting

disposition as per Ch. 6.12 Clause.7.6.2

4.3.29. Has a process for segregating aircraft serviceable parts, aircraft non-

serviceable parts, and non- aircraft parts as per Ch. 6.12 Clause 7.6.2

4.3.30. Has an Electrostatic Sensitive Devices (ESD) Program, as specified in

chapter 6.12- Clause 7.6.3

4.3.31. Has a method of storage that assures sensitive parts and equipment, such as

oxygen system components (oxygen generators and bottles), O-rings and

electrostatic sensitive devices are properly packaged, identified and stored to

protect them from damage and contamination as per Ch. 6.12 Clause -7.6.5.

4.3.32. Has a process that assures aircraft components and parts are shipped in

suitable containers that provide protection from damage and, when specified

by the OEM, ATA-300 or equivalent containers shall be used as per Ch. 6.12

Clause -7.6.1

4.3.33. Produces a completed and signed certificate of release to service that

certifies all maintenance work performed has been completed satisfactorily

and in accordance with the approved data and procedures described in the

MCM Ch. 6.12 Clause -9

4.3.34. Produces a completed and signed certificate of release to service that

includes:

Page 154: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 13 of 22

Issue Date: 15 Apr 2012

i. Basic details of the maintenance performed;

ii. A reference of the approved data used;

iii. The date such maintenance was completed;

iv. When applicable, identity of the approved maintenance organization;

v. Identity of the person or persons signing the release.

4.3.35. Retains detailed maintenance records to show that all requirements for the

signing of a maintenance release have been met

4.3.36. Retains records required in accordance with chapter 1.06. item 4.3 for a

minimum period of one year after the maintenance release has been signed

4.3.37. The Maintenance Organization shall have procedures to control and

document the calibration and records of all tools, including personnel own

tools, and preventing out-of-service and due for-calibration tools and

equipment from being used, in accordance with specifications in chapter

6.12- Clause 10.

4.4. Audit Elements: shall insure the following:

4.4.1. Adequacy, cleanliness and up-keeping of equipment and facilities.

4.4.2. Administrative and supervisory aspects of maintenance activities (including

contracted and subcontracted work).

4.4.3. Proper performance of maintenance on aircraft systems including engines

and components.

4.4.4. Appropriate maintenance scheduling, control and accountability of used

procedures.

4.4.5. Adequacy and serviceability of ground support equipment.

4.4.6. Adequacy, serviceability, calibration and identification of tools, including

personnel own tools, and test equipment.

4.4.7. Availability of sufficient and competent manpower to perform assigned

tasks, including appropriate qualifications / authorizations / certifications.

4.4.8. Adequacy of records and proper filling and up keeping.

4.4.9. Appropriate handling of required inspection items.

4.4.10. Use of work turnover forms and procedures.

4.4.11. Adequacy of parts and material including appropriate handling,

transportation, protection, storage, shelf life control, segregation of

Page 155: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 14 of 22

Issue Date: 15 Apr 2012

hazardous material and handling of delicate or sensitive items as ESD

items.

4.4.12. Appropriate fuel /oil /hydraulic /chemical storage and adherence to

environmental rules for disposal.

4.4.13. Compliance with aircraft deicing /anti-icing, requirements

4.4.14. Compliance with maintenance deferral procedures.

4.4.15. Implementation of safety rules for personnel and assets.

4.4.16. Availability, currency and proper use of applicable airworthiness data, work

forms, technical instructions and company procedures.

4.4.17. Modification tracking of aircraft and its parts/components.

4.4.18. Proper planning of tasks and follow up on work progress.

4.4.19. Compliance with aircraft fuel servicing operations including mobile fueling

units, fixed fueling facility and fuel checking for water and contamination,

fuel systems sampling program.

4.4.20. The implementation of an appropriate quality assurance program by the

maintenance provider

4.5. Audit Scheduling:

4.5.1. The audit scheduling will be done through a yearly plan to cover the whole

quality system. The yearly plan for procedures audit shall identify:

i. The audit date.

ii. The audit reference.

iii. The audit report due date.

iv. The duration of the audit conducted on each organization, product and / or

process; will depend on its scope and depth.

4.5.2. The yearly audits plan is reviewed by the Chief Inspector and approved by

the Chairman.

4.5.3. The maximum intervals for periodic audits of maintenance activities shall be

determined. The intervals may be more frequent in areas of chronic

problems and areas subjected to high-risk conditions. The intervals may

also be escalated in areas without significant problems provided there is a

justified data base.

Page 156: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 15 of 22

Issue Date: 4 Aug 2012

4.5.4. The audit notification shall be distributed to all concerned at least two weeks

prior to audit date. Deviation from schedule shall be approved by the Chief

Inspector and shall be timely communicated, to all interested organizations.

4.5.5. Unscheduled audits may be carried out if the need calls for.

4.5.6. The frequency of audits may be modified to suit conditions.

4.5.7. Areas with significant findings may be re-audited within shorter intervals; the

frequency of audit checks may be increased. Conversely, in minimal

problem areas, the audit frequency may be reduced.

4.5.8. The re-audit is to confirm the effectiveness of corrective actions taken in

response to the findings from the previous audit.

Audit Schedule

SER

AUDIT AREA

CHECKLIST NO.

FREEQUENCY

1 AMO Outstation QAF103/AMO/01 ONCE A YEAR

PER STATION 2 Ground Service Outstation QAF103/GS/01

3 Ramp Inspection. QAF103/AMO/02 ONCE PER

MOS.

4 Line Maintenance QAF103/AMO/03

2 PER YEAR

5 Maintenance Planning And

Scheduling

QAF103/AMO/04

6 Tech. Services DEPARTMENT QAF103/AMO/05

7 Manuals And Publications Dpt QAF103/AMO/06

8 Maintenance Records QAF103/AMO/07

9 Fuel Servicing QAF103/AMO/08

10 Base Maintenance QAF103/AMO/09

ONCE PER

YEAR

11 Overhaul and Repair Workshops QAF103/AMO/01

12 Material & Stores Management QAF103/AMO/10

13 Tools And Equipments QAF103/AMO/11

Page 157: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 16 of 22

Issue Date: 4 Aug 2012

14 Training Process QAF103/AMO/12

15 Quality Assurance QAF103/AMO/13

16 Safety Assurance QAF103/AMO/14

Internal Audit Schedule

SER

AUDIT AREA

CHECKLIST

NO.

FREEQUENCY

1 MAINT. Director MANAGEMENT QAF 103/I/1

2 Per Year

2 Engineering & Planning Department QAF 103/I/2

3 Maintenance Department QAF 103/I/3

4 Documentation Department QAF 103/I/4

5 Contract Department QAF 103/I/5

6 Chief Inspector . Department QAF 103/I/6

7 Quality Audit Department QAF 103/I/7

8 Training Department QAF 103/I/8

9 Records Department QAF 103/I/9

10 Quality Control Department QAF 103/I/10

4.6. The Audit Report:

4.6.1. When the audit is completed, and Before distribution, the preliminary

conclusions will be advised to the person(s) in charge of the areas subject

to audit. The quality auditor and the persons responsible for the

areas/subjects audited will determine and agree together the corrective

actions to be taken. This will also define the time allowed for corrective

actions to be implemented. The corrective action should be

determined taking into account the root cause of the finding, such that the

corrective action may be carried out in a fashion that will prevent possible

re-occurrence of the finding.

Page 158: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 17 of 22

Issue Date: 4 Aug 2012

4.6.2. If agreement cannot be reached on contraversial points, the opinion

of the audited organization should be included in the audit report.

Each part will raise a report to the respective chairman. Which may

transfer the subject disagreement to the corporete Safety Quality

Directorate for resolution.

4.6.3. The auditor/supervisor of the auditing team will submit a report of the

findings to the Chief Inspector.

4.6.4. Audit reports structure and breakdown should conform to the standard

stipulations.

4.6.5. Audit reports shall contain name of audited organization and name of

organization representative in the audit coordination process.

4.6.6. The report shall refer to the standards used, participants, dates, program,

confidentiality clause for who will get a copy of the report and summary of

audit findings.

4.6.7. The report shall be distributed to all organizational units affected by audit

or corrective measures.

4.6.8. Audit reports shall detemine the dates for the corrective actions. Reports

shall provide for follow-up on corrective actions.

4.6.9. Chief Inspector shall raise a report covering the whole audited activities,

findings, corrective and preventive actions agreed upon and related

organizations feedback to Chairman at least once annualy.

4.6.10. All relevant audit reports shall be in an editable format by the Chief

Inspector, this includes:

i. Quality Audit Plan Form 102

ii. Quality Audit Notification Form 101.

iii. Quality Audit Check List XX.

iv. Non-Conformity Report NCR Form 105

v. Corrective Action follow-up status Form 104

4.6.11. The retention period is two years.

4.7. Audit findings levels:

The findings of an audit will be categorized as follows:

Page 159: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 18 of 22

Issue Date: 15 Apr 2012

4.7.2. Level two: Action required to avoid lowering of maintenance standards and

to be corrected with one month.

4.7.3. Level three: Immediate action to avoid a potential safety issue or

airworthiness approval suspension

4.8. Feedback and Corrective/Preventive Actions Follow-up procudre:

4.8.1. The audit program shall be reviewed by the Chief Inspector at least once

yearly. Program shall be amended accordingly. Any changes in the MCM or

the organization procedures shall be reflected in the audit program.

4.8.2. Corrective actions, and/or plans for implementation of, are to be received

from the auditee within five working days.

4.8.3. Corrective actions may include, where appropriate, immediate actions

and/or long term actions depending on the nature of the findings. Corrective

actions shall address, as far as possible, root causes of the findings to

prevent re-occurrence

4.8.4. Remained open items during each month shall be raised to Chief Inspector

until a resolution is achieved.

4.8.5. Findings identified during audits should be rectified and the agreed

measures carried-out within the specified deadlines, under the responsibility

of the audited organizational units.

4.8.6. If the effectiveness of a corrective measure cannot be assessed at the time

of completion or if an additional audit is found to be necessary; it should be

incorporated in the next audit plan or scheduled for implementation in a

subsequent audit.

4.8.7. Rectification of findings and any stipulated subsequent audits should be

documented as part of the audit records and stored in editable format.

4.8.8. Chairman is responsible for the overall assessment of the audit system and

for approving the necessary corrective and improvement measures.

4.8.9. The recommended corrections shall be timely carried out by the audited

organization.

4.8.10. If necessary a check of the implementation of corrective action may be

done.

4.9. Quality Auditors Responsibilities:

Page 160: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 19 of 22

Issue Date: 15 Apr 2012

4.9.1 Controlling an Audit program.

4.9.2 Issuing the quality audit reports after discussing it with the concerned

organizational unit to adapt a corrective action plan after evaluation of the

conditions.

4.9.3 Following up the corrective action plan and ensuring that it is done within

the time frame.

4.9.4 Reporting all results of audits carried out to the Chief Inspector.

4.9.5 Ensuring that the completed audit reports are accessible to the assigned

Authority staff upon request.

4.9.6 One of the auditing team will be assigned as a lead auditor and he will be

the formal focal point of contact with the management.

4.10. Quality Auditors Qualifications:

Permanent / dedicated auditors are of permanent staff.

4.10.1 Pre-Qualifications:

i. Having a good command of written and spoken English language

ii. Having a suitable engineering degree.

iii. Knowledge of products / services in the area of his responsibility and

related methods, sequences, processes and systems.

4.10.2 Basic Qualifications:

i. Have an appropriate license.

ii. Have an aircraft / component maintenance experience for at least 5 years

on large aircrafts.

iii. Successfully completed an Aviation Auditor training course.

4.10.3 Additional Qualifications:

Satisfactorily completed the following courses:

i. Course on MCM including responsibilities and privileges of the quality

auditors

ii. Course on the effect of human factors and human performance limitations

in maintenance

iii. Course on ECAR 121 L and Part 145 and the related parts.

4.10.4 Non-dedicated Quality Auditors

Page 161: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 20 of 22

Issue Date: 15 Apr 2012

i. In case there is a need to perform a specific product audit where no

permanent / dedicated auditor is available, the Chief Inspector may

nominate candidates to perform the audit after assuring that his

qualifications suits the required tasks in addition to the qualifications of the

permanent auditor.

ii. Non-dedicated auditors shall not be involved in performance of the tasks, in

which they are assigned to act as an auditor.

4.11. Quality Auditors Authorization, Assessment, Management and Records

4.11.1. The quality auditors shall be issued an authorization to act as an auditor.

4.11.2. The authorization of the quality auditors is issued from the Chief Inspector

after assuring that the potential quality auditor is fulfilling the required

qualifications.

4.11.3. The Quality Auditors performance shall be continuously assessed by the

Chief Inspector or his nominee. This assessment will be based upon:

i. The auditor’s ability to discover and categorize the discrepancies.

ii. The auditor’s ability to support the Auditee by proposing appropriate

corrective actions

iii. The auditor’s ability to follow up the guidelines of auditing process.

iv. The spirit of the audit to assist the audited to comply with set requirements.

4.11.4. If the quality auditors’ assessment results are unsatisfactory, the Chief

Inspector may suspend revoke or withdraw the authorization of the

concerned auditor until required qualifications and skills are regained.

4.11.5. The Chief Inspector is responsible to keep the necessary Quality Auditors

records.

4.12. The Audit Team:

4.12.1. The Chief Inspector shall determine the auditor/auditors responsible for

conducting each audit.

4.12.2. Number of auditors performing an audit shall be determined according to

the scope and depth of the audit and the size of the organization to be audited.

4.12.3. The auditors shall have sufficient skills to uncover concealed problems,

define them, and give indications to their causes.

Page 162: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 21 of 22

Issue Date: 15 Apr 2012

4.12.4. The auditors should be familiar with the effect of human factor and human

performance limitation.

4.12.5. The essential responsibility of the auditors is to furnish enough detailed

facts on which a course of corrective actions can rely.

4.12.6. The auditors shall have the authority and the obligation to investigate

anything that would affect aircraft safety, airworthiness or legality.

4.12.7. The auditor is to ensure that the area audited is complying with related

organizational documents. He shall physically verify that all operations are in

accordance with set requirements.

5. Forms:

5.1 Quality Audit Plan Form 102

5.2 Quality Audit Notification Form 101.

5.3 Non-Conformity Report NCR Form 105

5.4 Corrective Action follow-up status Form 104

Page 163: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 22 of 22

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 164: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.11

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

1.11 Aircraft Lease

1. Objective:

To set a policy regarding the handling of leased aircraft.

2. References:

ECAR 91.23, 121.2, 121.153(c), 121.155 and EAC 121-2.

3. Responsibility:

Chief Inspector.

4. Description:

4.1. Types of leases:

4.1.1. Wet lease in

4.1.2. Wet lease out

4.1.3. Dry lease in

4.1.4. Dry lease out

4.2. If EGYPTAIR EXPRESS leases an aircraft in accordance with a lease agreement

as detailed thereunder, the leased aircraft shall comply with the following

requirements before released for flight:

4.2.1. The aircraft has a certificate of registration issued by an ICAO contracting

state,

4.2.2. The aircraft is of a type design that is accepted to ECAA,

4.2.3. The aircraft has a valid certificate of Airworthiness issued by the registring

authority,

4.2.4. The aircraft is in an Airworthy condition,

4.2.5. The aircraft meets the applicable Airworthiness requirements related to

identification and equipment.

Page 165: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.11

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

4.3. For any type of lease, the lease agreement shall determine which party is

responsible for the operational control of aircraft.

4.4. EGYPTAIR EXPRESS shall not lease from another air carrier, or any other person

not engaged in common carriage,

4.5. For any type of lease, the lease agreement shall determine which party is

responsible for aircraft maintenance. If the leased aircraft is a foreign registered

aircraft and is to be maintained by EGYPTAIR EXPRESS, EGYPTAIR EXPRESS

shall be accepted by the registering authority for such function. If the leased aircraft

is a foreign registered aircraft and is to be maintained by foreign personnel, their

licences/ authorizations shall be validated by ECAA.

4.6. For any type of lease, the lease agreement shall contain a truth-in-leasing clause as

a concluding paragraph in large print, immediately preceding the space for the

signature of the parties.

4.7. For any type of lease, the lease agreement shall contain identification of the

reference regulations under which the aircraft has been maintained and inspected

during the 12 months preceding the execution of the lease, and certification by the

parties thereto regarding the aircraft’s status of compliance with applicable

maintenance and inspection requirements in this regulation for the operation to be

conducted under the lease in respect to leased aircraft.

4.8. Unless the lease period is short term agreement a copy of the lease agreement

shall be submitted to the Authority, prior to conducting operations and another copy

must be carried on-board the leased aircraft, and

4.9. The lease agreement shall contain the registration number of the aircraft involved;

4.10. The lease agreement shall assure:

4.10.1. The timing reporting of faults, malfunctions, defects and other occurrences

from the operator to the leasor.

4.10.2. The timing supply of mandatory continuing Airworthiness information

between both parties.

4.10.3. The proper transfer and up-keeping of records and necessary

documentations between both lease parties to fulfill regulatory requirements.

Page 166: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.11

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

4.10.4. The governing record–keeping regulation under which the aircraft records

should be maintained should be determined prior to initiation of the lease or

transfer.

4.10.5. Applicable aircraft maintenance records are made available to the new

operator.

4.11. The following records should accompany the transfer:

4.11.1. Delivery inspection.

4.11.2. A/Ds compliance status.

4.11.3. S/B incorporated.

4.11.4. Time on life limits and life limited parts.

4.11.5. Last scheduled inspection including structural inspection document.

4.11.6. Major repair and alteration.

4.11.7. Part numbers and Serial numbers of installed equipment.

4.11.8. The applicable approved maintenance program

4.11.9. Justification for the performance of the required maintenance.

4.11.10. Certification of release to service.

4.11.11. Procedure to receive and respond to mandatory continuing Airworthiness

information received from the state of design or the state of registry and

should clearly identify the person responsible for these data.

4.11.12. Prior to initiation of the lease or other transfer, representatives of both

parties should co- ordinate the scope and content requirements of the

aircraft technical logs.

4.12. The following information shall be provided to the Authority to be

incorporated inside the certificate holder Operations Specifications:

4.12.1. The names, addresses and responsibilities of the lease parties specifying

the party responsible for operational control and the party responsible for the

continuing Airworthiness of the leased aircraft

4.12.2. The lease duration;

4.12.3. Aircraft type and serial number, nationality and registration of each aircraft

involved in the agreement;

Page 167: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.11

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

4.12.4. The kind of operation;

4.12.5. The times and airports of operation; and

4.12.6. Name and address of registered owner

4.12.7. State of registry and registration marks

4.12.8. C of A and statement from leasor that the aircraft fully complies with the

Airworthiness requirements of the state of registry.

4.13. For any type of lease, the Chief Inspector shall apply to the Authority and

obtain Authority acceptance a suitable time in advance.

4.14. For entrance into any lease agreement, the requirements of EAC121-2

shall be fulfilled.

5. Forms:

Application for Aircraft Lease Form 516.

Page 168: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 4

Issue Date: 4 Aug 2012

1.12 Safety Management

In Maintenance Operations

1. Objective:

This chapter describes how EGYPTAIR EXPRESS achieves safety management in

the activities of its maintenance operations.

2. References:

2.1. ICAO Document 9859.

2.2. ECAA Advisory Circular EAC00-11

2.3. EGYPTAIR EXPRESS Safety Management System Manual (SMSM).

2.4. EGYPTAIR M&E Maintenance Safety Management Manual (MSMM).

3. Responsibility:

3.1. EGYPTAIR EXPRESS Maintenance Director for day to day follow-up,

3.2. EGYPTAIR EXPRESS Chief Inspector for periodic audits.

4. Description:

4.1. As a contractor which provides all maintenance operations to EGYPTAIR

EXPRESS shall have and continuosly implement a Safety Management

System (SMS) , EGYPTAIR M & E shall have and continuosly implement a

Maintenance Safety Management System (MSMS).

4.2. The Safety Management System (SMS) shall cover:

4.2.1. Safety Risk Management; aimed at identification of hazards in the

maintenance operations; and

4.2.2. Safety Assurance that ensures that the identification of hazards and the

assessment of the consequences of safety risks, and the defenses that

exist in the system as a means of control, remain valid and applicable at all

times.

Page 169: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

4.3.1. Safety Policy and Objectives, composing of the following five elements: i. Management Commitment and Responsibility:

ii. Safety Accountabilities:

iii. Appointment of Key Safety Personnel; including a Safety Manager who shall

fulfill four essential functions:

a. Manage and oversee the hazard identification system;

b. Monitor safety performance of operational units directly involved in service

delivery;

c. Advise senior management on safety management matters; and

d. Assist department managers with safety management matters. 

e. The Safety Manager shall have a direct communication link to the

Chairman.

iv. Emergency Response Planning including co-ordination with other concerned

entities

v. SMS documentation

4.3.2. Safety Risk Management and is composed of two elements:

i. Hazard Identification; based on a combination of reactive, proactive and

predictive methods of safety data collection.

ii. Risk Assessment and Mitigation.

4.3.3. Safety Assurance and is composed of three elements:

i. Safety Performance Monitoring and Measurement through:

a. Mandatory Reporting Systems: in which people are required to report certain

types of events or hazards. This necessitates detailed procedures outlining

who shall report and what shall be reported.

b. Voluntary Reporting Systems: in which the reporter, without any legal or

administrative requirement to do so, submits voluntary event or hazard

information. The reported information should not be used against the

reporters, i.e. such systems must be non-punitive and afford protection to

the sources of the information, sometimes incentives to people to encourage

the reporting of such information.

c. Confidential Reporting Systems: these systems aim to protect the identity of

the reporter. Confidentiality is achieved by de-identification, and any

identifying information about the reporter is known only to “gatekeepers” in

Page 170: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 4

Issue Date: 4 Aug 2012

the reporting of such information.

c. Confidential Reporting Systems: these systems aim to protect the identity of

the reporter. Confidentiality is achieved by de-identification, and any

identifying information about the reporter is known only to “gatekeepers” in

order to allow for follow-up or “fill in voids” in the reported event(s).

Confidential incident reporting systems facilitate the disclosure of hazards

leading to human error, without fear of retribution or embarrassment, and

enable broader acquisition of information on hazards.

All these reporting systems shall assure protection of sources of safety

information

ii. The Management of Change

iii. Continuous Improvement of the SMS.

4.3.4. Safety Promotion and is composed of two elements:

i. Training and Education.

ii. Safety Communication.

4.4. EGYPTAIR M & E shall develop and maintain a maintenance safety manual addressing safety risk assessment and mitigation program. This manual shall include:

4.4.1. Scope of the safety management system;

4.4.2. Safety policy and objectives;

4.4.3. Safety accountabilities;

4.4.4. Key safety personnel;

4.4.5. Documentation control procedures;

4.4.6. Coordination of emergency response planning;

4.4.7. Hazard identification and risk management schemes;

4.4.8. Safety assurance;

4.4.9. Safety performance monitoring;

4.4.10. Safety auditing;

4.4.11. Management of change;

4.4.12. Safety promotion; and

4.4.13. Contracted activities.

4.5. EGYPTAIR M&E shall inform EGYPTAIR EXPRESS Chief Inspector

immediately of any occurrence during performing maintenance operation

Page 171: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 1:Management

Chapter 1.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 4

Issue Date: 4 Aug 2012

to any of EGYPTAIR EXPRESS property, and all procedures and safety

risk assessment and mitigation and the related safety issues submitted for

any type of lease, the lease agreement shall contain a truth-in-leasing

clause as a concluding paragraph in large print, immediately preceding the

space for the signature of the parties.

4.6. EGYPTAIR EXPRESS will perform periodic audits according to a preset audit

plan on EGYPTAIR M&E Safety Management processes to ensure continuous

compliance with set safety requirements of implementing the requirements.

Audits findings shall be timely corrected by EGYPTAIR M & E.

5. Forms:

5. 1. Hazard/ Confidential Human Factors Report Form. FORM 002

5. 2. Voluntary Report Form. FORM 003

Page 172: Express Mcm Issue 4 Amend 01 4 Aug 12

Part (2): Maintenance Control

Page 173: Express Mcm Issue 4 Amend 01 4 Aug 12

This page is intentionally left blank

Page 174: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 2

Issue Date: 4 Aug 2012

Index

2.00 Index

2.01 Maintenance Program

2.02 Maintenance Planning

2.03 Maintenance Control and Follow-up

2.04 Parts Removal and Installation

2.05 Deferred Maintenance

2.06 Continuing Airworthiness

2.07 Repairs and Modifications

2.08 Defect Recording and Control

2.09 Reserved

2.10 Aircraft Recorders

2.11 Electronic Navigation Data Management

2.12 Reduced Vertical Separation Minima (RVSM)

2.13 Reporting to the Authority and the OEM Type Certificate Holder

2.14 CAT - II Operations

Page 175: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 2

Issue Date: 4 Aug 2012

This page is left intentionally blank

Page 176: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 10

Issue Date: 4 Aug 2012

2.01 Maintenance Program

1. Objective:

To describe how to set a program of maintenance, preventive maintenance, alteration

for the specified aircraft, engine, systems and emergency equipment.

2. References:

ECAR 91.415, ECAR 91.423, 91.609, 121.135 and 121.374

Aircraft Maintenance Program documents reference numbers EMB 170/MP

3. Responsibility:

3.1. Chief Inspector for processing for Authority approval and for the handling interval

escalation.

3.2. Execluding interval escalation, function is contracted under the supervision of the

Maintenance Director.

4. Description

4.1. General :

4.1.1. EGYPTAIR EXPRESS has, a Maintenance Program and Maintenance Data for

each type of aircraft it operates. The Maintenance Program and Maintenance

Data for any aircraft shall be approved or accepted by ECAA before its

implementation. The Maintenance Program and Maintenance Data are to be

provided for the use and guidance of relevant maintenance personnel .

4.1.2. AMO develops on behalf of EGYPTAIR EXPRESS the customized maintenance

program (MP) document for each type/model of aircraft using Type Certificate

Holder Maintenance Planning Document (MPD) or equivalent as the main

reference.

4.1.3. Customized Maintenance Program shall fulfill the requirements of ECAA, type

certificate holder, supplmental type certificate holder ,the state of design and the

OEMs of Aircraft, engine , component (see Fig 1).

Page 177: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 10

Issue Date: 4 Aug 2012

4.1.4. The Maintenance Program shall contain the following information for each aircraft

as applicable, taking into account the anticipated utilisation of the aircraft;

i. EGYPTAIR EXPRESS name and address;

ii. The type, model and registration of the aircraft, engines and, auxiliary power

units;

iii. List of effective pages;

iv. Maintenance tasks and intervals at which they are performed taking into

accounthe anticipated utilization of the aircraft and where utilization cannot be

anticipated, calendar time limits shall be included.

v. A continuing structural integrity program;

vi. A system that identifies mandatory maintenance tasks, and their corresponding

intervals for tasks that have been specified as mandatory in the approval of the

type design, (i.e., Certification Maintenance Requirements (CMRs));

vii. Procedures for changing or deviating from items iv, v and vi above.

viii. Condition monitoring and reliability program description for aircraft systems,

componants and powerplants;

ix. Reference identification of the program document, the date of issue and issue

number;

x. A statement signed by Chief Inspector to the effect that the specified aircraft is

maintained in accordance with the program and that the program is reviewed

and updated as required;

xi. Provision to record date and reference to approved amendments incorporated

in the program;

xii. Details of pre-flight maintenance tasks accomplished by maintenance

personnel and not included in the Operations Manual for action by flight crew;

xiii. The tasks and the periods (intervals/frequencies) at which each part of aircraft,

engines, APUs, components, accessories, equipment, instruments, electrical

and radio apparatus and associated systems and installations are to be

inspected with the type and degree of inspection;

xiv. The periods when items are checked, cleaned, lubricated, replenished,

adjusted and tested;

xv. Details of specific structural inspections or sampling program;

xvi. Details of the corrosion control program;

Page 178: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 10

Issue Date: 4 Aug 2012

xvii. The periods and procedures for the collection of engine health monitoring data;

xviii. The periods when overhauls and/or replacements by new or overhauled parts

are to be made;

xix. Cross-reference to other documents approved by ECAA that contain details of

maintenance tasks related to mandatory life-limitations, Certification

Maintenance Requirements (CMR) and Airworthiness Directives (ADs); with

specific identification and care as to the mandatory status of these tasks;

xx. Details of, or cross-reference to, Reliability Program or ;

xxi. A statement that practices and procedures to satisfy the program are included

in a customised operator’s maintenance manual approved by ECAA;

xxii. Each maintenance task quoted is defined in the definitions section of the

program;

4.1.5. Customized Maintenance Program shall meet aircraft, engine, component

manufacturers requirements and EGYPTAIR EXPRESS specific requirements.

4.1.6. Any additional ECAA requirements related to the type/model

4.1.7. The MP shall contain all required aircraft maintenance tasks and intervals at

which each task is to be executed. Intervals may be stated in Calender

(Days/Months/Years) or in Flying Hours(FH) or in Cycles(C) of operation.

4.1.8. For ease of aircraft maimtenance scheduling, Flying Hours or Cycles may be

transferred into Calender depending on fleet average utilization and FH/C ratio.

Such ratio shall be updated at least once each twelve months to reflect actual

utilization.

4.1.9. The MP shall highlight mandatory tasks which are tasks required by ECAA, or

by the type certificate holder’s authority or contained in the concerned

MaintenanceReview Board (MRB) document .

4.1.10. The MP shall highlight RII tasks and special tasks such as those related to

operation shall be clearly identified in the MP.

4.1.11. The MP shall contain recommended tasks gained by local in-service

experience.

Page 179: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 10

Issue Date: 4 Aug 2012

4.1.12. The MP shall address how the Condition Monitoring(CM) items are to be

handled.

4.1.13. The MP may contain non-mandatory bulletins or recommendations issued by

the manufacturer. Non mandatory information such as service bulletins,

service letters and other information produced for the aircraft and its

components issued by an approved design organization, the manufacturer or

authorities shall be assessed to determine its use and implementation.

4.1.14. Maintenance scheduling and maintenance task sequencing shall take into

consideration the human factor principles and human limitation requirements

that includes, but is not limited to:

i. Layout of the Maintenance Item;

ii. Language used;

iii. Clear and concise instructions that are as brief and succinct as possible;

iv. Standardization of all task cards at the beginning to include the appropriate

personnel safety warnings and cautions;

v. All notes, warnings and cautions shall be apparent by the suggested use of

boxing, bolding, utilizing and underlining text;

vi. Contain clear instructions for the mechanic/inspector as to where to sign,

certify, initial, date the task;

vii. Where possible, colored cards may be used to display Maintenance Items and

task cards;

viii. Where a Maintenance Item has important graphic details, the graphics shall be

included;

ix. Full amplification of some tasks rather than referral to a separate document that

may distract the maintenance person; and;

x. Referral to the applicable Approved Data

4.1.15. Initial MP issue and all permanent revisions shall be approved by ECAA

before being implemented..

4.1.16. The approved master copy of MP will be kept by the contracted AMO under

the supervision of the Chief Inaspector.

Page 180: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 5 of 10

Issue Date: 4 Aug 2012

4.1.17. An MP distribution list is to be generated by MP issuer (AMO Engineering

Directorate) in which all MP users is listed. Sufficient number of copies is to

be produced as per the distribution list.

4.1.18. MP are to be made on a media form or on an A4 loose papers and put on a

three hole folder manual for ease of amending.

4.1.19. Approved aircraft maintenance programs shall be periodically reviewed (at

least once yearly) to ensure they reflect current type certificate holder's

recommendations, revisions to the Maintenance Review Board Report , the

mandatory requirements and maintenance needs of the aircraft.

4.1.20. Chief Inspector shall review the detailed requirements at least once annually

for its continued validity in light of the operating experience

Fig 1

4.2. MP Approvals

4.2.1. The Contracted Maintenance Engineering Directorate is responsible for

producing proposal aircraft MP issue or any amendment thereto,

4.2.2. The proposd aircraft MP or any amendment shall be sent to Chief Inspector for

review, acceptance and proceed for approval from ECAA

4.3. MP Amendment:

4.3.1. The MP shall be revised each time the MPD, or equivalent document, is revised

but in all cases shall be revised at least once each twelve months.

Manufacturer Maintenance

Manual

Manufacturer MPD

MRB Report

Maintenance Program

management

Customized Maintenance Program

Job Cards

Service Letters

ECAA Requirements

RCB Recommendations

Sٍervice Bulletins and EO

EOM Manuals

Airworthiness Directivities

Page 181: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 6 of 10

Issue Date: 4 Aug 2012

4.3.2. Period between issue date of an MPD new revision and the corresponding MP

revision issue are conveyed within a timeframe that will permit implementation

of changes to the Maintenance Program prior to the effective date of the

amendment.or four months whichever comes first

4.3.3. In case an amemded MP which encompasses additional tasks or additional

ristrictions than the then applied MP issuance is delayed is delayed due to

reasons beyond control, a temporary revision containing such additional tasks

or additional restrictions shall be issued to comply with any requirments as to

its effective date.

4.3.4. EGYPTAIR EXPRESS planning checks monthly manufactures MP revisions to

assure that the revision used by maintenance provider is the last revision.

4.3.5. Whenever ECAA finds that revisions to an approved aircraft maintenance

program are necessary for the continued adequacy of the program, EGYPTAIR

EXPRESS shall, after notification by ECAA, make any changes in the program

found to be necessary by the ECAA.

4.3.6. MP Amendments shall be distributed in due time to all MP users, according to

the distribution list and a receiving receipt shall be signed and provided to TPD

as a feed back.

4.3.7. A list containing the distribution, acknowledgement of receipt of MP and its

amendments and acknowledgement of embodiment into respective copies

signed by each recipient shall be maintained at the document distribution

section.

4.3.8. Each holder of an MP is responsible for embodiment of the received

amendments in due time.

4.3.9. Each recipient shall send a feedback to the document distribution section that

he has updated his copy to the latest amendment.

4.3.10. To ensure its adequacy and effectiveness, and to confirm that it is being properly

controlled and adhered to, the MP shall be supplemented by a reliability program.

4.3.11. When there is a need to change from one approved aircraft maintenance

program to another approved programm, the two programs shall be reviwed by

Page 182: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 7 of 10

Issue Date: 4 Aug 2012

Engineerig and a transfer check/Inspection (bridging) may need to be issued

and performed as agreed with ECAA, in order to implement the change.

4.4. Calculation of Maintenance Interval for a New Aircraft:

4.4.1. Unless otherwise specified in the delivery documentation of an aircraft, the

starting point for calculation of the due dates or times of the aircraft

maintenance tasks (flight cycles, flight hours or calendar time) is to be the first

flight of the aircraft.

4.4.2. The date of transfer of title may be used for calculation of the due date of tasks

with a calendar interval if the transfer occurs within 90 days of the date of the

first flight and the aircraft has been stored in accordance with manufacture's

procedures. Authority acceptance is required in this case.

4.4.3. The next date for intervals for scheduled maintenance tasks is calculated

starting from the completion date of the previous accomplishment.

4.5. Tasks Short Term Escalation:

4.5.1. Short Term Escalation Limitation:

i. A short term escalation program in which maintenance intervals may be

escalated is granted ECAA to EGYPTAIR EXPRESS in its Operations

Specifications and within certain limits. This privilege may be applied only in

justified exceptional circumstances, and only if such escalations are technically

feasible, such as:

a. Compensating for over-runs providing that the check interval shall not put

back the due date of the next check.

b. Carrying out maintenance intervals early, then the calculation of the next

check date should start from the date brought forward.

c. Shortage of parts, material or manpower.

ii. Safety aspects shall be considered before implementing the short-term

escalations limitation.

iii. Chief Inspector may set other restrictions to the occurrence of repetitive short-

term escalation.

Page 183: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 8 of 10

Issue Date: 4 Aug 2012

iv. Short-term escalation shall not be used to extend the following, unless specific

approval is taken from the ECAA:

a. Intervals specified by Airworthiness Directives.

b. Life limits specified by type certificate and supplemental type certificate data

sheets

c. Maintenance Program tasks which have been classified as mandatory by the

TC holder or the authority.

d. Tasks originated by Certification Maintenance Requirements (CMR)

4.5.2. The maximum variation of a prescribed period for an item is as follows: i. Items controlled by flight hours 10 % and not exeed 500 Hrs

ii. Items controlled by number of landings /cycles 5 % and not exeed 250 landings

/cycles

iii. Items controlled by calendar time:

a. One month for one Year or less checks.

b. Two months for two to three years checks

c. Three months for more than three years checks

iv. .Items controlled by more than one limit e.g. items controlled by flying hours

and calendar time or flying hours and landings / cycles, the more restrictive limit

should be applied.

4.5.3. Procedure:

i. Applications for escalation shall be forwarded to Chief Inspector on form No

311

ii. Applications for Escalation shall be forwarded three working days in advance

before the task(s) / check is due for checks up to and including multiple A

checks

iii. Two weeks in advance before the check is due for higher checks.

iv. Reasons for application for task(s)/check escalation shall be justified.

4.5.4. Escalation to a higher figure:

For escalation to a higher figure Form 311 with Appropriate Technical

Justification will be presented to ECAA by Chief Inspector before exceeding the

previously mentioned short-term escalation limitations for approval.

4.5.5. ECAA will be notified on yearly basis by short term escalation authorization

Page 184: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 9 of 10

Issue Date: 4 Aug 2012

5. Forms

5.1 Form No. 311.

5.2 Alert Notice (Maintenance Reliability Program) Form 134.

5.3 Reliability Mandatory Investigation – Action Report Form 139.

Page 185: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 10 of 10

Issue Date: 4 Aug 2012

This page is intentionally left blank

Page 186: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 6

Issue Date: 4 Aug 2012

2.02 Maintenance Planning

1. Objective:

This procedure describes how to develop Aircraft Maintenance Plan in order to track

required maintenance activities to comply with the applicable maintenance program

without impeding operation schedule. The procedure also explains how to assign

different aircraft for different flight schedules and how to produce a maintenance plan

for the whole fleet.

2. References:

ECAR 121.151, 121.153(a), (b), 121.157, 121.361, 121.367, 121.369, 91.7, 91.405,

and 91.407   

3. Responsibility:

3.1. EGYPTAIR EXPRESS Maintenance Director supervises the forecasting and

tracking the timely implementation of required aircraft maintenance activities

through AMO Planning section.

3.2. EGYPTAIR EXPRESS Planning Manager, , reviews the forcast of all fleet

maintenance checks, with consideration to the flight hours, flight cycles and/or

calender of each aircraft type according to the approved Customized

Maintenance Program and also reviews Bill of Work relevant to each aircraft

accordingly

4. Description

4.1. Maintenance Planning:

AMO Planning Manager shall, have a system for forecasting and tracking the timely

implementation of required aircraft maintenance activities .

4.2. Maintenance Director make necessary reviews to insure that AMO:

4.2.1. Develop maitenance yearly plan including :

i. The yearly allocation of flying time

ii. Usage Rate

iii. Aircraft availability

Page 187: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 6

Issue Date: 4 Aug 2012

iv. Other related planning data

4.2.2. Develops maitenance quartly/monthly plan with the necessary information

relating to the use of assigned aircraft and the maintenace effort and

capabilty required to provide the necessry suport.

4.2.3. Forward the quarterly and monthly plan to the AMO scheduling sectin to

develop weekly and daily schdules taking into consideraton any required

adjustments for unscheduled maintenance and operational requirments.

4.2.4. Program required maintenance checks according to the approved

Maintenance Program.

4.2.5. Prepare required work packages for execution. Package shall include, but

not limited to, the following elements:-

i. Master Index;

ii. Routine task cards;

iii. Engineering Order (AD's, SB's);

iv. Special work requirements;

v. Previously carried forward items; and

vi. Components due for removal.

