1 Experiences in the Júcar River Basin Droughts JÚCAR RIVER BASIN AUTHORITY HYDROLOGICAL PLANNING DEPARTMENT Juan J. Moragues Júcar River Basin Authority President Moscow, 5 June 2008 MENBO : Mediterranean Network of Basin Organisations REMOC : Red Mediterranea de Organismos de Cuenca REMOB : Reseau Mediterraneen des Organismes de Bassin Ramiro Martinez
34
Embed
Experiences in the Júcar River Basin Droughts · 3 Demandas CHJ (2003) 76,3% 19,7% 4,0% Agrícola Industrial Urbana Superficial runoff 25% Groundwater Recharge 75% Water resources
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
Experiences in the Júcar River BasinDroughts
JÚCAR RIVER BASIN AUTHORITYHYDROLOGICAL PLANNING DEPARTMENT
Juan J. MoraguesJúcar River Basin AuthorityPresidentMoscow, 5 June 2008
MENBO : Mediterranean Network of Basin OrganisationsREMOC : Red Mediterranea de Organismos de CuencaREMOB : Reseau Mediterraneen des Organismes de Bassin
1 400 000Equivalent population due to tourism (inhabitants)
4 360 000Population (inhabitants)43 000Area (km2)
GALICIA
PRINCIPADO DEASTURIAS
CANTABRIA
PAISVASCO
NAVARRA
ARAGON
CATALUÑA
VALENCIACASTILLA-LA MANCHA
MADRID
EXTREMADURA
ANDALUCIA
MURCIA
BALEARES
CANARIAS
LA RIOJA
CEUTA
MELILLA
CASTILLA-LEON
Júcar
4
0200400600800
100012001400160018002000
1975
/76
1976
/77
1977
/78
1978
/79
1979
/80
1980
/81
1981
/82
1982
/83
1983
/84
1984
/85
1985
/86
1986
/87
1987
/88
1988
/89
1989
/90
1990
/91
1991
/92
1992
/93
1993
/94
1994
/95
1995
/96
1996
/97
1997
/98
1998
/99
1999
/00
2000
/01
2001
/02
2002
/03
2003
/04
2004
/05
2005
/06
2006
/07
año
hm3
Aportación total al embalse de Tous Mediana de la aportación histórica en Reg NatMediana desde 1980 en Reg Nat
Year 2005/06 minimum historical from 1940/41
Three consecutive years of intense droughtAnnual natural inflows into the Tous reservoir
5
Júcar Drought Commission
6
Composition of the Commission: RD 1265/2005Delegated administrative entity of the Council of Government for the
follow-up and management of droughts Take part and vote (13)
Chairing: President of the Júcar River Basin Authority (C.H.J.)C.H.J (3) : Commissary, Technical Director, Head of the Hydrological Planning Department Ministries (2): Industry & Environment, Marine and Rural AffairsAutonomous Communities (4)Users (3):
Municipal Council of ValenciaRoyal Supply Channel of the Júcar (Acequia Real)Iberdrola, S.A.
Take part without vote (4)• Defending environmental interests: Agró• Industrial representatives: AVA• Representatives trade union: CCOO• Local entities from Albacete
7
Special Action Plan for drought situations
Special Action Plan for alert and eventual drought situation
Approved by the National Government:ORDER MAM/698/2007, 21 March, by which special action plans for alert and eventual drought situation are approved within hydrological plans for intercommunity basins.
8
Official web sitewww.chj.es
9
What is it? Special Action Plan for drought situations
From to
Crisis management
Planning and managing drought
conditions
Mitigation measures:Too lateToo cost
High Drought impact
Preventive measuresAlert systemMitigate the impacts
Act 10/2001, National Hydrological Plan
10
•OBJECTIVE: To minimise environmental, economical and social impacts of drought situations.•DIAGNOSIS:
•Characterisation of territorial and environmental elements.•Analysis and characterisation of historical droughts.•Definition of indicators, threshold and drought periods.
• PROGRAMME OF MEASURES:•Definition of measures for each zone in every drought period.
• MANAGEMENT SYSTEM:•Organisation and management system: Permanent Commission.
