CITY OF NEW HOPE Space Needs Study SUB-TOTAL CONSTRUCTION COSTS Cost: $1,450,000 EXISTING FACILITY MAINTENANCE NEEDS Wold Architects & Engineers toured through the existing City Hall and Police facility to assess the major building systems and components. The following is a summary of the findings: Existing Building Issues 1. Replace the roof over the Parks & Rec Addition 2. Replace the roof over the original City Hall 3. Tuckpoint and replace sealant on the existing exterior face brick 4. Replace approx. 40 windows on the original city hall Existing Mechanical Systems Issues 1. Provide a code required boiler shutdown switch 2. Replace the HVAC systems serving the original area of the building construction 3. Replace all remaining pneumatic systems with new direct digital control systems 4. Provide a make-up air system, exhaust, and controls in the vehicle garage Existing Electrical Systems Issue Solutions Services and Distributions 1. Replace existing old panelboard and feeder and provide additional panelboards 2. Provide additional receptacles at work station to meet the need 3. Replace existing old main service disconnect switch with new Lighting 1. Replace existing fixtures with new energy efficient lighting 2. Provide lighting control - occupancy sensors and switching 3. Replace existing exit sign with new LED exit signs 4. Replace existing emergency lighting with new LED lighting