4.2.6. Task Cards shall include necessary reference to Airworthiness Data.

4.2.7. Any issued non-routine task or finding shall be referenced to the originating

Task Card.

4.2.8. In Case of any deviation or deferral, reference shall be made to the

Maintenance Director.

4.2.9. Line maintenance work is to be scheduled without affecting Airworthiness

requirements or disturbing aircraft daily operational needs.

4.3. For tracking hours, cycles and calendar time for aircraft, engines and life-limited

components:

4.3.1. For aircraft equipped with ACARS system,ACARS system automatically sends

movement data to Opera system through the Fleet Watch system which

subsequently provides on time aircraft flight hours and cycles.

4.3.2. N.A.

4.3.3. In all cases the technical log pages are retained in which aircraft movement

data can be used whenever needed.

Page 188: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 6

Issue Date: 4 Aug 2012

4.3.4. Aircraft and componant data will be updated according to data from 4.3.1 or

4.3.2.

4.3.5. Aircraft daily status is sent to EGYPTAIR EXPRESS Chief Inspector and

Maintenance Director by e-mail.

4.3.6. Fortnight form are sent biweekly including A/C and Engines status

4.4. Maintenance Plans and Flight schedules for different fleets including maintenance

checks/stops are issued accordingly.

4.5. Planning performance is reviewed monthly by the Planning Manager.

4.6. Planning schedules used are issued by the AMO as follows:

4.6.1. Daily Operations Schedule:

This Schedule Form No. LPM-MC-PM-01-F06 is issued daily at 16:00 hrs

covering the following day operations plan taking into consideration current daily

events that might affect the schedule.

All flights are revised within each fleet type and assigned to a specific aircraft

registration number highlighting any restrictions that might exist. Flights are

derived from fleet watch. This schedule contains all types of maintenance

activities (checks/stops such as weekly, A checks…..etc)

4.6.2. Aircraft Hours Report:

This report is issued twice a week; on Monday and Thursday of each week

using Form No. LPM-MC-PM-01-F04 and includes flight hours of each aircraft

since its last hangar visit up to the date of issue including all escalations given

to each aircraft.

Hours are provided by records department via AMO Records server.

This report generates the following two reports.

4.6.3. Next due Checks Report:

This report is an extract of Aircraft hours report and indicates last check carried

out, hours, cycles and the expected coming check depending on the utilization

and the calculation of remaining hours/cycles/calendar to the next due check.

The report takes the form No. LPM-MC-PM-01-F04 and is submitted to the line

maintenance manager.

4.6.4. Operations Schedule:

Page 189: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 6

Issue Date: 4 Aug 2012

Flight schedule is received from EGYPTAIR EXPRES Services Department

on weekly basis. Maintenance activities are allocated and a final plan is

established.

4.6.5. Checks Record:

This is a historical log where all aircraft checks since delivery are recorded

identifying check type, date, hours and cycles at which the check was carried

out. Data are collected from AMO record server and exported to excel file.

4.6.6. Weekly Operations Schedule:

This schedule is issued on weekly basis, each Thursday, indicating flights

schedule per aircraft and assigned maintenance activities per registration

number. This Schedule is prepared according to approved flight schedule

agreed upon in a fixed meeting held each Tuesday between AMO and

EGYPTAIR EXPRESS representatives

4.6.7. Weekly workload Report:

This report is an extract of the weekly operations schedule. It is issued weekly

on Wednesday indicating all maintenance activities during the coming week .it

contains assigned registration numbers to flights, standby aircraft and aircraft

grounded for either line or base maintenance.

Form No. LPM-MC-PM-01-F09 is used and submitted to maintenance and

contracting director.

4.6.8. Monthly, Quarterly and Yearly Plans:

Monthly, Quarterly and Yearly plans are issued to illustrate all types of checks

and maintenance activities with respect to its due checks, required downtime

and aircraft hours and cycles. These plans are forwarded to Contracted AMO to

assign Maintenance location.

4.7. Communication between EGYPTAIR EXPRES and AMO:

A weekly meeting takes place each Tuesday between EGYPTAIR EXPRESS and

AMO Planning department. This meeting discusses the flight schedule for the

upcoming week. Results and recommendations of the meeting are reflected into the

weekly operations schedule issued by Planning Department. Decisions and actions

of the meeting are reflected directly into the fleet watch system.

Page 190: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 5 of 6

Issue Date: 4 Aug 2012

4.8. All planning records will be maintained in form of hard copies except check record

which will be maintained in an excel format file with backup copy updated daily or

otherwise as necessary.

5. Forms:

The following forms are maintained in planning department according to corresponding

retention time:

Form No. Retention period

LPM-MC-PM-01-F01 5 years

LPM-MC-PM-01-F02 3 years

LPM-MC-PM-01-F03 One year

LPM-MC-PM-01-F04 One year

LPM-MC-PM-01-F05 One year

LPM-MC-PM-01-F06 3 months

LPM-MC-PM-01-F07 3 years

LPM-MC-PM-01-F08 One year (Excel file)

LPM-MC-PM-01-F09 3 months

Page 191: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 6 of 6

Issue Date: 4 Aug 2012

This page is intentionally left blank

Page 192: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 16

Issue Date: 15 Apr 2012

2.03 Maintenance Control and Follow-up

1. Objective:

1.1. This procedure describes the aircraft maintenance control and follow-up

scheduling and approving non-routine work and deferred maintenance

activities.

1.2. To implement applicable standards and regulatory requirements regarding the

maintenance of aircraft including the policy for performing test flights and

release to service for aircraft and aircraft components

2. References:

2.1. ECAR 43.1, 43.5, 43.7, 43.9, 43.13, 91.7, 91.407, 121.151, 121.153(a), (b),

121.157, 121.361, 121.369.

2.2. Maintenance Agreement with AMO

3. Responsibility:

3. 1. Maintenance Director for supervision.

3. 2. Function is contracted to an ECAR Part 145 Approved Maintenance

Organization

4. Description:

4.1. EGYPTAIR EXPRESS shall have a maintenance control system that is in

accordance with procedures acceptable to ECAA that insures:

4.1.1. Each aircraft is duly registered and the appropriate certificates with

respect thereto are aboard the aircraft.

4.1.2. Each aircraft is maintained in an airworthy condition by insuring that .

i. Compliance with all applicable air worthiness requirements submitted by

the state of design

ii. The mandatory replacement times, inspection intervals, and related

procedures specified in manufacturer’s maintenance manual that or

alternative inspection intervals and related procedures set forth in an

operations specification approved by the ECAA or in accordance with an

inspection program approved.

Page 193: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 16

Issue Date: 15 Apr 2012

iii. The aircraft inspected and all discrepancies repaired as prescribed in

Manufactures manuals

iv. Maintenance personnel make appropriate entries in the aircraft

maintenance records indicating the aircraft have been approved for

return to service;

v. Any inoperative instruments or item of equipment, permitted to be

inoperative by CMEL repaired, replaced, at the concerned time.

vi. When listed discrepancies include inoperative instruments or equipment,

a placard shall be installed as required.

4.1.3. The Certificate of Airworthiness remains valid.

4.1.4. Operational and emergency equipment necessary for flight is serviceable

4.1.5. Appropriately equipped, configured and maintained for its intended use.

4.1.6. Maintained in conformance with this Maintenance Control Manual.

4.2. The Maintenance Director shall monitor maintenance activities to ensure the

following:

4.2.1. All maintenance on aircraft or aircraft component shall be carried out by or

through a maintenance organization approved / accepted by ECAA in

accordance with ECAR Part 145.

4.2.2. Aircraft is maintained according to a continuous Airworthiness

maintenance program. refer to Chapter 2.01.

4.2.3. All tasks defined in the maintenance agreement with each external

maintenance organisation that performs maintenance functions for

EGYPTAIR EXPRESS are completed in accordance with the maintenance

agreement and within the required time constraints.

4.2.4. Contracted AMO fulfills the ECAA requirements regarding the level of

technical personnel, equipment, tools, maintenance data, record keeping,

documentation and facilities. EGYPTAIR EXPRESS should audit the

fulfillment of such requirements.

4.2.5. Contracted AMO continuously manages and control of outstations

maintenance requirements, procedural issues, availability of required

resources (spares and material, manpower, technical data, facilities, tools

and equipment) according to aircraft type/scheduling whether

Page 194: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 16

Issue Date: 15 Apr 2012

maintenance is being performed by his staff or performed by another

subcontractor.

4.2.6. Contracted AMO shall have a detailed information with respect to all

locations where aircraft maintenance is to be performed (Ref. to 06.02

Line stations locations)

4.2.7. Contracted AMO ensures that all maintenance personnel, when abroad,

comply with the laws, regulations and procedures of those states where

the operations are conducted in proper time.

4.2.8. Contracted AMO shall transfer technical records, if any, to the EGYPTAIR

EXPRESS in proper time According to ch.1.06-4.3.2

4.2.9. Contracted AMO shall report to EGYPTAIR EXPRESS & ECAA aircraft

technical occurrences in due time

4.2.10. Where tasks are subcontracted by the AMO to other organisations their

accomplishment are subject to the quality system of the AMO as if it was

done in his facilities. .

4.2.11. Contracted AMO determines the required servicing material, its

specifications and required stocking for each type of aircraft. AMO is also

be responsible to supply, store, identify and segregate the required

material. After completion of all maintenance, a general verification shall

be carried out by the appropriately qualified AMO personnel to ensure the

aircraft or component is clear of all tools, equipment and any other

extraneous parts and material and that all access panels removed have

been refitted.

4.2.12. All maintenance, repairs and modifications are made following the

methods, techniques, standards, and instructions specified in the

Airworthiness data.

4.2.13. All maintenance is performed using the tools, equipment and material

specified in Airworthiness data. Where necessary, tools and equipment

shall be controlled and calibrated to an officially recognized standard.

4.2.14. All maintenance is performed within any environmental limitations

specified in the Airworthiness data. In case of inclement weather or

lengthy maintenance, proper facilities shall be used.

Page 195: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 16

Issue Date: 15 Apr 2012

4.2.15. Contracted AMO schedules routine or lengthy aircraft maintenance in

coordination with Maintenance Director with minimum effect on operational

requirements.

4.2.16. Contracted AMO shall be responsible to prepare the Bill of Work,

Maintenance Work Packages according to the approved Maintenance

Program requirements, arrange for manpower, Hangar space, and facility

arrangement to schedule the required work.

4.2.17. Maintenance Director reviews and approves the Bill of Work content after

ensuring that all the tasks (routine, nonroutine, cabin, S/B list, A/Ds list and

additional work) are included and in accordance with the approved

Maintenance Program requirements.

4.2.18. EGYPTAIR EXPRESS on site representative at AMO facility during the

performance of the maintenance services will receive a copy of the

approved Bill of Work to ensure the following:

i. Maintenance operations carried out by AMO are compling with the

following:

a. Conditions and restrictions of the OPS SPECs;

b. ECAA requirements;

c. Standards established by EGYPTAIR EXPRESS in the MCM.

d. Standards established by manufacturers

ii. Proper dispatch of aircraft, with regard to the control of defects:

iii. Ensure that hangar is adequately equipped with tools and equipment

required to perform the job

iv. Maintain a standard of aircraft cleanliness and appearance.

4.2.19. EGYPTAIR EXPRESS on site Representative shall receive an advanced

copy of the summery report: issued by AMO which include all maintenance

Tasks performed and cover the Bill of Work requirement

4.2.20. Appropriately qualified personnel perform all maintenance.

4.2.21. Appropriately qualified independent inspection personnel execute tasks

requiring inspection.

4.2.22. Required inspection items’ tasks shall include any flight safety sensitive

maintenance.

Page 196: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 5 of 16

Issue Date: 15 Apr 2012

4.2.23. Persons authorized to issue a certificate of release to service for aircraft or

aircraft component shall be appropriately authorized according to ECAR

145 requirements or through a procedure approved or accepted by ECAA.

4.2.24. Contracted AMO shall publish guidance to maintenance personnel

performing maintenance tasks, as appropriate, defining responsibilities for

these actions. This guidance must address the procedures to determine

the necessary maintenance action required by the certifying staff as

appropriate.

4.2.25. Applicable Airworthiness directives shall be accomplished in due time.

4.2.26. Contracted AMO shall ensures databases for use in aircraft navigation

systems are inserted prior to the first flight on the effective date for the new

database

4.2.27. If the aircraft is found to be airworthy and approved for release to service,

the following or a similarly worded statement should be used: "I certify that

this aircraft has been inspected in accordance with (insert type per

approved maintenance program) inspection and was determined to be in

airworthy condition”.

4.2.28. If during performing any maintenance it is found that unserviceable items

affecting airworthiness, non-routine card shall be arised and used for

recording and rectifiing the unserviceable items

4.2.29. If during performing any maintenance it is found that the aircraft is un-

airworthy or does not meet applicable type certificate data, Airworthiness

directives, or other approved data upon which its Airworthiness depends,

the AMO gives EGYPTAIR EXPRESS a signed,dated and detailed list of

those discrepancies and they shall be listed in the appropriate aircraft

records.

4.3. Aircraft Release to Service (CRS):

4.3.1. A Certificate of Release to Service (CRS) is required before flight at the

following:

i. Completion of any maintenance package specified by EGYPTAIR

EXPRESS.The maintenance package may include any one or a

combination of the following elements: a check or inspection from the

Page 197: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 6 of 16

Issue Date: 15 Apr 2012

approved aircraft maintenance program, Airworthiness Directives,

overhauls, repairs, modifications, aircraft component replacements and

defect rectification.

ii. Completion of any defect rectification, while the aircraft operates flight

services between scheduled maintenance. New defects or incomplete

maintenance work orders identified during maintenance shall be brought

to the attention of the EGYPTAIR EXPRESS to obtain an agreement to

rectify such defects or complete the missing elements of the

maintenance work order. In the case where such maintenance is to be

postponed and provided this missing element/defect does not affect the

airworthiness of the aircraft, this fact shall be entered in the aircraft CRS

before issue of such certificate.

4.3.2. Contracted AMO shall produce a completed and signed maintenance

release that certifies all maintenance work performed has been completed

satisfactorily and in accordance with the approved data and procedures

described in the MOE. The maintenance release shall include:

i. Basic details of the maintenance performed;

ii. A reference of the approved data used;

iii. The date such maintenance was completed;

iv. Identity of the approved maintenance organization;

v. Identity of the person or persons signing the release.

4.3.3. Before releasing an aircraft for flight, it shall comply with the following

requirements :

i. The aircraft has a Certificate of Registration issued by ECAA,

ii. The aircraft has a valid Certificate of Airworthiness issued by ECAA.

iii. The aircraft has a valid Certificate of Noise issued by ECAA.

iv. The aircraft meets the performance requirements of its type certificate

data sheet,

v. The aircraft weight and centre of gravity are determined using an

approved weight and balance program,

vi. The aircraft complies with internal/external markings and placards

requirements.

Page 198: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 7 of 16

Issue Date: 15 Apr 2012

vii. The aircraft meets the applicable Airworthiness requirements, i.e. has a

maintenance release to service certificate duly issued and signed. This

release to service certificate shall be issued before flight, after the

completion of any maintenance and shall be signed by an appropriately

authorized person in accordance with ECAR Part 145.

viii. The Airworthiness release of aircraft, which follows the line maintenance

is to be recorded in the aircraft Technical log. Entry of a check type and

sign-off constitutes a complete Airworthiness release to service.

ix. The Airworthiness release following a routine maintenance check shall

be recorded on Relevant certificate of release to service form. The form

contains Aircraft data, check, release period/flying hours, sign off and

stamp of certifying personnel.

x. Before signing the release to service the authorized person shall ensure

that all necessary maintenance work ,major repair and major modificatin

has been carried out according to an approved procedure, and approved

data. He shall ensure also that no known condition exists which would

make the aircraft/component un-airworthy and so far as the work

performed is concerned, the aircraft or component is in a condition for

safe operation. All such work shall be appropriately documented.

xi. Release to service certification form shall meet ECAArequirements.

4.3.4. The person signing the certificate of release shall be satisfied that all work

included in the work package has been properly carried out. A list by

name, title and authorizations granted on type/rating for persons

authorized to issue release to service shall be made by the contracted

AMOand continuously updated.

4.4. Component Release to Service (CRS):

4.4.1. A CRS is necessary at the completion of any maintenance on an aircraft

component while off aircraft (Authorized release certificate/airworthiness

approval tag) constitutes the aircraft component certificate of release to

service.

4.4.2. To install a component in aircraft it shall be in a satisfactory condition has

been appropriately released to service using Authorized Airworthiness

Page 199: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 8 of 16

Issue Date: 15 Apr 2012

Release Certificate / Airworthiness Approval Tag issued by the

manufacturer or by an approved or accepted ECAR Part 145 maintenance

organization or an appropriate equivalent document. For expendables, the

Authorized Airworthiness Release Certificate / Airworthiness Approval Tag

may be substituted by a certificate of conformity issued by the approved

supplier. The certificate shall contain necessary data about the item, entry

of the work performed, sign off and stamp.

4.4.3. A component is considered serviceable if it was temporarily removed from

aircraft for accesability.

4.4.4. Prior to installation of a component on an aircraft the installer shall ensure

that the particular component is eligible to be fitted when different

modification and/or Airworthiness directive configurations may be

applicable.

4.4.5. Standard parts shall only be fitted to an aircraft or component when the

maintenance data specifies the particular standard part. Standard parts

shall only be fitted when accompanied by evidence of conformity traceable

to the applicable standard.

4.4.6. Material being either raw material or consumable material shall only be

used on an aircraft or a component when the aircraft or component

manufacturer states so in relevant Airworthiness data. Such material shall

only be used when it meets the required specifications and has

appropriate traceability. All material must be accompanied by

documentation clearly relating to the particular material and containing

conformity to specification statement plus both the manufacturing and

supplier source.

4.4.7. Installed service life limited components shall not exceed the approved

service life limit as specified in the approved maintenance program. Such

components shall have records that can provide component history

traceable to initial introduction of component into service.

4.4.8. A component shall be considered unserviceable in any one of the

following circumstances:

i. Expiry of the service life limit as defined in the maintenance program;

Page 200: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 9 of 16

Issue Date: 15 Apr 2012

ii. Non-compliance with the applicable Airworthiness directives or other

continued Airworthiness requirements mandated by ECAA.

iii. Absence of the necessary information to determine the Airworthiness

status or eligibility for installation;

iv. Evidence for defects or malfunctions

v. Involvement in an incident or accident likely to affect its serviceability.

4.4.9. Unserviceable components shall be identified and stored in a secure

location under the control of the approved AMO until a decision is made in

the future status of such component.

4.4.10. Components which have reached their certified life limit or contain a non-

repairable defect shall not be permitted to re-enter the serviceable

component supply system unless certified life limits have been extended

or a repair solution has been approved according to Authority

requirements.

4.4.11. During component transportation and storage, necessary measures shall

be taken to protect against corrosion or damage.

4.4.12. If the need calls for installation of a part fabricated within the contracted

Part-145 approved maintenance organization, such part shall comply with

related specifications. Standard parts are to be fabricated in accordance

with the corresponding international standards. Fabricated parts installed

in aircraft shall have an appropriate certificate of conformity issued by an

appropriately qualified person according to an approved procedure within

the Part-145 organization.

i. Fabricated parts are only allowed for replacement of irreparable parts

that cannot be obtained in time or not economically viable to be obtained

as an original part or if the part does not relate to Airworthiness provided

that it complies with pre-specified approved specifications.

ii. Each fabricated part shall be appropriately identified according to an

approved procedure.

iii. Used materials shall be traceable to required material specifications.

4.5. Contracted AMO Maintenance Control Center MCC is responsible to:

Page 201: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 10 of 16

Issue Date: 4 Aug 2012

4.5.1. Coordinate with production control sections in hangars and line

maintenance for monitoring the progress of maintenance work and

detecting technical discrepancies that may affect aircraft operation, For

each operating aircraft, tracking and determining its technical status.

4.5.2. Be responsible for controlling, monitoring and scheduling non-routine and

deferred maintenance activities and obtaining necessary approvals,

including any CMEL/CDL requirements.

4.5.3. Recommend aircraft operational schedule adjustments to comply with

requirements for non-routine maintenance and defect rectifications.

4.5.4. Communicate with flight crew and line maintenance personnel about

maintenance discrepancies, deferred maintenance and CMEL items in co-

ordination with integrated operation control center (IOCC) .

4.5.5. Notify mechanical difficulties which may result in cancellation ,delayed or

emergency conditions are promptly notified to :

i. Chief Inspector.

ii. Maintenance Director.

iii. ECAA.

4.5.6. Supporting line maintenance requirements to assure dispatch of airworthy

aircraft. This includes: Providing proper interpretation of technical issues

pertinent to the situation, emergency mandatory requirements such as

telegrammic ADs/CNs and All Operator Telexes and when necessary,

obtaining additional technical assistance from Engineering to assure that

the requirements are met or a proper decision is made.

4.5.7. Coordinating and authorizing maintenance whenever an in-service aircraft

with a mechanical difficulty is en-route to, at, or inbound from a station.

4.5.8. Control of maintenance functions. This is exercised by :

i. Alerting downstream line stations on the status of incoming aircraft.

ii. Scheduling timely correction of defects at line maintenance where the

necessary spares, equipment, facilities and appropriate manpower are

available.

Page 202: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 11 of 16

Issue Date: 4 Aug 2012

iii. Coordinating for grounding of aircraft for application of emergency

mandatory requirements and rectification of discrepancies which can not

be deferred.

4.5.9. Supporting line maintenance requirements to assure, that when an aircraft

has been contaminated by a shipment of damaged or leaking dangerous

goods:

i. hazardous contamination is removed from the aircraft without delay

according to AMM;

ii. In the case of radioactive contamination, arrangements are made to take

the aircraft out of service and Aircraft is towed to a safe area for the

evaluation by qualified team from Egyptain Nuclear Authority.

4.6. Aircraft Line Maintenance:

In order to ensure that maintenace agreemnt for line maintenance has been

executed, two qualified engineers are available in each shift to monitor line

maintenance activities and four aircraft at least shall be checked in each shift

and daily report.Aircraft line maintenance shall contain all actions necessary

to ensure that the aircraft is fit to make the intended flight. These should, at

least, include the following:

4.6.1. Walk-around that includes an exterior inspection of the aircraft and its

equipment including:

i. Emergency equipment for condition;

ii. Obvious signs of wear or damage;

iii. Leakage of fuel, oil, hydraulic, water or presence of blue ice;

iv. Pilot static ports are not damaged or obstructed;

v. Flight controls are not locked or disabled;

vi. Frost, snow or ice is not present on critical services;

vii. Aircraft structure or structural components are not damaged.

4.6.2. An overview of the aircraft technical log (TLB) to ensure that the intended

flight is not adversely affected by any outstanding deferred defects and

that no required maintenance action shown in the deferred maintenance

log (DDL) is overdue or will become due during the flight.

Page 203: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 12 of 16

Issue Date: 15 Apr 2012

4.6.4. A control that other required servicing; water system and toilets are

properly made prior to flight. Water system & tanks sterilization and

disinfecting are to be accomplished according to the maintenance

program.

4.6.5. A control that required fluids sampling and analysis for engine oil,

hydraulic or fuel tank sampling is carried out, according to the

maintenance program intervals or on request, at an approved laboratory.

Results of sample analysis are to be checked and necessary

recommendations shall be carried out.

4.6.6. A control that all servicing panels and doors are checked and closed prior

to next aircraft operation.

4.6.7. A control that control surface and landing gear locks, pilot/static covers,

restraint devices and engine/aperture blanks have been removed before

flight.

4.6.8. A control that all the aircraft’s external surfaces & engines are free from

ice, snow, sand, dust etc.

4.6.9. A control that:

i. Tyre inflation having normal values.

ii. Necessary on-board documentation are complete and valid,

iii. The serviced fuel quantity is as required; the fuel receipt will be directed

on daily basis for record use.

iv. Defects affecting the safe operation of the aircraft are rectified within the

limits prescribed by the approved minimum equipment list (CMEL) or

configuration deviation list (CDL) as appropriate.

v. Defects that cannot be rectified before departure is deferred only when

justified causes are present (lack of downtime, spares, manpower,

facilities and equipment, etc.). This will be done with reference to the

Minimum Equipment List (CMEL) or the Configuration Deviation List

(CDL) for the aircraft type.

vi. An appropriate record and follow-up is to be made on deferred items not

to exceed their maximum allowed deferral time (Deferred Defect Daily

Status).

Page 204: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 13 of 16

Issue Date: 15 Apr 2012

vii. For those items permitted to be inoperative under an approved CMEL,

the maintenance person shall place a placard, which meets the aircraft's

CMEL requirements, on each inoperative item of equipment, marking it

as "Inoperative" or "Deactivated" and shall enter this into the aircraft

logbook (DDL).

viii. That deferrals cumulative effect regarding their quantity on the same

aircraft and any restrictions contained in the CMEL should be considered.

These should be made known to the flight crew a suitable time prior to

flight.

ix. Next due routine check validity shall apply up to the arrival of aircraft to a

place where it can be done.

4.7. Technical Assistance to Outstations by Maintenance Control :

4.7.1. Assistance of outstations for the interpretation of technical issues

related to Company policies and procedures, Maintenance Data

and also providing assistance during trouble shooting of aircraft.

4.7.2. Making necessary arrangements with all concerned for the

implementation of special repairs.

4.7.3. Obtain concission from EGYPTAIR EXPRESS Chief Inspector to allow

aircraft to ferry flight back to base.

4.7.4. Obtain concission from EGYPTAIR EXPRESS Chief Inspector to allow

aircraft to returned back to base with defect out of CMEL after getting

approval from ECAA.

4.8. Outstations Resources by Maintenance Control:

4.8.1. Maintaining a database for information regarding the current availability of

resources at all outstations.

4.8.2. Assuring availability of resources at an outstaion (spares, skilled

manpower, facilities and equipment, etc.) when a defect rectification is

required at this outstation. If resources are not available at an outstation to

rectify a problem, MCC will:

i. Arrange for maintenance with another repair station.

ii. Arrange for transport of the resources from the home base or other line

stations.

Page 205: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 14 of 16

Issue Date: 15 Apr 2012

iii. Arrange for ferry flight of the aircraft to a capable maintenance

performing station after obtaining the required approvals.

4.9. Coordination of Outstations activities with Home Base:

4.9.1. Technical support sectioncoordinates with Maintenance Director regarding

deferred maintenance scheduling, and the retention or transfer of out-

station records.

4.9.2. Technical support section coordinates with the outstation AMO regarding

the evaluation of aircraft system failures, identification and correction of

defects and implementation of special repairs.

4.9.3. Maintenance Control coordinates with Material Supplier regarding the

supply of parts and materials at outstations, coordination of

replenishments of satellite stores and flying kits, shipping of material to

and from outstations, and administration of parts pooling and loan

agreements.

4.9.4. Technical support section coordinates with Flight Crew for resolving

operational problems in due time to minimize schedule interruptions. MCC

also informs flight crew a suitable time in advance about deferred

maintenance and any operational consequences related thereto.

4.9.5. Maintenance Control center also provides resolution of disputes between

flight crew and line maintenance.

4.10. Documentation and Records :

4.10.1. Maintenance Control center maintains an information database for

available resources at each outstation. The database includes manpower

data (head count, skill level and certification), availability of tools, ground

support equipment, availability of spares and material, and availability of

facilities.

4.10.2. Technical support section maintains records of deferred items, and their

maximum deferral time.

4.10.3. Technical support section maintains a log of significant daily activities

including details of repairs being made to aircraft out of service at

outstations.

Page 206: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 15 of 16

Issue Date: 15 Apr 2012

4.10.4. Technical support section assures proper completion/routing of line

maintenance forms and records (aircraft logs, delay reports, stock

investigation slips, fueling sheets, unit tags, , …..etc.).

4.10.5. Maintenance Control center maintains visibility boards showing status of

each aircraft.

4.11. Test Flight Program:

4.11.1. The contracted AMO is responsible for establishing a test flight program

for each aircraft type. Program is to determine contents of test flight, when

a flight test is to be done and whether a complete or limited flight test is

required. Program shall be approved by Chief Inspector.

4.11.2. Maintenance crew participating and monitoring test flights shall be

appropriately qualified.

4.11.3. Before test flight is conducting, it shall be assured that all required

maintenance work has been appropriately performed.

4.11.4. An application for a test flight after maintenance work shall be submitted to

the Authority through the Chief Inspector for approval. Appropriate forms

are to be used

4.11.5. After conducting the flight test, a report is to be issued by the testing pilot.

This report shall be revised by the Chief Inspector and necessary

recommendations issued and shall be sent to ECAA.

4.12. Control of SAFA Reports:

4.12.1. SAFA audit reports shall be sent to Chief Inspector by Safety & Quality

General Director.

4.12.2. Chief Inspector shall take the necessary actions to rectify the reported

defects through the Contracted AMO and Ground Handling Company

according to defect.

4.12.3. Chief Inspector shall send the rectification report to Safety & Quality Dept.

of EGYPTAIR EXPRESS. Safety & Quality Dept of EGYPTAIR EXPRESS

shall send the report to S&Q Direcror of EGYPTAIR LINES and copies to

ECAA , EGYPTAIR EXPRESS Chairman and Holding Company Safety&

Quality Division. (see fig.1)

Page 207: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 16 of 16

Issue Date: 15 Apr 2012

( Fig. 1)

5. Forms:

5.1. Aircraft Technical Logbook (TLB).

5.2. Deferred Defect Daily Status Form (LPM-LM-RAMP-08-F01).

5.3. Certificate of Fitness for Flight Test Form 135.

5.4. Aircraft Release to Service CRS 506B.

5.5. Deferred Defect Logbook (DDL form F407).

SAFA.I.R

OPERATIONS

S&Q DIRECROR

ECAA

CHIEF INSPECTOR CHAIRMAN

M&E. QA/SAFETY

M&E CHAIRMAN CEO

S&Q DIVISION

GROUND SERVICE QA

M&E MAINT. Dir.

EGYPTAIR EXPRESS

M&E COMPANY

G.S. COMPANY

EGYPTAIR HOLDING COMPANY

S&Q DIRECROR

EGYPTAIR AIRLINES

Page 208: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 4

Issue Date: 4 Aug 2012

2.04 Parts Removal and Installation

1. Objective:

To implement applicable standards and regulatory requirements regarding the Parts

Removal and Installation for aircraft and aircraft components

2. References:

2.1. ECAR 43.1, 43.7, 91.3, 91.3, 91.407, 121.151, 121.153(a), (b), 121.157,

2.2. Maintenance Agreement with AMO

3. Responsibility:

Function is contracted to an ECAR Part 145 Approved Maintenance Organization

under the supervision of Maintenance Director.

4. Description:

The Maintenance Director shall monitor maintenance activities to ensure:

4.1. Parts Installation

4.1.1. No new part is installed on an aeronautical product unless the part as detailed

below meets the standards of:

i. Airworthiness applicable to the installation of new parts (refer to Table(1))

and;

ii. The new part has marking identifying it as a part specified in the type design

conforming to a recognized national or international standard, or

iii. The part has been approved for use on an aeronautical product, in

accordance with the type certificate, if the part was originally designed and

manufactured for an aeronautical use, or

iv. For non-critical airworthiness items only ,The part was manufactured under a

Parts Manufacturer Approval (PMA)

4.1.2. No used part is installed on an aeronautical product, unless the part meets the

standards of airworthiness applicable to the installation of used parts and is

either :

i. An airworthy part that has been removed from an aircraft for immediate

installation on aircraft, or

Page 209: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 4

Issue Date: 4 Aug 2012

ii. An airworthy part that has undergone maintenance for which a maintenance

release has been signed by an appropriately rated AMO.

iii. In all cases the action shall be appropriately documented by the AMO

concerned person

4.1.3. No used life-limited part is installed on an aeronautic product unless the part

meets the standards of airworthiness applicable to the installation of life-limited

parts and:

i. The technical history of the part is available to demonstrate the time in

service, authorized for that part in the type certificate governing the

installation has not been exceeded;

ii. The technical history referred to in sub-paragraph 4.1.3.i. is incorporated into

the technical record for the aeronautical product on which the part is

installed.

Table (1) Parts Certification requirements

Product Acceptable Type of Document

New parts, new components and Kits ECAA Authorized Release Certificate /

EASA Form One / JAA Form One*, or FAA

Form 8130-3 or equivalent issued by a

Type Certificate (TC) Holder,

Supplemental Certificate (STC) Holder or

Parts Manufacturer Approval (PMA) Holder

Used parts, component and Kits ECAA Authorized Release Certificate /

EASA Form One / JAA Form One*, or FAA

Form 8130-3 or equivalent issued by an

accepted or approved ECAR Part 145

Approval Holder

Standard parts (NAS, NSA such as: bolt,

nut, screw, fastener … )

Certificate of conformity to applied

aeronautical standards

Ingredients, consumables (oils,

sealants, greases, etc … )

Certificate of conformity or traceability to

appropriately certified batch

Raw material (e.g. for local

manufacturing)

Certificate of conformity or traceability to

appropriately certified batch

Page 210: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

Note: Only JAA Form 1 issued before 28 Sep 2004 for used material and before 28 Sep

2005 for new material.

4.2. Parts Removal

4.2.1. Line Maintenance Procedure for Return of Defective Parts Removed from

Aircraft. Defective components / parts Removed from Aircraft will take place in

the following cases:

i. Component / part found unserviceable.

ii. Component / part is time expired.

iii. Component / part received new / serviceable and found not compliant.

iv. Component / part received new, repaired or modified /serviceable but

deteriorated during handling.

v. Restitution after hire.

vi. Expendables / Consumables

4.2.2. Case of Component found Unserviceable / Non Complaint deteriorated during

handling:

The appropriately certifying staff shall Tag the item by the “Unserviceable Item

Tag”. And ask material handling section to route the material to unserviceable

dedicated area & hence to the main quarantine store.

4.2.3. Case of Expendables / Consumables

The appropriately certifying staff shall Tag the item by the “Scrapped Parts

Tag” and Instruct material handling section to place that item in special

identified locked container and routing it to the condemned store, where it is

held pending for final disposal.

4.2.4. Return of Defective Aircraft Components to Store

The material handling section supervisor ensures that:

i. Each component is attached with the appropriate tags and reports.

ii. The data registered in the attached documents is matched with that of the

returned component.

5. Forms

N/A

Page 211: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 212: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 8

Issue Date: 15 Apr 2012

2.05 Deferred Maintenance

1. Objective:

To describe how to issue, approve and handle customized minimum equipment list and

describe the procedure for deferring A/C system or component discrepancies and follow

up for rectification

2. References:

2 1. ECAR 91.213, 121.139, 121.304, 121.607(b), 121.628

2 2. Operations Specifications

3. Responsibility:

3.1. Excluding CMEL approval and Interval extension, function is subcontracted to

AMO under super vision of Maintenance director

3.2. Chief Inspector for processing CMEL approval with ECAA and for approving

interval extension as per approved Operations Specifications

4. Description:

4.1. Customized MEL :

4.1.1. EGYPTAIR EXPRESS is authorized from the ECAA to use minimum

equipment lists for its aircraft within the Operations Specifications granted.

4.1.2. Master Minimum Equipment List as issued by the Manufacturer and

approved by the State of Design authority, known as Master Minimum

Equipment List shall be used to produce a Customized Minimum Equipment

List (CMEL) to suit regulatory requirements and actual aircraft configuration.

4.1.3. In no way shall the CMEL be less restrictive than the MMEL.

4.1.4. Before developing the CMEL, consultation may be made with flight crew

about additional restrictions.

4.1.5. The Contracted Maintenance Provider develops the Customized Minimum

Equipment List document for each type/model of aircraft using Master

Minimum Equipment List as issued by the Manufacturer.

Page 213: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 8

Issue Date: 15 Apr 2012

4.1.6. CMEL shall contain guidance material for use and interpretation of listed

items.

4.1.7. CMEL shall be revised each time an MMEL’s revision is issued.

4.1.8. CMEL shall reflect specific aircraft configuration, modification status and any

additional regulatory requirements.

4.1.9. Time frame between MMEL issue or revision and the corresponding CMEL

revision issue and submitted to ECAA for approval shall not exceed six

weeks.

4.1.10. CMEL issue and permanent revisions shall be approved by the ECAA.

Temporary revisions based on Temporary Master MEL may be approved

from the Chief Inspector.

4.1.11. The approved master copy of CMEL shall be kept under the supervision of

the Chief Inaspector.

4.1.12. A CMEL distribution list is to be generated by engineering, in which all CMEL

users are listed. Sufficient number of copies are to be produced and

distributed as per this distribution list. Each copy shall bear a specific control

number for each specific holder

4.1.13. CMEL are to be made on an A4 loose papers and put on a three hole folder

manual for ease of amending.

4.1.14. Aircraft shall not be released to service with an inoperable or defective

system, instrument or equipment unless it is thereby permissible in the

approved CMEL.

4.1.15. It is not allowed to release an aircraft with an inoperative flight recorder and

cockpit voice recorder except in the following cases:

i. Ferry the aircraft from a place where repair or replacement cannot be made

to a place where they can be made;

ii. Continue a flight as originally planned, if the flight recorder becomes

inoperative after the aircraft has taken off;

Page 214: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 8

Issue Date: 15 Apr 2012

iii. Conduct an Airworthiness flight test during which the flight recorder or

cockpit voice recorder is turned off to test it or test any communications or

electrical equipment installed in the aircraft; or

iv. Ferry a newly acquired aircraft from the place where possession of it is taken

to a place where the flight recorder or cockpit voice recorder is to be

installed.

4.1.16. A copy of the CMEL for the specific aircraft shall continuously be kept on

board the aircraft. Aircraft copy shall be identified by the concerned aircraft

registration letters.

4.1.17. Inoperative system or equipment shall be recorded in the concerned aircraft

deferred defect logbook and made accessible to flight crew at all times

4.1.18. The pilot-in-command shall be informed by the contracted AMO a suitable

time before departure time about the deferred defect status in respective

aircraft and reference is to be made to any operational consequences of the

deferral.

4.1.19. Where appropriate, deferred items shall be placarded, marking it as

"Inoperative" or "deactivated".

4.1.20. Maintenace action for inoperative item shall be made according to

maintenance reference and completed within the required time constraints

and recorded in the aircraft technical log. Cross reference shall be made

between aircraft technical log page in which the defect is recorded and

deferred log page in which the deferral of the same defect is made. Record

shall include reference to the CMEL item number, reason for deferal,

maintenance action taken, date of deferal and authorized person signature

and stamp

4.1.21. The aircraft shall operated under all applicable conditions and limitations

contained in the minimum equipment list and the letter authorizing the use of

the list

4.1.22. Serviceability of inoperative system or equipment shall be restored within a

specified Interval. The Interval shall be prespecified inside the CMEL.

Page 215: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 8

Issue Date: 15 Apr 2012

4.1.23. Dispatching an aircraft with an inoperative system or equipment beyond such

Interval is not allowed unless it is authorized to do so by Chief Inspector as

he is authorized within the Operations Specifications granted.

4.1.24. A daily deferred defect status list is to be issued and contents are to be

continuously updated and followed up. List contains deferred item for each

aircraft, date of deferral, allowed interval for deferal, reason for deferral and if

needed, reference to interval extension as made by Chief Inspector or by

ECAA.

4.2. CMEL Approvals

4.2.1. The Contracted Maintenance Engineering Directorate is responsible for

producing proposal aircraft CMEL issue or any amendment thereto,

4.2.2. The proposed aircraft CMEL or any amendment shall be sent to Chief Inspector

for review, acceptance and proceed for approval from ECAA

4.3. CMEL Amendment:

4.3.1. EGYPTAIR EXPRESS through contracted AMO is responsible for

embodiment of the received amendments in due time.