Actions implemented to minimise environmental drought impact Actions implemented to management and policyActions implemented to conservation, save waterActions implemented to obtain other resources
14
Environmental measures
River flows maintenanceWetlands control
15
Environmental measures (1)River flows maintenance
Irrigation
From aquifer From Júcar river
Júcar river02468
1012141618202224262830
1-oc
t-04
1-di
c-04
1-fe
b-05
1-ab
r-05
1-ju
n-05
1-ag
o-05
1-oc
t-05
1-di
c-05
1-fe
b-06
1-ab
r-06
1-ju
n-06
1-ag
o-06
1-oc
t-06
1-di
c-06
1-fe
b-07
1-ab
r-07
1-ju
n-07
1-ag
o-07
1-oc
t-07
1-di
c-07
1-fe
b-08
1-ab
r-08
1-ju
n-08
1-ag
o-08
1-oc
t-08
Cau
dal m
3/s
Q [El Picazo] Q [Los Frailes] Qe [El Molinar]
16
Júcar river during summer 1995
Follow-up on the middle reach of river JúcarObjective: Maintenance of a minimum flow in river Júcar, in the reach downstream the Alarcón reservoir
Júcar river during summer 2006 and 2007
17
Reduction of uses 2007-08
Objective: Reduction of water extractions in the middle reach of the Júcar River, both in the superficial water supplies and those groundwater supplies with a major effect on the river flow.
2007 Acquisition of the water rights due to the reduction of irrigated surfaces2008 Acquisition of water rights due to the cultivation of crops which need less water
AGREEMENT FOR THE REALISATION OF A PUBLIC OFFER FOR THE AQUISITION (POA) OF WATER RIGHTS IN THE MIDDLE
REACH OF THE JÚCAR RIVER BASIN DUE TO ENVIRONMENTAL REASONS
18
Measurement network:Lake levelFlows at 5 discharge points
Environmental measures (2)
Albufera wetlandRamsar site
19
Follow-up measures in the Albuferalake in Valencia
20
0
100
200
300
400
500
6001-
oct
1-no
v
1-di
c
1-en
e
1-fe
b
1-m
ar
1-ab
r
1-m
ay
1-ju
n
1-ju
l
1-ag
o
1-se
p
(mm
.s.n
.m.)
Lake level 2007/08 Lake level 2006/07Normal level Lake leve 2005/06
Historical analyses of water supplySuperficial water volume diverted to irrigation from the
Júcar river
0100200300400500600700800900
1000
1992
/93
1993
/94
1994
/95
1995
/96
1996
/97
1997
/98
1998
/99
1999
/00
2000
/01
2001
/02
2002
/03
2003
/04
2004
/05
2005
/06
2006
/07
hm3
Suministro superficial a la Ribera del Júcar
27
To obtain other water resources
• Supply from other rivers• Use of drought wells (conjunctive use)• Waste water Reuse
28
Historical analyses of water supplySupply for metropolitan area of Valencia with superficial
water from Júcar and Turia
02040
6080
100120
1996
/97
1997
/98
1998
-99
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
hm3
Vol Total Júcar + Turia Vol Río Júcar Vol Río Turia
2914623120Total
3737Comunidad General del Canal Júcar-Turia
413Acequia Mayor de la Villa y Honor de Corbera
1486Sindicato de Riegos de Cullera
713Sindicato de Riegos de Sueca
33Real Acequia de Carcaixent
77Real Acequia de Escalona
65164Acequia Real del Júcar
Total instalacionesRebombeosPozos2008
Drought wells and pumping stations in irrigation networks
30
Drought well data:Volume and level
Pumping station in irrigation network
Monthly controlAlbufera lake
31
Waste water reuse (with remove nutrients)
Joint between Pinedotreatment plant and Oro irrigation network
828.506603.0043.791.40050.153.2256.780.6152006/07
29.609.135
Acequia del Oro (m3)
1.450.000
Acequia de Rascanya (m3)
Carraixet
338.488
Acequia de Moncada (m3)
144.347
Acequia de Tormos (m3)
Paterna-Fte. del JarroPinedo II. AmpliaciónEDAR
1.478.523
Acequia Favara (m3)
2007/08 *
Año
32
Emergency Works2005-08
33
Main investment in:•Improvement of the water supply guarantee for municipalities and alternative sources of resources. •Improvement of the treatment system of potable water•Improvement of the effectiveness of the irrigation systems
Emergency works
4.940,0Emergency works 2008 (still ongoing)
19.285,0Emergency works 2005
74.861,0Total
15.350,0Emergency works 200735.286,0Emergency works 2006