UP UP DN DN UP UP DN ROOF DEFECT: Natural Welsh Slates are falling off in all construction eras. WALL DEFECT: Cracks throughout the wall because the sand and cement render applied during the 1948 re-construction was not suitable for the stone rubble construction of 1847 wall which originally consisted of the lime based render. FIRE HAZZARD: The existing smoking shelter is a fire hazzard in accordance to Technical Guidance Document-Part B. It must be demolished durig re- construction. FLOOR DEFECT: The floors are made from timber joists therefore they must be breathable. Vents located at ground floor level. Defect is that there are pathways too close to the building walls and therefore they create moisture build- up and let the moisture rise up to the building. ROOF SOFFIT: 1847-There is no soffit. 1948-The soffit is 450mm. The junction of the two roofs makes it difficult to insulate externally. Rain Water Pipe Foul Water Pipe Ground Water Pipe EXISTING WASTE WATER Drainage Plan OFFICE BEDROOM BEDROOM BEDROOM BEDROOM SERVICES LOBBY ACTIVITY ROOM ACTIVITY ROOM DINING AREA PREPARATION AREA KITCHEN SERVICES WC 1010 1010 1010 1010 1010 1010 910 910 910 2420 GRASS AREA GRAVEL AREA GRASS AREA GRASS AREA PAVED SURFACE North WORKSHOP SHED 1 SHED 2 SHED 3 ENTRANCE WC MAIN ENTRANCE FIRE EXIT FIRE EXIT KITCHEN EXIT Suspended Timber Floor Ventilation on Ground Floor Natural Room Ventilation Mechanical Extraction Fan Ventilation Manhole GRASS AREA GRAVEL AREA GRAVEL AREA GRASS AREA GRASS AREA PAVED SURFACE North WORKS HOP SHED 1 SHED 2 SHED 3 ENTRANCE OFFICE BEDROOM BEDROOM BEDROOM BEDROOM SERVICES SERVICES WC ACTIVITY ROOM ACTIVITY ROOM LAUNDRY WC DINING ROOM PREPARATION AREA KITCHEN MAIN ENTRANCE FIRE EXIT FIRE EXIT KITCHEN EXIT EXISTING VENTILATION & SERVICES Scale LECTURER Drawn by Date Project number Institute of Technology Carlow BSc. in Architectural Technology Year 3 2015-2016 1 : 200 15/12/2015 13:32:48 Existing Construction & Defects 2 Saint Vincent de Paul House Refurbishment December 2015 Rasmante Sedleckaite Dan O'Sullivan / Noel Dunne/ Mark Duffy A100 EXISTING BUILDING DEFECTS 1) ROOF: -Loose slates around on the roof ridges. -No ventilation. -Fire separation damaged in the attic. -Gutters and downpipes. -No breather membrane. -Lead to valleys & flashings generally. 2) WALLS: -Cracks in the walls (loose render in parts of walls). -Inappropriate render to 1847 section. -Evidence of subsidence. -Cleaning of protected windows. -No evidence of DPC in 1847 walls. -Loose pipework. -Level of groud close to, or above floor level in places. 3) FLOORS: -Generally aappear soud, but underfloor vents to be checked. 4) SERVICES: -Some exposed services untidy (eg. power supply). Saint Vincent de Paul Construction 1 Wall crack details. Floor Vents Different roof soffit junction. Natural Welsh Slates Smoking shelter that must be demolished. Services pipes runing straight into the wall, Broken services pipe. Uneven ground floor surface constructed from concrete which makes moiture build up for the walls. 1847 Roof construction with a 450mm soffit. 