4.3.2. Ammendent revision submition to ECAA interval dose not exceed 6 weeks

from issue date

4.3.3. A list containing distribution, acknowledgement of receipt of CMEL and its

amendments and acknowledgement of embodiment into respective copies

signed by each recipient shall be maintained.

4.3.4. Each recipient shall send a feedback to the document distribution section that

he has updated his copy to the latest amendment.

4.3.5. The Maintenance Director is responsible for assuring the proper condition and

updating of on-board aircraft copies.

4.4. CMEL shall contain the following:

4.4.1. Approval statement

4.4.2. Preamble.

4.4.3. Cross-reference to MMEL issue and date

Page 216: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 5 of 8

Issue Date: 15 Apr 2012

4.4.4. CMEL items, conditions and quantities, listed in ATA sequence

4.4.5. Special operations required to be performed by flight crew or additional

maintenance action(s) required to be performed by maintenance personnel

4.4.6. Reference to other applicable documents (maintenance manual, operations

manual, etc.) as needed.

4.4.7. Category for corrective action time limits (A, B, C or D)

4.4.8. Statement of any special conditions or limitations for special operations

(ETOPS, RVSM, CAT II ……)

4.5. Configuration Deviation List

4.5.1. The CDL is approved as part of aircraft certification, EGYPTAIR EXPRESS

uses type certificate holder CDL without change. The CDL may be a separate

document or may constitute a part of the Aircraft Flight Manual (AFM).

4.5.2. No changes are permitted to the CDL except as made by the type certificate

holder.

4.6. Classification of Deferred Defects :

4.6.1. Non-Airworthiness Items:

These Items do not affect the continued safe operation of the aircraft and

may therefore be deferred until the next maintenance opportunity. Such items

are generally not specifically listed in the CMEL / CDL manuals.

4.6.2. Malfunctioning System or Component Listed in CMEL/CDL :

For the purpose of deferrals, defects may be classified as follows :

i. CMEL items which require no maintenance or flight crew action prior to

deferral.

ii. CMEL items which require placarding, they are denoted by an asterisk (*) in

the MEL manual.

iii. CMEL items which require maintenance action prior to deferral, they are

denoted by letter “M” in the CMEL manual

Page 217: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 6 of 8

Issue Date: 4 Aug 2012

iv. CMEL items which require flight crew action to deferral and/or during

operation of subsequent flight, they are denoted by letter “O” in the MEL

manual.

v. N/A

4.6.3. Other Items Not Listed in CMEL:

The CMEL does not contain obviously required items such as wings, flaps,

and rudders. Save what is mentioned in 4.6.1 and 4.6.2 above, all equipment

installed on an aircraft in compliance with the Airworthiness Standards and

the Operating Rules and Regulations and not listed on the CMEL must be

operative. A reference is usually to other applicable documents AMM / SRM /

CDL,,..etc.

In all cases the CMEL must not deviate from the Aircraft Flight Manual

Limitations, Emergency Procedures or Airworthiness Directives.

4.7. CMEL Items Repair Intervals :

CMEL discrepancies also fall into one of the following repair interval categories.

The intervals specify the maximum time limit prior to which the discrepancies must

be repaired :

“A” Repair within the time interval specified in the “Remarks or Exceptions” block

of CMEL;

“B” Repair within three calendar days (excluding the day the malfunction was

recorded);

“C” Repair within ten calendar days (excluding the day the malfunction was

recorded).

“D” Repair within one hundred twenty calendar days (excluding the day the

malfunction was recorded)

4.8. Deferred defect Control Procedure:

4.8.1. Before deferring a defect, Contracted AMO certifying person must ensure that

the defect is within the CMEL/CDL permissible and make necessary entries in

the aircraft records (A/C Technical log Book & DDL) and necessary

maintenance actions accompanying deferrals shall be made.

Page 218: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 7 of 8

Issue Date: 4 Aug 2012

4.8.2. Copy from DDL shall be sent to Contracted AMO planning for controlling,

monitoring and scheduling non-routine and deferred maintenance activities,

including CMEL/CDL requirements.(material and time)

4.8.3. Contracted AMO planning shall sent Copy from DDL to line maintenance tech

support.

4.8.4. Line maintenance tech. support Issue NRC to line maintenance for defects

rectification

4.8.5. After defect rectification ,action taken shall be recorded in DDL ,DDLcopy shall

be handled to line maintenance tech. support .

4.8.6. Contracted AMO Tech support shall E-Mail Deferred defect status on form

#LPM-LM-RAMP-08-F01f, promptly after any change. but not less than once

daily to EGYPTAIR EXPRESS Chief Inspector

4.8.7. No postponement of any defect rectification can be permitted without the

EGYPTAIR EXPRESS chief inspector approval .

4.9. CMEL Short time escalation Procedure :

4.9.1. If there is a difficulty to rectify the deferred defect within its repair time limit, an

extension request, form 318 is to be applied to EGYPTAIR EXPRESS Chief

Inspector from Contracted AMO Shedueling Departement .This may be applied

only in justified exceptional circumstances, where reasonable justification is

provided regarding why the extension is required; The extension request shall

be approved by the Chief Inspector prior to the end of rectification time limit

4.9.2. Chief Inspector has the authority according to operation specfication to

approve extensions above the maximum repair interval for categories B and C

only . ECAA must be notified by such extensions within 24 hours of the use of

this extension authorization.

4.9.3. Chief Inspector shall reviw the application to insure that:

i. The aircraft has no previously deferred defect on the aircraft that hinders the

current deferral

ii. The current defect does not affect the aircraft operation in its flight route

Page 219: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 8 of 8

Issue Date: 4 Aug 2012

4.9.4. Chief Inspector is authorized to approve one extension to the specified repair

intervals as specified in the approved MEL only for categories, B and C items.

4.9.5. Authorization for second extension of the same item must be approved by the

ECAA.

5. Forms:

5.1. Deferred Defect Log, form No. 407.

5.2. Deferred Item Extension, form No. 318.

5.3. Deferred Defect Daily Status, form No. LPM-LM-RAMP-08-F01.

Page 220: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 12

Issue Date: 4 Aug 2012

2.06 Continuing Airworthiness

1. Objective:

1.1. To maintain the Aircraft in an airworthy condition and to monitor and assess

maintenance and operational experience with respect to continuing airworthiness

of aircraft

1.2. To determine the EGYPTAIR EXPRESS policy to run a continuous analysis and

surveillance program

1.3. To set EGYPTAIR EXPRESS policy regarding the implementation of technical

requirements for performing a ferry flight

2. References:

2.1. ECAR 21.265 ECAR 43.1, 43.13, 43.17, 43.21, 91.7, 91.13, 91.403, 121.105,

121.303, 121.360 121.361-121.374 inclusive, 121.373and 121.378

2.2. Maintenance Agreement with AMO

3. Responsibility:

3.1. These functions are subcontracted to AMO approved in accordance with ECAR

Part 145 under the supervision of Maintenance Director.

3.2. Chief Inspector for program approval from ECAA and for approving interval

escalation.

4. Description:

4.1. General

Maintenance Director shall insure that the contracted AMO shall:

4.1.1. Have Technical Publications Department which is responsible for the

procurement of all Airworthiness Data from the concerned Manufacturer, Type

Certificate Holder, Supplmental Type Certificate Holder and Authority, either

hard or soft.

4.2. Reliability Program

4.2.1. General:

i. EGYPTAIR EXPRESS has a Reliability Program to monitor and assess

maintenance and operational experience with respect to continuing

airworthiness of aircraft, as prescribed by ECAA.

Page 221: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 12

Issue Date: 4 Aug 2012

ii. The Reliability Program approved by ECAA in the granted Operations

Specifications before Implementation.

iii. Program implementation contracted to AMO

iv. ECAA shall be advised when intervals change takes place.

v. ECAA shall approve any change from Hard Time to On-Condition.

vi. AMO Accountable Manager is responsible for the continuous overall running of

the RP. He is also responsible for approving changes to the MP resulting from

the RP

vii. All maintenance contracts or agreements shall include provisions for the

analysis and surveillance system as part of its total maintenance program.

EGYPTAIR EXPRESS and AMO shall co-operate to identify and resolve

technical problems that may arise.

viii. The RP shall be applied to all EGYPTAIR EXPRESS aircraft, power plants,

aircraft systems, and to all vital components attached thereto, checks and

inspections. A list of such aircraft, systems, as per ATA 100 specifications and

vital components shall be prepared and attached as an appendix to the RP for

each aircraft type.

ix. The RP shall also run engine condition monitoring program to all EGYPTAIR

EXPRESS engines based on engine performance, recorded data and engine

malfunction analysis reports, providing any recommend corrective action.

x. The RP shall also run to all Condition Monitored components installed in the

aircraft or attached thereto. A list of such components shall be prepared and

attached as an appendix to the RP for each aircraft type,

xi. The RP shall track chronic or repetitive unserviceable items, document the

troubleshooting history and implement instructions for corrective action.

xii. The Maintenance Director through running the maintenance reliability program

and through the continuous evaluation of the maintenance program ensures

that the maintenance program continues to be effective and remain in

compliance with standards.

4.2.2. Reliability Control Board (RCB) Members:

i. The board is to be headed by AMO Accountable Manager or his representative,

EGYPTAIR EXPRESS Chief Inspector and Maintenance Organization

representatives

Page 222: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 12

Issue Date: 4 Aug 2012

ii. Chief Inspector is responsible for ensuring that the program complies with all

related regulatory requirements.

iii. Chief Inspector is responsible for monitoring of the enforcement of RP policy

and to assure the implementation of corrective action

iv. AMO is responsible for the data development from source to analysis,

monitoring the performance standards, recommending corrective actions and

issuing the reliability reports. He shall apply a system of assessment to support

the continuing airworthiness of aircraft and to provide a continuous analysis of

the effectiveness of the defect control system in use.

v. AMO is responsible for data preparation and for implementation of corrective

actions.

vi. The manner in which information is exchanged within the RCB must be

described.

vii. RCB meetings shall be held monthly.

4.2.3. Data collection system:

i. This includes, but is not limited to:

a. Pilot technical write-ups,

b. Delays, cancellations,

c. Diversions and flight turn-backs due to technical reasons,

d. In-flight shutdowns,

e. In flight engine performance data,

f. Unscheduled removals,

g. Confirmed failure rate,

h. Functional and bench checks.

i. Data collected must be accurate and factual to support a high degree of

confidence in any derived conclusion.

ii. The system should provide for:

a. Monitoring on a continuous basis repetitive incidents and defects occurring in

flight or found during maintenance, highlighting any that are repetitive as

mentioned in reliability program or that appear significant. All items identified

as repeated discrepancies shall be highlighted for the purpose of tracking

and follow-up.

b. Monitoring on a continuous basis carry forward defects.

Page 223: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 12

Issue Date: 4 Aug 2012

c. Analyzing unscheduled component removals, shop findings and the

performance of aircraft systems for use as part of the maintenance program

efficiency.

4.2.4. Engineering Data Analysis:

i. AMO Engineering studies shall be made to determine the need for maintenance

program changes. Changes may involve, but are not limited to, maintenance

intervals (escalation, addition or deletion), contents of maintenance or

operational procedures, aircraft, aircraft systems or component modification or

repair and changes in techniques.

ii. Changes may include requirements for emergency equipment, changing from

Hard Time to On-Condition maintenance.

iii. Changes may require revisions to manuals and Operations Specifications.

iv. Special considerations shall be made to procedures for evaluating critical

failures, chronic or repetitive unserviceable items as they occur and the related

troubleshooting history.

v. Forms used to affect changes in the maintenance program shall be specified in

the program document.

vi. Statistical techniques used to determine operating reliability levels must be

described in the program document.

vii. For each aircraft within the fleet, data analysis should be compared with the

whole fleet and comparison of the whole EGYPTAIR EXPRESS fleet with the

worldwide fleet, as issued by manufacturer,

viii. Engineering shall set procedures for establishing acceptable statistical upper

and lower control limits and performance standards, target numbers that may

be set to specify target performance levels to be achieved for each aircraft,

aircraft system, or component controlled by the RP and to produce alerts if such

limits /standards are exceeded. Reference is to be made to past experience as

well as manufacturer and industry standards. The RP must also contain

procedure for monitoring and revising the prescribed limits and standards.

Procedure for such revision must include who, what, when and how.

ix. The standard established must be responsive, sensitive to the level of reliability

experienced, "stable" without being "fixed". Limits should not be so high that

Page 224: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 5 of 12

Issue Date: 4 Aug 2012

even abnormal variations would not cause an alert, or so low that it is constantly

exceeded in spite of the best known corrective action measures.

4.2.5. Corrective Actions;

i. Corrective action is developed in the form of Engineering Order (EO), form No.

213, which will be treated as “Reliability Mandatory” and is to be accomplished

within prescribed time limits as stated in the Engineering Order.

ii. If an extension of a corrective action timetable becomes necessary, a

notification with reasonable justification shall be sent to Chief Inspector for the

approval, a revision of the EO is to be issued.

iii. Each corrective action plan or program must have a planned completion date,

and must be appropriately documented.

iv. Proposed changes must not conflict with a corrective action program

established by a previous reliability analysis.

4.2.6. Follow-up and Monitoring;

i. The maintenance contractor shall consolidate all required data, analyze it and

return it in a useable form to EGYPTAIR EXPRESS with necessary comments

or recommendations for corrective actions for irregularities disclosed by the

report.

ii. Status of open corrective action EO’s will be listed in the monthly reliability

report until the system returns to its normal parameters.

4.2.7 Communications with Manufacturer:

i. Outcomes from reliability meetings regarding:

a. Pilot technical write-ups;

b. Delays, cancellations;

c. Diversions and flight turn-backs due to technical reasons;

d. Dispatch reliability;

e. Fleet utilization;(hours and cycles)

f. In-flight shutdowns;

g. In flight engine performance data;

h. Unscheduled removals;

i. Confirmed failure rate;

Shall be reported by the contracted AMO to the concerned manufacturer on a

monthly basis.

Page 225: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 6 of 12

Issue Date: 4 Aug 2012

ii. Details actions regarding significant technical findings are shall also be

communicated to the relevant manufacture

4.3. Aircraft Configuration Management

4.3.1. Aircraft configuration:

Aircraft configuration: is its technical specifications. This includes, but is not

limited to, the following:

i. Aircraft type certificate data sheets

ii. List of installed equipment. This includes radio/navigational equipment, options

specific to EGYPTAIR EXPRESS aircraft, time limited items, Buyer Furnished

Equipment, specific passenger cabin layout and interior equipment ( seats,

galleys, lavatories. emergency equipment,.. )

iii. Accomplished Airworthiness Directives

iv. Production standards concessions

v. List of service bulletins embodied

vi. Applied structure repairs interiors and exteriors.

vii. Applied special configurations and standards requirements e.g. extended range

operations , extended over water operations, All Weather Operations (AWO ) ,

CAT II, RVSM, ……..etc.

viii. Cargo compartment configuration.

4.3.2. Aircraft and Aircraft Component Configuration Changes :

i. Maintenance Director is responsible to follow up the studies, issued requests or

engineering orders made by M&E Engineering department for regulatory

requirements or EGYPTAIR EXPRESS configuration changes on aircraft and

aircraft components

ii. He also follow up actions to implement required changes in appropriate time

with view to required task force, equipment, material and letdown time taking

into account operational limitations and recession dates.

iii. Configuration changes shall be promptly reflected in aircraft records, documents

such as maintenance manuals, wiring diagrams, illustrated parts catalogue,

weight and balance and minimum equipment list. The Maintenance Programs

shall be revised as needed to reflect aircraft current configuration.

4.4. Continuous Analysis & Surveillance Program

Page 226: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 7 of 12

Issue Date: 4 Aug 2012

EGYPTAIR EXPRESS is to run a Continuous Analysis and Surveillance Program

(CASP) to ensure that contracted maintenance activities are appropriately

performed; maintenance operations and personnel conform to technical standards

and company policies and procedures for fulfilling the required standard of

Airworthiness. The CASP program shall monitor any deficiency in the maintenance

programs and provide for corrective actions. Corrective actions and

recommendations generated by deficiencies or irregularities disclosed by the CASP

shall be reflected as revisions to the maintenance program. Program shall be

applied on maintenance scheduling, control and accountability of work forms,

conformance to technical instructions pertaining to work forms, and other technical

instructions, and compliance with procedural requirements.

4.4.1. Program shall also address the adequacy and qualification of maintenance

personnel, tools, equipment and facilities, parts protection and stocking, and

housekeeping.

4.4.2. Program shall also address the qualification and continuous monitoring of

suppliers and subcontractors

4.4.3. The program consists of the following elements:

i. Facilities Inspection.

ii. Document Control.

iii. Aircraft Inspection.

iv. Component Inspection.

v. Engine condition monitoring program.

vi. Material Inspection.

vii. Required Inspection Items handling.

viii. Quality Audit Program.

ix. Records handling.

x. Tools test and Measuring Equipment handling.

xi. Personnel Qualification and training.

xii. Reporting of Discrepancies.

xiii. Reliability Program.

xiv. Oil consumption program.

4.4.4. The Program consists of the following elements:

Page 227: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 8 of 12

Issue Date: 4 Aug 2012

i. The running of a comprehensive audit program covering aircraft, facilities,

personnel, document control, material Inspection, records and tools and test

equipment handling. The audit program consists of four phases :

a. Scheduling

b. Preparation

c. Implementation

d. Reporting and Corrective Actions.

ii. The audit program should include a feedback system to the Accountable

Manager to ensure that corrective actions are both identified and promptly

addressed. The feedback system should also specify who is required to rectify

discrepancies in each particular case, and the procedure to be followed if

remedial action is not completed within an appropriate time scale.

iii. The audits may be carried out either by internal audit team or by external

auditors.

iv. Audits include the maintenance contractors and subcontractors and

organizations providing services or products to EGYPTAIR EXPRESS

v. Audits shall ensure that operations and personnel conform to technical

standards and company policies and procedures for fulfilling and maintaining

the required standards of Airworthiness.

vi. The audit program shall cover the following elements:

a. Facilities.

b. Document Control.

c. Aircraft Inspection and Release to Service.

d. Component Inspection and Release to Service.

e. Material receiving and Inspection.

f. Required Inspection Items handling.

g. Records handling.

h. Tools, Test and Measuring Equipment handling.

i. Personnel Qualification and Training.

j. Reporting of Discrepancies.

Page 228: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 9 of 12

Issue Date: 4 Aug 2012

vii. Running of a continuous airworthiness maintenance program, and the

measurement of effectiveness of the maintenance program through the

implementation of a maintenance reliability program.

viii. The continuing Analysis and Surveillance Program also includes a system of

data collection and analysis to monitor trends and to support the condition

monitoring process.

ix. EGYPTAIR EXPRESS implements an independent Maintenance Reliability

Program to satisfy the requirements for data collection and analysis.

x. EGYPTAIR EXPRESS shall be responsible for the continuing analysis and

surveillance of work performed by AMO. The main maintenance contractor

AMO will be responsible for any work subcontracted to a third party. Therefore

any such work must be subjected to periodic audits by AMO Quality Assurance

Personnel.

xi. EGYPTAIR EXPRESS Chief Inspector will establish a schedule acceptable to

ECAA which shows how and when the activities required will be monitored. In

addition, reports should be produced at the completion of each audit and should

include details of non-compliance.

xii. Program shall also address Engine condition monitoring program as following:

a. EGYPTAIR EXPRESS contracted engine manufacturer to monitor engine

performance during aircraft operation by sending the engine parameters

through data links to the manufacturer Engine monitoring program.

b. The manufacturer shall send reports of the engines performance condition

and recommendation if needed continuously to the engineering of the AMO.

c. According to the reports recommendation the AMO shall submit engine

malfunction analysis report (E.M.A.R) with the required maintenance

operation to restore the performance of the engine within the normal

operating limits.

d. Feedback shall be sent to the engineering and the manufacturer with the

finding and results.

4.5. Aircraft Safety Assessment Program

4.5.1. The aircraft safety assessment program constitutes part of the on-ramp audit. It

shall cover the following aircraft areas:

4.5.2. Flight Deck.

Page 229: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 10 of 12

Issue Date: 4 Aug 2012

4.5.3. Passengers Cabin.

4.5.4. Aircraft exterior.

4.5.5. Cargo compartments

4.5.6. A checklist is to be made and an auditor shall fill this checklist. Checklist shall

contain aircraft data, flight data, time and date.

4.5.7. Program is to be implemented at least once every six months for each aircraft.

Findings are to be categorized as follows:

i. Cat 1….Deferral is allowed. Deferral is to be recorded in the aircraft Deferred

Defect Log.

ii. Cat.2 … Aircraft operation will be restricted until a corrective action is taken.

4.5.8. A monthly report shall be issued about the program findings and corrective

actions.

4.6. Requirements for Ferry Flights

4.6.1. General

i. A copy of operation specification, which restates this permit, shall be carried on

board the aircraft when operating under a special flight permit.

ii. Before operating an aircraft that does not meet applicable airworthiness

requirements, Maintenance Director shall ensure that the aircraft inspected or

evaluated according to procedures in its manual and have a licensed or

approved engineer certify in the aircraft record that the aircraft is in a safe

condition for the flight as specified in the operator's manual.

iii. Only flight crewmembers and persons essential to operations of the aircraft

shall be carried aboard during ferry flights where the aircraft flight

characteristics may have been appreciably changed or its operation in flight

substantially affected.

iv. The operating weight of the aircraft must be the minimum necessary for the

flight with necessary reserve fuel load.

4.6.2. Requirements for Conduct of Ferry Flights:

i. Chief Inspector may authorize the aircraft to be ferried, as per Operations

Specifications, and ECAA shall be informed

ii. The ferried aircraft shall be capable of conducting the required flight safely and

not prohibited by any applicable Airworthiness Directives.

Page 230: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 11 of 12

Issue Date: 4 Aug 2012

iii. Chief Inspector shall ensure that the flight crew shall be informed about

authorizing the aircraft to be ferried.

iv. A reference to the Permission of Ferry Flight shall be carried on-board the

aircraft.

v. Procedures for the safe operation of the airplane, including specific

requirements for limitations and performance information are done.

vi. Operational equipment necessary for safe operation of the aircraft is available

vii. Required inspections when abnormal conditions exist or meteorological limits

are encountered

viii. Aircraft weight limits, Fuel distribution limits, and Center of gravity limits are to

be fulfilled

ix. Applicable relating conditions and limitations stated in the approved aircraft

flight manual are to be fulfilled.

x. For aircraft involved in an accident, Authorization for ferry flight shall not be

issued before approval from ECAA

5. Forms:

5.1. Application for Permission of a Ferry flight Form 12120-042

Page 231: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 12 of 12

Issue Date: 4 Aug 2012

This page is intentionally left blank

Page 232: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 6

Issue Date: 4 Aug 2012

2.07 Repairs and Modifications

1. Objective:

This procedure describes the aircraft Repairs and Modifications

2. References:

ECAR 43.5, 7, 9, 17 and Appendix B

3. Responsibility:

3.1. These functions are subcontracted to an organization approved or accepted in

accordance with ECAR Part 145 (AMO) under the supervision of Maintenance

Director.

3.2. Chief Inspector for approvals

4. Description:

4.1. Repairs and Modifications:

4.1.1. Repairs and Modifications described in Airworthiness data:

i. Repairs and modifications are performed in accordance with the

airworthiness data, such as but not limited to Structural Repair Manual

(SRM), Aircraft Maintenance Manual (AMM), Component Maintenance

Manual (CMM), repair drawings, Modification Bulletins, Service Bulletins

as issued by the Manufacturer, Type Certificate Holder, Supplemental

Type Certificate Holder or any relevant organization that publishes such

data in accordance with appropriate Part-21 approval or equivalent, etc.

ii. The Contracted Maintenance Provider maintenance planning department

/ concerned technical support will specify the work to be performed to

complete the repair including data references, material to be used;

required tools and equipments, and other needed processes such as:

heat treatment and tests by an authorized staff member.

4.1.2. Repairs and Modifications not described in the approved manuals:

i. If required repair is not described in the applicable manufacturer manual, Chief

Inspector will be notified in writing. and,

ii. Contracted Maintenance Provider is responsible to contact the manufacturer for assistance.

iii. Upon receiving the repair document from the manufacturer , Chief Inspector shall receive the information to get approval from ECAA,

Page 233: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 6

Issue Date: 15 Apr 2012

iv. Upon receiving approval from ECAA, Chief Inspector shall send copy to

Contracted Maintenance Provider

v. Contracted Maintenance Provider shall study the case from implementation

point of view.

vi. The approved, detailed repaired scheme is then send to the Contracted

Maintenance Provider production unit for implementation

4.2. Persons authorized to approve the aircraft Repairs and Modifications

The holder of a license without type rating after being granted the relevant

approval from an approved maintenance organization for release to service as

provided in ECAR 65& ECAR 145.

4.3. Performance rules:

4.3.1. The Contracted AMO shall use the methods, techniques, and practices

prescribed in the current manufacturers’ maintenance manual or instructions

for continued Airworthiness prepared by its manufacturer, or other methods,

techniques and practices acceptable to the ECAA.

4.3.2. The Contracted AMO shall use the tools equipment, and test apparatus

necessary to assure completion of the work in accordance with accepted

industry practices. If the manufacturer involved recommends special

equipment or test apparatus, he must use that equipment or apparatus or its

equivalent acceptable to the ECAA.

4.3.3. The Contracted AMO, shall do that work in such a manner and use materials of

such a quality, that the condition of the aircraft, airframe, aircraft engine, or

appliance worked on will be at least equal to its original or properly altered

conditions (with regard to aerodynamic, function, structural strength, resistance

to vibration and deterioration and other qualifies affecting airworthiness).

4.3.4. If aircraft has been maintained, or altered in a manner that may have

appreciably changed its flight characteristics or substantially affected its

operation in flight an appropriately rated pilot shall flies the aircraft, makes an

operational check of the maintenance performed or alteration made, and logs

the flight in the aircraft records.

Page 234: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 6

Issue Date: 15 Apr 2012

4.3.5. The aircraft does not have to be flown after it has been maintained, or altered

prior to be ground tested, inspected, or both to show conclusively that the

maintenance, preventive maintenance, or alteration has not appreciably

changed the flight characteristics or substantially affected the flight operation of

the aircraft

4.4. Recording of work:

4.4.1. The recording of the work will be in a sufficient detail to allow staging of work,

clear evidence that all requirements have been met and reference to

airworthiness data and record shall be retained according to chapter 3.1

4.4.2. Upon completion of each major alteration or major repair of an airframe,

aircraft engine a report shall, promptly, prepared and a copy shall be submitted

to ECAA and anther copy of each report shall kept to be available for

inspection by, the ECAA.

4.4.3. Certificate of Release to Service:

A person who performs a major repair or major modification, or who signs a

certificate release to service in respect of such a repair or modification,

assures:

i. The major repair or major modification conforms to the requirements of

technical data that have been approved;

ii. The approved technical data falls within the meaning assigned to the term

“Approved Data

iii. All materials used have been approved for use in the content of the repair

having appropriate release documents

4.5. Content, form, and disposition of Repairs and Modifications records

Maintenance record entries shall contain the following information:

4.5.1. A description and reference to data acceptable to the ECAA of work

performed;

4.5.2. The date of completion of the work performed;

4.5.3. The name, the signature, certificate number, and kind of certificate held by the

person performing the work

Page 235: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 6

Issue Date: 15 Apr 2012

4.6. Dent & Buckle findings

4.6.1. Objective:

To identify and to record aircraft structure damage location.

4.6.2. General:

i. A Dent and Buckle chart shall be initiated for each aircraft.

ii. Master copy of Dent and Buckle chart shall be on board of each Aircraft.

iii. A copy shall be kept in Structure Repair Department.

iv. Second copy shall be kept in EGYPTAIR EXPRESS maintenance directorate

in each aircraft file.

v. The record shall contain full details of location and dimensions of structure

damage and action taken for allowable damage or repair according to the

approval reference and shall be signed and stamped.

vi. Dent & Buckle Chart Review shall be added to the tasks of phase check and

shall be signed and stamped.

vii. Any Structure damage finding during line maintenance or phase check of

aircraft has to be recorded on the Dent and Buckle chart and plotted on the

structure drawing chart.

4.6.3. Handling of dent and buckle chart:

For new finding the certifying engineer shall make entry in the TLB, structure

Eng shall justify the finding according to SRM and:

i. If the finding is allowable and within limit he will sign out TLB with the

reference and any limitation, mark the finding and make entry in Dent & Buckle

Chart.

ii. If finding maximum limit before repair shall be monitored OR temporary repair

has been done acc. to SRM OR manufacturer recommendation, Structure

Eng. Shall make entry in DDL with the reference and any limitation and mark

the finding and shall make entry in the Dent & Buckle Chart. Planning

&scheduling department shall monitor the re-inspection interval acc. to SRM

limits OR manufacturer recommendation.

Page 236: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 5 of 6

Issue Date: 15 Apr 2012

iii. If finding is out of limit or not allowable and permanent repair is mandatory A/C

to be grounded until repair is accomplished, Structure Eng. shall make entry in

dent & buckle chart.

5 . Forms:

Dent & structure damage Form No.435

Page 237: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 6 of 6

Issue Date: 15 Apr 2012

This page is left intentionally blank

Page 238: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 2

Issue Date: 4 Aug 2012

2.08 Defect Recording and Control

1. Objective:

This procedure describes the Defect Recording and Control

2. References:

ECAR 121.375,ECAR 145.29.g

3. Responsibility:

These functions are subcontracted to an organization approved or accepted in

accordance with ECAA under the supervision of Chief Inspector for approvals

4. Description:

4.1. Defect Recording and control and documentation of troubleshooting history:

The aircraft log book is the system for recording defects and malfunctions during

aircraft operation and for recording and documenting Troubleshooting history of all

maintenance on an aircraft between scheduled base maintenance visits, it is used

for recording flight safety and maintenance information the operating crew and the

maintenance organization at all bases where the aircraft is operated needs to know.

4.2. Control of recuring defects and tracking chronic or repetitive unserviceable items :

4.2.1. The defect is considered repetitive If it occurs 3 times in 10 consecutive days

on the same aircraft.

4.2.2. Contracted AMO line maintenance Technical support section shall maintain an

oversight over defects reported in aircraft and shall identify recurring defects

accordingly. It shall schedule necessary rectification programs and keep

following-up to ensure the effectiveness of the rectification program. Aircraft

repeated discrepancy notification form No 327 will be sent on a daily basis

from the Line Maintenance Technical Support section to EGYPTAIR

EXPRESS IOCC in order to clearly highlight recurring defects to both the

concerned flight crews & EGYPTAIR EXPRESS Chief Inspector for the

required monitoring.

Page 239: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

4.2.3. Unsuccessful rectification attempts shall be clearly recorded in aircraft log

book.

4.2.4. Line Maintenance Technical support section is responsible for informing

relevant maintenance crew about previous unsuccessful rectification

attempts for repeated discrepancies in order to avoid the duplication of

unsuccessful attempts at rectification

4.2.5. Technical support section shall ensure that the rectification of a recurring

defect will take into account the methodology used in previous repair

attempts.

5. Forms:

Form No 327

Page 240: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

2.10 Aircraft Recorders

1. Objective:

To comply with ECAR requirements for Aircraft Recorders

2. References:

ECAR 91.609& Appendix E, ECAR 121.343&ECAR121.359

3. Responsibility:

Chief Inspector

4. Description

4.1. EGYPTAIR EXPRESS shall not conduct any operation with an aircraft listed in it's

operations specifications unless that aircraft complies with any applicable flight

recorder and cockpit voice recorder requirements of Part 91 except that may:

4.1.1. Ferry an aircraft with an inoperative flight recorder or cockpit voice recorder

from a place where repair or replacement cannot be made to a place where

they can be made;

4.1.2. Continue a flight as originally planned, if the flight recorder becomes

inoperative after the aircraft has taken off;

4.1.3. Conduct an airworthiness flight test during which the flight recorder or cockpit

voice recorder is turned off to test it or test any communications or electrical

equipment installed in the aircraft; or

4.1.4. Ferry a newly acquired aircraft from the place where possession of it is taken

to a place where the flight recorder or cockpit voice recorder is to be installed.

The flight data recorders are required to utilize a digital method of recording

and storing data and a method of readily retrieving that data from the storage

medium, that are capable of recording the data specified in ECAR 91

Appendix E within the range accuracy, and recording interval specified and

that are capable of retaining the data recording during at least the last 25

hours of aircraft operation.

4.2. Cockpit voice recorder duration

4.2.1. Shall be capable of retaining the information recorded as ECAR requirement

Page 241: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

4.2.2. Should be capable of retaining the information recorded from at least the last

two hours of its operation Should be capable of retaining the information

recorded from at least the last two hours of its operation

4.3. Annual inspection

Maintenance Planning shall contain annual inspection, replaying and readout of

recorded data of flight data and cockpit voice recording systems (FDR & CVR), to

ensure the continued serviceability of the Recorders & that they operate correctly

according to acceptable permissible limits for all recorded parameters for the

nominal duration of the recording using appropriate facilities for such readout. The

test shall also ensure that each aircraft-sensing unit or parameter meets preset

strength and clarity standards. A report of the annual inspection must be made

available to the Authority.

4.4. Inspection and continued serviceability of flight data and cockpit voice recording

systems shall be verified as follows:

4.4.1. Prior to the first flight of the day, the built in test features for the flight data

recorder (FDR), cockpit voice recorder (CVR) and flight data acquisition unit

will be exercised to confirm proper operation.

4.4.2. Annual inspections shall be completed as follows;

i. The readout of the recorded data from the FDR and CVR must confirm that

the recorder operates correctly for the nominal duration of the recording.

ii. The analysis of the FDR must evaluate the quality of the recorded data to

determine if the bit error rate is within acceptable limits and to determine the

nature and distribution of the errors.

iii. A complete flight recorded by the FDR must be examined to evaluate the

validity of the recorded parameters. Particular attention must be given to

those parameters that are taken from the aircraft’s electrical bus systems.

iv. The facilities used to accomplish the examination required in (iii) of this

section must have the necessary software to accurately convert the recorded

values to engineering units and to determine the status of discrete signals.

v. An annual examination of the CVR is required by re-playing the CVR

recording while the equipment is installed in the aircraft. As part of this test a

Page 242: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

sample signal must be recorded using each aircraft-sensing unit to ensure all

signal sources are meeting clarity standards.

vi. When practical, during the annual examination, a sample of in-flight recordings

of the CVR should be examined for signal strength and clarity:

vii. Flight recorder systems must be considered unserviceable when a period of

poor quality data, unintelligible signals, or one or more of the mandatory

parameters is not recorded correctly.

viii. A report of the annual inspection must be made available to the ECAA.

ix. The following requirements are established for calibrating the FDR system;

a. The FDR system should be recalibrated as recommended by the

manufacturer to ensure the accuracy of the engineering conversion routines

for the mandatory parameters and also to confirm the unit is operating

within tolerances.

b. When the parameters of altitude and airspeed are provided by sensors

dedicated to the FDR system, and then there should be a recalibration

performed as recommended by the manufacturer.

4.4.3. EGYPTAIR EXPRESS shall not conduct any operation with its listed aircraft in

the operations specifications unless that aircraft complies with any applicable

flight recorder and cockpit voice recorder requirements of Part 91 under which

its certificate is issued except ::

i. Ferry an aircraft with an inoperative flight recorder or cockpit voice recorder

from a place where repair or replacement cannot be made to a place where

they can be made;

ii. Continue a flight as originally planned, if the flight recorder becomes

inoperative after the aircraft has taken off;

iii. Conduct an airworthiness flight test during which the flight recorder or cockpit

voice recorder is turned off to test it or test any communications or electrical

equipment installed in the aircraft; or

4.5. In the event of an accident or incident requiring immediate notification to the

ECAA, EGYPTAIR EXPRESS shall keep the recorded information for at least 60

days or, if requested by the ECAA for longer period. Information obtained from the

record is used to assist in determining the cause of accidents or incidents in

Page 243: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

connection with the ECAA investigation. of all related flight recorder records, and if

necessary the associated flight recorders, and their retention in safe custody

pending their disposition

5. Forms N/A

Page 244: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.11

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

2.11 Electronic Navigation Data Management

1. Objective :

To set EGYPTAIR EXPRESS policy regarding the implementation of Electronic

Navigation Data Management

2. References:

ECAR 91 .423 ECAR Parts 121.57 and 121.305.

3. Responsibility

3.1. Function is contracted to an ECAR Part 145 Approved Maintenance Organization

3.2. Chief Inspector for monitoring

4. Requirements:

4.1. Contracted AMO shall obtain the databases from Vendors (as an accepted Data

Base Supppliers by the authority or type certificate holderfor use in aircraft

navigation systems by This can be achieved through the authorized downloading

from the Vendor web site or by mail. This shall be done timely by the AMO and

on regular basis.

4.2. The AMO will sent the data one week in advance of the applicable effective date

to the relevant line maintenance department so that it can be loaded on the

relevant aircraft prior to the first flight on the effective date for the new databases.

4.3. An entry in the aircraft logbook shall be made by the data loading person.

5. Forms

TLB

Page 245: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.11

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 246: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

� 2.12 Reduced Vertical Separation Minima (RVSM)

1. Objective

To set EGYPTAIR EXPRESS procedures regarding the implementation of technical

requirements for RVSM operations.

2. References:

ECAR 91 Appendixes G, ECAR Part 121.57 and 121.161.

3. Responsibility

Maintenance Director for implementation

Chief Inspector for monitoring

4. Description:

4.1. General:

EGYPTAIR AIRLINES and its aircraft are fulfilling the ECAA requirements

regarding the RVSM and approved accordingly.

4.2. Requirements for Reduced Vertical Separation Minimum (RVSM):

4.2.1. Instituted appropriate procedures in respect of continued airworthiness

(maintenance and repair) practices and programmes for RVSM

operation.

4.2.2. The aircraft is equipped with two operational independent altitude

measurement systems.

4.2.3. The aircraft has an automatic altitude control system that controls the

aircraft altitude within the regulatory specified tolerance band about

acquired altitude when the aircraft is operated in straight and level flight

under non-turbulent, non-gust conditions.

4.2.4. The aircraft must be equipped with an altitude alert system that signals

an alert when the altitude displayed to the cockpit crew deviates from

the selected altitude by more than the values specified by the regulatory

authority.

Page 247: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

4.2.5. The aircraft is equipped with one Secondary Surveillance Radar (SSR)

altitude reporting transponder with capability for switching to operate

from either altitude measurement system.

4.3. Requirements for Continued Compliance with RVSM Requirements:

4.3.1. The MEL has specific minimum requirements for RVSM, which may be

more stringent than those required for normal operation. EGYPTAIR

EXPRESS RVSM CMEL requirements have been derived from aircraft

Approved Flight Manual

4.3.2. In the event of structural damage within the vicinity of Pilot Probes,

Static Vents, TAT Probes or AOA sensors, the Structural Repair Manual

53-00-11

4.3.3. This section details the aerodynamic requirements for allowable

damage or repairs, which affect the Probes, Ports or AOA Sensors.

4.4. Downgrading of Aircraft as NON-RVSM CAPABLE:

4.4.1. Any defect rendering the aircraft as NON-RVSM CAPABLE must be

transferred to the Deferred Defect Log provided that the said defect is

allowable within the terms of the Minimum Equipment List (MEL). This

Deferred Defect must clearly state that the aircraft is NON-RVSM

CAPABLE. This should be also reflected in the aircraft Technical Log as

a NON-RVSM CAPABLE.

4.4.2. Persons authorized to downgrade an aircraft shall be appropriately

authorized for this particular circumstances.

4.4.3. As soon as an aircraft is classified as NON-RVSM CAPABLE, the MCC

must notify the EGYPTAIR EXPRESS Operations(IOCC).

4.5. Upgrading of Aircraft as RVSM CAPABLE

4.5.1. The defect causing the downgrade must be positively identified and

rectified.

