5/9/02 Experimental Project Report County Bradford and St. Johns Section/Subsection No. 28030-3508 and 78080-3423 State Road 16 and 9(I-95) Project Description Ground Tire Rubber In Open Graded Friction Course State Materials Office Gainesville, Florida
5

Experimental Project Report - fdot.gov · and two test sections (each containing 10 percent of 80 mesh size GTR) in the northbound and southbound traffic lanes. Performance is evaluated

Sep 12, 2018

Download

Documents

doannhu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Experimental Project Report - fdot.gov · and two test sections (each containing 10 percent of 80 mesh size GTR) in the northbound and southbound traffic lanes. Performance is evaluated

5/9/02

Experimental Project Report

County Bradford and St. Johns Section/Subsection No. 28030-3508 and 78080-3423

State Road 16 and 9(I-95) Project Description Ground Tire Rubber In Open Graded Friction

Course

State Materials Office Gainesville, Florida

Page 2: Experimental Project Report - fdot.gov · and two test sections (each containing 10 percent of 80 mesh size GTR) in the northbound and southbound traffic lanes. Performance is evaluated

Page 1 of 4

Project Description

County Bradford and St. Johns Section Number 28030-3508 and 78080-3423

State Road 16 and 9(I-95)

OBJECTIVE:

The objective of this study is to evaluate the relative long-term field performance of pavement containing a open graded friction course (FC2) mixture with different levels of Ground Tire Rubber (GTR), from 5 to 17 percent, and a section containing 10 percent Dry Mix. The Bradford County project (Fig. 1) was constructed in April of 1989 on State Road 16, and consists of a control and five other sections that includes four GTR sections containing 5 to 17 percent GTR along with a section containing 10 percent Dry Mix, all located in the westbound lane. The St. Johns County project (Fig. 2) was constructed on state road 9(I-95) in September of 1990, and consists of two control sections (one in each direction, the northbound and the southbound traffic lane) and two test sections (each containing 10 percent of 80 mesh size GTR) in the northbound and southbound traffic lanes. Performance is evaluated in terms of Ride, Rutting and Cracking. LOCATION AND DIAGRAM OF SECTION

Fig. 1

Page 3: Experimental Project Report - fdot.gov · and two test sections (each containing 10 percent of 80 mesh size GTR) in the northbound and southbound traffic lanes. Performance is evaluated

Page 2 of 4

LOCATION AND DIAGRAM OF SECTION (CONT.)

PROJECT NO. 78080-3423 SR 9(I-95) ST.JOHNS COUNTY

(10% of 80 mesh size GTR in the North & Southbound Test Sections)

Fig. 2

Page 4: Experimental Project Report - fdot.gov · and two test sections (each containing 10 percent of 80 mesh size GTR) in the northbound and southbound traffic lanes. Performance is evaluated

Pavement Distress

Project Number 28030-3508 SR 16 Bradford County

Rutting

0.00

0.10

0.20

0.30

8/91 10/92 9/93 9/94 9/95 10/96 9/97 10/98 9/99 11/00 8/01 8/02

Test Date

Rut

(in)

5% GTR 10% GTR 15% GTR 17% GTR CONTROL 10% DRY MIX

Cracking

050

100150200250300350400450500550

8/91 10/92 9/93 9/94 9/95 10/96 9/97 10/98 9/99 11/00 8/01 8/02Test Date

Cra

ckin

g (s

f/100

0 sf

)

5% GTR 10% GTR 15% GTR 17% GTR CONTROL 10% DRY MIX

Ride

0.00

1.00

2.00

3.00

4.00

5.00

8/91 10/92 9/93 9/94 9/95 10/96 9/97 7/99 9/99 8/01 8/02Test Date

Rid

e (P

SI)

5% GTR 10% GTR 15% GTR 17% GTR CONTROL 10% DRY MIX

3 of 4

Page 5: Experimental Project Report - fdot.gov · and two test sections (each containing 10 percent of 80 mesh size GTR) in the northbound and southbound traffic lanes. Performance is evaluated

Pavement Distress

Rutting

0.00

0.05

0.10

0.15

0.20

0.25

0.30

09/16/91 10/19/92 09/21/93 09/29/94 09/20/95 10/23/96 10/01/97 12/01/98 10/04/99 06/11/01

Test Dates

rutti

ng (i

n.)

NB - Section 1 NB - Control SB - Section 1 SB - Control

Cracking

000.0

002.0

004.0

006.0

008.0

010.0

012.0

09/16/91 10/19/92 09/21/93 09/29/94 09/20/95 10/23/96 10/01/97 12/01/98 10/04/99 06/11/01

Test Dates

crac

king

(ft.2 )

NB - Section 1 NB - Control SB - Section 1 SB - Control

Ride

0.00

1.00

2.00

3.00

4.00

5.00

09/16/91 10/19/92 09/21/93 09/29/94 09/20/95 10/23/96 10/01/97 12/01/98 10/04/99 06/11/01

Test Dates

ride

(psi

)

NB - Section 1 NB - Control SB - Section 1 SB - Control

4 of 4