Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 1 / 29 Compensatory habitats Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin Mühlbauer, Gerald Zauner
30

Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Jun 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 1 / 29

Compensatory habitats

Existing measures & options for the future

in large river impoundments

Clemens Ratschan,

Wolfgang Lauber, Martin Mühlbauer, Gerald Zauner

Page 2: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 2 / 29

Compensation for loss of habitat due to

• (River Regulation)

• (Navigation)

• (Hydropeaking, Residual flow, ..)

• Hydropower - Impoundments

Traun, 48°N 14°E Koppi, 48°N 140°E

figu

re: V

erb

un

d

Page 3: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 3 / 29

Main effect for indicator „fish“

Loss of key habitats for rheophilic fish- spawning habitats

- habitats for early life stages

embryo, larva, juveniles (0+, 1+)

Small fish biomass ≈ small populations

free flowing free flowing head of imp. impoundment

Fis

h b

iom

ass [

kg /

100 m

]

0

1

2

3

4

5

6

7

8

K.O. Fish Index Austria

1985-87 2007-2014

n=115

n=49

n=213

n=111

Page 4: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 4 / 29

Options for compensatory habitats

Figure: Boku Wien, IHG

head of

impoundment

impoundment

Page 5: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 5 / 29

Measures at the head of an impoundment

Danube downstream HPP Ottensheim-Wilhering

side arm (800 m)

further measures planned and being built

Page 6: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 6 / 29

Measures at the head of an impoundment

Page 7: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 7 / 29

Measures at the head of an impoundment

Inn downstream HPP Ering-Frauenstein

widening, island / side arm, backwater

(picture: under construction)

Page 8: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 8 / 29

Measures in the impoundment

• many examples

• limited longevity

• effect mainly for ubiquitary species

• limited contribution for

„good ecological potential“

Danube impoundment

Jochenstein

Page 9: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 9 / 29

Measures between impoundments = fishways

What is a „NATURE-LIKE FISHWAY“?

Page 10: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 10 / 29

Key factors for functional habitats

• Slope

• Morphology

• Dynamic flow

• Sediment dynamics

• Factor time (longevity, maintainance)

± state of the art in

„nature-like fishways“

poorly implemented

hardly implemented

Page 11: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 11 / 29

Section nature-like bypass channel (Inn)

pot. spawning habitat

Page 12: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 12 / 29

habitats for juveniles

Section nature-like bypass channel (Inn)

Page 13: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 13 / 29

MNQ MQ QA bordvoll

Standard Standard Standard Standard

Gefälle %o 1,10 1,10 1,10 1,10

Sohlbreite m 2 2 2 2

Böschung Flachufer 1:… 8 8 8 8

Breite Wasserspiegel m 8,8 8,8 16,0 19,1

Wassertiefe (Tiefenrinne) m 0,80 1,30 1,60 2,80

Fläche m² 4,6 10,4 15,1 36,6

benetzter Umfang m 9,8 14,6 17,4 20,8

hydraulischer Radius m 0,47 0,71 0,87 1,76

mittl. Fließgeschw. m/s 0,50 0,66 0,75 1,21

Abfluss m³/s 2,3 6,9 11,4 44

mittl. Schleppspannung N/m² 5,1 7,7 9,4 19,0

Schleppspannung erhöhtes MW (Bereich Böschungsknick) 12,9

Innwasserstand

Profil bzw. Gefälle

"Hohe Laichplatzqualität" & "mittlere bis hohe

Qualität" als Jungfischlebensraum

Qmax to maintain key habitats at the shore

Maintainance of high quality

spawning habitats and

medium-high juvenile habitats:

Flushing with ≥ 40 m3/s needed

(sections with low valley slope)

Page 14: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 14 / 29

Sedimentation of habitats at the shore

Page 15: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 15 / 29

Sedimentation of habitats at the shore

Tau 40-35-30-25m³/s

40

35

30

25

Page 16: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 16 / 29

Measures parallel to an impoundment

• Very high restoration potential in impounded river basins

(if area is available)

Slope

Morphology

Spacial dimension

Flow dynamics

Sediment dynamics

• Dynamic dotation from the impoundment + sediment management

and / or

• Integration of tributaries (space, base flow, flow dynamics, sediments)

Page 17: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 17 / 29

Measures parallel to an impoundment

Inn HPP Ering-Frauenstein

Dynamic bypass channel, 2,6 km

Dynamic dotation 2-10 m3/s

Sediment management

(picture: under construction)