4.5.2. The Technical Log should reflect that the aircraft is RVSM CAPABLE.

4.5.3. Only appropriately authorized inspector shall upgrade an aircraft to be

RVSM CAPABLE, dependant upon the reason for the previous

downgrading.

Page 248: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 4

Issue Date: 4 Aug 2012

4.5.4. As soon as the aircraft becomes RVSM CAPABLE, the MCC must

notify the EGYPTAIR EXPRESS Operations(IOCC).

4.6. RVSM Training Requirements:

4.6.1. Maintenance staff shall be provided with a suitable training describing

the RVSM. This can take the form of reading an RVSM Briefing

Document. Once staff have read and understood the RVSM notes, they

are required to sign an Acknowledgement Sheet stating that they have

read and clearly understood the RVSM Briefing Document.

4.6.2. The RVSM training records shall be available on demand to EGYPTAIR

EXPRESS auditors.

4.6.3. RVSM Continuation Training is contained with the elements of the

various existing Technical Aircraft Continuation Training Courses.

These courses are run by EGYPTAIR Training Organization.

5. Forms:

Application for Aircraft RVSM approval ECAA Form No. 12000-26

Page 249: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 250: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.13

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 4

Issue Date: 4 Aug 2012

2.13. Reporting to the Authority and the OEM

Type Certificate Holder

1. Objective: To establish and execute a system for reporting hazardous conditions

encountered during aircraft operation to the Authority, Type Certificate Holder and

design organizations.

2. References: ECAR 39 .21, ECAR 801, ECAR 91.10, 121.702, ECAR 121.703, 121.705,

121.707,

3. Responsibility: 3.1. Cheif Inspector

3.2. Contracted Maintenance Provider.

4. Description: 4.1. EGYPTAIR EXPRESS shall provide ECAA with Type Certicate Holder with

faults, malfunctions and other ocurrences which could affect the continuing

airworthiness of aircraft, as prescribed by ECAA at aircraft delivery. Accident

Reporting:

4.1.1. Mantenance provider MCC shall notify immediately ECAA and Chief

Inspector by telephon or fax or any other means for any Aircraft accidents/

incident on form 330.

4.1.2. Initial reporting on form F12000-15). shall be reported withen 72 hrs to ECAA

by, telex, or fax.

4.1.3. An investigation shall be carried out. An investigation team is to be

nominated ECAA by Accident Investigation Authority.

4.1.4. Material involved in the accident shall not be moved, repaired, modified,

overhauled, scrapped or handled to a third party unless the action is

approved by the Accident investigation authority via IOCC Emergency

Response Team Leader via maintenance member.

4.1.5. The investigation team prepare the accident report.to ECAA.

4.2. Occurrence Reporting:

Page 251: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.13

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 4

Issue Date: 4 Aug 2012

4.2.1. Occurrence Reporting shall be for defects or un-airworthy conditions as

follows:

i. Occurrence shall be immediately notified to the ECAA by telephone or telex or

fax.

ii. Aircraft incidents shall be reported to the Authority within 72 hours from occurrence

by telephone or fax.

iii. The reporting shall be in the form mentioned in ECAR 39 subpart B (F12000-15).

iv. The report shall contain all mechanical failures, malfunctions or defects that is

hazardous to flight safety as in paragraf 4.2.3

4.2.2. The following informations is to be included in the Report:

i. Aircraft data, Occurrence date, flight number, place and stage when the

Occurrence occurred.

ii. The aircraft and involved part total time and total cycles, time and cycles since

last major check or shop visit

iii. The nature of the failure, malfunction or defect.

iv. Any emergency procedure implemented.

v. Identification and disposition of the part(s) involved.

vi. Apparent cause of the failure, malfunction or defect.

vii. Analysis as to the cause or root cause of the failure or defect.

viii. Analysis so as to the data obtained from the installed flight recorder and

cockpit voice recorder.

ix. Dumped records shall be kept for at least 60 days or, if requested by the

Authority for longer period. Whether the part was repaired, replaced or other

action taken;

x. Related correspondence with aircraft/part(s) manufacturer

xi. Recommendations as to the corrective action(s)

4.2.3. List of reportable occurrences that should be reported:

i. General

a. Any failure, malfunction or defect where the safety of operation was or could

have been endangered or which could have led to an unsafe condition.

ii. Aircraft Structure

a. Any failure of aircraft primary structure or a principal structural element

Page 252: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.13

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 4

Issue Date: 4 Aug 2012

b. Engine structural failure;

c. Control system failure;

d. Major defect or damage to aircraft structure and also that requires major

repair;

e. Cracks, permanent deformation or corrosion or defect or damage of aircraft

primary structure or principal structural element that a repair scheme is not

already provided in the manufacturer's repair manual, or that occur after

repair;

f. Any part of the aircraft that would endanger the aircraft or any person by

becoming detached in flight or during operations on the ground;

g. Defects or damage to aircraft structures, if more than allowed tolerances

h. Damage which necessitates repair before further flight.

iii. Power plant

a. Engine(s) removed prematurely because of malfunction, failure or defect.

b. Un-commanded loss of thrust/power, shutdown or failure of any engine;

c. Uncontained failure of engine compressor, turbines;

d. Engine exhaust system malfunction during flight that caused damage to

engine, adjacent structure, equipment or subjected the aircraft to an unsafe

condition.

e. inability to relight or restart a serviceable engine during flight

iv. Aircraft Systems or Equipment

a. Fire or explosion;

b. Smoke, toxic or noxious fumes in the aircraft; crew to deal

c. Fuel leakage that results in substantial loss, or is a fire hazard;

d. Fuel system malfunction that has significant effect on fuel supply and/or

distribution; Brake system components that result in loss of brake actuating

force when the aircraft is in motion on the ground;

e. Fire warnings, except those immediately confirmed as false;

f. Unwanted landing gear or gear doors extension / retraction

g. Significant loss of braking action

h. Dangerous Goods Spillage, leakage, causing fumes, gases smoke or fire.

Page 253: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.13

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 4

Issue Date: 4 Aug 2012

i. Pressurization system malfunction necessitating a change in flight plan, or

the use of emergency or standby oxygen system

j. A complete loss of more than one electrical power generating or hydraulic

power system during flight

4.2.4. The occurrences shall be reported by the AMO to EGYPTAIR EXPRESS, the

Original Equipment Manufacturer and the Type Certificate Holder are the

conditions which considered a hazard to flight safety such as:

a. Significant cracking, deformation, corrosion or failure of primary structure.

b. Any evidence of burning, electrical arcing, significant hydraulic fluid or fuel

leakage.

c. Any emergency system or total system failure,

d. Overdue for compliance of any airworthiness directive (AD / CN).

e. Control system failure;

f. Engine(s) removed prematurely because of malfunction, failure or defect;

5. Forms:

5.1. ECAA Preliminary Notification Occurrence Report Form No. 12000-15

5.2. Accident / Incident Report Form No. 330.

Page 254: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 8

Issue Date: 15 Apr 2012

2.14 CAT II Operations

1. Objective :

To set EGYPTAIR EXPRESS policy regarding the implementation of technical

requirements for, category II automatic landing operations.

2. References:

ECAR 91.189 ECAR 91 appendix D.

3. Responsibility

3.1. Maintenance Director for implementation

3.2. Chief Inspector for monitoring

4. Description:

4.1. General

To implement a CAT II operation, the following shall be applied:

4.1.1. Engineering shall identify aircraft, aircraft component data, maintenance and

reliability program related to the CAT II operation and review aircraft applicable

documents accordingly. Applicable documents include but not limited to

aircraft Minimum Equipment List and Flight Manual.

4.1.2. Engineering shall be responsible for continuously reviewing the Authority

requirements, identifying program requirements, updating the program and

working on follow-up.

4.1.3. Engineering shall continuously coordinate with the flight operations for

compliance with the CAT II provisions

4.1.4. Quality Assurance shall be responsible for determining maintenance

personnel qualification requirements. Concerned maintenance provider shall

be responsible for qualifying maintenance personnel according to these

requirements.

4.1.5. Chief Inspector shall apply to the Authority for CAT II operation approval

Page 255: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 8

Issue Date: 15 Apr 2012

4.1.6. The CAT II operation shall not be implemented unless there is an authorization

for CAT II operation in the Operations Specifications granted by the Authority.

4.1.7. Engineering is responsible for ensuring that the CAT II aircraft continuously

comply with Type Certificate or Supplemental Type Certificate requirements.

4.2. CAT II maintenance program shall address the following:

4.2.1. Applicable tasks and procedures addressing lower landing minima and low

visibility operations.

4.2.2. Applicable MRB and other mandatory requirements relating to low visibility

operations.

4.2.3. Verification of the lower landing minima systems and configuration status.

4.2.4. Identification of modifications, additions, and changes required for CAT II

operation other than those specified in Aircraft Flight Manual, Type Certificate

or Supplemental Type Certificate Requirements.

4.2.5. Identification of maintenance requirements and log entries necessary to

change minima status.

4.2.6. CAT II Program shall cover the following:

i. Effectively as related to aircraft registration.

ii. Definition and identification as related to aircraft systems/components

iii. Identification as related maintenance program tasks.

iv. Reliability / performance reporting to all concerned.

v. Compliance with regulatory requirements.

vi. Operational performance reporting and record keeping.

vii. The Reliability Section shall monitor all CAT II related systems / components

and report to RCB in regular basis. Pilot performance reports and

maintenance reports shall be filed with any defect deferrals.

viii. Operations function checks and records for evaluation period.

ix. Maintenance training.

4.3. Reliability program shall address the following:

Page 256: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 8

Issue Date: 15 Apr 2012

4.3.1. An analysis shall be made on a case-by-case basis of all-significant

discrepancies, failures, defects and malfunctions experienced in service (or

during testing) that may be unique to the low visibility program and description

of the way it is dealt with.

4.3.2. An assessment of the corrective actions taken for each problem identified or

reported in the lower minimum system and related component discrepancies

for the purpose of quality control, analysis and prevention of re-occurrence. A

verification action may be required for certain discrepancies. Determination

shall be made to who must initiate verification actions and who is responsible

for the determination of what action is necessary should be identified. All such

actions should be appropriately certified and filed.

4.3.3. The reliability program shall define, address, and monitor chronic and

repetitive discrepancies related to CAT II operations.

4.4. Follow up on CAT II related components.

The follow-up shall include the following details:

4.4.1. Component part, specification or model.

4.4.2. Component manufacturer or vendor.

4.4.3. Quantity per aircraft

4.4.4. Repair facility used.

4.4.5. Performance data such as but not limited to MTBUR, MTBF and its relation to

scheduled Maintenance program, related maintenance tasks.

4.5. Chief Inspector shall:

4.5.1. Review the program prior to submission for Authority approval. The

management of Authority approval is the responsibility of the Chief Inspector.

4.5.2. Address the Authority to amend the granted Operation Specifications in order

to include CAT II operations.

4.5.3. Supervise CAT II event analysis and control of the corrective action and

prepare necessary repots for the Authority.

Page 257: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 8

Issue Date: 15 Apr 2012

4.5.4. Supervise the Record keeping of the release, event corrective action for

compliance with records standards.

4.5.5. Monitor and review of corrective action(s) implementation and its verification

required to keep or restore Authority CAT II approval.

4.5.6. Notify all concerned regarding CAT II Authority approval status in due time. If

the CAT II approval is suspended, the Chief Inspector shall immediately

inform all concerned.

4.6. CAT II Performance Reports and Reported Defects:

4.6.1. The Maintenance Manager will receive performance reports on regular basis

from the flight operations. If reports contain technical discrepancies, he will act

accordingly. If engineering support is required, the Maintenance Manager will

inform engineering to provide such support.

4.6.2. The maintenance engineers / inspectors shall review the aircraft technical log

entries for CAT II related system/ component reported defects and rectify as

per the standard program maintenance manual.

4.6.3. Record keeping of the Work tasks and the performance reports shall be filed in

the Aircraft record files and supplement CAT II evaluation files.

4.6.4. The reliability corrective actions shall be filed in the aircraft record files.

4.6.5. Any CAT II approved aircraft shall only be released to flight by an approved

release certifying person who is trained on maintenance of CAT II related

systems/ items.

4.6.6. An aircraft approved for CAT II operation and planned for a flight operation

which is subject to CAT II flight, the flight must be appropriately identified in

flight documents.

4.6.7. The CAT II job number shall be appropriately identified in the line maintenance

checks and shall be released by a certifying staff who is trained on the CAT II

related item maintenance.

4.6.8. Any deferral of related item must be checked if such deferral affects the level

of operation that will degrade its CAT II performance. If an aircraft is subjected

Page 258: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 5 of 8

Issue Date: 15 Apr 2012

to a CAT II related item defect deferral, MCC shall be immediately informed

and shall relay this information to the flight crew suitable time prior to dispatch.

The affected aircraft, in such case, shall remain out of lower minimum status

until successful corrective action has been verified. Any aircraft system with a

maintenance deferral that affects CAT II operation shall be placarded properly

to prevent reliance on it and such process shall be appropriately documented

in aircraft logbook and made visible to the flight crew by the concerned

certifying staff. The above requirement shall apply equally to any CAT II

chronic or repetitive discrepancies

4.6.9. Deferred items affecting CAT II performance shall be monitored for rectification

by the reliability section and concerned maintenance inspectors.

4.6.10. Maintenance task certification and release of work which includes CAT II

related items shall be certified by approved certifying staffs who has trained on

CAT II related items maintenance.

4.6.11. The Chief Inspector may arrange for regular meetings with the pilots flight

crews to discuss events, performance discrepancies related to CAT II

operation. Review of CAT II items with the flight operation may be required if

the subject change include or require pilot operation procedure.

4.6.12. The project engineering may arrange with flight operation for review of the

related items for the proper operation procedure. The reviewed items shall be

proposed to the QA director for authority approval granting.

4.6.13. The aircraft CAT II operation approval shall be declared into the aircraft

technical log and endorsed in the training program, Maintenance program and

configuration and audit files.

4.6.14. Component which is related to CAT II operation shall be identified in shop

maintenance paper work (job or repair order) by the shop production control.

4.6.15. The shop findings for CAT II related components with respect to the limits as

required by the maintenance data shall be appropriately investigated by

engineering and necessary actions taken.

Page 259: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 6 of 8

Issue Date: 15 Apr 2012

4.6.16. Records of deferred items shall be filed in the aircraft CAT II record files in

addition to the normal A/C records system

4.6.17. The Engineering shall review airworthiness issues (A.D.s, C.N.s, S.B.s, S.l.s or

reliability changes) for the CAT II related components/systems and issue

necessary engineering orders to comply with requirements. A special mod

standard of the CAT II related component might be established.

4.6.18. The stores inspectors shall review component configuration (CAT II related)

according to its mod standard prior to be stored, any discrepancy may be

reported to the engineering Directorate.

4.7. Downgrading of Aircraft as NON-CAT II CAPABLE

4.7.1. Any defect rendering the aircraft as NON-CAT II CAPABLE must be

transferred to the Deferred Defect Log provided that the said defect is

allowable within the terms of the Minimum Equipment List (MEL). This

Deferred Defect must clearly state that the aircraft is NON-CAT II CAPABLE.

This should be also reflected in the aircraft Technical Log as a NON-CAT II

CAPABLE.

4.7.2. Persons authorized to downgrade an aircraft shall be appropriately authorized

for this particular circumstances.

4.8. As soon as an aircraft is classified as NON-CAT II CAPABLE the MCC must notify

the EGYPTAIR EXPRESS Operations. Upgrading of aircraft as CAT II CAPABLE

4.8.1. The defect causing the downgrade must be positively identified and rectified.

4.8.2. The Technical Log should reflect that the aircraft is CAT II CAPABLE.

4.8.3. Only appropriately authorized inspector shall upgrade an aircraft to be CAT II

CAPABLE dependent upon the reason for the previous downgrading.

4.8.4. As soon as the aircraft becomes CAT II CAPABLE the MCC must notify the

EGYPTAIR EXPRESS Operations.

4.9. Training

4.9.1. Maintenance staff shall be provided with a suitable training describing the CAT

II. This can take the form of reading a CAT II Briefing Document. Once staff

have read and understood the CAT II notes, they are required to sign an

Page 260: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 7 of 8

Issue Date: 15 Apr 2012

Acknowledgement Sheet stating that they have read and clearly understood

the CAT II Briefing Document.

4.9.2. The CAT II training records shall be available on demand to EGYPTAIR

EXPRESS auditors.

4.9.3. CAT II Continuation Training is contained with the elements of the various

existing Technical Aircraft Continuation Training Courses. These courses are

run by EGYPTAIR Training Organization.

5. Forms:

N/A.

Page 261: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 2: Maintenance Control

Chapter 2.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 8 of 8

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 262: Express Mcm Issue 4 Amend 01 4 Aug 12

PART: (3): TECHNICAL RECORDS

Page 263: Express Mcm Issue 4 Amend 01 4 Aug 12

This page is intentionally left blank

Page 264: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

Index

3.00 Index

3.01 Aircraft Technical Log.

3.02 Aircraft Maintenance Records

3.03 Fuel and Oil Records

3.04 Airworthiness Directives and Service Bulletins

Page 265: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 266: Express Mcm Issue 4 Amend 01 4 Aug 12

 

MCM  Part 3: Technical Records 

Chapter 3.01 

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4Amen. No.: 00                                                                                                                                            Page 1 of 6                   

Issue Date: 15 Apr 2012 

3.01. Aircraft Technical Log.

1. Objective:

Description how to handle aircraft on-board Technical Logbooks.

2. References:

ECAR 43.13, 121.375, 121.563, 121.687 and 121.701.

3. Responsibility:

3.1. Chief Inspector to create and obtain ECAA approval, monitor the production and

distribution of logbooks for all aircraft.

3.2. Handling of Log Books is subcontracted under the supervision of the Maintenance

Director.

4. Description:

4.1. General:

4.1.1. Each aircraft shall be furnished with the following set of logbooks:

i. Technical Logbook (TLB).

ii. Deferred Defect Logbook (DDL).

iii. Cabin Logbook (CLB).

iv. Deferred Cabin Logbook (DCLB).

4.1.2. EGYPTAIR EXPRESS Chief Inspector shall create, monitor the production and

distribution of logbooks for all aircraft.

4.1.3. EGYPTAIR EXPRESS Chief Inspector shall ensure that logbooks are

maintained for all aircraft operations

4.1.4. All logs shall be made accessible to concerned flight crew at all times.

4.1.5. Page forms of Technical Log and Deferred Defect Log and any amendments

there to shall be approved by the Authority.

4.1.6. All log pages shall be serialized consequentially.

4.1.7. All entries in aircraft logbooks shall be current with undeletable ink and cannot

be erased.

4.1.8. Errors corrected in the aircraft logbooks shall remain readable and identifiable.

Page 267: Express Mcm Issue 4 Amend 01 4 Aug 12

 

MCM  Part 3: Technical Records 

Chapter 3.01 

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4Amen. No.: 00                                                                                                                                            Page 2 of 6                   

Issue Date: 15 Apr 2012 

4.1.9. Each person who takes action in the case of a reported or observed failure or

malfunction of an airframe, engine or appliance that is critical to the safety of

flight shall make, or have made, a record of that action in the aircraft's

maintenance log.

4.1.10. Duty assignments of crew members, shall be stated in the general declearation

(GD) form, and shall be kept onboard the aircraft, a copy shall be kept at the

dispatch section (ref. to OMA,1)

4.2. Technical Logbook (TLB):

4.2.1. Aircraft technical logbook shall comprise the following elements:

i. aircraft nationality and registration;

ii. date;

iii. Name and signature of the pilot in command

iv. place of departure;

v. place of arrival;

vi. time of departure;

vii. time of arrival;

viii. hours & minuets of flight;

ix. incidents, observations, as applicable;

x. details of defects and rectifications/actions taken;

xi. signature and identity of the person recording the defect.

xii. signature and identity of the person signing the release to service following

maintenance.

xiii. Company name and logo

xiv. Aircraft fluids serviced quantities: fuel / oil.

xv. Aircraft parameters such as tires pressures and engine parameters.

xvi. Line maintenance checks carried out.

xvii. Aircraft acceptance for flight statement signed by the pilot in command.

xviii. Type of flight; revenue, non-revenue; training, testing ,repositioning, ETOPS,

non-ETOPS.

4.2.2. Technical Log pages are to be made of a master white copy and additional

three copies

Page 268: Express Mcm Issue 4 Amend 01 4 Aug 12

 

MCM  Part 3: Technical Records 

Chapter 3.01 

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4Amen. No.: 00                                                                                                                                            Page 3 of 6                   

Issue Date: 15 Apr 2012 

i. Master copy, shall remain on board the relevant aircraft until the next letter

check where it is kept at the main records.

ii. Second copy, shall be left at departure point. In outstations ,These copies will

be kept by handling company for 30 days then routed to Cairo base to be kept

in maintenance record department

iii. Third copy shall be retained in the main Records Section in the Main Base

after the end of the flight until being replaced by the master white copy.

iv. AMO Record Section shall scan TLB pages monthly and keep it in server

v. Fourth copy is to be used for engineering purposes. 

4.2.3. EGYPTAIR EXPRESS shall ensure that the completed A/C TLB pages are

retained according to 1.06 - 4.4.3.

4.2.4. The AMO main records section shall utilize the recorded time (hours, calendar

time and cycles), to calculate Total time in service (hours, calendar time and

cycles, as appropriate,) of the aircraft, engines and all life-limited components;

4.2.5. Defect entries shall be written in the defect cell either by pilot or engineer , pilot

name and signature cell filled in case pilot reported the defect OR engineer

sign and stamp in case defect reported by engineer. If no defect reported pilot

shall sign the first defect cell (NIL).

4.3. Deferred Defect Logbook (DDL):

4.3.1. Deferred Defect Log is made to record discrepancies for which rectification can

be deferred in accordance with the CMEL/CDL and to record the actions taken

to rectify these items. The log is filled out by maintenance approved personnel.

4.3.2. Deferred Defect Log pages shall be made of a master white copy and

additional two copies of different colors.

i. Master copy, shall remain on board the relevant aircraft at least until

rectification of deferrals after which it is transferred to the main records.

ii. First copy shall be sent by the contracted AMO line maintenance for records

and planning purposes.

Page 269: Express Mcm Issue 4 Amend 01 4 Aug 12

 

MCM  Part 3: Technical Records 

Chapter 3.01 

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4Amen. No.: 00                                                                                                                                            Page 4 of 6                   

Issue Date: 15 Apr 2012 

iii. Second copy shall be maintained in the Main Records until replaced by the

master copy.

4.3.3. Deferred Defect Log pages shall contain the following data/records:

i. Company Name and Logo

ii. Aircraft Nationality and Registration Marks

iii. Departure point where the discrepancy has been deferred / extended.

iv. Detail of deferred discrepancies and reference to the CMEL/CDL item

allowing for deferral.

v. Reference to the technical log page number on which the deferred item has

been first recorded

vi. Date of and reason for deferral

vii. Interval for deferral

viii. Signature and stamp of the maintenance approved person who made the

deferral

ix. Rectification date, action taken to rectify deferred discrepancy and reference

to maintenance data

x. Signature and stamp of the maintenance approved person that made the

rectification

xi. Record of extension by ECAA / CI.

4.4. Cabin Logbook (CLB):

4.4.1 Cabin Log is to be made to record cabin non-airworthy items discrepancies

observed by the cabin crew during operation of aircraft. Any discrepancy, which

may affect the Airworthiness, shall be reported to the cockpit crew to be

entered in aircraft Technical Log

4.4.2 Record of corrective actions taken by maintenance personnel to rectify cabin

discrepancies.

4.4.3 Cabin Log pages is to be made of a master white copy and additional colored

copy. Master copy is to remain on board the relevant aircraft until the next letter

check. Second copy, is to be left at departure point.

4.4.4 Cabin log pages shall contain the following data/records:

i. Company Name and Logo

Page 270: Express Mcm Issue 4 Amend 01 4 Aug 12

 

MCM  Part 3: Technical Records 

Chapter 3.01 

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4Amen. No.: 00                                                                                                                                            Page 5 of 6                   

Issue Date: 15 Apr 2012 

ii. Aircraft Nationality and Registration Marks

iii. Date

iv. Departure point and arrival point

v. Discrepancies observed by cabin crew during operation

vi. Signature of concerned cabin crew

vii. Action taken to rectify or defer discrepancies

viii. Signature of maintenance approved person who performed the corrective

actions

4.5. Deferred Cabin Logbook (DCLB):

4.5.1. Deferred Cabin Log is to be used to record cabin discrepancies for which

rectification can be deferred for subsequent rectification action. The log is to be

filled by concerned maint. personnel.

4.5.2. Deferred Cabin Items Log pages is to be made of a master white copy and

additional coloured copy. Master copy , is to remain on board the relevant

aircraft until rectification of discrepancies. Second copy, is to be left at

departure point.

4.5.3. Deferred Cabin Items Log is to contain the following data/records:

i. Company Name and Logo

ii. Aircraft Nationality and Registration Marks

iii. Departure point where the discrepancy has been deferred

iv. Detail of deferred discrepancies.

v. Reference to the cabin log page number on which the deferred item has been

first recorded

vi. Date of and reason for deferral

vii. Signature and stamp of the maintenance approved person who made the

deferral

viii. Action taken to rectify the deferred discrepancy with reference to relevant

maintenance data

ix. Signature and stamp of the maintenance approved person that made the

rectification

Page 271: Express Mcm Issue 4 Amend 01 4 Aug 12

 

MCM  Part 3: Technical Records 

Chapter 3.01 

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4Amen. No.: 00                                                                                                                                            Page 6 of 6                   

Issue Date: 15 Apr 2012 

5. Forms:

5.1. Aircraft Technical Log Tech. Log (TLB).

5.2. A/C Deferred Defect Log (DDLB) Form 407.

5.3. A/C Cabin Log (CLB) Form 413.

5.4. Deferred Cabin Item Log (DCLB) Form 414.

Page 272: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Chapter 3.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

3.02. Aircraft Maintenance Records.

1. Objective:

To establish, maintain and monitor a system of maintenance records.

2. References:

ECAR 43.1, 43.3, 43.11, 43.15, ECAR 91.417, 91.419 ECAR121.376, 121.377,

121.685, 121.701.

3. Responsibility:

Function is subcontracted under the responsibility of the Chief Inspector.

4. Description:

4.1. General:

4.1.1. Records shall contain details of the relevant aircraft or component, methods,

techniques and practices, type of inspection and a brief description of work

performed including tolerances and limits, reference to documents and tools

used, as applicable, date of completion of work and name / signature / stamp of

person in charge. If work constitutes major repairs or major alterations it shall

contain approval from ECAA.

4.1.2. Only properly qualified person(s) shall sign a maintenance record. Qualification

includes training, certification or authorization as applicable.

4.1.3. An up-to-date signature roster of maintenance personnel who are approved to

perform and certify maintenance for EGYPTAIR EXPRESS shall be available to

the C.I.

4.1.4. It is not allowed to intentionally enter any false entry in any record. If correction

to an inadvertent mistake is to be made in a record, the old writing shall be

omitted in a way not to cause its complete disappearance. Use of corrector or

whitener is prohibited.

Page 273: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Chapter 3.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

4.1.5. Aircraft shall be released to service only after assuring that its records are

completed.

4.1.6. Paper records shall use proper paper quality that can withstand normal use

during the record retention period.

4.1.7. Paper records shall be written with undeletable ink.

4.1.8. Records are to be made available for inspection to ECAA Inspectors or other

authorized entities at any time during business hours.

4.1.9. Records shall include tracking of total time in service (hours, calendar time and

cycles, as appropriate,) since last overhaul of the aircraft, engines or its

components subject to a mandatory overhaul life; with special regard to life

limited parts as specified in approved aircraft maintenance program.

4.1.10. For time controlled items, record of previous operating history shall be provided

in a justified manner unless the item has been completely disassembled,

inspected, repaired as necessary, reassembled, tested, and approved in the

same manner and to the same tolerances and limits as a new item.

4.1.11. The records shall contain any change made as required by Airworthiness

Directives; or any change made in compliance with manufacturer’s service

bulletins.

4.1.12. Records shall not be filed for storage unless all required data in the record is

completed.

4.1.13. All records shall be stored in a suitable area and shall be protected against

loss, theft, fire, water, weather conditions or unauthorized access.

4.1.14. Retention of Maintenance Records is subcontracted to EGYPTAIR M&E.

4.1.15. Should the retention period expires (as mentioned in 1.8-4.4.3), relevant

records are to be either transferred to a dead store or soft or microfilm copies

are retained instead and paper shall be shredded before sent to recycling and

CDs shall be destroyed.

4.1.16. No record is to be destroyed without the prior written consent of ECAA via the

Chief Inspector.

Page 274: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Chapter 3.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

4.2. Applicable Maintenance and Quality Records:

4.2.1. Record kept under the control of Chief Inspector include but not limited to the

following List :

i. A list of organizations currently approved to perform maintenance on the

Operator's aircraft, engines, components or parts.

ii. Chief Inspector shall have a window in computer format to an up-to-date

signature roster providing positive identification of maintenance personnel who

are approved to perform and certify maintenance for EGYPTAIR EXPRESS,s

aircraft.

iii. Audit reports

iv. Personnel files

v. Escalation and Extensions

vi. Accidents and Incidents reports

4.2.2. The following List constitutes EGYPTAIR EXPRESS maintenance records are

maintained through EGYPTAIR MAINTENANCE AND ENGINEERING. This list

should be continuously checked for completion, condition, currency and/or

validity:

i. Certificate of Release to Service,

ii. Aircraft Technical Log sheets

iii. Maintenance checks compliance sheets

iv. Task cards, routine and non-routine

v. Chronic or repetitive defects, troubleshooting history and implementation of

corrective action.

vi. Aircraft fourteen-night operational data.

vii. Aircraft weighing reports.

viii. Aircraft test flight reports.

ix. Maintenance ferry reports.

x. AD/CN standard for aircraft and aircraft components

xi. AD/CN status for aircraft and aircraft components

Page 275: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Chapter 3.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

xii. AD/CN compliance cards for aircraft and aircraft components

xiii. SB/EO/SIL status for aircraft and aircraft components.

xiv. SB/EO/SIL compliance cards for aircraft and aircraft components.

xv. Approved Major Repair/Alteration forms

xvi. Aircraft structure repair files including repair reference, cards, schemes and

necessary approvals.

xvii. Airframe Logbook

xviii. Engine Logbook

xix. Auxiliary Power Unit Logbook

xx. List of aircraft installed parts including part numbers and serial numbers.

xxi. Aircraft installed components Airworthiness release certificates.

xxii. Fuel and Oil consumption records.

4.3. Aircraft accident / incident records:

4.3.1. All records of the Aircraft involved in the accident / incident shall be collected and

freezed and not moved, corrected, modified, scrapped or handled to a third

party unless the action is approved by Accident invistegation Authority via

IOCC Emergency Response Team Leader via maintenance member.

4.3.2. . It is preferable to produce a copy of all records of the aircraft involved in the

accident / incident.

4.3.3. When an aircraft becomes involved in an accident or incident; The IOCC Emergency

Response Team Leader via maintenance member shall insure that:

i. The flight data recorder FDR and or the voice recorder VCR – as appropriate –

are prompetly removed from the A/C.

ii. The associated flight recorders are preserved and retained in safe custody

pending disposition in accordance with the appropriate investigation.

iii. Monitor downloading data and preparation of necessary reports.

5. Forms:

N/A.

Page 276: Express Mcm Issue 4 Amend 01 4 Aug 12

 

MCM  Part 3: Technical Records 

Chapter 3.03 

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4 Amen. No.: 00                                                                                                                                               Page 1 of 2              

Issue Date: 15 Apr 2012  

3.03. Fuel and Oil Records. 

1. Objective:

To provide a procedure to maintain fuel and oil records.

2. References:

ECAR 43.13, 121.375, 121.687 and 121.633

3. Responsibility:

This function is subcontracted under the supervision of the Maintenance Director.

4. Description:

4.1. General:

4.1.1. During aircraft arrival inspection, the assigned qualified technician will carry out

all engines oil topping, after engines shut down (within applicable AMM time

limits) ; then in-charge certifying staff will certify oil topping by checking that

added quantities are within acceptable limits according to applicable AMM and

record these quantities in the aircraft technical log bock TLB.

4.1.2. Fuelling operation is performed according to applicable AMM; then in-charge

certifying staff will check added quantities and record these quantities in the

aircraft technical log bock TLB.

4.1.3. TLB copy No.4 shall be sent to AMO engineering department for calculating

performance correction and / or issuing an Engineering order for a required

corrective action.

4.1.4. Records regarding fuel and oil consumption for any aircraft or engine shall be

kept for a minimum of three operational months

5. Forms:

5.1. Aircraft Technical Log book. (TLB).

 

 

 

Page 277: Express Mcm Issue 4 Amend 01 4 Aug 12

 

MCM  Part 3: Technical Records 

Chapter 3.03 

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4 Amen. No.: 00                                                                                                                                               Page 2 of 2              

Issue Date: 15 Apr 2012  

 

 

 

 

 

 

 

This page is intentionally left blank

Page 278: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Chapter 3.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 4

Issue Date: 4 Aug 2012

3.04 Airworthiness Directives and Service Bulletins

1. Objective:

To establish policy for Airworthiness Directives (AD) and Service Bulletins (SB)

receipt, evaluation, processing and incorporation into EGYPTAIR EXPRESS fleet.

2. References:

ECAR 39.05, 121. 367,369

3. Responsibility:

3.1. Maintenance Director.

3.2. This function is subcontracted to AMO.

4. Description:

4.1. General :

4.1.1. Airworthiness Directives (AD):

AD which has been issued by the ECAA or Airworthiness authority of the

state of the TC Holder or STC Holder shall be treated as mandatory.

4.1.2. Service Bulletins (SB):

Service Bulletins and recommendations from organizations responsible for

the type design will be classified as follows:

i. Alert: which means that an urgent action is announced by the manufacturer

action is defined in a specific time frame this shall be implemented within the

specified time frame

ii. Recommended: which means that the actions which are announced by

manufacturer(s), are recommended This may be implemented within a

recommended time frame with reference to be made to the EGYPTAIR

EXPRESS.

iii. Optional: which means that the actions which are announced by

manufacturer(s) are made to improve the systems/components reliability

performance, operating costs or passenger satisfaction. This may be

implemented with reference to be made according to feasibility study

Page 279: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Chapter 3.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 4

Issue Date: 4 Aug 2012

4.2. AD’s management:

Maintenance Director shall insure that the AMO set up the procedures to have

the AD,s concerned Authority promptly and:

4.2.1. Have Technical Publications Department which is responsible for the

procurement of AD,s documents from the concerned authority, either hard or

soft copy .

4.2.2. This shall be transferd to document manager to update the standard.

4.2.3. AD,s documents shall be sent to AMO engineering to carry out necessary

studies on each AD for applicability, required material, required manhours,

aircraft let down time, time frame, tools & equipment and documents

affected.and if there are affect on the aircraft operation AMO engineering

shall send an Information Bulliten to EGYPTAIR EXPRESS Operation

Departement,

4.2.4. Issue Engineering Order containing all necessary information.

4.2.5. Issued Engineering Orders are to be sent to planning for scheduling

implementation.

4.2.6. Implement the Engineering Order on the specific aircraft. are completed

within the required time constraints

4.2.7. The aircraft STATUS will be updated accordingly & all concerned will be

informed.

4.2.8. Each aircraft STANDARD / STATUS should be available through the

computer system network for ADs.

4.3. S.B’s Management:

4.3.1. Contracted AMO Technical Publications Department is responsible for the

procurement of SB,s documents from the manufacturer, either hard or soft.

4.3.2. this shall be transferd to document manager to update the standard.

4.3.3. Also shall sent to AMO engineering to carry out necessary studies on each

SB for applicability, required material, required manhours, aircraft let down

time, time frame, tools & equipment and documents affected.and if there are

affect on the aircraft operation AMO engineering shall send an Information

Bulliten to EGYPTAIR EXPRESS Operation Departement,

4.3.4. Issue Engineering Order containing all necessary information.

Page 280: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Chapter 3.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 4

Issue Date: 4 Aug 2012

4.3.5. Issued Engineering Orders are to be sent to planning for scheduling

implementation.

4.3.6. Implement the Engineering Order on the specific aircraft.

4.3.7. The aircraft STATUS will be updated accordingly & all concerned will be

informed.

4.3.8. Each aircraft standard / status should be available through the computer

system network for ADs Mandatory & Alert Service Bulletins.

4.3.9. For Recommended & Optional Service Bulletins, technical & financial

considerations will be applied before issuing the Engineering Order.

4.4. Record System:

4.4.1. All records regarding the Airworthiness Directives (AD) and Service Bulletins

(SB) receipt, evaluation, processing and incorporation into EGYPTAIR

EXPRESS fleet shall be retained by EGYPTAIR Maintenance and

Engineering as per MCM Part (1) chapter 1.08.

4.4.2. Contracted AMO shall provide Maintenance Director monthely an up dated

AD,s complins status.

4.4.3. Contracted AMO shall provide Maintenance Director quartly an up dated

SB,s complins status.

4.5. A D follow up procedure :

5.4.1. A bi-weekly check on authorities website shall be carried out to stand on the

latest issued A D‘s

5.4.2. A copy of A D‘s list from Technical documents and publications department

shall be sent to engineering directory

5.4.3. Engineering director shall make a comparison between both above sources

to assure that all AD‘s issued by authorities were received by contracted

AMO. Form E/P 01

5.4.4. A three samples from AD will be revised BI-weekly with full details. this

sample will be as follows :

i. Not applicable A D. Form E/P 02

ii. AD with terminated action.Form E/P 02

iii. A D with repetitive inspection.Form E/P 02

Page 281: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 3: Technical Records

Chapter 3.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 4

Issue Date: 4 Aug 2012

5. Forms:

Form E/P 01

Form E/P 02

Page 282: Express Mcm Issue 4 Amend 01 4 Aug 12

PART (5): AIRCRAFT GROUND HANDLING

(GRH)

Page 283: Express Mcm Issue 4 Amend 01 4 Aug 12

This page is intentionally left blank

Page 284: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 2

Issue Date: 4 Aug 2012

Index

5.00 Index

5.01 Airside Technical Operations 5.02 Aircraft Fuelling

5.03 Aircraft De-icing and Anti-icing

5.04 Aircraft Mass and Balance Procedure 5.05 Transport of Dangerous Goods by Air

Page 285: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

5.01 Airside Technical Operations

1. Objective:

To set up a procedure to be followed during aircraft technical ramp activities.

2. References:

2.1. Relevant aircraft documents

2.2. Applicable IATA recommendations

2.3. Outstation handbook.

3. Responsibility:

3.1. Maintenance Director for contract making and implementation.

3.2. Chief Inspector for contract review and activities audit.

4. Description:

The maintenance provider shall assign a dedicated oppreriately qualified person to

supervise and coordinate all ramp actevities, near and arround the aircraft during

aircraft technical ramp activities, such person shall insure that relevant safety

procedures are complied with as follows:

4.1. Aircraft Towing/Pushback Procedure:

Refer to outstation handbook chapter: 3.8. for detailed procedure.

4.1.1. This procedure regards towing / push-back of aircraft, when cockpit is

occupied by a flight crew or maintenance staff member.

4.1.2. All participants shall be qualified for the assigned job and related emergency

action.

4.1.3. Instructions in applicable Aircraft Maintenance Manual and local Airport

Regulations must be complied with

4.1.4. All machines or equipment used shall be serviceable, suitable for the job and

appropriately used.

4.1.5. Prior to movement, appropriate communication shall be established between

ground, cockpit and concerned airport authority. Communication shall be

maintained during the entire towing or push- back operation.