1 : 200 Ground Floor-Drainage Layout 2 1 : 200 Ground Floor-Ventilation & Manholes 3 EXISTING BUILDING INFORMATION: BUILDING ERAS: THERE ARE THREE DIFFERENT ERAS WITHIN THE CONSTRUCTION OF SAINT VINCENT DE PAUL BUILDING. FIRST ERA WAS CONSTRUCTED DURING THE 1847 TIME PERIOD WHEN CONSTRUCTION SOURCES WERE LIMITED. SECOND ERA WAS IN THE 1948 WHERE CONSTRUCTION MATERIALS WERE STILL LIMITED, BUT IMPROVEMENTS WERE MADE REGARDING TO THE 1847 CONSTRUCTION. FINAL CONSTRUCTION ERA WAS DURING THE 1992 WHEN A KITCHEN EXTENTION WAS MADE, THEN MATERIALS WERE BETTER IN REGARDS TO INSULATION. THE WHOLE BUILDING MUST PROVIDE BREATHABILITY THROUGHOUT THE WALLS, FLOORS AND ROOFS TO AVOID CONDENSATION BUILD UP. SITE INFORMATION: THE SITE IS VERY LIMITED IN REGARDS TO ACCESS, ESPECIALLY FOR DISABLED PEOPLE, AS THERE IS ONLY RUBBLE STONE AROUND THE BUILDING AND A LIMITED PATHWAY AT THE BACK OF THE BUILDING WHICH IS BADLY CONSTRUCTED. PARTS OF THE PATHWAY ARE ATTACHED TO THE WALLS OF THE BUILDING, WHICH CREATES EXCESSIVE MOISTURE BUILD UP WITHIN THE FLOORS AND WALLS OF THE BUILDING. THERE ARE NO RAMPS AT ENTRANCES WHICH ARE AS HIGH AS 200MM ABOVE GROUND FLOOR LEVEL. THERE ARE NO PARKING SPACES. FIRE SAFETY: THERE IS NOT ENOUGH SPACE ON THE SITE FOR A FIRE BRIGADE TO ENTER AND PERFORM A SAFE TURNING CIRCLE. THERE IS A SMOKING SHELTER ON THE LEFT SIDE OF THE BUILDING WHICH WAS STATED TO BE A FIRE HAZZARD BECAUSE OF THE CONSTRUCTION MATERIAL IT WAS MADE OF. 1847 CONSTRUCTION: WALLS DURING THE 1847 CONSTRUCTION ARE ASSUMED TO BE RUBBLE STONE WITH LIME MORTAR BUILD UP, THERE WAS NO INSULATION AT THAT TIME PERIOD. FLOORS ARE MADE FROM TIMBER JOISTS WHICH ARE ASSUMED TO BE SUPPORTED BY STONE TASSEL WALLS. THERE ARE VENTS AT GROUND FLOOR LEVEL TO ALLOW FOR THE WALLS TO BREATHE. ROOF IS CONSTRUCTED FROM TIMBER RAFTERS, THERE IS NO DPC, AND THE FINISH OF THE ROOF IS COVERED BY NATURAL WELSH SLATES, WITH INSULATION AT CEILING LEVEL BETWEN THE JOISTS. WINDOWS WERE TRADITIONAL TIMBER SHUTTER TYPE, WITH A TIMBER FRAME AND SINGLE GLAZING. 1948 CONSTRUCTION: WALL CONSTRUCTION URING THIS PERIOD IS ASSUMED TO BE FROM BLOCKWORK WITH A CAVITY WITH A SAND & CEMENT RENDER FINISH WHICH CREATED WALL CRACKING PROBLEMS ON THE SURFACE, AS IT WAS AN UNSUITABLE FINISH FOR THE WALLS. THERE WAS NO INSULATION THROUGHOUT THIS PERIOD. THE FLOORS WERE BEING KEPT CONSISTENT THROUGHOUT THE BUILDING AND CONSTRUCTED FROM TIMBER JOISTS WITH A TIMBER SHEETS AND MARMOLEUM AS FINISH THROUGHOUT CORRIDORS, TERRACCOTTA THROUGH WC'S, AND CARPET THROUGHOUT THE BEDROOMS. ROOF CONSTRUCTION WAS SAME AS THE 1847 CONSTRUCTION. AT THIS RECONSTRUCTION PERIOD THE OLD WINDOWS OF THE 1847 CONSTRUCTION WERE REPLACED TO STEEL WINDOWS. 1992 CONSTRUCTION: WALLS DURING THIS CONSTRUCTION PERIOD WERE ASSUMED TO BE A CAVITY BLOCKWORK WALL WITH 30-60MM INSULATION. THE FLOORS WERE ASSUMED TO BE CONCRETE, THEREFORE VENTILATION WAS NOT NEEDED AS PR TIMBER FLOORS OF THE OLDER CONSTRUCTION, THE FINISH OF THE FLOORS CONSISTS OF MARMOLEUM. THE ROOF CONSTRUCTION IS ASSUMED TO BE THE SAME AS THE OLDER CONSTRUCTION PERIODS.
1

