7/22/2010 EXP21R310 Experion Batch Manager 1
Honeywell, Inc.
Topic: Experion Batch Manager Sample Demo
Contents
Describe Alias Table Functionality ........................................................................................................3
In practical scenarios, a batch process may require to change the process equipment for loaded recipe. ‘Alias Table Load Option’ allows user to change the instance details (an instance represents a process Equipment) without disturbing the loaded control strategy.
When any change is made to a loaded RCM/SCM, including alias table parameter reference, the delta flag appears on the project tab and remain until the object is loaded, or is updated from project.
Step Action
1 Open Control Builder from Configuration Studio if not already open.
2 Click File Import
3 Browse for C:\Documents and Settings\All Users\Application Data\Honeywell\Experion PKS\IXPORT\Student \AliasTable.
Click Select All
Verify that checkbox Import CEE Assignments is checked
Click Import
4 The imported CMs, SCMs, UCM and RCMs with prefix ‘DCB_’ will be assigned to ACE_13 controller
5 Load and activate all parameters
6 Right-click on RCM DCB_CIP_OP in Project mode
Experion Batch Manager Sample Demo
Describe Alias Table Functionality
4 EXP21R310 Experion Batch Manager 7/22/2010
Honeywell, Inc.
Step Action
7 Right click on DCB_CIP_OP RCM and select Module properties….
ATTENTION
Alias Table load option works only in the following scenarios:
Modifications are done without opening the RCM in chart view.
Only ‘Existing Instances’ are modified.
Alias Table load option will not work for any major change e.g. Adding a new instance in the alias table
Experion Batch Manager Sample Demo
Describe Alias Table Functionality
7/22/2010 EXP21R310 Experion Batch Manager 5
Honeywell, Inc.
Step Action
8 Build Instance 2 for CIP_BLENDER
Type DCB_B2_CIP.NAME under Instance 2 tab of CIP_BLENDER
Type DCB_BLE2_UCM.NAME under Instance 2 tab of BLENDER_UCM
Type DCB_B2_CIP.DATA.PURGE_TIME.VALUE under Instance 2 tab of PURGE_TIME
Click Ok
9
A Yellow delta flag will appear against RCM DCB_CIP_OP in the Project tab.
Experion Batch Manager Sample Demo
Describe Alias Table Functionality
6 EXP21R310 Experion Batch Manager 7/22/2010
Honeywell, Inc.
Step Action
10 Right click on DCB_CIP_OP and select Load Alias Table… option
TIP
The option Load Alias Table option can also be selected from Controller Menu
Experion Batch Manager Sample Demo
Describe Alias Table Functionality
7/22/2010 EXP21R310 Experion Batch Manager 7
Honeywell, Inc.
Step Action
11 Click Continue button
12 Click Continue
13 The Instance 2 of Alias table is successfully loaded
All control Strategy for Alias Table is loaded and activated.
Alias Table Configuration lab is completed.
Process Introduction:
Demonstration describes batch process with the help of an example. The example process consists of a mixer and two blenders. It works in semi-continuous and batch Polymer industries where mixing of ingredients prior to blending is common.
In this process, two materials Material1 and Material2 are mixed in Mixer and the resultant intermediate is transferred to one of 2 Blenders. The blender can be selected by the user. The Material3 and Material4 are then blended with the intermediate transferred from the Mixer. After completion of Agitation process in the selected Blender, Final Product is transferred to Storage Tank.
As same set of equipment is used for different recipes, Clean In Place (CIP) process is used in Blender for purging operation. Blender 1 and Blender 2 will be acquired by different Recipes. So Clean In Place is required.
Each batch of material has an association formulation that varies from batch to batch. The formulations may vary the amount of the two ingredients (Material1 and Material2) and Blending Time. The formulation also indicates which Blender, the Mixer will transfer the batch to.
Demo Batch Control Application:
This pre-built strategies and Custom Displays will help the user to understand how EBM Components can be configured.
This example uses names for Phase block library that reflects S88 standards
This demonstration mainly focus on following key EBM Functionality
1. EBM Layered Recipes
a. Allows user to build and execute multiple hierarchical recipes using RCM, SCM, UCM, CM and Phase Block
2. Formulations using Data block
a. To store data and provide automatic alignment of formula and report parameters between Recipe layers
3. Alias Table
a. Acts as switch to connect the client block to different destination blocks as defined through user selected instances parameters at run time. This gives SCM/RCM the ability to control different equipment each time it runs.
4. Common Device
a. The Common Device Functionality in Control Module enables an Exclusive use resource to completely acquired by a Sequence (SCM/RCM) and own it unless and until the sequence intends to release it.
10 Click ‘Show All Status’ and ‘Show Tags’ buttons located at the right-hand side of the Process display
Observe raw material valves (DCB_RM_ZXV011, DCB_RM_ZXV021), agitator (DCB_M1_AGIT001) and level in mixer.
ATTENTION
When RM1 (raw material 1) addition completes, the valve DCB_RM_ZXV011 is closed and the DCB_M1_ADDMAT1 state will show Idle. The raw material RM2 will be added to the mixer, hence DCB_M1_ADDMAT2 will show state as Running. The agitator will be started as indicated by DCB_M1_AGIT001
18 Change the state of the valve DCB_B1M1_ZXV011 to ON. The quantity of RM4 (raw material 4) will begin to increase. When the quantity of the RM4 crosses 3, change the state of the valve DCB_B1M1_ZXV011 to OFF.
ATTENTION
DCB_B1M1_ZXV011 and DCB_B2M1_ZXV011 are manual valves. Hence, the quantity of RM4 will be manual input
The quantity of RM4 must be set before addition of RM3 to blender completes i.e. before the state of DCB_BX_ADDMAT3 changes to Idle from Running
Select the Batch ID i.e. Batch01 and view the Report Parameters table
ATTENTION
The Report Parameters table is updated after batch completion. It indicates the raw material and final product quantities used during a particular batch process
Experion Batch Manager Sample Demo
Demo ate Experion Batch Manager Sample Configuration nstr
7/22/2010 EXP21R310 Experion Batch Manager 25
Honeywell, Inc.
Step Action
Arbitration
26 Start batch process DCB_DEMO2 with Batch ID as Batch02
Repeat steps from 1 to 11.
ATTENTION
Before selecting the blender for batch process, the CIP process will be executed for the blender. CIP stands for “Clean In Place”. Clean In Place procedure is done for cleaning the equipment, before the same equipment is used by another recipe.
27 The Units Button will be activated and flashing for blender selection. Do not select the blender.
ATTENTION
At this point, we will proceed to CIP Unit-Selection without selecting the blender for DCB_DEMO
32 The Unit Arbitration Status window indicates that, the current owner of DCB_BLE1_UCM is DCB_CIP_OP. Also, DCB_BLENDER1 is in a queue to use DCB_BLE1_UCM
Close the Unit Arbitration Status window
ATTENTION
Blender 1 is currently acquired by DCB_CIP_OP for the Clean In Place process, and hence it appears under Owner ID
DCB_BLENDER1 is another requesting RCM and is commanded by DCB_DEMO 2 process, hence it is in queue to acquire DCB_BLE1_UCM
The CIP process lasts for 10 seconds. Hence the UCM, DCB_BLE1_UCM will be acquired for 10 seconds.
33 Click the CIP button to open the CIP – Unit Select window and wait for the CIP Status to indicate Complete (when the CIP process on blender is completed)