4.1.6. Towing or push-back shall be carried out with stopped or idle engines.

4.1.7. Towing / push-back activity shall be made along unobstructed path. Sufficient

distances or clearances with surroundings shall be maintained. Markings and

Page 286: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

guidelines on established taxi ways, parking ramps, taxi or towing lanes shall

be appropriately followed.

4.1.8. Necessary collision avoidance lights shall be illuminated

4.1.9. Movement speed limits shall be observed taking into consideration airport

ambient conditions

4.1.10. Sharp turns shall be avoided during towing / push-back operations.

4.1.11. Application of brakes shall be as smoothly as possible.

4.1.12. Emergency braking may be initiated during emergencies

4.1.13. In case of communication failure, the tractor horn may be used to ask for

braking in repeated short signals, sounding the Mechanic’s call horn and / or

by flashing the nose gear light.

4.2. Aircraft Arrival Procedure:

Refer to outstation handbook chapters: 3.1.

4.3. Aircraft Marshalling Procedure:

Refer to outstation handbook chapters: 3.2.

4.4. Aircraft Parking Procedure:

Refer to outstation handbook chapters: 3.3.

4.5. Aircraft Line Maintenance Servicing Control:

Refer to outstation handbook chapters: 3.4.

4.6. Ground Equipment Positioning:

Refer to outstation handbook chapters: 3.5.

4.7. Aircraft Fuelind/Defueling And Sampling Operations:

Refer to 5.2 &outstation handbook chapters: 3.6.

4.8. Aircraft Dispach Procedure:

Refer to outstation handbook chapter: 3.7.

4.9. Engine Ground Operation:

Refer to outstation handbook chapters: 3.9.

4.10. Forign Opject Damage FOD Prevention:

Refer to outstation handbook chapters: 3.10.

4.11. Aircraft Dispatch Procedure:

Refer to outstation handbook chapter: 3.7.

Page 287: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

4.12. Ground Deicing and Anti-icing Program:

Refer to 5.3 & outstation handbook chapters: 3.5.

5. Forms:

N/A

Page 288: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 289: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 6

Issue Date: 15 Apr 2012

5.02 Aircraft Fuelling Operations

1. Objective:

To set a policy to ensure that all fuelling operations are conducted in conformity with

applicable regulatory requirements.

2. References:

ECAR 91.12

Station handbook chapter: 02.06

3. Responsibility:

Function is subcontracted under the responsibility of the Maintenance Director.

4. Description:

4.1. Contracted Maintenance Organization Responsibilities:

The contracted maintenance organization is responsible for aircraft fuelling

operation, and shall ensure the following:

4.1.1. No fuelling operations is to be done while an aircraft engine is running

4.1.2. The refuelling provider shall take necessay precautions to ensure fuel

delivered and loaded onto aircraft is (refer to Station hand book 2.6)

i. Free from contamination;

ii. Of correct grade and specification for each aircraft type.

4.1.3. An audit will be done at each location where EGYPTAIR EXPRESS has

aircraft fuelling operations. to ensures the existence of periodic inspections of

critical aspects of the fuel supply system at each applicable location, to

include, as a minimum:

i. Fuel facilities;

ii. Safety and quality procedures;

iii. Performance levels of personnel.

4.1.4. Equipment serving the aircraft will be positioned at a maximum distance from

fueling points and vents. A clear path shall be maintained to permit rapid

evacuation of fueling vehicle(s) and personnel in an emergency. Unnecessay

equipment shall be shut down and shall not be restarted until fuel vapors have

dissipated.

Page 290: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 6

Issue Date: 15 Apr 2012

4.1.5. When wind velocity exceeds 30-knots or when electrical storms are within a 5-

mile radius of fueling operations, fueling shall be stopped. When electric

storms are within one mile, all maintenance activities are to be suspended..

4.1.6. Radar equipment and high power emitting radio transmitters shall not be

operated in the vicinity of fueling operations.

4.1.7. A qualified fire guard provided with a wheeled portable 50-Ib carbon dioxide or

10-gallon chlorobromomethane fire extinguisher is to be located in the

immediate vicinity of the aircraft being fuel serviced when any hazard

suspicious arises.

4.1.8. Fuel overflow vents will be kept under constant observation.

4.1.9. Vehicle and aircraft traffic in the vicinity are to be prohibited from inside a 50-

foot restricted area.

4.1.10. Aircraft will not be fueled / defueled inside hangars not designed for fueling

and defueling, or within 50 feet of such structures, measured from the

servicing or defueling point or vents.

4.1.11. Before actual fueling is started, the aircraft shall be chocked according to

standard operating procedures.

4.1.12. Both the aircraft and fueling vehicles shall be statically bonded and grounded

as described in aircraft maintenance manual.

4.1.13. Ground power units, unless explosion proof, when required for aircraft fueling

and defueling, should be parked the full length of the power cable, but in no

case less than 50 feet from the aircraft fueling points or vents.

4.1.14. Under no circumstances will auxiliary power units be parked under any part of

an aircraft.

4.1.15. Operators is to remain in the immediate vicinity and in sight of ground power

units at all times units are being operated.

4.1.16. Before the fuelling operation is begun, each person involved will be checked

for matches, lighters, or other spark-producing devices, and instructed to

dissipate body static potential by gripping the static ground line.

4.1.17. A qualified operator will be stationed at the pumphouse during the entire

operation for emergency shutdown if the need arises.

Page 291: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 6

Issue Date: 15 Apr 2012

4.1.18. The duty of coupling or uncoupling the nozzle to or from the single point fuel

system of the aircraft shall be assigned to the fuelling operators.

4.1.19. Fuel operators shall be appropriately trained for refuelling process, training

shall include initial and Periodicity of recurrent training shall not exceed 36

months.

4.1.20. Fuelling procedures shall follow applicable Airworthiness data.

4.1.21. Necessary fuel farm / fuel analysis shall be made periodically as stated in

aircraft maintenane program and according to applicable maintenance data.

4.2. Refuel or Defuel Aircraft while Passengers are On-board:

It is not allowed to refuel or defuel aircraft while passengers are on-board unless:

4.2.1. There is sufficient number of on board crew trained on passenger evacuation

procedures and they are informed about the performance of the fuelling

operations for being ready to initiate evacuation of the aircraft in the event of

an emergency; and

4.2.2. , During fuelling operations with passengers or crew onboard the aircraft, the

designated person for performing fuelling operations shall follow the refuelling

procedures as per the applicable maintenance manual in addition to what is

mentioned herein. In this context this designated person shall, following the:

i. Communicate with the flight crew or other qualified persons onboard the

aircraft;

ii. Promptly notify the flight crew or other qualified personnel onboard the

aircraftand/or other appropriate personnel engaged in aircraft ground handling

activities when fuelling is about to begin and when it has been completed;

iii. Promptly notify the flight crew or other qualified personnel onboard the aircraft

when a hazardous condition or situation has been determined to exist.

4.2.3. Ground handling personnel, including those who provide aircraft fuel servicing,

are properly trained and have clear understanding of all required

communication procedures and have the ability to execute procedures in an

expeditious manner should a dangerous situation develop.

4.2.4. In case of hazardous condition or fuel spillage; Immediately stop fueling

operation, call airport fire service and provide notification to the flight crew or

other qualified personnel onboard the aircraft.

Page 292: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 6

Issue Date: 15 Apr 2012

4.2.5. Ensure procedures specify a fuelling safety zone, which, as a minimum,

encompasses the area within a 6m (20 foot) radius from fuelling receptacles,

tank vents and fuelling equipment.Procedures also restrict equipment

performing aircraft servicing functions from being positioned within a 3 m (10

foot) radius of aircraft fuel vent openings. As a minimum, limitations and

restrictions in a fuelling safety zone preclude the use or activation of:

i. Items that could be sources of ignition or fire (e.g., matches, welding

equipment,flashbulbs);

ii. Portable electronic devices with proper separation distance from aircraft fuel

vents and/or fuelling equipment (e.g., mobile telephones, portable radios,

pagers).

4.2.6. The refuelling provider shall have Safety procedures applicable to fuelling

operations that include:

i. Restrictions and limitations for the operation and positioning of non-fuelling

vehicles and ground support equipment;

ii. Ensuring evacuation areas on the ground beneath aircraft exit doors (not in

use for aircraft servicing) are kept clear of obstructions;

iii. Where a boarding bridge is in use, maintaining an access path from the

aircraft to the terminal;

iv. Where a boarding bridge is not in use, positioning passenger steps at the

aircraft door(s) normally used for boarding;

v. Establishment of a bonding connection between the fuelling vehicle and

aircraft to provide for dissipation of electrical energy that may develop;

vi. A prohibition from connecting or disconnecting electrical equipment to the

aircraft;

vii. Provisions for operation of the aircraft APU;

viii. Prevention of damage to the fuel hose;

ix. A requirement for the cessation of aircraft fuelling when it is determined

lightning is a threat

4.3. Monitoring Fueling Operations:

An oversight audit of fuelling subcontractor shall be periodically made,

the audit shall cover the following areas:

Page 293: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 5 of 6

Issue Date: 15 Apr 2012

4.3.1. Aircraft fuelling procedures and resposibilities including inspection and check.

4.3.2. Communication procedures.

4.3.3. Type and characteristics of fuel.

4.3.4. Initial and recurrent training of personnnel performing or monitoring the

process of aircraft fuelling.

5. Forms:

N/A

Page 294: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 6 of 6

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 295: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 10

Issue Date: 4 Aug 2012

5.03 Aircraft Deicing and Anti-icing

1. Objective:

To set a program for de-icing/anti-icing of an aircraft before dispatch when there,

exists or expected, frost, ice or snow adhering to the wings, control surfaces, engine

inlets or other critical surface of the aircraft that may adversely affects the safety of the

flight.

2. References:

2.1. ECAR 121.629

2.2. Outstation Handbook CH 03.11.

2.3. Aircraft Maintenance Manual AMM CH 12.31-01-SE

2.4. Flight operation Manual OMA CH 8. 2.4

2.5. ICAO Doc 9640-AN/940.

2.6. ISO 11075, 11076, 11077 and ISO 11078.

2.7. The SAE ARP 4737, SAE AS 5116; SAE AMS 1424, SAE AMS 1428 and

SAE ARD 50102.

3. Responsibility:

3.1. Maintenance Director for implementation.

3.2. Chief Inspector, for assurance.

3.3. Approved Maintenance Organization for implementation through different service

providers.

3.4. Flight crews on arriving flights to report occurrences of in-flight icing to the

respective ground engineer who will inform concerned de-icing/anti-icing service

provider. Concerned service provider will perform de-icing/anti-icing under the

direct supervision of the certifying engineer of the approved maintenance

organization.

4. Description:

4.1. Definitions And Interpretations

4.1.1. Frozen Contaminants::

Page 296: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 10

Issue Date: 4 Aug 2012

Frozen contaminants include light freezing rain, freezing rain, freezing drizzle,

frost, ice, ice pellets, snow, snow grains, and slush.

4.1.2. The Clean Aircraft Concept:

This concept means that the aircraft is being free of all frozen contaminants

adhering to its critical surfaces.

4.1.3. Ice Detection and Warning System:

Ice Detection and Warning systems are used to confirm that aircraft critical

surfaces are free of adhering frozen contaminants prior to take-off. They shall

also meet aircraft manufacturer, operator, and/or regulatory authority

requirements.

The information provided by these devices give advisory advice to more

accurately estimate the duration of the holdover time; and minimize the need

to return for additional de-icing/anti-icing.

When used to perform an aircraft surfaces check prior to and/or after a

treatment, the Ice Detection and Warning System should be considered a part

of the procedure. It should also be used by appropriately trained personnel.

4.1.4. Anti-icing:

A precautionary procedure used to provide protection against the formation of

frozen contaminants on treated surfaces of the aircraft for a limited period of

time (the holdover time). Anti-icing fluids are normally applied unheated on

clean aircraft surfaces, but may be applied heated, and includes Type I fluid,

concentrates or mixtures of water and Type I, II, III or IV fluid.

4.1.5. Deicing:

A procedure used to remove frozen contaminants from the aircraft in order to

obtain a Clean Aircraft Concept. The procedure can be accomplished using

fluids, infrared energy, mechanical means, or by heating the aircraft. Deicing

fluid is usually applied heated to assure maximum deicing efficiency and

includes heated water, type I fluid, concentrates or mixtures of water and Type

I, II, III or IV fluid..

4.1.6. Equipment Used for De-icing/Anti-icing:

De-icing/anti-icing is carried out by using the heated fluids dispensed from

spray nozzles mounted on specially designed de-icing/anti-icing trucks. To

Page 297: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 3 of 10

Issue Date: 4 Aug 2012

ensure the reliability of the de-icing operation in relation to function, safety and

performance the following shall be considered:

i. The size and design of the de-icing/anti-icing equipment should be agreed

upon between manufacturer and user, to best meet the different operational

conditions.

ii. Appropriate training of equipment operators to perform a fast, technically safe

and environmentally safe de-icing/anti-icing operation,

iii. The nozzle, application procedure, and spraying techniques have to be observed.

iv. The equipment should be able to handle all types of commercially available

approved de-icing/anti-icing fluids,

v. The selection of equipment for the application of the fluid system is to be

within the fluid manufacturer’s specification and without fluid degradation.

vi. For equipment with mixing systems, the accuracy of the mixing system

should be stated in the service provider's documents. This information allows

to determining the safety margin of the de-icing operation and assures when

examining the mixing system whether it is working properly or not, whether

the accuracy of the fluid mix is within the stated tolerance or not. The service

provider should regularly check the accuracy of the fluid mix at the operating

nozzle.

4.1.7. Holdover Time (HOT), Tables and their Use:

Holdover Time (HOT) is the estimated time that deicing/anti-icing fluid will

prevent the formation of frozen contaminants on the critical surfaces of an

aircraft under all weather conditions.

With a one-step de-icing/anti-icing procedure, the HOT begins when the final

application of de-icing/anti-icing fluid commences and expires when the de-

icing/anti-icing fluid applied to the aircraft loses its effectiveness. With a two-

step procedure, the HOT begins at the commencement of the second (anti-

icing) step. The HOT runs out at the commencement of take-off roll or when

frozen deposits start to form or accumulate on treated aircraft surfaces.

Current and approved published HOT tables shall be implemented by

concerned personnel. These tables contain:

i. List of qualified deicing and anti-icing fluids;

Page 298: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 4 of 10

Issue Date: 4 Aug 2012

ii. Holdover times for these fluids;

iii. Guidelines for their application, fluid mixtures and minimum concentrations

as a function of outside air temperature;

iv. Their lowest on-wing viscosity values; and

v. Ice pellet allowance times

The times of protection shown in the HOT tables are to be used as guidelines

only.

They shall be used in conjunction with the pre-takeoff check. The

manufacturer’s specific HOT must not be exceeded. However, it may be

required to use more conservative times than those specified in the tables

especially with detrimental weather conditions (e.g., temperature, wind velocity

and direction, precipitation and relative humidity). HOT is also affected by the

airplane surroundings, such as operation in close proximity to other airplanes

(jet blast), ground equipment and structures.

During certain weather conditions, such as heavy snow and heavy freezing

rain these tables will not apply. Thus, a take-off under these conditions is

prohibited.

After a de/anti-icing treatment a take-off is permitted provided the time

between end of the treatment and take-off does not exceed the times

mentioned in the HOT tables for the mentioned weather conditions.

4.1.8. De-icing/Anti-icing Methods:

De-icing/anti-icing fluids shall be applied close to the skin of the aircraft to

minimize heat loss. Procedures of the Aircraft Maintenance Manual shall be

strictly adhered to. Spraying usually starts with the fuselage and covers the

aircraft critical surfaces as follows, list not exhaustive:

i. Fuselage: Spray along the top centre line and then outboard. Avoid

spraying directly on windows.

ii. Wings, Flaps, Spoilers and Horizontal Stabilizers: Spray from the leading

edge towards the trailing edge, and from the highest point of the surface

camber to the lowest point, unless otherwise may be required.

iii. Vertical Surfaces. Start at the top and work downwards, spraying from the

leading edge toward the trailing edge.

Page 299: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 5 of 10

Issue Date: 4 Aug 2012

iv. Landing Gear and Wheel Bays. Keep application of de-icing/anti-icing fluid

in this area to a minimum. High pressure spraying is not recommended.

Don’t spray directly onto brakes/wheels.

v. Engines/APUs. Avoid spraying fluids into engines or APUs air intakes.

Consult manufactures’ recommendations. Ensure that engines are free to

rotate before start up and that the front and back of fan blades are free of

ice.

vi. Air-conditioning bleed systems must be switched off during de-icing/anti-

icing operations. Don’t spray directly onto exhausts or thrust reversers.

vii. Sensor, Probes and Antennas. Avoid spraying directly onto pitot heads,

static vents, detector probes and angle of attack sensors.

De-icing/anti-icing can be carried out as a one-step process using heated de-

icing/anti-icing fluid to both de-ice and anti-ice at the same time or as two

separate step process, one to de-ice and the second to anti-ice. The second

step shall be applied, before the first step fluid freezes, typically within three

minutes and, if necessary, area by area. Selection of the one or two step

process depends on weather conditions, available equipment, available fluids,

mixtures, fluid temperature, pressure, aircraft related limits and HOT.

When using thickened de-icing/anti-icing fluids, the two step procedure is

preferred.

The aircraft shall be de-iced/anti-iced as close to its departure time and/or

departure runway as possible.

4.1.9. De-Icing/Anti-Icing Check Procedures:

A visual or physical check of critical aircraft surfaces to confirm that a

treatment has been effective and that the aircraft complies with the Clean

Aircraft Concept must be carried out before the aircraft can be safely

dispatched. These checks are as follows:

i. Prior to the application of de-icing/anti-icing fluids a walk-around or pre-flight

check is to be accomplished by the ground crew. The airplane critical

surfaces shall be checked for frozen contaminants. If frozen contaminants

are discovered, de-icing/Anti-icing of the aircraft must be carried out.

Page 300: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 6 of 10

Issue Date: 4 Aug 2012

ii. The Post Deicing/Anti-icing Check: This check is an integral part of the

deicing/anti-icing process and is made by the service provider after

deicing/anti-icing application to ensure all critical parts of the aircraft are

free from any frozen contaminants. This check is performed from points

offering sufficient visibility of these parts (e.g. from the deicing equipment

itself or another elevated piece of equipment).

The Pre-takeoff Check: This check is carried out following the application of

de-icing/anti-icing fluids and within the HOT by the flight crew, from inside or

outside the aircraft, depending on the type of aircraft. It is made to ensure

that the critical surfaces of the aircraft as determined by aircraft

manufacturer are free from frozen contaminants before pushback or taxi.

This check shall be accomplished as close to the time of takeoff as possible

and is normally made by visually checking the wings or other surfaces.

Several pre-takeoff checks may be required during the HOT period based

on factors that include the length of the HOT, weather, or other conditions.

The pre-takeoff check is integral to the use of HOTs. Specific techniques for

identification of clear ice, which will be difficult to recognize, should be

included in all training programs.

iii. The Pre-takeoff Contamination Check (when HOT has been exceeded or

when the condition of the critical surfaces of the airplane cannot be

effectively assessed by a pre-take-off check or if any doubt exists of the

affectivity of anti-icing) and is performed by flight crew and/or other qualified

ground personnel and must be completed within 5 minutes before beginning

takeoff to assure the Clean Aircraft Concept just before commencing take-

off roll.. This check is accomplished when conditions are such that frozen

contaminants may reasonably be expected to adhere to the aircraft. If any

doubt exists concerning the aircraft’s condition after completing this check

as to whether or not any deposit may adversely affect the aircraft’s

performance, or if the check cannot be performed just prior take-off, a new

complete deicing/ anti-icing treatment should be made and a new HOT is

determined.

Page 301: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 7 of 10

Issue Date: 4 Aug 2012

Special methods and/or equipment may be necessary to perform any check at

night time or in extreme adverse weather conditions.

i. In all checks, the check performer should assure that he is able to see

enough of the wings, control surfaces, and other surfaces to determine

whether or not they are free of contaminants.

4.1.10. Implementation:

i. At each airport where operations are expected to be conducted in

conditions conductive to ground icing, an agreement shall be made with a

service provider who is appropriately qualified for providing the ground

deicing/anti-icing services.

ii. During service performance, the service provider shall co-ordinate with the

appropriate airport authorities whenever such co-ordination is needed.

iii. Refer to the applicable deicing and anti-icing procedures for the aircraft type

in the Aircraft Manufacturer Maintenance Manual and the Operations

Manual.

iv. The person in charge of the de-icing/anti-icing procedure is responsible for

accomplishing this procedure and verifying the results of the de-icing/anti-

icing treatment. The de-icing/anti-icing application information reported to

the flight crew is part of the technical airworthiness of the aircraft. The

person responsible for the de-icing/anti-icing process must be clearly

designated. He shall check the aircraft for the need to de-ice, initiate de-

icing/anti-icing, if required, and shall be responsible for the correct and

complete de-icing/anti-icing treatment of the aircraft.

4.1.11. Communications

i. Two way communications through Intercom or VHF should be established

to relay pertinent deicing/anti icing information and the results of checks to

the flight crew. In case of VHF the aircraft registration number shall be

used. Standard terminology shall be used during these communications.

ii. Before commencing deicing/anti-icing operations communication between

ground personnel and the flight crew to a) verify that the airplane is properly

configured for deicing in accordance with the manufacturer’s

recommendations and, b) confirm the fluid to be used, c) confirm the extent

Page 302: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 8 of 10

Issue Date: 4 Aug 2012

of treatment required, and d) acknowledge any aircraft type specific

procedures to be used.

iii. Upon completion of deicing/anti-icing treatment and the associated post

deicing/anti-icing check of the aircraft the ground person that performed the

check shall provide the flight crew with the treatment the aircraft has

received and confirm that the aircraft is in compliance with the Clean

Aircraft Concept (to determine the start of the HOT). Data is to be in the

following sequence and is to be appropriately recorded:

a. Type of fluid used.

b. Percentage of de-icing/anti-icing fluid in the fluid/water mixture, e.g. “100”

for 100% fluid, “75” for 75% fluid and 25% water.

c. Local time, in hours and minutes, the beginning of the final de-icing/anti-

icing step.

d. Date: day, month and year (only required for record keeping).

Note: When a two-step de-icing/anti-icing operation has been carried out, the

second step fluid data is applied.

iv. Prior to departure, the flight crew must receive an “All Clear” signal from the

ground crew that it’s safe to taxi.

Whenever de-icing has taken place, the pilot / respective engineer must

make an appropriate entry in Technical Log showing the times of start and

completion of the de-icing process.

4.1.12. Ground Training & Qualification

i. Ground personnel shall be appropriately trained and qualified on required

deicing and anti-icing operations, in accordance with the approved

procedures and the published deicing safety standards at specific deicing

locations.

ii. Ground personnel must be able to adequately read, speak, and understand

English in order to follow written and oral procedures applicable to the

deicing/anti-icing program.

iii. Training may comprise initial, transition, recurrent, upgrade and

continuation training. Training shall include aircraft type-specific techniques

for use by personnel for recognizing contamination on aircraft surfaces and

Page 303: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 9 of 10

Issue Date: 4 Aug 2012

each person's responsibilities and duties. This training shall specifically

cover, but not limited to the following subjects:

a. recognition of relevant weather phenomena;

b. effects of frost, ice, snow and slush on performance, stability and control;

c. basic characteristics of de-icing/anti-icing fluids including the use of HOT

tables;

d. general techniques and procedures for de-icing and anti-icing

e. Specific measures to be performed on different aircraft types, and

procedures specifically recommended by the operator, aircraft or fluid

manufacturer;

f. types of checks required and procedures and responsibilities for checks;

g. de-icing/anti-icing equipment operating procedures, including on the job

training;  

h. quality control procedures for handling de-icing/anti-icing fluids.

i. techniques for recognizing frozen precipitation on aircraft critical surfaces;

j. health effects, safety precautions and accident prevention;

k. emergency procedures;

l. fluid application methods and procedures;

m. use and limitations of holdover time guidelines;

n. communication procedures with flight crew including aircraft positioning (if

required), the aircraft departure process and equipment clear, job done,

safe to start taxiing;

o. environmental considerations for de-icing and anti-icing operations, i.e.

locations for de-icing and anti-icing, reporting spillage, and hazardous

waste control; and

p. New procedures, new developments, and lessons from the previous

winter.

iv. The service provider shall maintain accurate records of the training and

qualifications of ground personnel. Records must include detailed

description of initial and recurrent training and qualifications concerning the

specific requirements, duties and responsibilities.

Page 304: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 10 of 10

Issue Date: 4 Aug 2012

4.1.13. Quality Assurance Auditing

A Quality Assurance auditing shall be made to ensure the correct de-

icing/anti-icing operation at different stations where applicable. Auditing will

include the following elements:

i. All parts of the de-icing/anti-icing operation are checked for ensuring the

ongoing conformance with all regulations, operators, manufacturers and

handling agents' requirements.

ii. Methods and procedures have been defined to allow the clear and safe

accomplishment of all the tasks that are necessary for de-icing/anti-icing

aircraft.

iii. Training of ground personnel involved in the de-icing/anti-icing operation is

carried out to guarantee the correct performance of all related tasks.

iv. Training and qualifications records that guarantee that all training and skill

requirements are fulfilled to ensure correct performance of all tasks.

v. An evaluation of the effectiveness of the deicing/anti-icing training received.

vi. Publications required for the aircraft de-icing/anti-icing operation that ensure

the correct accomplishment of all tasks.

vii. Equipment and fluids handling and storage are maintained in such a way

that the correct quality is ensured.

viii. Health and environmental regulations, and operator requirements are

obeyed.

4.1.14. Special Maintenance Considerations

Necessary maintenance actions shall be implemented to prevent, detect and

remove residues of dried fluid with the potential to cause problems due to the

repetitive application of thickened de-icing/anti-icing fluids to prevent

formation/build up of a dried residue in aerodynamically quiet areas, exterior

surfaces, which can reduce lift, increase drag and stall speed and cause

flight controls problems.

5. Forms:

N/A

Page 305: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

5.04 Aircraft Mass and Balance Procedure

1. Objective:

To set a policy to continuously determine the dry operating mass and center of gravity

for the aircraft.

2. References:

ECAR Part 91 Appendix H

3. Responsibility:

3.1. Chief Inspector for Final weighing report approval, and supervision of

subcontracted functions.

3.2. Function is contracted under the supervision of the Maintenance Director.

4. Description:

4.1. General:

4.1.1. Each aircraft shall be weighed, to determine its mass and center of gravity, at

initial entry into service and subsequently each three years. Weighing shall

be carried out as per applicable approved weight and balance manual.

4.1.2. Within the three years period, Engineering will account for the effects of

embodied modifications and repairs on the mass and balance of the aircraft

and publish necessary corrections to all concerned.

4.1.3. In case of repairs or modifications that may have an effect on aircraft weight

or center of gravity that cannot be accurately calculated the aircraft must be

re-weighed.

4.1.4. The mass of all additional aircraft operational items shall be considered when

calculating dry operating mass. This may be done by actual weighing of

individual items or by using standard masses. The influence of their position

on the aircraft center of gravity must also be determined.

4.1.5. An approved weighing form shall be used for mass and balance

documentation and calculation. The form shall contain aircraft registration,

type, the dry operating mass, the corresponding CG of the aircraft, names

and signatures of personnel involved in the process of weighing and CG

determination.

4.1.6. The weighing must be accomplished either by the manufacturer or by an

approved maintenance organization. Personnel involved in the weighing

Page 306: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

process must be appropriately qualified. Weighing operation and calculations

shall be re-checked by a qualified person other than the person that

performed initial weighing and CG calculations.

4.1.7. Final weighing report shall be approved by Authority via the Chief Inspector.

4.1.8. For a new aircraft, the weight made by the manufacturer may be used after

making necessary adjustments. These adjustments are to be made on

EGYPTAIR EXPRESS applicable weighing forms.

4.1.9. For a used aircraft transferred to EGYPTAIR EXPRESS from another

operator, the previous weighing report may be used taking into consideration

the three years inter-weighing lapse period and the necessary EGYPTAIR

EXPRESS corrections.

4.1.10. The mass and CG of each aircraft shall be re-established whenever the

cumulative changes to the dry operating mass exceed ± 0.5% of the

maximum landing mass or the cumulative change in CG position exceeds ±

0.5% of the mean aerodynamic chord. This is to be done either by re-

weighing or by calculation provided that there is a true justification to prove

the validity of the method of calculation chosen.

4.1.11. The following precautions shall be taken in consideration for consistency with

good practices:

i. Completeness of the aircraft and equipment

ii. On-board fluids are properly accounted for

iii. Aircraft is in clean and proper configuration; otherwise difference in

configuration is to be accounted for.

4.1.12. Appropriate and properly calibrated weighing equipment must be used for

weighing process Manufacturer’s instruction regarding the use and

calibration of weighing equipment must be adhered to. The accuracy of

weighing equipment shall be within ± 0.1 %.

4.1.13. Maintenance Subcontractor is responsible for developing the weight and

balance control program and defining the weight standards of each aircraft,

aircraft equipment list, passenger cabin and cockpit equipment and residual

fluids.

i. The weighing shall be accomplished in an enclosed hangar to exclude the

effects of air drafts should they prevail.

Page 307: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

ii. After completion of the weighing process, the person in charge will compute

the empty mass and CG.

iii. Updated mass and center of gravity, after being approved by ECAA, shall be

promptly distributed to all concerned. A copy of this update shall be kept on-

board. All related documents shall be modified accordingly.

iv. Mass and Centre of Gravity data shall be distributed to Flight Operations and

Dispatch with copies to aircraft records and on-board the relevant aircraft

v. Upon receiving the approved aircraft weighing results, the Flight Operations

and dispatch are responsible for developing operational loading schedules,

loading procedures, load forms and related documents.

5. Forms:

Form No: 100

Chart C- Basic Empty Weight and Balance Record.

Page 308: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 309: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4 Amen. No.: 01 Page 1 of 6

Issue Date: 4 Aug 2012

5.05 Transport of Dangerous Goods by Air

1. Objective:

To describe EGYPTAIR EXPRESS policy of carriage Dangerous Goods.

2. References:

3.1. ECAR Part 175

2.1. ICAO Technical Instructions for the safe transport of dangerous Goods by

Air.

2.2. IATA Dangerous Goods Regulations Manual.

3. Responsibility:

3.2. Passenger's/shippers

3.3. EGYPTAIR EXPRESS / Handling Agent.

3.4. EGYPTAIR EXPRESS acceptance staff.

3.5. The loading Personnel.

3.6. The captain in command.

4. Description:

4.1. Policy of Carriage of Dangerous Goods:

4.1.1. Carriage Dangerous Goods with Supernumeraries or crew: According to

IATA Dangerous Goods Regulations, dangerous goods must not be

carried by supernumeraries or crew

4.1.2. Carriage Dangerous Goods as EXPRESS shipment:

EGYPTAIR EXPRESS accepts to Carry Dangerous Goods shipments

according to the requirement of ECAA & ICAO/IATA Regulations.

EGYPTAIR EXPRESS must comply with the following:

i. The name, address and telephone number of the consignee must be

written in full on the air waybill and on the package;

Page 310: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4 Amen. No.: 01 Page 2 of 6

Issue Date: 4 Aug 2012

ii. The shipper of any dangerous Goods must provide a written under

tacking to re-ship the consignment at the shipper's cost and risk if the

consignment is not cleared, or received by the consignee, within

fifteen (15) working days from the arrival of the consignment;

iii. Dangerous Goods in excepted quantities originating in Egypt will not

be accepted;

iv. Infected animals, dead or alive, will not be accepted.

4.1.3. Carriage of Weapons, Munitions of War & Sporting Weapons:

i. For transport of weapons of war and munitions of war permission

must be granted by the states concerned.

a. Weapons of war or munitions of war:

1) Must be stowed in the aero plane in a place which is inaccessible

to supernumeraries during flight;

2) Firearms must be unloaded.

ii. Supernumeraries and crew members are not permitted to carry

firearms in the cabin or on the flight deck except those crew

members assigned as Security Officer to the respective flight.

iii. Police Officer on escort duty shall hand over their unloaded weapons

to a crew member to be stored for the duration of flight on the flight

deck. The ammunition shall be carried by the police officers in the

cabin. After arrival the weapons shall be returned at the aero plane

before the supernumeraries disembark.

iv. The operator has to take all reasonable measures to ensure that he

will be informed about any intended transportation of any sporting

weapons or ammunition by one of his aero planes.

a. Sporting rifles, shotguns and pistols belonging to accompanying

supernumeraries for their own use, and any other kind of small arms

may not be carried aboard the aero plane except as checked

baggage stowed in one of the belly compartments, unloaded and

suitably packed;

Page 311: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4 Amen. No.: 01 Page 3 of 6

Issue Date: 4 Aug 2012

b. When accepting the carriage of sporting weapons, the company

shall ensure that they are :

1) Stowed in the aero plane in a place which is inaccessible to

supernumeraries during flight unless the Authority has

determined that compliance is impracticable and has accepted

that other procedures might apply;

2) Unloaded in the case of firearms or other weapons that can

contain ammunition.

c. Securely packed ammunition in Division IAS may be carried in

quantities not exceeding 5 Kg gross weight per person for that own

person's use. Excluding ammunition with explosive or incendiary

projectiles.

Allowance for inure than one passenger must not be combined into

one or more packages.

v. Before the flight the commander must not be notified by the ground

handling staff of details of weapons or ammunition intended to be

carried on board, including its location.

4.2. Responsibilities of Carriage of Dangerous Goods:

4.2.1. Passenger’s/Shipper's Responsibilities:

i. Supernumeraries should be informed in such a manner that they are

warned as to the types of dangerous Goods that must not be taken on

board an aero plane.

Warning notices and/or placards should be prominently displayed at

ticket-and check- in counters, in boarding areas and baggage claim

areas.

The ticket should also contain a warning on the ticket itself, on the

ticket wallet or on a leaflet.

ii. A shipper must comply fully with IATA Dangerous Goods Regulations

when offering a consignment of dangerous goods with EGYPTAIR

Page 312: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4 Amen. No.: 01 Page 4 of 6

Issue Date: 4 Aug 2012

EXPRESS. In addition, shipper must comply with any applicable

regulations set forth by the states of origin, transit and destination.

4.2.2. EGYPTAIR EXPRESS Responsibilities

i. EGYPTAIR EXPRESS /Handling Agent must comply with the

requirements of IATA DGR for:

a. Acceptance;

b. Storage;

c. Loading;

d. Inspection;

e. Provision of information, including emergency response information;

f. Reporting;

g. Retention of Records;

h. Training.

ii. EGYPTAIR EXPRESS cover the procedures & Regulations to be

followed by everyone involved in preparing a consignment of dangerous

goods and placing it on an aircraft according to the requirements of

training (DGR 1.5-1.5A) in their manuals.

a. EGYPTAIR EXPRESS Acceptance Staff must:

1) Complete a checklist which involves a comprehensive check of the

package and documentations;

2) The consignment is accepted only if all relevant requirements have

been complied with.

b. The Loading Personnel must:

1) Inspect each package for leakage or damage before loading into a

bulk loading on aircraft;

2) Inspect each bulk loading for evidence of leakage or damage before

loading on aircraft;

Page 313: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4 Amen. No.: 01 Page 5 of 6

Issue Date: 4 Aug 2012

3) Correctly position, segregate and secure each package;

4) Correctly certify the above information to the pilot-in-command.

c. The Captain must:

1) Receive and retain, full written details of all dangerous goods

loaded on the aircraft (notification to pilot-in-command);

2) Inspect that all information about loading, position, segregate and

secure each package are correctly;

3) Be aware of the actions to be taken in the event of emergencies

involving dangerous goods.

iii. EGYPTAIR EXPRESS has a system to retain all relevant documents for

all phases of transport dangerous goods

iv. EGYPTAIR EXPRESS maintain all record of training according to the

requirements of ECAA (DGR 1.5.4) refer to m9.2

5. Form:

N/A

Page 314: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 5: Aircraft Ground Handling

Chapter 5.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4 Amen. No.: 01 Page 6 of 6

Issue Date: 4 Aug 2012

This page is left intentionally blank

Page 315: Express Mcm Issue 4 Amend 01 4 Aug 12

PART (6): APPENDICES

Page 316: Express Mcm Issue 4 Amend 01 4 Aug 12

This page is intentionally left blank

Page 317: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

Index

6.00 Index 6.01 Company Certificates 6.02 Type of operation 6.03 Fleet Compositions 6.04 Line Stations 6.05 Required Inspection Items

6.06 Quality Audit Checklists 6.07 Maintenance Contracts 6.08 Approved Suppliers List 6.09 Approved Subcontractors List 6.10 A/C Handling at out stations 6.11 Certifying Staff List 6.12 Requirements for AMO 6.13 Forms 6.14 Sample of Documents

Page 318: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Index

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 319: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.1 Company Certificate

Page 320: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.01

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is left intentionally blank

Page 321: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.02 Types of Operation

EGYPTAIR EXPRESS Company is an air operator properly equipped and certified to

conduct scheduled and non-scheduled passenger and cargo operations all over the

world, excluding the region of Latin America, according to the Egyptian Civil Aviation

Authority requirements.

Page 322: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.02

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is left intentionally blank

Page 323: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.03 Fleet Composition

Type / Model / Make Aircraft Registration Serial No.

ERJ170-100 LR / Embraer powered by two

CF34-8E5 / GE. engines

SU-GCT 17000167

SU-GCU 17000169

SU-GCV 17000170

SU-GCW 17000175

SU-GCX 17000178

SU-GCY 17000185

SU-GDF 17000266

SU-GDG 17000269

SU-GDH 17000274

SU-GDI 17000276

SU-GDJ 17000282

SU-GDK 17000284

Page 324: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.03

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 325: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

Appendix 6.04 Line Stations

Location Code City Country

Domestic

CAI Cairo Home base

Egypt

SSH Sharma El Sheikh

HRG Hurgada

LXR Luxor

ASW Aswan

ALY Alexandria

TCP Tapa

MUH Marsa Matruh

RMF Marsa Alam

Regional

JED Jeddah Kingdom of Saudi Arabia

AMM Amman Jordan

BEY Beirut Lebanon

NAP Napoli

Italy

CAT Catania

BLQ Bologna

MLA Malta Malta

BUD Budapest Hungary

KWI KUWAIT KUWAIT

Page 326: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.04

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 327: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.05 Required Inspections Items

EGYPTAIR EXPRESS has assigned the following specific tasks as Critical Tasks

Requiring Inspection:

ATA TITLE OF THE TASK JOB

REMARKS Rig/Adj. Insp. /Chk. Install Op/Test Repair

05 Conditional Inspections

Tech. ground and flight incidents

* *

08 Leveling & Weighing *1 1: Weighing

22 Auto Pilot System * *1 1: Only in case a

rigging or adjustment is made

25 Equipment / Furnishing

Evacuation slides system * * * *

26 Fire Protection

- Fire extinguishing system - Fire detection loops - Smoke detection system

* *1 1: In case of an Item

replacement

27 Flight Control System

- Primary flight control system

* *1 *2 1: Flight control surface only

- Secondary flight control system

* *1 *2 2: in case a rigging or

adjustment is made/ function check.

28

Fuel System Critical Design Configuration Cont. Limitation (CDCCL) Tasks

Refer to applicable Airworthiness Data

29 Hydraulic Power

Emergency power generation

* * *

32

Landing Gear

- Landing gear assembly & doors

* *

- Extension and retraction system

* *

- Emergency extension system

* *

Page 328: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.05

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

ATA TITLE OF THE TASK JOB

REMARKS Rig/Adj. Insp./Chk. Install Op/Test Repair

34 NAVIGATION

- Pilot static system - Compass system

* *

52 DOORS

- Entry, service, emergency exit and Express doors

* *

53 FUSELAGE *1 1 : MAJOR REPAIR OR ALTERATION OUTSIDE THE

STRUCTURE REPAIR MANUAL LIMITS

(MINIMUM 2 STRUCTURAL

ELEMENTS INVOLVED)

54 NACELLES/PYLONS * *1

55 EMPENNAGE *1

57 Wings *1

71 POWER PLANT

- Engine * * *

72 Engine

- Fan Blades *1 * *1: Fan trim balance

76 ENGINE CONTROL - Engine control system * *

78 EXHAUST - Thrust reverser assembly * * * *

Page 329: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 2

Issue Date: 4 Aug 2012

6.06 Quality Audit Checklists Index

SER

AUDIT AREA

CHECKLIST NO.