EXISTING CONSTRUCTION & DEFECTS

Jan 12, 2017

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EXISTING CONSTRUCTION & DEFECTS

UP

UPDN

DN

UP

UPDN

ROOF DEFECT:Natural Welsh Slates are falling off inall construction eras.

WALL DEFECT:Cracks throughout the wall because the sand and cementrender applied during the 1948 re-construction was notsuitable for the stone rubble construction of 1847 wallwhich originally consisted of the lime based render.

FIRE HAZZARD:The existing smoking shelter is a firehazzard in accordance to TechnicalGuidance Document-Part B.It must be demolished durig re-construction.

FLOOR DEFECT:The floors are made from timber joists therefore theymust be breathable.Vents located at ground floor level.Defect is that there are pathways too close to thebuilding walls and therefore they create moisture build-up and let the moisture rise up to the building.

ROOF SOFFIT:1847-There is no soffit.1948-The soffit is 450mm.The junction of the two roofs makes itdifficult to insulate externally.

Rain Water Pipe

Foul Water Pipe

Ground Water Pipe

EXISTING WASTE WATERDrainage Plan

OFFICE BEDROOM BEDROOM

BEDROOM BEDROOM

SERVICES LOBBY

ACTIVITY ROOM

ACTIVITY ROOM

DINING AREAPREPARATIONAREA

KITCHEN

SERVICES

WC

1010 1010 1010

1010

1010

1010910

910

910

2420

GRASS AREA

GRAVEL AREA

GRASSAREA

GRASS AREA

PAVED SURFACE

NorthW

ORKSHOP

SHED 1

SHED 2

SHED 3

ENTRAN

CE

WC

MAIN ENTRANCE

FIRE EXIT

FIRE EXIT

KITCHEN EXIT

Suspended TimberFloor Ventilation onGround Floor

Natural Room Ventilation

Mechanical ExtractionFan VentilationManhole

GRASS AREA

GRAVEL AREAGRAVEL AREA

GRASSAREA

GRASS AREA

PAVED SURFACE

North

WORKSH

OP

SHED 1

SHED 2

SHED 3

ENTRAN

CE

OFFICE BEDROOM BEDROOM

BEDROOM

BEDROOM

SERVICESSERVICES

WC

ACTIVITY ROOM

ACTIVITY ROOM

LAUNDRYWC

DINING ROOM PREPARATIONAREA

KITCHEN

MAIN ENTRANCE

FIRE EXIT

FIRE EXIT

KITCHEN EXIT

EXISTING VENTILATION& SERVICES

Scale

LECTURER

Drawn by

Date

Project number

Institute of Technology CarlowBSc. in Architectural Technology

Year 3 2015-2016

1 : 200

15/1

2/20

15 1

3:32

:48

Existing Construction & Defects

2

Saint Vincent de Paul HouseRefurbishment

December 2015

Rasmante Sedleckaite

Dan O'Sullivan / Noel Dunne/Mark Duffy

A100

EXISTING BUILDING DEFECTS

1) ROOF:-Loose slates around on the roof ridges.-No ventilation.-Fire separation damaged in the attic.-Gutters and downpipes.-No breather membrane.-Lead to valleys & flashings generally.

2) WALLS:-Cracks in the walls (loose render in parts of walls).-Inappropriate render to 1847 section.-Evidence of subsidence.-Cleaning of protected windows.-No evidence of DPC in 1847 walls.-Loose pipework.-Level of groud close to, or above floor level in places.

3) FLOORS:-Generally aappear soud, but underfloor vents to bechecked.

4) SERVICES:-Some exposed services untidy (eg. power supply).

Saint Vincent de Paul Construction1

Wall crack details.

Floor Vents

Different roof soffit junction.

Natural Welsh Slates

Smoking shelter thatmust bedemolished.

Services pipes runing straight into the wall,

Broken services pipe.

Uneven ground floor surface constructedfrom concrete which makes moiturebuild up for the walls.

1847 Roof construction with a 450mm soffit.

1 : 200Ground Floor-Drainage Layout2

1 : 200Ground Floor-Ventilation & Manholes3

EXISTING BUILDING INFORMATION:

BUILDING ERAS:THERE ARE THREE DIFFERENT ERAS WITHIN THE CONSTRUCTION OF SAINT VINCENT DE PAUL BUILDING. FIRST ERA WAS CONSTRUCTED DURINGTHE 1847 TIME PERIOD WHEN CONSTRUCTION SOURCES WERE LIMITED. SECOND ERA WAS IN THE 1948 WHERE CONSTRUCTION MATERIALS WERESTILL LIMITED, BUT IMPROVEMENTS WERE MADE REGARDING TO THE 1847 CONSTRUCTION. FINAL CONSTRUCTION ERA WAS DURING THE 1992WHEN A KITCHEN EXTENTION WAS MADE, THEN MATERIALS WERE BETTER IN REGARDS TO INSULATION. THE WHOLE BUILDING MUST PROVIDEBREATHABILITY THROUGHOUT THE WALLS, FLOORS AND ROOFS TO AVOID CONDENSATION BUILD UP.