Page 18: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 18 / 29

Measures parallel to an impoundment

Danube HPP Ottensheim-Wilhering

Bypass channel: 14,2 km

MQ = 3,4 m3/s, MJHQ > 20 m3/s

Page 19: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 19 / 29

Measures parallel to an impoundment

Danube HPP Ottensheim-Wilhering

Bypass including tributary Aschach

MQ = 6 m3/s, MJHQ =140 m3/s

Page 20: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 20 / 29

Measures parallel to an impoundment

Danube HPP Ottensheim-Wilhering

Bypass including tributary Innbach

MQ = 17 m3/s, MJHQ 235 m3/s

Page 21: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 21 / 29

Combination of measures – habitat network

restoration &

protection

of fish

population

spawning

Danube

HPP Ottensheim-Wilhering

+ backwater

+ further

tributaries

Page 22: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 22 / 29

Combination of measures – habitat network

spawning & juvenile habitats (phytophilic species)

spawning juvenile habitats

(rheophilic species) (rheophilic species)

Inn HPP Ering-Frauenstein

Page 23: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 23 / 29

Compensatory habitats,

migrations and fish protection

• Goal: Restoration of fish populations in series of impoundments

• Presently: Massive habitat deficits

• Danube catchment / Austria:

Populations of long-distance migrating fish species extinct

-> lower need for very highly efficient upstream passage

• Technical or nature-like approach?

Page 24: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 24 / 29

impooundm

ent

impooundm

ent

impoundm

ent

impoundm

ent

A

technical fishway+protectionB

fishway+compensatory habitats

Hypothetical ScenariosRestoration of fish populations

in medium-sized / large rivers

intensive

migration

non-intensive

migration

key habitat

upstream

key habitat

downstream

turbine passage

mortalityx

Page 25: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 25 / 29

fishw

ay

fishw

ay

fishw

ay

byp

ass c

hannel

byp

ass c

hannel

fishw

ay

Instr

eam

habitat

Instr

eam

habitat

rack+

bypass

rack+

bypass

rack+

bypass

A

technical fishway+protectionB

fishway+compensatory habitats

intensive

migration

non-intensive

migration

key habitat

upstream

key habitat

downstream

turbine passage

mortalityx

Hypothetical ScenariosRestoration of fish populations

in medium-sized / large rivers

Page 26: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 26 / 29

Sta

u

migrations

upstream

migrations

downstream

xx

x

migrations

downstream

xxx x

xxx

migrations

upstream

A

technical fishway+protectionB

fishway+compensatory habitats

intensive

migration

non-intensive

migration

key habitat

upstream

key habitat

downstream

turbine passage

mortalityx

Hypothetical ScenariosRestoration of fish populations

in medium-sized / large rivers

20-40 km

Page 27: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 27 / 29

FA

H

FA

H

fishw

ay

Sta

uS

tau

Sta

u

Rechen+

FAB

Rechen+

FAB

rack+

bypass

migrations

upstream

migrations

downstream

xx

x

migrations

downstream

xxx x

xxx

migrations

upstream

A

technical fishway+protectionB

fishway+compensatory habitats

intensive

migration

non-intensive

migration

key habitat

upstream

key habitat

downstream

turbine passage

mortalityx

migration distances: lower

mortality adults: low

mortality juveniles: low

key habitats: high

recruitment: high

population size: high

risks: lower

investment: lower

energy loss: lower

[QFAH]

Hypothetical ScenariosRestoration of fish populations

in medium-sized / large rivers

migration distances: high

mortality adults: (low)

mortality juveniles: higher

key habitats: low

recruitment: low

population size: low

risks: higher

investment: higher

energy loss: higher

[QFAH+QFAbH]

Huge positive effects for other biota

(incl. humans)

Page 28: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 28 / 29

Rechen+

FAB

Rechen+

FAB

migrations

upstream

migrations

downstream

xx

x

migrations

downstream

xxx x

xxx

migrations

upstream

A

technical fishway+protectionB

fishway+compensatory habitats

intensive

migration

non-intensive

migration

key habitat

upstream

key habitat

downstream

turbine passage

mortalityx

(Maximum) Variant B+

fishway + compensatory habitats

+ technical fish protection

still possible later

if feasible

& neccessary

with lower risk/higher knowledge

Hypothetical ScenariosRestoration of fish populations

in medium-sized / large rivers

Page 29: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 29 / 29

Conclusions

• Compensatory habitats in impoundments can be

feasible and very effective, especially at the

head of impoundments or parallel to

impoundments

• In nature-like fishways and bypass-channels,

sedimentology & dynamic hydraulics need

more attention

• In series of impoundments, creation of

compensatory habitats may restore fish

populations much more effectively than

technical solutions for fish passage and fish

protection

Page 30: Existing measures & options for the future in large river ...€¦ · Existing measures & options for the future in large river impoundments Clemens Ratschan, Wolfgang Lauber, Martin

Compensatory habitats | 10. Sept. 2018 | FIThydro, Augsburg 30 / 29

Thanks

All photos in this presentation: ezb-TB Zauner

For your attention!

The , which implemented many of the

measures shown in this presentation!