FREEQUENCY

1 AMO Outstation QAF103/AMO/01 ONCE A YEAR

PER STATION 2 Ground Service Outstation QAF103/GS/01

3 Ramp Inspection. QAF103/AMO/02 ONCE PER

MOS.

4 Line Maintenance QAF103/AMO/03

2 PER YEAR

5 Maintenance Planning And

Scheduling

QAF103/AMO/04

6 Tech. Services DEPARTMENT QAF103/AMO/05

7 Manuals And Publications Dpt QAF103/AMO/06

8 Maintenance Records QAF103/AMO/07

9 Fuel Servicing QAF103/AMO/08

10 Base Maintenance QAF103/AMO/09

ONCE PER

YEAR

11 Overhaul and Repair Workshops QAF103/AMO/01

12 Material & Stores Management QAF103/AMO/10

13 Tools And Equipments QAF103/AMO/11

14 Training Process QAF103/AMO/12

15 Quality Assurance QAF103/AMO/13

16 Safety Assurance QAF103/AMO/14

Page 330: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.06

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 2 of 2

Issue Date: 4 Aug 2012

Internal Audit Schedule

SER

AUDIT AREA

CHECKLIST

NO.

FREEQUENCY

1 MAINT. Director MANAGEMENT QAF 103/I/1

2 Per Year

2 Engineering & Planning Department QAF 103/I/2

3 Maintenance Department QAF 103/I/3

4 Documentation Department QAF 103/I/4

5 Contract Department QAF 103/I/5

6 Chief Inspector . Department QAF 103/I/6

7 Quality Audit Department QAF 103/I/7

8 Training Department QAF 103/I/8

9 Records Department QAF 103/I/9

10 Quality Control Department QAF 103/I/10

Page 331: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 1 of 4

Issue Date: 15 Apr 2012

6.07 Maintenance Contract

1. General

1.1. EGYPTAIR EXPRESS has a maintenance agreement with EGYPTAIR

MAINTENANCE AND ENGINEERING. This contract, together with all

amendments must be acceptable by ECAA.

1.2. EGYPTAIR MAINTENANCE AND ENGINEERING approval Documents shall

contain the intended scope of work of aircraft/engine /component to the

subject contract

1.3. EGYPTAIR MAINTENANCE AND ENGINEERING may subcontract part of

the maintenance services to a third party. Any subcontractor used by

EGYPTAIR MAINTENANCE AND ENGINEERING shall be appropriately

accepted by ECAA.

1.4. EGYPTAIR EXPRESS is provided with a list of all third party subcontractors.

1.5. The list shall have detailed information with respect to all locations where

aircraft maintenance is to be performed

1.6. EGYPTAIR EXPRESS keep a copy of each written contract under which it

provides services as a commercial operator for a period of at least one year

after the execution of that contract or change

1.7. The requirement for a maintenance agreement applies to all functions that

are outsourced for substantial maintenance providers such as heavy

maintenance and engine overhaul.

1.8. If maintenance is expected to be accomplished in accordance with specific

industry standards, an acceptable agreement identifies and specifies the

standards by exact name.

1.9. Maintenance has been properly carried out. This includes all maintenance

carried out by 'Contractors'

1.10. The formal maintenance agreement document is not intended to provide

detailed work instructions to the Contractor; established procedures are

required within the operator and Contractor organisations to take care of

these functions.

1.11. The Maintenance Agreement includes, but is not limited to:

Page 332: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 2 of 4

Issue Date: 15 Apr 2012

i. an approval process for the Contractor by the operator and where

applicable the Contractors and/or the operator's Authority;

ii. a list of facilities where the maintenance is to be carried out, including a

list of satellite facilities that the Contractor may use;

iii. a `Statement of Work' (SOW) for the Maintenance Agreement that

contains the detailed technical requirements, including references to

maintenance intervals, manuals, Airworthiness Directives (ADs), Service

Bulletins (SBs) and EGYPTAIR EXPRESS special requirements in a

clear, unambiguous and sufficiently details

iv. a specific assignment of responsibilities to ensure no misunderstanding

arises between EGYPTAIR EXPRESS, the Contractor and ECAA that

could result in a situation where the work, which has a bearing on the

airworthiness or the serviceability of EGYPTAIR EXPRESS 's aircraft, is

not properly performed;

v. a requirement for the Contractor to produce a suitable quality plan for the

project;

vi. use and control of parts and materials;

vii. process for the approval of deviations from maintenance documents;

viii. a need for an internal evaluation system by the Contractor;

ix. access by the operator's quality assurance department staff for the

purpose of evaluating ongoing quality;

x. a reporting structure that immediately notifies the operator of any

significant defects;

xi. a system of completing, reviewing, retaining maintenance records;

xii. a system of calibration of tooling and equipment;

xiii. a system of operator supplied product;

xiv. a system of inspecting and testing, i.e., a quality control system;

xv. a system of handling unsatisfactory product;

xvi. a system of handling, storage, packaging and delivery;

xvii. a system of product identification and traceability;

xviii. a system of training by the Contractor of its staff as well as a system of

training the Contractor by the operator;

Page 333: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 3 of 4

Issue Date: 15 Apr 2012

xix. a system of Release To Service of an aircraft or component;

xx. a system for communication between the operator and the Contractor;

xxi. a Service Level Agreement (SLA) that includes clear Key Performance

Indicators as agreed between the operator and the contractor for the

assessment of achievement of ongoing quality levels (the definition of the

specific indicators depends on the policy of the Operator);

xxii. a system of periodic review meetings to include some or all of those

below:

a. Contract Review Meeting

b. Work scope Planning Meeting

c. Technical Meeting (ADs/CNs/SBs)

d. Commercial and/or Logistics Meeting

e. Quality Meeting

f. Reliability Meeting

1.12. EGYPTAIR EXPRESS shall remain at all times responsible for the

airworthiness of its aircraft and shall ensure before each flight that all

required maintenance has been properly carried out in due time.

Page 334: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.07

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 4 of 4

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 335: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.08 Approved Suppliers List

General

1. The policy of EGYPTAIR EXPRESS is not to use material supplier unless it is

appropriately approved or accepted by ECAA.

2. Maintenance Agreement with EGYPTAIR MAINTENANCE AND ENGINEERING

allows it for managing Material supply.

3. EGYPTAIR MAINTENANCE AND ENGINEERING shall select, accept and monitor

the performance of Material suppliers.

4. EGYPTAIR MAINTENANCE AND ENGINEERING shall provide EGYPTAIR

EXPRESS with a List of approved/accepted material supplier's List No. EGME 020

5. Copy of the last revision list shall be kept in Chief inspector office

Page 336: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.08

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 337: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.09

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.09 Approved Subcontractors List

General

1. EGYPTAIR MAINTENANCE AND ENGINEERING may subcontract part of the

maintenance services to a third party.

2. Any subcontractor contracted with EGYPT AIR MAINTENANCE AND

ENGINEERING shall be appropriately approved by ECAA to the subject

contract.

3. EGYPTAIR EXPRESS shall be provided with a list of all third party

subcontractors.

4. The list shall have detailed information with respect to all locations where

aircraft maintenance is to be performed .List No. is EGME 30

5. Copy of the last revision list shall be kept in Chief inspector office

Page 338: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.09

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.:4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 339: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.10 Aircraft handling at outstations

EGYPTAIR EXPRESS shall be provided with a list of Aircraft Handling at outstations

The list shall be kept in Chief Inspector office

Page 340: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.10

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

This page is intentionally left blank

Page 341: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.11

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.11 Certifying Staff List General Technical Authorization Department in the contracted maintenance provider is responsible

to establish, develop and continuously update the List of certifying staff

This list will indicate category A, C, X Electric and X Avionics Certifying staff. This list will

be considered as an integrated part of his MOE, and will be kept in Technical

Authorization Department under the reference EGME 010 E. Chief Inspector shall have a

window to this list in computer format.

List of category A, C, X Electric & X Avionics support staff:

This list will indicate category A, C, X Electric & X Avionics support staff for base

maintenance and will be kept in Technical Authorization Department under the reference

EGME 015 E.

Structure of the list:

Certifying Staff List contents must include the followings:

• Full name of person granted the authorization / approval.

• Function & Qualification relevant to the authorization / approval.

• Scope of authorization / approval.

• Authorization / approval issue date.

• Authorization / approval expiry date.

• Regularity License Number; Identification number of the authorization

List of certifying staff:

List of certifying staff is prepared and kept current under the responsibility of the Technical

Authorization Manager under Reference Number –EGME 010E. The expiration date is

controlled under the responsibility of the Technical Authorization Manager based on

required recurrent and continuation training dates. The list is updated whenever a change

takes place to any of its contents. The list is made on a paper format (hard copy) but can

be made available and maintained also in computer format.

Page 342: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.11

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

Records:

• Technical authorization department keeps certifying staff records for 2 years after

certifying person ceases employment with EGYPTAIR MAINTENANCE AND

ENGINEERING.

Page 343: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 1 of 42

Issue Date: 15 Apr 2012

6.12 Requirements of Maintenance Contractor

1. Approval:

1.1. EGYPTAIR EXPRESS aircraft shall not be operated unless it is maintained and

released to service by an Approved Maintenance Organization (AMO) that:

1.1.1. Has established procedures acceptable to ECAA that ensure good

maintenance practices, and is in compliance with all relevant requirements.

1.1.2. Approved from ECAA as ECAA Part 145 Approved Maintenance

Organization (AMO).

1.1.3. EGYPTAIR EXPRESS agreed with EGYPT AIR MAINTENANCE AND

ENGINEERING to be its Contractor for all maintenance activities.

1.1.4. EGYPT AIR MAINTENANCE AND ENGINEERING shall have and maintain a

valid ECAA Part 145 Approved Maintenance Organization certificate. and

shall continuously comply with all requirements of (AMO) acceptable to the

ECAA.

1.1.5. EGYPTAIR MAINTENANCE AND ENGINEERING shall have an approved

Maintenance Organization Exposition that contain its corporate commitment

which declares that:

i. Its policy and procedures shall be complied with at all times, and that safety

shall be recognized as the prime consideration by all staff. and

ii. Policy rules and procedures will not override the necessity of complying with

the regulation requirements published by ECAA from time to time regarding

its approval as an ECAR Part 145 (AMO).

iii. it shall implement its safety and quality policy stated in the approved MOE,

and

iv. it shall review and improve the procedures continuously for the customers

benefit.

1.2. Main Contractor and any subcontractor shall have an approval certificate that

contains:

1.2.1. Its name and location

Page 344: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 2 of 42

Issue Date: 15 Apr 2012

1.2.2. The date of issue and period of validity of the approval;

1.2.3. Scope of approval that contains the type, rating, category and level of work

required by EGYPTAIR EXPRESS for aircraft and engines stated in (MCM

Ch 06.03). EGYPTAIR MAINTENANCE AND ENGINEERING is authorized

by EGYPTAIR EXPRESS to subcontract part of the maintenance activities to

another subcontractor under its quality system supervision and according to

authority requirements. EGYPTAIR EXPRESS Maintenance Director shall be

duly informed

1.2.4. A copy of any subcontractor's approval certificates shall be made available at

the Main Contractor, and will be subject to review by EGYPTAIR EXPRESS

Maintenance Director.

1.2.5. ECAA shall accept the procedures of the Main Contractor regarding

subcontractor's selection and assessment.

1.2.6. All subcontractors shall be either ECAA, EASA or FAA approved

Maintenance Organizations, and shall be accepted by the ECAA.

2. Management

2.1. General:

The Contractor shall have a nominated accountable manager and a group of

senior persons directly reporting to the accountable manager, all shall be

acceptable to ECAA, whose responsibilities include ensuring that the

maintenance organizations complies with the requirements of ECAR 145 All

such personnel shall possess appropriate qualifications, acceptable to ECAA.

The Accountable Manager shall be responsible for the management and

supervision of the maintenance organization.

2.1.1. In this respect he shall ensure that all necessary resources are available to

accomplish required maintenance in accordance with ECAR 145 to support

the organization’s approval;

2.1.2. It shall have corporate commitment that the maintenance organisation shall

comply with the policy, rules and procedures stated in the MOE as applicable

and at all times.

Page 345: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 3 of 42

Issue Date: 15 Apr 2012

2.1.3. It shall ensure that safety and policy establish in the MOE are continuously

implemented and promoted.

2.1.4. It shall insure that the maintenance organization remains in compliance with

ECAR Part 145, and grant access for the ECAA to the organization at any

time.

2.2. Nominated Senior Persons:

2.2.1. The Contractor senior persons shall be responsible for all functions

specified in the MOE. Responsibility of each required activity shall be

allocated to a nominated senior person. Such activities include but are not

limited to:

i. Quality Assurance.

ii. Base Maintenance.

iii. Line Maintenance.

iv. Work Shops.

v. Engineering and Planning.

vi. Material and Logistics.

vii. All of whom shall report to the Accountable Manager of the Maintenance

Organization

2.2.2. The credentials of each nominated senior person shall be accepted by

ECAA.

2.2.3. Deputies shall be appointed for all managerial positions, to act in case of

absence of the senior persons from workplace.

2.2.4. The Maintenance Contractor shall have procedure to specify clearly the

deputization procedures for those senior persons in case of lengthy

absence of said manager(s). The length of absence to justify deputizing is

the period beyond which the respective activity cannot function properly

due to such absence.

2.3. Qualified Personnel and Certifying Staff:

Page 346: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 4 of 42

Issue Date: 15 Apr 2012

The Maintenance Contractor and any other subcontractors shall have the

necessary personnel to plan, perform, supervise, inspect and release to service

the maintenance work to be performed.

2.3.1. The required qualification of personnel and certifying staff shall be based

on:

i. ECAA regulations.

ii. Job description they will be assigned to perform.

iii. Prerequisites.

iv. Objectives.

2.3.2. Qualified personnel shall be trained and certified to the prerequisites they

are assigned to perform.

2.3.3. Qualified personnel may report to any of the managers specified, depending

upon the type of control the Contractor uses.

3. Quality Assurance

3.1. EGYPTAIR EXPRESS Chief Inspector shall ensure that the Maintenance

Contractor has an independent Quality Assurance (QA) Program that:

3.1.1. monitors compliance with ECAA regulations, requirements and the

Maintenance Organization Exposition (MOE) of the Contractor;

3.1.2. addresses the specific requirements of EGYPTAIR EXPRESS, as specified

in the maintenance agreement;

3.1.3. comprises the specifications and control processes as specified below :

i. Specifications :

a. An internal audit / evaluation and surveillance program ;

b. An established audit schedule ;

c. A record of audit findings and corrective and/or preventive actions;

d. Assurance of appropriate corrective and/or preventive / action;

e. All elements necessary to confirm the maintenance organization is in

compliance with the applicable that regulations and the MOE;

Page 347: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 5 of 42

Issue Date: 15 Apr 2012

f. The QA program confirms all referenced procedures remain applicable and

effective.

ii. Control processes:

a. An audit/evaluation program, using published checklists that cover all

aspects of the maintenance organization technical activities, conducted

within 12 (24 for some limited activities as agreed by ECAA) months

following the date that the operating certificate is issued and repeated

periodically;

b. Review of audit reports conducted at intervals established in the approved

MOE;

c. Recording of findings of compliance and non-compliance resulting from the audits/evaluations of a. and b. above.

d. Ensuring that the findings of the audits are communicated to the concerned

nominated director and being made available to Egypt Air Airlines;

e. Implementing immediate and long-term actions to correct the root cause(s) of

each non-compliance noted ;

f. Follow-up procedures to ensure necessary corrective/preventive actions

(both immediate and long-term) implemented by the Maintenance

Organization are effective;

g. A record-keeping system to ensure details of audit findings, corrective

actions, preventive actions and follow-up are recorded and that the records

are retained for two complete evaluation cycles.

3.1.4. Is under the sole control of the person assigned managerial responsibility

for the program (Quality Assurance Director).

3.1.5. The quality system shall enable the Maintenance Contractor to ensure it can

deliver a safe product and remain at all times in compliance with the

requirements. This is achieved through:

i. An independent audit program that consists of routine sample checks of all

aspects of the approved maintenance organization's ability to carry out all

maintenance to the required standards. This process includes:

Page 348: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 6 of 42

Issue Date: 15 Apr 2012

a. Product sampling, as this is the end result of the maintenance process,

which represents an objective overview of the complete maintenance related

activities. Product sampling is intended to complement the requirement for

certifying personnel to be satisfied that all required maintenance has been

properly carried out before the issue of the Certificate of Release to Service.

b. A percentage of random audits carried out on a sample basis when

maintenance is being carried out. Random audits shall include audits done

during the night for those organizations that work at night.

3.1.6. A quality feedback system that ensure that all findings resulting from the

independent quality audits of the organization are properly investigated and

corrected in a timely manner:

i. Independent quality audit reports shall be sent to the relevant department(s)

for rectification action, proposing target rectification dates ;

ii. Rectification dates should be discussed with such department(s) before the

nominated quality auditor confirms dates in the report ;

iii. The relevant department(s) shall rectify findings within the agreed rectification

dates and inform the quality department of the completion of such

rectifications.

3.1.7. The Quality Manager shall

i. hold regular meetings with personnel to check progress on rectification

ii. inform the Accountable Manager of any safety issues and the extent of

compliance with ECAA requirements.

iii. send to the Accountable Manager summary report at least a half yearly on

findings of audits non-compliance

3.1.8. The Accountable Manager shall hold meetings at least twice per year with

the Senior Managers to review the overall performance

3.1.9. All records pertaining to the independent quality and the quality feedback

system shall be retained for at least two years after the date of closure of the

finding to which they refer, or for such other periods as to support changes to

the audit time periods, whichever is longer.

Page 349: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 7 of 42

Issue Date: 15 Apr 2012

3.1.10. The QA Program shall not be based on a system of end product inspection,

but upon periodic verifications of all aspects of the systems and practices

used for the control of maintenance to ensure compliance with regulations

and with EGYPTAIR EXPRESS approved procedures.

3.1.11. The program shall provide an unbiased picture of the Maintenance

Contractor performance to verify that activities comply with EGYPTAIR

EXPRESS as outlined in the MCM and confirm that the systems and

procedures described in the Maintenance Contractor MOE remain effective

and achieving its requirements .

3.1.12. The Maintenance Contractor and any other subcontractors shall have a

process for periodic review of the QA Program by the quality manager for the

purpose of ensuring compliance with current requirements of the

Maintenance Program and the MCM.

4. Personnel

4.1. The Maintenance Contractor and other subcontractors shall assure its

Personnel Competence and Acceptance to ECAA:

4.1.1. It shall utilize maintenance personnel whose competence has been

established in accordance with a procedure and to a level acceptable to

ECAA.

4.1.2. Planners, mechanics, specialized services personnel, supervisors and

certifying personnel are required to be assessed for competence by on the

job evaluation and/or examination relevant to their particular job role within

the organization before unsupervised work is permitted.

4.1.3. Job descriptions shall be available for each job role in the organization to

assist in the assessment of competence

4.1.4. The assessment shall establish that, in addition to knowledge of

organizational procedures relevant to their particular role in the organization,

the following:

Page 350: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 8 of 42

Issue Date: 15 Apr 2012

i. Planners are able to interpret maintenance requirements into maintenance

tasks and have an appreciation that they have no authority to deviate from

the maintenance data;

ii. Mechanics are able to carry out maintenance tasks to any standard specified

in the maintenance data and notify supervisors of mistakes requiring

rectification to meet required maintenance standards;

iii. Specialized services personnel are able to carry out specialized

maintenance tasks to the standard specified in the maintenance data and will

both inform and await instructions from their supervisor(s) in any case where

it is impossible to complete the specialized maintenance in accordance with

the maintenance data;

iv. Supervisors are able to ensure that all required maintenance tasks are

carried out and where not completed or where it is evident that particular

maintenance tasks cannot be carried out in accordance with the

maintenance data, it is reported to the responsible person for appropriate

action;

v. Additionally, for those supervisors who also carry out maintenance tasks,

that they understand that such tasks are not to be undertaken when

incomputable with their management responsibilities;

vi. Certifying personnel are able to determine when the aircraft or aircraft

component is ready to release to service and when it is not to be released to

service;

4.2. Licensed/Authorized Maintenance Personnel to sign the Certificate of Release

to Service:

4.2.1. The Maintenance Contractor and other subcontractors shall utilize

appropriately licensed/authorized maintenance personnel to sign the

maintenance release. Such personnel shall have met the applicable ECAR 65

with respect to age, knowledge, experience and, when required, medical

fitness and skill.

4.2.2. Aircraft Maintenance Certifying personnel should fulfill predefined qualification

and training> Typical standards would include ATA spec 104 level 3 for type

Page 351: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 9 of 42

Issue Date: 15 Apr 2012

training or equivalence for basic training before being allowed to certify

maintenance work on aircraft /aircraft component.

4.2.3. Certifying and Support Staff Qualifications:

i. Certifying staff are those personnel who are authorized to certify Aircraft or

Aircraft Component for release to service after performing maintenance

activities.

ii. Personnel qualifications:

The setup of the required qualifications of the Maintenance Contractor staff

shall be based on:

a. Egyptian Civil Aviation Authority Regulations.

b. Job description they will be assigned to perform.

c. Prerequisites.

d. Contractor objectives.

iii. Each certifying and support staff shall be qualified first as a licensed

engineer in accordance with Egyptian Civil Aviation Regulations ECAR Part

65.

4.2.4. The Maintenance Contractor personnel authorization may vary according to

assigned work they are to perform. Record Administration of Certifying and

Support Staff:

i. Records of the Maintenance Contractor certifying staff shall be maintained,

and shall be accessible by the ECAA Inspectors, EGYPTAIR EXPRESS

auditors and Maintenance Contractor auditors on demand. Records may be

maintained as hard copy and as electronic records.

ii. Any license holder shall be responsible for fulfilling the requirements

necessary for his license renewal.

iii. Expiration periods for required training shall be monitored.

iv. All type courses results related for the issuance of authorization for certifying

and support staff shall be kept in personnel records, in an editable format for

at least two years after the concerned employee had left the company or all

such person's authorizations had been withdrawn or revoked whichever is

earlier.

Page 352: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 10 of 42

Issue Date: 15 Apr 2012

v. The certifying staff list shall be continuously updated accordingly.

4.3. Qualifications for Inspectors:

4.3.1. Quality Inspectors:

i. Inspectors shall be assigned in an adequate number to all production

activities in order to assure adherence to technical and workmanship

activities. They should fulfill a technical supervision and act as delegates of

the quality control.

ii. Basic Qualifications & Experience:

a. The Maintenance Contractor should determine necessary experience and

qualifications for its inspectors as may be complying with Authority

requirements.

b. The inspector should pass necessary medical examinations of the near

vision and color perception.

c. The inspector shall have the required skills in inspection procedure and

operating inspection devices including interpretation of defects indicated by

these devices.

iii. The inspector should have passed satisfactorily suitable training courses on

Company procedures, Exposition,

a. Human Factors and Human Performance

b. ECAR Part 145 and related Parts as may be relevant.

c. Material Inspectors should additionally have been trained on detection of

suspected unapproved parts.

d. visual inspection of the incoming material ATA 300 and dangerous goods

regulations

5. Training Program

5.1. Training Program for Maintenance Personnel :

5.1.1 Basic Training: all the technical personnel shall receive:

i. Basic training course in their specialty to fulfill concerned civil aviation

authorities regulation and qualification requirements.

ii. On Job Training

Page 353: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 11 of 42

Issue Date: 15 Apr 2012

iii. (MOE) Training

iv. MCM relevant Training

v. ECAR Part 145 Regulations

5.1.2 Specific Training and practical training on each aircraft type/aircraft

components they have to maintain.

5.1.3 Recurrent Training: a recurrent training plan shall be scheduled for

maintenance personnel once every (24 months) for the type rating they are

authorized for.

5.2. Human Factor Training :

The knowledge and skills related to human performance, including coordination

with other maintenance personnel and flight crew.

i. Human factor training may be conducted through training organizations

acceptable to the ECAA.

ii. Quality system intervention will be considered during the human factors

training and actions will be initiated as necessary.

5.2.1. The training shall reflect the particular nature of the organization (size and

scope of work). The human errors in maintenance and corrective actions

recognized by quality audits shall be reflected in the training.

i. The human factors training shall include:

a. Introduction to human factors.

b. Safety culture/organizational factors.

c. Human errors.

d. Human performance and limitations.

e. Environment.

f. Procedures, information tools and practices.

g. Team work.

h. Organization human factor program.

5.2.2. Human Factors Continuation Training shall be made each two years to

ensure that staff remains aware and updated in terms of human factors and

Page 354: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 12 of 42

Issue Date: 15 Apr 2012

also to collect feedback on human factors issues. The human factors

continuation training shall ensure:

i. Continuation training relates to relevant quality audit findings and other

internal/external sources of information available on human errors in

maintenance.

ii. Keep records of such training for all concerned personnel.

5.3. The Main Contractor and other subcontractors, shall have a training program

that assures maintenance personnel with technical responsibilities have the

requisite knowledge of:

i. Applicable Regulations;

ii. Maintenance standards and recommended practices; and: iii. Relevant maintenance and control procedures:

5.4. Training Program Provisions for Continuation Training:

5.4.1. The Main Contractor and other subcontractors shall have a training program

that provides for continuation training for all maintenance personnel on an

interval not to exceed 24 months, which may be reduced to a lesser interval

based on findings generated by the QA Program.

5.4.2. Continuation training shall be a two-way process to ensure that certifying

personnel remain current in terms of procedures, human factors and technical

knowledge, and that the approved maintenance organization receives

feedback on the adequacy of its procedures and maintenance instruction,

through:

i. Organization reviews

ii. Outcomes from reliability meetings.

iii. Stipulated key performance indicators (KPI's).

iv. Outcomes from audit reports.

5.4.3. Continuation due training would involve the involvement of the quality

department to ensure feedback is auctioned. This is assured through

alternatively, there is a procedure to ensure that feedback is formally

communicated between passed from the training department and to the

quality department to initiate action.

Page 355: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 13 of 42

Issue Date: 15 Apr 2012

5.4.4. Continuation training would cover changes in Authority requirements, changes

in organization procedures and the modification standard of the products

being maintained plus human factor issues identified from any internal or

external analysis of incidents. It would also address instances where

personnel failed to follow procedures and the reasons why particular

procedures are not always followed. The continuation training is to reinforces

the need to follow procedures and ensure that incomplete or incorrect

procedures are identified so they can be corrected. This shall be

complemented by does not preclude the possible need to carry out a quality

audit of such procedures. If it is evident that there is an incomplete or incorrect

procedure, the quality audit shall be made on such procedure and necessary

corrective actions shall be taken.

5.4.5. The program for continuation training shall lists all certifying personnel and

when training will take place, the elements of such training and an indication it

was carried out reasonably on time as planned. Such information should be

subsequently transferred to the certifying personnel record. These

Continuation training requirements are intended to apply mainly to personnel

performing and certifying maintenance, planners, incoming inspectors and

other personnel having safety-critical responsibilities.

5.5. Training Program for Auditors:

The Maintenance Contractor and other subcontracted (AMO) shall have a

training (initial and continuation training) and qualification program for auditors

used in the QA Program.

5.6. Training Program for Receiving Inspectors:

The Maintenance Contractor and other subcontractors shall have a training

program that provides for initial and continuation training for receiving

inspectors.

6. The Maintenance Contractor shall have Facilities and Physical Resources

6.1. The Basic Maintenance Facilities shall be as follows:

6.1.1. A place of business, with a fixed address;

Page 356: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 14 of 42

Issue Date: 15 Apr 2012

6.1.2. Sufficient communications equipment/software, such as telephones, facsimile

machines, email and others online facilities.

6.1.3. Any devices used to establish when a particular aircraft requires maintenance.

This may include planning bulletin boards, card files or a computer system;

6.1.4. a secure, appropriate place for technical records, equipped with fire detection

and protection, to retain aircraft technical records

6.1.5. For Base maintenance of aircraft, aircraft hangars; large enough to

accommodate aircraft on planned Base maintenance according to an agreed

aircraft hangar visit plan that shall be continuously updated on regular basis or

otherwise as required as per applicable operational and maintenance program

changes , Hangar shall have sufficient aircraft access equipment and

inspection platforms/docking such that the aircraft may be properly inspected

together with office accommodation such that the working environment

permits personnel to carry out work tasks in an effective manner.

6.1.6. Repair workshops shall be large enough to accommodate the components on

planned maintenance

6.1.7. For line maintenance of aircraft, hangar access shall be available to

accommodate aircraft as necessary during inclement weather for lengthy work

or work that needs hangar facility.

6.1.8. Office accommodation shall allow incumbents, whether they are management,

planning, technical records, quality or certifying personnel, to carry out their

designated tasks in a manner that contributes to good aircraft maintenance

standards. Aircraft maintenance personnel shall be provided with an area

where they may study maintenance instructions and complete maintenance

records in a proper manner.

6.1.9. A secure, appropriate stores and storage control system that shall be

equipped with fire detection system. and shall be suitable for the storage of

parts, equipment, tools and material.

6.1.10. Maintenance Facilities Environmental Conditions and cleanliness

Standards:

Page 357: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 15 of 42

Issue Date: 15 Apr 2012

i. Facilities shall be appropriate for planned work, shall assure appropriate

working environment for the work carried out and shall assure that the

effectiveness of personnel will not be impaired.

ii. Inside the facilities all safety rules shall be adhered to, fire detection and

protection system shall be installed and checked periodically for

operations.

iii. An emergency escape plan shall be declared and well known by all

personnel.

iv. Facilities shall be protected from the weather conditions:

a. The aircraft hangar and aircraft component workshop provides

protection from the normal prevailing local weather elements that are

expected throughout any 12-month period. Where the working

environment deteriorates to an unacceptable level so that the

particular task cannot be correctly performed, the work shall be

suspended until satisfactory conditions are regained.

b. Dust and any other airborne contamination shall be kept to a minimum

and shall not be permitted to reach a level in the work task area where

visible aircraft/component surface contamination is evident.

c. Aircraft hangar and workshop structures shall be to a standard that

prevents the ingress of rain and the effect of wind when becoming

more than the acceptable wind speed.

d. Temperature and moisture shall be controlled so that personnel can

carry out repaired tasks without undue discomfort.

e. Where a particular maintenance task requires the application of

specific environmental conditions, then such conditions shall be

adhered to observed. Such specific conditions shall be identified in the

approved maintenance instructions.

f. Hangar and workshop floors should be sealed to minimize dust

generation, vacuum sweeper is used on floors at regular intervals by

cleaning staff to clear FOD prior of carrying maintenance tasks, and

waste bins to be placed at various points, and emptying is carried out

at regular intervals.

Page 358: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 16 of 42

Issue Date: 15 Apr 2012

g. For both base and line maintenance where dust or other airborne

contamination results in visible surface contamination, all susceptible

systems shall be sealed until acceptable conditions are reestablished.

h. Floors shall be checked at regular intervals to ensure that:

1) No loose objects around work areas.

2) No spillage of fluids that may cause fire and accident hazard.

3) No dropping of objects or fluids from vehicles moving within the

facility.

4) Fire points, escape routs and emergency exits are clear and not

obstructed.

i. The lighting in the work area shall be up to the required standards to

ensure that each inspection and maintenance task can be correctly

carried out.

j. Noise levels shall not be permitted to rise to the point of distracting

personnel from carrying out inspection and maintenance tasks.

k. Personnel should be provided with the necessary personal equipment

to stop excessive noise whenever needed.

l. The personnel shall wear protective clothing and safety shoes,

adapted to the task they are caring out when ever needed. Clothing

will be of non-static electrical producing material.

m. Smoking and eating should be forbidden in all maintenance work

areas.

6.2. Necessary Technical Data, Equipment/Tools and Material required to perform

maintenance:

6.2.1. Technical Data :

i. The Maintenance Contractor shall receive all necessary airworthiness data

from the ECAA and/or appropriate authority, the aircraft/aircraft component

design organization and any other approved design organization, as

appropriate to support the work performed.

ii. All airworthiness data shall be kept up to date and made available to all

personnel who need access to such data to perform their duties:

Page 359: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 17 of 42

Issue Date: 15 Apr 2012

a. To keep the data up to date a procedure shall be set up to monitor the

amendment status of all data and maintain a check that all

amendments are being received by being a subscriber to any

document scheme;

b. Data being made available to personnel maintaining aircraft means

that the data shall be available in the hangar in close proximity to the

aircraft being maintained;

Where computer systems are used, the number of computer terminals shall

be sufficient in relation to the size of the work program to enable easy

access, unless the computer system can produce paper copies.

6.2.2. Equipment and Tools.

i. Maintenance Contractor and other subcontractors, shall have the

equipment and tools necessary to perform the work for which the

maintenance organization has been approved and as specified in the

approved data, to include tooling stock management procedure where:

a. A record for the arrival of tools and equipment in the stores to notify the

concerned production unit by the availability of the tool/equipment in the

store.

b. A tool control register that contains:

1) Issued tool data.

2) Calibration/ servicing date.

3) Next Calibration/ servicing due date.

4) Corresponding bin location in the tool/equipment store.

c. The tool control register shall be used for tools utilization tracking.

d. Each registered tool/equipment should be stored in the correct location,

and each tool/equipment stored shall be attached with :

1) Serviceable Tag.

2) Copy of the calibration certificate, or certificate of compliance, as

applicable.

3) User manual if applicable.

Page 360: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 18 of 42

Issue Date: 15 Apr 2012

e. The tools/equipment shall be stored so that it is protected from weather

conditions, storage environmental requirements such as light, dampness,

temperature and cleanliness shall be followed. In such a manner that they

are protected against any damage, slipping or deterioration during storage

or handling within the store. If special conditions for storage of specific

tools/equipment are required, this will be carried out according to

manufacturer's instruction.

f. Storage area shall be suitable to accommodate and allow easy access to,

and handling of bulky or heavy equipment.

Tools/equipment shall be appropriately segregated as to its serviceability

and calibration status

g. A tool record shall contain the following data:

1) Date of delivery of the tool to the user.

2) User name and code Number.

3) Tasks performed by the tool.

4) Aircraft registration or component data, as applicable.

ii. Maintenance Contractor shall have an approved procedure to use alternate

tools and to determine the equivalency and obtain necessary approvals for

such use.

iii. Maintenance Contractor shall update the tool register with the following as

relevant:

a. Original tool P/N.

b. Alternate tool P/N, S/N.

c. Maintenance data reference.

d. Manufacturer and QA approval reference number.

6.2.3. Material Required:

The Maintenance Contractor and other subcontractors shall assure sufficient

supplies and spare parts for the timely rectification of defects taking into

consideration the MEL scope and permissible and in accordance with the

mutually agreed service level agreement.

Page 361: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 19 of 42

Issue Date: 15 Apr 2012

6.3. Storage Facilities:

6.3.1. Maintenance Contractor and other subcontractors shall have Storage

Facilities that:

i. Clearly and accurately identifies and segregates:

a. Parts and material;

b. Oxygen and other high-pressure bottles;

c. Flammable, toxic or volatile materials;

d. bulky, heavy, odd shaped, pallets or large items

ii. Aisles and lateral or cross walks are to be wide enough for accessibility,

issuing, cleaning and use during emergencies.

iii. Office space exists to promote efficient operation, and appropriate record up-

keeping.

iv. Storage facilities shall be clean, well-ventilated and maintained at an even dry

temperature to minimize effect of condensation.

v. Storage racks are strong enough to hold aircraft components, and provide

sufficient support for large components such the component is not distorted

during storage.

6.3.2. Storage Requirements:

i. Material shall be backed and stored in such a way that:

a. It is not subject to damage or deterioration, protected against moisture,

temperature, light, electromagnetic fields, static electricity or mechanical

damage.

b. Any applicable special storage requirements from the manufacturer

specifications are to be followed.

c. Openings are covered to prevent the ingress of foreign object or loss of

preserving fluids.

ii. Safety and environmental protection regulations are to be followed. Stored

material shall be checked at regular intervals, materials found not acceptable

have to be disposed off or restored.

iii. Material with limited shelf life shall be appropriately identified and checked to

ensure that the shelf life has not been expired through periodic documented

Page 362: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 20 of 42

Issue Date: 15 Apr 2012

inspections and expiry date monitoring system). A list of the material

concerned is to be kept.

iv. Electrostatic sensitive aircraft devices (ESD) shall be protected by suitable

measures (e.g. special packaging, grounding of shelves and tables, etc) to

avoid damage by static electricity.

v. Identification and Tagging of Aircraft material shall be ensured at all times.

vi. Segregation between serviceable materials and unserviceable materials

shall be done.

vii. Incoming materials shall not be inducted into stores without having passed a

receiving inspection.

viii. Optimize issuing, e.g. First in First Out.

6.4. Shelf life program:

Maintenance Contractor and other subcontractors shall have a shelf-life

program for applicable stored items, which includes a requirement for the shelf-

life limit to be controlled and displayed.

6.5. Receiving Inspection:

Maintenance Contractor and other subcontractors shall have a receiving

inspection process that assures that

i. All aircraft materials (purchased, returned after repair, borrowed, etc)

undergo an incoming inspection before acceptance or use. and only aircraft

materials containing no discrepancies are released for use.

ii. Aircraft materials containing discrepancies shall be isolated to prevent

further use.

iii. Only appropriately qualified inspectors will plan, carry out and evaluate

inspection of incoming materials.

6.5.1. Receiving Inspection shall perform:

i. Packaging Inspection: to ensure that the received material packaging comply

with ATA 300 specification requirements.

Page 363: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 21 of 42

Issue Date: 15 Apr 2012

ii. Identity Inspection : to ensure that the P/N and S/N on the part name

plate/part tag and the life limit information match with the data in the

"Purchase Order" (P.O), and shipping documents.

iii. Quantity Inspection: to check received quantity against the shipped/ordered

quantity.

iv. Visible Damage Inspection: to check received material for visible exterior

damage and missing protective caps. "Random Sampling Inspection" will be

applied for the patch numbered lots.

v. Dangerous Goods Regulation Inspection: to ensure that the packaging

complies with the dangerous goods packaging as per standards.

vi. Supplier/Subcontractor Data Inspection: to ensure that the

Supplier/Subcontractor on the shipping documents are the same

Supplier/Subcontractor of the purchase order (both of them shall be within

the Approved Supplier/Subcontractor Lists

vii. Certificate Inspection: Assures incoming material has the required

certification documentation and traceability

viii. Documents Inspection: to compare the delivered certificates of release to

service (CRS).

6.5.2. Release to Service of Accepted Materials:

The inspection of incoming materials shall be documented by concerned material

inspector after which issue of a "Serviceable Tag" to be attached to the received

material, For Material Containing Discrepancies:

i. receiving section shall issue "Item Discrepancy Report"

ii. The material having discrepancy shall be routed to the hold area, identified

with "Item Discrepancy Report" and segregated waiting for a decision to be

returned, repaired, scrapped or re-accepted. The receiving hold area shall be

restricted for access to the authorized staff only and identified for the

purpose of quarantine.

7. Material Handling

7.1. Maintenance Director shall insure that the outcomes of all incoming inspections

are to be systematically and regularly evaluated the results of such evaluations

Page 364: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 22 of 42

Issue Date: 15 Apr 2012

are to be incorporated into the continuous assessment of the quality capability

of each supplier. These results are also to be taken into account when

concluding quality agreements and auditing suppliers.

