Slide: 1 Last Edit: 4/30/2018 EXIDE CLEANUP PROJECT PUBLIC MEETING Wednesday, April 25, 2018 6:00PM – 8:00PM Project Hotline: 1-844-225-3887 DTSC Commerce Office 6119 E. Washington Blvd. #120 Commerce, CA 90040
19

EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Jul 24, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 1

Last Edit: 4/30/2018

EXIDE CLEANUP PROJECT PUBLIC MEETING

Wednesday, April 25, 20186:00PM – 8:00PM

Project Hotline:1-844-225-3887

DTSC Commerce Office6119 E. Washington Blvd. #120

Commerce, CA 90040

Page 2: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 2

Last Edit: 4/30/2018

EXIDE FACILITY CLOSURE, PHASE I

Matt Wetter, PE, QEP

Senior Hazardous Substances Engineer

Site Mitigation and Environmental Restoration Program

Page 3: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 3

Last Edit: 4/30/2018

Closure, Phase 1 - Overview

• Began Nov 2017, scheduled through Fall 2020 • Approximately 34 months

• Removal of Regulated Units• Removal of Containment Buildings and some

ancillary buildings• Conduct soil sampling• Develop plan for Phase 2 to address soils and

foundations• Will be coordinated with ongoing corrective action to

characterize extents of contamination

Page 4: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 4

Last Edit: 4/30/2018

Site Layout

Page 5: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 5

Last Edit: 4/30/2018

Additional Background Informationhttp://www.dtsc.ca.gov/HazardousWaste/Projects/ExideClosure.cfm

Page 6: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 6

Last Edit: 4/30/2018

Work Completed to Date (Nov 2017 to Present)

• Preconstruction Activities• Mobilize and set up equipment• De-energize and/or reroute electrical lines

• Sump and crack sealing (Industrial Level Caulking)• Dry decontamination (HEPA vacuuming)• Wet decontamination (pressure washing)• Off-site shipment/disposal of waste and

equipment• Preparation for Full Enclosure Unit, aka Haki

System (Scaffolding Setup)

Page 7: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 7

Last Edit: 4/30/2018

Regulated Unit Status

Page 8: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 8

Last Edit: 4/30/2018

Regulated Unit Status (RMPS Only)

Page 9: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 9

Last Edit: 4/30/2018

Full Enclosure Unit Construction

• Scaffolding• For support of full

enclosure unit

Page 10: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 10

Last Edit: 4/30/2018

Four Month Look Ahead

• Wet and dry decontamination of Regulated Units

• Decontaminate and deconstruct Regulated Units for recycling, disposal, or transfer

• Full enclosure unit (HAKI) system mobilization and complete construction

Page 11: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 11

Last Edit: 4/30/2018

Project Contacts

• Matt Wetter, PE, QEPSenior Hazardous Substances EngineerDTSC Closure - Project Manager [email protected]

• Dionne FaulkAssociate Government Program AnalystDTSC Closure - Public Participation [email protected]

Page 12: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 12

Last Edit: 4/30/2018

OFFSITE PROPERTIESWITHIN THE PRELIMINARY INVESTIGATION AREA (PIA)

By: Hortensia Muniz, P.E. Residential Cleanup Project Manager

Page 13: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 13

Last Edit: 4/30/2018

Offsite Properties within the Preliminary Investigation Area

Page 14: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 14

Last Edit: 4/30/2018

Properties Sampled

As of April 19, 2018:• 8,503 properties with

Unique Assessor Parcel Numbers (APNs) Sampled

Page 15: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 15

Last Edit: 4/30/2018

Properties Cleaned Up

As of April 19, 2018:

• 270 Parcels cleaned up• 186 cleaned up by Exide in the Initial Assessment

Area• 84 cleaned up by DTSC’s zone contractors • 50 in 2016 by Parsons • 34 Time Critical Removal Actions (28 in 2017 and 6 2018)

Page 16: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 16

Last Edit: 4/30/2018

Page 17: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 17

Last Edit: 4/30/2018

Cleanup Activities:• take place across

7 zones • have safeguards

to protect the health of community members and workers.

Page 18: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 18

Last Edit: 4/30/2018

Cleanup Activities Will:

• use of low-emission trucks and equipment,

• air monitoring, • dust suppression, • visible flags on trucks

carrying contaminated soil,

• specific routes identified in Traffic Management Plan, and

• other safeguards to protect the health of community members and workers.

Page 19: EXIDE CLEANUP PROJECT PUBLIC MEETING · 4/25/2018  · Slide: 11 Last Edit: 4/30/2018. Project Contacts •Matt Wetter, PE, QEP. Senior Hazardous Substances Engineer. DTSC Closure

Slide: 19

Last Edit: 4/30/2018

Contact Information

Hortensia Muniz, P.E. Residential Cleanup Project Manager [email protected]

Exide Project Hotline:1-844-225-3887