Top Banner
Powering forward. Together. Board Policy Committee and Special SMUD Board of Directors Meeting Wednesday, November 14, 2018, scheduled to begin at 5:30 p.m. Customer Service Center, Rubicon Room Exhibit to Agenda Item #3
12

Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Feb 08, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Powering forward. Together.

Board Policy Committee and Special SMUD Board of Directors Meeting

Wednesday, November 14, 2018, scheduled to begin at 5:30 p.m.

Customer Service Center, Rubicon Room

Exhibit to Agenda Item #3

Page 2: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Workforce Optimization Initiative

• What is Workforce Optimization?

• Current Challenges

• Expected Benefits

• Goals & Objectives

• Today / Future

• Scope

• Work Groups

• Workflow / Impacts

• ClickSoftware

• Next Steps

November 14, 2018 2 Board Policy Committee and Special SMUD

Board of Directors Meeting

Page 3: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

What is Workforce Optimization?

Workforce Optimization (WFO) is an integrated, enterprise solution

for scheduling and mobile work management for our field forces.

It includes:

– Better utilization of SAP as our work management system

– A new scheduling and field mobile work management tool

• Bundle work and optimize resources

• Spatial planning capability

• Dispatching

• Creating, updating and closing work in the field

3

Page 4: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Current Challenges

• Lack of visibility of work in-progress, completed, or

scheduled

• No centralized scheduling tool for sharing resources or

coordinating work

• Numerous, disparate work management processes, many

paper-based

• Field forces lacking mobile tools for obtaining work

assignments, gathering field data, reporting time

• Lack of real-time reporting for labor and materials

variances per job

• Lack of detailed unit cost reporting by work type

4

Page 5: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Expected Benefits

• Prioritize work by:

▪ Providing accurate visibility of workload demand and capacity

▪ Maximize resource utilization and effectiveness

▪ Enable accurate measurements of crew utilization

• Centralize workforce scheduling and dispatching

▪ Provide real-time workforce scheduling to achieve optimal demand

• Improve operational efficiencies & customer experience and

reduce operating costs

▪ Enable standardization of processes, reporting and technology

• Improve service control and visibility

• Improve compliance through better document management and

enhanced reporting capability

5

Page 6: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Goals and Objectives

Workforce Optimization will enable:

• Maximize resource management SD-2, 5, 6 & 8

and operational performance,

• Streamline processes, SD-2, 5 & 8

• Improve customer service, SD-5

• Reduce costs SD-2, 5

6

Page 7: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Today / Future – Workforce Optimization

November 14, 2018 7

Today Future

No enterprise

scheduling or

dispatching tool for

planned work

• No scheduled work

• Highly manual/ paper

dispatching process

• No visibility to

assignments or status

• Limited data available to

field

Asset and Work

Management

• Visibility to scheduled work and assignments

across enterprise

• Enhanced mobile experience for field

• Real-time work status / updates from the field

• One system of record for work completion -

SAP

Geographical Information

System (GIS)

Enterprise Document

Management (EDM)

Scheduling

and Mobile

Page 8: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Workforce Optimization is comprised of 5 projects:

• Project 1 – Work Management (SAP)

• Project 2 – Workforce Scheduling

• Project 3 – Mobile Work Management

• Project 4 – Annual Line Patrol – COMPLETE

• Project 5 – Distribution Inspection Mobility

Workforce Optimization - Scope

8

SAP Enterprise Asset

Management (EAM) SAP Compatible Units

(CU)

Data Analytics

Foundational / Companion Projects:

Page 9: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Work Groups in scope (26 total)Customer

• Revenue Protection

Line Assets

• Cable Injection & Replacement

• Cable Locators

• Inspectors – Miscellaneous

• Inspectors – Project Readiness(pre-fielding)

• Inspectors – Utility Compliance

• Maintenance Crews

• New Business

• Pole Replacement

• Service Crews

• Transmission & Large Construction

• Troubleshooters

• Underground Cable Faults

• Vegetation Management

Power Generation• Gas Pipeline Operations

• Hydro Maintenance and Operations

Substation, Telecom & Metering• Construction Management Inspectors

(CMI)

• Electrical Techs

• Field Metering – Customer Service Field Representatives

• Field Metering – Meter Techs

• Hazmat

• Maintenance

• Network

• Small Survey

• Station Recorders

• Telecom

Approximately 450 field and 100 office staff impacted

9

Page 10: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Work Creation and

Planning

WFO – Future State Workflow

Work Scheduling /

DispatchingWork Execution

Statuses

Wo

rkfl

ow

Work Order

operations

Work Order

operations

Schedule

10

Completion information

Page 11: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

– Scheduling & Mobile

11

Page 12: Exhibit to Agenda Item #3 - Sacramento Municipal Utility ...

Next Steps

Achieved Milestones

• Purchased ClickSoft – scheduling and mobility

• Pre-work / Process Mapping

• SAP Work Management Proof of Concept (POC)

• Annual Line Patrols (ALP)

Planned Milestones

• Distribution Inspection Mobility Q4 2018 – Q2 2019

• SAP Work Management / Process Readiness Q4 2017 – On-Going

• Integrate ClickSoft (first 5 work groups) Q3 2019 – Q2 2020

• Integrate remaining 21 work groups Q2 2020 – Q4 2021