7.2. Only appropriately qualified personnel shall plan, carry out and evaluate

inspections of incoming materials.

7.3. Acceptance of materials:

i. If a discrepancy is found during inspection, material inspector in receiving

section shall:

a) Issue Rejected Item Tag

b) Issue an Item Discrepancy Report.

c) The part shall be routed to the hold area attached with. Rejected

Item Tag and copy of Item Discrepancy Report.

7.4. Receiving Inspection shall assure that Materials meet the standards of

airworthiness applicable to it; marking identifying it as a part specified in the type

design conforming to a recognized national or international standard, or

i. the part has been approved for use on an aeronautical product, in

accordance with the type certificate/STC, or the part was manufactured

under a Parts Manufacturer Approval (PMA)

ii. Material like metal sheets, rolled material or weld wires or parts taken

thereof has appropriate identification or appropriate markings in an

undeletable manner during maintenance process in use. Traceability shall

be insured by inserting used batch numbers in the aircraft records

iii. Standard parts shall be identified with their batch number. Any such part or

sub-part shall be traceable to the applicable batch number. Traceability

shall be insured by inserting used batch numbers in the aircraft records

iv. For Components with limited shelf life, the shelf life shall be appropriately

identified, and tracked to avoid use after shelf life expiry. Traceability shall

be assured

v. Repaired / Overhauled Components were overhauled / repaired / tested at

an approved repair station stated in the approved subcontractor’s list,

Page 365: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 23 of 42

Issue Date: 15 Apr 2012

applicable forms are fully completed for the component and applicable

requirements are complied with.

7.5. Documentation of Materials:

7.5.1 Certificate of Conformance / Conformity:

i. The manufacturer or his authorized representative certifies that the material

fulfils the necessary Airworthiness requirements (approved data) or national

standard (specification)

ii. Standard parts and / or their packaging shall be marked with the

appropriate specification (standard) and – if applicable – the batch number.

iii. A certificate of conformance / conformity is to contain the following

information, as applicable:

a. Designation of the component / materials.

b. The part number and, if necessary (the serial number / batch number).

c. A declaration of conformity with the specifications (standard according to

which the component / material was manufactured).

d. The shelf life.

e. The quantity supplied.

f. Name and address of the manufacturer / maintenance organization.

g. Authorized signature and / or stamp of the manufacturer / maintenance

organization.

h. Date of issue.

For raw materials a conformity statement with the above information on the

delivery documents shall be sufficient if no certificate of conformity can be

made available.

7.6. Packaging and Transportation of Materials:

7.6.1. The Maintenance Contractor and other subcontractors, shall have a

process that assures:

i. Materials are always to be transported so that they are not lost, damaged or

deteriorated to such an extent that their characteristics are inadmissibly

modified.

Page 366: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 24 of 42

Issue Date: 15 Apr 2012

ii. Any applicable manufacturer specifications or standards are to be complied

with. Packaging in suitable clean containers to protect against

contamination, reciprocal damage or external damage.

iii. Covering of openings in aircraft components to prevent the ingress of foreig

objects (solids, liquids) or against loss of preserving fluids.

iv. Securing of materials (packed or unpacked) against slipping and falling from

the transportation surface (e.g. pallet / fork lift truck combination).

v. Suitable protection against the weather during transportation (precipitation,

atmospheric, humidity and temperature).

vi. Transportation of acceleration-sensitive or impact-sensitive aircraft

Components (E.g. instruments, power-plant) in special packaging or with

Special vehicles.

vii. Compliance with work safety, hazardous materials and environmental

protection regulations.

viii. Training / instruction of transportation personnel in the use of transportation

equipment / aids (vehicles, cranes, etc).

ix. In the event of (actual or suspected) damage occurring during storage or

transportation, the material is first to be isolated to prevent further use. Such

materials are to be forwarded to the receiving inspection unit for advance

decisions.

x. Materials transported shall be adequately packaged in accordance with the

above requirements. The transport company shall be informed in writing

(contract) and be able to conform to the necessary transportation conditions.

7.6.2. Material Storage and Tagging:

The Maintenance Contractor and other subcontractors shall have a secure

quarantine area for rejected parts and materials awaiting disposition.

The Maintenance Contractor and other subcontractors shall have a process

for segregating aircraft serviceable parts, aircraft non-serviceable parts, and

non-aircraft parts.

i. Non-aircraft parts shall be stored at a separate place apart from aircraft

parts.

Page 367: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 25 of 42

Issue Date: 15 Apr 2012

ii. The Chief Inspector shall make audits on store areas to ensure

segregation of parts (MCM 1.10).

7.6.3. Maintenance Contractor and other subcontractors shall have an

Electrostatic Sensitive Devices (ESD) Program, which:

i. Ensure that , where ESD parts are handled , shop floor grids are grounded

;

ii. Ensure all ESD are only handled using approved ''earthing'' (grounding )

wrist straps and conductive desk mats ;

iii. Devices are contained in ESD-approved conductive packaging sealed with

conductive tape

iv. ESD are not to be stored on shelving covered with carpet, foam, vinyl or

any other material that can store or produce an electrical charge ;

v. Appropriate warning and caution signs and decals are placed in areas

where ESD are handled

vi. Wrist straps and earthing mats are tested to ensure conductivity at regular

intervals or prior to use, and such test results are recorded.

7.6.4. The Maintenance Contractor and other subcontractors shall implement a

suitable ESD control program;

7.6.5. The Maintenance Contractor and other subcontractors, shall have a method

of storage that assures sensitive parts and equivalent such as Oxygen

system components, O-rings and electrostatic sensitive devices are

properly packaged, identified and stored to protect them from damage and

contamination and

7.6.6. the storage recommendations from the manufacturer are followed, with

particular emphasis on recommendations with respect to temperature and

humidity.

7.6.7. Life limited parts when being removed from a type certificated product shall

be controlled using the appropriate;

7.6.8. Record keeping system, which substantiates P/N, S/N and current life

status of the part. Each time the part is removed, the record shall be

updated. Tag attached to part, which includes P/N, S/N and current life

Page 368: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 26 of 42

Issue Date: 15 Apr 2012

status of the part. Each time the part is removed, the record shall be

updated Mutilation, where the part shall be mutilated to prevent its

installation.

7.6.9. The Maintenance Contractor and other subcontractors shall continuously

monitor shelf life control items due dates.

8. Procedure Manual

8.1. The Maintenance Contractor and other subcontractors, shall have a

Maintenance Organization Exposition Manual (MOE) for the use and guidance of

relevant maintenance personnel that defines how the Approved Organization

accomplishes and controls the aircraft maintenance activities and provides all

personnel of the AMO with the necessary information to enable them to

accomplish their duties, and that allows the Authority to understand and approve

how the AMO complies with the applicable Airworthiness Requirements,

Purpose of the MOE is to set forth the procedures, means and methods for the

AMO to accomplish maintenance. Compliance with its contents will assure

fulfillment of the AMO's responsibilities. The MOE shall contain the following

information:

8.1.1. A table of contents;

8.1.2. Acceptance of ECAA;

8.1.3. A means of identifying each page of the MOE in the form of a list of effective

pages, with each page numbered and either dated or marked with a revision

number

8.1.4. A brief description of the organization that includes :

i. General description of the scope of work authorized under the

organization's terms of approval;

ii. The approximate size of the organization;

iii. The geographic location of the office facilities and/or the base of operations

iv. General description of the organization's facilities;

v. A chart depicting the distribution of the functions.

Page 369: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 27 of 42

Issue Date: 15 Apr 2012

8.1.5. A description of the organization procedures and quality or inspection

systems;

8.1.6. A statement signed by the Maintenance Contractor Accountable Manager

confirming the MOE and any incorporated documents identified there in

reflect the Organization's means of compliance with ECAA requirements;

8.1.7. Names and duties of the responsible personnel;

8.1.8. Names and duties of the person or persons whose responsibilities are to

ensure that maintenance is carried out in accordance with the MPM;

8.1.9. A description of the procedures used to establish the competence of

maintenance personnel;

8.1.10. A description of the methods used for the completion and retention of the

Operator's maintenance records, including procedures for retaining back-

up records;

8.1.11. A description of the procedure for preparing the maintenance certificate of

release to service and the circumstances under which the release is to be

signed;

8.1.12. The process for authorizing personnel to sign the maintenance release

and the scope of their authorization;

8.1.13. A description of any additional procedures for complying with the

Operator's maintenance procedures and requirements;

8.1.14. A description of the procedures for complying with the service information

reporting requirements;

8.1.15. A description of the procedures for receiving , amending and distributing

within the maintenance organization , all necessary airworthiness data

from the type certificate holder or type design organization.

8.1.16. Maintenance Contractor and other subcontractors shall have process to

amend the MOE as necessary to keep the information contained therein

up-to-date. The Quality manager of the AMO is responsible for monitoring

revisions of the MOE, unless otherwise agreed by the Authority. Unless

the Authority shall have agreed via a procedure state in the amendment

Page 370: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 28 of 42

Issue Date: 15 Apr 2012

section of the MOE that certain defined classes of amendments may be

incorporated without prior Authority approval, this process includes

monitoring revisions to the associated procedures manuals;

8.1.17. A description of the maintenance procedures and the procedures for

completing and signing a maintenance release when maintenance is

based on a system other than that of an approved maintenance

organization;

8.1.18. A description of the procedures for monitoring , assessing and reporting

maintenance and operational experience;

8.1.19. A description of the procedures for assessing continuing airworthiness

information and implementing any resulting actions;

8.1.20. A description of the procedures for implementing action resulting from

mandatory continuing airworthiness information;

8.1.21. A description of the procedures for ensuring that unserviceable items

affecting airworthiness are recorded and rectified;

8.1.22. A description of the procedures for advising the State of

Registry/Authority/ Operator of significant in-service occurrences;

8.1.23. A description of the system used to distribute the MOE, including a

description list; for non-scheduled work, temporary copies of relevant

portions of the MOE or any incorporated reference;

8.1.24. Where the Organization uses standards for the performance of

elementary work or servicing different from those recommended by the

manufacturer , the identification of those standards;

8.1.25. Procedures to ensure regulatory information and technical data

appropriate to the work performed are servicing;

8.1.26. Details of the methods used to record the maintenance , elementary work

or servicing performed , including the method of recording of defects in the

technical record required by these standards;

8.1.27. A detailed description of the procedures used to ensure that any

maintenance tasks required by the maintenance schedule, airworthiness

Page 371: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 29 of 42

Issue Date: 15 Apr 2012

directives or any task required for the rectification of a defect are

completed within the required time constraints;

8.1.28. A description of the evaluation program required by these standards;

8.1.29. A description of the defect rectification and control procedures, including

details of:

8.1.30. The methods used to defect and report recurring defects;

8.1.31. The procedure for scheduling the rectification of defects whose repair has

been deferred.

8.1.32. The procedures used to immediately report to EGYPTAIR EXPRESS any

defects, service difficulties, un-airworthy conditions, failures or

malfunctions specified below:

8.1.33. Defects or Un-airworthy conditions related to Aircraft structure , Power

plant and aircraft systems or equipment ,as specified in (MCM 2.12);

8.1.34. Defects occurring at an excessive frequency that in isolation would not be

considered reportable (e.g., a high frequency of spurious warnings for

certain systems or high failure rate for a specific component);

8.1.35. Incorrect assembly of components;

8.1.36. Use of incorrect oil, hydraulic fluid or other essential fluids.

8.1.37. A description of the technical dispatch procedures, including procedures

for ferry-flight authorizations, extended range operations (ETOPS,

EROPS, and LROPS). all weather operation or any other special

operation ;

8.1.38. Procedure to ensure that only parts and materials that meet the

requirements of the State of Registry/Authority/operator are used in the

performance of elementary work or servicing , including details of any

spare part tool arrangements that have been used into;

8.1.39. A description of the methods used to ensure that the personnel authorized

to perform elementary work or servicing are trained as required by the

Page 372: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 30 of 42

Issue Date: 15 Apr 2012

ECAA and qualified in accordance with these requirements , as

applicable;

8.1.40. A description of personnel records to be retained;

8.1.41. Details of the procedures applicable to maintenance arrangements and a

list of all such arrangements, including the procedures used to

communicate to an approved maintenance organization the maintenance

requirements for planned and unforeseen maintenance activities , as well

as those mandated by airworthiness directives;

8.1.42. Procedures used for the storage and control of petroleum, oil and other

lubricants as required by national regulations;

8.1.43. Responsibilities and procedures for revisions to the management part of

the MOE and any associated manuals are to be specified.

8.2. The Maintenance Contractor and other subcontractors shall have process to

furnish copies of all amendments to the MOE promptly to all organizations or

persons to whom the manual has been issued.

8.3. Chief Inspector shall audit the MOE and the latest revision.

9. Release to Service Procedure

The Maintenance Contractor and other subcontractors shall produce a completed

and signed maintenance release that certifies all maintenance work performed has

been completed satisfactorily and in accordance with the approved data and

procedures described in the MOE of the maintenance organization.

9.1. General:

9.1.1 Release to service is performed only with certifying staff authorized for this

job. Release to service is only issued for an Aircraft or Aircraft components

that fall within the Aviation authority approval scope of work of Egypt Air

M&E and other subcontractors.

9.1.2 Maintenance release shall includes:

i. basic details of the maintenance performed;

ii. a reference of the approved data used;

Page 373: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 31 of 42

Issue Date: 15 Apr 2012

iii. the date such maintenance was completed;

iv. The applicable, identity of the approved maintenance organisation;

v. Identity of the person(s) signing the release.

9.1.3 Maintenance planning and production control for base maintenance,

concerned technical support for line maintenance and workshops shall

control and develop the work package in a manner that, it will comply with

the EGYPTAIR EXPRESS bill of work orders.

9.1.4 The maintenance package may include any one or a combination of the

following elements: a check or inspection from the approved aircraft

maintenance program, Airworthiness Directive, overhauls, repairs,

modifications, aircraft component replacements, and defect rectification.

9.1.5 IF new defects or incomplete maintenance work orders identified during

maintenance it shall be brought to the attention of the EGYPTAIR EXPRESS

to obtain agreement to be rectifying such defects or complete the missing

elements of the maintenance work order.

9.1.6 In case where EGYPTAIR EXPRESS declines to have such maintenance

carried out and provided this missing element / defect does not affect the

airworthiness of the aircraft, this fact is entered in the aircraft CRS before

issue of such certificate.

9.1.7 Certifying staff will issue the release to service only when all work and

documents are completed.

9.2. Release To Service after Line Maintenance :

9.2.1. A release to service is necessary before each flight after completion of any

line maintenance work (package of scheduled maintenance and/or defect

rectification).Release to service of an aircraft is only issued by personnel

with appropriate authorization (certifying staff).

i. The airworthiness release of an A/C, which follows the line maintenance

work, will be recorded in the aircraft TLB. Entry of the check type and sign-

off constitute an airworthiness release to service. Line maintenance

Page 374: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 32 of 42

Issue Date: 15 Apr 2012

certifying staff shall be familiar with the structure of the operator's technical

log book.

ii. The release to service certifies that the completed work or work package

was performed in accordance with ECAR Part 145, maintenance program,

Quality Manuals and the related Airworthiness data.

9.2.2. The certifying staff assigned to sign-off the release to service shall ensure

that:

i. Assigned work package is performed.

ii. The aircraft log book and deferred log book are reviewed.

iii. All sign-off in the complete work package were performed by appropriately

qualified personnel.

iv. All necessary work arising from the maintenance items had been carried

out, and all defects are rectified or deferred.

v. If a certificate item requiring inspection, therefore the assigned inspector

will sign-off this item together with the production engineer.

9.3. Release to Service after Base maintenance:

This procedure is set to cover issuance of release to service for A/C after a

base maintenance check (2A ,or equivalent and higher checks)

The authorized inspector responsible for checking the whole work package

shall ensure that:

9.3.1. All work package task cards are properly performed and completed, or

otherwise deferred or considered as an open item.

9.3.2. All functional/operational checks are satisfactorily carried out

9.3.3. No Airworthiness Directive (A/D) is or shall be over-due at the time of

issuance of the CRS.

9.3.4. Collect all the originals of all certificates of the issued materials and changed

components and includes them in the work package.

9.3.5. All aircraft work package task cards and inspection tasks are carried out and

signed-off.

Page 375: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 33 of 42

Issue Date: 15 Apr 2012

9.3.6. Each uncompleted task is assessed, maintenance items that can be deferred

according to the Customer's Airworthiness Data (MEL, CDL, AMM, SRM

…..), deferral procedure is performed and the affected system is considered

inoperative or degraded.

9.3.7. For maintenance items that shall be performed, release to service shall not

be issued until relevant task is properly completed and certified.

9.3.8. The inspector of category A&C assigned shall sign the CRS with validity and

limitations of the specified completed maintenance check.

9.3.9. Any postponed tasks considered as open items shall be entered in the CRS

during issuance.

9.4. Certificate of Release to Service of Aircraft Components:

9.4.1. General:

i. Certificate of release to service shall only be issued for those aircraft

components that fall within the aviation authority approved scope.

ii. Release certificate should not be issued for any item when it is known that

the item is unserviceable except in the case of an item undergoing a series

of maintenance process at several maintenance organizations approved

under ECAR Part 145. In this case a clear statement should be indorsed in

the certificate to declare that the release certificate is limited to a partial

maintenance of the component and that the component is delivered

unserviceable to anther organization for the maintenance finalization.

9.4.2. Authority and Procedures:

i. CRS of an aircraft component is only issued by a certifying person holding

appropriate authorization.

ii. Before issuing the (CRS) to release to service an aircraft component, the

certifying staff shall ensure that:

a. The maintenance work specified in the work order/work package has been

carried out.

b. The operator is notified in writing of any eventually non-performed

maintenance work no later than the time at which the aircraft component is

handed over.

Page 376: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 34 of 42

Issue Date: 15 Apr 2012

c. Approval has been obtained from the original (type certificate holder) or

appropriately approved design organization for deviations from

airworthiness data. The operator is responsible for obtaining such

approval. The deviation shall be effective only after EGYPTAIR EXPRESS

Chief Inspector approval and ECAA approval are granted.

d. If authorized (CRS) is lost, a replacement form may be issued. In such

case, it should be stated that it is a replacement certificate and verification

of the certificate data will be required.

9.4.3. Equivalent Document to an Authorized Release Certificate:

i. A release document issued by an approved/accepted ECAR Part 145

organization, or an organization approved by under the terms of a bilateral

agreement signed by the ECAA.

ii. In the case of new aircraft components, a release certificate shall be issued

by an approved manufacturer.

9.4.4. Authorized Release Certificate:

i. The original certificate shall accompany the items and correlation shall be

established between the certificate and the item. A copy of the certificate

shall be retained by the organization that manufacturer or maintained the

item. The certificate that accompanies the item may be attached to the

item by being placed in envelop for durability.

ii. All printing shall be clear and legible to permit easy reading.

iii. Completion of the certificate shall be in English language.

iv. Corrector and whitener are prohibited in the Authorized Release certificate.

v. There shall be an entry in all blocks to make the document a valid

certificate.

9.5. Required Inspection Items Control Procedure:

In performing the Required Inspection the following criteria shall be applied:

9.5.1. Maintenance Director will determine the procedures, standards, and limits

necessary for the required inspections with reference to applicable

Airworthiness data. Basis for such procedures, standards, and limits shall

be approved by the Chief Inspector.

Page 377: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 35 of 42

Issue Date: 15 Apr 2012

9.5.2. The Maintenance Contractor and other subcontractors shall apply given

EGYPTAIR EXPRESS procedures, standards, and limits to accept or reject

items required to be inspected.

9.5.3. The Maintenance Contractor and other subcontractors shall have a

procedure which ensures the avoidance of the generation of the same

mistake during aircraft maintenance or component maintenance on identical

/ redundant system that will / may have serious consequences on the safe

operation of the Aircraft or Aircraft component.

9.5.4. Required Inspections shall be performed by appropriately qualified and

authorized independent inspectors.

9.5.5. Independent inspectors’ decisions shall not be countermanded except by a

higher inspection level, the Chief Inspector, or after reference to the

Authority. Such countermanding shall be appropriately documented.

9.5.6. The Maintenance Contractor and other subcontractors shall ensure that

findings arising from inspections are re-inspected after completion of

maintenance work required.

9.5.7. The Maintenance Contractor and other subcontractors shall ensure that

uncompleted maintenance and inspection work resulting from work

interruptions, such as shift changes and personnel absence, are

appropriately completed before a release to service is issued. This is to be

achieved by on-time record of performed maintenance and the provision of

shift handover logging system.

9.5.8. The Maintenance Contractor and other subcontractors shall ensure that the

release to service certificate is issued only after ensuring that all required

maintenance and inspections have been completed. Deferring or

postponing any maintenance work shall be in accordance with an approved

procedure and with reference to applicable airworthiness data (MEL, CDL).

9.6. Inspection Methods:

Page 378: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 36 of 42

Issue Date: 15 Apr 2012

9.6.1. Inspectors shall consult publications normally used in the course of

maintenance to assure that work accomplished on required inspections

conforms to applicable manual procedures, standards and limits.

9.6.2. Unless specific inspection instructions are contained within the applicable

manual, the inspector will make a visual inspection of each installation for

security, safety, and workmanship.

9.6.3. Repairs and alterations will be inspected for proper material, fasteners,

workmanship, and conformity with engineering orders.

9.6.4. Fuel, oil, hydraulic and pneumatic systems will be checked.

9.6.5. Functional checks of flight control systems shall be witnessed by the

inspector.

9.7. Control of Critical Tasks Requiring Inspection:

9.7.1. This procedure is established to capture and rectify maintenance errors for

critical maintenance tasks requiring inspection. Critical tasks requiring

inspection are those tasks that could, as minimum, result in a failure,

malfunction, or defect endangering the safe operation of the aircraft if not

performed properly of the released aircraft.

9.7.2. Critical Tasks Requiring Inspection are determined according to the

following criteria:

i. Previous experiences of maintenance errors, depending on the

consequence of the failure,

ii. Information arising from the ‘occurrence reporting system’,

iii. Authority requirements for error capturing, if applicable.

iv. Tasks that if not performed properly or if improper parts / material were

used could result in a failure malfunction or defect that could endanger the

safe operation of the aircraft.

9.7.3. Critical tasks requiring inspection shall be determined by Engineering and

highlighted during work package preparation by the responsible

maintenance planning engineer. The highlighting will take the form of a

Page 379: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 37 of 42

Issue Date: 15 Apr 2012

“Critical Task” or Required Inspection Item (RII) endorsement on such tasks

work sheets.

9.7.4. During execution, these tasks will require additional inspection to be

performed by a staff member, other than the person performing the task.

Person performing the additional inspection shall be of at least the same

qualifications / authorizations as the person first accomplished the task.

9.7.5. With regard to aircraft line and base maintenance on critical tasks requiring

inspection, no person is allowed to carry out and simultaneously inspect

what he has carried out. If a maintenance task involves some element of

disassembly/reassembly of several components of the same type fitted to

more than one system on the same aircraft during a particular maintenance

check, and only one person is available to carry out these tasks then the

work card or worksheet shall include an additional stage for re-inspection of

the work by this person after completion of all the same tasks.

9.7.6. The following maintenance tasks should primarily be reviewed according to

the requirements of relevant airworthiness data to assure that there exists

no impact on safety:

i. Installation, rigging and adjustments of flight controls,

ii. Installation of aircraft engines,

iii. Overhaul, calibration or rigging of components such as engines,

transmissions and gearboxes,

iv. Application of major repairs and major alterations.

9.7.7. For twin engine aircraft similar work in engine, its LRUs or wiring should be:

i. Carried out by different persons; or

ii. Carried out in different times separated by aircraft flight hours; or

iii. Considered critical items required inspection.

9.8. Release to Service after Required Inspection:

The appropriate certifying staff assigned to sign the release to service for the

aircraft shall review all paperwork and ensure that all work has been completed

Page 380: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 38 of 42

Issue Date: 15 Apr 2012

and accepted by an appropriately authorized in rare sector prior to release of the

aircraft.

EGYPTAIR EXPRESS has assigned specific tasks as Critical Tasks Requiring

Inspection as in apendex 6.04

10. Tooling and Calibration

Maintenance Contractor and other subcontractors shall have procedures to

control and document the calibration and records of all tools, and preventing out-

of-service and due-for calibration tools and equipment from being used, in

accordance with specifications the procedures shall include:

10.1. Control of Tools/Equipment Calibration and Maintenance Scheduled and

unscheduled checking of tools/equipment.

10.1.1. Scheduled checking: Any inspection, service or calibration on regular basis

as mentioned in manufacturer's instructions or tables of scheduled

checking.

10.1.2. Un-scheduled checking: Is which may be carried out in some particular

cases such as initial reception of a tool without calibration certificate. Loss

of calibration certificate or reports after use and handling of the tool.

10.2. The Maintenance Contractor and other subcontractors shall have a clear

system of Labeling of all tooling, equipment and test equipment is therefore

necessary, providing information on:

10.2.1. when the next inspection or service or calibration is due;

10.2.2. Whether the item is serviceable or unserviceable and the reason for its

unserviceable. A Recall System for Tools/Equipment for Calibration and

Maintenance:

i. Attach calibration overdue, when the calibration due date has been

exceeded.

ii. Segregate the tool/equipment in a dedicated area labeled by "waiting for

calibration".

iii. A tool/equipment Defect Report shall be issued.

iv. Tool/Equipment shall be sent for calibration or repair.

Page 381: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 39 of 42

Issue Date: 15 Apr 2012

10.3. Subcontracting Calibration and Maintenance for Tools/Equipment:

10.3.1. The Maintenance Provider shall subcontract calibration work for

tools/equipment to approved calibration laboratories having an ISO

standard 10012-1/1992 or the standard NFX 07-010 or equivalent.

10.3.2. The Maintenance Provider shall subcontract maintain work for

tools/equipment to original equipment manufacturer (OEM), as specified by

the aircraft/component manufacturer.

10.4. Document Required After Calibration and Maintenance of Tools/Equipment:

10.4.1. Records for all tools/equipment shall be kept until two years after the item is

withdrawn from service. The following data shall be recorded for the

tools/test equipment:

i. Name, description, Part No. and serial No

ii. calibration date;

iii. calibration due date;

iv. Periodic calibration / test interval;

v. identity of individual or vendor that performed calibration or check;

vi. a calibration certificate for each item calibrated by an outside agency;

vii. details of adjustments and repairs;

viii. repair history of the tool;

ix. the part number and serial number of the standard used to perform the

calibration;

x. Maintenance tasks carried out on the tool/equipment and reference used.

10.4.2. Procedures of Acceptance:

i. Identification and Marking:

A unique identification number for each accepted tool shall be marked on

the tool in a suitable undeletable manner, and identify the tool by a

calibration sticker.

ii. Updating of Tool Register:

The tool/equipment register shall be updated by the data of the accepted

tool/equipment item.

iii. Tagging:

Page 382: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 40 of 42

Issue Date: 15 Apr 2012

A serviceable tag shall be issued for the accepted tool/equipment, and a

shelf/life tag for the items having shelf/life time indicating next due date.

11. Technical Record Control and Records Retention

11.1. Maintenance records are records used as the basis for issuing the certificate of

release to service (CRS) for an aircraft/component. It provides objective

evidence that the aircraft/component has been appropriately maintained.

11.2. The level of record details shall be sufficient to determine whether all items of

scheduled and unscheduled work, including trouble shooting, conforms to

the relevant data. This shall include reference to the data applied (unless

such data is indicated in the (CRS).

11.2.1. Type of inspection and a brief description of work performed including

tolerances and limits.

11.2.2. Reference to documents and tools used as applicable.

11.2.3. Date of completion of work, Name/Signature and stamp of certifying person.

11.2.4. When work constitutes major repair or major alteration, the records shall

contain the approval from the Civil Aviation Authority and from the (OEM).

11.3. Technical Records Control:

11.3.1. All Technical records shall be stored in a suitable area and shall be

protected against loss, theft, fire, weather conditions or un-authorized

access.

11.3.2. All Technical records shall be filled and stored in such a manner that the

records could be accessible to the authorized personnel. The filing and

storage system shall promote ease of ret rival, accessibility and adequate

control.

11.3.3. Only properly qualified persons shall sign maintenance record,

qualifications includes training, certification or authorization as applicable.

11.3.4. It is not allowed to intentionally enter any false entry in any record, if

correction to an inadvertent mistake is to be made in a record, the old

Page 383: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 41 of 42

Issue Date: 15 Apr 2012

writing shall be omitted in a way not to cause its complete disappearance.

Use of corrector or whitener is prohibited.

11.3.5. Paper records shall use proper paper quality that can withstand normal use

during the record retention period. Paper records shall be written with

undeletable ink.

11.3.6. An aircraft records shall not be filled for storage, unless all required data in

the records are completed

11.3.7. Retention of maintenance Records is contracted to the Main Maintenance

Contractor. Should the retention period expires, relevant records are to be

either transferred to a dead store, soft or Microfilm copies are retained

instead.

11.3.8. No records are to be destroyed without prior written consent of the ECAA,

through EGYPTAIR EXPRESS Chief Inspector.

11.3.9. The technical records which are to be maintained in a computer system

shall be updated daily and a continuous backup system is made. Backup

system is to be updated at least weekly. Computer records backups shall

be stored in a safe place a way from the area in which the original

computers are located.

11.3.10. The records constitute technical records and their retention periods:

Refer to Ch.1.06

Page 384: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.12

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 00 Page 42 of 42

Issue Date: 15 Apr 2012

This page is left intentionally blank

Page 385: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.13

EGYPTAIR EXPRESS Maintenance Inspection Department.

Issue No.: 4 Amen. No.: 01 Page 1 of 2

Issue Date: 4 Aug 2012

6.13 Forms

No. Form No. Form Title

1. EMB 170 Aircraft Technical Log

2. CRS 506B Aircraft Release to Service

3. Form 100 Airplane Weighing Form

4. Form QAF 101 Quality Audit Notification

5. Form QAF 102 Quality Audit Report

6. Form QAF 104 Corrective Action Follow-up Status

7. Form QAF 105 Non Conformity Report (NCR)

8. F12000-15 ECAA Occurrence Report ,

9. Form 121 Fortnight Status

10. Form 12120-042 Application for Permission of a Ferry Flight

11. Form 135 Certificate of Fitness

12. Form 204 Originated Document Change Request Form

13. Form 205 Deviation / Waiver Request

14. Form 311 Application for Short Term Escalation (Check/ Task)

15. Form 318 Deferred Item Extension Request

16. Form 327 Aircraft repeated discrepancy notification

17. Form 330 Accident / Incident Report

18. Form 407 A/C Deferred Defect Log

19. Form 413 A/C Cabin Log

20. Form 414 Deferred Cabin Item Log

21. LPM-LM-RAMP-08-F01 Deferred Defect Daily Status

22. Form 435 Dent & structure damage

23. Form 516 Application for Aircraft Lease

24. Form 677/A Aircraft SB/EO Compliance Status

25. Form 677/E Engine SB/EO Compliance Status

26. Form 678 AD’s Compliance/ Status

27. Chart C Basic Empty Weight and Balance Record

28. Form T1 Annual training plan

29. Form 002 Hazard/ Confidential Human Factors Report Form.

30. Form 003 Voluntary Report Form

31. Form 210 Information Bulletin

32. Form E/P 01 AD BI-weekly list revise form

33. Form E/P 02 BI-weekly AD revise form

34. Form 12000-26 Application for Aircraft RVSM approval ECAA

35. Form 134 C Component Reliability Alert Notice No

36. Form 134 S System Reliability Alert Notice No.

37. Form 139 Mandatory Investigation Action Report No.

Page 386: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4Amen. No.: 00 Page 1 of 2

Issue Date: 15 Apr 2012

6.14 Sample of Documents

Manufactures Airworthiness Data:

1. Maintenance Planning Document (MPD)

2. Aircraft maintenance manual(AMM)

3. Structural repair manual (SRM)

4. Illustrated Parts Catalogues (IPC).

5. Component maintenance manual (CMM)

6. Engine maintenance manual (EMM)

7. Alert/recommended service bulletins (inspections or modifications) (SBs)

8. Aircraft flight manuals (AFM)

9. Master minimum equipment list (MMEL)

10. Miscellaneous publications.

11. Service bulletins (inspection or modifications) (SB's)

12. Service letters/field notes/maintenance tips …etc (SL, FN, MT)

Authorities Airworthiness Data:

1. Airworthiness directives(AD's)

2. Egyptian Civil Aviation Regulations (ECAR).

3. Egyptian Aviation Circulars (EAC)

Page 387: Express Mcm Issue 4 Amend 01 4 Aug 12

MCM Part 6: Appendices

Appendix: 6.14

EGYPTAIR EXPRESS Maintenance Inspection Department.

 

Issue No.: 4Amen. No.: 00 Page 2 of 2

Issue Date: 15 Apr 2012

EGYPTAIR EXPRESS originated technical data and controlled by chief inspector

1. Maintenance Control manual (MCM).

2. Outstation Hand Book

3. Customized Maintenance Programs (MP)

4. Customized minimum equipment list (MEL) 

 

Page 388: Express Mcm Issue 4 Amend 01 4 Aug 12

A/C REG. : SU- DATE :

FROM : TO :

REVENUE

NON REV.

Item No

JCN : ATA ( 4 digits ) : REF.No.: RII? YES NO D.D. Log P.No.

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

……………………………………………………………………..

…………………………………………………………………….. ………………………………………………………………………………………………..

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. REF.No.: RII? YES NO

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

……………………………………………………………………… ……………………………………………………………………………………………….

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

JCN : ATA ( 4 digits ) : RII? YES NO

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

……………………………………………………………………… ……………………………………………………………………………………………….

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

RII? YES NO

AIRCRAFT TECHNICAL LOG Aircraft Type (Embraer 170)

(Press Hard, You Are Making 3 Copies)ECAA AOC No. 010

FLT. No.

S/No. 0 0 0 0 0 0

Hrs.LOG TIME

LANDED

FOR TRAINING FLIGHTS ONLY

SECTOR TIME

TIME B / F

ALL TIMES TO BE RECORDED IN GMT

No. of Full stop LDGS. :

Mins.

AIRBORNE

........... A

........... A

........... B

(E.E) / ACTION TAKEN

B

Insp.Sign.& Auth(RII)

Total No. of LDGS. : TOTAL TIME

Eng.Sign.&Auth

Eng.Sign.&Auth

…………………………………………………………………………

No. of Overshoots :

REF.No.:

Insp.Sign.& Auth(RII)

Eng.Sign.&Auth.

Insp.Sign.& Auth(RII)

DEFECT

REF No

Item No

…………………………………………………………………………. RII? YES NO

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………….. ………………………………………………………………………………………………..

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

…………………………………………………………………………. ………………………………………………………………………………………………………

………………………………………………………………………….

T/O-1 T/O-2 TOGA: S/N Off

Supplier Arrival Kgs

Slip No. Ltr

Density Kgs

Temperature C Departure Kgs

TYRE PRESSURE

APU

Sys 3

Main ( Right )

FUEL

Main ( Left )

OIL

Flex.:Temp C

Nose

AIRCRAFT ACCEPTED FOR FLIGHT

Capt. Name

I hereby certify that the maintenance specified above has been carried out in accordance with Manufacturer's Documents, Egyptian Civil Aviation Regulations and EGYPTAIR EXPRESS relevant approved documents .

Capt. Sign.

P/N On

Eng.Sign&Auth

.......... B

Pos. P/N Off

REF.No.:

Sys2

System Departure

1

Item No.

Engine No.

HYDRAULIC

Arrival Departure

Sys 1

Uplift

Uplift

Capt. Name

…………………. ………………………….

Capt. Sign.

Insp.Sign.& Auth(RII)

Arrival

Uplift

DAILY

S/N On

CHECK SIGN. AUTH. DATE TIME STN.

PDC/TRANSIT

A L C

WEEKLY/RAMP

A

2

4th. Copy: Engineering

3rd. Copy: Main record section

Issue 3 Amend:02 10 OCT.2011

Master Copy: On board

2nd. Copy: Departure point

Form( EMB 170)

A L C

Page 389: Express Mcm Issue 4 Amend 01 4 Aug 12
Page 390: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Page 1 of 4 Form 100

Issue Date: 15 Apr 2012

Weighing Report

A/C TYPE : ERJ 170-100LR A/C REG :

MSN :…………………… DATE :

(I) EQUIPMENT :-

MODEL P/N S/N CALIBRATION EXP. DATE

(II) A/C CONFIGURATION 1) WING T/E & L/E FLAPS RETRACTED 2) SPOILERS AND SPEED BRAKES RETRACTED 3) HORIZONTAL TAILPLANE AT O DEG. POSITION. 4) LANDING GEARS DOWN 5) DOORS CLOSED

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

(III) REASON FOR WEIGHING ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

(IV) A/C WEIGHING CONDITION

CONDITION SITUATION

REMARKS YES NO

WITHOUT CREW

WITHOUT FUEL

WITH ENGINE,APU and IDG OIL "NORMAL"

WITH HYD. , FLUIDS "NORMAL"

WITHOUT TEST INSTRUMENT

WITH WATER TANKS "EMPTY"

WITHOUT BALLAST

WITHOUT ENGINE PLUGS

WITH PASSENGER SEATS ( F/C + HOR + Y/C )

WITH SAFETY EQUIPMENTS

'WITH FLIGHT DOCUMENTS

'WITH FERRY FLIGHT KIT

'WITH SPARE WHEELS

WEIGHING CARRIED OUT BY : SIGN.&STAMP

Page 391: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Page 2 of 4 Form 100

Issue Date: 15 Apr 2012

A/C REG :

DATE :

(V) PLAT FORM

READINGS :-

W&B M

WHEELLOCATION LOAD (KG)

CONSUL W&B M 1st 2nd 3rd AVERAGE

1 1

2 2

3 3

4 4

5 5

6 6

TOTAL

(VI) CALCULATION EQUATIONS Formula: XCG (m) = [N * (XN * cos- ZN * sin) + M * (XM * cos- ZM * sin) + W * sin* ZCG] / W * cosXCG (m) = Distance from DATUMmeasured parallel to the fuselage center line, in meters.

• XN = X position of the nose-landing-gear wheel axle.

• ZN = Z position of the nose-landing-gear wheel axle.

• XM = X position of the main-landing-gear wheel axle

• ZM = Z position of the main-landing-gear wheel axle.

W = N + M = Total aircraft weight (Kg).

• N = Nose landing gear reaction, total (Kg).

• M = Main landing gear reaction, total (Kg).

• = Aircraft pitch attitude.

• ZCG (m) = - 0,606 (constant value).

(VII) CALCULATION RESULTS

W = KG

Hn = Hm = (deg)= 0o

Xn = Xm =

XCG=

WEIGHING CARRIED OUT BY: SIGN&STAMP

4

2

6

5

1

3

Xn

Xm

Page 392: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Page 3 of 4 Form 100

Issue Date: 15 Apr 2012

A/C REG. :

(VIII) OVERAGE ITEMS DATE :

ITEM NO. DESCRIPTION WEIGHT (Kg)

ARM (m)

MOMENT (Kg.m)

TOTAL

(IX) SHORTAGE ITEMS

ITEM NO. DESCRIPTION WEIGHT (Kg)

ARM (m)

MOMENT (Kg.m)

TOTAL

WEIGHING CARRIED OUT BY: SIGN&STAMP

Page 393: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Page 4 of 4 Form 100

Issue Date: 15 Apr 2012

A/C REG. :

(X) FINAL RESULTS DATE :

WEIGHT TERMS WEIGHT

(Kg) ARM (m)

MOMENT (Kg.M)

PLATFORM TOTAL VALUES

OVERAGE TOTAL VALUES

SHORTAGE TOTAL VALUES

STANDARD TOTAL VALUES

MAC% = [BALANCE ARM – 12.925]* x100/3.194

MAC% =

A/C TOTAL WEIGHT = Kg

I HEREBY CERTIFY THAT WEIGHING IS CARRIED OUT IN ACCORDANCE WITH EMB 170 WEIGHT & BALANCE MANUAL AND AMM PART 2.