SITE INFORMATION:THE SITE IS VERY LIMITED IN REGARDS TO ACCESS, ESPECIALLY FOR DISABLED PEOPLE, AS THERE IS ONLY RUBBLE STONE AROUND THEBUILDING AND A LIMITED PATHWAY AT THE BACK OF THE BUILDING WHICH IS BADLY CONSTRUCTED. PARTS OF THE PATHWAY ARE ATTACHED TOTHE WALLS OF THE BUILDING, WHICH CREATES EXCESSIVE MOISTURE BUILD UP WITHIN THE FLOORS AND WALLS OF THE BUILDING. THERE ARE NORAMPS AT ENTRANCES WHICH ARE AS HIGH AS 200MM ABOVE GROUND FLOOR LEVEL. THERE ARE NO PARKING SPACES.

FIRE SAFETY:THERE IS NOT ENOUGH SPACE ON THE SITE FOR A FIRE BRIGADE TO ENTER AND PERFORM A SAFE TURNING CIRCLE.THERE IS A SMOKING SHELTER ON THE LEFT SIDE OF THE BUILDING WHICH WAS STATED TO BE A FIRE HAZZARD BECAUSE OF THE CONSTRUCTIONMATERIAL IT WAS MADE OF.

1847 CONSTRUCTION:WALLS DURING THE 1847 CONSTRUCTION ARE ASSUMED TO BE RUBBLE STONE WITH LIME MORTAR BUILD UP, THERE WAS NO INSULATION ATTHAT TIME PERIOD.FLOORS ARE MADE FROM TIMBER JOISTS WHICH ARE ASSUMED TO BE SUPPORTED BY STONE TASSEL WALLS. THERE ARE VENTS AT GROUNDFLOOR LEVEL TO ALLOW FOR THE WALLS TO BREATHE.ROOF IS CONSTRUCTED FROM TIMBER RAFTERS, THERE IS NO DPC, AND THE FINISH OF THE ROOF IS COVERED BY NATURAL WELSH SLATES, WITHINSULATION AT CEILING LEVEL BETWEN THE JOISTS.WINDOWS WERE TRADITIONAL TIMBER SHUTTER TYPE, WITH A TIMBER FRAME AND SINGLE GLAZING.

1948 CONSTRUCTION:WALL CONSTRUCTION URING THIS PERIOD IS ASSUMED TO BE FROM BLOCKWORK WITH A CAVITY WITH A SAND & CEMENT RENDER FINISH WHICHCREATED WALL CRACKING PROBLEMS ON THE SURFACE, AS IT WAS AN UNSUITABLE FINISH FOR THE WALLS. THERE WAS NO INSULATIONTHROUGHOUT THIS PERIOD.THE FLOORS WERE BEING KEPT CONSISTENT THROUGHOUT THE BUILDING AND CONSTRUCTED FROM TIMBER JOISTS WITH A TIMBER SHEETS ANDMARMOLEUM AS FINISH THROUGHOUT CORRIDORS, TERRACCOTTA THROUGH WC'S, AND CARPET THROUGHOUT THE BEDROOMS.ROOF CONSTRUCTION WAS SAME AS THE 1847 CONSTRUCTION.AT THIS RECONSTRUCTION PERIOD THE OLD WINDOWS OF THE 1847 CONSTRUCTION WERE REPLACED TO STEEL WINDOWS.

1992 CONSTRUCTION:WALLS DURING THIS CONSTRUCTION PERIOD WERE ASSUMED TO BE A CAVITY BLOCKWORK WALL WITH 30-60MM INSULATION.THE FLOORS WERE ASSUMED TO BE CONCRETE, THEREFORE VENTILATION WAS NOT NEEDED AS PR TIMBER FLOORS OF THE OLDERCONSTRUCTION, THE FINISH OF THE FLOORS CONSISTS OF MARMOLEUM.THE ROOF CONSTRUCTION IS ASSUMED TO BE THE SAME AS THE OLDER CONSTRUCTION PERIODS.