ENGINEER SIGN. & STAMP

INSPECTOR SIGN. & STAMP

NOTE: TO GETOPERATIONAL EMPTY WEIGHT OPERATIONAL ITEMS SHOULD BE ADDED

- CERW AND BAGGAGE - CATERING - WATER AND WASTE

Page 394: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue 03 amend : 01 Form 101

Issue date: 15 Aug. 2010

Quality Audit Notification

To: EGYPTAIR M&E QUALITY ASSURANCE DIRECTOR. Date of Audit : -- /-- /20--

Audit References: MCM,ECAR 121,–

Audit Subject(s) :

-

Audit Team :

-

Audit Program:

Time Activity Time Activity

09:00

09:30

15:30

16:00

OPENING MEETING.

AUDIT PERFORMANCE.

AUDIT FINISH

CLOSE-UP MEETING & DEBREIFING

Quality Audit Manager: Signature: Date:

Received By :

Name: ..................................................……………………. Position: ……………………………………………………

Comments:

……………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………….

Department manager: Date:

Page 395: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue 03 amend :0

Issue date: 15 Aug 2010

Form 102

Quality Audit Report

Date: ..........................……..... Audit Control No.: ………………………………..

No. Discrepancy Evidence Reference Corrective Action Person in Charge Suspense Date

Auditee Representative: Auditor: Signature:

Page 396: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 3 Amen. No.: 00 Page - of - Form 102

Issue Date: 15 Aug 2010

QUALITY AUDIT STATUS 20--

Audit Report Data Follow-up Data

Ser. Audit

Area / Activity Audit

Control No. Audit Finding

title

NCR Data Audit

Date

Report

Issue

Date

Expected

Response

Date

Actual

Response

Date

(Accepted)

Closing

Date

(Unaccept)

Re-audit

Date

Comments No.

Finding Level

1 2 3

Page 397: Express Mcm Issue 4 Amend 01 4 Aug 12

NON-CONFORMITY REPORT (NCR)

Issue 03 amend : 01 Page 1of 2

Issue date: 15 Aug 2010

Part I: EgyptAir Express Quality Audit:

Audit Control No.

NCR No. Audit date Report Issue Date

Audited Area

QAF1--/--/-- -- --/--/-- --/-- /--

ECAR Ref. MCM Ref. Others Level of Nonconformity

121. 1.10 Maint. Contract 1 2 3

Auditor Name(s):-

Response Date:-

Description of Findings (Evidence is recommended)

Name Signature Date Auditee Rep. Eng. Quality auditor. Eng.

Part II: Auditee Company/ Department:

1- Root Cause:

Name: Eng. Sign: Date:

Page 398: Express Mcm Issue 4 Amend 01 4 Aug 12

NON-CONFORMITY REPORT (NCR)

Issue 03 amend : 01 Page 2of 2

Issue date: 15 Aug 2010

Corrective/ Preventive Actions to be taken Responsible Committed Date

2- Corrective Action:

3- Preventive Action: Name: Eng. Sign: Date: Part III: EgyptAir Express Quality Audit Evaluation and Verification:

Evaluation and Verification

The above Corrective/ Preventive Action/Plan is o Satisfactory o Unsatisfactory Reason (If Unsatisfactory) If Satisfactory o No need for audit and considered closed o Needs Re-AuditTo be re-audited before : Actual date of re-audit : Auditor Name :Eng. Sign: Date:

Lead Auditor : Eng. Sign: Date:

Re-Audit Follow Up

The Non-Conformity is considered as: o Closed o Open

Closed Date : Issue new NCR No: Auditor Name : Eng Sign: Date:

Lead Auditor : Eng Sign: Date:

Page 399: Express Mcm Issue 4 Amend 01 4 Aug 12

Occurrence Report

Issue: 1 date: Dec 2009 F12000-15

To be sent to : EC AA

FLIGHT SAFETY STANDARDS SECTOR

Egyptian Civil Aviation building, CAIRO AIRPORT Road, A.R.E.

Complete all sections where information is relevant Date Received by ECAA ECAA O ccurrence No.For multi-choice boxes, indicate which entry is appropriate

Aircraft Type and Series Registration Operator Date of Occurrence Flight Phase Nature of fl ight

PARKED SCHIED PAX

FLIGHT AND WEATHER DETAILS TAXYING NON-SCHED PAX

TAKE-OFF SCHED FREIGHT

Flight No. DAY WIND Runway Precipitation Icing Turbulence INIT CLIMB NON-SCHED FREIGHT

NIGHT CLIMB SURVEY

TWILIGHT Used CRUISE PLEASURE

From IAS RAIN LIGHT LIGHT LIGHT DESCENT AGRICULTURAL

Kts State SNOW MOD MOD MOD HOLDING BUSINESS

To TIME Height DRY SLEET HEAVY HEAVY SEVERE APPROACH CLUB / GROUP

GMT Ft WET HAIL EXTREME LANDING PRIVATE

Geog. Position VISIBILITY O.A.T . ICE Cloud Type CIRCUIT POSITIONING

C SNOW Height / Ft AEROBATICS FERRY

SLUSH Amount / 8ths HOVER TEST

TRAINING

DESCRIPTION :

ENGINEERING DETAILS Constructor No Engine Type & Series Ground phase Maintenance Ground Handling

Unattended Taxying

Component / Part Location on aircraft Manual Overhaul / Repair Agency Maintenance Manufacturer advised

Reference Program N/A

OC CM HT

Manufacturer Part No. Serial No. Hours / Total Since Overhaul/

Cycle /Landings Inspection

Any published Airworthiness information relevant to occurrence (e.g. Mod / Insp. / Repair) plus compliance status of aircraft or equipment

Organization

Reference No. SignatureDate:- Name:-

Repair/

EXPRESS

EGYPT AIR EXPRESSAddress and Tel. No.:- EGYPTAIR COMPANY COPLEX, SOUTH BUILDING, CAIRO AIRPORT RD. ,CAIRO , EGYPT.

Position:- CHIEF INSPECTOR

Page 400: Express Mcm Issue 4 Amend 01 4 Aug 12

FORTNIGHT REPORT

A/C Up To :

A/C RegHours Installation

Time Since New

Total cycles Time SinceCycle Since

Removal at Rem S/N Installation..\FLIGHT Cycles Date (T.T) (T.C) LSV LSV (T.C) cycles Date

Position S/N

Aircraft Engine Auxiliary Power Unit

Status of Engine Model Spares

a) Stand by Engines b) Engines At Shop c) Engines Abroad

Remarks :

Prepared by : Reviewed by : Maint. Director :

Issue No.: 4 Amen. No.: 00 Page 1 of 2 Form 121Issue Date: 15 Apr 2012

Page 401: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Page 1 of 1 Form 678

Issue Date: 15 Apr 2012

AD’s Compliance / Status

* Aircraft Type : ERJ 170-100LR Registration SU-…… Serial No…………….. * Engine/Part Part No./Type : Serial No.

No. AD/CN No. S.B No. Issue Date E.O No. Subject Effective

Date Compliance

Limit from E. Date Compliance

Date REP

UNIT

* Fill either one according to application

Revised By Maintenance Manager:

Name :……………………………………………………. Signature:……………………………………………… Date :…………………..…………..……

Page 402: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Page 1 of 1 Form 677

Issue Date: 15 Apr 2012

Aircraft SB/EO Compliance - Status

* Aircraft Type : ERJ 170-100LR Registration SU-……. Serial No …………....

No. S.B No. Issue Date AD/CN No E.O No. Subject Compliance

Limit Compliance

Date REP

UNIT

* Fill either one according to application

Revised By Maintenance Manager:

Name :……………………………………………………. Signature:……………………………………………… Date :…………………..…………..……

Page 403: Express Mcm Issue 4 Amend 01 4 Aug 12

Application for Permission of a Special Flight- Form No 12120-042

Flight Test Sign Tow

Ferry Flight Positioning Flight

Section1: To be completed by the applicant

1- Owners Name 2- Operator

3- Mailing Address of Company 4- Telephone #

5- Fax #

6- A/C Nationality & Registration Marks 7- A/C Make & Model

8- Engines Type and Manufacturer

9- Propellers Model and Type

10- Reason for Flight Date

11- Additional Information provided and attached NO

YES 1) 2) 3)

I hereby certify that the above A/C has been maintained according manufacturer maintenance manuals and according to manufactures maintenance schedule and the aircraft is found airworthy and eligible for ------------------------

Name of Engineer In Charge Position:

License Number Signature:

Date:

Section2. For Official Use Only

Received By Date:

Department assigned responsibility: Date forwarded to Department

AID TLD MD

Approval Number:

Remarks

Page 404: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Page 1 of 1 Form 677 /E

Issue Date: 15 Apr 2012

Engine SB/EO Compliance - Status

* Engine: CF34-8E5 Position : …. Serial No. ………………

No. S.B No. Issue Date AD/CN No E.O No. Subject Compliance

Limit Compliance

Date REP

UNIT

* Fill either one according to application

Revised By Maintenance Manager:

Name :……………………………………………………. Signature:……………………………………………… Date :…………………..…………..……

Page 405: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No: 04 Amen:01 Form E/P 01

Issue Date: 4 Aug 2012

A.Ds Bi-Weekly List

check

Bi-Weekly No:

A.Ds List from Library is Typical to Authority Publication

Yes

No:

Difference If Exist: ……………………………………………………………………………………………………………………………….………

…………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………….

……………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………….

……………………………………………………………………………………………………………………………………….

Conclusion:

……….……………….……………….……………….……..………………………………………………

………...………………………………………...……………………….…………………………………..

……….……………….……………….……………….……………….……………………………………

……….……………….……………….……………….……..………………………………………………

………...…………………………………………………………………………………………………………..

………………………………………………………………………………………………………………………….

…………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………

Prepared by :

Name: Position: Date:

Page 406: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue: 04 Amen: 01 Form E/P 02

Issue Date 4 Aug 2012

A.Ds Bi-Weekly

revise

A/C Type: AD No:

Current Status ( E.O #) Follow Up

Effective Date

Repetitive Rep. interval

Terminate Date

N/A Reason

Difference If Exist: ……………………………………………………………………………………………………………………………….………

…………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………

Conclusion:

……….……………….……………….……………….……..………………………………………………

………...………………………………………...……………………….……………

……….……………….……………….……………….……………….………

……….……………….……………….……………….……..………………………………………………

………...………………………………………………………………………………………………..

……………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………….

……………………………………………………………………………………………………………………….

…………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………….

Prepared by :

Name: Position: Date:

Page 407: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 3 Amen. No.: 01 Form 135

Issue Date: 15 Oct 2011

Certificate of Fitness for Flight Test

A/C Type : .........................................................

A/C Reg. : ...........................................................

Nationality : ............................................................

I hereby certify that the aircraft define here on has been inspected and is fit for test flight.

The certificate is valid until .....................................or until the airworthiness condition of

The aircraft is altered whichever comes earlier .

( ........................................................ ) “ A “ License No.

( ........................................................ ) “ C “ License No.

( ....................................................... ) “ X “ License No.

Airworthiness Department Approval :

The aircraft defined SU - ......................... is approved for flight test within 7 days.

C.A.S.A. INSPECTOR

NAME: .................................................................

SIGN. : ..................................................................

DATE: ..................................................................

Page 408: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Form 204

Issue Date: 15 Apr 2012

Originated Document Change

Request Form

Manual/Document Title.....................................................…………………. Control No.............................……………

Chapter/Section............................ Subject........................................................................………………….

Issue Date.........................………….. Revision/Date............…………. Page No....................................……………..

Brief Description of Change Subject

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

References

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

Corrections /Recommendations

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

.......................................................................................................................................................

......................................................................................................................................................

......................................................................................................................................................

......................................................................................................................................................

Department Name Signature Date …………………………… …………………… ……………………. ……………

Chief Inspector Comment

.......................................................................................................................................................

Name: ………………………………………. Signature…........….……….. Date..............

Page 409: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Form 205

Issue Date: 15 Apr 2012

Deviation / Waiver Request No : ……………………..

(1) Subject (Aircraft-Part-Task-Procedure-Others): ...........……........…….……………..............

(2) Title of deviation/ waiver*...........................................................................................

(3) Requested by: Name......................................................... position....................………......

(4) Class of deviation/ waiver minor* major*

(5) Details of affected part

......................…………………………...................................................................................................................

......................…………………………...................................................................................................................

......................…………………………...................................................................................................................

(6) Airworthiness data affected ( E.O. - AMM -IPC - AWM - CMM - SRM ……… Others )*

......................…………………………...................................................................................................................

......................…………………………...................................................................................................................

......................…………………………...................................................................................................................

(7)Discrepancy Details

......................…………………………...................................................................................................................

......................…………………………...................................................................................................................

......................…………………………...................................................................................................................

(8) Recommended action

......................…………………………...................................................................................................................

......................…………………………...................................................................................................................

......................…………………………...................................................................................................................

(9) Reason for deviation / waiver request

Initiator/Requester Name: ……………………………………. Position:………………………….

Signature: .....…………………..…………........... Date`...…………………...........

Engineering Director Accept Deny

Comments:………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

Signature: .....…………………..…………........... Date`...…………………...........

Chief Inspector Accept Deny

Comments:………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

Signature: .....…………………..…………........... Date`...…………………...........

ECAA Accept Deny

Signature: .....…………………..…………........... Date`...…………………...........

* cross out the non applicable item

Page 410: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 01 Page 1 of 1

Issue Date: 4 Aug 2012

Information Bulletin

Sheet …… of ……

I.B No. : …………………..………….…... Aircraft type : ………………..………………… Date : ….…/ .……/ .………

Subject : ..……………………………………………………………............................................ ATA : …..…………….………

Reference : ...................…………………........................................….. Our reference : ………………..…….……………….……....

Background :

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

Actions :

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

..........................................................................................................................................................................................................

Recommendation :

……………………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………………

Prepared by : Name : ………………........................................ Signature : …....……………......

Reviewed by : Name : ………………........................................ Signature : …....…………….......

Approved by : Name : ………………........................................ Signature : …....……………......

Page 411: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 3 Amen. No.: 00 Form 311

Issue Date: Mar 2010

Application for Short Term Escalation (Check/ Task)

A/C Type A/C Registration Customer Check / Task Card Interval

Part 1 : Data

A/C Current Data Flt hrs:…….…. Cycles:………… Calendar:…….…

Task / Check due at Flt hrs:…….…. Cycles:………… Calendar:…….…

Task / Check Proposed at Flt hrs:….……. Cycles:………… Calendar:……….

Proposed Escalation Flt hrs:……….. Cycles:………… Calendar:……….

Reason for Escalation: …………………….………………………………………………………………………………………………..……….

Is the Check/Task previously escalated? No Yes , Specify :……………………………….

Period Flt hrs:……….. Cycles:………… Calendar:……….

Last check carried out at Flt hrs:……….. Cycles:……….. Calendar:………..

I hereby certify that the item required to be escalated does not contain any of the items specified in operations specifications

Escalation Prohibitions.

Name: ………………………………….….. Sign.& Stamp. : ………………..……… Date: …………………………

Note : Attach the relevant task card

Part 2:-Quality Control Recommendations

Inspector recommendation: (if required) ……………………………………………………………………………………………………………………………………………………………

Name: ………………………………….….. Sign : ……..……..…………………. Date: …………………………

Part 3 : Aircraft Records Verification

Above data is correct Yes No If No, Specify:-…………………………………...

Date :………………… Flt hrs:………..…….. Cycles:……………….. Calendar:…………..….

Does the proposed escalation Affects component/part?

No Yes If Yes, specify:-…………………………

Description: ……………………………….. P/N: ………………………………………………………………… S/N: …………………………

Operating Time Due at After Escalation, Due at Main Record

T.S.N T.S.O T.S.T Name: ………………………..

Sign: ……………. Date: ……………………

Part 4 : Escalation Authorization

ECAA approval required? Yes No

Check/Task Escalated to Flt Hrs………… Cycles……………. Calendar:……….

Recommendations: …………………….…………………………………………………………………………………….

Customer Representative Acceptance: …………………………….…………………….. Date:-………………………..

ECAA Approval Yes No

Check/Task Escalated for Flt hrs…………….. Cycles………………. Calendar:…………

ECAA Recommendations (if Any) ……………………………………………………………………..…………………

ECAA Ref. Letter:-

Name: …………………………………….... Sign: ……………..…………………. Date: ………………………..

Page 412: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Form 318

Issue Date: 15 Apr 2012

Deferred Item Extension Request

Deferred Item

A/C Type: .........…................... A/C Reg. ...….. ........... Station: ......................... Job Control No. (JCN): .......................................

Deferral Category B C Concession Deferral date: ........................... Rectification due date: ................................

Reference manual : ...........................................................................................................................................................................................................

Discrepancy: ........................................................................................................................................................................................................................

………………………………………………………………………………………………………………………………………………………………………………..

Reason for deferral : .....................................................…….. .......................................................................................................................................

Part Required (If Applicable )

Description Part number Purchase Order No. Robbing Available Estimated available

Date Yes No

Production Control Department

Requested extension for rectification ..........................………………………………………………..................................................……………………..

Reason for extension: ...................................................................................................................................................................................................

..............................................................................................................................................................................................................................................

ECAA Approval Required ? No Yes

Name (P.C.D.) ..................................................... Signature: ............................................... Date: .........................................

Approval

Extension Request is : Denied Approved up to: ............…… ................. Submitted to

ECASAECASA Approval Not Required

Director, Quality Assurance & Control

Name: ................................................ Signature: ..................................................... Date: ................................................

ECAA Approval Required

E CAA Administrator

Name: ..................................................... Signature: ................................................. Date: ................................................

Page 413: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Page 1 of 1 form 327

Issue Date:15 Apr 2012

A/C Repeated Discrepancy Notification

A/C Type: …………………………...………………… A/C Registration: ………………………………………….

No. Date J.C.N. Discrepancy Action Taken Reference

For T/S: ………………………………………………………….………. Signature: ……………………………………… Date: ...……………………………….

Page 414: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue: 04 Amend : 00 Form 330 Issue Date: 15 Apr 2012

واقـعة/ نموذج إبالغ عن حادث

Accident / Incident Reporting Form

....... .... .... .... .... .... ... ... ...: (Address) الجهة التابع لها .………………………………… : ( Originator)اسم المبلـغ

زز: (Date & Time) ساعة و تاريخ اإلبالغ ………………………………: (.Tel/Fax No)الفاآس/رقم التليفون

( Accident Data)بيانات الحادث أو الواقعة

Flt)رقم الرحلة -٣ .……… … (A/C Type)طراز الطائرة – ٢ ………… : (.A/C Reg)حروف تسجيل الطائرة – ١

No ): :( Purpose of Flight)الغرض من الرحلة – ٥ ………………………… (A/C Owner)ثمر المست/ مالك الطائرة – ٤

……….………………………………………………………: (Place of accident/Incident)الحادث/ مكان و موقع الواقعة – ٦

(Time)الحادث / ساعة و تاريخ الواقعة – ٧

.………………………………………………………..……………………: (Names of Flight Crew) أسماء طاقم القيادة – ٨

: ( Phase at which the accident / incident take place) الحادث/ المرحلة التي حدثت خاللها الواقعة – ٩

accident / incident (Summary( الحادث / ملخص الواقعة – ١٠

of:………………………………………………………………………………………………………………………………

……………….……………………………………………………………………………………………………………

.....................…………………………………………...…………: (Injuries to personnel)اإلصـابـات باألفــراد – ١١

..........………………………………………………………………… (Damages to property)التـلفـيات المبـدئيـة – ١٢

…………….……………………………..……………………………………………………………………………….

.…………………………………………………………………..…………… : (Other damages)التـلفـيات األخرى – ١٣

……………………..……………………………………………………………………………………………………….

: (Additional Information)أى معلومات أخرى يرى المبلغ إضافتها – ١٤

…………………………..…………………………………………………………………………………………………

: )إن وجد(بيانات محضر الشرطة – ١٥

) : إن وجد(رقم و تاريخ محضر الشرطة –أ

: المتسبب –ب

(For MCC)عن مرآز مراقبة الصيانة

.........…………………..….… / (Name)االســم

…………………………………/ (Job Title) ةالوظيــف

................……………...………/ (Signature)التـوقيــع

Page 415: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Form 407

Issue Date: 15Apr 2012

A/C Deferred Defect Log

No.: ……………………….

Originated from D M Y MCC Control No.

A/C Type Station Tech. log Cabin log Related log page No./Item Def. date

A/C Reg. S U - Maint. log JCN

Deferred Defect Rectification

ATA (4 digits): A

……………………………………………………………….. .....…...................................................................................

………………………………………………………………. .........................……............................................................

……………………………………………………………….. ................................……......................................................

………………………………………………………………. Ref. No.: RII? Yes No

B REF. (MEL/CDL/AMM/SRM...): ........................................................................................

Required Action: .......................................................................................

Operation (O) Repetitive Yes No ........................................................................................ Maintenance (M) Repetitive Yes No

Ref. No.: RII? Yes No If Operation, it should be denoted, If Maintenance, be sure of being executed

Deferral Category: Rect. Due (date/Flt. Hrs.) Item P/N off S/N off P/N on S/N on Pos Tot. Mhr

Deferral Reason:

Required Item Description:……………………..………………………….………..

P/N:………………………………… Voucher No.:…………..………

I hereby certify that the Maintenance specified above has been carried out in accordance with Manufacturer’s documents, Egyptian Civil Aviation Regulations and Maintenance Control Manual (MCM).

I hereby certify that the above defect is deferred in accordance with the mentioned reference and does not affect the safe operation of the aircraft.

Eng. Sign & Stamp:

Extension No. Extension To (Date/ Fhr) Eng. Sign & Stamp Item Eng. Sign & Stamp Insp Sign & Stamp (for RII) Station Rec. Date

Note: Only one deferred defect is to be entered, all entries in capital letters

Page 416: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00 Form 413

Issue Date: 15 Apr 2012

A/C Cabin Log Ser.

( )

A/C Type: A/C Reg.: SU. Flt. No. MS: From: To: Date:

DEFECT ACTION TAKEN Certification

Item: ATA: JCN: Item: Trans. To deferral log 407 414 Page No.: Eng. Signature & Stamp

………………………………. ………………………………………………………………………… ………………………………………………………………………….. Insp. Sign & Stamp (for RII)

………………………………………………………………………… ………………………………………………………………………….. ………………….……………

………………………………………………………………………… ………………………………………………………………………….. Date: ……..………. Stn: ………..

………………………………………………………………………… ………………………………………………………………………….. C.A. Tech Name & Sign

Reported by: CDC CA Eng Stn: …….… Name & Sign: Reference: RII? Yes No ……………...……….……………….

Date: …………. Stn ...………..

Item: ATA: JCN: Item: Trans. To deferral log 407 414 Page No.: Eng. Signature & Stamp

………………………………. ………………………………………………………………………… ………………………………………………………………………….. Insp. Sign & Stamp (for RII)

………………………………………………………………………… ………………………………………………………………………….. ………………………………

………………………………………………………………………… ………………………………………………………………………….. Date: …………. Stn...………..

………………………………………………………………………… ………………………………………………………………………….. C.A. Tech Name & Sign

Reported by: CDC CA Eng Stn: …………. Name & Sign: Reference: RII? Yes No …………………….……………….

Date: …………. Stn...………..

Item: ATA: JCN: Item: Trans. To deferral log 407 414 Page No.: Eng. Signature & Stamp

………………………………. ………………………………………………………………………… ……………………………………………………………………….… Insp. Sign & Stamp (for RII)

………………………………………………………………………… ……………………………………………………………………….… …………….…………………

………………………………………………………………………… ………………………………………………………………………….. Date: …………. Stn...………..

………………………………………………………………………… ………………………………………………………………………….. C.A. Tech Name & Sign

Reported by: CDC CA Eng Stn: …….……. Name & Sign: Reference: RII? Yes No …………………….……………….

Date: …………. Stn...……….. Reason for Removal Codes:

Item No. Description P/N off S/N off P/N on S/N on Qty Pos Rem Code

Total MHr

01 Defect 02 Time Control

03 Task Card 04 Trouble-Shooting

05 Modification 06 Robbing

07 Loan/Pool return 08 Others

I hereby certify that the maintenance specified above has been carried out in accordance with Manufacturer’s documents, Egyptian Civil Aviation Regulations and Maintenance Control Manual (MCM)

A/C Supervisor (Sign & Stamp): ………………………………...……….…………...

Date: ……………..…….……….

Page 417: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 3 Amen. No.: 00 Form 414

Issue Date: Mar 2010

Deferred Cabin Item Log

No. :.................................

A/C Type Station Cabin Log Page No. Item No. Deferral Date J.C.N

A/C Reg SU-

D M Y

Deferred Defect Rectification

ATA (4 digits) ................................................................................................................................................

..................................................................................................... ................................................................................................................................................

..................................................................................................... ................................................................................................................................................

..................................................................................................... ................................................................................................................................................

..................................................................................................... ................................................................................................................................................

..................................................................................................... ................................................................................................................................................

..................................................................................................... ................................................................................................................................................

Ref. No. (AMM/SRM/….): Reference No.:

Rect. Due (date/Fhr./…..):

Deferral Reason: P/N off S/N off P/N on S/N on Pos. Tot. Mhr

Required Item Description: ………………………………………

P/N Required: ……………………… Voucher No.: ……………

Technician Name & Sign Technician Name & Sign

Name: ……………………………………….. Sign: ……………………………. Name: ………………………………………….. Sign: …………………………….

I hereby certify that the above defect is deferred in accordance with the mentioned reference and does not affect the safe operation of the aircraft.

I hereby certify that the maintenance specified above has been carried out in accordance with Manufacturer’s documents, Egyptian Civil Aviation Regulations and Maintenance Control Manual (MCM).

Eng. Sign & Stamp :……………………………… Date: ………....……… Eng. Sign & Stamp: ………………………...............…..……… Date: ………..................................

Note: Only one deferred defect is to be entered, all entries in capital letters

Page 418: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 3 Amen. No.: 00 Page 1 of 2 Form 516

Issue Date: Mar 2010

Application for Aircraft Lease

Particulars of the lessor

Name: …………………………………..………… Country: ……………………….………………………..

Registered office: ……………………………..…. Head office: ……………………….…………………….

Postal address: …………………..…….……………………………………………………………………………………….

Telephone number: ………………………..…… Fax: …………………………………………………..

Particulars of the lessee

Name: …………………………………..………… Country: ……………………….………………………..

Registered office: ……………………………..…. Head office: …………………………………………….

Postal address: …………………..…….……………………………………………………………………………………….

Telephone number: ………………………..…… Fax: ……………………………………………….…..

Lease General Details

Type of lease: ……………………………………………………………….

Lease duration from ……………………… to …………………………

Registration marks of leased aircraft………………………………………………………………………………………………………….….

Serial number of leased aircraft: ………………………………………………………………………………………………………………….

Maintenance base: ………………………………………………………………..

Type of operation

Scheduled Charter

Passenger Cargo Combined

Areas of operation

International Local (Specify): …………………………………………………………………

Responsibility for

Airworthiness: ………………………………………………..…. Maintenance: …………………………………………………………

Servicing: …………………………………………………….. Dispatch: ………………………………………………………………

Exposition manual: … …………………………………………... Up-Keeping of documents and records: …………………………..

Performance: ……………………………………………………. Crew members and training: ……………………..…………………

Operational procedures (control & scheduling): …………………………………………………………………………….……………….….

Maintenance status of aircraft

Approved maintenance program reference: ………………………………………………………………………………………………………

Next major maintenance due at: …………………………………………………………………………………………………………………..

Page 419: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 3 Amen. No.: 00 Page 2 of 2 Form 516

Issue Date: Mar 2010

Application for Aircraft Lease

Official copies of documents required (if leased aircraft are registered in another country):

Certificate of registration

Certificate of airworthiness

Certificate of insurance

Certificate of compliance with airworthiness directivities

5- Crew license in case of wet lease

Certificate of Operational control:

I the undersigned assume the responsibility of the operational control of aircraft listed in this application, and undertake to comply

with the limits and procedures lay down by: ………………………… during the lease period from: ……………… to: ……………..

for and behalf of lessor.

Job Title: …………………………. Signature: ……………………………… date: …………………………

It is requested that lease agreement (copy attached) in respect of aircraft listed in the application may please be

recognized by you, and we will provide all facilities for any inspectors required.

Lessor

Name: …………………………………………………..

Signature: ……………………………. Date: …………………….

Lessee

Name: …………………………………………………..

Signature: ……………………………. Date: …………………….

For official use only

Inspections findings: ………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

Inspectors

Name: ……………………………….. Signature: ……………….…………………. Date: …………………….

Central Department of Airworthiness decision

.…………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………………………

Head of Central Department of Airworthiness:

Name: ……………………………….. Signature: ……………….…………………. Date: …………………….

Page 420: Express Mcm Issue 4 Amend 01 4 Aug 12

DENT AND BUCKLE CHARTAircraft Type and Model EMB-170

Aircraft Registration

Issue:4 Amend:01 Date :4 Aug 2012 Page 1 of 1 Form 327

ItemNo./Sheet

No.

Damage Type No.

Damage Location DateApproved Referance

Inspection Interval

Repair Before

TLB/NRC/TC No.

StationCertifying

Staff Stamp

Remarks/Action TakenDamage Dimensions

Issue:4 Amend:01 Date :4 Aug 2012 Page 1 of 1 Form 327 Issue:4 Amend:01 Date :4 Aug 2012 Page 1 of 1 Form 327

Page 421: Express Mcm Issue 4 Amend 01 4 Aug 12

30 August 2012 Page 1

ENGINE #1 FAN BLADES

S.N:

Page 422: Express Mcm Issue 4 Amend 01 4 Aug 12

30 August 2012 Page 2

ENGINE #2 FAN BLADES

S.N:

Page 423: Express Mcm Issue 4 Amend 01 4 Aug 12

30 August 2012 Page 3

ENGINE S.N:

ENGINE S.N:

Page 424: Express Mcm Issue 4 Amend 01 4 Aug 12

30 August 2012 Page 4

Page 425: Express Mcm Issue 4 Amend 01 4 Aug 12

EMB-170 Engine pos. 2

SU- Referance ESM72-21-13

Blade No.

Damage Type No.

Damage Area DateInspection

IntervalRepair Before

TLB/NRC/TC No.

StationCertifying Staff

StampRemarks/Action Taken

FAN BLADES DAMAGE CHART

Aircraft Type and Model Engine Type CF34-8E

Aircraft Registration EngineS.N

Damage Dimensions

Issue no.: (01) Issue Date: 18/4/2012

1 OF 1Updated On 8/30/2012 LPM-RECORDS-02-F(02)

Page 426: Express Mcm Issue 4 Amend 01 4 Aug 12

EMB-170 Engine pos. 1

SU- Referance ESM72-21-13

Blade No.Damage Type No.

Damage Area Date Inspection IntervalRepair Before

TLB/NRC/TC No.

StationCertifying Staff

StampRemarks/Action Taken

FAN BLADES DAMAGE CHART

Damage Dimensions

Engine Type

EngineS.N

CF34-8E

Aircraft Registration

Aircraft Type and Model

Issue no.: (01) Issue Date: 18/4/2012

1 OF 1Updated On LPM-RECORDS-02-F(02)

Page 427: Express Mcm Issue 4 Amend 01 4 Aug 12

CAMO Local Procedure Manual

Technical Services Directorate Reliability Department

Component Reliability Alert Notice No. : CAN XXXX (Customer / ACType)

(P/N / Description)

Overhaul shop / Repair and warranty Technical Service

Delivery date Target date Receiving date Delivery date Target date Receiving date

dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy

Study Period ATA ETOPS Significant # of Removals Rate Alert Rate Previous Alert.

Quarter/Year Yes No Yes No

To Overhaul Shop / Repair and Warranty: As per attached component reliability analysis report, give the shop finding report and repair text for all S/Ns included in that report.

Overhaul Shop / Repair and Warranty investigation:

Attachments:

Shop Chief Inspector: Dep. MGR : Director: Date: dd/mm/yy

Technical Services Recommendation:

Attachments:

Eng. in Charge: Dep. MGR : Director: Date: dd/mm/yy

RCB Decision:

Reliability Follow-UpAlert Report Issued by reliability

O/H / Repair & warranty

Reply

Corrective Action By

Engineering

RCB Approval

Reliability alert Follow-

Up

2nd Alert Report Issued

New Corrective

Action

Reliability alert Follow-

Up Alert Closed

Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

2012 2013 Component Removal rate: No. Of unscheduled Removals per 1000 F/Hs ISSUE: 01 LPM-TS-RB-01F (1 C) ISSUE DATE:01/05/2012 Form 134 C

Page 428: Express Mcm Issue 4 Amend 01 4 Aug 12

CAMO Local Procedure Manual

Technical Services Directorate Reliability Department

System Reliability Alert Notice No. : SAN XXXX (Customer / A/C Type) PIREPS (Month. Year)

ATA ETOPS Significant

# of PIREPS

Rate Alert Rate Delivery Date

Target Date

ATA Previous Alert.

Yes No dd/mm/yy dd/mm/yy Yes No

PIREPS Last 12 Months

0

0.5

1

1.5

Month 1

Month 2

Month 3

Month 4

Month 5

Month 6

Month 7

Month 8

Month 9

Month 10

Month 11

Month 12

Month 1

Rate

Alert

A/C 18% A/C 2

7%A/C 36%

A/C 48%

A/C 56%A/C 6

2%A/C 77%A/C 8

6%A/C 96%

A/C 103%

A/C 115%

A/C 126%

A/C 132%

A/C 143%

A/C 155%

A/C 163%

A/C 174%

A/C 183%

A/C 194%

A/C 205%

Reliability investigation Within (Month. Year):

Technical Services Recommendation:

Attachments:

Eng. in Charge: Dep. MGR : Director: Date: dd/mm/yy

RCB Decision:

Reliability Follow-UpAlert Report Issued by reliability

Corrective Action By

Engineering

RCB Approval

Reliability alert Follow-

Up

2nd Alert Report Issued

New Corrective

Action

Reliability alert Follow-

Up Alert Closed

Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

2012 2013 PIREPS: Pilot Reports Rate: # Of PIREPS per 100 flights LPM-TS-RB-01F (1S) ISSUE: 01 ISSUE DATE: 01/05/2012 Form 134 S

Page 429: Express Mcm Issue 4 Amend 01 4 Aug 12

CAMO Local Procedure Manual

Technical Services Directorate Reliability Department

Mandatory Investigation Action Report No. : ASD XXXX (Customer, A/C Type)

A/C Reg. From To Date Time ATA – Sub Check Ref. Task Area/Zone J.C.N.

Defect Reported By Pilot Report (A/C Tech. Log Page) No ……………..

Non Routine Card (NRC) No …………….. o Base Maint. o Line Maint.

A/C Flight Status

Delay (Time). Cancelation. A/C Turn Back (ATB). A/C Diversion.

Discrepancy Category

Technical Incident. Significant ETOPS Discrepancy. Significant (Non – Structure).

Common Discrepancy (A/C Type). Repeated Discrepancy (A/C Reg.).

Discrepancy:

Technical Support Technical Service

Delivery date Target date Receiving date Delivery date Target date Receiving date

Technical Support Analysis and Action Taken

P/N Off: S/N Off: P/N On: S/N On: Pos.

Engineer in Charge: Supervisor : MGR: Date:

Technical Services Recommendation

       

Attachments: 

Eng. in Charge: Dep. MGR : Director: Date:

RCB Decision:

Reliability Follow-UpAlert Report Issued by reliability

Technical Support Action

Engineering Corrective Action

RCB Approval

Reliability alert Follow-

Up

2nd Alert Report Issued

New Corrective

Action

Reliability alert Follow-

Up Alert Closed

Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May

2012 2013 ISSUE: 01 LPM-TS-RB-01F (2) ISSUE DATE: 01/05/2012 Form 139

Page 430: Express Mcm Issue 4 Amend 01 4 Aug 12

 

TECHNICAL TRAINING PLAN

 

Page 1 of 1  

  Issue no: 3  Amen. No. : 02                                                                                                                                                                                                                  Form T1

  Issue date: 15 Oct 2011                                                                                                                                                                                                                  

--/--/20-- : --/--/20--

TRAINEE NAME TRAINING COURSE

1

2  

3    

4    

5    

PLANNED TRAINING

COMPLETED TRAINING

NOT APPLICABLE SIGNATURE:

CHIEF INSPECTOR:

Page 431: Express Mcm Issue 4 Amend 01 4 Aug 12

 

 

 

Flight Safety Department Voluntary Report

 

VOULANTRY REPORT FORM All the information about the reporter in case of filling it will not be submitted to any person or department and it will be confidential, provided it is submitted within 48 hours and there was no accident or incident/ occurrence related to the report.

VOLUNTARY INFORMATION

Name: Telephone/ Mobil E-mail address

DATE OF OCCURRENCE

D / M / Y / /

TIME LOCAL / UTC

FLIGHT NR

ROUTE From To Diverted to

FLIGHT PHASE TOWING PARKED at GATE:

PUSH-BACK

TAXI-OUT

TAKE-OFF

INITIAL CLIMB

CLIMB

CRUISE DESCENT HOLDING APPROACH LANDING TAXI-IN & PARKING

MAINTENANCE PHASE LINE MAINTENANCE HANGER

SUMMARY (TITLE OF THE EVENT)

DETAILED DESCRIPTION OF THE EVENT

You don't have to sign the report and you can send it by mail or e-mail or send through our safety box at IOCC

Date………………..……Name……………..………….……Rank………..………………Signature………………

Email : [email protected]

Tel : + 202 26964036 Fax : +202 26964008

Edition 2. Rev .2 Aug. 2012 Form 003  

Page 432: Express Mcm Issue 4 Amend 01 4 Aug 12

EGYPTAIR EXPRESSSafety & Quality Dep.

Confidential Hazard/ Human Factors ReportExisting condition------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Recommended Corrective Action-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Please detail the existing condition and any recommended correctiveaction. Use additional sheets as necessary. Drop in Safety Box or Mail tothe Flight Safety Office. If you would like an update on any action pleaseprovide your Name and Phone or Address.

……………………………………………………………………….

TO BE FILLED BY FLIGHT SAFETY DEPT. ONLY

Date: Dep.: Name and phone no. (Optional):---/----/------ ----------------- ----------------------------------

Location: Received: File No. :Rcvd: File No: Assigned :

Email : [email protected] : + 202 26964036 Fax : +202 26964008

EX81342
Typewritten Text
EX81342
Typewritten Text
002
EX81342
Typewritten Text
Page 433: Express Mcm Issue 4 Amend 01 4 Aug 12

Issue No.: 4 Amen. No.: 00                                                                                                            Page 1 of 1                                                                                                                                                  Chart C Issue Date: 15Apr 2012 

CHART C- BASIC EMPTY WEIGHT AND BALANCE RECORD ( Continuous history changes in structure of equipment affecting weight and balance)

AIRPLANE MODEL: ERJ170-100LR SERIAL NUMBER : 17000 PAGE NO::

ITEM NO WEIGHT CHANGED RUNNING BASIC EMPTY WEIGHT

DATE IN OUT DESCRIPTION OF ARTICLE OR

MODIFICATION

ADDED REMOVED

WEIGHT BASIC ARM MOMENT WEIGHT BASIC ARM MOMENT WEIGHT BASIC ARM MOMENT % MAC

(Kgf) (m) (Kgf*m) (Kgf) (m) (Kgf*m) (Kgf) (m) (Kgf*m)